Loading...
HomeMy WebLinkAboutItem 13 Approval of Change Order No. 3 (Final) for Bid #18-03 Kimball Area Water Main Upgrade ProjectContact Name: Contact Number: oeoee floHda AGENDA ITEM COVER SHEET Meeting Date: Item # TJ Tomlinson, E.I. (407) 905-3159 June 15, 2021 13 Reviewed By: Department Director:. Jamie C rpJe City Manager: Robert Frank Subject: Approval of Change Order No. 3 (Final) forBid #18=03 Kimball Area'Water Main Upgrade Proiect. Background Summary: The Mayor and City Commission previously approved the Kimball Area Water Main Upgrade Project on July 17, 2018 in the amount of $344,097.00 to Central Florida Tapping and Construction Inc. (CFT). Changer Order No. 1 for the addition of Phase II of the project in the amount of $279,151.48 and Changer Order No. 2 for the addition of Phase III of the project in the amount of $335,056.00 was approved by the Mayor and City Commission on October 16, 2018 and October 6, 2020 respectively. This led to a final contract amount of $958,304.48. The Contractor was able to conduct construction without significant impact to the road and sidewalk and as a result, significant cost savings were attained in the items bids to remove/replace pavement, curb, and sidewalks. Items bid by CFT that were not fully utilized to complete the project can be seen in the Final (Close Out) Payment Summary attached to the Final Change Order. This led to a reduction in the contract amount by $59,479.92. Issue: Should the Mayor and City Commission approve Change Order No. 3 (Final) for the Kimball Area Water Main Upgrade Project for the reduction of the contract price from $958,304.48 to $898,824.56 resulting in an overall cost savings to the City in the amount of $59,479.92? Recommendations: Recommend the Mayor and City Commission to approve Change Order No. 3 (Final) with CFT in the reduction of $59,479.92 changing the final contract price to $898,824.56. Attachments: 1. Change Order No..3 2. Kimball Area Water Main Upgrade Phases Financial Impact: The Kimball Area Water Main Upgrade Project had a budgeted amount of $600,000.00 for fiscal year 2017/2018 from the Water Repair and Replacement Fund (410-533-10-6302), an amount of $300,000.00 for fiscal.year 2018/2019 from the Capital Improvements Fund (401-533-10-6302), and an amount of $300,000.00 for fiscal year 2020/2021 from the Capital Improvement Fund (401-533-10- 6302) which made available a total project balance in the amount of $1,200,000.00. Based on the initial Contract amount of $344,097.00, additional expenses from Change Orders in the amount of $279,151.48 and $335,056.00, a cost savings in the amount of $59,479.92 for this contract, and other miscellaneous project expenses including but not limited to plumbing services and meter costs, the project will have an unencumbered balance of $43,550.70. Type of Item: (please mark with an `Y) Public Hearing Ordinance First Reading Ordinance Second Reading Resolution - Commission Approval Discussion & Direction For -Clerk's Dept Use. - Consent Agenda. Public Hearing Regular Agenda Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney Reviewed by Finance Dep Reviewed by N/A N/A N/A 2 CITY OF OCOEE 150 North Lakeshore Drive Ocoee, Florida 34761 *This Change Order Requires Action by the City Commission* Kimball Area Water Main Upgrade Bid #18-03 CHANGE ORDER NO. 3 DATE: 05/20/2021 PURCHASE ORDER: 1426421 The following changes are hereby made to the CONTRACT DOCUMENTS. Original CONTRACT PRICE Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDERS Net Increase (Decrease) Resulting from this CHANGE ORDER The current CONTRACT PRICE including this CHANGE ORDER Original CONTRACT COMPLETION DATE: Current CONTRACT COMPLETION DATE adjusted by previous CHANGE ORDERS Net Increase Resulting from this CHANGE ORDER Current CONTRACT COMPLETION DATE including this CHANGE ORDER $344,097.00 $958,304.48 ($59,479.92) $898,824.56 January 17.2019 February 9, 2021 106 days May 26, 2021 Kimball Area Water Main Upgrade Bid #18-03 CHANGES ORDERED: I. REQUIRED CHANGES Reduction in overall contract price by $59,479.92 changing the overall contract price from $958,304.48 down to $898,824.56. H. JUSTIFICATION The attached Final Summary of Values shows cost savings for items that were not needed to complete the project resulting in an overall cost savings to the City. III. NARRATIVE OF NEGOTIATIONS N/A IV. PAYMENT The Kimball Area Water Main Upgrade Project had a budgeted amount of $600,000.00 for fiscal year 2017/2018 from the Water Repair and Replacement Fund (410-533-10-6302), an amount of $300,000.00 for fiscal year 2018/2019 from the Capital Improvements Fund (401-533-10-6302), and an amount of $300,000.00 for fiscal year 2020/2021 from the Capital Improvement Fund (401- 533-10-6302) which made available a total project balance in the amount of $1,200,000.00. Based on the initial Contract amount of $344,097.00, additional expenses from Change Orders in the amount of $279,151.48 and $335,056.00, a cost savings in the amount of $59,479.92 for this contract, and other miscellaneous project expenses including but not limited to plumbing services and meter costs, the project will have an unencumbered balance of $43,550.70. V. APPROVAL AND CHANGE AUTHORIZATION The original project and funding allocation was established by issuance of a CITY purchase order, subject to the terms and conditions contained in the CITY's solicitation, Project Manual, Drawings, Specifications, and/or the CONTRACTOR's service and price proposal, which collectively form the terms of an agreement between the CITY and the CONTRACTOR for the performance of the Work. This proposed change to the agreement requires approval by the City Commission under the CITY's Purchasing Rules and Regulations and is consistent with any prior action by the City Commission to award the Work to the CONTRACTOR. It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original agreement other than matters expressly provided herein. CONTRACTOR acknowledges, by its execution and acceptance of this Change Order, that the adjustments in contract price and time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the CITY for the Work covered by this Kimball Area Water Main Upgrade Bid #18-03 Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the CITY arising from or relating to the matters or Work set forth or contemplated by this Change Order. [Balance of this page was left blank intentionally] Kimball Area Water Main Upgrade Bid #18-03 RECOMMENDED BY: CITY OF OCOEE, FLORIDA By- Signature Date: 7 - 2 (72 6 Title: < < I P% D i r-e 4t.;c APPROVED BY: CITY OF OCOEE, FLORIDA Rusty Johnson, Mayor FOR USE AND RELIANCE ONLY BY THE CITY OF OCOEE, APPROVED AS TO FORM AND LEGALITY THIS DAY OF , 20_ City Attorney ACCEPTED BY: CENTRAL FLORIDA TAPPING By: ja --AL- Signature Date: Ta✓Q-- 1, 2c?-, Title: Date: Attest: Melanie Sibbitt, City Clerk APPROVED BY THE CITY OF OCOEE COMMISSION IN A MEETING HELD ON 20_ UNDER AGENDA ITEM NO. Kimball Area Water Main Upgrade Bid #18-03 Final (Close Out) Payment Summary of Values Project Duration: Project Name: Kimball Area Water Main Upgrade Contractor: Central Florida TaoDing & Construction Services Inc. Start: 9/5/2018 End: 5/12/2021 Pay Item 37 Description Remove and Replace Miami Curb Units Linear Feet Unit Price $25.00 Contract & Change Order Quantities 339 Final Quantitiy 0 Net Change in Quatities Net Cost Change -$8,475.00 Total P(ice $0.00 38 Remove and Replace D-Curb Linear Feet $23.00 33 0 -$759.00 $0.00 39 Remove and Replace Ribbon Curb (12X12) Linear Feet $35.00 30 0 -$1,050.00 $0.00 40 Seeding Square Yards $1.00 1957 0 -$1,957.00 $0.00 41 Solid Sodding (Bahia) Square Yards $4.50 3529 7372.55 3843.55 $17,295.98 $33,176.48 42 Solid Sodding (St. Augustine) Square Yards $6.00 100 280 180 $1,080.00 $1,680.00 43 Solid Sodding (Zoysia Sod) Square Yards $7.00 50 13 -37 -$259.00 $91.00 CO1.01 Furnish and Install 8" Die. DIP Water Main Linear Feet $40.D0 2262 7099 -`' -163 -$6,520.00 $83,960.00 C01.02 8" x 8" x 6" D.I. TEE Each $400.00 7 7 0 $0.00 $2,800.00 C01.03 6" to 4" Reducer Each $240.00 2 3 1 $240.00 $720.00 C01.04 8" Gate Valve Each $1,655.00 6 6 0 $0.00 $9,930.00 CO1.05 IDouble 1" P.E. Service (Long) Each $825.001 17 17 0 $0.00 $14,025.00 C01.06 IDouble 1" P.E. Service (Short) Each $650.001 10 10 0 $0.00 $6,500.00 C01.07 10" to 8" Tapping Saddle and 8" Tapping Valve Each $3,985.00 1 1.2598 0.2598 $1,035.30 $5,020.30 C01.08 6" to 4" Tapping Saddle and 4" Tapping Valve Each $2,135.00 2 2 0 $0.00 $4,270.00 CO2.01 Connect Proposed B" Water Main to Existing 8" Water Main Each $670.00 1 1 0 $0.00 $670.00 CO2.02 Connect Proposed 8" Water Main to Existing 6" Water Main Each $590.00 1 1 0 $0.00 $590.00 CO2.03 Connect Proposed 6" Water Main to Existing 6" PVC Water Main with Post Restraints Each $860.00 2 3 1 $860.00 $2,580.00 CO2.04 6" x 6" Tapping Saddle and 6" Tapping Vavle Each $3,495.00 1 1 0 $0.00 $3,495.00 CO2.05 8" x 8" x 8" D.I. TEE Each $455.00 1 1 0 $0.00 $455.00 CO2.06 8" x 8" x 4" D.I. TEE Each $385.00 1 1 0 $0.00 $385.00 CO2.07 8" x 6" Reducer Each $280.00 1 1 0 $0.00 $280.00 Net Change Due to Actual Qua nties Used -$59,479.92 otal To Date: $898,824.56 T AAA 0(-,Oee llwi4¢ Final (Close Out) Payment Summary of Values Project Duration: Project Name: Kimball Area Water Main Upgrade Contractor: Central Florida Taapin2 & Construction Services Inc. Start: 9/5/2018 End: 5/12/2021 Pay Item 1 Description Mobilization/ Demobilization Units Lump Sum Unit Price $4,050.00 Change Order Quantities 2.865950617 Final Quantitiy 2.865950617 Net Change in Quatities 0 Net Cost Change $0.00 Total Price $31,607.10 2 General Conditions Lump Sum $8,835.00 3.169017544 3.169017544 0 $0.00 $27,998.27 3 Maintenance of Traffic Lump Sum $3,600.00 3.310888889 3.310888889 0 $0.00 $11,91-9.20 4 Erosion Control Lump Sum $1,800.00 3.318888889 3.318888889 0 $0.00 $5,974.00 5 Construction Photographs and Audio - Visual Recording Lump Sum $900.00 2.56 2.56 0 $0.00 $2,304.00 6 Survey (Horizontal and Vertical Controls & As-Builts) Lump Sum $4,130.00 3.560874092 3.560874092 4.8a178E-16 $0.00 $14,706.41 7 Connect to Proposed 6" Water Main to Existing 6" Water Main Each $600.00 8 6 -2 -$1,200.00 $3,600.00 8 Connect to Proposed 4" Water Main to Existing 4" Water Main Each $560.00 2 2 0 $0.00 $1,120.00 9 Furnish and Install 6" Dia. DIP Water Main Linear Feet $27.00 4250 4728 478 $12,906.00 $127,656.00 30 Furnish and Install 4" Dia. DIP Water Main Linear Feet $32.00 2749 2746 -3 -$96.00 $87,872.00 11 6" x 6" x 6" D.I. Tee Each $335.00 8 10 2 $670.00 $3,350.00 12 6" x 6" x 4" D.I. Tee Each $320.00 3 2 -1 -$320.00 $640.00 13 6" Line Stop Each $3,490.00 4 3 -1 -$3,490.00 $10,470.00 14 6" Gate Valve Each $1,025.00 15 17 2 $2,050.00 $17,425.00 15 4" Gate Valve Each $875.00 4 3 -1 -$875.00 $2,625.00 16 General D.I.P. Fittings Tons $5,700.001 4.23 2.161 -2.069 -$11,793.30 $12,317.70 17 Thrust Block Each $560.00 3 1 -2 -$1,120.00 $560.00 18 Install Fire Hydrant Assembly Including 6" Valve Each $3,460.00 10 10 0 $0.00 $34,600.00 19 Single 1" P.E. Service (Long) Each $615.00 89 92 3 $1,845.00 $56,580.00 20 Single 1" P.E. Service (Short) Each $440.00 84 69 -15 -$6,600.00 $30,360.00 21 S" Temporary Bacteriological Sampling Point Each $525.00 4 1 -3 -$1,575.00 $525.00 22 Temporary Construction Jumper Each $1,320.00 3 3 0 _ $0.00 $3,960.00 23 Abandon and Grout 6" Asbestos Cement Water Main Linear Feet $15.00 3623 3865 242 $3,630.00 $57,975.00 24 Abandon and Grout 4" Asbestos Cement Water Main Linear Feet $10.00 768 800 32 $320.00 $8,000.00 25 Abandon and Grout 6" PVC Water Main Linear Feet $15.00 760 697 .63 -$945.00 $10,455.00 26 Cut and Cap Existing 2" Galvanized Water Main Lump Sum $1,060.00 1 1 0 $0.00 $1,060.00 27 Abandon In Place 6" Gate Valve Each $580.00 8 1 -7 -54,060.O0 $580.00 28 Abandon In Place 4" Gate Valve Each $550.00 1 1 0 $0.00 $550.00 29 Abandon In Place 2" Gate Valve Each $520.00 3 0 ° -3 -$1,560.00 $0.00 30 Remove and Stockpile Pavers Lump Sum $440.00 1 1 0 $0.00 $440.00 31 Remove and Replace Pavement Square Yards $75.001 953 319.5 -6335 -$47,512.50 $23,962.50 32 Temporary Roadway Restoration (1" of Asphalt) Square Yards $80.00 75 46.87 -28.13 -$2,250.40 $3,749.60 33 Remove and Replace Concrete Sidewalk 4" Thick Square Yards $50.00 237 217.5 -19.s -$975.00 $10,875.00 34 Remove and Replace Concrete Driveways 6" Thick Square Yards $75.00 1716 1755 39 $2,925.00 $131,625.00 35 Remove and Salvage Fire Hydrant (Property of City) Each $450.00 5 5 o $0.00 $2,250.00 36 ISign & Mailbox Existing (Relocate/Reinstall) Single Post Each $105.00 90 81 -9 -$945.001 $8,505.00 Legend iExisting Water Meter Existing Water Line Existing Fire Hydrant Existing Water Valve Proposed Water Main ��}}- New Valve -Q) l New Fire Hydrant II j Install Single Long Service (Meter/Box by City) d Install Double Long Service (Meter/Box by City) .'' Lli A/00 Remove and Replace 6" Thick Concrete Driveway Remove and Replace 4" Thick Sidewalk Remove and Replace Roadway Pavement SCALE: 1 " = 300' DESIGNED BY: M.D.W. & Z.L.F. DATE: Nov 2016 0- niiII.......... Legend Labels & Description P## Plan Sheet No.## P## Phase 1 P## Phase 11 P## Phase III CITY OF O C O E E PROJECT: UTILITIES DEPARTMENT SHEET: 1800 A. D. Mims Rd., Ocoee, A. 34761 (407)905-3159 r' r" r r r r rr r r r r r J, r � r .• r P15' r J / r C/ r Kimball & Malcom Area Watermain Upgrade Legend DRAWING NO. ta 3 of 28 ENGINEER Charles K. Smith, P.E. LIC. NO: 39632