HomeMy WebLinkAboutItem #07 Award of Bid #B07-04 Reclaimed Water System Retrofit for Reserve Subdivision
AGENDA ITEM COVER SHEET
Meeting Date: 5/15/07
Item # 7
Contact Name:
Contact Number:
J(jff
MI/ --
Subject: Award of Bid #B07-04 Reclaimed Water System Retrofit for Reserve Subdivision
Joyce Tolbert
1516
Reviewed By:
Department Director:
City Manager:
Background Summary:
The Engineering Department and Finance Department have reviewed all bids. Staff recommends awarding the bid
to Young's Communications Co., Inc. as the most responsive and responsible bidder for the amount of
$434,515.00. The Engineer's estimate for this project was $975,000.00, and the approved budget for the Reserve
project is $538,720.00 from the 2003 Water and Sewer Bond Issue.
Issue:
Award the contract to construct the Reclaimed Water Distribution System, located in the Reserve Subdivision, to
Young's Communications Co., Inc.
Recommendations
Staff recommends that the City Commission:
1) Award Bid #B07 -04 for construction of the Reclaimed Water System Retrofit for Reserve Subdivision to
Young's Communications Co., Inc. in the amount of $434,515.00.
2) Authorize the Mayor, City Clerk, and Staff to execute all necessary contract documents once the
appropriate bonds and insurance are secured.
Attachments:
1. Bid Tabulations A&B
2. ITB #B07-04
Financial Impact:
$434,515.00 from the 2003 Water and Sewer Bond Issue.
Type of Item: (please mark with an "x')
Public Hearing
_ Ordinance First Reading
_ Ordinance Second Reading
Resolution
~ Commission Approval
Discussion & Direction
For Clerk's Deot Use:
_ Consent Agenda
_ Public Hearing
_ Regular Agenda
_ Original Document/Contract Attached for Execution by City Clerk
~ Original Document/Contract Held by Department for Execution
Reviewed by City Attorney
N/A
Reviewed by Finance Dept.
Reviewed by ( )
df~;J-
N/A
N/A
2
City Manag-er
Robert Frank
Commissioners
Gary Hood. District 1
Scott Anderson. District 2
Rusty Johnson. District 3
Joel Keller. District 4
Mayor
S. Scott Vanderg-rift
STAFF REPORT
FROM:
The Honorable Mayor and City Commissioners
Joyce Tolbert, Purchasing AgenteJ-'
May 8, 2007
TO:
DATE:
RE:
Award of Bid #B07-04 Reclaimed Water System Retrofit for Reserve Subdivision
ISSUE
Award the contract to construct the Reclaimed Water Distribution System, located in the Reserve Subdivision, to
Young's Communications Co., Inc.
BACKGROUND/DISCUSSION
The bid was publicly advertised on March 25,2007 and opened on April 25, 2007. There were a total of eleven
(11) bids for Bid Tab B (Directional Drill) and eight (8) bids for Bid Tab A (Open Trench):
Bidder Bid Tab A-Open Trench Bid Tab B-Directional Drill
1. Young's Communications Co., Inc. No bid $ 434,515.00
2. Florida Contracting Company No bid $ 444,100.00
3. Expertech Network Installation No bid $ 613,597.98
4. US Water Services Corp. No bid $ 658,430.00
5. American Persian Engineers & Const. $ 992,425.00 $ 683,650.00
6. Rayken Inc. $ 729,282.50 $ 730,487.50
7. Volt Information Sciences No bid $ 735,698.00
8. Cornerstone Businesses No bid $ 792,369.00
9. Schuller Contractors $ 889,000.00 $ 889,000.00
10. Central FL Environmental $1,197,034.74 $ 998,463.17
11. Gregory Electric Co. No bid $1,266,284.00
12. Emerald Utilities and Site Develop. $ 793,202.00 No bid
13. A&M SI Construction $ 892,700.00 No bid
14. Gibbs & Register $ 988,150.00 No bid
15. Stately Contractors $1,025,325.00 No bid
Attached is the bid tabulation and all bids are available in the Finance Department for review.
The Engineering Department and Finance Department have reviewed all bids. Staff recommends awarding the
bid to Young's Communications Co., Inc. as the most responsive and responsible bidder for the amount of
$434,515.00. The Engineer's estimate for this project was $975,000.00, and the approved budget for the Reserve
project is $538,720.00 from the 2003 Water and Sewer Bond Issue.
2
BID #B07-04 RECLAIMED WATER SYSTEM RETROFIT FOR RESERVE SUBDIVISION
REVISED BID TAB "B"
: "';::.;3';';" '. .." _,J,il;ii:.. ip ;; . "':.;;;.. ~~,;,;;'.'--P-;;".... ;--
I- ';.,1', Florida J ..... ./. .''''. i';',
BID TAB "B" .. Inc.
Bid Bond Yes Yes Yes Yes Yes Yes
License Check Yes Yes Yes Yes Yes yes
DESCRIPTION EST'D QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
Mobilization/Demobilization 1 $4,500.00 $4,500.00 $12,000.00 $12,000.00 $10,000.00 $10,000.00 $24,959.00 $24,959.00 $35,000.00 $35,000.00 $21,750.00 $21,750.00
General Reauirements 1 $2,500.00 $2,500.00 $8,000.00 $8,000.00 $22,050.00 $22,050.00 $10,457.00 $10,457.00 $35,000.00 $35,000.00 $25,850.00 $25,850.00
Indemnification 1 $2,000.00 $2,000.00 $100.00 $100.00 $1,000.00 $1,000.00 $13,007.00 $13,007.00 $100.00 $100.00 $250.00 $250.00
Utility Test Pits 1 $250.00 $250.00 $4,000.00 $4,000.00 $18,214.79 $18,214.79 $1,021.00 $1,021.00 $5,000.00 $5,000.00 $9,400.00 $9,400.00
Connection to Existina Water Main 3 $682.00 $2,046.00 $7,950.00 $23,850.00 $1,821.48 $5,464.44 $5,051.00 $1.5,153.00 $5,500.00 $16,5001)0 $3,100.00 $9,300.00
Furnish and Install 8-inch HDPE Reclaimed Water Main 8800 $32.14 $282,832.00 $30.00 $264,000.00 $42.93 $377,784.00 $49.57 $436,248.00 $35.00 $308,000.00 $53.40 $469,920.00
Furnish and Install 8-inch DI Gate Valve and Box 14 $1,601.00 $22,414.00 $2,200.00 $30,800.00 $1,917.11 $26,839.54 $2,050.79 $28,711.00 $5,500.00 $77,000.00 $2,150.00 $30,100.00
Furnish and Install DI Blow-Qff Valve 1 $480.00 $480.00 $800.00 $800.00 $789.34 $789.34 $1,402.00 $1,402.00 $2,500.00 $2,500.00 $1,250.00 $1,250.00
8-inch DI 11.25-dearee Bend 1 $520.00 $520.00 $500.00 $500.00 $582.14 $582.14 $752.00 $752.00 $750.00 $750.00 $1,190.00 $1,190.00
8~nch DI 22.5-dearee Bend 2 $775.00 $1,550.00 $500.00 $1,000.00 $582.39 $1,164.78 $755.50 $1,511.00 $750.00 $1,500.00 $1,190.00 $2,380.00
~h DI 45-degree Rend 18 $538.00 $9,684.00 $500.00 $9,000.00 $579.32 $10,427.76 $682.61 $12,287.00 $750.00 $13,500.00 $1,190.00 $21,420.00
l,;:"",~n UI Wye 1 $984.00 $984.00 $1,600.00 $1,600.00 $1,797.13 $1,797.13 $1,700.00 $1,700.00 $750.00 $750.00 $1,875.00 $1,875.00
8-inch DI Tee 5 $811.00 $4,055.00 $1,250.00 $6,250.00 $846.87 $4,234.35 $845.60 $4,228.00 $750.00 $3,750.00 $1,400.00 $7,000.00
Sod Replacement 1000 $1.35 $1,350.00 $1.00 $1,000.00 $1.18 $1,180.00 $0.51 $511.00 $0.50 $500.00 $0.40 $400.00
SinQle Service Connection* 24 $819.00 $19,656.00 $520.00 $12,480.00 $845.78 $20,298.72 $612.42 $14,698.00 $950.00 $22,800.00 $825.00 $19,800.00
SinQle Service Connection (w/Roadway CrossinQ)* 13 $678.00 $8,814.00 $700.00 $9,100.00 $1,165.77 $15,155.01 $1,043.77 $13,569.00 $2,500.00 $32,500.00 $1,475.00 $19,175.00
Double Service Connections* 35 $810.00 $28,350.00 $600.00 $21,000.00 $1,184.42 $41,454.70 $781.26 $27,344.00 $950.00 $33,250.00 $870.00 $30,450.00
Double Service Connection (w/Roadway CrossinQ)* 34 $1,015.00 $34,510.00 $900.00 $30,600.00 $1,535.22 $52,197.48 $1,212.62 $41,229.00 $2,500.00 $85,000.00 $1,515.00 $51,510.00
Asphalt Removal and Temporary Repair 50 $51.00 $2,550.00 $72.00 $3,600.00 $4.55 $227.50 $91.82 $4,591.00 $75.00 $3,750.00 $106.00 $5,300.00
Grass (sod) replacement and restoration 2000 $1.35 $2,700.00 $1.00 $2,000.00 $1.18 $2,360.00 $0.51 $1,021.00 $0.50 $1,000.00 $0.40 $800.00
Replace 4-inch concrete sidewalk 20 $81.00 $1,620.00 $36.00 $720.00 $5.46 $109.20 $99.50 $1,990.00 $100.00 $2,000.00 $33.50 $670.00
Replace 6~nch concrete driveway apron and sidewalk 10 $90.00 $900.00 $90.00 $900.00 $8.50 $85.00 $108.40 $1,084.00 $150.00 $1,500.00 $44.75 $447.50
Replace concrete curb 10 $25.00 $250.00 $80.00 $800.00 $18.21 $182.10 $95.70 $957.00 $200.00 $2,000.00 $25.00 $250.00
TOTAL $434,515.00 $444,100.00 $613,597.98 $658,430.00 $683,650.00 $730,487.50
Note: FL Contracting had an inconsistency on their bid
tab for Connection to Existing Water Main.
Discrepancy between unit price in words and unit price in
numerals, resolved in favor of the words per the bid
documents.
Page 1 of 2
BID #B07-04 RECLAIMED WATER SYSTEM RETROFIT FOR RESERVE SUBDIVISION
REVISED BID TAB "B"
......... c., .t~~t.......... ........]...>1 ')..._.....))
. .,_-:.tone Buslne~ses, Cl!~IF~~
BIO TAB "B" Inc. .... Inc. .... Envi~'=:tal Co':';~t '. .. ...... ...;~.
Bid Bond Yes Yes Yes Yes Yes
License Check Yes Yes Yes Yes Yes
DESCRIPTION EST'D QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
Mobilization/Demobilization 1 $29,000.00 $29,000.00 $76,642.00 $76,642.00 $117,215.00 $117,215.00 $100,667.06 $100,667.06 $130,000.00 $130,000.00
General Reouirements 1 $20,000.00 $20,000.00 $35,309.00 $35,309.00 $60,000.00 $60,000.00 $58,737.50 $58,737.50 $175,000.00 $175,000.00
Indemnification 1 $15,000.00 $15,000.00 $100.00 $100.00 $120.00 $120.00 $16,960.85 $16,960.85 $2,000.00 $2,000.00
UtilllV Test Pits 1 $15,553.00 $15,553.00 $7,500.00 $7,500.00 $6,000.00 $6,000.00 $18,288.00 $18,288.00 $8,500.00 $8,500.00
Connection to Existi,," Water Main 3 $3,500.00 $10,500.00 $2,780.00 $8,340.00 $2,600.00 $7,800.00 $5,826.76 $17,480.28 $2,200.00 $6,600.00
Furnish and Instail 8-inch HOPE Reclaimed Water Main 8800 $52.00 $457,600.00 $50.00 $440,000.00 $48.00 $422,400.00 $60.64 $533,632.00 $80.00 $704,000.00
Furnish and Instail 8-inch 01 Gate Vaive and Box 14 $3,200.00 $44,800.00 $2,098.00 $29,372.00 $1,989.00 $27,846.00 $1,816.10 $25,425.40 $1,650.00 $23,100.00
Furnish and Instail 01 Blow-Off Valve 1 $2,500.00 $2,500.00 $1,290.00 $1,290.00 $960.00 $960.00 $1,120.14 $1,120.14 $1,500.00 $1,500.00
8-inch 01 11.25-<Jeoree Bend 1 $300.00 $300.00 $885.00 $885.00 $1,800.00 $1,800.00 $419.10 $419.10 $350.00 $350.00
8-inch 01 22.5-<Jearee Bend 2 $300.00 $600.00 $889.00 $1,778.00 $1,800.00 $3,600.00 $426.72 $853.44 $475.00 $950.00
8-inch 01 45-<Jearee Bend 18 $300.00 $5,400.00 $889.00 $16,002.00 $1,800.00 $32,400.00 $422.91 $7,612.38 $575.00 $10,350.00
8-inch 01 Wve 1 $500.00 $500.00 $1,561.00 $1,561.00 $2,400.00 $2,400.00 $857.25 $857.25 $785.00 $785.00
8-inch 01 Tee 5 $300.00 $1,500.00 $938.00 $4,690.00 $1,200.00 $6,000.00 $640.08 $3,200.40 $675.00 $3,375.00
Sod Reolacement 1000 $2.10 $2,100.00 $1.00 $1,000.00 $1.00 $1,000.00 $1.05 $1,050.00 $3.60 $3,600.00
Sinole Service Connection' 24 $775.00 $18,600.00 $1,096.00 $26,304.00 $1,500.00 $36,000.00 $1,131.57 $27,157.68 $1 ,450.00 $34,800.00
Sinole Service Connection Iw/Roadwav Crossinal' 13 $1,375.00 $17,875.00 $1,413.00 $18,369.00 $2,077.00 $27,001.00 $2,515.58 $32,702.54 $1,650.00 $21,450.00
Double Service Connections' 35 $950.00 $33,250.00 $1,568.00 $54,880.00 $1,742.00 $60,970.00 $1,390.65 $48,672.75 $1,475.00 $51,625.00
Double Service Connection Iw/Roadwav Crossinal' 34 $1,575.00 $53,550.00 $1,766.00 $60,044.00 $2,082.00 $70,788.00 $2,552.70 $86,791.80 $2,249.00 $76,466.00
Asohail Removal and Temoorarv Reoair 50 $28.50 $1,425.00 $67.00 $3,350.00 $18.00 $900.00 $174.76 $8,738.00 $14.50 $725.00
GrassTsodl reolacement and restoration 2000 $2.10 $4,200.00 $1.00 $2,000.00 $1.00 $2,000.00 $1.54 $3,080.00 $3.90 $7,800.00
Reolace 4-inch concrete sidewalk 20 $28.50 $570.00 $67.00 $1,340.00 $48.00 $960.00 $99.70 $1,994.00 $59.60 $1,192.00
Reolace 6~nch concrete drivewav aoron and sidewalk 10 $32.50 $325.00 $94.00 $940.00 $60.00 $600.00 $199.39 $1,993.90 $66.60 $666.00
Reillace concrete curb 10 $55.00 $550.00 $67.30 $673.00 $24.00 $240.00 $102.87 $1,028.70 $145.00 $1,450.00
TOTAL $735,698.00 $792,369.00 $889,000.00 $998,463.17 $1,266,284.00
Note: FL Contracting had an inconsistency on their bid
tab for Connection to Existing Water Main.
Discrepancy between unit price in words and unit price in
numerals, resolved in favor of the words per the bid
documents.
Page 2 of 2
BID #07-04 RECLAIMED WATER SYSTEM RETROFIT FOR RESERVE SUBDIVISION
BID TAB "A"
" /. ".' 'ce'
111:;."" Ro'" ~f/",j/i"j'.....T.i""/"." :.'j.J,
BID TAB "A" .' j.~i'l.h....~d;...._i...~ lit:. 'ii, / Inc. ':!.:. ;..,~uj .... ."// f'-'i"~i~.J~i"i
" ..
Bid Bond Yes Yes Yes Yes
License Check Yes Yes Yes Yes
DESCRIPTION EST'D QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
Mobilization/Oemobi I ization 1 $21,750.00 $21,750.00 $90,769.50 $90,769.50 $115,235.00 $115,235.00 $60,000.00 $60,000.00
General Requirements 1 $24,600.00 $24,600.00 $23,000.00 $23,000.00 $59,000.00 $59,000.00 $35,000.00 $35,000.00
Indemnification 1 $250.00 $250.00 $1,150.00 $1,150.00 $118.00 $118.00 $100.00 $100.00
Utility Test Pits 1 $9,400.00 $9,400.00 $11,500.00 $11,500.00 $5,900.00 $5,900.00 $10,500.00 $10,500.00
Connection to Existinq Water Main 2 $3,100.00 $6,200.00 $2,300.00 $4,600.00 $295.00 $590.00 $2,000.00 $4,000.00
Furnish and Install 8-inch HOPE Reclaimed Water Main 8800 $35.25 $310,200.00 $40.25 $354,200.00 $40.00 $352,000.00 $59.00 $519,200.00
Furnish and Install 8-inch 01 Gate Valve and Box 14 $1,650.00 $23,100.00 $1,380.00 $19,320.00 $1,686.00 $23,604.00 $1,250.00 $17,500.00
Furnish and Install 01 Blow-Off Valve 1 $825.00 $825.00 $1,725.00 $1,725.00 $944.00 $944.00 $1,500.00 $1,500.00
8-inch 01 11.25-degree Bend 20 $750.00 $15,000.00 $230.00 $4,600.00 $767.00 $15,340.00 $300.00 $6,000.00
8-inch 01 22.5-degree Bend 18 $750.00 $13,500.00 $230.00 $4,140.00 $531.00 $9,558.00 $350.00 $6,300.00
8-inch 01 45-degree Bend 22 $750.00 $16,500.00 $230.00 $5,060.00 $1,470.00 $32,340.00 $325.00 $7,150.00
8-inch 01 Cross 1 $1,275.00 $1,275.00 $460.00 $460.00 $1,180.00 $1,180.00 $1,000.00 $1,000.00
8-inch 01 Tee 5 $950.00 $4,750.00 $345.00 $1,725.00 $1,038.00 $5,190.00 $450.00 $2,250.00
Sod Replacement 2050 $0.40 $820.00 $4.60 $9,430.00 $1.00 $2,050.00 $1.00 $2,050.00
Sinqle Service Connection* 24 $675.00 $16,200.00 $460.00 $11,040.00 $688.00 $16,512.00 $1,050.00 $25,200.00
Single Service Connection (w/Roadway Crossinq)* 13 $1,320.00 $17,160.00 $2,760.00 $35,880.00 $1,407.00 $18,291.00 $1,250.00 $16,250.00
Double Service Connections* 35 $715.00 $25,025.00 $517.50 $18,112.50 $1,264.00 $44,240.00 $1,000.00 $35,000.00
Double Service Connection (w/Roadway Crossing)* 34 $1,360.00 $46,240.00 $2,817.50 $95,795.00 $1,652.00 $56,168.00 $1,000.00 $34,000.00
Asphalt Removal and Temporary Repair 1250 $77.75 $97,187.50 $26.00 $32,500.00 $18.00 $22,500.00 $18.00 $22,500.00
Grass (sod) replacement and restoration 2000 $0.40 $800.00 $4.60 $9,200.00 $1.00 $2,000.00 $1.00 $2,000.00
Replace 4-inch concrete sidewalk 1000 $33.50 $33,500.00 $26.45 $26,450.00 $47.00 $47,000.00 $40.00 $40,000.00
Replace 6-inch concrete driveway apron and sidewalk 1000 $44.75 $44,750.00 $32.20 $32,200.00 $59.00 $59,000.00 $45.00 $45,000.00
Replace concrete curb 10 $25.00 $250.00 $34.50 $345.00 $24.00 $240.00 $20.00 $200.00
TOTAL $729,282.50 $793,202.00 $889,000.00 $892,700.00
Page 1 of 2
BID #07-04 RECLAIMED WATER SYSTEM RETROFIT FOR RESERVE SUBDIVISION
BID TAB "A"
..... Jef, >Lec'. if) rfL/.~.f:;ji'0.. ~2a~
......... , ......
G.ibbs&Re..;~i~(~~]! '....:-J ',.! J'.lit.>' '; .. ;.ii'.'
BID TAB "A" ..'j.
Bid Bond Yes Yes Yes Yes
License Check Yes Yes Yes Yes
DESCRIPTION EST'D QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
Mobilization/Demobilization 1 $50,000.00 $50,000.00 $45,000.00 $45,000.00 $58,000.00 $58,000.00 $90,977.76 $90,977.76
General Requirements 1 $38,000.00 $38,000.00 $45,000.00 $45,000.00 $58,000.00 $58,000.00 $57,812.50 $57,812.50
Indemnification 1 $100.00 $100.00 $100.00 $100.00 $100.00 $100.00 $16,693.75 $16,693.75
Utility Test Pits 1 $22,000.00 $22,000.00 $15,000.00 $15,000.00 $17,400.00 $17,400.00 $18,720.00 $18,720.00
Connection to Existinq Water Main 2 $1,600.00 $3,200.00 $5,500.00 $11,000.00 $2,300.00 $4,600.00 $5,735.00 $11,470.00
FiJl-nish and Im;tali a-Inch HOPE Reclaimed Water Main 8800 $50.00 $440,000.00 $45.00 $396,000.00 $45.00 $396,000.00 $56.72 $499,136.00
Furnish and Install 8-inch DI Gate Valve and Box 14 $1,700.00 $23,800.00 $5,500.00 $77,000.00 $1,500.00 $21,000.00 $1,859.00 $26,026.00
Furnish and Install DI Blow-Off Valve 1 $1,400.00 $1,400.00 $2,500.00 $2,500.00 $1,200.00 $1,200.00 $1,102.50 $1,102.50
8-inch DI 11.25-deqree Bend 20 $400.00 $8,000.00 $750.00 $15,000.00 $660.00 $13,200.00 $429.00 $8,580.00
8-inch DI 22.5-deqree Bend 18 $400.00 $7,200.00 $750.00 $13,500.00 $660.00 $11,880.00 $436.83 $7,862.94
8-inch DI 45-degree Bend 22 $450.00 $9,900.00 $750.00 $16,500.00 $660.00 $14,520.00 $433.00 $9,526.00
8-inch DI Cross 1 $1,200.00 $1,200.00 $750.00 $750.00 $1,400.00 $1,400.00 $877.50 $877.50
8-inch DI Tee 5 $1,000.00 $5,000.00 $750.00 $3,750.00 $1,000.00 $5,000.00 $655.20 $3,276.00
Sod Replacement 2050 $3.00 $6,150.00 $0.50 $1,025.00 $0.50 $1,025.00 $1.00 $2,050.00
Sinqle Service Connection* 24 $950.00 $22,800.00 $950.00 $22,800.00 $1,100.00 $26,400.00 $1,113.75 $26,730.00
Sinqle Service Connection (w/Roadway Crossinq)* 13 $1,400.00 $18,200.00 $2,500.00 $32,500.00 $2,400.00 $31,200.00 $3,312.50 $43,062.50
Double Service Connections* 35 $1,000.00 $35,000.00 $950.00 $33,250.00 $1,700.00 $59,500.00 $1,368.75 $47,906.25
Double Service Connection (w/Roadwav Crossinq)* 34 $1,600.00 $54,400.00 $2,500.00 $85,000.00 $2,900.00 $98,600.00 $3,378.31 $114,862.54
Asphalt Removal and Temporary Repair 1250 $80.00 $100,000.00 $65.00 $81,250.00 $60.00 $75,000.00 $77.60 $97,000.00
Grass (sod) replacement and restoration 2000 $3.00 $6,000.00 $0.50 $1,000.00 $0.50 $1,000.00 $1.51 $3,020.00
Replace 4-inch concrete sidewalk 1000 $60.00 $60,000.00 $45.00 $45,000.00 $60.00 $60,000.00 $47.58 $47,580.00
Replace 6-inch concrete driveway apron and sidewalk 1000 $75.00 $75,000.00 $49.00 $49,000.00 $70.00 $70,000.00 $61.75 $61,750.00
Replace concrete curb 10 $80.00 $800.00 $50.00 $500.00 $30.00 $300.00 $101.25 $1,012.50
TOTAL $988,150.00 $992,425.00 $1,025,325.00 $1,197,034.74
Page 2 of 2
SECTION 00020
INVITATION TO BID #B07-04
RECLAIMED WATER SYSTEM RETROFIT
FOR RESERVE SUBDIVISION
OCOEE, FLORIDA
Sealed bids, in duplicate, will be received at the office ofthe Purchasing Agent in the City ofOcoee,
until 2:00 pm, local time, on April 25, 2007. Sealed bids must be date and time stamped at the
office of the Purchasing Agent before that time. Any bids received after that time will not be
accepted under any circumstances. Any uncertainty regarding the time a bid is received will be
resolved against the bidder. Bids submitted after the designated time will be returned unopened. All
bids received before the due date and time will be publicly opened and read aloud by the Purchasing
Agent or her designee in the City ofOcoee City Hall Conference Room at approximately 2:01 pm.
Description of Work: All work for the project shall be designed and constructed in accordance with
the drawings and specifications prepared by Miller Legg, as subsequently modified by the City of
Ocoee. The proposed project will be awarded and constructed, if award is made, in conformance
with the plans and specifications. Bids shall be submitted for furnishing, delivering, and installing
all materials, equipment, incidentals, and services, including labor, for the work, which generally
includes, but is not necessarily limited to, the following:
. 8,800 linear feet 8-inch reclaimed water main
Prospective bidders may secure a copy of the complete bid package (drawings and specifications)
from the Purchasing Agent at Ocoee City Hall, Finance Department, 150 N. Lakeshore Drive, Ocoee,
FL 34761-2258, (407) 905-3100, ext. 1516, for a non-refundable fee of$150.00 per set. Checks
should be made payable to the City of Ocoee. Partial sets of bid documents will not be issued.
Information concerning this Invitation to Bid is also available from Onvia/DemandStar by accessing
the City's Web site atl]tJP__\~~w,-,-.~j:oC(_)S_(~Jl~I~JL[J~lll_s:c/l~llIc h(_~Ln 12./ P~rs.;lli!~i n&(~spit f} id;;.
Bids shall be prepared from complete, full-size contract documents. Addenda will be posted on
DemandStar and transmitted to all holders of complete contract documents not later than twenty-four
(24) hours before bid time via facsimile or U.S. mail, as determined by the City of Ocoee.
Pre-bid Conference: None is scheduled.
Bid Bond: A certified check or bid bond shall accompany each bid. The certified check or bid bond
shall be for an amount not less than five percent (5%) of the bid price, and shall be made payable to
the City of Ocoee as a guarantee that the Bidder will not withdraw for a period of ninety (90) days
after bid closing time.
0: \Purchasing\ WORD\Bids\2007 BIDS-RFPS\B0704 _Reserve_Reclaimed _Water_Distribution _ITB.DOC
ML PROJ#06-00248 00020-1
031405
Bid Submittal: A single bid shall be submitted for the work. The contract will be awarded pursuant
to the requirements of applicable state and federal laws and regulations and pursuant to any
applicable City of Ocoee purchasing rules and procedures.
Bids shall be on the bid form provided in the bidding documents and enclosed within a sealed
envelope, with the words "Bid #B07 -04 for Construction of the Reserve Reclaimed Water
Distribution System" and the bidder's name, address, and State of Florida contractor's license number
clearly shown on the outside thereof. Bidder must acknowledge receipt of all addenda in the
prescribed bid form. Bids must be signed by an authorized representative of the bidder. Failure to
comply with either condition shall be cause for bid disqualification. Mailed bids shall be sent to the
attention of the Purchasing Agent, City of Ocoee, 150 North Lakeshore Drive, Ocoee, FL 34761-
2258.
Award ofContract(s): The City ofOcoee reserves the right to waive technicalities or irregularities,
to reject any or all bids, and/or to accept that bid which is in the best interest of the City, price,
qualifications and other factors taken into consideration. The City reserves the right to award the
contract to the bidder which, in the sole discretion ofthe City, is the most responsive and responsible
considering price, qualifications, and other factors.
City Clerk
OCOEE, FLORIDA
March 25, 2007
END OF SECTION
O:\Purchasing\ WORD\Bids\2007 BIDS-RFPS\B0704 _Reserve_Reclaimed _ Water_Distribution _ITB.DOC
ML PROJ#06-00248 00020-2
031405
Mayor
S. Scott Vandergrift
Commissioners
Gary Hood
District 1
Scott Anderson
District 2
Rusty Johnson
District 3
Joel F. Keller
District 4
City Manager
Robert D. Frank
center of Good L .
<\.~e l~~
1\gerx:la., m~ I S:I 2CfJ7
:C+em -tt f
Aclckd af-{e:y
8~~ \AloS
~\\s~e.d
May 14, 2007
VIA EMAIL AND US MAIL
William Chandler, President
Florida Contracting Co., Inc.
P.O. Box 25
Deland, FL 32721
Email: wchandler@fcci.cc
Re: Bid #B07-04 (Reclaimed Water System Retrofit for Reserve Subdivision)
Bid #B07-05 (Reclaimed Water System Retrofit for Reflections Subdivision)
Dear Mr. Chandler:
I am in receipt of your email dated May 9, 2007 (the "Bid Protest"), in which you
requested that the City reconsider its tabulation of the Total Bid Price attributable
to Florida Contracting Co., Inc. ("FCCI") with respect to City of Ocoee Bid
#B07-04 and Bid #B07-05, based on the bid documents submitted by FCCI in
response to the project manuals, including all applicable addenda thereto, for Bid
#B07-04 and Bid #B07-05 (collectively, the "Project Manuals"). A copy of the
Bid Protest is attached hereto for reference.
The Bid Protest was timely received in accordance with Article 28 of the
Instructions to Bidders, as set forth in the Project Manuals. A copy of Article 28
is attached hereto for reference. The Bid Protest has been reviewed by the City
based on the standards set forth in the Project Manuals. In considering the Bid
Protest, the City has been cognizant of the requirements set forth in the Project
Manuals.
For the reasons set forth below, the Bid Protest is DENIED by the City:
1. Discrepancies in Bid Forms. As more specifically discussed
below, the Schedule of Bid Items forms submitted by FCCI in response to the
Project Manuals contained discrepancies that the City was required to resolve in
accordance with certain requirements and procedures set forth in the Project
Manuals. Based on the City's resolution of the discrepancies contained in such
documents, as required by the Project Manuals, the City correctly tabulated
City of Ocoee . 150 N Lakeshore Drive. Ocoee, Florida 34761
Phone: (407) 905-3100 . fax: (407) 656-8504. www.ci.ocoee.fl.us
FCCI's Total Bid for Bid #B07-04 as $444,100 and FCCI's Total Bid for Bid
#B07-05 as $396,150. Charts listing the Total Bid for each applicable bidder with
respect to Bid #B07-04 and Bid #07-05 are attached hereto for reference.
2. Resolution of Discrepancies. In resolving the discrepancies
contained in the Schedule of Bid Items forms submitted by FCCI, the City relied
on the following provisions of the Project Manuals:
a. Section 12.2 of the Instructions to Bidders set forth in the
Project Manuals provides as follows:
Bid formes) must be completed in duplicate by handwritten
ink or typewriter. The bid price of each item and lump sum
"Total Bid" or "Total Base Bid" on the bid form must be
stated in words and numerals. In case of a conflict, words
shall take precedence. (underlining added)
b. Section 17.1 of the Instructions to Bidder set forth in the
Project Manuals provides, in part, as follows:
Discrepancies between the multiplication of units of work
and unit prices will be resolved in favor of unit prices.
Discrepancies between the indicated sum of any column of
figures and the correCt sum thereof will be resolved in favor
. of the correct sum. Discrepancies between words and
figures will be resolved in favor of words. (underlining
added)
3. Schedules of Bid Items. Each of the Schedule of Bid Items forms
(Bid Tabs B) submitted by FCCI as part of its responses to Bid #B07-04 and Bid
#B07-05 contained various discrepancies. Copies of the Schedule of Bid Items
forms submitted by FCCI are attached hereto for reference. Specifically, on each
form, there was a discrepancy between the Unit Price (in words) and the Unit
Price (in numerals) with respect to Base Bid Item No. U5 (Connection to Existing
Water Main). The Unit Price (in words) provided by FCCI was "seven thousand
nine hundred fifty" and the Unit Price (in numerals) provided by FCCI was
"$2,650." Based upon the above-referenced provisions of the Project Manuals,
the City correctly resolved this discrepancy in favor of the Unit Price (in words).
Accordingly, the City correctly considered "seven thousand nine hundred fifty,"
or $7,950, as FCCI's Unit Price for such item. Further, on each form, there was a
discrepancy between the Total Price for Item No. U5 (calculated by multiplying
total number of units of work by the Unit Price) and a Unit Price of $7,950. The
Schedule of Bid Items forms required that bidders account for three (3) units of
work, at the applicable Unit Price, in calculating the Total Price for Item No. U5.
City of Ocoee · 150 N Lakeshore Drive. Ocoee, Florida 34761
Phone: (407) 905-3100 . fax: (407) 656-8504. www.ci.ocoee.f1.us
The Total Price for Item No. U5 provided by FCCI was "$7,950." Based upon
the above-referenced provisions of the Project Manuals, the City correctly
resolved this discrepancy in favor of the Unit Price. Accordingly, the City
correctly considered $23,850 ($7,950 times 3 units of work) as FCCI's Total Price
for such item. Finally, on each form, there was a discrepancy between the
indicated sum of figures contained in Total Price column of the Schedule of Bid
Items forms and the correct sum of such figures. The indicated sums provided by
FCCI for Bid #B07-04 and Bid #B07-05 were $428,200 and $380,250,
respectively. Based on the City's resolution of the discrepancies noted above, and
based upon the above-referenced provisions of the Project Manuals, the City
correctly tabulated FCCI's Total Bid for Bid #B07-04 as $444,100 and FCCI's
Total Bid for Bid #B07-05 as $396,150.
Accordingly, the Bid Protest is denied.
Sincerely,
Joyce Tolbert
Purchasing Agent
cc: The Honorable Mayor and City Commissioners
Rob Frank, City Manager
Jamie Croteau, Assistant City Manager
David Wheeler, City Engineer
Wanda Horton, Finance Director
Crystal Conley, Purchasing Technician
Paul Rosenthal, City Attorney
City of Ocoee · 150 N Lakeshore Drive · Ocoee, Florida 34761
Phone: (407) 905-3100 · fax: (407) 656-8504. www.ci.ocoee.fl.us
From: Bill Chandler [mailto:wchandlerilufcC:i.ccl
Sent: Wednesday, May 09, 2007 9:';0 Pf"1
To: Tolbert, Joyce
Subject: Sid ProkST:
Df~~E!r tv1s. r\'.')!bert:
Pursuant to our telephone conversation we reouest the City re:consider,ts position on the bid tabulation for Bids
607 -04, ReserJes and Bid B07-0S, Renec\i(}',g
On both bids, we adrnit to a clerical error in the written (in words) Unit Price section for bid item U5, Connection to
Existing Water Main Our Unit Price (in numbersj for both bids was $2,650,00 with a total price (in numbers) of
$7,950,00, Our intent IS clear in that the total bid price for this iterr supports the unit price at the bid quantity,
Further, our Total Bid Price shown at the bottom of the bids, both in words and numbers, supports our intent in
that our written numbers matches our written word and supports the written price for U5, This clearly reflects our
biOS as being the responsible low bidder.
....x. vy'p,h;:\ln91~.r@fGJ,\.CCi.. ..................:.............. ..<ii...........:.................... ........................... ........ ...X........ .... ......................... ............ .... '.' '.' .... ..
........... ...................................i....... .......... ........ .:..... .... ..... ..... '../ ...........: . ..... .' .. .' ..:/'.. ..... ....... .i. i........ ..........i............ ..... .....,........ ...'................... ". ..... ...................
..i.' ," .. .....:, ...... ...... .... .,'".: . .. ......: .'. ...... ..' .:'.,.....,... ..' '. . ......,. ,
. ........ ..... .......... .............:......'.....X.......... .......... ...:.."....... '.,. .:. '.. ".".::'....: '''''.'.
. .' '.' ........ ....... ......:...,"..'..... ........:. ....,..
..... ....,...... ...... ,"c'Li; ........................... ':"....". .,...... .'....,...,....:..'.. .."....... ",:
. ./.'.' ........... .....,......... ....... ..:.................... . .."..... ..... " ....
....,....' ' ..........::....'.. ,. ..... .' '.:.' . .... .:.",:, ....... ....... ...:.......
': ..... .,': i,lll":.' < '<< .... ....
f'f' .... .....<,, ...... ....
. .', .... .,. ., '.' "., ......<,..", ";f.ff .'.f....;'.f,0 ......
. ...... ..........:.....i......i ......... ... .... :.......... .... :...... ..:..... .i..... '. "., ..:
....., ..... . ...>........;, .....< ... ..... , <.' ,,' .'>XX',..
,< < .XL.,.X"Xf'", f' ..... ,......... X,...." ,.;. ,."
,XX', X, ....X.,.. "f, ..",X, .... ;.......... .,X,.'....X .X,X'; ..... ix, iX"
.....:. ...... .....,...:.: . ........:.. ........ ............, ......... ..... ........ .................. ..... ".... ".
.... .. '. ......,........ '. ....... ...... ............ .....::......... .,:................ ....... ............. . .....:... ' '. ........ ...
......... .:...../. . .............. ..........'.... ........... .:.... ....................... '..:.'. ....................: ....i
.' .......... .'. ."i ...... . .....:.:..........: .......... '.:' ..i.....'. ........... .......
.....,.. ..' :. .... .. .,.,,:'. ,'.','. .: .' ,./,:'... ...,..,......
:..,., ":". ..,..:' ............ .....,. .....,.... ..... .." ">:".'
..' .>0 ;} ..... .... .. ...<, ,< "'," ..," "....... ... ,
.. ... .. .. · . " .... ....... x' <.< ....;}.., ........x
..i ....i.. .......i.. ........ ....... '.':.'. .i ....................:..:.......: ii' ..........:.......:.: ............ ................... . .....' . ...... .................:.. ........:....
. .... X..;} "X X",,, "'.,'.';;.'" ".. ..... .. . '.';' ", ,".X.
. .....:........ '..". ;.........i' ",'" ,'.""""
" ',.', . <".'.,. .,.;...; . '. .
..... .. .... .... .:. ...?.. ....:..... ........ ...... ................ ',....i .....,... ........ .'. ............ ..... .......:...............:...... ......:... ..'
..i..........'...,.: "". .................... '''i.:,: .'.'..".. ..,.:.....,. ....:.., .......:...: ........... ,..,..,.' '.'
'...... ...... ". ...... ....,.... ..' .... ..:......: ,...:'. ...... ........ .:i........'........ "::.:'" .. i,'.
..... ..... .....i................i.......: .............:.....'........:. .....'.........:..... ',' ...:?.....,.
A..RTICLE 28 - BID PROTESTS
()wner's Fimmce!Purchasing Department '.vi]] ccr;sidr:~r bid r)rnk"',\:, <:cd: irw CC'nl r:\C t award, d:Jmages.
:melior any other relief. Any bidder :::eck ,,',1'11., ;'\1.1 p[ntC',1 '~h:lll 'i:~C the tollo\ving. procedures:
. i:: 1 \ bidd(~T sh~\1J rdl~ ~..! \vr1th;n bid prulcsl under thls :\.rticlc or be barred any relief; ora.l protests
~~h~dl11dl hi"; ~-lck.:lu\}...'!edged.
~8.2
, -
The bidprotestsba}lbeJiJedwith the Purchasing Agent not later than three (3) calendar days
after the posting ,of the notice, of intent to award or recommendation of award by staff.
BID #807-04 RECLAIMED WATER SYSTEM RETROFIT FOR RESERVE SUBDIVISION
REVISED BID TAB "6"
BIO TAB "8"
Bid Bond ..-
, Ucense-Check Yes Yes Ves Yes .,C: Yes .
."
~_RIPTlON . EST'O OTY. UNIT PRICE TOTAL PRICE UNIT PRICE. TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
MObnlZErtlonJDemob~""till!1 1 . $450Ct.00 $4,500.00 $12,UOo.00 $12,000.00 $10,000.00 .~~ ~~.J!.59.00 $2495'J,OO &35000.00 $3!;,OOC.oo $21.750.00 $21 7S().00
Ge1'l6fa~ Re.Quirements 1 $2,500.00 $2;500.00 $8,Uoo.oO $8,OOO.UO $22.050.00 $22,050.00 $10457,00 $tU,457.oo $35,000.00 ~~ $25,850.00 $25,850.00
Indemnification 1 S2,OOf):OO ' ,', $2,000.00 $100;00 $100.00 $1000.00 $1,000.00 S13,007.00 $13,007.00 $100.00 $100.00 $?.50.00 $250.00
Utill!v Test Pits 1 $250:00 $250.00 $41100.oo $4,000.00 $18,214.79 $18,214.79. $1.021.00 $5000.00 $:i,OOO.OO "19 400.00 $9 400.00
Connection to ExI.UtlQ Wat.r MaIn :i $882.00 ,S2,046.OO .OQ.: $23,850.00 $1 821.48 $5 464.44 $5,051.00 00 $5 500.00 $18.500.00 $3100.00 $9,300.00
Fumlstt and Inst." 8-lnch HOPE Reclalmod Water Main 8800 '532,14 $282,83<\;00 ,00 $264,000.00 $42.93 $J77.l84~OO. $49:57 00 $35.00 $308 000.00 $53.40 $489,920.00
Furnish ami Inslilll 8~ncl1 DI Gal. Valve and ad)( 14 $f601~OO $22,414.00 00 530,800.00 $1.BI7.11 $2G,1l39;54 $2,050.79 $ .$5,500.00 $77 000.00 -$2. 15'0.00 $30 100.00
Furnish and tnstaU 01 Blow-Off Val"" 1 $480.00 $400~OD $600.00 . $800.00 $789.34 $789.34 $1,402.00 $2 500.00 $2,500.00 51 250.00 $1.250.00
8.inch 01 11.25.ct.",ee Bend 1 $520.00 5520.00 $SOO.OO $500.00 $502.14 $582.14 $752.00 .'-'.$7:52.00 $750.00 5750.00 ,--~ $1.190.00 $I~
8~nd1 01 22.5-<1e~'ee Bend Z S7ts.00 : $1 5.'10.00 $,';00'00 $1,000.00 $582.39 51,164.78 $755.50 $1;511.00 $750.00 $1,500.00 51.190.00 52,380.00
~l!?l45.:!!$ire. flond 18 $538:00 59,084.00 $500,00 $9,000.00 $S79.:l2 $10.427.76 $682.61 .. $1:<:267.00 $750.00 513,500.00 $1190.00 $21,420.00
8--ir.ch DI Wve 1 $984.00 $984.00 $1,OOO,OQ $1 600.00 $1.797.13 $1,797.13 51.700.00 Sl;7oo.0Q $750.00 $750.00 $1 875.00 $1 875.00
8-lnch, 01 Tee 5 $81t.oo $4 055,00 $1.:250:00 $6,250.00 $846.87 $4.234,3.5 ~.1!15.60 $4;~6.00 $750.00 $3.750.00 51,400.00 $7,000.00
Sod Replacem""t 1000 51.35 $1;3.50.00 ,$".00 $1 000.00 $1.18 $1J80:00 $0.51 $511.00 $0.50 $500.00 $0,40 $400.00
Sirinle Sel\'ice Connectloo' 24 $819.00 $19,656.00 $520.00 $12,480.00 $845.78 $202!l8.T2 $612.42 $14,698.00 $9-50.00 S2<,800.00 $825.00 $19,800.00
Sin<Jle. Sari/tee ConnedJon (wlRpadwav Cros&Jno. . 13 $678.00 "$8,814.00 5700.00 $9100.00 $1~- $15.155.1)1 $1.043.77 $la;5ll!l.oO $2,500.00 $32,600.00 $1,475.00 $19,1'15.00
Ooublf! -~grvlce'Ccnn,ecUon$~ 35 $810.0Q $28,35000 $600.00 521,000.00 $1,184042 $41 454.7l $781.26 $27,344.00 $950.00 ~33.250 .00 5810.00 $3() 450.00
Double Setvfce ('",nneellon (wlRoadway CrO..iM)' 34 $1 01.5.00 .,$34,510.00 $900.00 $.10600.00 $1,53522 $52 197 AI $1,212.62 $41..229.00 $2500.00 $85.000,00 $1,515.00 $51,51Q.00
Asphalt RemovaJ and Temporary Repair 50 ,551ll0 $2550.00 $72.00 13,600.00 $4.55 $227.S( $91.82 $4,591.00 $75.00 S3,750.00 $106.00 ~5.300.00
Grass (sod) r801aoertt.ent 8li<fmstorallon 2000 :.$1.35 $2.100.00 $1.00 12.000.00 $1.18 $2,360.00 -$0.51 $10i!I.oo $0.50 $1,000.00 SOAO $800.00
Reolaoe 4~nd1 concrele sld.....lk 20 $61.00 $l,620.i)O $36,00 $7'&00 $5.46 $10l!20 - $99.50 $1;990.00 $100,00 $2.000.00 $33.50 $670.00
Renlaoe 6.inch tonerele dovawavapf{Jfl and sldowalk 10 590.00 ,$900.00 $90.00 $900.00 $8.50 $65,00 $108.40 $1.084.00 $150.00 $1,500.00 $44.75 5447.50
Reolace COflCffi!e curb 10 . ~25.oo $260.00 $80.00 $B00.00 $18.21 S18~.10 $95.70 :.$957.00 $200.00 $2 000.00 $25.00 $250.00
TOTAL $434,515.00 .$444,100.QO $613,597.98 $658,430.00 $683,650.00 $130,487.50
Net.. FL COnlraclll1g hod an IflCOlT.,slency 011 U10r bid
lab Ibr Cumaclion ta f:>dsting Water Main.
Disr:rapancy ba~n UI1iI prica in wont. 'lJld I1nl/ prioo in
nUfT1GI7il's. rnSIJfved in favor of thO" "wfJslJer ttl~ bid
document.'t
Page t 012
BID #807-04 RECLAIMED WATER SYSTEM RETROFIT FOR RESERVE SUBDIVISION
REVISED BID TAB "B"
- ~
BID TAB "B" ..
Bid Bond
License ('.hc'C~ Yes Yes Yes Y"" Yes
DESCRIPTION E51'O an; UNIT PRICE TOTAL PRICE UNIT PRICE :LOTALPRICE UNIT PRICE TOTAL PRICE UNITProCE TOTAL PRICE UN!T PRIC" TOTAL PRICE
. MobilizallonlOemobi!l7.1lllen 1 $29,000.00 JO.O( ~7e,642.OO $76.642.00 $117.215.00 $1,., 215.00 $100,667.06 $100 867.06 $130000.00 $130,000.00
General Reoulremp..nts 1 $20,000.00 .00 $35,309.00 $35,309.00 WO,ooo,OO $60000.00 $58;737.50 $58,737.50 $175000.00 $175.000.00
lridemnlfiCation 1 $15000.00 515.000.00 $100.00 $100.00 .120.00 5120.00 ..$16.960.85 $16960.65 $2 000:00 $2000.00
utility lest f'llS. 1 $15553.00 S15.553;Q1i $7 500.00 $7.500.00 $6.000.00 $6000.00 $18,288.00 $18288.00 $8.500.00 $8,500.00
Conntle\<<m \0 Eoc!sllnoWeter Milin 3 $3,500.00 $10bOO:00 $2,180.00 $8340.00 $2 600.IiD $7 ,81i0 .00 $5:826.76 $17,460.213 $2,200.00 $6,600.00
furnish an<t.lo.lol! S~i'ICh HOPE Heclalmad Wale' MaIn 8800 $52.00 $457600.01i $.'iO.00 $440000.00 $48.00 $422,400.00 :;$60.64 $533,632.00 $80.00 $104,000.00
Furnish end Install /Hnch OJ G~te ValV<! ~nd Box 14 . ~ 200.00 $44;6OG.OO 52,008.1i0 $29 372.00 $1.969.00 $27,846.00 51;816.10 $25,425.40 $1,650.00 $23,100.00
furnish ~od'lnsISUDl BlOW-Off. Valll6 1 $2,500.00 $ii500~OO $1 290.00 51,290.00 $960.00 $000.00 .. $1120.14 $1,120.14 $1,500.1i0 $1.500 .00
. B~nch 011 J..2S-degreo Bend 1 $300.00 $300,00 $885.00 $885.00 $1 800.00 $1 800.00 ....$4.19.10 $419.10 $3bO.OO $350.00
&4nch Dl22.5-<lenree Bend 2 $300.llll $600:00 -- $869.00 $1 178.00 $1,800.00 $3600.00 .:: $1126.72 $853.44 $475,00 $050.00
&..lnr.l1 Dl41H1aalee. Send 18._ $300.00 $5j400.00 $889.00 $16 002.00 $1.800.00 $32,400 .00 =1If $',612.38 $575.00 $10,350,~
~~nct1 Dl Wv;,:. 1 $,>110.00 $500.00 ~15Gl.00 $1 561.00 $2.400.00 $2400.00 25 $851.25 $78.~.oO $7B5.00
Hict.OITe. 5 $300.00 $1500.00 $938.00 $4,690.00 51,200.00 $6000.00 ll8 $3 200040 W75.00 -~
Sod ReDIscement 1000 52.10 $2.100.00 $1.00 Sl,OOO.Oll 51.00 $1,000.00 'S1.0S $1 050.00 $3.60 $3,600.00
SIn Ie Service Connection" 24 ST75.00 $18,600.00 .$1 ,096.00 $26,304.00 $1 500,00 $36.000 .00 $1131.57 $27157.86 $1,450.00 $34,800.00
Sin 19 S9t\Ilce ConneoUon (wfRoadwav Crosslnol" 13 $1 375.00 $17,875.00 $1,413.00 $16369.00 . $2,077.00 527 001.00 .$2515.b8 $32.702.54 $1 850.00 S21,450.00
DoobleS9t\Ile<> Con~ctloos' . 35 $950.00 $33,250.00 $1,568.00 $54.880.00 $1.742.00 $60,910.00 $1.390_65 $48,672.75 $1.475.00 $51,625.00
Doublo SenNCG. COOllecllon IwIRoadWllv Crosslno \" 34 $1 575.00 $5,,550.00 $1,766.00 $60,044.00 $2,082.00 $70786.00 $1,552.70 $86,791.80 $2,249.00 $76,486.00
A.nhall.RarilOval OFidTerno<irarv Reoalr 50 $28.60 $1,425,00 $67.00 $3,350.00 $18.00 $900.00 .$174:76 $8,738.00 $14.50 . $125.00
Grass 1IDd renJacemenf and, resloratton 2000 .... $2.10 $4.200.00 $1.00 $2,000.00 $1.,00 $2,000_00 ...'$1,54 $3080.00 $3.90 $7,SOO.00
ReDl.co 44nch concrate .fdtlwal~ ..20 . $28.511 $570..00 $67.00 $1 340.00 $4<1.00 $960.00 ...$S9.70 $1,994.00 $59.60 $1;192.00
R60lace 6-iflcn CQncref.e driveway s,pron and 'sidewalk 10 $32.50 $325.00 ~94.00 $940.00 $60.00 $600,00 $199.39 $1 993.90 $66.60 $C>66.OO
RaDJacc 'COncreto 'CUrb . 10 $55.00 $5$ltOO $67.30 $613.00 $24.00 $240.00 $l02.87 $1,028.70 $145.00 $1,450.00
TOTAL $735698.00 $l92,3G9.00 W89,OOO.00 $996,403.17 . $1 266.284.00
-
Not.. FlContrBWng had an rnconStstency on Illelr bkJ
lab for Connoction /r} ExistIng Wal... Main,
Discmpar>ey balw."1l unapri;c In wents alld unit orico ill
n~JmiYals. rosolvad fn favor of the words per fils tlkf
documents.
Page.2 of 2:
BID #B07.ll5 RECLAIMED WATER SYSTEM RETROFIT FOR REFLECTiONS SUBDfVISION
REVISED BID TAB "B"
-----
BID TAB "B"
~ ".
Ll~ense Check I Yes Yes Yes ..... Yes -.--- Yes -
-
u ..:.. ...
DESCRIPTlClN Esro OTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
Mobilization/Demobilization ----- .... $4,500.00 $4,500.00 $12,000.00 $12,000.00 $10,000.00 $10,000.00 $26,219.00 $26,219.00 $25,000.00 $25,000.00
1
General Requirements 1 $2;noo.OO . $2,500.00 , $8,000.00 $8,000.00 $22,0~.00 $22,050.00 $10,839.00 $10,839.00 $25,OOO.OQ $25,000.00
Ibdemnification 1 $2,000.00 $2,000,00 $100.00 $100.00 $1,000.00 $1.000;00 510,202.00 $10,202.00 $100.00 $100.00
Utility Test PUs 1 $250:00 $250,00 $4,000.00 $4,000.00 $18,253.98 $18,25:>J18 $1,021.00 $1,021.00 $5,000,00 $5.000.00
. Connection to ExisUnaWater Main 3 $1;233,00 $3 69S;00 $7,950.00 $23,850.00 $1.825.40 $5.476:20 $4.005.00 $12,015.00 $5,600.00 $16,800JlO
. Furnish and Install8-lneh HOPE ~edalmed Water MHln 7350 $32.14 $236,229.00 $30.00 $220,500.00 $43.02 $316,1\Tl;(j(j $51.81 $380,803.50 $35.00 $257,250.00
FUlTllsh and Install 8-inch 01 Gate Valve and Box 15 $1,585.00 $23,775.00 $2,200.00 $33,000.00 $1,92123 $28,818,45 $1 ,956.83 $29,352.45 $5,500.00 . $82.500.00
FUlTllsh and Install D1 Blow-Off Valve . 1 . ,$487.00 $487.00 $800.00 $800,00 $791.04 $79t,{)4 . $1 402.00 $1,402.00 .. $2,500.00 - $2,500.001
8-1nch 01 11.25-deoree Bend 1 $535.00 $535.00 $500.00 $500.00 $583.40 $583.40 $752.00, $752.00 $750.00 $750.00
8-lnch DI 22.5--degree Bend ..----. 2 $54O~00 $1,080.00 $500.00 $1,000.00 $583.64 $1,167;28 $755.50 $1 ~'i1100 $750.00 $1,500.00
. 8-inch DI <\5-<legree Bend 15 $540.00 $8.100.00 $500.00 $7 500.00 ~' $580.56 ~~.. $155,40 $11,331.00 Jj750.00 $11,250 .OO~
8-1nch OJ Cross 1 $950.00 $050,00 $600.00 $600.00 $912.64 $912,64 . $1,700.00 $1,700.00 $1,250.00 $1.250.001
~~nr.h OJ Tee 4 $811.00 $3.244.00 $1,250.00 $5,000.00 $954.38 $3,817;52 $977.25 $3,909.00 $750.00 $3,000.001
Sod Replacement 1500 . $1.35 $2,025.00 $1.00 $1,f,oo.00 $1.18 $1,770:00 $0.51 $765.00 $0.50 $750.00.1
Single SelVlce Connection' 20 $910.00 $18,200.00 $520.00 S10AOO.OO $835.39 $16,707J30 $512.45 r-' $1:1,249.00 $95000 $19,000.001
. Sinnle SE!fVic!' ConoSl'UOI'I (w/Roadway Crossing)' 9 $650.QO s5Ma.DO $700.00 $6,300.00 $1,194.56 $10,751004 $1,043.78 $9.394.02 $2,5QO.Oq ~~
IDouble Service Connections' 35. $810,00 $28;3fi().00 $600.00 $21,000.00 $1,179.49 $41,282.15 $'181.26 $27,344.10 $,950.00 ~33,25O~~
I Double Service CofUlecUon Iw/Roadway Grossing)' -.-.
37 $1,050,00 $38,850.00 S900.g0 $33,300.00 $1,55U4 $57 ,399,58 $1,2'12,59 $44,865.83 $2,500.00 $92,500.00
AS[lhafl Remova! and Temoorary Repafr 20 $51.00 $1,020.00 $72.00 $1,440.00 $4.56 $91;20 $91.85 $1,837.00 $U5.00 $1,300.00
Grass (sod) replacement arid re.<;toratlon 5000 $1.35 $6,750.00 - $0.75 $:J,750.00 $1.18 $5J900.00 $0.51 $2,550.00 $0.50 $2,500.00
Rejllace 4:inch concrete side\Wl.!1< 10 $81.00 $in 0.00 $36.00 $360.00 $5.48 $54080 $99,50 $995.00 $65.00 $650.00
Replace 6.inch concrete driveway apron and sidewall< 5 $90.00 '- $450.00 -'--. $90.00 $450.00 $8.52 $42.60 . $108.40 $542.00 $65.00 $325,00
Replace concrete curb 10 $25.00 $250.00 $80.00 $800.00 $18.25 $182,50 $95.70 $957.00 $25.00 $250.00
TOTAL $389,904.00 $396,150.00 $551,957.58 $592,555.90 5604,925.00
, .
Nola, FL Contracting had an InconSistency 0/1 therr bId
tab for Connection to Existing WGter Main.
DL'>Grepal1cy betwarm unil price in wonts and unif price in
r>uroorols, ,esolved in favor of Ifle words per thIJ bid
documents.
Page 1 012
BID #807-05 RECLAIMED WATER SYSTEM RETROFIT FOR REFLECTIONS SUBDIVISION
REVISED BID TAB "8"
BID TAB "B"
Bid Bond - ..-
lJcense Check Yes :"': Yes Yes I....... Ves Yes
:. I. .'
DESCRIPTION ESrO OTY. UNIT PRICE TOTAL PRICE' UNIT PRICE' TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE
Moblllz.alionlDemobili21ltlon 1 $19200.00 $19,200.00 $15,000.00 $15000.00 $118,778.00 $118,778.00 $83,484.36 $83,484.36 $130,000.00 $130,000.00
General Requirements 1 $25,325.00 $25,325.00 $15,000.00 $15,000.00 $89,250.00 $89.250.00 $57,812.50 $57.1112.50 $175.000.00 $175.000.00
Ibdemnificalion 1 $250.00 $250:00 _$17,453.00 $17,453.00 $100.00 $100.00 $16.693.75 $16693.75 $2.000.00 $2,000.00
UtilllvTeslPlls 1 S9,400.00 $9,400.00 $13,000.00 $13,000.00 $5,950.00 $5.950.00 $14,500.00 $14.500.00 . $8.500.00 $8,500.00
Connecti<lnlo !::xis Uno \<\later Main 3 $3,100,00 $9.300;00 $3,314.00 $9.942.00 $3,927.00 $11,781.00 $5,735.00 $17205.00 $2.150.00 $6,450.00
FUrnish ahd Install8-1nchHOPE Reclalmed Water Main 7:>50 ."-. ..$53AO $392;4\)0.00 $52.00 $382,200.00 $48.00 $352,800.00 r','. $64.58 $474,563.00 $68.901 SSOO,415.00
Fuml$halid Inslall8-inchDJ Gate Valve and. Box 1.5 $2,150.00 $32;250.00 $3.200.00 $48,000.00 $1 785.00 $26,775.00 $1,787.50 $26,812.50 $1,550.00 $24,750.00
Furnish and Install DIBlow.OrrValve 1 $1,250,00 $1.250.00 $2,500.00 $2.500.00 $2,142.00 $2.142.00 1$1,102.50 $1,102.50 $1,500.(,19 $1,500.00
8-inch 01, 1.1.25-deoree Bend 1 $1,1\'10.00 $1.190.00 $300.00 $300.00 $2,023.00 -. $2,023.aa I,'. $412.50 $412.50 $32".00 $325.00
8-inch DI 22,5-<Jearc;e Bend 2 $1,190.00 $2,360.00 $300.00 $600.00 $2,083.00 $4,166.00 $420.00 $840.00 $400.00 $800.00
It!'!.ch DI 45-degree Bend 15 $1.190.00 $17,1'150.00 $300.00 $4,500.00 $2,023.00 $30,345.00 $416.25 $6,243.75 $550 .of) $8,250.00
8-inch Of Cross 1 $1,500.00 $1,500.00 $300.00 $300.00 $2.023.00 $2.023.00 I $787.50 $787.50 $750.00 $750.00
8.lnch Ol Tee 4 $1,400.00 $5,600.00 $500.00 $2,000.00 $1.517.00 $6.068.00 . $630.00 $2,520.00 $750.00 $3,000.00
Sod Replacement 1500 SO.40 S600.00 $2.00 $3,000.00 $2.00 $3.000.00 $0.79 $1.185.00 $3.10 $4,1l50.00
Single Service.Connection' 20 $825.00 $16,500.00 $775.00 $15500.00 $1,488.00 $29,760.00 $1.113.75 $22,275.00 $975.00 $19,500.00
. Slnille ServiCeConnecUon-{W/Roadwav Crossinul' 9 $1;475.00 $13,275.00 $1,375,00 $12,375.00 $1,507.00 $13563.00 $3,W4.~e ,.. '$27,937.44 $1,249.00 $11.2.41.00
Double Service Connectloos' 35 $870.00 $30,45tl:00 $950.00 $33,250.00 $1,734.00 $60.690.00 $1 ,368.75 $47,906.25 $1,475.00 $51,625.00
Double Service Connection wlRoadway Crosslnq)' 37 $1.515.00 .. $56,055.00 $1,575.00 $58,275.00 $1,898.00 $70,226.00 1$2,644.94 $97,862.711 $2.249.00 $83,213.00
Asphalt Removal and Temnorarv Railalr 20 $170.00 $3 400.00 $28.50 $570.00 $24.00 $480.00 . $463.88 $9,277.()0 $14.50 $290.00
Gross. sod replaceniimtanctresloratlon 5000 $OAO $2,000,00 $2.00 $10.000.00 $1.00 S5,OOO.00 . $0.86 $4,300.00 $3.90 $19,500.00
ReplaceA"'lnch concrete sidewalk 10 $33.50 $335.00 $29.00 $290.00 $48.00 $480.00 ., $195.25 $1.962.50 $59.60 $596.00
Replace6~l1ch concrete drlvewav aPron and sidewalk 5 $44.75 .. $223.75 $33.00 $165.00 $.100.00 $1.!l62.50 $66.00 $330.00
$60.00 $392.50
Replace concrete curt:> 10 $2.5.00 $250.00 $55.00 $550.00 $30.00 $300.00 ... $101.25 $1,012.50 $145.00 $1,450.00
TOTAL $641,073.75 .. $644,770.;Q0 $836.000.00 $918,758.93 $1,060,135.00
Note. FL Canlracting flad an IrlCOfls/srencyon their bid
t.b for CMllection to E;t;isffng Water Main.
Oisr.repanq betwGen unit plicG in vvonf8 and unit plica in
numerals, re~,;tved in f.wor of the words pel" 1110 bid
documents. . .
Page 2 012
SCHEDULE OF BID HEMS
BID TAB "Il" DIREctIONAL DRlLL INSTALLATION
RESERVE RECLAIMED WATER DISTRffiunON SYSTEM
b~..--
f'~;~: ,<I ~ :.;~:~~~~~"t:, ' .
!~~:~~:'_ " . ".:'L.;t',.,,' . ;_'~.~;.~.~.~;~.'.~'" .
.: ' .,,::~.,'.;i;;.~;.; ..:.._!...._.:~~ ,'...
U 1 MobilizationIDemobilizatioll
U2 Genera] Requirements
03 Indemnification
U4 Utility TcstPits
--
U5 Conucction to Existing Water Main.'
U6 Furnish and Install 8-inch HDPEReclaimed Water Main
U7 Furnish and Instai.J 8-inch DI GiiteValveimdBox
U8 F1llIliBh md:Install Dr Blow-Off Valve
f--
U9 8-inchDI 1 L25-{jegree Bend
UI0 8-inch Dr 22.5-degree Bend
Ul1 8-inch DI 45-~gJ.-ee Bend
Ui2 ! 8-inch DI Cross
un 8-mch DI Tee
U14 Sod RepJa~em\l1lt
U15 Single Service Connectiou.
i---
., ~~"~;~01'~;:~:'1.;";~':; :;Wm:~~bE . .:':~f UNIT)'lU(;E
. . ':'.~" :,:' ~~i5IT2:'~':- :nrl'N' wo:.RDS-1 :,.;.:,,-<"(IN'N'UM:BERS}
:: .'~ ... '. ""=-."'..". ""'"'' .".... """ '. "
LS 1 /... l. ,..u, "'" .<J1..vi r1Dl1(/f~ / 2. ~ ,
L8 1 e.1~nr +hou.:sanC d oI./t;\;fS f:1 nnr-;_~___.
LS 1 oh~ h t.!.tJd.{ ("'J ",[ ell aI~ /OQ <
LS 1 ,~w +\r"IC\J;;'rJ.-;:::ro H~ ..; net::)
EA 3 ~~tt'O~~(~l~.c;~rC.
LF 8,800 14hr-h.. r\ DIla..(S ......... ~~
EA 14 ~+htlvSD-nrl-tu;c hL.UY\1i 1 Z,U::O .
EA 1 ~.\ '** hU.Mrea M\o;;.f · P-.Cc::J.
EA 1 +. 'Ie. h'\i.LI'\.A('~ rI r.iol\oJ -S'&lO .
EA 2 S;fV~ hurrl(o"c f"'\DII!tf SQ::> ,
EA! 18..[', v@... hUl"V'h:ed f'ic l\a.iCi .$i:JtO
EA 1-- S\S~:~ hu.rdre.6 ~o( tdl' 1fi?l;C).
EA 5 ::m€. t\'Ovs a."c -twoh~ed.t Ift-u I:z.5"O ..
SF 1,000 rvI1 del \0-.{ /.oc>
EA 24 1-C'\JQ.ht~red I .\ ...hdu, .5 L-<? <.
EA 13 ~~ n .J r n'tll\d'i's 7 (2fJ c
----. EA 35 C:, 'L \--.U,'hr~ (",..,\ d ~C\~ rr &, CJO .
EA 34 n\ne.-.hu.od.(~" reo _
SY 50 !S::..vw\-\t'-tv..Jo ri,,\\Q..J(s 1 z.. .
! SF 2,000 f')r..i) t..... ~ \\ / o~
SY 20 \y .. \ C 'i r\ l'\ \\0.. ('C. 3' . e<:0
SY 10 f\\()\-v' D.o\\a. (<; fb .0.0
LF !.. 10 I e:.1.C\"~ r1.IJ\\o...("S 8(7.0.0
~(hon:kw ~ E.'C]ht.j~vSQnJJ
+w" Y\vN.1('ed d t>\\~ .
U16
U17
U18
U19
U20
U21
-.
U22
U23
-----
Single Service Connection (wlRoadway Crossing)"
Double Service ConnectiullS"
Double Service Connection (wlRoadway Crossing).
Asphalt Removal md Temporary Repair
Grass (sod) replacemem fll]dTe5toration
Replace 4--inch concrete sidewalk
Replace 6-iuch concrete drivewayaprOlJ. and sidewalk
Replace coucrete curb
TOTAL
"Service connection to include I-inch. supply pipe from main to service fitting.
C:\CapitalI'rojects\Reclaimed 'WaJer Projects\Reserve & RellectiOIl5\Bid Documents\Reserve\0030 OJAB I.doc
ML PROJ#06-00248 00300-6 4/12/2007
r~A~~
/J
LeJ .
'--"
I
i
!
i
j
I
t~)T~~~~ 11
:(l.N"~}l;.~
1'2/6Q:? - I
~. oC:O ~ !
/90<< !
4 <<'.LJ .
: rJ\qC[). B
: U'1 ceo
,~~.~-
. A--r1 .
':>610 .
-"--
~ .act::) -
CJ,err)~
/" 6c€J .
IL:J )"~o .. i
lc,oe:;.
/; .45Zt:J .
! CL la€l -
2./; e:x:t:rr2 -
~o. ~~
I J~~-
.. 7w
~m-
!A-(i~ ~~
i--------
I
!
\
SCREDULE OF RID ITEMS
BID TAB "B" DIRECI'IONALDRILL_lNSTALLATlON
IU:FLECTIONS RECLAtMEn WATER DISTRIBUTlON SYSTEM
i UI . Mbbilizitlon/Dexnobiliiilion
r------
, U2 General Requiremep.ts
I
I U3 Indemnification
r U4 Utility Test Pits
f-- -
I US ConneL"tion to Existing Water Main.
C___~__ Furnish andInstall8-inch.HDPEReclah:uedWater Main
. U7 Furnish and Install a-inch DI Gate Vidve and Box
I us Fumis.h andlnstaIl DI Blow-OffV31ve.
~ U9 8-inch DI 1l.25--degree Bend
i VIO 8- incli Dr 11-5--degree Bend
l-
I UI} 8-mchDI 45-degree Bend
i _ UlHS-inch DI Wye
r---~- 8-inchDITee
~ Sod Replacement
UIS Single Service Connection"
U16 Single Service Connection (wlRoadway Crossing)*
Ul7 Double Service Connections"
VIS Double Service Connecti.on (wlRoadway Crossing)'"
UI9 Asphalt Removal and Temporary Repair
V20 Grass (sod) replacement and restoration
U2I
C:\Capitnl F[tIjectslReclaimed Willer Projects\Reserve & Reflec:tiow:\Ilid DocuInell!SlRcflectiflnsi00300JAB Ldoc
_Ml PROJ#06-00248 00300-6 411212007
ru;.L;.t.A ~wU:r/~ I~'