Loading...
HomeMy WebLinkAboutItem 04 Approval of the Fifth Amendment to the Interlocal Agreement between the City of Ocoee and the School Board of Orange County regarding the Coca-Cola Property (Ocoee Crown Point PUD)0C0(?C Florida STAFF REPORT Meeting Date: March 21, 2023 Item #: 4 Contact Name: Michael Rumer Department Director: Michael Rumer Contact Number: Ext. 1018 City Manager: Robert Frank Subject: Approval of the Fifth Amendment to the Interlocal Agreement between the City of Ocoee and the School Board of Orange County regarding the Coca-Cola Property (Ocoee Crown Point PUD). (Development Service Director Rumer) Background Summary: The City and the School Board of Orange County entered into an Interlocal Agreement (ILA) related to the Coco -Cola property in 2000. Since that time, the ILA has been amended four times. In 2022, the City granted certain Temporary Construction and Access Easements to the School Board to allow construction of a roadway servicing the School Board's new technical school. In order to eliminate traffic flow constraints to allow development of the property under contract between the City and Wire Development, a redesign of the roadway is required to construct a roundabout within the access roadway. The proposed Fifth Amendment sets forth the terms for the payment by the City for the redesign and related construction costs. The redesign cost is $21,533.42. The Fifth Amendment also provides that the City will pay for any increase in construction costs associated with the roundabout redesign plan. Issue: Should the Honorable Mayor and City Commissioners approve the Fifth Amendment to the Interlocal Agreement between the City of Ocoee and the School Board of Orange County regarding the Coca-Cola Property (Ocoee Crown Point PUD)? Recommendations: Staff recommends the Honorable Mayor and City Commissioners approve the Fifth Amendment to the Interlocal Agreement between the City of Ocoee and the School Board of Orange County regarding the Coca- Cola Property (Ocoee Crown Point PUD). Attachments: Fifth Amendment to Ocoee Crown Point PUD Interlocal Agreement Financial Impacts: $21,533.42 for redesign costs, plus change orders related to associated construction costs. Type of Item: Consent City of Ocoee - 1 N. Bluford Avenue - Ocoee, Florida 34761 Phone: (407) 905-3100 - www.ocoee.org Page 61 of 146 THIS INSTRUMENT PREPARED BY AND SHOULD BE RETURNED TO: Scott A. Cookson, Esq. Shuffield, Lowman & Wilson 1000 Legion Place, Suite 1700 Orlando, Florida 32801 (407)581-9800 FIFTH AMENDMENT TO INTERLOCAL AGREEMENT REGARDING COCA -COLA PROPERTY (OCOEE CROWN POINT PUD) THIS FIFTH AMENDMENTTO INTERLOCAL AGREEMENT REGARDING COCA -COLA PROPERTY (this "Fifth Amendment") is made this day of , 2023 by the CITY OF OCOEE, a Florida municipal corporation, whose mailing address is 1 N. Bluford Avenue, Ocoee, Florida 34761 (the "City") and THE SCHOOL BOARD OF ORANGE COUNTY, FLORIDA, a body corporate existing under the Constitution and laws of the State of Florida, whose mailing address is 445 Amelia Street, Orlando, Florida 32801 (the "School Board") (the City and the School Board are sometimes collectively referred to herein as the "Parties"). WITNESSETH: WHEREAS, the City and the School Board entered into that certain Interlocal Agreement regarding the Coca-Cola property dated June 13, 2000 with respect to the acquisition and development of a PUD to be known as Ocoee Crown Paint PUD, which was amended by that certain First Amendment thereto dated August 25, 2003, that certain Second Amendment thereto dated September 20, 2005, that certain Third Amendment thereto dated August 14, 2014, and that certain Fourth Amendment thereto dated July 1, 2016 (the Interlocal Agreement Regarding Coca-Cola Property and all Amendments thereto are collectively referred to herein as the "Interlocal Agreement"); and WHEREAS, the City granted to the School Board certain Temporary Construction and Access Easements to facilitate the installation and construction of an access roadway for the School Board property (the "Access Roadway"), more particularly described on Exhibit "A" attached hereto and Incorporated herein by this reference; and WHEREAS, the City has entered into that certain agreement with Wire Development ("Wire Development") for the Sale and Purchase of property located within the Crown Point PUD (the "Wire Development Property"), more particularly described on Exhibit "B" attached hereto and incorporated herein by this reference; and WHEREAS, access to the southern section of the Wire Development Property is limited due to traffic flow constraints; and Page 62 of 146 WHEREAS, in order to facilitate traffic flow from the southern section of the Wire Development Property, additional property is needed for the Access Roadway; and WHEREAS, the School Board has agreed to dedicate additional property for the Access Roadway (the "Additional Property"); and WHEREAS, the design of the Access Roadway must be modified to incorporate the changes necessary to address the traffic flow constraints to the Wire Development Property with said design conforming substantially to the conceptual plan attached hereto as Exhibit "C' (the "Roundabout Plan"); and WHEREAS, the City has agreed to pay the additional costs for the redesign and construction of the Roundabout Plan modification to the Access Roadway; and WHEREAS, the Parties desire to enter into this Fifth Amendment to govern the rights and obligations of the Parties related to the Access Roadway; and NOW, THEREFORE, in consideration of the promises and agreements herein contained, the Parties hereto agree as follows: 1. Recitals. The above recitals are true and correct and incorporated herein by this reference. 2. Definitions. All capitalized terms used herein shall be defined in the InterlocaI Agreement unless otherwise indicated or defined in this Fifth Amendment. 3. Dedication of Right of Way. The School Board agrees to dedicate or convey such lands for the additional right-of-way for the Access Road in substantially the same location as reflected on Exhibit "D" attached hereto and incorporated herein by this reference. 4. Redesign Costs. The School Board agrees to engage Klima Weeks Engineering, Inc. to design, engineer, and permit the Roundabout Plan to provide the access required by the School Board and Wire Development (the "Roundabout Plan Design") which shall be substantially similar to the Roundabout Plan. Klima Weeks Engineering, Inc. has provided a proposal for its engineering services which is attached hereto as Exhibit "E" in the total amount of $21,533.42 (the "Redesign Costs") The City hereby agrees to pay Redesign Costs to the School Board within fifteen (15) days of the Effective Date of this Fifth Amendment. 5. Change Orders. The School Board utilizes a Gross Maximum Price ("GMP") construction method, and the current access roadway design was bid as part of the GMP. As such, any increase in cost associated with the Roundabout Plan Design is a direct result of same and the City shall be responsible for the full cost of the resulting change order. The School Board shall provide the Roundabout Plan Design to Its contractor as a change order request. Upon receipt of the final change order, the School Board shall provide same to the City and the City shall fund said change order in full within thirty (30) days of receipt by wire transfer to the School Board. 6. Ratification; Conflicts. Except as modified by this Fifth Amendment, the Parties hereby ratify and confirm the continued validity and viability of all terms, conditions, and obligations set forth in the Declaration. In the event of any conflict or inconsistency between the terms of the Declaration, as Page 63 of 146 amended by the first and second amendment thereto, and this Fifth Amendment, the terms of this Fifth Amendment shall be construed to control and prevail. In the event of any conflict or inconsistency between the Land Use Plan and this Fifth Amendment, the terms of this Amendment shall be construed to control and prevail. 7. Authority. Each Party represents and warrants to the other that it has all necessary power and authority to enter into and consummate the terms and conditions of this Fifth Amendment; that all acts, approvals, procedures and similar matters required in order to authorize this Fifth Amendment have been taken, obtained or followed as the case may be; and that upon execution of this Fifth Amendment by both parties hereto and their successors in interest. 8. Recordation of Fifth Amendment. The Parties hereto agree that an executed original of this Fifth Amendment shall be recorded by the City in the Public Records of Orange County, Florida. 9. Counterparts. This Fifth Amendment may be executed in any number of counterparts, each of which shall be deemed to be an original, but all of which together shall constitute one and the same instrument. 10. Effective Date. This Fifth Amendment shall be effective upon the day it is executed by the last party to sign. IN WITNESS WHEREOF, the City and the School Board, acting by and through their duly authorized officers, having caused this Fifth Amendment to be executed as of the day and year first above written. [SIGNATURE PAGES TO FOLLOW] Page 64 of 146 Signed, Sealed and Delivered In the Presence of: Print Name: Print Name: FOR USE AND RELIANCE ONLY BY THE CITY OF OCOEE, FLORIDA; APPROVED AS TO FORM AND LEGALITY this day of .2023. ME Scott A. Cookson, City Attorney STATE OF FLORIDA COUNTY OF ORANGE CITY OF OCOEE, FLORIDA By: Rusty Johnson, Mayor Date: ATTEST: M Melanie Sibbitt, City Clerk (SEAL) APPROVED BY THE OCOEE CITY COMMISSION AT A MEETING HELD ON 12023 UNDER AGENDA ITEM NO. I HEREBY CERTIFY that on this day before me, an officer duly authorized in the State and County aforesaid to take acknowledgments, personally appeared RUSTY JOHNSON and MELANIE SIBBITT, personally known to me to the Mayor and City Clerk, respectively, of the CITY OF OCOEE, FLORIDA and that they severally acknowledged executing the same in the presence of two subscribing witnesses freely and voluntarily under authority duly vested in them by said municipality. They are personally known to me. WITNESS my hand and official seal in the County and State last aforesaid this day of , 2023. Signature of Notary Name of Notary (Typed, Printed or Stamped) Commission Number (if not legible on seal) My Commission expires (if not legible on seal): Page 65 of 146 Signed, Sealed and Delivered Witness: Print Name: Witness: Print Name: Reviewed and approved by Orange County Public School's Acting Chief Facilities Officer Rory Salimbene Acting Chief Facilities Officer Date: STATE OF FLORIDA COUNTY OF ORANGE "SELLER" THE SCHOOL BOARD OF ❑RANGE COUNTY, FLORIDA, a body corporate and political subdivision of the State of Florida By: Teresa Jacobs, its Chair Date: "SELLER" THE SCHOOL BOARD OF ORANGE COUNTY, FLORIDA, a body corporate and political subdivision of the State of Florida M Maria F. Vazquez, Ed.D., as its Superintendent Date: Approved as to form and legality by legal counsel to The School Board of Orange County, Florida, exclusively for its use and reliance. Christopher J. Wilson, Esq. Attorney Date: The foregoing instrument was acknowledged before me by means of ❑ physical presence or ❑ online notarization, this day of . 2023, by TERESA JACOBS and MARIA F. VAZQUEZ, Ed.D, personally known to me to the School Board Chair and Superintendent, respectively, of the SCHOOL BOAR❑ OF ORANGE COUNTY, FLORIDA. They are personally known to me. WITNESS my hand and official seal in the County and State last aforesaid this _ day of . 2023. Signature of Notary Name of Notary {Typed, Printed or Stamped} Commission Number (if not legible on seal) Page 66 of 146 EXHIBIT "A" ACCESS ROADWAY SKETCH AND LEGAL DESCRIPTION LEGAL DESCRIPTION: THAT PORTION OF LAND. LYING IN SECTIONS 6, TOWNSHIP 22 SOUTH, RANGE 28 EAST, ORANGE COUNTY, FLORIDA, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCE AT THE SOUTHWEST CORNER OF SAID SECTION 6; THENCE N 59' 44' 02" E ALONG THE SOUTH LINE OF THE SOUTHWEST 1/4 OF SAID SECTION 6 A DISTANCE OF 1261.07 FEET. THENCE DEPARTING SAID SOUTH LINE RUN N 00' 15' 58" W A DISTANCE OF 1336.04 FEET TO THE POINT OF BEGINNING, BEING A POINT ON A NORTHERLY BOUNDARY LINE OF LAND AS DEPICTED IN OFFICIAL RECORDS BOOK 10881, PG. 8146. PUBLIC RECORDS OF ORANGE COUNTY, FLORIDA, LYING IN SECTION 1, TOWNSHIP 22 SOUTH, RANGE 27 EAST AND SECTIONS 6 AND 7, TOWNSHIP 22 SOUTH, RANGE 25 EAST, ORANGE COUNTY, FLORIDA, THENCE, N 15- 51' 27" W ALONG THE EASTERLY BOUNDARY LINE OF SAID LAND A DISTANCE OF 51.9E FEET; THENCE, LEAVING SAID EASTERLY BOUNDARY LINE RUN S 89' 59' 56" E A DISTANCE OF 463.56 FEET TO THE WESTERLY RIGHT OF WAY LINE OF OCOEE—APOPKA ROAD (ALSO KNOWN AS COUNTY ROAD 437); BEING A POINT ON A NON —TANGENT CURVE CONCAVE EASTERLY, HAVING A RADIUS OF 2351.83 FEET, A CHORD BEARING OF S 03' 27' 35" E AND A CHORD LENGTH OF 50.09 FEET THENCE ALONG SAID RIGHT OF WAY LINE AND ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF 01' 13, 13" FOR AN ARC LENGTH OF 50.09 FEET TO A POINT OF INTERSECTION WITH A NON —TANGENT LINE; THENCE LEAVING SAID WESTERLY RIGHT OF WAY LINE RUN N 89' 59' 56" W A DISTANCE OF 452.38 FEET TO THE POINT OF BEGINNING. SAID LANDS CONTAINING 0.530 ACRES MORE OR LESS. LANDS SUBJECT TO RIGHTS--OF—WAYS, EASEMENTS OR RESTRICTIONS ON RECORD IF ANY. NOTES. 1. THIS SKETCH AND DESCRIPTION IS NOT A BOUNDARY SURVEY. 2. SURVEY MAP AND REPORT OR THE COPIES THEREOF ARE NOT VALID WITHOUT THE SIGNATURE AND THE ORIGINAL RAISED SEAL OF A FLORIDA LICENSED SURVEYOR AND MAPPER. 3. LANDS SHOWN HEREON WERE NOT ABSTRACTED FOR RIGHTS OF WAY, EASEMENTS, OWNERSHIP, AND/OR OTHER INSTRUMENTS OF RECORD. 4. REVISIONS D❑ NOT CONSTITUTE A RECERTIFICATION OF THE EXISTING FIELD CONDITIONS OF THIS SURVEY. S. BEARINGS SHOWN HEREON ARE ASSUMED AND BASED ON THE SOUTH LINE OF THE SOUTHWEST 1/4 OF SECTION 6, TOWNSHIP 22 SOUTH, RANGE 29 EAST, AS BEING NORTH B9- 44' 02" EAST, 6. THE DESCRIPTION SHOWN HEREON WAS PREPARED BY THIS SURVEYOR. SHEE T 9 OF 2 THE HEREON DESCRIBED PROPERTY IS TRUE AND CORRECT TO THE BEST OF OUR KNOWLEDGE AND BELIEF AS PREPARED UNDER OUR DIRECTION IN JULY 7, 2020. 1 FURTHER CERTIFY THAT THIS THIS SKETCH AND DISCRIPTION MEETS THE STANDARDS OF PRACTICE AS SET FORTH IN RULE 5J-17 ADOPTED BY THE FLORIDA BOARD OF PROFESSIONAL SURVEYORS AND MAPPERS, PURSUANT TO FLORIDA STATUTE 472.027. SKETCH AND LEGAL DESCRIPTION Table Of Contents: NOT A SURVEY Sheet 1 of 2 - Legal description, Certification & Notes Sheet 2 of 2 - Sketch DRAWN 6Y: USA SKETCH OF DESCRIPTION 1Iq%'(1:'T2I ut1!ty CJHECKED BY, JOB NUMBER: 06236001-12 DATE' engineers REVISIONS NAN R. HERNANDEZ, PSM FLO RIDA PROFESSIONAL SURVEYOR AND MAPPER 1-855-222-T2UE I WWW.T2UE.00M LICENSENUMBER: 7016 Page 67 Of 146 SKETCH AND LEGAL DESCRIPTION ARMEMTIONS: L -LENGTH R = RADIUS ❑ = DELTA CH -CHORD CB -CHORD BEARING RIW = RIGHT OF WAY ORB = OFFICIAL RECORD5 BOOK (D) = DEED (M)=MEASUR€D (C) = CALCU LATE C) PG{S) = PAGES(S) 1 = 100 NTL = NON -TANGENT LINE NTC = NON -TANGENT CURVE P.O.S = POINT OF BEGINNING O 50 100 20D P.O.0=POINTOFODMMENCEMENT PC = POINT OF CURVATURE GRAPH I C SCALE PT = POINT OF TANGENCY - - COR =CORNER SEC =SECTION - - TWP =TOWNSHIP RGE = RANGE C1 ONNGE COUNTY R=2357,83(C) PARCEL IL) NO. L=50,09'(C) p - N 06 22 28 0000 CO 082 / 1 Q C $ LANDS NOW OR F0IRMERLY OF=01'93'13"(C) Q d EASTERLY CITY OF OCOEE BOUNDARY CH=Sa•pg•(C) rY LINE GB=S03 °2735"E(C) S89° 59' 56" E NTC q N N I 5° 51' 27" W 463.56' _ Z t �y ¢ x 5I.98 N890 59 56"W ILj 452,38' NTL b o a P. ❑ B NORTHERLY Q 0 BOUNDARY WISIEPly u¢ LINF LAND AS DEPICTED IN OFFICIAL RIGHT OF Ln 4 RECORDS BOOK 10881, PG. WAY LINE ` 8146, PUBLIC RECORDS OF p 3 NS9' ¢4' d2"E H [t} ORANGE COUNTY, FLORIDA, p C n'1 LYING IN SLCIIONS 1, 7267.07' TOWNSHIP 22 SOUTH, RANGE 27 C r EAST AND SECTION 6 AND 7, Of 0 TOWNSHIP 22 SOUTH, RANGE 28 O a' EAST, ORANGE COUNTY, /7 FLORIDA P.0.lr S. LINE SW_ 1/4 iNtiL COR. SEC. 6, SEC. 6, PiVP. 22 S. RNG. 28 E. ' O�+00❑¢ TWP, 22 S. W. LINE N.W. 114]Y- RGE. 28 E. R. 28 EWP. 22 S. Tp 5 OR qF rt �yq. ga6 y� Table Of Contents: � IIIL_ Sheet 1 of 2 - Legal desai0on, Certification & Notes '(1ty Sheet 2 of 2 - Sketch engineers SKETCH AND LEGAL DESCRIPTION SKETCH OF DESCRIPTION SCALE: 1'= 100' NOT A SURVEY JOB NUMBER: 0528&0011.12 �-855-222-T2VE WWW.T2UE.CaM SHEET: 20F2 Page 68 of 146 EXHIBIT "B" WIRE DEVELOPMENT PROPERTY BEG AT SW COR OF SEC 6-22-28 RUN W 769.91 FT N 763.16 FT TO SELY R/W LINE OF W OF W ORANGE TRAIL N 44 DEG E 431.54 FT NELY 701.09 FT N 73 DEG E 844.41 FT SELY 357.24 FT N 84 DEG E 10.01 FT SELY 26.95 FT SWLY 1653.68 FT W 590.30 FT TO POB & BEG NW COR OF SAID SEC 07-22-28 RUN S 849 FT ALONG SEC LINE TH NELY 1040 FT TO N LINE OF SEC TH W 642 FT ALONG N LINE OF SEC TO POB & BEG SE COR ❑F SEC 01-22-27 RUN W ALONG SEC LINE 769.91 FT N 44 DEG E 1083.72 FT TH RUN S ALONG SEC LINE 763.16 FT TO POB & (LESS COMM AT SE CORNER OF SEC 1 TH NO-20-26W ALONG E LINE OF SE 1/4 OF SAID SEC 1 A DIST OF 8OFT TO POB THN LEAVING SAID E LINE OF SE 1/4 OF SAID SEC 1 RUN 589-41- 40W 373.85 FT TO POC OF CURVE CONCAVE RT HAV A RAD OF 50OFT AND A CENT ANG OF 29-49-01 TH ALONG ARC OF SAID CURVE A DIST OF 260.2FT TO SELY R/W LINE OF W ORANGE TRLTH THE FOLLOWING COURSES AND DIST ALONG SAID SELY R/W LINE N44-55-56E 876.12 FTTH SO-20-26E 3.5FTTH N44-55-46E 431.54 FT TO POC OF CURVE CONCAVE RT HAV A RAD OF 1404.9 FT AND A CENT ANG OF 28-35-33 TH ALONG ARC OF SAID CURVE A DIST OF 701.09FT TO POT TH N73-31-19E 323.43FT TH LEAVING SAID SELY R/W LINE RUN S15-51-31E 176.73 FT TH N90E 452.38 FT TO WLY R/W LINE OF OCOEE-APOPKA RD BEING A PT ON A NON -TAN CURVE CONCAVE ELY HAV A RAD OF 2351.83FT A CENT ANG OF 0-57-20 AND A CH OR 39.22FT THAT BEARS 54-32-55E TH THE FOLLOWING COURSES AND DIST ALONG ARC OF SAID CURVE AND WILY R/W LINE A DIST OF 39.22FT TH N84-58-24E 10.01FT TO A PT ON A NON -TAN CURVE CONCAVE NELY HAV A RAD OF 2341.83FT A CENT ANG OF 00-39-34 AND A CH ❑F 26.95 FT TO POT TH 55041012E 107.55FT TO NWLY R/W LINE OF STATE RD 429 BEING A PT ON A NON -TAN CURVE CONCAVE SELY HAV A RAD OF 3064.79 FT A CENT ANG OF 30-54-55 AND A CH OF 1633.69FT THAT BEARS 544-24-26W TH LEAVING SAID WILY R/W LINE RUN ALONG ARC OF SAID CURVE AND NWLY R/W LINE A DIST OF 1653.68FT TO S LINE OF SW 1/4 OF SEC 6 TH LEAVING SAID NWLY R/W LINE RUN N89-43-59E ALONG S LINE OF SW1/4 OF SAID SEC 6 A DIST OF 74.27FT TO NWLY R/W LINE OF FULLERS CROSS ROAD BEING A PT ON A NON - TAN CURVE CONCAVE SELY HAV A RAD ❑F 317.9FT A CENT ANG OF 33-58-25 AND CH OF 185.75 FTTHAT BEARS 553-9-34W TH LEAVING THE S LINE OF SW1/4 OF SAID SEC 6 RUN ALONG ARC OF SAID CURVE AND NWLY R/W LINE A DIST OF 188.5FTTO POT TH S36-10-30W ALONG NWLY R/W LINE 18.89FTTH LEAVING SAID NWLY R/W LINE 18.89FT TH LEAVING SAID NWLY R/W LINE RUN N43-27-32W 27.07FT TO POC OF A CURVE LT HAV A RAD OF 590FT AND A CENT ANG OF 46-50-49 TH ALONG ARC OF SAID CURVE A DIST OF 482.4FT TO POT TH S89-41-40W 55.21FT TO POB.) Page 69 of 146 1 ' - PROF RTY I INF � y w L� ti i•.� I 0 � EXHIBIT "C" ROUNDABOUT PLAN 1 PROPERi" LIRE EXHIBIT C B=R PROPOSED ROUND -A -BOUT �� Klima 3Z •3: drawn by: dD0 plot scale: 1" = So' Weeks checked by: JAK project number: 1gDLRGOo6 • < <� o . . o date: 03-01-23 Page 70 of 146 EXHIBIT "D" ADDITIONAL RIGHT OF WAY PROPERTY ' PROPERTY LINE a tAy � ,S �1 10.00' FROM BACK OF CURB AREA TO BE DEDICATED BY 01 PROPERTY LINE EXHIBIT D g' = ° OOPS ROUND -A -BOUT RJW DEDICATION n1itn t== Weeks drawn by: SDO plot scale: i" = So' ®� _g:rr: checked by: SAK pmjeet number: 19DLAGoo6 date: 03-01-23 Page 71 of 146 EXHIBIT "E" REDESIGN COSTS LDLRGROUP SLR Group Inc. a Florida corporation ant h-t Nine Strp.. t, Suite go Orlando, TT. gzRni January 10, 2023 Tamara Cox OCPS Facilities & Construction Contracting 6501 Magic way, Portable 101E Orlando, FL 32809 Re: C-0112: Site 73-T-W-7 Orange Technical College, Westside Campus Replacement Project ADD SERVICE 7: 0vi1, Landscape and Irrigation Design for Round -about at Main Entrance Dear Ms. Tamara Cox: On behalf of DLR Group and our design team, I am pleased to offer this letter of proposal for additional civil, landscape and irrigation design along with architectural project management for OTC West The project includes civil. landscape, irrigation and project management design services to design a new road round -about for the northern, main entrance to the OTC West site. The work will be in accordance with an agreement between OCPS, the City of Ocoee, and the developer of the property to the north of the school. The round -about design will provide access to the OTC project and the developer parcel. This is to be located on a combination of the OCPS-owned and developer -owned parcel with an entry from Ocoee -Apopka Road. Once designed and constructed, it is our understanding that the entry road and the round -about will be conveyed to the City of Ocoee as right-of-way. Scope of work includes: ■ The round -about design is a modification to the previously designed entry. It extends over OCPS and Developer property. ■ Mod if cation of the currently designed stormwater conveyance inlets and piping within the round -about will be required ■ Landscape and irrigation will be modified to enhance the Round -about. • The Marquee Sign location will be modified as required. ■ Coordination with the surveyor, for city con venance. ■ Coordination with the developer's engineers • Production of PR- proposal request documentation and permitting with a pp I i ca ble j u risd i ctio n a. Refer to the attached fee breakdowns for detailed hours and rates projected TOTAL FOR AD0IT10NAL SERVICES FEE $211Q&42 ELEVATE the HUMAN EXPERIENCE THROUGH DESIGN Page 72 of 146 January 10, 2023 Page 2 EXCLUSIONS: The proposed fee does not cover the following items: Estimating (DLR Group will review Cast Estimates completed by the CM to ensure Owner's Requirements are met and included) Survey of site Environmental Assessments 30% Schematic Design Phase 15 days OCPS / Developer/City Review 10 days PR Production- Construction Documents 15 days Permitting- City of Ocoee and BCCO 30-45 days The work will commence upon acceptance of this add service. Upon agreement of the fees and services requested for the execution of this project, it is our understanding that OCPS will incorporate the above -described information into a Professional Services Agreement. Sincerely, DLR Group -P� -1� Nicole Nichols, AIA Practice Leader & Principal -in -Charge Principal -in -Charge ELEVATE Me HUMAN EXPERIENCE THROUGH DESIGN Page 73 of 146 ARCHTECT-ENGINEER P' COST PROPOSAL A DIRE CT School Two Stage Gontr5act No. Completun In weeks OTC @ Westsicie SA LA RY • Roundabout at Entry Cul, Landscape, Mgmt SPECIALTIES JOB TITLES WN- HOURS HOUFLY RATE OVER -HEAD MULTIPLIERS A D93480.00 SUB-TOTAL PER SPECIALTY Architectural R57- Roundabout at Entry Ppec Disci pi ire Leader LA Practice Lacier 2 2 65 $265 ind in ate Ind In ale Senior Professional Professional ARARC7 12 24 $206 145 ind in ate ind in rate Pmfesslonal Support 2 $115 Ind In ate Technical 2 $90 ind in ate 180.00 0. $7,410-00 Strmctuai 0.00 a.0a 0. $0.00 Mechanical 0.00 0.00 0. 00 Electrical OA0 0.00 a. $0.00 Estimates 0.00 0.00 $0.00 Other. 0.40 0.00 0. $0.00 T vta I Drav+ngs TOTAL MAN-HOURS 44 TOTAL SALARIES -A $7AI0.04 1 Klima Weeks B. CONSULTANTS (attach estimate) Civil En ineerin $14,123.42 2 3 4 5 6 7 8 TOTALCONSULTANTS-tJ 14,123.42 G. OTHER DIRECT COSTS (attach estimates asneGessa�y) 1 NOT TO ExGEED REIMBIJRSABLES 2 CT COSTS - COMPENSATION SCHEDULE FOR TOTAL COST PHASE I DOLLAR AMT. Program Verification Phase TOTAL COST TO OOPS Schematic Design $ 1,076.67 Design Development ARCHrrECT-ENGINEER FIRM NAME $21 533.42 &ADDRESS Construction Documents $ 16,796.07 ❑LR GFOU , Inc - Building Permit $ 2,68401 100 East Pine Street Suite 404 Bidding $ 646,00 Orlando, FL 32801 Construction Phase PREPARED AND APPROVED BY: S' natur itle 6 11 23 Manth Warran Ins eat- 7. , .l r[- r� 'r f ' Nicole Nichols Electronic Record Documents $ 4X67 Nat -To -Exceed Reinhursables I JDATE: 4Jan-23 GAIPSSHELLSIAE Fee Schedule Form Template Contract Administration Page 74 Of 146 4 LL z� oY w�a _0 3 � WeeksY � W � s U. te. C I V I L [ N C I N![ R[ W G m� January 3, 2023 Ms. Susan Pendergraft, AIA, LEED AP DLR Group 100 East Pine Street, Suite 404 Orlando, Florida 32801 RE: Orange Technical College — Westside —Orange County Additional Service # 4 — Round -About Entry Improvements Dear Susan: Pursuant to a request from OCPS, we are pleased to provide this additional services fee proposal to perform civil design services in connection with the above referenced project. The scope of this proposal is t] design a new round- about for the northern entry to the school site, in accordance with an agreement between OCPS, the City of Ocoee, and the developer of the property to the north of the school. To provide full and safe access to the developer -owned property to the north, the round -about design will be implemented and will include access to the OTC project and the developer parcel. This is to be located on a combination of the OCPS owned and developer owned parcel and does not affect the intersection of the entry drive and Ocoee -Apopka Road. Once designed and constructed, it is our understanding that the entry road and the round -about will be conveyed to the City of Ocoee as right -of --way. More specifically, we provide the following: a. The inclusion of the roundabout will require modification of the existing entry design both on city/developer owned property and on the OCPS property. b. Modification of the currently designed stormwater conveyance inlets and piping within the roundabout will be required. c. Coordination with the surveyor on the property that will be conveyed to the city will be necessary. d. Coordination with the developer's engineers will he necessary for final placement of the round -about exit serving the developer parcel. Page 75 of 146 e. The plans will be developed as a modification to the current OTC-Westside construction documents, with the intent to be issued to Wharton -Smith as a PR. f. Permitting of the above roadway improvements with the appropriate jurisdictions which include St. Johns River Water Management District, and the City of Ocoee. With the above in mind, and per your request, this proposal includes the following BASE ❑ESIGN SERVICES. Scope of Work: BASE DESIGN SERVICES 1) Construction Documents: Klima Weeks will provide the engineering, design, and plans production for the civil portions of the work to be designed in accordance with the Florida Building Code and other applicable requirements of the identified jurisdictions. These improvements are NOT designed to OCPS standards or ❑G's since they are primarily under the jurisdiction of other entities. The plans will be provided to ❑LR in electronic format, AutoCad v. 2022 using the current OCPS drawing standards, and the current project specific border. The current project specifications would cover these revised entry improvements; therefore, no new specifications are required. 2) Construction Administration: Construction administration services are currently included in the OTC-Westside project and therefore additional fees related to the construction administration services are NOT included herein. This concludes the specific scope of work. Exclusions from the proposal include any work effort not described in the above scope of work, landscape/irrigation services, traffic studies, structural designs for walls, geotechnical services, environmental assessments of any kind, signalization design, surveying services, and agency permitting or plan review fees. We propose to provide the services described herein for a lump sum fee of $14,123.42 to be broken down as shown on the attached OOPS A/E Cost Proposal fee breakdown form. We appreciate the opportunity to submit this fee proposal and look forward to working with you toward the successful completion of this project. If there Page 76 of 146 should be any questions concerning this proposal, please feel free to contact our office. Sincerely, Proposal Accepted By: Klima Weeks Civil Engineering, Inc. DLR Group C . A. 011� ]ay A. Klima, P.E. Principal Klima Weeks Civil Engineering, Inc. Page 77 of 146 ARCHITECT -ENGINEER WS COST PROPOSAL COSTSA. DIRECT SALARY School Contract No. Completion In Weeks Crange de-ASllege- Westside AS # 4 SPECIALTIES J09 TITLES MAN- HOURS HOURLY RATE OVER -HEAD MULTIPLIER DOLLAR AMOUNT SUB -TOTAL PER SPECIALTY Orange Tech College-Westside Discipline: Civil Engineering Firm: Klima Weeks AS # 4 - Round -about Design Pro ect Mana er 25.0 $63.36 2.36 $3.738.24 Engineer 40.0 $43.75 2.38 $4.130.00 Designer 40.0 $38.10 2.36 $3,663.2$ Draftsman 20.0 $36.00 2.38 $1599.2 Technician 15.D $26.50 2.36 $902.70 $0.0 $0.0� $14,123.42 $0.00 $0.31 Total Drawngs TOTAL MAN-HOURS 140 TOTAL SALARIES -A $14.120.42 1 2 3 4 5 6 7 TOTALCON SULTANTS-6 OTHER DIRECT $ 1 2 TOTAL OTHER DIRECT COSTS -C COMPENSATION SCHEDULE FOR TOTAL C OST PHASE TOTAL COST TO OCPS $14,123.42 E ARCHITECT -ENGINEER FIRM NAME & ADDRESS Master Planning Schematic Design - Phase 1 Design Development - Phase 2 $ - $ 706.17 $ Construction Documents - Ph, 3 $ 11,016.26 Klima Weeks Civil Engineering, Inc. 385 Douglas Ave. Suite 2100 Altamonte Springs, FL 32714 C itV Perm ittin $ 1,76543 Bidding $ 353.09 Construction Phase $ - vVarranty Inspection (6, 11, 23) $ - PREPARED AND APPROVED BY: Si naturelTitlZJanuary Electronic Record Documents $ 282.47 JayA. Klii TOTAL $ 14,123,42 DHTE: 023 Page 1 KW AS 44 OTC-WestsIde OCPS Fee Proposal Form.xIsx Page 78 of 146