HomeMy WebLinkAboutItem 11 Approval of Change Order No. 2 for the Kimball Area Water Main Upgrade Project Phase IIIt ocoee Ilorldo AGENDA ITEM COVER SHEET Meeting Date: October 6, 2020 Item # I I Contact Name: T'Jean Tomlinson, E.1 Contact Number: 407-905-3159 Manager:Reviewed By: A/ Department Director: JaOefr City -••- Subject: Approval of Change Order No. 2 for the Kimball Area Water Main Upgrade Project Phase III Background Summary: In 2016, the Utilities Department planned and designed the upgrade of the water mains in the Kimball & Malcom Area, designated the Kimball Area Water Main Upgrade Project, with three separate phases for construction (Plan Sheet 1-1). This project was planned due to water service in this area being supplied through outdated water mains reaching the end of their service life. On July 17, 2018, the City Commission awarded Phase 1 of this project to Central Florida Tapping and Construction Services Inc. (CFT). On October 16, 2018, the City Commission approved Change Order No. 1 to proceed with Phase II of this project and add it to the contract with CFT. Phase II was completed at approximately 90 percent in December of 2018; however, a small portion of the abandonment for Phase II will need to be completed with Phase III due to 2 -inch water lines connecting Phase II to Phase III. This Change Order is for Phase III, the final phase of the Kimball Area Water Main Upgrade Project. Phase III includes construction of new water mains which will allow for the abandonment of old water mains in the remaining portion of Phase II as well as all old water mains in Phase III. Phase I was substantially completed on August 4, 2020, leaving only Phase II and Phase III to be completed. All work to be performed for Phase III is similar to work done for Phases I and II. Advertising Phase III for Bid would realize an increase in construction prices due to the current construction market. CFT has worked on Phase I and Phase II with adequate results and has agreed to honor the original contract unit prices for Phase III for a total amount of $335,056.00. Staff is recommending the approval of Change Order No. 2 to move forward with the construction of Phase III which would complete all phases of the Kimball Area Water Main Upgrade Project. The Utilities Department shall be available for questions. Issue: Should the Mayor and City Commission approve Change Order No. 2 for the Kimball Area Water Main Upgrade Project? Recommendations: Recommend the Mayor and City Commission approve Change Order No. 2 with Central Florida Tapping and Construction Services in the amount of $335,056.00 and authorize the City Manager to approve each change order for this project up to the limit of his purchasing authority and up to the budgeted amount for this project. Attachments: 1. Change Order No. 2 2. Plan Sheets for Phase III 3. Kimball & Malcom Area Water Main Upgrade Project Legend Sheet (L1). Financial Impact: The total cost for construction of Phase 1 ($344,097.00), Change Order No. 1/Phase II ($279,151.48) and expenses for residential plumbing services for Phase I and Phase II ($136,327.20) totaled $759,575.68. This leaves an available project balance of $140,403.84 for Phase 3. The approved budget for Fiscal Year 20/21 will make available $300,000.00 from the Capital Improvements Fund (401-533-10-6302) leaving a project balance of $440,403.84. Funding for the construction of Phase III (Change Order No. 2), in the amount of $335,056.00 will leave a remaining available project balance of $105,347.84. Type of Item: (please mark with an "V) Public Hearing For Clerk's Dept Use: Ordinance First Reading Consent Agenda Ordinance Second Reading Public Hearing Resolution - Regular Agenda X Commission Approval Discussion & Direction Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney N/A Reviewed by Finance Dept.U C pxi N/A Reviewed by Q I N/A 2 ocoee flarida CITY OF OCOEE 150 North Lakeshore Drive Ocoee, Florida 34761 *This Change Order Requires Action by the City Commission* Kimball Area Water Main Upgrade Bid #18-03 CHANGE ORDER NO. 2 DATE: 09/24/2020 PURCHASE ORDER: 1426421 The following changes are hereby made to the CONTRACT DOCUMENTS, Original CONTRACT PRICE Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDERS Net Increase (Decrease) Resulting from this CHANGE ORDER The current CONTRACT PRICE including this CHANGE ORDER Original CONTRACT COMPLETION DATE: Current CONTRACT COMPLETION DATE adjusted by previous CHANGE ORDERS Net Increase Resulting from this CHANGE ORDER Current CONTRACT COMPLETION DATE including this CHANGE ORDER $344.097.00 623 248.48 $335.056.00 $958.304.48 January 17. 201 January 17.2019 754 days February 9, 2021 Kimball Area Water Main Upgrade Bid #18-03 CHANGES ORDERED: I. REQUIRED CHANGES I. This change order will cause a net increase to the contract total in the amount of $335,056.00. 2. Increase in Pay Items to complete the project: No. 1 Mobilization/Demobilization by approximately One and Eight Hundred Four Thousandths (1.804) of One (1) Lump Sum in the amount of Seven Thousand Three Hundred Six ($7,306.00) Dollars No.2 General Conditions by approximately One and Eight Hundred Seven Thousandths (1.807) of One (1) Lump Sum in the amount of Fifteen Thousand Nine Hundred Sixty -Five ($15,965.00) Dollars No. 3 Maintenance of Traffic by approximately One and Seven Hundred Seventy - Nine Thousandths (1.779) of One (1) Lump Sum in the amount of Six Thousand Four Hundred Four ($6,404.00) Dollars No. 4 Erosion Control by approximately One and Seven Hundred Seventy -Nine Thousandths (1.779) of One (1) Lump Sum in the amount of Three Thousand Two Hundred Two ($3,202.00) Dollars No. 5 Construction Photographs and Audio — Visual Recording by One (1) of One (1) Lump Sum in the amount of Nine Hundred ($900.00) Dollars No. 6 Survey (Horizontal and Vertical Controls & As-Builts) by approximately One and Eight Hundred Four Thousandths (1.804) of One (1) Lump Sum in the amount of Seven Thousand Four Hundred Fifty ($7,450.00) Dollars No. 7 Connect Proposed 6" Water Main to Existing 6" Water Main by Three (3) Each No. 9 Furnish and Install 6" Dia. DIP Water Main by One Thousand Thirteen (1,013) Linear Feet No. 10 Furnish and Install 4" Dia. DIP Water Main by Three Hundred Seventy -Four (374) Linear Feet No. 11 6" x 6" x 6" D.I. TEE by Two (2) Each No. 12 6" x 6" x 4" D.I. TEE by One (1) Each No. 13 6" Line Stop by Two (2) Each No. 14 6" Gate Valve by Two (2) Each No. 16 General D.I.P Fittings by One and Sixty -Five Hundredths (1.65) Tons No. 17 Thrust Block by Two (2) Each No. 18 Install Fire Hydrant Assembly including 6" Valve by Four (4) Each No. 19 Single 1" P.E. Service (Long) by Thirty -Two (32) Each No. 20 Single 1" P.E. Service (Short) by Twenty -One (21) Each No. 21 1" Temporary Bacteriological Sampling Point by Two (2) Each No. 23 Abandon and Grout 6" Asbestos Cement Water Main by One Thousand One Hundred Ninety -Three (1,193) Linear Feet No. 25 Abandon and Grout 6" PVC Water Main by Six Hundred Twenty (620) Linear Feet No. 27 Abandon in Place 6" Gate Valve by Two (2) Each No. 31 Remove and Replace Pavement by Two Hundred Fifty -Six (256) Square Yards Kimball Area Water Main Upgrade Bid ##18-03 No. 33 Remove and Replace Concrete Sidewalk 4" Thick by Ninety -Four (94) Square Yards No. 34 Remove and Replace Concrete Driveways 6" Thick by Six Hundred Twenty (620) Square Yards No. 35 Remove and Salvage Fire Hydrant (Property of City) by Three (3) Each No. 36 Sign & Mailbox Existing (Relocate/Reinstall) Single Post by Twenty -Four (24) Each No. 37 Remove and Replace Miami Curb by One Hundred Forty -Nine (149) Linear Feet No. 41 Solid Sodding (Bahia) by One Thousand Three Hundred Ninety (1,390) Square Yards No. 42 Solid Sodding (St. Augustine) by Fifty (50) Square Yards CO1.01 Furnish and Install 8" Dia. DIP Water Main by One Thousand Three Hundred Sixty -Four (1,364) Linear Feet CO1.02 8" x 8" x 6" D.I. TEE by Two (2) Each CO1.04 8" Gate Valve by Four (4) Each C01.05 Double I" P.E. Service (Long) by Five (5) Each 3. Added Pay Items to complete the project: CO2.01 Connect Proposed 8" Water Main to Existing 8" Water Main by One (1) Each in the Total Amount of Six Hundred Seventy ($670.00) Dollars CO2.02 Connect Proposed 8" Water Main to Existing 6" Water Main by One (1) Each in the Total Amount of Five Hundred Ninety ($590.00) Dollars CO2.03 Connect Proposed 6" Water Main to Existing 6" PVC Water Main with Post Restraints by Two (2) Each in the Total Amount of One Thousand Seven Hundred Twenty ($1,720:00) Dollars CO2.04 6" to 6" Tapping Saddle and 6" Tapping Valve by One (1) Each in the Total Amount of Three Thousand Four Hundred Ninety -Five ($3,495.00) Dollars CO2.05 8" x 8" x 8" D.I. TEE by One (1) Each in the. Total Amount of Four Hundred Fifty -Five ($455.00) Dollars CO2.06 8" by 8" by 4" D.I. TEE by One (1) Each in the Total Amount of Three Hundred Eighty -Five ($385.00) Dollars CO2.07 8" to 6" Reducer by One (1) Each in the Total Amount of Two Hundred Eighty ($280.00) Dollars H. JUSTIFICATION In preparation for the abandonment of the old water mains in Phase I and Phase II, the Utilities Department uncovered 2 -inch pipe connections to the water main to be abandoned that serve the Phase III portion of the Kimball Area Water Main Upgrade Project. As the mains in the Phase III project area do not have ideal as-builts and were constructed before current regulations, the Utilities Department cannot be sure if there are other connections that tie in Phase H to Phase III. After investigation of the Phase III project area, the Utilities Department believes that completing Phase III of the project will eradicate any uncertainties and the abandonment of the old water mains and 2 -inch pipes in Phase II and Phase III are expected to be completed without any complications. Kimball Area Water Main Upgrade Bid #18-03 Change Order No. 2 will complete Phase III of the Kimball Area Water Main Upgrade Project. This project will include the installation of an 8 -inch, 6 -inch, and 4 -inch Ductile Iron pipe supplying residents on Carmen Drive, Flewelling Avenue, Apricot Drive, and Malcom Road West of Russel Drive, respectively; the abandonment of the old 6 -inch water mains on Flewelling Avenue and the old 6 -inch water mains on Apricot Drive; and disconnection and abandonment of all 2 -inch pipes that are connected to Phase II. This upgrade project will provide better pressure and water quality to the Kimball Area. III. NARRATIVE OF NEGOTIATIONS Units costs for Phases I and II were the same and work for both Phases was performed by Central Florida Tapping and Construction Services Inc (CFT). CFT has agreed to honor bid unit prices submitted for the previous phases. The unit cost for CO1.01 — COI.07 was reviewed by the Utilities Department and found to be reasonable and within range of recent values. IV. PAYMENT The total expenses for the additional work in conjunction with Change Order No. 2 are $335,056.00. Based on the Contract amount for Phase I of $344,097.00, expenses from the bidding process, residential pluming services for Phase I and Phase 11, and expenses in the amount of $279,151.48 from Change Order No. 1, the Project has an available unencumbered balance of $140,403.84. The approved budget for Fiscal Year 20/21 will make available $300,000.00 from the Capital Improvements Fund (401-533-10-6302) leaving a project balance of $440,403.84. Funding for the construction of this Change Order in the amount of $335,056.00 will leave a remaining available project balance of $105,347. V. APPROVAL AND CHANGE AUTHORIZATION The original project and funding allocation was established by issuance of a CITY purchase order, subject to the terms and conditions contained in the CITY's solicitation, Project Manual, Drawings, Specifications, and/or the CONTRACTOR's service and price proposal, which collectively form the terms of an agreement between the CITY and the CONTRACTOR for the performance of the Work. This proposed change to the agreement requires approval by the City Commission under the CITY's Purchasing Rules and Regulations and is consistent with any prior action by the City Commission to award the Work to the CONTRACTOR. It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original agreement other than matters expressly provided herein. CONTRACTOR acknowledges, by its execution and acceptance of this Change Order, that the adjustments in contract price and time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of Kimball Area Water Main Upgrade Bid #18-03 performance or modifications of time will be granted by the CITY for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the CITY arising from or relating to the matters or Work set forth or contemplated by this Change Order. [Balance of this page was left blank intentionally] Kimball Area Water Main Upgrade Bid #18-03 RECOMMENDED BY: CITY OF OCOEE, FLORIDA 11 USignature Date: 7 - -� B -oZ ae� 0 Title: c ;ltB ,r APPROVED BY: CITY OF OCOEE, FLORIDA In Rusty Johnson, Mayor FOR USE AND RELIANCE ONLY BY THE CITY OF OCOEE, APPROVED AS TO FORM AND LEGALITY THIS DAY OF ,20_ cm City Attorney ACCEPTED BY: CENTRAL FLORIDA/TAPPING By: Zj---c Signature Date: 2Tk,M e EIL L Y 7 t Title: E S : d�,j r Date: Attest: Melanie Sibbitt, City Clerk APPROVED BY THE CITY OF OCOEE COMMISSION IN A MEETING HELD ON 20_ UNDER AGENDA ITEM NO. Kimball Area Water Main Upgrade Bid #18-03 Vicinity Map Sheet Index 1. Cover (CI) 2. Key Sheet (KI) 3. Plan Sheet {P1} 4. Plan Sheet {P2} 5. Plan Sheet {P3} 6. Plan Sheet {P4} 7. Plan Sheet {P5} 8. Plan Sheet {P6} 9. Plan Sheet {P7} 10. Plan Sheet {PB} 11. Plan Sheet tP9} 12. Plan Sheet (PI 0) 13. Plan Sheet (PI 1} Water Main Project Addition Phase III Rusty Johnson Mayor Larry Brinson, Sr. District 1 Commissioner Rosemary Wilsen District 2 Commissioner Richard Firstner District 3 Commissioner George Oliver III District 4 Commissioner Robert Frank City Manager Craiq Shadrix Assistant City Manager Legend aiding Water Main Existing Gate Valve -�� E Isting Fire Hydrant PL Proposed Water Main T SFT Proposed Gate Valve Proposed Fire Hydrant Proposed Double Loag/Short Service Proposed Single i Long/Short Sendce Remove and Replace Driveway Remove Replace Pavement and CITY OF OCOEE UTILITIES DEPARTMENT 1800 A. D. Mims Rd. Ocoee, FI. 34761 (407)905-3159 Conswcf BG' of a' Install Single St Remove and Replace 6' thick C (C Notes: 1All existing utilities to be abandoned not called out on these plans shall be abande WIMTKNOWTOMM UTILITIES DEPARTMENT 1800 A. D. Mims Rd. Ocoee, FI. 34761 (407) 905-3159 Bdcusial Test lgcatloo Install Single Short Service (rye.) Remove and Replace F thick Concrete Driveway Install Single Long Service (tyg.) _ ._._._-later Mal, Remove and Replace 6' thick Concrete onveway (airy oetalt PW0e6) Install Single Short Servlce (typ.) Notes: 1. All existing Wilites to be abandoned not called out on these plans shall be abantic (City detail PWo02) UTILITIES DEPARTMENT 1800 A. D. Mims RC. Ocoee, FI. 34761 (407)905-3159 Install Sk,ld Long Servlce (tyg.) Banderol Test Loostlon Install Single Wng Service (typ.) Remove antl Repla- 6'thick cam,". Driveway (City Detail PWg04) Notes: 1. All existing utilises to be abandoned not calletl out on these plana shall be abandc UTILITIES DEPARTMENT 1600 A. D. Mims Rd. Ocoee, FI. 34761 (407)905-3159 See Page P6 Remove antl Replace F thlck Concrete Driveway (city Detall PWOoa) mstan Single Shot Semce (typ.) Construct 163' 014" D.I.P. Water Main Install Single Short Se'le, (ty") Batterial Testl.oratlon Nates: i. All existing utilities to be abandoned not called out on these plans shall be stands UTILITIES DEPARTMENT 1300 A. D. Mims Rd, Ocoee, FI. 34761 (407) 905-3159 a B.ulel West Lo-fion 0 Install Single Short st'lea ll Remove and Replace 6' thick Concrete Cril Notes: 1. At existing utilities to be abandoned not called out on these plans shall be abandc Abandon and Groot 291' of 6- A. C. Water Main Install Single Long SeMce MP.) Construct 264' of In D.I.P. Water Main Install New Fire Hydrant Assembly and In x 8't 6 -TEE 3 #' UTILITIES DEPARTMENT 1800 A. D. Mims Rd. Ocoee, FI. 34761 (407)905-3158 See Page P6 See Page P4 Install Single Short Sol..(YP.) Install Single Long Servlce(Yp) Remove and Replace 6 -thick Carl Driveway Remove and Salvage Exiting Rae Hydrant Construct 204' of 6- D.I.P. Water Main Remove and Replace Roadway Pavement (City Damn PW002) Install Single Long SeMce (t,,) 0' x 6' Reddea, Rest) and 8' Gate Valve(Nonth) Gate Velve Construct 67' of to D.I.P. Water Main OBacterial Test Location N a" 'a w s r Install single Ghon Gerald. (W.) Hand dig amund Mehl pole. If proposed main annnot be imablled betwen eexisting main and edge anthill wafx, main must be Installed mwarda the pavement(desheb line) Remove and Replace 6^.ruck Concrete Driveway (City Detail PWO(A) Coa4mct 291' of 6" D.I.P. Water Main Notes: 1. All existing utililiea to be abandoned not called out on these plans shall be abanda Install Single Shan Servlae(typ.) ConsW et BB0(4' D.I.P. Water Main Remove and Replace 6'thlok Concrete Driveway (City Detail PWON) Con4vct 126' of, 6" D.I.P. Water Main Remove and Salvage Existing Fire hydrant Install New Fire Hydrant Assembly and 6'x 6'x 6 TEE 9 (City DetailPWgg2) 6"Gate Valve (West)and 4" Gate Valve (NOM) UTILITIES DEPARTMENT 1800 A. D. Mims Rd. Ocoee, FI. 34761 (407) 905-3159 CDBacterial Test Location N 'be Tannedi W £. ee b Cornett W D.I.P. Water Main 9 Notes: 1. All existing utilities to be abandoned not called out on these plans shall be abantlr Conatruct6 Abandon and GmN Connect 6. Water Malc F PVC Water nn. Abandon and Grout i UTILITIES DEPARTMENT 1800 A. D. Mims Rd. Ocoee, FI. 34761 (407) 905-3159 See page Pro Remove and Replace Read., Pavement (City Detail PW002) Install 1-Tembe., Beren, [agical Sampling Point t y ( Bacterial Test Localon Remove and Replace Roadway Pavement (city Detail PW002) Temporary Constmcdon.lomper (City Detail) 21 1) Connect 6" D.I.P. Water Mon to Evlsdng F Water Main with Post Retains and Install an 6" Gate Valve Notes: i. NI tensGng utilities to be abandoned not called out on these plans shall be Bbando UTILITIES DEPARTMENT 1800 A. D. Mims Rd. Ocoee, FI. 34761 (407) 9053159 mtedolalcal Sampling Point '.r Main b Existing T Water Male OBacterial Tut Location Cut and cap 2"Water Main (By Others) Connect 6" O.I.P. Water Main to as eng 6" Water Main by Wet Tap Remove and Replace Roatlway Pavement (City tEetall PWn02) Notes: 1. All existing utilities to be abandoned not called out on these plans shall be abantlt __.. TM New Fire Hydrant Assembly wiN New 6" x 6" x_ 5 TEE UTILITIES DEPARTMENT 1800 A. D. Mims Rd. Ocoee, FL 34761 (407)905-3159 wble Long Service (typ.) 191a Long Sell- pyp.) or Contract Jumper nnedetl to Hytlrand .it UT211) 6"o.I.P. Water Main g 3' Water Main and Gond 66' of 6" PVC Water Main Bacterial Tact Wootton Install Single long Send- (tYp.) with S' Saddles Notes: 1All existing utilities to be abandoned not called out on these plans shall be abond, UTILITIES DEPARTMENT 1800 A. D. Mims Rd. Ocoee, FI. 34761 (407)905-3159 Be,sadel Test Locaticn Install Single tang servloe No.) with 6- Saddles Notes: 1. All existing utilities to be abandoned not called out on these plans shall be abandt • 0I UTILITIES DEPARTMENT 1800 A. 0. Mims Rd. Ocoee, R 34761 (407) 905-3159 by others) Bactenal Test Location Legend Labels & Description Legend m—j O nExisting Water Meter Phase II Skoog water Jne III E fisting Fire Hydrant = UTILITIES DEPARTMENT '' Existing Water Valve L 1 Prep -,d Water Main �" ���//�O� 1800 A. D. Mims Rd., Ocoee, FI. 34761 (�����Illlimak: JAZ New Valve .7 iilllllllll����� (407)905-3159 3 Fire Hydrant VNew Z of RInstall Single Long Ser ea (Meter/Box by Cry) RE �� frN Install donate long Service (meter/Box by Cis) EZZI Remove antl Replace 6' TMek Concrete Droeway Remove and Replace 4' Thlck Sidewalk Remove antl Replace Roadway Pavement Legend Labels & Description %X6 Plan Sheet No.## O Phase Pmt Phase II OPhase III � tee �� P3 Pt ' P4 ^\ \° J P9 F� SCALE: t" = 300' ' �'i CITY O F O C O E E PROJECT: ��Kimball &Malcom Area dRAwING NO. =a Watermain Upgrade desl : M.D.W. & Z.L.F.Z.L. & = UTILITIES DEPARTMENT '' L 1 SHEET: Legend �" ���//�O� 1800 A. D. Mims Rd., Ocoee, FI. 34761 (�����Illlimak: DATE: Nov 2016 .7 iilllllllll����� (407)905-3159 3 of