Loading...
HomeMy WebLinkAboutItem #09 Ingram Road Reuse Main Installation AGENDA ITEM COVER SHEET Meeting Date: June 19, 2007 Item # Cf Contact Name: Contact Number: David A. Wheeler, P. E. 407 -905-3100, ext. 1504 Reviewed By: Department Director: City Manager: Subject: Ingram Road Reuse Main Installation Background Summary: The McCormick Woods residential subdivision is being constructed at the southwest corner of McCormick Road and Ingram Road. As part of the infrastructure construction the developer was required to install pipeline along Ingram Road for future expansion of the City's reuse system. The Ingram Estates development is planned to be constructed on the southeast corner of the same intersection. They would be required to construct a reuse main to connect to the City's reuse system. At one time Ingram Estates and McCormick Woods were on approximately the same time schedule, however Ingram Estates has been delayed in redesign. City staff chose to work with both developers and have them split the cost with the City paying the cost to oversize the reuse main. Each development individually would have needed a 4 or 6 inch pipeline for their development's reuse service. Together they would need an 8 inch pipeline and the City chose to oversize to a 12 inch pipeline to serve other areas. It was proposed to split the cost into three equal shares and each developer agreed to the plan and cost. KKH, LLC, the developer of the McComick Woods subdivision installed the pipeline in the Ingram Road right-of- way as they were building the new roadway. The total cost of the 1,600 linear foot 12 inch reuse main plus valves and fittings was $88,740.00. The reuse pipeline is laid along the eastern side of Ingram Road and runs from McCormick Road to the southern end of the McCormick Woods development. The City would pay for two- thirds of the pipeline construction and seek reimbursement from the Ingram Estates developer as part of their subdivision approval for their one-third share. The City's share would be $57,826.67 at this time and would seek reimbursement from Jordan Ventures,LLC of $28,913.34 at the time their project is approved. Issue: Approval of expenditure of $57,826.67 for the extension of the City's reuse system along Ingram Road as a share of the pipeline required for the McCormick Woods and Ingram Estates developments. Recommendations Staff recommends that the City Commission approve payment of $57,826.67 to KKH, LLC for 1,600 linear feet of 12 reuse piping plus valves and fittings for the extension of the City's reuse system and authorize the City Manager to expend the funds from the Utilities Bond Funds and revise the Bond Funds Budget appropriately. Attachments: Invoice from KKH, LLC Financial Impact: The funding of this project will come from the 2003 Utility Bond and the reimbursement from Ingram Estates will go back to the Utility Enterprise fund upon receipt from Jordan Ventures, LLC. Type of Item: (please mark with an "x") Public Hearing _ Ordinance First Reading Ordinance Second Reading Resolution _ Commission Approval Discussion & Direction For Clerk's Deot Use: _ Consent Agenda _ Public Hearing _ Regular Agenda Original DocumenUContract Attached for Execution by City Clerk Original DocumenUContract Held by Department for Execution Reviewed by City Attorney Reviewed by Finance Dept. Reviewed by 0 N/A N/A N/A 2 KKH, LLC. 3100 Clay Street, Suite 275 Orlando, Florida 32804 Tel 407.896.9059 Fax 407.894.2276 IINWCC>>llCCJE INVOICE NO:0001 DATE: April 6, 2007 To: Ship To: Mr. David Wheeler City of Ocoee 150 North Lakeshore Drive Ocoee, Florida 34761 SALESPERSON P.O. NUMBER DATE SHIPPED SHIPPED VIA F.O.B. POINT TERMS Due Upon Receipt QUANTITY DESCRIPTION UNIT PRICE AMOUNT Progress payment- McCormick Woods / Ingram Rd Reuse Line Total cost $86,740.00 City of Ocoee $ 28,913.33 Jordan Adventures $ 28,913.34 SUBTOTAL $57,826.67 SALES TAX N/A SHIPPING & HANDLING N/A TOTAL DUE $57,826.67 UPON APPROVAL, FORWARD TO; KKH, LLC 3100 Clay Street Suite 275 Orlando, FL 32804 Phone Fax 407-896-9059 407-894-2276 Make all checks payable to: KKH, LLC. If you have any questions concerning this invoice, call: Dwayne Hamner, 407.896.9059 SHARED COST INVOICE-OCOEEINGRAM RD 07/24/2005 09:57 4072912815 AMICK CONSTUCTION PAGE 02 CLEARING & GRUBBING 10101 MOBILIZATION 1 LS 2,000.00 2,000.00 SUB TOTAL CLEARING & GRUBBING $2,000.00 REUSE WATER DISTRIBUTION SUB TOTAL REUSE WATER MISCELLANEOUS WORK 1.600 LF 36.40 58,240.00 4 EA 2,150.00 8,600.00 1 EA 850.00 850,00 2 EA 575.00 1,150.00 1 LS 6,900.00 6,900.00 1 LS 1,600.00 1,600.00 $77.340.00 90101 12" PVC DR18 PIPE 90102 12" GATE VALve & BOX 90103 6" GATE VALVE & BOX 90104 BLOW OFF 90105 0,1. FITTINGS & RESTRAINTS 90106 TESTING REUSE MAIN 100101 100102 100103 100104 100105 CITY OF OCOEE PERMIT FEES M. O. T. . ROAD CLOSURE GEOTECHNICAL TESTING CONSTRUCTION LAYOUT AS. BUILTS 1 1 1 1 1 LS LS LS LS LS 3,100.00 2,000.00 1,500.00 800.00 2,000.00 3,100,00......... 2,000.00 1,500.00 800.00 2,000.00 SUB TOTAL MISCELLANEOUS WORK $9,400.00 TOTAL BASE BID $88.740.00 PROPOSAL IS VALID FOR A PERIOD OF 30 DAYS FROM BID DATE. PROPOSAL IS BASED ON THE WORK BEING COMPLETED WHILE WE ARE INSTALLING THE DRAINAGE ALONG INGRAM ROAD AND WHILE INGRAM ROAD IS CLOSED. RELOCATION OF FENCES, SODDING THE RIW AND PAVEMENT REPAIR IS NOT INCLUDED. THE PROPOSAL IS BASED ON THE RED LINE DRAWING SHEET 12A PROVIDED BY DAVID WHEELER. THIS PRICE IS BASED ON THE APPROVAL FOR THIS WORK NOT DELAYING THE CONSTRUCTION OF INGRAM ROAD WE HAVE FIGURED BEING ABLE TO CLOSE INGRAM ROAD WHILE REMOVING THE EXISTING PAVEMENT CONSTRUCTING THE NEW ROAD AND INSTALLING THE REUSE MAIN. ' IF SILT FENCE IS REQUIRED, THE UNIT PRICE IS $1.50fLF. 09:52:14 AM, 07/24/2006 Page 1 MCWREUSE.WK4