HomeMy WebLinkAboutItem 09 Approval of Contracted Sidewalk Repairs Utilizing Existing City of Kissimmee Contract with APEC LLC0
oco_; _
flotida
AGENDA ITEM COVER SHEET
Fleeting Date: December , 2022 .
Item #Reviewed By
r
Contact N m � Stephen . I{rta Department Director.
Contact Number, r 2 � .�... City Manager:
Background Summary:
The City Commission approved funding in the current budget to perform contracted sidewalk repairs, In
carder to expedite the project, Public irks is requesting nrnmission authorization to piggy -back on the
existing competitively hid City of Kissimmee m ontr t 117132022-002, Alternative Paving Methods, awarded
to APEC, LL , which also includes sidewalk replacement items. APEC is one of the it 's continuing
contractors for small construction services 'providers RF 22- . The attached cost estimate of
$208,876,14 to provide the sidewalk replacement is based on the competitively bid and awarded City of
Kissimmee ee contract. This award does not exhaust the budget for the sidewalk replacement and
additional locations can be added to the work in accordance with the Purchasing manual, Public Works
recommends approval of this proposal.
Issue
Request the Honorable Mayor and City Commission award the contracted sidewalk repairs utilizing an
existing City" of Kissimmee contract with - APEC, LL .
Recommendations:
Staff ,recommends the Honorable Mayor and City Commission authorize s purchase order be issued for
the contracted sidewalk repairs with APEC, LLC utilizing the existing competitively bid City of Kissimmee
contract IFB2022-002, in the amount of $208,876.14, and authorize the City Manager and Staff to
approve changeordersto this contract up to the limit of his purchasing authority for each orange order,
and up to the budgeted amount for this project for all change orders.
Attachments:
City of Kissimmee e Contract IF132 22-002,
APEC Cost Proposal.
Financial Impact:
The work is adequately funded in the Public Works Streets Division budget.
Type of Item: (please mark with an 'Y
Public Hearing r l `rh' Ze'n"cd
OrdinanceFirst treading _. o"n ntA
Ordinance Second Reading Public bearing
Resolution Regular Agenda
Commission Approval
Discussion & olr ration
(Irininzi :nr`+, lr A-ntir.n ntr r i -4tt r AH fart °vprj ifirin hip t .iht r'.1smrL-
Original Document/Contract Held by Department for Execution
Reviewed by City Attorney NIA
Reviewed by Finance Dept. Zt,
N/A
Reviewed by ( ) N/A
N �ecr,
American Persian Engineering & Construction LLC
5401 S. Kirkman Rd #336, Orlando, FL 327819
(407)6197888
11/15/2022
APED takes Pride in every project and milestone completed. We strive to set a standard higher than the industry and are
immensely proud to practice the best methodologies on providing the most efficient project management process.
M
We are pleased to provide you the below quote on the services requested on removal of existing sidewalk and installation of new
sidewalk. This proposal has been prepared in conjunction with the list which was provided by your office.
■
The following table details the pricing for delivery of the services outlined in this proposal. This pricing is valid for 30 days from the date
of this proposal:
1
1 18
Miscellaneous Concrete Removal
1-200
SY
1251.89
$40.00
$50,075.60
—2
121
Concrete Sidewalk-(4" thickness)
1-100
SY
255.56
$100.00
$25,556.00
3
122
Concrete Sidewalk-(4" thickness)
101-250
SY
845.11
$95.00
$80,285.45
4
124
Concrete Sidewalk-(6" thickness)
1-100
SY
151.22
$120.00
$18,146.40
—5
1
Mobilization
I
%
1
10%
$17,406.35
6
3
Maintenance of Traffic
I
%
1
10%
$17,406.35
Exclude:
® Signage of any kind
® Permit
Sincerely
Arman PourMirza, PIVIP
CITY OF
r r_ --
Mobilization/Maintenance of Traffic I
1
Mobilization
1
%
10.W/o
2
Night Work Mobilization
1
%
10.00°'0
3
Maintenance of Traffic
1
%
l0 OP/1�
4
Maintenance of Traffic Nightwork
1
%
10.00%
Asphalt, Earthwork, and Concrete
5
Inlet Protection System
1-25
EA
$200.00
6
Inlet Protection System
26-50
EA
$50.00
7
Inlet Protection System
51-100+
EA
$50.00
8
Floating Turbidity Barrier
1-200
LF
$200.00
9
Floating Turbidity Barrier
201-500
LF
WHO
10
Floating Turbidity Barrier
501-1000+
LF
$50.00
11
Staked Silt Fence
1.200
LF
$20.00
12
Staked Silt Fence
201-500
LF
$20.00
13
Staked Silt Fence
501+
LF
$5.00
14
Clearing and Grubbing
1
AC
$3,ODD.00
15
Curb and Gutter Removal
1-200
LF
$0.00
16
Curb and Gutter Removal
201-500
LF
$35.00
17
Curb and Gutter Removal
501+
LF
$30.00
18
Miscellaneous Concrete Removal
1_200
SY
$40:00
19
Existing Pipe Removal
1-200
LF
$33.00
20
Existing Pipe Removal
201-500
LF
$30.00
21
Existing Pipe Removal
501+
LF
$30.00
22
Removal of Existing Pavement
1-200
SY
$25:00
23
Removal of Existing Pavement
201-500
SY
$23.00
24
Removal of Existing Pavement
501+
SY
520.00
25
Roadway Excavation
1-200
CY
$30.00
26
Roadway Excavation
201-500
CY
$30.00
27
Roadway Excavation
501+
CY
$30.00
28
Swale Grading
1-200
LF
$30.00
29
Swale Grading
201-500
LF
$25.00
30
Swale Grading
501+
LF
$20.00
31
Embankment (Truckload)
1-200
CY
$50.00
32
Embankment (Truckload)
201-500
CY
$4.5.00
33
Embankment (Truckload)
501+
CY
$400
34
Flowable Fill
1-9
CY
$400.00
35
Flowable Fill
10-18
CY
$50.00
36
Flowable Fill
19-27+
CY
$300.00
37
Asphaltic Base Course
1-200
TN
$400.00
38
Asphaltic Base Course
201-500
TN
$250:00
W,
39
Asphaltic Base Course
501+
TN
$230.00
40
Optional Base Group 1
1-200
SY
$50.00
41
Optional Base Group 1
201-500
SY
$2 .00
42
Optional Base Group 1
501-1000+
SY
$25.00
43
Optional Base Group 4
1-200
SY
$30.0f1
44
Optional Base Group 4
201-500
SY
$28.00
45
Optional Base Group 4
501-1000+
SY
$25.00
46
Optional Base Group 6
1-200
SY
$30.00
47
Optional Base Group 6
201-500
SY
$23.00
48
Optional Base Group 6
501-1000+
SY
$2500
49
Optional Base Group 9
1-200
SY
$50.00
50
Optional Base Group 9
201-500
SY
$45.00
51
Optional Base Group 9
501-1000+
SY
$40.00
52
Optional Base Group 11
1-200
SY
$50.00
53
Optional Base Group 11
201-500
SY
$4500
54
Optional Base Group 11
501-1000+
SY
$40.00
55
Milling (1")
1-200
SY
520.00
56
Milling (1")
201-500
SY
$0.00
57
Milling (1")
501-1000+
SY
$15.00
58
Milling (1.5")
1-200
SY
$25.00
59
Milling (1.5")
201-500
SY
$23.00
60
Milling (1.5")
501-1000+
SY
$20.00
61
Milling (2")
1-200
SY
$25.00
62
Milling (2")
201-500
SY
$23.00
63
Milling (2")
501-1000+
SY
$20.00
64
Milling (3")
1-200
SY
$25.00
B5
Milling (3'")
201-500
SY
$23.00
66
Milling (3'")
501-1000+
SY
$0.00
67
Milling (4")
1-200
SY
$25.00
68
Milling (4")
201-500
SY
$23.00
69
Milling (4")
501-1000+
SY
$20.00
70
Milling (5")
1-200
SY
$25.00
71
Milling (5")
201-500
SY
$23.00
72
Milling (5"')
501-1000+
SY
$20.00
73
Milling (6")
1-200
SY
$25.00
74
Milling (6")
201-500
SY
$23.00
75
Milling (6")
501-1000+
SY
$20.00
76
Type III Asphaltic Concrete
1-200
TN
$450.00
77
Type III Asphaltic Concrete
201-500
TN
$425.00
78
Type III Asphaltic Concrete
501+
TN
$400.00
79
Asphaltic Concrete Type "S-1"
1-200
TN
$400.00
80
Asphaltic Concrete Type "S-1"
201-500
TN
$350.00
81
Asphaltic Concrete Type "S-1"
501+
TN
$300.00
82
Asphaltic Concrete Type "S-3"
1-200
TN
$400.00
83
Asphaltic Concrete Type "S-3"
201-500
TN
$350.00
84
Asphaltic Concrete Type "S-3"
501+
TN
$300.00
85
Adjusting Manholes (Metal Riser Rings)
1-5
EA
;$400.00
86
Adjusting Manholes (Metal Riser Rings)
6-10
EA WHO
87
Adjusting Manholes (Metal Riser Rings)
11-20+
EA $200.00
88
Adjusting Valve Boxes (Metal Riser Rings)
1-5
EA $400.00
89
Adjusting Valve Boxes (Metal Riser Rings)
6-10
EA 200.00
90
Adjusting Valve Boxes (Metal Riser Rings)
11-20+
EA $150.00
91
18" RCP CD - Cl
1-200
LF 200.00
92
18" RCP CID - Cl
201-500
LF WHO
93
18" RCP CID - Cl
501+
LF 140,00
94
Type "A" Curb
1-25
LF SOD
95
Type "A" Curb
26-50
LF $55.00
96
Type "A" Curb
51-100+
LF 50.00
97
Type "B" Curb
1-20
LF $60.00
98
Type "B" Curb
26-50
LF 55.00
99
Type "B" Curb
51-100+
LF W.00
100
Type "D" Curb
1-25
LF 6-0.00
101
Type "D" Curb
26-50
LF Wko
102
Type "D" Curb
51-100+
LF W.00
103
Type "E" Curb
1-25
LF 60.00
104
Type "E" Curb
26-50
LF 55.00
105
Type "E" Curb
51-100+
LF J-0,00
106
Type "F Curb
1-25
LF
107
Type "F Curb
26-50
LF 5-500
108
Type "F" Curb
51-100+
LF �50.00
109
Valley Gutter
1-25
LF P0.00
110
Valley Gutter
26-50
LF $65ko
III
Valley Gutter
51-100+
LF $60.00
112
Traffic Separator- (4')
1-25
LF $120.00
113
Traffic Separator - (4')
26-50
LF V 10.00
114
Traffic Separator - (4')
51-100+
LF �166:0-6-
115
Traffic Separator - (6')
1-25
LF $430D
116
Traffic Separator - (6')
26-50
LF V210.00
117
Traffic Separator - (6')
51-100+
LF SIMOO
118
Traffic Separator - (width varies)
1-25
SY S130.00
119
Traffic Separator - (width varies)
26-50
SY 120.00
120
Traffic Separator - (width varies)
51-100+
SY .110.00
121
Concrete Sidewalk - (4" thickness)
1-100
SY 105-0
122
Concrete Sidewalk - (4" thickness)
101-250
SY 95.00
123
Concrete Sidewalk - (4" thickness)
251-500+
SY 90.00
124
Concrete Sidewalk - (6" thickness)
1-100
SY 120.00
125
Concrete Sidewalk - (6" thickness)
101-250
SY $110.00
126
Concrete Sidewalk - (6" thickness)
251-500+
SY $100.00
127
Concrete Sidewalk - (6" Thickness)
1-100
SY U20.00
128
Concrete Sidewalk - (6" Thickness)
101-250
SY 7110 -00
129
Concrete Sidewalk - (6" Thickness)
251+
SY $100.00
130
Detectable Warning Surfaces (Inset)
1-50
SF $60.00
131
Detectable Warning Surfaces (Inset)
51-100
SF S60.00
132
Detectable Warning Surfaces (Inset)
101+
SF $50.00
21
Pavement Markings
143
Install Sign (single post)
1-5
EA
MOM
144
Install Sign (single post)
6-15
EA
V0.00
145
Install Sign (single post)
16-30+
EA
$200.00
146
Install Sign (multi -post)
1-5
EA
$450.00
147
Install Sign (multi -post)
6-15
EA
$400.00
148
Install Sign (multi- post)
16-30+
EA
WOO
155
6" Solid Traffic Stripe (paint) (yellow)
1-200
LF
$15.00
156
6" Solid Traffic Stripe (paint) (yellow)
201-500
LF
$142
161
18" Solid Traffic Stripe (paint)
1-25
LF
USA
162
18" Solid Traffic Stripe (paint)
26-50
LF
JITOO
170
6" Dotted Guide Lines (paint)
1-50
LF
$15D
173
Directional Arrows (Paint)
1-10
EA
1200.00
174
Directional Arrows (Paint)
11-50
EA
WHO
175
Directional Arrows (Paint)
51+
EA
$160.00
176
Pavement Messages (Paint)
1-10
EA
$200.00
177
Pavement Messages (Paint)
11-50
EA
178
Pavement Messages (Paint)
51+
EA
22
179
8" Solid Traffic Stripe (Paint)
1-200
LF $16.00
180
8" Solid Traffic Stripe (Paint)
201-500
LF $15.00
181
8" Solid Traffic Stripe (Paint)
501-1000+
LF 14.00
182
6" Solid Stripe/Extru. Thermo (white)
1-200
LF $20.00
183
6" Solid Stripe/Extru. Thermo (white)
201-500
LF $19.00
184
6" Solid Stripe/Extru. Thermo (white)
501-1000+
LF W.00
185
6" Solid Stripe/Extru. Thermo (yellow)
1-200
LF $210.00
186
6" Solid Stripe/Extru. Thermo (yellow)
201-500
LF S19.00
187
6" Solid Stripe/Extru. Thermo (yellow)
501-1000+
LF $18M
188
12" Solid Traffic Stripe/Extru. Thermo
1-25
LF S2„00
189
12" Solid Traffic Stripe/Extru. Thermo
26-50
LF $19.00
190
12" Solid Traffic Stripe/Extru. Thermo
51-100+
LF M.00
191
18" Solid Traffic Stripe/Extru. Thermo
1-25
LF 52100
192
18" Solid Traffic Stripe/Extru. Thermo
26-50
LF 521.0
193
18" Solid Traffic Stripe/Extru. Thermo
51-100+
LF S"I"On
194
24" Solid Traffic Stripe/Extru. Thermo
1-25
LF $23.00
195
24" Solid Traffic Stripe/Extru. Thermo
26-50
LF 52100
196
24" Solid Traffic Stripe/Extru. Thermo
51-100+
LF $21.00
197
6" Skip Traffic Stripe/Extru. Thermo
1-200
LF 520.00
198
6" Skip Traffic Stripe/Extru. Thermo
201-500
LF S19.00
199
6" Skip Traffic Stripe/Extru. Thermo
501-1000+
LF SISM
200
6" Dotted Guide Lines/Extru. Thermo
1-50
LF 5110.00
201
6" Dotted Guide Lines/Extru. Thermo.
51-100
LF SMOO
202
6" Dotted Guide Lines/Extru. Thermo.
101-150+
LF SIS.00
203
Directional Arrows / Extru. Thermo.
1
EA $200.00
204
Preformed Symbol
I
EA $200.00
205
Pavement Messages / Extru. Thermo.
1
EA $200.00
206
8" Solid Traffic Stripe / Extru. Thermo
1-200
LF 522.00
207
8" Solid Traffic Stripe / Extru. Thermo
201-500
LF 521.00
208
8" Solid Traffic Stripe / Extru. Thermo
501-1000+
LF $210.00
209
Remove Ex. Pavement Markings(paint)
1-100
SF $15.00
210
Remove Ex. Pavement Markings(paint)
101-300
SF $14.00
211
Remove Ex. Pavement Markings(paint)
301-500+
SF $13.00
212
Rem. Ex. Pavement Markings(thermo)
1-100
SF $15.00
213
Rem. Ex. Pavement Markings(thermo)
101-300
SF 514M
214
Rem. Ex. Pavement Markings(thermo)
301-500+
SF 513.00
TOTAL BID AMOUNT OF ITEMS 5 to 214 ABOVE 522,962.W
Item
Description
ICuntity
Unit of
Measure
Unit
Price
HOT-IN-PLACE (With Virgin Top Course) Asphalt Recycling
215
Asphalt Recycling
1-10,000
SY
No Bid
216
Asphalt Recycling
10,001 - 50,000
Sy
No Bid
217
Asphalt Recycling
50,001+
Sy
oBid
218
Recycling Agent
1-10,000
GAL
No Bid
219
Recycling Agent
10,001 - 50,000
GAL
No Bid
220
Recycling Agent
50,001+
GAL
No Bid
HOT -IN -PLACE (100%) Asphalt Recycling
23
221
Base Course HIPR
1 - 10,000
SY
No Bid
222
Base Course HIPR
10,001 - 50,000
SY
NioBid
223
Base Course HIPR
50,001+
SY
No Bid
224
2" Complete HIPR
1-10,000
SY
NoBid
225
2" Complete HIPR
10,001 - 50,000
SY
NoBid
226
2" Complete HIPR
50,001+
SY
No Bid
227
Asphalt Recycling Agent
1-10,000
SY
NoBid
228
Asphalt Recycling Agent
10,001 - 50,000
SY
No Bid
229
Asphalt Recycling Agent
50,001+
SY
No Bid
TOTAL BID AMOUNT OF ITEMS 215 to 229 ABOVE No Bid
Item
Description
Estimated
y
Unit Of
I Measure
Unit
Price
Specialty
Paving Methods
1
Mobilization
1
% No Bid,
2
Night Work Mobilization
1
% No Bid
3
Maintenance of Traffic
1
% No Bid
4
Maintenance of Traffic Nightwork
1
% No Bid
S-1
Rut Fill / Scratch Course (Micro)
1-50
TN No Bid
S-2
Rut Fill / Scratch Course (Micro)
51-100
TN No Bid
8-3
Rut Fill / Scratch Course (Micro)
101+
TN NOBd
S-4
Single Micro Surface 20-24 Ibs
1-10,000
SY No Bid
S-5
Single Micro Surface 20-24 Ibs
10,001 - 50,000
SY ltioBid
S-6
Single Micro Surface 20-24 Ibs
50,001+
SY No Bid
S-7
Double Micro Surface 30-34 Ibs
1-10,000
SY NoBid
8_8
Double Micro Surface 30-34 Ibs
10,001-50,000
SY No Bid
S-g
Double Micro Surface 30-34 Ibs
50,001+
SY No Bid
TOTAL BID AMOUNT OF ITEMS S-1 to S-9 ABOVE NO Bid
Item
Description'
Estimated
Quantity
Unit of
Measure
Unit
Price
1
Mobilization
1
%
NoBid
2
Night Work Mobilization
1
% No Bid
3
Maintenance of Traffic
1
%° No Bid
4
Maintenance of Traffic Nightwork
1
%'No Bid-
S-10
Single Chip Seal -#89 Granite
1-10,000
SY No Bid
S-11
Single Chip Seal -#89 Granite
10,001 - 50,000
SY NoBid
S-12
Single Chip Seal -#89 Granite
50,001+
SY NO Bid
S-13
Double Chip Seal-#57 w#89 Granite
1-10,000
SY No Bid
S-14
Double Chip Seal -#57 w #89 Granite
10,001 - 50,000
SY No Bid
S-15
Double Chip Seal -#57 w#89 Granite
50,001+
SY NO Bid
TOTAL BID AMOUNT OF ITEMS S-10 to S-15 ABOVE No Bid
Item
aescrifition"
Estimated
quantity
Unit of
Measure
Unit
Pride
1
Mobilization
1
%
No Bid
2
Night Work Mobilization
1
%
No Bid
3
Maintenance of Traffic
1
%
No Bid
4
Maintenance of Traffic Nightwork
1
%
No Bid
S-16
Full Depth Reclamation /6"-9"
1-10,000
SY
No Bid
S_17
Full Depth Reclamation /6"-9"
10,001 - 50,000
SY
NoBid
24
5-18
I Full Depth Reclamation /6"-9"
50,001+
SY
No Bid
S-19
Full Depth Reclamation 9"-12`
1-10,000
SY
No Bid
5-20
Full Depth Reclamation 9"-12"
10,001 - 50,000
SY
No Bid
S-21
Full Depth Reclamation 9"-12"
50,001+
SY
No Bid
5-22
Cement for Reclamation
1
TN
No id
5-23
Emulsion for Reclamation
1
Gal
No Bid
S-24
Reclaimed Asphalt Paving (RAP)
1-10,000
SY
No Bid
S-25
Reclaimed Asphalt Paving (RAP)
10,001 - 50,000
SY
No Bid
S-26
Reclaimed Asphalt Paving (RAP)
50,001+
SY
No Bid
TOTAL BID AMOUNT OF ITEMS S-16 to 5-26 ABOVE
No Bid
Item
Description
Estimated
Quantity
Unit cif
Measure
Unitftce
1
Mobilization
1
%
NoBid -
2
Night Work Mobilization
1
%
No Bid
3
Maintenance of Traffic
1
%
No Bid
4
Maintenance of Traffic Nightwork
1
%
No Bid
$-27
Fog Seal
1- 10,000
SY
No Bid
S-28
Fog Seal
10,001- 50,000
SY
No Bid
5-29
Fog Seal
50,000+
SY
No Bid
TOTAL BID AMOUNT OF ITEMS 5-27 to 5-29 ABOVE
No Bid
Item
Description
Estimated
Quantity
Unit of
Measure
Unithee
1
Mobilization
1
%
No Bid
2
Night Work Mobilization
1
%
No Bid
3
Maintenance of Traffic
1
%
No Bid
4
Maintenance of Traffic Nightwork
1
%
NoBid
5-30
Cape Seal
1- 10,000
SY
NoBid
S-31
Cape Seal
10,001- 50,000
SY
No Bid
S-32
Cape Seal
50,000+
SY
N?oBid
TOTAL BID AMOUNT OF ITEMS 5-30 to 5-32 ABOVE
NOBid
Item
Description
Estimated
Quantity
Unit of
Measure
Vitt Fria
1
Mobilization
1
%
No Bid
2
Night Work Mobilization
1
%
No Bid
3
Maintenance of Traffic
1
%
No Bid
4
Maintenance of Traffic Nightwork
1
%
No Bid
5-33
In -Place Recycling-Reconstrction
1- 10,000
SY
No Bid
5-34
In -Place Recycling-Reconstrction
10,001- 50,000
SY
No Bid
5-35
In -Place Recycling-Reconstrction
50,000+
SY
NoBd
TOTAL BID AMOUNT OF ITEMS 5-33 to 5-35 ABOVE
NOBid
Item
Description
Estimated
Quantity
Unit of
Measure
I. t Ake
1
Mobilization
1
%
No Bid
2
Night Work Mobilization
1
%
No Bid
3
Maintenance of Traffic
1
%
No Bid
4
Maintenance of Traffic Nightwork
1
%
No Bid
S-36
Crack Filling/Sealing
1-500
GAL
No Bid
5-37
Crack Filling/Sealing
501 -1000
GAL
No Bid
S-38
Crack Filling/Sealing
1,001+
GAL
NO Bid
W_
TOTAL BID AMOUNT OF ITEMS S-36 to S-38 ABOVE No Bid
Item
Description
Estimated
Quantity
Unit of Uii!Pfiee
Measure
I
Mobilization
1
% Nlo Bid
2
Night Work Mobilization
1
% No Bid
3
Maintenance of Traffic
1
% NTO Bid
4
Maintenance of Traffic Nightwork
I
% No Bid
S-39
Asphalt Rejuvenator
1-50,000
SY No Bid
S-40
Asphalt Rejuvenator
50,001 - 100,000
SY 1\To Bid
S-41
Asphalt Rejuvenator
100,001+
SY No Bid
TOTAL BID AMOUNT OF ITEMS S-39 to S-41 ABOVE No Bid
Item
Description
Estimated
Quantity
Unitof U'Aitprite
Moasuro,
I
Mobilization
I
% 10.00%
2
Night Work Mobilization
I
% 10.00%
3
Maintenance of Traffic
I
% 10.00%
4
Maintenance of Traffic Nightwork
I
% 10.00�
S-42
Speed Hump W/ Curbing
1-50
FT $240.00
S-43
Speed Hump W/ Curbing
51-100
FT UXOD
S-44
Speed Hump W/ Curbing
101+
FT $230,00
S-45
Speed Hump No Curbing
1-50
FT S240.00
S-46
Speed Hump No Curbing
51-100
FT S240.00
8-47
Speed Hump No Curbing
101+
FT S230.00
TOTAL BID AMOUNT OF ITEMS S-42 to S-47 ABOVE $1,420,00
Item
Description'
Estimated
Quantity
Unit of Uzi t Pita
measure
1
Mobilization
1
% No Bid
2
Night Work Mobilization
1
% No Bid
3
Maintenance of Traffic
I
% Nio Bid
4
Maintenance of Traffic Nightwork
I
% No Bid
S-48
Slurry Seal
1-10,000
SY No Bid
S-49
Slurry Seal
10,001 - 50,000
SY No Bid
S-50
Slurry Seal
50,001+
SY No Bid
TOTAL BID AMOUNT OF ITEMS S-48 to S-50 ABOVE No Bid
'Quantities are not guaranteed. Final payment will be based on actual quantities.
NAME OF CONTRACTOR:
Address
Width(ft) Length(ft) Thickness (inch)
11 P 1111,11I,!,'IlI
Notes Completed
roots
SF SY
;Q;:,. a «<� / <■
a!=§z\\<
. ........
.J«,\\/\\. 1 1 11 1. .. .. \
......
.....
. .
;*■« »< w y...1 ..
� � � � �
. ..
. . .
. �
:*■}\ \ a: «�
�
� \
� �
. ... .
.. . . �
I®■� \�
� �
� .
\
j * • . r
pNO
y i t i
. - . .
«!• is
i�
r r-
« .i
r .t
on side of house
0I'L55
96
10.66
84
. 33
Totals
10,187
LMOS41