Loading...
HomeMy WebLinkAboutItem 08 Approval of Ingram Road Sidewalk Improvements with Barracuda Building Corporation Ocoee florida AGENDA ITEM COVER SHEET Meeting Date: February 15, 2022 Item # Reviewed By: Contact Name: Stephen C. Krug Department Director: Contact Number: 6002 City Manager: Subject:'Ingram Road Sidewalk Improvements with Barracuda Building C•rporation. Commissioner Brinson, SR, District 1 and Commissioner Oliver III, District 4. Background Summary: The City Commission approved the capital improvements on Ingram Road for street, lighting and sidewalk to connect the neighborhoods near McCormick Road with the West Orange Trail. The lighting installation has been completed by Duke Energy and Public Works is ready to proceed with the installation of the sidewalk. Public Works solicited pricing from contractors on the City's Term Contract for Small Construction Services, RFP17-002, and received a single bid of interest from Barracuda Building Corporation. Public Works checked the pricing against neighboring municipal term contracts to determine the. $74,939.00 quote is in line with, or below, said contracts. Public Works recommends awarding the work to Barracuda Building Corporation as they have successfully completed multiple projects for the City under the Term Contract. Issue: Award the Ingram Road sidewalk improvements to Barracuda Building:Corporation. Recommendations: Recommend approval to issue a purchase order to Barracuda Building Corporation for the Ingram Road Sidewalk Improvements through RFP17-002, Term Contract for Small Construction Services, for a not to exceed amount of $74,939.00, and authorize the City Manager and staff to approve and execute change orders to the work in accordance with the limits established in the Purchasing Code. Attachments: Barracuda Building Corporation Quote. Financial Impact: The work is adequately funded in the Capital Improvements Budget. Type of Item: (please mark with an "x") Public Hearing Fo Clerk's Dept Use: Ordinance First Reading Consent Agenda,, .. Ordinance Second Reading Public Hearing Resolution Regular Agenda X Commission Approval Discussion&Direction Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney N/A Reviewed by Finance Dept. oD N/A Review ed by ( ) N/A 2 BB C BARRACUDA BUILDING CORPORATION CGC#1504612 January 31,2022 Mr. Richard Campanale,City Engineer City of Ocoee Public Works Dept RE: Ingram Road Sidewalk Project Ocoee,F[. Construction Proposal Dear Mr. Campanale, Barracuda Building Corp.proposes to construct the following scope of work for the sum of seventy four thousand nine hundred thirty nine dollars and no cents,($74,939.00)including labor,materials,equipment,insurance&taxes: • Maintenance of traffic • Temp.toilet • Temp water for our scope of work(meters provided by others) • Layout • , .Grading • Cleanup • Clearing and grubbing of existing grass for new sidewalk&clearing of trees where the sidewalk returns to the existing trail • 4"thick concrete sidewalks as shown on drawings • 2 EA ADA mats • Road striping&signage as shown on drawings The following is a list of clarifications&qualifications to our proposal: • Geotechnlcal testing(proctor,compaction,density tests,etc.)is excluded. • Relocation or repairs of existing utilities&fencing Is excluded • .Permit costs are excluded This proposal Is based on 3 drawings,dated 12/1712021,1 site map&3 sheets of concrete specs prepared by the City of Ocoee.Public Works Dept . We thank you for the opportunity to bid this project&we look forward to working with you&the City of Ocoee again. if you will kindly sign this proposal below,we can schedule your work at your convenience. Sincerely,. 7600440, . Jim Thompson,President Barracuda Bldg.Corp. Accepted by: Date: City of Ocoee,FL 1000 OCOEE-APOPKA ROAD, SUITE.400 APOPKA, FL 32703 PHONE: (407)814-8644. FAX: (407)814-8044