HomeMy WebLinkAboutItem 07. Approval to Award RFQ #23-004 Construction Manager for Floral Street Water, Sewer and Road Reconstruction
City of Ocoee ▪ 1 N. Bluford Avenue ▪ Ocoee, Florida 34761
Phone: (407) 905-3100 ▪ www.ocoee.org
STAFF REPORT
Meeting Date: April 18, 2023
Item #: 7
Contact Name: Shannon Hopper, Joyce Tolbert Department Director: Rebecca Roberts
Contact Number: Ext. 1524, Ext. 1516 City Manager: Robert Frank
Subject: Approval to Award RFQ #23-004 Construction Manager at Risk for Floral Street
Water, Sewer and Road Reconstruction. (Procurement Manager Tolbert)
Background Summary: The Floral Street Sanitary Sewer and Water Project is part of the Downtown
Master Plan to stimulate development in the downtown Ocoee area. The project includes extension of the
gravity sewer system which will consist of approximately 1,700 Linear Feet (LF) of new gravity sewer, six new
manholes, and stub outs with clean outs for sewer service connections; an upgrade of the potable water
system in this area; and extension of an existing 8” Ductile Iron (DI) water main. The cost of the improvements
for this project is estimated to be $1,000,000.00. The Construction Manager at Risk (CMR) selected for the
work will provide pre-construction services, including development of a Guaranteed Maximum Price (GMP)
and construction phase administration. The City retained Hazen and Sawyer as the engineer of record for this
project, and the design plans are approximately 60% complete. The anticipated start of construction is
Summer 2023.
In compliance with the Consultants’ Competitive Negotiations Act (CCNA), Florida Statutes § 287.055, et seq.,
Construction Management Florida Statute § 255.103., and the policies and procedures of the City of Ocoee,
the City solicited statements of qualifications from qualified Construction Manager at Risk (CMR) firms to be
responsible for construction administration and general contracting services resulting in the successful, timely,
and economic completion of City’s Floral Street Water, Sewer and Road Reconstruction Project for the best
possible value. Construction management services shall include but not necessarily be limited to: Pre-
construction Phase services, including design and construction document review and recommendations in
collaboration with the project design team; submission of a Guaranteed Maximum Price and Guaranteed
Completion Date; and Construction Phase services, conditioned upon acceptance of the Guaranteed
Maximum Price and Guaranteed Completion Date offered by the firm. The construction management entity
must have the ability to secure an appropriate surety bond pursuant to Florida Statute § 255.05, and in
conformance with City requirements, and must hold construction subcontracts.
The RFQ was advertised on January 29, 2023, and was publicly opened on February 28, 2023. A total of three
(3) responses were received. The Finance and Utilities Departments reviewed the qualification statements and
all were considered responsive. See the attached Checklist.
The three (3) responses were evaluated by the RFQ Evaluation Committee appointed by the City Manager,
which comprised of four (4) members: Jamie Croteau, Utilities Director; Steve Krug, Public Works Director;
Jen Bolling, Assistant Utilities Director; and T’Jean Tomlinson, Project Manager – Utilities' Dept. The public
RFQ Evaluation Committee meeting was held on March 27, 2023, with the Evaluation Committee interviewing,
evaluating, and short-listing the firms on specific evaluation criteria. The evaluation committee short-listed the
three firms in ranked order, and recommended contracting with the top ranked firm, J. Malever Construction
Page 280 of 668
City of Ocoee ▪ 1 N. Bluford Avenue ▪ Ocoee, Florida 34761
Phone: (407) 905-3100 ▪ www.ocoee.org
Company, Inc., as indicated in the attached award recommendation from the Utilities' Director.
Rank Respondent
1 J. Malever Construction Company, Inc.
2 Prime Construction Group, Inc.
3 Oelrich Construction Company, Inc.
Issue:
Should the City Commission award Request for Qualifications (RFQ) #23-004 for Construction Manager at
Risk for Floral Street Water, Sewer and Road Reconstruction project to the top-ranked firm, J. Malever
Construction Company, Inc., as recommended by the Evaluation Committee?
Recommendations:
Staff recommends the Honorable Mayor and City Commissioners:
1.) Award Request for Qualifications (RFQ) #23-004 Construction Manager at Risk for Floral Street Water,
Sewer and Road Reconstruction to the top ranked firm J. Malever Construction Company, Inc.; and
2.) Authorize the City Manager and Staff to proceed with contract negotiations for up to, but not exceeding, a
budget amount of $45,000.00 for preconstruction and design services and up to, but not exceeding, 9% for the
construction management fee; and,
3.) Authorize the Mayor, City Clerk, and Staff to execute the required contract documents for the
preconstruction and design services for this project. Subsequently, Staff will proceed with negotiations for the
Construction Phase, Guaranteed Maximum Price (GMP) and the Guaranteed Completion date of the project,
which will be brought back to the City Commission for approval upon receipt of the required performance and
payment bonds and insurance.
In compliance with the Consultants’ Competitive Negotiations Act (CCNA), Florida Statute § 287.055, if
contract negotiations are unsuccessful with the top-ranked firm, staff shall terminate negotiations and initiate
negotiations with the next ranked firm, and so on, until an agreement is reached.
Attachments:
1. RFQ 23-004 Addendum
2. RFQ 23-004_CMAR Floral Street Water, Sewer and Street Reconstruction
3. Checklist
4. J. Malever Construction Company
5. J. Malever Interview Handout
6. Prime Construction Group, Inc.
7. Oelrich Construction
8. Oelrich Interview Handout
9. Shortlist and Evaluation Forms
10. Recommendation Memo
Financial Impacts:
This project will be funded by bond proceeds and other dollars appropriated by City Commission.
Type of Item: Consent
Page 281 of 668
Mayor Commissioners
Rusty Johnson Larry Brinson Sr, District 1
Rosemary Wilsen, District 2
City Manager Richard Firstner, District 3
Robert Frank
George Oliver III, District 4
January 25, 2023
ADDENDUM NO. ONE (1)
CITY OF OCOEE
RFQ #23-004
CONSTRUCTION MANAGER AT RISK FOR
FLORAL STREET WATER, SEWER AND ROAD RECONSTRUCTION
This addendum shall modify and become a part of the original RFQ Documents for RFQ #23-004. This
addendum consists of two (2) pages, including attachments. Respondents should acknowledge receipt
of this addendum in their qualification package submission. Failure to do so may subject the Respondent
to disqualification. The RFQ submission deadline has changed.
Subsequent to the solicitation for RFQ #23-004 going live on Bonfire, the city was made aware that
the required advertisement did not publish in th e Orlando Sentinel on January 22, 2023 as
indicated in the RFQ Documents. In order to comply with the advertising requirements of
§ 255.0525 (2), Florida Statutes, the submission deadline has changed. Additionally, the deadline
for questions has changed. The new dates are as follows:
Deadline for Questions: February 15, 2023, 2:00 p.m. local time
Submission Deadline: February 28, 2023, 2:00 p.m. local time
Shannon Hopper
Shannon Hopper
Purchasing Technician
cc: Jamie Croteau, Utilities Director
Attachment: Legal Advertisement
Page 282 of 668
Request for Qualifications, Legal Advertisement
The City of Ocoee, Florida, (the “City”) is soliciting sealed statements of qualifications for
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road
Reconstruction. Qualification Packages will only be accepted electronically through Bonfire, a
free e-Procurement platform, until 2:00 p.m., local time, on February 28, 2023. Qualification
Packages received after that time or through any other method will not be accepted under any
circumstances. Qualification Packages that have been timely received through Bonfire will be
publicly opened virtually online and the names of the responding firms read aloud at that time;
instructions will be provided at https://www.ocoee.org/959/Public-Bid-Meetings. All questions
regarding this RFQ shall be in writing to Shannon Hopper, Purchasing Technician, Finance
Department/Purchasing, shopper@ocoee.org. No Pre-Submittal conference is scheduled at this
time. Prospective respondents may secure a copy of the documents required for submitting a
statement of qualifications at no charge through Bonfire by accessing the City’s published
solicitation page at https://ocoee.bonfirehub.com. For more information, visit
https://www.ocoee.org/323/Purchasing. Prospective respondents will be provided with all
information regarding this RFQ, addenda, and changes to the project requirements through the
Bonfire e-Procurement Platform. Melanie Sibbitt, City Clerk, Orlando Sentinel, January 29, 2023.
Page 283 of 668
CITY OF OCOEE
REQUEST FOR QUALIFICATIONS
(RFQ) #23-004
CONSTRUCTION MANAGER AT RISK
FOR
FLORAL STREET WATER, SEWER AND
ROAD RECONSTRUCTION
Page 284 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 2
TABLE OF CONTENTS
FOR
RFQ #23-004
CONSTRUCTION MANAGER AT RISK
FOR
FLORAL STREET WATER, SEWER AND ROAD RECONSTRUCTION
RFQ DOCUMENTS
Section Page
Legal Advertisement 3
RFQ Instructions & General Terms & Conditions 4 - 19
Conflict of Interest Disclosure Form* 20
Drug-Free Workplace Certification Form* 21
Company Information and Signature Sheet* 22
Summary of Litigation Form* 23-24
Attachment “1” – Floral Street Sewer Project Map (1 page) 25
Attachment “2” – Engineering Standards Manual (Link) 26
Attachment “3” – Draft Agreement including Exhibits “A” – “L” (81 pages) 27
*Submit with qualification package
End Table of Contents
Page 285 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 3
Request for Qualifications, Legal Advertisement
The City of Ocoee, Florida, (the “City”) is soliciting sealed statements of qualifications for
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road
Reconstruction. Qualification Packages will only be accepted electronically through Bonfire, a
free e-Procurement platform, until 2:00 p.m., local time, on February 21, 2023. Qualification
Packages received after that time or through any other method will not be accepted under any
circumstances. Qualification Packages that have been timely received through Bonfire will be
publicly opened virtually online and the names of the responding firms read aloud at that time;
instructions will be provided at https://www.ocoee.org/959/Public-Bid-Meetings. All questions
regarding this RFQ shall be in writing to Shannon Hopper, Purchasing Technician, Finance
Department/Purchasing, shopper@ocoee.org. No Pre-Submittal conference is scheduled at this
time. Prospective respondents may secure a copy of the documents required for submitting a
statement of qualifications at no charge through Bonfire by accessing the City’s published
solicitation page at https://ocoee.bonfirehub.com. For more information, visit
https://www.ocoee.org/323/Purchasing. Prospective respondents will be provided with all
information regarding this RFQ, addenda, and changes to the project requirements through the
Bonfire e-Procurement Platform. Melanie Sibbitt, City Clerk, Orlando Sentinel, January 22, 2023.
Page 286 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 4
CITY OF OCOEE
REQUEST FOR QUALIFICATIONS “RFQ” #23-004
CONSTRUCTION MANAGER AT RISK
FOR
FLORAL STREET WATER, SEWER AND ROAD RECONSTRUCTION
A. INTRODUCTION AND GENERAL INSTRUCTIONS
1. The City of Ocoee, Florida, in conformance with the Consultants’ Competitive
Negotiations Act (CCNA), Florida Statutes § 287.055, et seq., Florida Statutes
§ 255.103, et seq., Construction Management or Program Management Entities, and
the policies and procedures of the City of Ocoee (City), is soliciting statements of
qualifications from qualified Construction Manager at Risk firms (CMR) that will be
responsible for construction administration and general contracting services resulting
in successful, timely, and economic completion of the City’s Floral Street Water, Sewer
and Road Reconstruction Project for the best possible value.
Construction management services shall include but not necessarily be limited to:
a. Pre-construction Phase services, including design and construction document
review and recommendations in collaboration with the project design team;
b. Submission of a Guaranteed Maximum Price and Guaranteed Completion Date;
c. Construction Phase services, conditioned upon acceptance of the Guaranteed
Maximum Price and Guaranteed Completion Date offered by the firm.
Interested firms or individuals must be experienced in providing CMR services for
projects of a scope and nature comparable to those described. The construction
management entity must have the ability to secure an appropriate surety bond pursuant
to Florida Statute § 255.05, and in conformance with City requirements, and must hold
construction subcontracts. Use of qualified subcontractors for specialty work is
acceptable. To be considered, the firm or individual shall be a licensed professional in
accordance with Florida State law and be familiar with all applicable State of Florida,
St. Johns River Water Management District, Orange County, and City of Ocoee codes,
regulations, and laws. Include a copy of all applicable licenses held by firms or
subcontractors proposed to perform work.
2. The City intends to award a single contract to one (1) firm deemed to be the most highly
qualified to perform the required services. In determining whether a firm is qualified,
the City shall consider the Evaluation Criteria set forth in this RFQ.
3. Prospective Respondents may secure a free copy of the documents required for
submitting a statement of qualifications through the Bonfire platform by accessing the
City’s published solicitation page at https://ocoee.bonfirehub.com. For more
information visit https://www.ocoee.org/323/Purchasing. Prospective Respondents
will be provided with all information regarding this RFQ, addenda, and changes to the
project requirements through the Bonfire platform; there is no charge to use Bonfire.
Partial sets of documents required for submitting a statement of qualifications will not
be issued.
Page 287 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 5
4. The City ONLY accepts electronic solicitation responses online through the City’s
Bonfire platform at https://ocoee.bonfirehub.com. This link can also be accessed
through the City’s website at https://www.ocoee.org/323/Purchasing under the
Current Open Solicitations menu. All submissions for this RFQ MUST be submitted
electronically through the Bonfire Platform, submissions received in any other format
will not be accepted; paper, fax, or e-mailed submissions will NOT be
accepted. Minimum system requirements: Microsoft Edge, Google Chrome, Safari, or
Mozilla Firefox. JavaScript and browser cookies must be enabled.
Registration with Bonfire is free and is required prior to submitting a Response. You
will be required to register once you click the “PREPARE YOUR SUBMISSION” in
the solicitation file. It is suggested your company register no later than 24 hours in
advance of the submission deadline to ensure proper registration. Should your company
need assistance with registering, please contact the Bonfire Support Desk by emailing
support@gobonfire.com. Support by email is provided Monday to Friday from 8:00
a.m. – 8:00 p.m. EST/EDT.
Upon completing the registration with Bonfire, Respondents will be able to submit a
bid securely, any time before the submission deadline, at https://ocoee.bonfirehub.com
by clicking the “PREPARE YOUR SUBMISSION” under the solicitation. An
instructional video is provided for an overview of the submission process. Once
Respondent’s bid has been submitted, Respondent will receive a date/time stamp
confirmation within the Bonfire platform and an email from Bonfire confirming the
submission. Bids submitted on the Bonfire Platform will remain locked and
inaccessible by City staff until the submission deadline. Respondents are encouraged
to allow ample time to upload and submit their qualification package as the system will
automatically lock responses upon the submission deadline. A virtual public bid
opening will be held on the date and time indicated in this RFQ. Details on how to
access the virtual bid opening will be posted on Bonfire once available and will also be
posted on the City’s website at https://www.ocoee.org/959/Public-Bid-Meetings.
5. The City will receive questions regarding this RFQ only through written inquiries
directed to Shannon Hopper, Purchasing Technician through the RFQ project file on
the Bonfire Platform or by email at shopper@ocoee.org. The deadline for receipt of
questions is February 8, 2023 at 2:00 p.m., local time. Questions received after that
time may not be answered. Any clarifications/changes will be made by way of written
addenda only, issued by the Purchasing Technician and posted on Bonfire.
6. Prospective Respondents should not contact City staff, with the exception of the
Purchasing Technician, members of the Ocoee City Commission or other City
consultants for information regarding this RFQ before the award date. Any contact
with any other member of City Staff, City Commission, or its Agents during the
solicitation, award, and protest period may be grounds for disqualification.
7. Each qualifications package should consist minimally of a cover letter, statement of
qualifications, conflict of interest disclosure form, and company information form
(attached at the end of these instructions). Respondents should also include a copy of
all applicable licenses held by the CMR and key staff/project team proposing to
perform the work. Qualification packages should be limited to a total of fifty (50) 8.5”x
Page 288 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 6
11” pages (required forms are excluded from page count), single-sided, portrait
orientation, 12-point font if possible. Additional requirements of submissions are
supplied below in Section D: Submittals. Any qualifications package failing to conform
to these specifications is subject to rejection. The person signing the signature sheet on
behalf of the respondent must have the legal authority to bind the respondent to the
submitted qualification package and shall be understood to do so. All expenses for
providing a qualification package to the City in response to this RFQ shall be borne by
the Respondent.
8. Respondents shall submit one (1) complete electronic copy of their qualification
package on the Bonfire Platform. Qualification packages must be received by Bonfire
no later than 2:00 p.m., local time, on February 21, 2023. Any attempt to submit a
bid after the submission deadline will not be accepted under any circumstances. Any
uncertainty regarding the time a qualification package is received will be resolved
against the Respondent. It shall be the sole responsibility of the Respondent to have the
qualification package uploaded and submitted on the Bonfire Platform prior to the
due date and time.
File Uploads – Submission materials should be prepared in the file formats listed under
Requested Information for this opportunity in the Bonfire Platform. The maximum
upload file size is 1000 MB. Documents should not be embedded within uploaded files,
as the embedded files will not be accessible or evaluated. All electronic files uploaded
must be in a common format accessible by software programs the City uses. Those
common formats are generally described as Microsoft Word (.doc or .docx), Microsoft
Excel (.xls or .xlsx), Microsoft Power Point (.ppt or pptx), or Adobe Portable Document
Format (.pdf). Respondents will not secure, password protect or lock uploaded files;
the City must be able to open and view the contents of the file. Respondents will not
disable or restrict the ability of the City to print the contents of an uploaded
file. Scanned documents or images must be of sufficient quality, no less than 150 dpi,
to allow for reading or interpreting the words, drawings, images or sketches. The City
may disqualify any Submittal Response that does not meet the criteria stated in this
paragraph.
9. Action on qualification packages is expected to be taken by the City Commission
within ninety (90) days of the submission opening date; however, no guarantee or
representation is made herein as to the time between receipt of the qualification
package and subsequent City Commission action. A more detailed schedule is given
below.
10. All applicable laws and regulations of the United States, the State of Florida, and the
City of Ocoee will apply to any resulting Agreement. The provisions of the
Consultant’s Competitive Negotiations Act, § 287.055, Florida Statutes and the
provisions of § 255.103, Florida Statutes shall apply, where applicable.
11. The successful Respondent shall be required to execute an Agreement, in form and
content acceptable to the City, indemnifying and holding harmless the City, its
officials, officers, employees, and agents from all claims.
Page 289 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 7
By entering into this contract, the awarded firm is obligated to comply with the
provisions of § 448.095, Florida Statutes, "Employment Eligibility." This includes, but
is not limited to utilization of the E-Verify System to verify the work authorization
status of all newly hired employees, and requiring all subcontractors to provide an
affidavit attesting that the subcontractor does not employ, contract with, or subcontract
with, an alien unauthorized to work in the USA. Failure to comply will lead to
termination of this contract, or if a subcontractor knowingly violates the statute, the
subcontractor must be terminated immediately.
12. CONVICTED VENDOR LIST (PUBLIC ENTITY CRIME): A person or affiliate
who has been placed on the convicted vendor list following a conviction for a public
entity crime may not submit a proposal on an award to provide any goods or services
to a public entity, may not submit a proposal on an award with a public entity for the
construction or repair of a public building or public work, may not submit proposals
on leases of real property to a public entity, may not be awarded or perform work as a
Contractor, Supplier, Subcontractor, or Consultant under an award with any public
entity, and may not transact business with any public entity in excess of the threshold
amount provided in § 287.017, Florida Statutes, for Category Two for a period of 36
months from the date of being placed on the convicted vendor list. [See Florida Statute
287.133 (2) (a).]
13. FLORIDA PUBLIC RECORDS LAW: In accordance with Chapter 119 of the
Florida Statutes, and, except as may be provided by Chapter 119 of the Florida Statutes
and other applicable State and Federal Laws, all Respondents should be aware that the
proposal and the responses thereto are in the public domain and are available for public
inspection. Respondents are requested, however, to identify specifically any
information contained in their proposal which they consider confidential and/or
proprietary and which they believe to be exempt from disclosure, citing specifically the
applicable exempting law. All proposals received in response to this request of proposal
become the property of the City of Ocoee and will not be returned. In the event of an
award, all documentation produced as part of the contract will become the exclusive
property of the City.
14. PUBLIC RECORDS COMPLIANCE: The City of Ocoee (City) is a public agency
subject to Chapter 119, Florida Statutes. The Contractor agrees to comply with
Florida’s Public Records Law. Specifically, the Contractor shall:
1. Keep and maintain public records required by the City to perform the service.
2. Upon request from the City’s custodian of public records, provide the City with a
copy of the requested records or allow the records to be inspected or copied within a
reasonable time at a cost that does not exceed the cost provided in chapter 119, Florida
Statutes, or as otherwise provided by law.
3. Ensure that public records that are exempt or confidential and exempt from the public
records disclosure requirements are not disclosed except as authorized by law for the
duration of the contract term and following completion of the contract if the Contractor
does not transfer the records to the City.
4. Upon completion of the contract, Contractor agrees to transfer at no cost to the City
all public records in possession of the Contractor or keep and maintain public records
required by the City to perform the service. If the Contractor transfers all public record
to the City upon completion of the contract, the Contractor shall destroy any duplicate
Page 290 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 8
public records that are exempt or confidential and exempt from public records
disclosure requirements. If the Contractor keeps and maintains public records upon
completion of the contract, the Contractor shall meet all applicable requirements for
retaining public records. All records stored electronically must be provided to the City,
upon request from the City’s custodian of public records, in a format that is compatible
with the information technology systems of the City.
5. A Contractor who fails to provide the public records to City within a reasonable time
may be subject to penalties under § 119.10, Florida Statutes.
IF THE CONTRACTOR HAS QUESTIONS REGARDING THE
APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO
THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS
RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN
OF PUBLIC RECORDS AT 407-905-3100, EXTENSION 1022,
CCDL@ci.ocoee.fl.us, WITH AN OFFICE LOCATED AT 1 N.
BLUFORD AVENUE, OCOEE, FLORIDA 34761.
15. PATENT INDEMNITY: Except as otherwise provided, the successful respondent
agrees to indemnify the City and its officers, agents, and employees against liability,
including costs and expenses for infringement upon any letters patent of the United
States arising out of the performance of this Contract or out of the use or disposal by
or for the account of the City or supplies furnished or construction work performed
hereunder, to the extent caused by the negligence, recklessness, or intentional wrongful
misconduct of Respondent and persons employed or utilized by the Respondent in the
performance of the construction contract.
Further, Respondent shall fully indemnify, defend, and hold harmless the City and its
officers, agents, and employees from any suits, actions, damages, and costs of every
name and description, including attorneys’ fees, arising from or relating to violation or
infringement of a trademark, copyright, patent, trade secret, unpatented invention, or
intellectual property right. If Respondent uses any design, device, or materials covered
by letters, patent, or copyright, it is mutually agreed and understood without exception
that the bid price shall include all royalties or cost arising from the use of such design,
device, or materials.
16. The City reserves the right to accept or reject any or all proposals, to waive formalities,
technicalities or irregularities, to request clarification of information submitted in any
proposal, or to re-advertise for new proposals. The City may accept any item or group
of items of any proposal, unless Respondent qualifies its proposal by specific
limitations. The City may accept one or more proposals if, in the City’s discretion, the
City determines that it is in the City’s best interest to do so.
The City reserves the right to award the contract to the Respondent which, in the City’s
sole discretion, is the most responsive and responsible. The City reserves the right, as
an aid in determining which proposal is responsible, to require a Respondent to submit
such additional evidence of Respondent’s qualifications as the City may deem
necessary, and may consider any evidence available to the City of the financial,
Page 291 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 9
technical, and other qualifications and abilities of a Respondent, including past
performance (experience) with the City and others. The City Commission shall be the
final authority in the selection of any and all proposals for acceptance and award.
17. This project will be funded by bond proceeds and other dollars appropriated by the City
Commission. The project will be awarded upon securing the required funding.
18. Performance and Payment Bonds:
a. The Successful Respondent shall furnish the City with a State of Florida 100%
Performance and a 100% Payment Bond written by a Surety Company acceptable
to the City. Surety companies executing bonds shall be duly insured by an insurer
or corporate surety and signed by a licensed agent who holds a current Power of
Attorney from the surety company issuing the bond. The attached Performance
and Payment Bond Forms shall be used.
b. The cost of the Payment and Performance Bonds shall be borne by the Successful
Respondent. The bonds shall be accompanied by duly authenticated or certified
documents, in duplicate, evidencing that the person executing the Bonds in behalf
of the Surety had the authority to do so on the date of the bonds. The date of the
certification cannot be earlier than the Agreement.
19. Conflict of Interest/Non-Collusion Certification:
Respondent declares by submission of a qualification package that the only persons, or
parties interested in their bid are those named herein, that this bid is, in all respects, fair
and without fraud and that it is made without collusion with any other vendor or official
of the City of Ocoee. Neither the Affiant nor the above-named entity has directly or
indirectly entered into any agreement, participated in any collusion, or otherwise taken
any action in restraint of free competitive pricing in connection with the entity’s
submittal for the project. This statement restricts the discussion of pricing data until
the completion of negotiations and execution of the Agreement for this project.
Respondent certifies that no City Commissioner, other City Official or City employee
directly or indirectly owns assets or capital stock of the bidding entity, nor will directly
or indirectly benefit by the profits or emoluments of this proposal. (For purposes of
this paragraph, indirect ownership or benefit does not include ownership or benefit by
a spouse or minor child.)
The Respondent certifies that no member of the entity’s ownership or management is
presently applying for an employee position or actively seeking an elected position with
the City. In the event that a conflict of interest is identified in the provision of services,
the Respondent agrees to immediately notify the City in writing. Complete the
attached Conflict of Interest Disclosure Statement and submit with qualification
package.
Respondent further declares that a careful examination of the scope of services,
instructions, and terms and conditions of this bid has occurred, and that the bid is made
according to the provisions of the bid documents, and will meet or exceed the scope of
services, requirements, and standards contained in the Bid documents.
Page 292 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 10
Respondent agrees to abide by all conditions of the negotiation process. In conducting
negotiations with the City, Respondent offers and agrees that if this negotiation is
accepted, Respondent will convey, sell, assign, or transfer to the City all rights, title,
and interest in and to all causes of action it may now or hereafter acquire under the
Anti-trust laws of the United States and the State of Florida for price fixing relating to
the particular commodities or services purchased or acquired by the City. At the City’s
discretion, such assignment shall be made and become effective at the time the City
tenders final payment to Respondent. The bid constitutes a firm and binding offer by
Respondent to perform the services as stated.
20. Payment Terms:
Payment will be based upon monthly applications for payment properly submitted by
the Contractor to the Owner and based upon the percentage of work complete.
Retainage shall be five (5) percent of work to date based on the progress payment,
including all change orders. All retainage amounts shall be paid when the work is
complete, unless otherwise stated in the contract. Payment for all applications for
payment for work properly completed shall be made, not later than the Twenty-fifth
(25th) business day after the date on which the properly submitted Application For
Payment is initially received by the Owner.
No payment will be made for materials ordered without proper purchase order
authorization. Payment cannot be made until materials, goods or services, have been
received and accepted by the City in the quality and quantity ordered.
Any contract resulting from this solicitation is deemed effective only to the extent of
appropriations available.
The City of Ocoee, Florida has the following tax exemption certificates assigned:
• Florida Sales & Use Tax Exemption Certificate No. 85-8013779974C-0; and
• Pursuant to Chapter 212, Florida Statutes, the City is exempt from federal
excise, state, and local sales taxes.
21. Safety Requirements:
Respondent guarantees that the services to be performed and the goods to be provided
herein, shall comply with all applicable federal, state and local laws, ordinances,
regulations, orders and decrees, including without limitation such of the following acts
as may be applicable: Federal Consumer Product Safety Act, Federal Fair Labor
Standards Act, Occupational Safety and Health Act, Federal Hazardous Substances
Labeling Act, Federal Flammable Fabrics Act, and any applicable environmental
regulations.
a. All contractors are required to comply with the Congressional Federal Register
(CFR) of the U.S. Department of Labor, Occupational Safety and Health
Administration (OSHA) Construction Industry, Part 1926, and CFR 1910, General
Industry Standards, that are applicable in construction work.
b. The prime contractor is not only responsible for the safety aspects of his operation
Page 293 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 11
and employees, but also that of all subcontractors on the job site.
c. Assure that a certified first aid person is designated, phone numbers of physicians,
hospital and ambulance services are posted (copy to Personnel Director, City of
Ocoee) and that a first aid kit is available.
d. All individuals are required to wear hard hats on all construction sites.
e. Provide personal protective equipment that may be required for jobs in progress
(e.g.: hard hats, safety glasses, respirators, ear protection, long pants and shirts,
etc.).
f. Observe the speed limit on City property.
g. Construction areas cleaned daily; excavations must be barricaded or flagged until
backfilled. In some cases, bracing, shoring and sloping may be required.
h. Scaffolds shall have guard rails on all open sides and secured to prevent
displacement.
i. Powder actuated stud guns or low velocity and/or similar powder actuated tools
require eye and ear protection as well as to ensure that all unauthorized personnel
are well clear.
j. Welding and cutting - a fire watch and appropriate fire extinguisher shall be
provided and combustible materials cleaned up.
k. All heavy equipment must have, where applicable, (a) back-up alarms, (b) boom
angle indicator, (c) load chart, (d) reeving, (e) fire extinguisher, (f) condition of
hook and other items in accordance with OSHA 1926.550 and ANSI B30.5.
l. Construction material shall not be stored so as to block exits.
m. Ground fault circuit interrupters are required on all electrical circuits not part of the
permanent wiring of the building.
n. Personal fall protection must be provided at elevations exceeding ten (10) feet.
o. Per City Ordinance, any Contractor using construction dumpsters within the City
of Ocoee must obtain these services through the City’s Franchisee.
22. Drug-Free Workplace:
Provide a statement concerning the Respondent’s status as a Drug-Free Workplace or
evidence of an implemented drug-free workplace program. Complete the attached
Drug-Free Workplace Form and submit with qualification package.
23. Certification of Non-Segregated Facilities:
The Respondent certifies that the Respondent does not and will not maintain or provide
for the Respondent’s employees any segregated facilities at any of the Respondent’s
establishments and that the Respondent does not permit the Respondent’s employees
to perform their services at any location, under the Respondent’s control, where
segregated facilities are maintained. The Respondent agrees that a breach of this
certification will be a violation of the Equal Opportunity clause in any contract resulting
from acceptance of this Bid. As used in this certification, the term “segregated
facilities” means any waiting room, work areas, time clocks, locker rooms and other
storage and dressing areas, parking lots, drinking facilities provided for employees
which are segregated on the basis of race, color, religion, national origin, habit, local
custom, or otherwise. The Respondent agrees that (except where the Respondent has
obtained identical certification from proposed contractors for specific time periods) the
Respondent will obtain identical certifications from proposed subcontractors prior to
Page 294 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 12
the award of such contracts exceeding $10,000 which are not exempt from the
provisions of the Equal Opportunity clause, and that the Respondent will retain such
certifications in the Respondent’s files.
The non-discriminatory guidelines as promulgated in Section 202, Executive Order
11246, and as amended by Executive Order 11375 and as amended, relative to Equal
Opportunity for all persons and implementations of rules and regulations prescribed by
the U.S. Secretary of labor, are incorporated herein.
24. Scrutinized Companies:
Bidder certifies that the company is not participating in a boycott of Israel. Bidder
certifies that the Bidder is not on the Scrutinized Companies that Boycott Israel List,
not on the Scrutinized Companies with Activities in Sudan List, not on the Scrutinized
Companies with activities in the Iran Petroleum Energy Sector List, or has been
engaged in business operations in Cuba or Syria, as those terms are used and defined
in sections 287.135 and 215.473 of the Florida Statutes. In the event that Bidder is
unable to provide such certification but still seeks to be considered for award of this
solicitation, Bidder shall, on a separate piece of paper, clearly state that it is on one or
both of the Scrutinized Companies lists and shall furnish together with its proposal a
duly executed written explanation of the facts supporting any exception to the
requirement for certification that it claims under Section 287.135 of the Florida
Statutes. Bidder agrees to cooperate fully with the City in any investigation undertaken
by the City to determine whether the claimed exception would be applicable. The City
shall have the right to terminate any contract resulting from this solicitation for default
if Bidder is found to have submitted a false certification, or to have been placed on the
Scrutinized Companies that Boycott Israel List, or to have been placed on the
Scrutinized Companies for Activities in Sudan List, or the Scrutinized Companies with
Activities in the Iran Petroleum Energy Sector List, or has been engaged in business
operations in Cuba or Syria.
B. INSURANCE TERMS AND CONDITIONS
The successful respondent shall be required to provide evidence of General (Public &
Property) Liability Insurance in the form of a certificate of insurance issued on behalf
of the City of Ocoee and naming the City as an additional insured, by companies
acceptable to the City at the minimum limits and coverages listed below with deductible
amounts acceptable to the City. The selected Contractor shall not commence any work
in connection with an Agreement until all of the following types of insurance have been
obtained and such insurance has been approved by the City, nor shall the Contractor
allow any subcontractor to commence work on a subcontract until all similar insurance
required of the subcontractor has been so obtained and approved. Policies other than
Workers’ Compensation shall be issued only by companies authorized by subsisting
certificates of authority issued to the companies by the Department of Insurance of
Florida which maintain a Best’s Rating of “A” or better and a Financial Size Category
of “VII” or better according to the A.M. Best Company. Policies for Workers’
Compensation may be issued by companies authorized as a group self-insurer by
440.57, Florida Statutes.
Page 295 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 13
1. Loss Deductible Clause: The City shall be exempt from, and in no way liable for,
any sums of money which may represent a deductible in any insurance policy. The
payment of such deductible shall be the sole responsibility of the General
Contractor and/or subcontractor providing such insurance.
2. Workers’ Compensation Insurance: The Contractor shall obtain during the life of
this Agreement, Workers’ Compensation Insurance with Employer’s Liability
Limits of $500,000/$500,000/$500,000 for all the Contractor’s employees
connected with the work of this project and, in the event any work is sublet, the
Contractor shall require the subcontractor similarly to provide Workers’
Compensation Insurance for all of the latter’s employees unless such employees are
covered by the protection afforded by the Contractor. Such insurance shall comply
fully with the Florida Workers’ Compensation Law. In case any class of employees
engaged in hazardous work under this contract for the City is not protected under
the Workers’ Compensation statute, the Contractor shall provide, and cause each
subcontractor to provide adequate insurance, satisfactory to the City, for the
protection of the Contractor’s employees not otherwise protected. Include Waiver
of Subrogation in favor of the City of Ocoee.
3. Contractor’s Public Liability and Property Damage Insurance: The Contractor shall
obtain during the life of this Agreement COMMERCIAL AUTOMOBILE
COVERAGE, this policy should name the City of Ocoee as an additional insured,
and shall protect the Contractor and the City from claims for damage for personal
injury, including accidental death, as well as claims for property damages which
may arise from operations under this Agreement whether such operations be by the
Contractor or by anyone directly or indirectly employed by the Contractor, and the
amounts of such insurance shall be the minimum limits as follows:
4. Automobile Bodily Injury Liability & Property Damage Liability
• $1,000,000 Combined single limit per occurrence (each person, each accident)
• All covered automobile will be covered via symbol 1
• Liability coverage will include hired & non-owned automobile liability
• Include Waiver of Subrogation in favor of The City of Ocoee
5. Comprehensive General Liability (Occurrence Form) - This policy should name the
City of Ocoee as an additional insured and should indicate that the insurance of the
Contractor is primary and non-contributory.
• $2,000,000 GENERAL AGGREGATE
• $2,000,000 PRODUCTS-COMPLETED OPERATIONS AGGREGATE
• $1,000,000 PER OCCURRENCE
• $1,000,000 PERSONAL & ADVERTISING INJURY
• Include Waiver of Subrogation in favor of the City of Ocoee
6. Subcontractor’s Comprehensive General Liability, Automobile Liability and
Worker’s Compensation Insurance: The Contractor shall require each
subcontractor to procure and maintain during the life of this subcontract, insurance
of the type specified above or insure the activities of these subcontractors in the
Contractor’s policy, as specified above.
Page 296 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 14
7. Owner’s Protective Liability Insurance: As applicable for construction projects,
providing coverage for the named insured’s liability that arises out of operations
performed for the named insured by independent contractors and are directly
imposed because of the named insured’s general supervision of the independent
contractor. The Contractor shall procure and furnish an Owner’s Protective
Liability Insurance Policy with the following limits: $1,000,000, and per
occurrence, $2,000,000. Aggregate and naming the City of Ocoee as the Named
Insured.
8. Contractual Liability: If the project is not bonded, the Contractor’s insurance shall
also include contractual liability coverage to insure the fulfillment of the contract.
NOTE: PUBLIC LIABILITY INSURANCE AND AUTOMOBILE
LIABILITY INSURANCE, THE CITY SHALL BE NAMED AS
ADDITIONAL INSURED.
• $1,000,000 PER OCCURRENCE
• $2,000,000 AGGREGATE
Commercial Umbrella:
• $1,000,000 PER OCCURRENCE
• $2,000,000 Aggregate
• Including Employer’s Liability and Contractual Liability
Builders Risk: (as applicable for construction projects)
• $100,000 Any (1) Location
• $1,000,000 Any (1) Occurrence
(Remainder of page intentionally left blank.)
Page 297 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 15
9. Certificates of Insurance: Certificate of Insurance Form (see sample, above), naming
the City of Ocoee as an additional insured will be furnished by the Contractor upon
notice of award. These shall be completed by the authorized Resident Agent and
returned to the Office of the Purchasing Agent. This certificate shall be dated and show:
• The name of the Insured Contractor, the specific job by name and job number,
the name of the insurer, the number of the policy, its effective date, and its
termination date.
• Statement that the Insurer shall mail notice to the Owner at least thirty (30) days
prior to any material changes in provisions or cancellation of the policy, except
ten (10) days written notice of cancellation for non-payment of premium.
Page 298 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 16
C. SCOPE OF SERVICES
The Floral Street Sanitary Sewer and Water Project is part of the Downtown Master Plan
to stimulate development in the downtown Ocoee area. This project will be funded by
bond proceeds and other dollars appropriated by the City Commission. The cost of the
improvements for this project is estimated to be $1,000,000.00. Additional
information regarding Ocoee’s Downtown Redevelopment is available on the city website
at http://www.ocoee.org/807/Downtown-Master-Plan.
In order to promote growth in the Downtown area, the City is seeking to accomplish the
following:
• Extend the gravity sewer system from Bluford Ave. west to Floral St.,
S. Cumberland Ave., and Sills Alley. This sewer extension will consist of
approximately 1,700 LF of new gravity sewer, six new manholes, and stub outs
with clean outs for sewer service connections.
• Upgrade the potable water system in this area due to age and redundancy.
• Extend an existing 8-inch D.I. water main on N. Cumberland Ave. approximately
280 LF to loop the water system on W. McKey St. and W. Oakland Ave.
The City retained Hazen and Sawyer as the engineer of record for this project. The design
plans are approximately 60% complete. The anticipated start of construction for this
project is Summer 2023.
The CMR selected for the work will provide:
1. Pre-construction services including thorough document review and identification for
constructability, completeness, redundancies, gaps, the development of cost
containment strategies, value engineering, and development of a Guaranteed
Maximum Price (GMP) and Guaranteed Delivery Date.
2. Construction phase administration, including all scheduling and construction phasing
of the work, coordination with the other development work that may be concurrently
occurring adjacent to the work site, general contracting services (for all trades and
including self-performance of work at the CMR's option and with City approval),
coordination with private and public utilities, and securing of all required local
construction permits (there is no cost for City-issued permits).
D. SUBMITTALS
Qualifications packages shall be designed to portray to the City how the Respondent’s
services can best match the knowledge, skills, and abilities suggested by the anticipated
Scope of Services given above. Interested firms or individuals must be experienced in
providing CMR services and shall be a licensed General Contractor in the State of Florida
in good standing. Use of qualified subcontractors for specialty work is acceptable and
expected. To be considered, the firm or individual must be familiar with all applicable State
of Florida, St. Johns River Water Management District, Orange County and City of Ocoee
codes, regulations, and laws. Please include a copy of all applicable licenses held by the
CMR firm and project team proposed to perform work.
Page 299 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 17
In order for the City to evaluate the qualification package, each Respondent shall provide
information relative to their ability to provide services that will best meet the needs of the
City. The required submission materials include the following:
I. CMR’s Qualifications
• List of CMR’s key employees/project team members, their qualifications/resumes, and
their role in providing the desired City services.
• CMR’s and key employee’s/project team members’ certifications and licenses with
regulatory agencies, professional organizations, etc.
• Provide a project staff organization chart for the entire CMR team.
• List of CMR’s current or recent successfully completed similar projects within the past
five (5) years with other public or private agencies which illustrates the experience of
the CMR.
• List of at least three (3) client references to include organization name, contact person,
telephone number(s), and e-mail address.
• Current and projected workload of the CMR. Provide project and client names, project
commencement and projected completion dates, and construction dollar value of the
project.
• Project Approach: Briefly describe the CMR’s understanding of the project and how
the CMR would accomplish this work.
II. CMR’s Office Location and Other Forms (not included in page limit)
• List the office location of the CMR and approximate distance (in miles) and time (in
hours) to City Hall.
• Attach a Letter of Intent from a qualified surety company indicating the Respondent’s
bonding capacity for this project (performance and payment bond) and the surety’s
willingness to issue such a bond that is in compliance with Florida Statute 255.05, on
the City’s forms provided in this RFQ, in an amount in excess of the estimated budgeted
amount shown in the Scope of Services section of this RFQ. See Section 18 of the
RFQ for additional information.
• Conflict of Interest Disclosure Form
• Drug-Free Workplace Certification Form
• Company Information/Signature Sheet
• Summary of Litigation Form
• Addendum Acknowledgement, if applicable
• Certified small or minority business, women's business enterprise, or labor surplus area
firm certification. Include certifications for Responding CMR firm only. Partial points
will not be awarded for M/WBE sub-consultants.
Page 300 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 18
E. TIME SCHEDULE
The anticipated schedule of events related to this solicitation is:
Date of RFQ Request for qualifications advertised
17 days later Last day for questions
30 days later Statements of qualification are due
35 days later Statements of qualification distributed to evaluation committee
45 days later Evaluation committee meeting held
50-60 days later Interviews of no fewer than three Respondents, if possible
Next meeting Short-list of ranked firms recommended to City Commission
Dates are estimated and subject to change at the City’s discretion.
F. SELECTION PROCESS
1. The criteria for selection shall be based on the criteria listed in the RFQ. The City
reserves the right, before awarding the contract, to require a Respondent to submit
additional evidence of its qualifications, as the City may deem necessary, and shall
conduct discussions with, and may require public presentations by, no fewer than three
(3) firms, if possible. The City shall be the sole judge of the competency of
Respondents.
2. A City evaluation committee will evaluate each respondent’s qualifications and after
interviews and/or oral presentations will short-list and recommend to the City
Commission the top three (3) firms, if possible, in ranked order of qualifications based
upon the evaluation committee’s evaluation of the responses and any client references.
All Respondents shall be notified Bonfire or other means of the evaluation committee’s
recommended ranking of firms to the City Commission. The City Commission’s
decision to endorse or modify the ranking by the evaluation committee shall be final.
The City Commission shall be the final authority in the award or rejection of any and
all responses.
3. The City will apply the negotiation requirements of § 287.055, Florida Statutes. The
City will attempt to negotiate an agreement with the top-ranked Respondent. If no
agreement is reached with the top-ranked Respondent, negotiations will be terminated
and initiated with the second-ranked Respondent, and so on, until an agreement is
reached.
4. Upon the successful negotiation of an agreement, a formal contract will be prepared
and subsequently executed by both parties. The general form of this agreement is
provided in Attachment 3. The successful Respondent shall be required to execute an
agreement which provides, among other things, that all plans, drawings, reports, and
specifications that result from Respondent’s services shall become the property of the
City.
5. The following evaluation criteria will be used to rate the timely received responses:
Page 301 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 19
Evaluation Criteria Maximum
Points
1. Overall expertise of the CMR to provide requested services:
• General Civil
• Roadway and other transportation
• Environmental and stormwater
• Potable water, sanitary sewer, and reclaimed water utilities
30
2. Past performance and experience of the CMR Project Team 30
3. Project approach and understanding of the project 20
4. Current and projected workload of the CMR 10
5. CMR’s office location and proximity to Ocoee City Hall 5
6. Certified small or minority business, women's business enterprise, or labor
surplus area firm – Responding Firm only. 5
Total Possible Points 100
Information supplied by client references may be used in determining the relative
merits of a Respondent under any and all of the above-listed criteria.
G. BID PROTESTS
All Bid Protests shall be submitted to the Purchasing Agent in the following manner by
email to Shannon Hopper, shopper@ocoee.org with a copy to Joyce Tolbert,
jtolbert@ocoee.org:
1. A Bidder shall file a written bid protest under this Article or be barred any relief;
oral protests shall not be acknowledged.
2. A bid protest shall be limited to the following grounds: (a) issues arising from the
procurement provisions of the Project Manual, its addenda, and other bidding
documents; and/or (b) applicable federal, state, or local law. No bid protest may be
based upon questions concerning the design documents (drawings and
specifications). The Bidder shall clarify all questions concerning the design
documents of the project prior to submitting its bid.
3. The content of the bid protest shall fully state the factual and legal grounds for the
protest and the legal basis for the relief requested.
4. The bid protest shall be filed with the Purchasing Agent not later than five (5)
calendar days after the posting of the notice of intent to award or recommendation
of award by staff, whichever is earlier.
5. The Purchasing Agent, on behalf of the City, shall make a determination of the
merits of the protest not later than five (5) business days after receipt of the protest.
If the City denies the protest, the City may proceed with award of the contract unless
enjoined by order of a court of competent jurisdiction.
END OF INSTRUCTIONS
Page 302 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 20
RFQ CONFLICT OF INTEREST DISCLOSURE FORM
The award of this contract is subject to the provisions of Chapter 112, Florida Statutes. All Proposers must
disclose within their Proposal: the name of any City of Ocoee employee, Mayor or City Commissioner,
other City Official, or City Consultants, who owns assets or capital stock, directly or indirectly, in the
Proposer’s firm or any of its branches, or would directly or indirectly benefit by the profits or emoluments
of this proposal. (Indirect ownership or benefit applies to any members of his or her immediate family.)
Proposer certifies that no member of the entity’s ownership or management is presently applying for an
employee position or actively seeking an elected position with the City. In the event that a conflict of
interest is identified in the provision of services, Proposer agrees to immediately notify the City in writing.
The purpose of this disclosure form is to give the City the information needed to identify potential conflicts
of interest for the City Commission, Evaluation Committee members, and other key City employees and
consultants involved in the award of this contract.
According to Chapter 112, Florida Statutes, the term “conflict of interest” “means a situation in which
regard for a private interest tends to lead to disregard of a public duty or interest”, and refers to situations
in which financial or other personal considerations may adversely affect, or have the appearance of
adversely affecting, an employee’s professional judgment in exercising any City duty or responsibility in
administration, management, instruction, research, or other professional activities.
Please check one of the following statements and attach additional documentation if necessary:
_________ To the best of our knowledge, the undersigned firm has no potential conflict of interest for
this Proposal.
_________ The undersigned firm, by attachment to this form, submits information which may be a
potential conflict of interest for this Proposal.
Acknowledged by:
____________________________________________________________________________
Firm Name
____________________________________________________________________________
Signature
____________________________________________________________________________
Name and Title (Print or Type)
____________________________________________________________________________
Date
Page 303 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 21
DRUG-FREE WORKPLACE CERTIFICATION
The undersigned Respondent, in accordance with Florida Statute 287.087 hereby certifies that it
has a drug-free workplace program. In order to have a drug-free workplace program, a business
shall:
1. Publish a statement notifying employees that the unlawful manufacture, distribution,
dispensing, possession, or use of a controlled substance is prohibited in the workplace and
specifying the actions that will be taken against employees for violations of such
prohibition.
2. Inform employees about the dangers of drug abuse in the workplace, the business's policy
of maintaining a drug-free workplace, and available drug counseling, rehabilitation, and
employee assistance programs, and the penalties that may be imposed upon employees for
drug abuse violations.
3. Give each employee engaged in providing the commodities or contractual services that are
under bid a copy of the statement specified in subsection (1).
4. In the statement specified in subsection (1), notify the employees that, as a condition of
working on the commodities or contractual services that are under bid, the employee will
abide by the terms of the statement and will notify the employer of any conviction of, or
pleas of guilty or nolo contendere to, any violation of Chapter 893 or of any controlled
substance law of the United States or any state, for a violation occurring in the workplace
no later than five (5) days after such conviction.
5. Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or
rehabilitation program is such is available in the employee's community, by any employee
who is so convicted.
6. Make a good faith effort to continue to maintain a drug-free workplace through
implementation of this section.
As the person authorized to sign the statement, I certify that this firm complies fully with the above
requirements.
Respondent:
Signed:
By:
(Print or Type Name)
Title:
Date:
Page 304 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 22
COMPANY INFORMATION/SIGNATURE SHEET RFQ #23-004
FAILURE TO COMPLY WITH THESE RFQ INSTRUCTIONS WILL RESULT IN
DISQUALIFICATION OF YOUR QUALIFICATION PACKAGE. PLEASE SIGN BELOW
ATTESTING THAT YOU HAVE READ AND UNDERSTAND ALL RFQ INSTRUCTIONS,
AND THAT YOU UNDERSTAND THAT THE SUCCESSFUL RESPONDENT WILL BE
REQUIRED TO ENTER INTO A LEGALLY BINDING CONTRACT WITH THE CITY OF
OCOEE.
__________________________________ __________________________________
COMPANY NAME TELEPHONE (INCLUDE AREA CODE)
__________________________________
FAX (INCLUDE AREA CODE)
__________________________________
E-MAIL ADDRESS
_________________________________ IF REMITTANCE ADDRESS IS
AUTHORIZED SIGNATURE (manual) DIFFERENT FROM PURCHASE ORDER
ADDRESS, PLEASE INDICATE BELOW:
________________________________
NAME/TITLE (PLEASE PRINT) ____________________________________________
________________________________ ____________________________________________
STREET ADDRESS
_________________________________
CITY STATE ZIP
FEDERAL ID #____________________
_____Individual _____Corporation _____Partnership _____Other (Specify)________________________
Sworn to and subscribed before me by means of ☐ physical presence or ☐ online notarization this
________day of ____________________, 20____.
Personally Known___________ or
Produced Identification_________
____________________________ Notary Public - State of _______
(Type of Identification) County of __________________
___________________________
Signature of Notary Public
___________________________
Printed, typed or stamped
Commissioned name of Notary Public
Page 305 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 23
SUMMARY OF LITIGATION
Summary of Litigation: State “None” if no litigation. Provide a summary of any litigation claim(s), bid or
contract dispute(s) filed by or against the CMR firm in the past five (5) years which is related to the services
that the CMR firm provides in the regular course of business. The summary shall state the nature of the
litigation, claim, or contract dispute, a brief description of the case, the outcome or projected outcome, and
the monetary amounts involved, in accordance with the guidelines below:
Claims/Litigations
1. Within the past 5 years, has your organization filed suit or a formal claim against a project owner (as a
prime or subcontractor) or been sued by or had a formal claim filed by an owner, subcontractor or supplier
resulting from a construction dispute? Yes________ No_________ If yes, please attach additional sheet(s)
to include:
Description of every action Captions of the Litigation or Arbitration
Amount at issue: ______________________
Name (s) of the attorneys representing all parties:
________________________________________________________________________________
Amount actually recovered, if any: ____________________________________
Name(s) of the project owner(s)/manager(s) to include address and phone number:
________________________________________________________________________________
2. List all pending litigation and or arbitration.
_____________________________________________________________________________________
_____________________________________________________________________________________
3. List and explain all litigation and arbitration within the past five (5) years - pending, resolved,
dismissed, etc.
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
4. Within the past 5 years, please list all Liens, including Federal, State and Local, which have been filed
against your Company. List in detail the type of Lien, date, amount and current status of each Lien.
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
5. Have you ever abandoned a job, been terminated or had a performance/surety bond called to complete
a job? Yes________ No________ If yes, please explain in detail:
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
6. For all claims filed against your company within the past five (5) years, have all been resolved
satisfactorily with final judgment in favor of your company within 90 days of the date the judgment
became final? Yes ______ No_______ If no, please explain why?
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
Page 306 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 24
7. List the status of all pending claims currently filed against your company:
_____________________________________________________________________________________
_____________________________________________________________________________________
8. In the last ten (10) years, has the CMR Firm/Team ever been in bankruptcy or receivership?
Yes________ No________
If yes, please explain in detail:
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
9. In the last five (5) years, has OSHA cited and assessed penalties against the CMR Firm/Team for
violations of its safety or health regulations? Yes________ No________
If yes, please explain in detail:
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
10. Has the Environmental Protection Agency or any Florida Water Management District cited and
assessed penalties against the CMR Firm/Team or the owner of a project during the time in which the parties
were performing on a contract? Yes________ No________
If yes, please explain in detail:
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
11. Has any insurance carrier, for any form of insurance, refused to renew the insurance policy for the
CMR Firm/Team due to non-payment or contractor losses? Yes________ No________
If yes, please explain in detail:
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
Liquidated Damages
1. Has a project owner ever withheld retainage, issued liquidated damages or made a claim against any
Performance and Payment Bonds? Yes________ No________
If yes, please explain in detail:
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
Page 307 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 25
ATTACHMENT “1”
FLORAL STREET SEWER PROJECT MAP
Page 308 of 668
1
2
21
8
8
5
2
8
6
8
6
4
2 12
36
33
18 10
30 14
15
11 14
15
1715
11
16 14
29
40
12
2412
16
13 2921
2016
24 2812
10
26
25
26
1212
10
102
219
101
212
133
104
112
145
114
116
102
108
108
123
225
115
117
119
129
112
220201 140120
205
201212
209 216213
101
144
145145
116118120
112 102104106114108110
112
133 129 125
8" PW
4" P W
6" PW2" P W
8" PW8" P W
6" P W
8" PW8" PW2" P W
2" P W
8" P W
2" PW6" PW8" PW6 " P W
6" PW2" P W
2" P W
8" PW2" PW
6" P W
6" PW6"
PW2" P W
8" PW6" PW
6" PW2" PW6" PW6" PW8" PW8" P W
6" P
W
2" PW
6 " P W
6"
P
W8" PW8" P W 6" P W
8" PW2" P W
8" PW8" PW8" PW6" PW8" PW2" P W
8" PW2" P W 2" PW8" P W 2" P W
3/4" PW
6" PW8" PW8" S S G M
16" Transmission FMFloral Stre et
W Mcke y S tree t
Bay StreetS Bluford AvenueTaylor Stre
et
S Kissimmee AvenueS Cumberland AvenueE M ckey St ree tN Bluford AvenueMag nolia St ree t
Lafayette Street
W Oaklan d Street E O aklan d Ave nueW Oaklan d Av enu e
Sills AlleyN Cumberland AvenueN Kissimmee AvenueW Oaklan d Av enu eDowntown Floral Street Project
Last Update d: Decemb er 1 2, 2 0221:1,325
¯
Overview Map
Legend
Pot able Water Fea tures
Existing Pota bl e Wa terMain Line
Ñ Water Hydr ant (Oco ee)
Potable Wate r Main L ine tobe Con structed, Remo ved,or Replaced
Sanitary Sewe r Feature s
Existin g S ew er G ravityMain
!!2 Existing Manh ole
Existing Sewe rPressurized M ain s
!!2 Proposed Man hole
Proposed Se wer G ravityMain
Conn ect to existin g Sanitary Sewer
115' 2" WM to b e Relo cated &25' Co nstructed to L oop 2" W M
Remove & Upgrade490' of 8" W M
Remove & Upgr ade335' of 8 " W M Remove 400 ' of 2" WM& Insta ll 400' of 6" WM
Constru ct 26 0' of 8" WM
Construct 15' 2" W M to Conn ect 2 " WM & Aba ndon 100' o f 2" WM
Page 309 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 26
ATTACHMENT “2”
OCOEE ENGINEERING STANDARDS MANUAL (LINK)
https://www.ocoee.org/212/Engineering-Standards
Page 310 of 668
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 27
ATTACHMENT “3”
DRAFT CONSTRUCTION MANAGER AT RISK AGREEMENT
INCLUDING EXHIBITS “A” – “L”
Page 311 of 668
Page 1 of 81
AGREEMENT
BETWEEN OWNER AND CONSTRUCTION MANAGER AT RISK FOR
FLORAL STREET WATER, SEWER AND ROAD RECONSTRUCTION
THIS AGREEMENT made the ________ day of ______________ in the year 20__ by and
between ___________________ (“Construction Manager”), a Florida corporation, and the CITY
OF OCOEE, a Florida municipal corporation, (“City” or “Owner”).
ARTICLE l
THE CONSTRUCTION TEAM AND EXTENT OF AGREEMENT
The Construction Manager accepts the relationship of trust and confidence established between it
and the Owner by this Agreement. Construction Manager covenants with the Owner to furnish
its best skill and judgment and to cooperate with the Engineer of Record in furthering the
interests of the Owner. Construction Manager agrees to furnish efficient business administration
and superintendence and use its best efforts to complete the project in the best and soundest way
and in the most expeditious and economical manner consistent with the interest of the Owner.
1.1 The Construction Team
The Construction Manager, the Owner, and the Engineer of Record, and any supporting
design professions, called the "Construction Team," shall work jointly during design and
through final construction completion and shall be available thereafter should additional
services be required. The Engineer and the Construction Manager shall communicate
through the Owner, except as may otherwise be provided in this Agreement or when
direct communications have been specifically authorized by the Owner. The Construction
Manager shall copy the Owner on all correspondence sent to or received from the
Engineer or any of its consultants of which the Owner was not copied.
The specific representatives of the Construction Team are shown in Exhibit "A" attached.
1.2 Extent of Agreement
This Agreement for Pre-construction and Construction Management Services for the
Project between the Owner and the Construction Manager supersedes any prior
negotiations, representations, or agreements. When drawings, specifications, and other
descriptive documents defining the work to be included in the Guaranteed Maximum
Price (GMP) are complete, an Amendment to the Agreement shall be signed by the
Owner and Construction Manager acknowledging the GMP and the drawings,
specifications, and other descriptive documents upon which the GMP is based. To
expedite the preparation of this GMP Amendment by the Owner, the Construction
Page 312 of 668
Page 2 of 81
Manager shall obtain two (2) sets of dated drawings, specifications, and other documents
upon which the GMP is based from the Engineer via the Owner. The Construction
Manager shall acknowledge on the face of each document of each set, that it is the set
upon which it based its GMP and shall send one set of the documents to the Owner along
with its GMP proposal, while keeping one set for itself. See Exhibits “J” and “K”.
This Agreement shall not be superseded by any provisions/revisions of the documents for
construction and may be amended only by written instrument signed by both Owner and
Construction Manager.
1.3 Definitions
A. Project – The Project is the total work to be performed under this Agreement. The
Project consists of permitting and construction for RFQ #23-004 - Construction
Manager at Risk for Floral Street Water, Sewer and Road Reconstruction.
B. Owner – City of Ocoee, a political subdivision of the State of Florida.
C. Construction Manager – ___________________.
D. Engineer of Record – Hazen and Sawyer, P.C.
E. Owner’s Representatives – City of Ocoee Utilities Director.
F. Guaranteed Maximum Price – The Construction Manager's latest guaranteed
maximum price.
G. Guaranteed Delivery Date – The Construction Manager’s latest guaranteed
delivery date.
H. Contract Documents – This Agreement, the Plans, Specifications, related
Construction Documents, RFQ #23-004 and all addenda, Construction Manager’s
Response to RFQ #23-004, all written proposals from the Construction Manager,
and or any other documents incorporated herein by reference.
The general intent of the Contract Documents is to include all items necessary for
the proper execution and completion of the scope of the Work by the Construction
Manager. All Work mentioned or indicated in the Contract Documents shall be
performed by the Construction Manager as part of this Agreement unless it is
specifically indicated in the Contract Documents that such Work is to be done by
others. In the event the Drawings or the Specifications disagree in themselves or
with each other, the Construction Manager shall provide the better quality or
better quantity of Work unless otherwise directed by a written addendum to the
Agreement. In the event of discrepancies among the Contract Documents, the
documents shall be construed according to the following priorities:
Page 313 of 668
Page 3 of 81
Highest Priority - GMP Amendment
Second Priority - Amendments to drawings and specifications – later date to
take precedence
Third Priority - Construction Management Agreement
Fourth Priority - Specifications
Fifth Priority - Drawings
Sixth Priority - Request for Qualifications Solicitation Document and all
addenda, and all written proposals and responses from
Construction Manager.
I. Punch List – List of items of work to be completed and deficiencies to be
corrected, which items shall not affect the attainment of Substantial Completion.
Such items shall be complete or otherwise disposed of prior to final
acceptance/completion.
J. Schedule of Values – The schedule to be used as a basis for progress payments to
be made to the Construction Manager by the Owner during performance of the
Work, based on the then current percentage of progress of construction of the
Project, subject to the review of the Engineer.
K. Substantial Completion Date – The date, certified by the Engineer, that the
Project, or designated portion thereof, is sufficiently complete, in accordance with
the Construction Documents and a Certificate of Completion issued, so that the
Owner can reasonably utilize the Project, or designated portion thereof, for its
intended use. Additionally, complete all items referred to as necessary for
Substantial Completion, as defined in Article 2.10 (h) and in the Construction
Documents.
L. Substantial Completion – The Project, or designated portion thereof, is
sufficiently complete, in accordance with the Construction Documents and a
Certificate of Completion issued and as certified by the Engineer, so that the
Owner can reasonably utilize the Project, or designated portion thereof, for its
intended use. Additionally, complete all items referred to as necessary for
Substantial Completion, as defined in Article 2.10(h) and in the Construction
Documents. The only remaining work to be performed is the Punch List.
M. General Conditions – Those items that are not specific to any trade and are
required for the construction of the Project. Examples of General Conditions
items include daily cleanup and safety rails. [Reference 9.2(16)]
N. Project Improvements – Shall mean the improvements comprising the utility,
stormwater, roadway and street scape improvements for the Floral Street Water,
Sewer and Road Reconstruction, as identified in RFQ #23-004, to be constructed
and installed by the Construction Manager pursuant to this Agreement and the
Construction Contract.
O. Underground Facilities – All pipelines, conduits, ducts, cables, wires, manholes,
vaults, tanks, tunnels or other such facilities or attachments, and any encasements
Page 314 of 668
Page 4 of 81
containing such facilities which have been installed underground to furnish any of
the following services or materials: electricity, gases, steam, chilled water,
telephone or other forms of communications, cable television, sanitary sewage,
stormwater drainage removal, potable water, traffic, and control systems.
P. Final Completion – The following items have been completed or satisfied:
1. Construction of the Project is totally complete (all work as defined in the
Contract Documents), and certified as such by the Owner and Engineer.
2. The Project is suitable for full use as determined by the Owner and Engineer.
3. All Punch list items have been completed or otherwise disposed of or
accounted for to the Owner's satisfaction and approval.
4. A Final Certificate of Completion and all other permits and approvals required
have been legally and validly issued.
5. Construction Manager's executed Final Releases of Lien have been delivered
to the Owner.
1.4 Owner's Construction Budget
Owner's funds budgeted and requested for construction of the Project: The Owner's
Construction Budget is estimated at $2 million, including all Construction Manager fees,
costs of the work, and the Owner's and Construction Manager's construction and interface
contingencies, as defined in Articles 8 and 9. This acknowledgment of the Owner's
budgeted funds is not to be construed as the Construction Manager's Guaranteed
Maximum Price. A Guaranteed Maximum Price will be offered by separate
documentation, as outlined in Article 7.
ARTICLE 2
CONSTRUCTION MANAGER'S SERVICES
The services which the Construction Manager shall provide include, but are not limited to, those
described or specified herein. The services described or specified shall not be deemed to
constitute a comprehensive specification having the effect of excluding services not specifically
mentioned.
2.1 Project Management Information System (PMIS)
General:
1. Commencing immediately after contract award, the Construction Manager
shall implement and shall utilize throughout the life of this Agreement all
subsystems of the Project Management Information System hereinafter
referred to as PMIS.
Page 315 of 668
Page 5 of 81
2. The reports, documents, and data to be provided shall represent an
accurate assessment of the current status of the Project and of the Work
remaining to be accomplished and it shall provide a sound basis for
identifying variances and problems and for making management
decisions. It shall be prepared and furnished to the Owner and the
Engineer monthly.
3. If requested by the Owner, the Construction Manager shall conduct a
comprehensive workshop for participants designated by the Owner and
additional seminars as required, to provide instruction. This workshop and
the seminars shall facilitate each participant’s and the Owner's
representatives' use and understanding of PMIS; shall support, in part, the
function of organizing in concert with the Engineer for the design and
construction of the Project; and shall establish, with the full concurrence
of the Owner and the Engineer, procedures for accomplishing the
management control aspect of the Project.
4. The PMIS shall be described in terms of the following major subsystems:
A. Narrative Reporting, on a monthly basis,
B. Schedule Control, on a monthly basis,
C. Cost Control, and estimating,
D. Project Accounting,
E. Accounting and Payment, and
F. Action Reports.
2.2 Narrative Reporting Subsystem
1. The Construction Manager shall prepare written reports, as described
hereunder. No other PMIS narrative reports shall be required. All reports
shall be in 8.5" X 11" format, unless directed otherwise by the Owner.
2. The Narrative Reporting Subsystem shall include the following reports:
A. A Monthly Executive Summary that provides an overview of current
issues and pending decisions, future developments and expected
achievements, and any problems or delays, including code violations
found by Permitting Authority.
B. A Monthly Cost Narrative describing the current construction cost
estimate status of the Project.
C. A Monthly Scheduling Narrative summarizing the current status of
the overall project schedule. This report shall include an analysis of
the various project schedules, a description of the critical path, and
Page 316 of 668
Page 6 of 81
other analyses as necessary to compare planned performance with
actual performance.
D. A Monthly Accounting Narrative describing the current cost and
payment status of the entire project. This report shall relate current
encumbrances and expenditures to the budget allocations.
E. A Monthly Construction Progress Report during the construction
phase summarizing the work of the various subcontractors. This
report shall include information from the weekly job site meetings as
applicable such as general conditions, long lead supplies, current
deliveries, safety and labor relations programs permits, construction
problems and recommendations, and plans for the succeeding month.
F. A Daily Construction Diary during the construction phase describing
events and conditions on the site, as well as, identifying the number
of crews, men per crew, and heavy equipment on the project each
day.
3. The reports outlined in subsection 2A through E, above, shall be bound
with applicable computer reports and submitted monthly during design
and construction phases and shall be current through the end of the
preceding month. Copies shall be transmitted to the Owner and the
Engineer and others designated by the Owner's Representative with the
monthly pay requisition.
Additional copies of the report outlined in subsection 2A shall be bound
separately and distributed monthly, as directed by the Owner's
Representative.
4. The report outlined in subsection 2F, above, shall be maintained at the site
available to the Owner and Engineer. A bound copy of the complete diary
shall be submitted to the Owner at the conclusion of the Project.
2.3 Schedule Control Subsystem:
1. Master Project Schedule - Within 30 days of award of this Agreement, the
Construction Manager shall submit to the Owner for approval, a Master
Project Schedule covering the planning and design approvals,
construction, and Owner utilization of the Project. This schedule shall
serve as the framework for the subsequent development of all detailed
schedules. The Master Project Schedule shall be produced and updated
monthly throughout the project. No revisions, activity additions, activity
deletions, or logic changes to the Master Project Schedule or any other
schedule previously approved by the Owner, shall be made without the
Owner's approval.
Page 317 of 668
Page 7 of 81
2. Within thirty (30) days after the date of the Owner's issuance of a Notice
to Proceed for construction, the Construction Manager shall prepare and
submit to the Owner's Representative for approval a construction schedule
in quadruplicate in sufficient detail to graphically depict the activities
contemplated to occur as a necessary incident to performance of the work
required to complete the project, showing the sequence in which the
Construction Manager proposes for each such activity to occur and
duration (dates of commencement and completion, respectively) of each
such activity. The schedule shall be based on a "Network Analysis
System" and shall be the latest version of Primavera, or another acceptable
alternative. The Owner shall determine whether the construction schedule
developed and submitted by the Construction Manager meets the
requirements stated above and such determination shall be binding on the
Construction Manager. Failure of the Construction Manager to develop
and submit a construction schedule as aforesaid shall be sufficient grounds
for the Owner to find the Construction Manager in substantial default and
certify that sufficient cause exists to terminate this Agreement or to
withhold any payment.
Following development and submittal of the construction schedule, as
aforesaid, the Construction Manager shall, at the end of each calendar
month occurring thereafter, update the construction schedule to show the
actual progress of the work performed and the occurrence of all events
which have affected the progress of performance of the work already
performed or will affect the progress of the performance of the work yet to
be performed in contrast with the planned progress of performance of such
work, as depicted on the original construction schedule and all updates
thereto as reflected in the updated construction schedule last submitted
prior to submittal of each such monthly update. Each such update to the
construction schedule shall be submitted to the Owner in duplicate. Failure
of the Construction Manager to update, revise, and submit the construction
schedule as aforesaid shall be sufficient grounds for the Owner to find the
Construction Manager in substantial default, and certify that sufficient
cause exists to terminate this Agreement or to withhold payment to the
Construction Manager until a schedule or schedule update acceptable to
the Owner is submitted. No revisions, activity additions, activity deletions,
or logic changes shall be made without the Owner's approval, which shall
not be unreasonably withheld.
3. When required by the Owner, the Construction Manager shall prepare and
incorporate into the schedule database, at the required intervals, the
following schedules:
A. Subcontractor Construction Schedules (Sub-networks) - Upon the
Page 318 of 668
Page 8 of 81
award of each sub-contract, the Construction Manager shall jointly,
with the subcontractor, develop a schedule which is more detailed
than the pre-bid schedule included in the specifications, taking into
account the work schedule of the other subcontractors. The
construction schedule shall include as many activities as necessary to
make the schedule an effective tool for construction planning and for
monitoring the performance of the subcontractor. The construction
schedule shall also show pertinent activities for material purchase
orders, shop drawing schedules and material delivery schedules.
B. Completion Schedule - The Construction Manager shall jointly
develop with the Engineer and Owner a detailed plan, inclusive of
punch lists, final inspections, maintenance training and turn-over
procedures, to be used for ensuring accomplishment of a smooth and
phased transition from construction to public use. The Completion
Schedule shall be produced and updated monthly from its inception
through final Owner acceptance.
4. All schedules will be provided to the Owner on electronic Flash Drive
media in a format acceptable to the Owner. The Construction Manager
will provide the Owner with the appropriate software, if necessary, to read
the data. The cost of providing the licenses and software shall be part of
the cost of construction and included as part of Article 9, Cost of the
Work.
2.4 Budget Control Subsystem - The operation of this subsystem shall provide sufficient
timely data and detail to permit the Construction Team to control and adjust the project
requirements, needs, materials, equipment and systems by building and site elements so
that construction will be completed at a cost which, together with all other project costs,
will not exceed the GMP.
Requirements of this subsystem include the following submissions at the
following phases of the project:
1. Estimates - Prior to the start of pre-construction services, the Owner may
require any of the following estimates:
A. Completion of Schematic Documents
B. Completion of 100% Design Development Documents
C. 100% GMP Estimate - When the Construction Documents are
sufficiently complete enough to establish the GMP.
2.5 Project Accounting Subsystem
1. The operation of this subsystem shall enable the Construction Team to
monitor and control the funds available for the project, cash flow, costs,
change orders, payments, and other major financial factors by comparison
Page 319 of 668
Page 9 of 81
of budget, estimate, total commitment, amounts invoiced, amounts
payable, and to plan effectively, This subsystem will be produced and
updated monthly and includes the following reports, which together will
serve as a basic accounting tool and an audit trail. This report will also
provide for accounting by building and site element.
2. Costs Status Report presenting the budget, estimate, and base commitment
(awarded contracts and purchase orders) for any given contract or budget
line item. It shall show approved change orders for each contract which
when added to the base commitment will become the total commitment.
Pending change orders will also be shown to produce the total estimated
probable cost to complete the work.
3. A Payment Status Report showing the value in place (both current and
cumulative), the amount invoiced (both current and cumulative), the
retainage, the amount payable (both current and cumulative), and the
balance remaining. A summary of this report shall accompany each pay
request.
4. A Detailed Status Report showing the complete activity history of each
item in the project accounting structure. It shall include the budget,
estimate and base commitment figures for each contract. It shall give the
change order history including change order numbers, description,
proposed and approved dates, and the proposed and approved dollar
amounts. It shall also show all pending or rejected change orders.
5. A Cash Flow Diagram showing the projected accumulation of cash
payments against the project. Cash flow projections shall be generated for
anticipated monthly payments as well as cumulative payments.
6. A Job Ledger shall be maintained, as necessary, to supplement the
preparation of the project accounting subsystem. The job ledger will be
used to provide construction cost accountability for general conditions
Work, on-site reimbursable expenses, and costs.
2.6 Project Manual
When directed by the Owner, the Construction Manager shall provide the
following:
1. Upon award of contract, the Construction Manager shall develop a draft
comprehensive Project Manual describing the services set forth in this
Agreement for Owner's approval. This shall provide a plan for the control,
direction, coordination and evaluation of work performed throughout the
project, including identification of key personnel, responsibilities of
Construction Manager, Owner, and Engineer; work flow diagrams; and
strategy for bidding the work. The Project Manual shall be updated as
necessary with the Owner's approval throughout the design, construction
Page 320 of 668
Page 10 of 81
and Owner utilization phases. Two copies of the Project Manual and any
updates shall be submitted to the Owner and Engineer. In developing the
Project Manual, the Construction Manager shall coordinate with the
Owner and the Engineer.
2. Contents of Project Manual - The Project Manual shall describe in detail
the procedures for executing the work and the organizations participating.
The Project Manual shall include as a minimum the following sections:
A. Project Definition - The known characteristics of the project or sub-
projects shall be described in general terms which will provide the
participants a basic understanding of the project or sub-projects.
B. Project Goals - The schedule, budget, physical, technical and other
objectives for the project shall be defined.
C. Project Strategy - A narrative description of the project delivery
methods shall be utilized to accomplish the project goals.
D. Project Work Plan - A matrix display of the program of work to be
performed by the Construction Manager, the Engineer and the Owner
during each phase of the project.
E. Project Organization - A summary organization chart showing the
interrelationships between the Owner, the Construction Manager and
the Engineer, and other supporting organizations and permitting
review agencies. Detailed charts, one each for the Construction
Manager, the Engineer, and the Owner showing organizational
elements participating in the project shall be included.
F. Responsibility Performance Chart - A detailed matrix showing the
specific responsibilities and interrelationships of the Owner, the
Engineer, Construction Manager, and subcontractors. The
Responsibility Performance Chart shall indicate major responsibility,
and minor responsibility, for each specific task required to deliver the
project. The Construction Manager shall develop a similar chart for
the personnel within its own organization, as well as for its
subcontractors, who are assigned to the project, and also for the
personnel of the Owner and the Engineer from data supplied by each.
G. Flow Diagrams - These charts shall display the flow of information
and the decision process for the review and approval of shop
drawings and submittals, progress and change orders.
H. Written Procedures - The Construction Manager will provide written
procedures for communications and coordination required between
Construction Team members throughout the project. Procedures shall
cover such items as correspondence, minutes, reports, inspections,
team meetings, technical reviews, design reviews, and other
necessary communications.
Page 321 of 668
Page 11 of 81
2.7 Design and Review and Recommendations
The Construction Manager shall perform the services described in this Article. The
services to be provided under Paragraph 2.7 constitute the Pre-construction Phase
services. The parties acknowledge the Construction Phase may commence before the Pre-
construction Phase is completed, and, to a certain extent, both phases shall proceed
concurrently. The parties acknowledge that the Owner may choose not to proceed with
the Construction Phase or any portion of the construction in its sole discretion, and
Owner may terminate the Agreement for its convenience per Paragraph 14.3.
1. Preliminary Evaluation - The Construction Manager shall provide a
preliminary evaluation of the Owner's program and Project budget
requirements, each in terms of the other.
2. Consultation -The Construction Manager will jointly schedule and attend
regular meetings with the Owner and Engineer. The Construction Manager
will consult with the Owner regarding site use and improvements, and the
selection of materials, building systems, and equipment. The Construction
Manager will provide recommendations on construction feasibility;
actions designated to minimize adverse effects of labor or material
shortages; scheduling and time requirements for procurement, installation,
and construction completion; and factors related to construction cost
including estimates of alternative designs or materials, preliminary
budgets, and possible economies, including providing value engineering
options.
The Construction Manager's fundamental role and responsibility during
and throughout the progress of the Pre-construction Phase of the Project
shall include examination of the contract documents with written
communication(s) to the Owner, Owner's Representative, and Engineer of
any gaps, redundancies, and conflicts that have the potential to adversely
affect the cost, schedule, and constructability of the Project.
3. Phased Construction - The Construction Manager shall make
recommendations to the Owner regarding the phased issuance of
Drawings and Specifications to facilitate phased construction of the Work,
taking into consideration such factors as economies of scale, time of
performance, availability of labor and materials, and provisions for
temporary facilities. The Owner may choose to terminate this Agreement
before commencing any part of the Construction Phase.
4. Review Reports - Within ten (10) days after receiving the Construction
Documents for each phase of the project, the Construction Manager shall
perform a specific review thereof, focused upon factors of a nature
encompassed in Paragraph 2.7(1) and 2.7(2) above and on factors set out
in Paragraph 2.7. Promptly after completion of the review, Construction
Manager shall submit to the Owner, with copies to the Engineer, a written
report covering suggestions or recommendations previously submitted;
Page 322 of 668
Page 12 of 81
additional suggestions or recommendations, as Construction Manager may
deem appropriate; all actions taken by the Engineer with respect to same;
any comments Construction Manager may deem to be appropriate with
respect to separating the work into separate contracts; alternative
materials; and all comments called for under Article 2.7(3) .
THE CONSTRUCTION MANAGER SHALL WARRANT, TO THE
BEST OF CONSTRUCTION MANAGER'S KNOWLEDGE, WITHOUT
ASSUMING ANY ENGINEERING RESPONSIBILITY, THAT THE
PLANS AND SPECIFICATIONS ARE CONSISTENT, PRACTICAL,
FEASIBLE, AND CONSTRUCTIBLE. CONSTRUCTION MANAGER
SHALL WARRANT THAT THE WORK DESCRIBED IN THE PLANS
AND SPECIFICATIONS FOR THE VARIOUS SUBCONTRACTOR
BIDDING PACKAGES IS CONSTRUCTIBLE WITHIN THE
SCHEDULED CONSTRUCTION TIME.
The recommendations and advice of the Construction Manager concerning
design alternatives shall be subject to the review and approval of the
Owner and Owner's professional consultants. Construction Manager shall
not assume in any way the responsibilities of the Engineer; in particular,
the responsibility of assuring that the Drawings and Specifications, which
are identified in Exhibit "I", are in accordance with applicable laws,
statutes, ordinances, Building Codes, Rules, and Regulations. However, if
the Construction Manager recognizes that portions of the Drawings and
Specifications are at variance therewith, the Construction Manager shall
promptly notify the Engineer, via the Owner, in writing regarding the
identified variances.
5. Long-lead Procurements - The Construction Manager shall review the
design for the purpose of identifying long-lead procurement items
(machinery, equipment, materials and supplies). When each item is
identified, the Construction Manager shall notify the subcontractors, the
Owner and the Engineer of the required procurement and schedule. Such
information shall be included in the bid documents and made a part of all
affected sub-contracts. The Construction Manager shall keep itself
informed of the progress of the respective subcontractors or suppliers
manufacturing or fabricating such items, and advise Owner and Engineer
of any problems or prospective delay in delivery. The Construction
Manager may recommend to the Owner a schedule for procurement of the
long-lead time items, which will constitute part of the Work as required to
meet the Project Schedule. If such long-lead items are procured by the
Owner, they shall be procured on terms and conditions acceptable to the
Construction Manager. Upon the Owner's acceptance of the Construction
Manager's LSP proposal, all contracts for such items shall be assigned by
the Owner to the Construction Manager, who shall accept responsibility
for such items as if procured by the Construction Manager. The
Construction Manager shall assist in expediting the delivery of long-lead
time items.
Page 323 of 668
Page 13 of 81
6. Planning Separate Contracts - Without assuming any design responsibility,
the Construction Manager shall review the design with the Engineer and
make recommendations to the Owner with respect to dividing the work in
such manner as will permit the Construction Manager to take bids and
award separate construction sub-contracts on the current schedule while
the design is being completed. The evaluation shall take into consideration
such factors as natural and practical lines of severability, sequencing
effectiveness, access and availability constraints, total time for
completion, construction market conditions, availability of labor and
materials, community relations, and any other factors pertinent to saving
time and cost by overlapping design and construction that are authorized
by the Owner.
7. Interfacing
A. The Construction Manager shall take such measures as are
appropriate to provide that all construction requirements will be
covered in the separate subcontracts for procurement of long lead
items, the separate construction subcontracts and the general
conditions items performed without duplication or overlap, sequenced
to maintain completion of all work on schedule. Particular attention
shall be given to provide that each bid package clearly identifies the
work included in that particular separate subcontract, its schedule for
start and completion and its relationship to other separate contractors.
B. Without assuming any design responsibilities of the Engineer, the
Construction Manager shall include in the reports required under
Article 2.7(4) comments on overlap with any other separate
subcontracts, omissions, lack of correlation between drawings, and
any other deficiencies noted, in order that the Owner and Engineer
may arrange for necessary corrections.
8. Job-Site Facilities - The Construction Manager shall arrange for all job-
site facilities necessary to enable Construction Manager, Owner's
Representatives and Engineer to perform their respective duties in the
management, inspection, and supervision of construction.
2.8 Construction Phase
1. Construction Manager's Staff - The Construction Manager shall maintain
sufficient off-site support staff, and competent full-time staff at the Project
site authorized to act on behalf of the Construction Manager to coordinate,
inspect and provide general direction of the work and progress of the
subcontractors and it shall provide no less than those personnel during the
respective phases of construction that are set forth in Exhibit "B" to this
agreement. Construction Manager shall not change any of those persons
named in Exhibit "B" unless mutually agreed to by the Owner and
Construction Manager. In such case, the Owner shall have the right of
Page 324 of 668
Page 14 of 81
approval of the qualifications of replacement personnel. Such approval
will not be unreasonably withheld.
2. Lines of Authority - The Construction Manager shall establish and
maintain lines of authority for this personnel, and shall provide this
definition to the Owner and all other affected parties, such as the code
inspectors of the Permitting Authority, the subcontractors, the Engineer
and the Owner's representatives, to provide general direction of the work
and progress of the various phases and subcontractors. Owner, Owner’s
Representative, and Engineer may attend meetings between the
Construction Manager and its subcontractors; however, such attendance
shall not diminish either the authority or responsibility of the Construction
Manager to administer the subcontractor.
3. Schedule and Project Manual Provisions - The Construction Manager shall
provide subcontractors and the Owner, its representatives and the Engineer
with copies of the Project Manual (total number of copies not to exceed
10) developed and updated as required by Article 2.6 expanded for each
Construction Phase, employing their respective milestones, beginning and
finishing dates, their respective responsibilities for performance, and the
relationships of their work with respect to subcontractors and suppliers.
Construction Manager shall also continue to provide current scheduling
information, direction and coordination regarding milestones, and
beginning and finishing dates. Construction Manager is also responsible
for performance and the relationships of the Construction Manager's work
to the work of its subcontractors and suppliers to enable them to perform
their respective tasks so that the development of construction progresses in
a smooth and efficient manner in conformance with the overall project
schedule. The schedule shall include all phases of the construction work,
material supplies, long lease procurement, approval of shop drawings,
change orders in progress, schedules for change orders, and performance
testing requirements. Construction Manager shall advise the Owner, its
representatives and the Engineer of their required participation in any
meeting or inspection giving each at least one week notice unless such
notice is made impossible by conditions beyond its control. Construction
Manager shall hold job-site meetings at least once each month with the
Construction Team or more frequently as required by work progress, to
review progress, discuss problems and their solutions and coordinate
future work with all subcontractors.
4. Solicitation of Bids
A. Without assuming responsibilities of the Engineer, the Construction
Manager shall prepare invitations for bids, or requests for proposal
when applicable, for all procurement of long-lead items, materials
and services, and Subcontractor contracts. Such invitations for bids
shall be prepared in accordance with the following guidelines:
Page 325 of 668
Page 15 of 81
1. Those portions of the Work that the Construction Manager
does not customarily perform with the Construction Manager's
own personnel shall be performed under subcontracts or by
other appropriate agreements with the Construction Manager.
2. The Construction Manager shall obtain bids from
subcontractors, vendors, consultants and from suppliers of
materials or equipment fabricated to a special design for the
Work.
3. The Construction Manager shall strive to receive at least three
competitive bids per trade package. Should the nature of the
trade package prohibit three competitive bids, the
Construction Manager shall notify the Owner in writing as to
the reason and offer suggestions, if any, to create trade
interest.
B. The Construction Manager shall be responsible for coordinating with
the Engineer and preparing all information that is the responsibility of
the Construction Manager for bidding of the separate bid packages.
C. As part of such preparation, the Construction Manager shall review
the specifications and drawings prepared by the Engineer.
Ambiguities, conflicts, lack of clarity of language, use of illegally
restrictive requirements, and any other defects in the specifications or
in the drawings noted by the Construction Manager shall be brought
to the attention of the Owner and Engineer in written form. The
Construction Manager is solely responsible for reviewing and
comparing the Contract Documents with each other and shall
immediately report to the Engineer any and all errors, inconsistencies
or omissions. In the event the Construction Manager performs any
Work with the knowledge that it involves an error, inconsistency or
omission in the Contract Documents, the Construction Manager shall
be responsible for such erroneous, inconsistent, or omitted Work.
The Construction Manager is also responsible for taking such field
measurements as are necessary in order to verify field conditions and
to compare such field measurements and conditions with the Contract
Documents. Any and all errors, inconsistencies or omissions shall be
immediately reported to the Engineer. The Construction Manager and
the Owner's Representative shall mutually agree when and if to
conduct a pre-bid conference with prospective bidders and the
Engineer. In the event questions are raised which require an
interpretation of the bidding documents or otherwise indicate a need
for clarification or correction of the invitation, the Construction
Manager shall transmit these to the Owner and the Engineer, and
upon receiving clarification or correction in writing, the Construction
Manager shall prepare an addendum to the bidding document, and
issue same to all of the prospective bidders. The Construction
Manager shall not enter into contracts without the Owner reviewing
Page 326 of 668
Page 16 of 81
the proposed successful bidder. The Owner shall promptly, within (3)
business days, review all proposals and provide comments so as not
to cause delay in the award of a contract. Owner's failure to respond
within this time frame shall constitute acceptance of the proposed
contract. Owner shall have the right to reject any award of
subcontract providing such rejection is justifiable and with cause.
Should the Owner reject a proposal without cause and should the next
bondable, qualified bidder that is acceptable to the Construction
Manager be greater than the GMP budget for that work item, the
Owner shall issue a change order to the Construction Manager,
increasing the GMP for the amount of the difference between the
proposed award and that which the Owner has requested.
D. The Construction Manager is required to enter into written
agreements with each subcontractor who will perform any portion of
the Work on the Project. The subcontract agreement shall incorporate
the terms of the Contract Documents, and the terms of this
Agreement, and be assignable to Owner. Further, where appropriate,
the Construction Manager shall require each subcontractor to enter
into similar agreements with sub-subcontractors and material
suppliers. Before entering any agreement with a subcontractor,
Construction Manager shall confirm that the subcontractor is properly
licensed by the State, Seminole County, and any applicable
municipality, for the portion of the Work to be performed on the
Project, and shall supply such information or proof of licensing, in
writing, to Owner.
5. Bonds - In accordance with the provisions of Section 255.05, Florida Statutes, the
Construction Manager shall provide to the Owner, on forms furnished by the
Owner and attached as Exhibit “L”, a 100% Performance Bond and a 100% Labor
and Material Payment Bond each in an amount not less than the total construction
cost as defined in Article 9 and inclusive of the construction fee.
To be acceptable to the Owner as Surety for Performance Bonds and Labor and
Material Payment Bonds, a Surety Company shall comply with the following
provisions:
A. The Surety Company shall have a currently valid Certificate of
Authority, issued by the State of Florida, Department of Insurance,
authorizing it to write surety bonds in the State of Florida.
B. The Surety Company shall have currently valid Certificate of
Authority issued by the United States Department of Treasury under
Sections 9304 to 9308 of Title 31 of the United States Code.
C. The Surety Company shall be in full compliance with the provisions
of the Florida Insurance Code.
D. The Surety Company shall have at least twice the minimum surplus
and capital required by the Florida Insurance Code at the time the
Page 327 of 668
Page 17 of 81
bond is issued.
1. The Surety Company shall have at least the following minimum
ratings in the latest issue of Best's Key Rating Guide.
Contract Amount Policy Holder's Rating Required Financial Rating
$500,000 to $1,000,000 A Class IV
$1,000,000 to $2,500,000 A Class V
$2,500,000 to $5,000,000 A Class VI
2. The Surety Company shall not expose itself to any loss on any
one risk in an amount exceeding Ten Percent (10 %) of its
surplus to policyholders, provided:
a. In the case of the surety insurance company, in addition to
the deduction for reinsurance, the amount assumed by any
co-surety, the value of any security deposited, pledged or
held subject to the consent of the surety and for the
protection of the surety shall be deducted.
b. Any risk or portion of any risk being reinsured shall be
deducted in determining the limitation of the risk as
prescribed in this section. These minimum requirements
shall apply to the reinsuring carrier providing authorization
or approval by the State of Florida, Department of
Insurance to do business in this state has been met.
6. Quality Control - The Construction Manager shall develop and maintain a written
program, acceptable to the Owner and Engineer, to assure quality control of the
construction. Construction Manager shall supervise the work of all subcontractors
providing instructions to each when their work does not conform to the
requirements of the plans and specifications and Construction Manager shall
continue to exert its influence and control over each subcontractor to ensure that
corrections are made in a timely manner so as to not affect the efficient progress
of the work. Should disagreement occur between the Construction Manager and
Engineer over acceptability of work and conformance with the requirements of
the specifications and plans, the Owner shall be the final judge of performance
and acceptability, subject to the dispute provisions of this Agreement.
7. Subcontractor Interfacing - The Construction Manager shall be the single point of
interface with all Subcontractors for the Owner and all of its agents and
representatives including the Engineer. Construction Manager shall negotiate all
change orders, field orders and request for proposals, with all affected
Subcontractors and shall review the costs of those proposals and advise the Owner
and Engineer of their validity and reasonableness, acting in the Owner's best
Page 328 of 668
Page 18 of 81
interest prior to requesting approval of each change order from the Owner. Before
any Work is begun on any change order, a written authorization from the Owner
must be issued. However, when health and safety are threatened, the Construction
Manager shall act immediately to remove the threat to health and safety.
Construction Manager shall also carefully review all shop drawings and then
forward the same to the Engineer for review and actions. The Engineer shall
transmit them back to the Construction Manager who will then issue the shop
drawings to the affected subcontractor for fabrication or revision. The
Construction Manager shall maintain a suspense control system to promote
expeditious handling. Construction Manager shall request the Engineer via the
Owner to make interpretations of the drawings or specifications requested of him
by the subcontractors and shall maintain a suspense control system to promote
timely response. Construction Manager shall advise the Owner and Engineer
when timely response is not occurring on any of the above.
8. Permits - The Construction Manager shall secure all necessary permits from the
Permitting Authority and all necessary utility connection permits, the cost of
which will be considered a direct cost item, but not subject to Construction
Manager profit, as described in section 8.3.
9. Job Site Requirements
A. The Construction Manager shall provide for each of the following
activities as a part of its Construction Phase Cost:
1. Maintain a log of daily activities, including manpower records, heavy
equipment on site, weather, delays, major decisions, etc.
2. Maintain a roster of companies on the project with names and
telephone numbers of key personnel.
3. Establish and enforce job rules governing parking, clean-up, use of
facilities and worker discipline.
4. Provide labor relations management for a harmonious, productive
project.
5. Provide a safety program for the project to meet OSHA requirements.
Monitor for subcontractor compliance without relieving them of
responsibilities to perform work in accordance with the best
acceptable practice.
6. Provide a quality control program as developed under Article 2.8(6)
herein above.
7. Miscellaneous office supplies that support the construction efforts,
which are consumed by its own forces.
8. Travel to and from its home office to the project site, as the project
requires.
Page 329 of 668
Page 19 of 81
B. The Construction Manager shall provide personnel and equipment or shall
arrange for separate subcontracts to provide each of the following as a
direct cost item:
1. Schedule the services of independent testing laboratories for the
necessary testing of materials to ensure conformance to contract
requirements, if the Owner does not provide for these services.
2. The printing and distribution of all required bidding documents and
shop drawings, including the sets required by the Permitting
Authority's inspectors.
10. Job Site Administration - The Construction Manager shall provide, as part of its
job site fee, job site administrative functions during construction to assure proper
documentation, including but not limited to such things as the following:
A. Job Meetings - Hold weekly progress and coordination meetings to
provide for an easy flowing project. Implement procedures, assure timely
submittals, expedite processing approvals and return of shop drawings,
samples, etc.; Coordinate and expedite critical ordering and delivery of
materials, work sequences, inspection and testing, labor allocation, etc.;
Review and coordinate each subcontractor's Work; Review and implement
revisions to the Schedule; Monitor and promote safety requirements. In
addition, a regular monthly project status meeting will be held between the
Engineer, Owner and Construction Manager.
Use the job site meeting as a tool for planning of work and enforcing
schedules and for establishing procedures, responsibilities, and
identification of authority for all to clearly understand.
Identify party or parties responsible for follow up on any problems, delay
items or questions and identify a course for solution. Revisit each pending
item at each subsequent meeting until resolution is achieved. Require all
present to make any problems or delaying event known to those present
for appropriate attention and resolution.
B. Shop Drawing Submittals/Approvals - Provide staff to check shop
drawings and to implement procedures to be approved by Owner for
submittal and transmittal to the Engineer and Owner of such drawings for
action, and closely monitor their submittal and approval process.
C. Material and Equipment Expediting - Provide staff to closely monitor
material and equipment deliveries, important checking and follow-up
procedures on supplier commitments of all subcontractors.
D. Payments to Subcontractors - Develop and implement a procedure for
review, processing, and payment of applications by subcontractors for
progress and final payments.
E. Document Interpretation - Refer all questions for interpretation of the
documents prepared by the Engineer to the Engineer via the Owner.
Page 330 of 668
Page 20 of 81
F. Reports and Project Site Documents - Record the progress of the project.
Submit written progress reports to the Owner and the Engineer including
information on the subcontractors' work, and the percentage of
completion. Keep a daily log available to the Owner, the Engineer and the
Permitting Authority inspectors.
G. Subcontractors’ Progress - Prepare periodic punch lists for the
subcontractors' work, including unsatisfactory or incomplete items and
schedules for their completion.
H. Substantial Completion - Ascertain when the work, or designated portions
thereof, are ready for the Owner's and the Engineer's substantial
completion inspection. Prior to the Owner's and Engineer's pre-substantial
completion inspection, the Construction Manager shall issue a list of
incomplete items. After the Owner's and the Engineer's inspection, the
Construction Manager shall prepare a schedule for the completion of the
list indicating completion dates for the Owner's review. The Owner and
the Engineer will issue a certificate of substantial completion when the
work on the Construction Manager's pre-substantial completion punch list
has been accomplished, to the best of the Construction Manager's ability
(See Exhibit “C”).
After the Construction Manager has notified the Engineer that the project
is substantially compete, and the Engineer agrees that all Contract
Documents and each pay item is complete, the Engineer shall notify the
Construction Manager and the Owner, in writing, that the project has
attained substantial completion. Engineer, Owner, and Construction
Manager will perform the semifinal inspection within seven (7) day of
substantial completion. As part of the semi-final inspection,
representatives of the Owner will perform a joint review of the
project. The Engineer will generate a final project condition report, with
resolutions of discrepancies if any, and provide a copy to the Owner and
Construction Manager. If, at the semifinal inspection, all construction
provided for and contemplated by the Agreement is found complete to the
Engineer’s satisfaction, such inspection shall constitute the final
inspection, as prescribed herein. If, however, any work is found
unsatisfactory, in whole or in part, the Engineer shall compile a “punch
list” of work to be completed. A copy of the “punch list” will be furnished
to the Construction Manager, with the indication that the work so noted
must be completed. Time shall continue to be charged on the
project. Any “punch list(s)” furnished to the Construction Manager prior
to final inspection and acceptance shall state that it is not to be construed
as the “final” list. It shall also state that items damaged beyond the control
of the Construction Manager and prior to the final inspection must be
corrected prior to final acceptance. It shall also state that the Construction
Manager is still responsible for maintenance, including mowing, of the
Project(s) until final acceptance.
I. Final Completion - Monitor the Subcontractors' performance on the
Page 331 of 668
Page 21 of 81
completion of the project and provide notice to the Owner and Engineer
that the work is ready for final inspection. Secure and transmit to the
Owner, through the Engineer, all required guarantees, affidavits, releases,
bonds and waivers, manuals, record drawings, and maintenance books,
including the Final Completion form shown in Exhibit “D”.
J. Start-Up - With the Owner's personnel, direct the checkout of utilities,
operations, systems and equipment for readiness and assist in their initial
start-up and testing by the trade contractors.
K. Record Drawings/As-Built Drawings - The Construction Manager shall
monitor the progress of its own forces or its Subcontractors on marked up
field prints. The Construction Manager shall record all deviations from
original drawings. Final payment will not be made until the requirements
of this paragraph have been met. During the progress of the work, the
Construction Manager shall record on all field sets of drawings the exact
locations, as installed, of all underground and otherwise concealed
conduit, pipe and duct lines which were not installed exactly as shown on
the contract drawings. Upon completion of the work, this data shall be
recorded to scale on electronic files of the contract drawings. Where
changes are to be recorded, the drawing shall be erased before the changes
are made. Where the work was installed exactly as shown on the contract
drawings the drawing shall not be distributed other than being marked
“As-Built.” In showing the changes the same legend shall be used to
identify piping, etc., as was used on the contract drawings. Each sheet
shall bear the date and name of the subcontractor submitting the drawings.
The Construction Manager shall review the completed as-built drawings
and ascertain that all dates furnished on the drawings are accurate and
truly represent the work as actually installed. When manholes, boxes,
underground conduits, inverts, etc., are involved as part of the work, the
Construction Manager shall furnish true elevations and locations, all
properly referenced by using the original benchmark used for the
institution or for this project. The drawings including those unchanged
and changed shall be submitted to the Engineering and the Owner when
completed, together with two sets of blue line or black line prints for
certification. Upon completion and prior to final inspection, the following
must be provided to the Engineer and Owner:
1. Test results, as required.
2. Maintenance Bond for facilities to be conveyed to the Owner.
3. As-built drawings shall be submitted after final inspection and prior
to acceptance for water, wastewater and drainage systems, both on
and off-site. These drawings shall be based upon field surveys, and
will show all boundary, rights-of-way, easement and lot lines, and
shall be certified by a Registered Professional Land Surveyor in
accordance with Chapter 62-817, F.A.C. Note: Digital format
drawings (ACAD and PDF and/or ArcView).
Page 332 of 668
Page 22 of 81
a. Location of all sanitary manholes and cleanouts, the service
end of all laterals, and the elevation of all inverts and
manhole tops.
b. Location and top invert elevations of all lift stations and
location and elevation of all valves, and point at which force
main crosses any wastewater or drainage lines.
c. Location, size and invert elevation of all drainage pipes.
d. Location of all water mains, valves, and joints, and the
elevation of all fittings.
e. Spot elevation at fifty (50)-foot intervals along the top of
the berm and sufficient bottom elevations to show
conformance to design, of all retention/detention ponds.
f. Spot elevation at fifty (50)-foot intervals along all off-site
drainage ditches and swales.
g. CAD files should be in State Plane Coordinates (SPC) Feet,
East Zone - Florida, North American Datum (NAD) 1983.
h. Objects should be assigned by layer with color by layer. No
cryptic layer names. If cryptic layer names are used (i.e.
DXF files from microstation) then a list defining layer
names must be provided.
11. Administrative Records - The Construction Manager may be required to maintain
at the job site on a current basis, files and records such as, but not limited to the
following:
Contracts or Purchase Orders
Shop Drawing
Submittal/Approval Logs
Equipment Purchase/Delivery Logs
Contract Drawings and Specifications with Addenda
Warranties and Guarantees
Cost Accounting Records
Labor Costs
Material Costs
Equipment Costs
Cost Proposal Requests
Payment Request Records
Meeting Minutes
Cost-Estimates
Bulletin Quotations
Lab Test Reports
Insurance Certificates and Bonds
Contract Changes
Purchase Orders
Page 333 of 668
Page 23 of 81
Material Purchase Delivery Logs
Technical Standards Design Handbooks
"As-Built"/Record Drawing
Operating & Maintenance Instruction
Daily Progress Reports
Monthly Progress Reports
Correspondence Files
Transmittal Records
Inspection Reports
Bid/Award Information
Bid Analysis and Negotiations
Punch Lists
PMIS Schedule and Updates
Suspense (Tickler) Files of Outstanding Requirements
Project Manual
Job Photographs
Schedules (original, updated, and as-built)
The project records shall be available at all times to the Owner and Engineer for
reference or review.
12. Owner Utilization
The Construction Manager shall:
A. Provide services during the design and construction phases, which will
provide a smooth and successful Owner utilization of the project. Provide
consultation and project management to facilitate Owner utilization and
provide transitional services to get the work, as completed by the
contractors, subcontractors, “on line" in such conditions as will satisfy
Owner operational requirements.
B. Conduct the Construction Manager’s preliminary punch list inspection and
coordinate the completion of all punch list work to be done with Owner
utilization requirements in mind. Videotape all major equipment startup
procedures and deliver videotapes as part of the closeout documents.
C. Catalog operational and maintenance requirements of equipment to be
operated by maintenance personnel and convey these to the Owner in such
a manner as to promote their usability. Provide operational training, in
equipment use, for building operators.
D. Secure required guarantees and warranties, assemble and deliver same to
the Owner in a manner that will facilitate their maximum enforcement and
assure their meaningful implementation.
The Owner may take control of portions of the project providing the above items
discussed in this paragraph have been completed and the Substantial Completion, Start-
Up, Record Drawing, and Warranty requirements specified in paragraphs 2.8(10) and
2.8(13) have been completed to the Owner’s satisfaction for the portions to be occupied,
Page 334 of 668
Page 24 of 81
excluding the requirements for a warranty inspection nine months after Owner
Utilization.
13. Warranty
Where any work is performed by the Construction Manager’s own forces or by
subcontractors under contract with the Construction Manager, the Construction
Manager shall warrant that all materials and equipment included in such Work
will be new except where indicated otherwise in Contract Documents, and that
such Work will be of good quality, free from improper workmanship and
defective materials and in conformance with the Drawings and specifications.
With respect to the Work, the Construction Manager further agrees to correct all
work found by the Owner to be defective in material and workmanship or not in
conformance with the Drawings and Specifications for a period of one year from
the Date of Substantial Completion or partial utilization of any portion of the
building, whichever comes first, or for such longer periods of time as may be set
forth with respect to specific warranties contained in the trade sections of the
Specifications. The Construction Manager shall collect and deliver to the Owner
any specific written warranties given by others as required by the Contract
Documents. Also, the Construction Manager shall conduct, jointly with the
Owner and the Engineer, a warranty inspection approximately eleven (11) months
after the date of Owner Utilization.
14. Uncovering and Correction of the Work
A. In the event the Construction Manager covers a portion of the Work
contrary to the request of the Engineer or prior to an inspection by the
Engineer, the Construction Manager must if requested in writing uncover
the Work, and then shall be required to replace the work at the
Construction Manager’s sole expense, without any change to the contract
time.
B. The Project is subject to and shall be constructed in accordance with the
Florida Building Code and to all applicable codes referenced therein.
C. The Construction Manager shall promptly correct any and all Work
rejected by the Engineer and any and all Work which fails to comply with
the requirements of the Contract Documents. The Construction Manager
shall bear all of the costs for correcting such Work, including any
compensation for the Engineer’s services.
D. If within one (1) year after the date of final completion of the Work or
after the date for commencement of warranties, any of the Work is found
to be not in accordance with the requirements of the Contract Documents,
the Construction Manager shall promptly return to the Project and correct
the deficient Work upon receipt of written notification from the Owner to
do so. The obligation set forth in this subparagraph shall survive
acceptance of the Work under this Agreement and any termination of the
Agreement. The Owner shall give such written notice promptly after
discovery of the deficient Work. This one (1) year Construction Manager
Page 335 of 668
Page 25 of 81
warranty described in this subparagraph does not impact or impair any
manufacturer’s warranty or the Owner’s ability to make any other claim
against the Construction Manager as allowed under Florida law.
E. The Construction Manager shall immediately remove from the Work Site
any and all portions of the Work which are not in compliance with the
requirements of the Contract Documents. In the event the Construction
Manager fails to correct any non-conforming Work within a reasonable
time, the Owner may correct such non-conforming Work, the cost of
which shall be the Construction Manager’s responsibility. In the event the
Owner corrects the non-conforming Work, the Owner in its sole discretion
may remove, store or sell for salvage any salvageable materials or
equipment related to or a part of the non-conforming work at the
Construction Manager’s expense. If the Construction Manager fails to
reimburse the Owner for such expenses within 7 days after written notice,
the Owner may take any and all action it deems appropriate in order to
obtain reimbursement of its expenses under this subparagraph. Any action
taken by the Owner under this subparagraph shall not in any respect serve
to limit in law or equity the Owner’s ability to place any other claim
against the Construction Manager.
F. The Owner has the discretion to accept work that is not in compliance
with the requirements of the Contract Documents. In this event, the
Owner shall reduce its decision to writing, which shall include any
reduction, if any, to the Contract Sum as a result of the acceptance of non-
conforming Work. Any such adjustment to the Contract Sum shall apply
whether or not final payment has been made under this Agreement.
15. Site Conditions
A. Field Measurements. Before undertaking each part of the construction, Construction
Manager shall carefully study and compare the Contract Documents and check and
verify pertinent figures shown thereon and all applicable field measurements.
Construction Manager shall promptly report in writing to the Owner any conflict,
error or discrepancy which Construction Manager or any of its Subcontractors or
Suppliers may discover and shall obtain a written interpretation or clarification from
Owner before proceeding with any Work affected thereby; provided, however,
Construction Manager shall not be liable to the Owner for failure to report any
conflict, error or discrepancy unless Construction Manager or any of its
Subcontractors or Suppliers had actual knowledge thereof or should reasonably have
known thereof.
B. Physical Conditions (Including Underground Facilities)
1. The Contract Documents may identify reports of explorations and tests of
subsurface conditions at the site, and those drawings of physical conditions in
or relating to existing surface or subsurface structures or Underground
Page 336 of 668
Page 26 of 81
Facilities owned by Owner which are at or contiguous to the site, that have
been utilized by the design professional in preparation of the Contract
Documents. Construction Manager shall have full responsibility for physical
conditions, and Underground Facilities owned by Owner or others, shown or
indicated in the Contract Documents.
2. The information and data shown or indicated in the Contract Documents with
respect to Underground Facilities owned by others or at contiguous to the site
is based on information and data furnished to Owner or the design
professional by the owners of such Underground Facilities or by others. The
Owner shall not be responsible for the accuracy or completeness of any such
information or data, and the Construction Manager shall have full
responsibility for reviewing and checking all such information and data.
3. If the Contract Documents necessitate amending to order changes in the Work
due to Underground Facilities owned by the Owner or others, whether they be
shown or indicated or newly discovered, Owner shall authorize the required
changes in the Work by Change Order. If those Underground Facilities
owned by the Owner or others cause or will cause delays in the performance
or extend completion of all or part of the work, Construction Manager shall
absorb all related delay, extension or acceleration costs, however caused;
except that if Owner and Construction Manager agree that the delays require a
change in Contract Time, Owner shall authorize the necessary change in
Contract Time. However, an extension in Contract Time, when and if so
granted shall be Construction Manager’s sole and exclusive remedy with
respect to Owner for any delay, disruption, interference, inefficiency,
acceleration, extension or hindrance and associated costs, however caused,
resulting from variance in the location or configuration of Underground
Facilities owned by the Owner or others shown or indicated, or from newly
discovered Underground Facilities owned by the Owner or others.
4. Unless it prejudices Work already excavated and uncovered, Construction
Manager shall schedule layout, excavation and uncovering of Work or
Underground Facilities a sufficient time in advance to allow the Owner’s
Engineer of Record’s review, and the possible amending or supplementing of
the Contract Documents.
C. Special Requirements for Underground Facilities Construction Manager shall have
full responsibility: a) for field locating any and all Underground Facilities including
utilities shown or indicated as to depth and alignment in advance of excavation; b) for
identifying the owner of any newly discovered Underground Facility and promptly
notifying that owner and Engineer of that discovery; c) for shoring, blocking and
protecting Underground Facilities including utilities shown, indicated or discovered;
d) for coordination, scheduling and sequencing the Work with the owners of all
Underground Facilities shown, indicated or discovered; e) for repairing any damage
to the satisfaction of those owners, to the extent that the damage was due to
Page 337 of 668
Page 27 of 81
Construction Manager’s failure to adhere to the requirements of this section, or to the
fault or negligence of Construction Manager; and f) for the safety and protection of
any affected Work, and for repairing any damage done to the work. Except as
otherwise provided in this section, all costs involved and time required to perform
these responsibilities shall be considered as having been included in the Contract Sum
and in the Construction Manager’s schedule for the performance of the Work within
the Contract Time, even if the Contract Documents need amending to authorize minor
deviations or changes in the Work due to those Underground Facilities including
utilities.
D. Engineer and Layout
1. The Engineer will provide centerline control points (Begin Project, End
Project, PIs, PTs, etc.) and benchmarks at appropriate intervals along the line
of the Project to facilitate the proper layout of the Work. Normally, only one
benchmark will be furnished for water crossings. The Construction Manager
shall preserve all reference points and benchmarks furnished by the Owner.
As an exception to the above, for Projects where the Plans do not show a
centerline or other survey control line for construction of the Work (e.g.
resurfacing, safety modifications, etc.) the Engineer will provide only points
marking the beginning and ending of the Project and all exceptions.
2. The Construction Manager shall furnish all stakes, templates and other
materials necessary for establishing and maintaining of the lines and grades
necessary for control and construction of the Work.
3. Utilizing the control points furnished by the Owner, the Construction Manager
shall establish all horizontal and vertical controls necessary to construct the
Work in conformance with the Plan and Specifications. The Work shall include
performing all calculations required and setting all stakes needed as such as
grade stakes, offset stakes, reference point stakes, slope stakes, and other
reference marks or points necessary to provide lines and grades for construction
of all roadway, bridge and miscellaneous items. When the work includes utility
construction to be done by the Construction Manager, it shall also establish all
horizontal and vertical controls necessary to carry out such Work. The Engineer
may assist in coding of input, arrange for processing by the Owner’s computer
and furnish computer output; however, Engineer’s assistance shall not release
Construction Manager from Construction Manager’s responsibility.
4. On Projects involving construction of new base, stakes to establish lines and
grades for subgrade base, curb and related items shall be set at intervals along
the line of the Work no greater than 50 feet on tangents and 25 feet on curves.
Grade stakes shall be set at locations directed by the Engineer to facilitate
checking of subgrade, base and pavement elevations in crossovers, intersections
and irregular shaped areas. For bridge construction stakes and other control,
references, shall be set at sufficiently frequent intervals to assure that all
Page 338 of 668
Page 28 of 81
components of a structure are constructed in accordance with the lines and
grades shown in the Plans. For Projects where the Plans do not show a
centerline or other survey control line for construction of the Work (resurfacing,
safety modifications, etc.) only such stakes as necessary for horizontal and
vertical control of Work items will be required. For resurfacing and resurfacing
widening type Projects, the Construction Manager shall establish horizontal
controls adequate to assure that the asphalt mix added coincides with the
existing pavement. In tangent sections, horizontal control points shall be set at
100-foot intervals by an instrument survey. In curbs, sections, horizontal
control points shall be set at 25-foot intervals by locating and referencing the
centerline of the existing pavement. The Construction Manager shall reference
the beginning and ending of each no passing zone for use during temporary
striping operations. The Construction Manager shall establish by an instrument
survey and mark on the surface of the finished pavement at 25-foot intervals,
points necessary for striping of the finished roadway. As an exception, for
resurfacing and resurfacing-widening Projects, these points shall be established
in the same manner as used for horizontal control of paving operations. Marks
shall be made with white paint. If striping is included in the Work to be done
by the Construction Manager, an alternate method for layout of striping may be
approved by the Engineer provided that the alignment achieved is equal or
better than that which would be achieved using an instrument survey. For
Projects with permanent striping by the Construction Manager, the
measurement and analysis in order to establish the location and length of no-
passing zones shall be accomplished by approved electronic methods consisting
of a minimum of two distance-measuring devices. For all Projects, a station
identification stake shall be set at each right-of-way line at 100-foot intervals
and at all locations where a change in right-of-way width occurs. Each of
these stakes shall be marked with painted numerals, of sufficient size to be
readable from the roadway, corresponding to the Project station at which it is
located. As an exception to the above, for Projects where Plans do not show
right-of- way lines, station identification stakes shall be set at locations and
intervals appropriate to the type of Work being done. For resurfacing and
resurfacing- widening Projects, station identification stakes shall be set at 200-
foot intervals.
16. Maintenance of Traffic
A. Construction Manager shall be responsible for the proper maintenance control and
detour of traffic in the area of construction, during the course of construction. All
traffic control and maintenance procedures shall be in accordance with the
requirements of either the Florida Department of Transportation, City of Ocoee, or
the local municipality, within their respective area of jurisdiction. It shall be the
Construction Manager’s responsibility, prior to submitting its GMP Amendment, to
determine the requirements of these agencies so that its Proposal reflects all costs to
be incurred. No claims for any increase to the GMP will be considered for costs
incurred in the proper maintenance, control, detour and protection.
Page 339 of 668
Page 29 of 81
B. Traffic shall be maintained at all times where practical, and as more particularly
specified hereinafter. No traffic shall be detoured without prior knowledge and
approval of the respective traffic control agency having jurisdiction. The
Construction Manager shall notify such agencies 48 hours in advance of such time it
proposes to detour such traffic.
17. Fencing On all Work which included fencing and where the ENGINEER determines
it to be necessary for maintaining the security of adjacent property, or for protection
of pedestrians who are likely to gain access to the Work from adjacent property, the
CONTRACTOR shall erect appropriate temporary security fence as a first order of
business. Temporary fencing shall be installed at temporary construction easement
areas on all commercial and residential properties appropriate to secure the Work area
and protect persons and domestic animals. At all times, the CONTRACTOR shall
conduct the Work under secure temporary fencing. Permanent fencing shall be
addressed as required by the Plans and Specifications.
ARTICLE 3
OWNER'S RESPONSIBILITIES
3.1 Owner’s Information
The Owner shall identify its requirements for the project.
3.2 Owner’s Representative
The Owner shall designate, in writing, any additional representatives authorized to act on
the Owner's behalf with respect to the Project who were not previously defined in Article
1.3, together with the scope of his/her respective authority. In no event shall any
delegation of authority be contrary to State or City laws or codes. Such designations as of
the date hereof are set forth on Exhibit "F" hereto. Functions that this Agreement
provides will be performed by the Owner can be delegated by the Owner only by written
notice to the Construction Manager from the Owner. Exhibit "F" may be amended from
time to time by the Owner pursuant to written notice of and acceptance by the
Construction Manager of such amendment. The Construction Manager shall be entitled to
rely on directions (and it shall be required to follow directions) from the Owner's
Representative designated on Exhibit "F" or an amendment to Exhibit "F" within the
authority conferred by the Owner in this Agreement or any Amendment or Change Order
to this Agreement. Owner hereby authorize the Owner’s Representative to: (1) act as the
Owner’s agent and execute documents associated with this Project. Examples of these
documents are Construction Manager's Contingency Authorizations, Notices of
Commencement, Certificates of Substantial Completion and permits from applicable
agencies; (2) administer, coordinate, interpret and otherwise manage the contractual
Page 340 of 668
Page 30 of 81
provisions and requirements of this Agreement; (3) negotiate a duly authorized Change
Order on behalf of the Owner; and (4) issue a duly authorized purchase order,
memorandum, letter or other instrument covering the services and work to be provided
pursuant to this Agreement. Directions and decisions made by Owner's Representatives
shall be binding on the Owner. The Owner's Representative does not have the authority to
authorize work beyond the scope of the GMP.
The Owner additionally authorizes the City Manager, in conjunction with the Owner's
Representative, to authorize changes in the work up to the limits designated in the City of
Ocoee Purchasing Code. Said work shall be funded from the Owner's Contingency and
shall not cause an increase to the overall project budget. Any changes above the City’s
Purchasing Code limits will need City Commission approval.
3.3 Engineer's Agreement
The Owner has retained an Engineer for design and to prepare construction documents
for the Project. The Engineer's services, duties and responsibilities are described in the
Agreement between the Owner and the Engineer, a copy of which will be furnished to the
Construction Manager. The Agreement between the Owner and the Engineer shall not be
modified without written notification to the Construction Manager.
3.4 (Intentionally omitted.)
3.5 Drawings and Specifications
The Construction Manager will be furnished a reproducible set of all copies of Drawings
and Specifications reasonably necessary and ready for printing.
3.6 Cost of Surveys & Reports
The services, information, surveys and reports required by the above paragraphs shall be
furnished with reasonable promptness in accordance with the approved schedule at the
Owner's expense, and the Construction Manager shall be entitled to rely upon the
accuracy and completeness thereof.
3.7 Project Fault Defects
If the Owner becomes aware of any fault or defect in the Project or non-conformance
with the drawings and specifications, Owner shall give prompt written notice thereof to
the Construction Manager and Engineer.
3.8 (Intentionally omitted.)
3.9 Lines of Communication
Page 341 of 668
Page 31 of 81
The Owner and the Engineer, through the Owner, shall communicate with the
subcontractors or suppliers only through the Construction Manager so long as such
method of communication is effective in maintaining project schedules and quality.
3.10 Permitting & Code Inspections
The Owner recognizes and coordinates with the appropriate Permitting Authority and
expects the Construction Manager to do the same.
ARTICLE 4
PERMITS, FEES AND NOTICES
4.1 Unless otherwise provided in the Contract Documents, the Construction Manager shall
secure and pay for the permits, which are customarily secured by a General Contractor
in performing site work, utility, and roadway construction.
4.2 The Construction Manager shall comply with and give notices, as required by laws,
ordinances, rules, regulations and lawful orders of public authorities bearing on
performance of the Work.
4.3 It is not the Construction Manager's responsibility to ascertain that the Contract
Documents are in accordance with applicable laws, statutes, ordinances, Building Codes
and Rules and Regulations. However, if the Construction Manager observes that
portions of the Contract Documents are at variance therewith, the Construction Manager
shall promptly notify the Engineer and Owner in writing, and necessary changes shall be
accomplished by appropriate modification.
4.4 If the Construction Manager performs Work knowing it to be contrary to laws, statutes,
ordinances, Building Codes and Rules and Regulations without such notice to the
Engineer and Owner, the Construction Manager shall assume full responsibility for such
Work and shall bear the attributable costs.
4.5 Cost for all re-inspections of work performed by the Construction Manager found
defective and subsequently repaired, shall be borne by the Construction Manager, unless
such cost is not a result of negligence on the part of the Construction Manager.
ARTICLE 5
SUBCONTRACTS
5.1 Definition
A subcontractor is a person or organization who has a direct contract with the
Page 342 of 668
Page 32 of 81
Construction Manager to perform any of the work at the site. Nothing contained in the
Contract Documents shall create any contractual relation between the Owner or Engineer
and any subcontractor.
5.2 Proposals
Subject to Article 9 and, in accordance with Article 2.8(4), the Construction Manager
shall request and receive proposals from subcontractors and suppliers and will award
those contracts to the qualified low bidders after Construction Manager and the Owner
have reviewed each proposal and are satisfied that the subcontractor/supplier is qualified
to perform the work.
5.2.1 Required Subcontractors' Qualifications and Subcontract Conditions:
1. Subcontractual Relations - The Construction Manager shall require each
Subcontractor to assume all the obligations and responsibilities which the
Construction Manager owes the Owner under the Agreement, to the extent of
the work to be performed by the subcontractor. The subcontracts shall be
made in writing and shall preserve and protect the rights of the Owner and
Engineer under the Contract Documents with respect to the Work to be
performed by the subcontractor so that the subcontracting thereof will not
prejudice such rights. Where appropriate, the Construction Manager shall
require each subcontractor to enter into similar agreements with its sub-
subcontractor.
2. Insurance requirements for subcontractors shall be no more stringent than
those requirements imposed on the Construction Manager by the Owner.
3. The Construction Manager shall make available to each proposed
Subcontractor, prior to the execution of the Subcontract, copies of the
Contract Documents to which the Subcontractor will be bound by this
Article 5.
5.2.2 All subcontracts shall provide:
1. LIMITATION OF REMEDY - NO DAMAGES FOR DELAY
The subcontractor's exclusive remedy for delays in the performance of the
subcontract caused by events beyond its control, including delays claimed to
be caused by the Owner or Engineer or attributable to the Owner or Engineer
and including claims based on breach of contract or negligence, shall be an
extension of its contract time and shall in no way involve any monetary claim.
2. In the event of a change in the work, the subcontractor's claim for adjustments
in the contract sum are limited exclusively to its negotiated costs for such
changes plus no more than 15% for overhead, profit and bond costs.
3. The subcontract shall require the subcontractor to expressly agree that the
foregoing constitute its sole and exclusive remedies for delays and changes in
the work and thus eliminate any other remedies for claims for increase in the
contract price, damages, losses or additional compensation.
Page 343 of 668
Page 33 of 81
4. Each subcontract shall require that any claims by the subcontractor for delay
or additional cost must be submitted to the Construction Manager within the
time and in the manner in which the Construction Manager must submit such
claims to the Owner, and that failure to comply with the conditions for giving
notice and submitting claims shall result in the waiver of such claims.
5. Each subcontract shall require the Owner to be added as an additional
insured on the subcontractor’s general liability policy for the project.
5.3 Responsibilities for Acts and Omissions
The Construction Manager shall be responsible to the Owner for the acts and omissions
of its employees, agents, subcontractors, their agents and employees, and all other
persons performing any of the work or supplying materials under a contract to the
Construction Manager.
ARTICLE 6
SCHEDULE, TIME OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
6.1 Time is of the essence of the performance of this Agreement. At the time a Guaranteed
Maximum Price (GMP) is established, as provided for in Article 7, a project substantial
completion date, a project final completion date, and an Owner Utilization date for
completion of the project in accordance with the master project schedule, shall also be
established by the Construction Team. The Construction Manager agrees to complete the
construction in accordance with the agreed upon substantial completion date, final
completion date and Owner Utilization date. The Construction Manager acknowledges
that failure to complete the project within the construction time set forth in the approved
schedule will result in substantial damages to the Owner. Construction Manager hereby
expressly waives and relinquishes any right which it may have to seek to characterize the
liquidated damages, set out in this paragraph 6.1 below, as a penalty, which the parties
agree represents a fair and reasonable estimate of the Owner’s actual damages at the time
of contracting if Construction Manager fails to achieve Substantial Completion or Final
Inspection within the Contract Time. Further, the parties acknowledge that it would be
extremely difficult, if not impossible, to ascertain Owner’s actual damages with any
degree of certainty in the event Construction Manager fails to achieve either Substantial
Completion or Final Inspection within the Contract Time.
In the event the Construction Manager does not achieve Substantial Completion within
the Contract Time, including approved extensions, the Construction Manager shall pay
the Owner, as liquidated damages and not as a penalty, the sum of $500 per day for each
calendar day the actual time of performance exceeds the authorized Contract Time before
substantial completion. Liquidated damages shall be $700 per day from Substantial
Completion to final completion.
6.2 The date of Owner Utilization shall occur as described in Article 2.8(12) herein above.
Page 344 of 668
Page 34 of 81
Warranties called for by this Agreement or by the Drawings and Specifications shall
commence on the Date of Substantial Completion, unless otherwise agreed to, in writing,
between the Owner and Construction Manager.
ARTICLE 7
GUARANTEED MAXIMUM PRICE FOR CONSTRUCTION
7.1 When the design documents are sufficiently complete to establish the scope of work for
the project or any portion thereof, as generally defined by a design document listing to be
provided by the Engineer and Construction Manager upon execution of this Agreement,
which is to be used only as a guide in developing for the Owner's approval, the
specifications and plan data necessary to establish a Guaranteed Maximum Price; or at
such time thereafter designated by the Owner; the Construction Manager will establish
and submit in writing to the Owner, for its approval a Guaranteed Maximum Price,
guaranteeing the maximum price to the Owner for the construction cost of the project or
designated part thereof and the Construction Manager’s Fee. The Construction Manager
acknowledges multiple GMPs may be required for the portions of the project to support
the project phasing and schedule. Such Guaranteed Maximum Price will be subject to
modification for changes in the project as provided in Article 10. However, the actual
price paid for the work by the Owner shall be the actual cost of all work subcontracts,
supply contracts, direct labor costs, direct supervision costs, and direct job costs as
defined under Article 9, plus the Construction Manager's fees; or the GMP; whichever is
less when the work is complete. Costs which would cause the GMP to be exceeded will
be paid by the Construction Manager without reimbursement by the Owner. All savings
will be returned to Owner.
7.2 Intentionally omitted.
7.3 At the time of submission of a Guaranteed Maximum Price, the Construction Manager
will verify the time schedule for activities and work, which were adopted by the
Construction Team and used to determine the Construction Manager's cost of work.
Included in the GMP will be a Construction Contingency, which is included for the
parties to use, with the Owner's consent. The contingency is intended to cover the costs
associated with project scope that were not adequately detailed at the time of GMP. The
contingency is also intended to protect against price increases between the submission of
the GMP and the completion of the 100% construction documents, as well as for the
purpose of defraying expenses due to unforeseen circumstances relating to construction,
and for price increases attributable to any code compliance reviews. The Construction
Manager will be required to furnish documentation evidencing expenditures charged to
this contingency prior to the release of funds by the Owner. Documentation for use of the
Contingency shall be determined by the Construction Team, shall be included in the
Project Manual, and must be displayed monthly in the PMIS. The Engineer shall verify
Page 345 of 668
Page 35 of 81
the actual costs.
7.4 When the project is bid and 100% of the Trade Contracts have been executed, the
contingency within the GMP may be decreased in proportion to the percent of the work
completed up to a maximum of 50%. In other words, if 10% of the work has been
completed and the Owner requests that the contingency within the GMP be adjusted, then
10% of the contingency within the GMP will be removed from the GMP by change order
up to a maximum of 50% of the initial GMP contingency value.
During the buyout period of Trade Contracts, at a point mutually agreed upon between
the Owner and Construction Manager, the net amount of the buyout will be reviewed. If
the net amount of the total buyout results in excess funds being required, those funds will
be taken from the Construction Contingency.
If the net amount of the buyout results in a savings, the savings will be assigned to the
Owner's Buyout Contingency as defined in Article 7.5
If bids are not received for a portion of the work at or below the applicable line item
amount in the GMP, the Construction Manager reserves the right to perform that portion
of the work or negotiate for its performance for the specified line item lump sum amount
or less.
7.5 The Owner's Buyout Contingency shall be created by savings generated by Subcontractor
buyout (Article 7.4) and also by reductions in scope that otherwise could reduce the
GMP. The intent of this Owner's Buyout Contingency is to allow funds already within the
GMP to remain in the GMP and be used at the Owner's discretion for scope issues that
may be required or desired during the course of the project.
Authorizations to spend down the Owner's Buyout Contingency will be granted by the
City Manager up to the limits designated in the City of Ocoee Purchasing Code.
Authorizations to spend down more than the limits designated in the City’s Purchasing
Code must be granted the City Commission.
7.6 All items that may be requested by Owner, comprising the Construction Manager’s
General Conditions for the project, include:
a) costs, including transportation and storage, installation, maintenance, dismantling
and removal of materials, supplies, temporary facilities, machinery, equipment, and
hand tools not customarily owned by construction workers, that are provided by the
Construction Manager at the site and fully consumed in the performance of the
Work; and cost (less salvage value) of such items if not fully consumed, whether
sold to others or retained by the Construction Manager. Cost for items previously
used by the Construction Manager shall mean fair market value;
Page 346 of 668
Page 36 of 81
b) costs of document reproduction including bid sets, facsimile transmissions and
long-distance telephone calls, postage and parcel delivery charges, telephone
service at the site and reasonable petty cash expenses of the site office;
c) that portion of the reasonable expenses of the Construction Manager’s personnel
incurred while in discharge of duties directly connected with the Work; the
Construction Manager’s allowed burden percentage multiplied on the personnel’s
weekly salary shall be no more than 45%;
d) that portion of insurance and bond premiums that can be directly attributed to this
Agreement for Construction. Premiums shall be net of trade discounts, volume
discounts, dividends and other adjustments;
e) sales, use or similar taxes imposed by a governmental authority and paid by the
Construction Manager, and directly related to the Work;
f) fees and assessments for the building permit and for other permits, licenses and
inspections for which the Construction Manager is required by the Agreement for
Construction to pay;
g) data processing costs directly related to the Work; however, these costs shall not
include any hardware, software, or CADD costs unless approved by the Owner in
writing;
h) expenses incurred in accordance with the Construction Manager’s standard
personnel policy for relocation and temporary living allowances of personnel
required for the Work, if approved by the Owner;
i) the cost of obtaining and using all utility services required for the Work;
j) the cost of crossing or protecting any public utility, if required, and as directed by
the Owner;
k) all reasonable costs and expenditures necessary for the operation of the site office,
such as stationary, supplies, blueprinting, furniture, fixtures, office equipment and
field computer services and hardware, provided that quantity and rates are subject to
Owner’s prior written approval;
l) the cost of secure off-site storage space or facilities approved in advance by Owner;
m) rental charges for temporary facilities, and for machinery, equipment, and tools not
customarily owned by construction workers; however any rental charge shall not
exceed the purchase price of such facilities, machinery, equipment or tools; and;
Page 347 of 668
Page 37 of 81
n) other expenses or charges properly incurred and paid in the prosecution of the
Work, with the prior written approval of the Owner.
ARTICLE 8
CONSTRUCTION MANAGER'S COMPENSATION
In consideration of the performance of this Agreement, the Owner agrees to pay the
Construction Manager as compensation for its services, costs or fees, as set forth in
Article 8.1(1) and 8.1(2) as follows.
1. Design Phase/Pre-construction - For the performance of the Preconstruction services
set forth under Articles 2.3, 2.4, 2.6, 2.7 and for profit and overhead related to these
services, the Construction Manager shall be paid a not to exceed fixed fee of
$___________________ The Design Phase/Pre-construction Costs shall be paid
according to the percent complete of the design phase. (Contractor’s Proposal
Attached.)
The Construction Manager's personnel to be assigned during this phase and their
duties and responsibilities to this project and the duration of their assignments are
shown on Exhibit "E''
2. Construction Phase – For the Construction Manager’s performance of the
Construction Phase Work, the Owner shall pay Construction Manager the Contract
Sum. The Contract Sum is the Cost of the Work as defined in Article 9 plus the
Construction Manager’s Fee. The Construction Manager guarantees that the Contract
Sum shall not exceed the Guaranteed Maximum Price set forth in the Guaranteed
Maximum Price Amendment, as it may be further amended by Change Order. To the
extent the Cost of the Work exceeds the Guaranteed Maximum Price, the
Construction Manager shall bear such costs in excess of the Guaranteed Maximum
Price without reimbursement or additional compensation from the Owner.
The Construction Manager’s Fee for Construction Phase Work shall be based upon a
percentage of the Cost of the Work. The Construction Manager’s Fee shall be
deemed compensation for all of Construction Manager’s overhead, profit and general
expenses of any kind, except as may be expressly included as a Cost of the Work as
defined by Article 9, for services provided during and related to the construction
phase. The percentage to be used to determine the Construction Manager’s fee
shall be ( %).
The fee shall be paid proportionally to the ratio of the cost of the work in place,
including stored materials (see Article 12.5), as it bears on the latest estimate of the
total construction cost or the GMP, whichever is less. The balance of the fee shall be
paid when construction of the project is finally completed and utilization of the
project is accepted by the Owner. If construction is authorized only for a part of the
Page 348 of 668
Page 38 of 81
project, the fee paid shall be proportionate to the amount of work authorized by the
Owner.
ARTICLE 9
COST OF THE WORK FOR CONSTRUCTION PHASE SERVICES
9.1 Costs to Be Reimbursed
9.1.1 The term Cost of the Work shall mean costs necessarily incurred by the
Construction Manager in the proper performance of the Work. Such costs shall be
at rates not higher than the standard paid at the place of the Project except with
prior consent of the Owner. The Cost of the Work shall include only the items set
forth in Sections 9.1 through 9.7.
9.1.2 Where any cost is subject to the Owner’s prior approval, the Construction
Manager shall obtain this approval prior to incurring the cost. The parties shall
endeavor to identify any such costs prior to executing Guaranteed Maximum
Price Amendment.
9.2 Labor Costs
9.2.1 Wages of construction workers directly employed by the Construction Manager to
perform the construction of the Work at the site or, with the Owner’s prior
approval, at off-site workshops.
9.2.2 Wages or salaries of the Construction Manager’s supervisory and administrative
personnel when stationed at the site with the Owner’s prior approval.
9.2.3 Wages and salaries of the Construction Manager’s supervisory or administrative
personnel engaged at factories, workshops or on the road, in expediting the
production or transportation of materials or equipment required for the Work, but
only for that portion of their time required for the Work.
9.2.4 Costs paid or incurred by the Construction Manager for taxes, insurance,
contributions, assessments and benefits required by law or collective bargaining
agreements and, for personnel not covered by such agreements, customary
benefits such as sick leave, medical and health benefits, holidays, vacations and
pensions, provided such costs are based on wages and salaries included in the
Cost of the Work under Sections 9.2.1 through 9.2.3.
9.2.5 Bonuses, profit sharing, incentive compensation and any other discretionary
payments paid to anyone hired by the Construction Manager or paid to any
Subcontractor or vendor, with the Owner’s prior written approval.
Page 349 of 668
Page 39 of 81
9.3 Subcontract Costs
Payments made by the Construction Manager to Subcontractors in accordance with the
requirements of the subcontracts.
9.4 Costs of Materials and Equipment Incorporated in the Completed Construction
9.4.1 Costs, including transportation and storage, of materials and equipment
incorporated or to be incorporated in the completed construction.
9.4.2 Costs of materials described in the preceding Section 9.4.1 in excess of those
actually installed to allow for reasonable waste and spoilage. Unused excess
materials, if any, shall become the Owner’s property at the completion of the
Work or, at the Owner’s option, shall be sold by the Construction Manager. Any
amounts realized from such sales shall be credited to the Owner as a deduction
from the Cost of the Work.
9.5 Costs of Other Materials and Equipment, Temporary Facilities and Related Items
9.5.1 Costs of transportation, storage, installation, maintenance, dismantling and
removal of materials, supplies, temporary facilities, machinery, equipment and
hand tools not customarily owned by construction workers that are provided by
the Construction Manager at the site and fully consumed in the performance of
the Work. Costs of materials, supplies, temporary facilities, machinery, equipment
and tools that are not fully consumed shall be based on the cost or value of the
item at the time it is first used on the Project site less the value of the item when it
is no longer used at the Project site. Costs for items not fully consumed by the
Construction Manager shall mean fair market value.
9.5.2 Rental charges for temporary facilities, machinery, equipment and hand tools not
customarily owned by construction workers that are provided by the Construction
Manager at the site and costs of transportation, installation, minor repairs,
dismantling and removal. The total rental cost of any Construction Manager-
owned item may not exceed the purchase price of any comparable item. Rates of
Construction Manager-owned equipment and quantities of equipment shall be
subject to the Owner’s prior approval.
9.5.3 Costs of removal of debris from the site of the Work and its proper and legal
disposal.
9.5.4 Costs of document reproductions, facsimile transmissions and long-distance
telephone calls, postage and parcel delivery charges, telephone service at the site
and reasonable petty cash expenses of the site office.
9.5.5 That portion of the reasonable expenses of the Construction Manager’s
supervisory or administrative personnel incurred while traveling in discharge of
duties connected with the Work.
Page 350 of 668
Page 40 of 81
9.5.6 Costs of materials and equipment suitably stored off the site at a mutually
acceptable location, subject to the Owner’s prior written approval.
9.6 Miscellaneous Costs
9.6.1 Premiums for that portion of insurance and bonds required by the Contract
Documents that can be directly attributed to this Contract. Self-insurance for
either full or partial amounts of the coverages required by the Contract
Documents, with the Owner’s prior approval.
9.6.2 Sales, use or similar taxes imposed by a governmental authority that are related to
the Work and for which the Construction Manager is liable.
9.6.3 Fees and assessments for the building permit and for other permits, licenses and
inspections for which the Construction Manager is required by the Contract
Documents to pay.
9.6.4 Fees of laboratories for tests required by the Contract Documents, except those
related to defective or nonconforming Work for which reimbursement is
excluded, and which do not fall within the scope of Section 9.7.3.
9.6.5 Royalties and license fees paid for the use of a particular design, process or
product required by the Contract Documents; the cost of defending suits or claims
for infringement of patent rights arising from such requirement of the Contract
Documents; and payments made in accordance with legal judgments against the
Construction Manager resulting from such suits or claims and payments of
settlements made with the Owner’s consent. However, such costs of legal
defenses, judgments and settlements shall not be included in the calculation of the
Construction Manager’s Fee or subject to the Guaranteed Maximum Price.
9.6.6 Costs for electronic equipment and software, directly related to the Work with the
Owner’s prior written approval.
9.6.7 Deposits lost for causes other than the Construction Manager’s negligence or
failure to fulfill a specific responsibility in the Contract Documents.
9.6.9 Subject to the Owner’s prior approval, expenses incurred in accordance with the
Construction Manager’s standard written personnel policy for relocation and
temporary living allowances of the Construction Manager’s personnel required
for the Work.
9.7 Other Costs and Emergencies
9.7.1 Other costs incurred in the performance of the Work if, and to the extent,
approved in advance in writing by the Owner.
Page 351 of 668
Page 41 of 81
9.7.2 Costs incurred in taking action to prevent threatened damage, injury or loss in
case of an emergency affecting the safety of persons and property.
9.7.3 Costs of repairing or correcting damaged or nonconforming Work executed by the
Construction Manager, Subcontractors or suppliers, provided that such damaged
or nonconforming Work was not caused by negligence or failure to fulfill a
specific responsibility of the Construction Manager and only to the extent that the
cost of repair or correction is not recovered by the Construction Manager from
insurance, sureties, Subcontractors, suppliers, or others.
9.8 Costs Not To Be Reimbursed
9.8.1 The Cost of the Work shall not include the items listed below:
.1 Salaries and other compensation of the Construction Manager’s personnel
stationed at the Construction Manager’s principal office or offices other than
the site office, except as specifically provided in Section 9.2, or as may be
provided in Article 11;
.2 Expenses of the Construction Manager’s principal office and offices other
than the site office;
.3 Overhead and general expenses, except as may be expressly included in
Sections 9.1 to 9.7;
.4 The Construction Manager’s capital expenses, including interest on the
Construction Manager’s capital employed for the Work;
.5 Except as provided in Section 9.7.3 of this Agreement, costs due to the
negligence or failure of the Construction Manager, Subcontractors and
suppliers or anyone directly or indirectly employed by any of them or for
whose acts any of them may be liable to fulfill a specific responsibility of the
Contract;
.6 Any cost not specifically and expressly described in Sections 9.1 to 9.7;
.7 Costs, other than costs included in Change Orders approved by the Owner,
that would cause the Guaranteed Maximum Price to be exceeded; and
.8 Costs for services incurred during the Preconstruction Phase.
9.9 Discounts, Rebates and Refunds
9.9.1 Cash discounts obtained on payments made by the Construction Manager shall
accrue to the Owner if (1) before making the payment, the Construction Manager
included them in an Application for Payment and received payment from the
Owner, or (2) the Owner has deposited funds with the Construction Manager with
which to make payments; otherwise, cash discounts shall accrue to the
Construction Manager. Trade discounts, rebates, refunds and amounts received
from sales of surplus materials and equipment shall accrue to the Owner, and the
Construction Manager shall make provisions so that they can be obtained.
Page 352 of 668
Page 42 of 81
9.9.2 Amounts that accrue to the Owner in accordance with the provisions of Section
9.9.1 shall be credited to the Owner as a deduction from the Cost of the Work.
9.10 Related Party Transactions
9.10.1 For purposes of Section 9.10, the term “related party” shall mean a parent,
subsidiary, affiliate or other entity having common ownership or management
with the Construction Manager; any entity in which any stockholder in, or
management employee of, the Construction Manager owns any interest in excess
of ten percent in the aggregate; or any person or entity which has the right to
control the business or affairs of the Construction Manager. The term “related
party” includes any member of the immediate family of any person identified
above.
9.10.2 If any of the costs to be reimbursed arise from a transaction between the
Construction Manager and a related party, the Construction Manager shall notify
the Owner of the specific nature of the contemplated transaction, including the
identity of the related party and the anticipated cost to be incurred, before any
such transaction is consummated or cost incurred. If the Owner, after such
notification, authorizes the proposed transaction, then the cost incurred shall be
included as a cost to be reimbursed, and the Construction Manager shall procure
the Work, equipment, goods or service from the related party, as a Subcontractor,
according to the terms of this Agreement. If the Owner fails to authorize the
transaction, the Construction Manager shall procure the Work, equipment, goods
or service from some person or entity other than a related party according to the
terms of this Agreement.
9.11 Accounting Records
The Construction Manager shall keep full and detailed records and accounts related to the
cost of the Work and exercise such controls as may be necessary for proper financial
management under this Contract and to substantiate all costs incurred. The accounting
and control systems shall be satisfactory to the Owner. The Owner and the Owner’s
auditors shall, during regular business hours and upon reasonable notice, be afforded
access to, and shall be permitted to audit and copy, the Construction Manager’s records
and accounts, including complete documentation supporting accounting entries, books,
correspondence, instructions, drawings, receipts, subcontracts, Subcontractor’s proposals,
purchase orders, vouchers, memoranda and other data relating to this Contract. The
Construction Manager shall preserve these records for a period of ten (10) years after
final payment, or for such longer period as may be required by law.
ARTICLE 10
Page 353 of 668
Page 43 of 81
CHANGES IN THE PROJECT
10.1 Change Orders
The Owner, without invalidating this Agreement, may order Changes in the Project
within the general scope of this Agreement consisting of additions, deletions or other
revisions, with the GMP and the Construction Completion Date being adjusted
accordingly. All changes in the Project, not covered by an authorized contingency, shall
be authorized by a Change Order signed by the Owner before the change is implemented.
Construction Manager’s claims for additional time shall be accompanied by detailed
dates, correspondences, notices and other data to prove the claim as required by Article
16.
1. A Change Order is a written order to the Construction Manager signed by the Owner
issued after the execution of this Agreement, authorizing a Change in the Project, the
Construction Manager's fee, or the Construction Completion date. Each adjustment in
the GMP resulting from a change order shall clearly separate the amount attributable
to the Cost of the Work. A change order must be in writing. No course of conduct,
verbal discussions or dealings between the parties can be a basis for any claim to
change the GMP or contract time.
2. The increase or decrease in the Guaranteed Maximum Price resulting from a change
in the Project shall be determined in one or more of the following ways: (Should any
costs be required for design of an Alternative System that would be advantageous to
the project and result in a deductive change order, the Construction Manager shall
include the cost of the redesign services of the Engineer so that the Owner can make
proper assessment of the cost of such change. Payment for additional services shall be
made by the Owner.)
a. by mutual acceptance of a lump sum properly itemized and supported by
sufficient substantiating data to permit evaluation by the Engineer and Owner;
b. by unit prices stated in the Agreement or subsequently agreed upon;
c. by cost as defined in Article 9 and a mutually acceptable fixed or percentage fee;
or;
d. by the method provided in Subparagraph 10.3
3. If none of the methods set forth in Clause 10.2 is agreed upon, the Construction
Manager, provided Construction Manager receives a written order signed by the
Owner, shall promptly proceed with the Work involved. The cost of such Work shall
then be determined on the basis of the reasonable expenditures and savings of those
performing the Work attributed to the change. However, in the event a Change Order
is issued under these conditions, the Construction Manager shall establish an
estimated cost of the work and the Construction Manager shall not perform any work
whose cost exceeds that estimate without prior written approval by the Owner. In
Page 354 of 668
Page 44 of 81
such case, and also under Article 10.2 above, the Construction Manager shall keep
and present, in such form as the Owner may prescribe, an itemized accounting
together with appropriate supporting data of the increase in the Cost of the Work as
outlined in Article 9. The amount of decrease in the Guaranteed Maximum Price to be
allowed by the Construction Manager to the Owner for any deletion or change which
results in a net decrease in cost will be the amount of the actual net decrease.
4. Should concealed conditions encountered in the performance of the Work below the
surface of the ground, which are either at material variance with the conditions
indicated by the Drawings, Specifications, or Owner furnished information or at
material variance with those conditions ordinarily found to exist in geographic area in
which the Project is located, then the Guaranteed Maximum Price and the
Construction Completion date shall be equitably adjusted by Change Order upon
Construction Manager’s adherence to the claim procedures outlined in Article 16 of
this Agreement . No adjustments in Contract Time or GMP will be allowed to the
extent the concealed or unknown condition should have been reasonably discovered
by Construction Manager during pre-construction or pre-proposal review. The only
exception to the prohibition of adjustments to time or GMP will be where organic
soils on the site when encountered differ significantly, greater or less, than the
quantities estimated in providing the GMP. The Construction Manager will propose
the methodology and assumptions employed to establish the quantity of materials
with the GMP submission; however such methodology and assumptions must be
approved by the Owner. In the event the Construction Manager encounters organic
soil conditions significantly (“significant” to be determined at GMP) different from
its interpretation of the geotechnical reports which is materially at variance with the
quantities derived through the application of Construction Manager's methodology
and assumptions, as approved by the Owner, the Construction Manager must
immediately notify the Owner, and the Owner will consider mitigation strategies,
which may involve adjustments in contract time or GMP.
5. In the event the Construction Manager encounters on the site material reasonably
believed to be asbestos or polychlorinated biphenyl (PCB) which has not been
rendered harmless, petroleum waste, biohazardous substances, radioactive waste or
any other substance falling within the category of hazardous or toxic waste under the
Comprehensive Environmental Response, Compensation and Liability Act
(CERCLA) or any other state or federal environmental statute or regulation,
hereinafter collectively referred to as "hazardous waste," the Construction Manager
shall immediately stop Work in the area affected and report the condition to the
Owner in writing. Owner shall thereafter as soon as reasonably possible conduct a
thorough investigation to determine if the suspected material in the affected area is in
fact hazardous waste and shall certify to Construction Manager that such material is
not hazardous waste or if such material is in fact hazardous waste that such hazardous
waste has been abated and that it is safe to return to the affected area and resume
work. The Construction Manager may require the Owner to furnish copies of reports
of tests conducted by a qualified testing laboratory acceptable to Construction
Manager verifying the absence of such hazardous waste before Construction Manager
Page 355 of 668
Page 45 of 81
will be required to resume work. The Contract time and amount shall thereafter be
equitably adjusted to account for the time lost due to the encountering of the
hazardous waste and the reasonable cost associated therewith pursuant to the
procedures for changes orders. The Construction Manager shall, through an analysis
of network schedule, have the burden to prove the need for such time delays and
associated costs.
6. The Construction Manager shall not be required to perform any work relating to
hazardous waste without consent pursuant to the changes clause herein.
10.2 Claims for Additional Cost or Time
All claims for additional cost or time shall be made by request for a change order
submitted as provided in Article 16.
As used in this subparagraph, “cost” shall mean the estimated or actual net increase or
decrease in cost to the Construction Manager, subcontractor, or sub-subcontractor for
performing the work covered by the change, including actual payments for materials,
equipment rentals, expendable items, wages and associated benefits to workmen and to
supervisors employed full time at the site, insurance bonds and other provable direct
costs, but not including any administrative, accounting, or other indirect or overhead
costs, or any wages or benefits of supervisory personnel not assigned full time to the site,
or any amount of profit or fee to the Construction Manager, subcontractor or sub-
subcontractor.
If the Construction Manager is delayed at any time in the progress of the work by any act
or neglect of the Owner or the Engineer or of any employee of either or by any separate
Construction Manager employed by the Owner or by any changes ordered in the work by
labor disputes, fire, or unusual delay in transportation, unavoidable casualties or any
causes beyond the Construction Manager's control or by delay authorized by the Owner
pending resolution of disputes, and such delay extends the completion date, then the dates
for completion may be equitably adjusted.
Only delays which are determined to extend the critical path for the schedule for
constructing the project will result in a time extension. Neither the Owner nor the
Construction Manager shall be considered to own the schedule float time.
10.3 Minor Changes in the Project
The Owner will have authority to order minor changes in the Project not involving an
adjustment in the Guaranteed Maximum Price or an extension of the Construction
Completion Date and not inconsistent with the intent of the Drawings and Specifications.
Such changes shall be effected by written order. The Documentation of changes shall be
determined by the Construction Team, included in the Project Manual and displayed
Page 356 of 668
Page 46 of 81
monthly in the PMIS. Changes shall be approved by the Owner and Engineer.
10.4 Emergencies
In any emergency affecting the safety of persons or property, the Construction Manager
shall act at its discretion to prevent threatened damage, injury or loss. Any increase in the
Guaranteed Maximum Price, or extension of time claimed by the Construction Manager
on account of emergency work, shall be determined as provided in Article 10.
ARTICLE 11
DISCOUNTS
11.1 All discounts for prompt payment shall accrue to the Owner to the extent the Cost of the
Work is paid directly by the Owner or from a fund made available by the Owner to the
Construction Manager for such payments. To the extent the Cost of the Work is paid with
funds of the Construction Manager, all cash discounts shall accrue to the Construction
Manager. All trade discounts, rebates and refunds, and all returns from the sale of surplus
materials and equipment, shall be credited to the Cost of the Work.
ARTICLE 12
PAYMENTS TO THE CONSTRUCTION MANAGER
12.1 Monthly Statements
The Construction Manager shall submit to the Owner a sworn statement, along with the
cost reports required under Article 2.5(2) & (3), showing in detail all moneys paid out,
cost accumulated or costs incurred on account of the Cost of the Work during the
previous period and the amount of the Construction Manager's fees due as provided in
Article 8. This data shall be attached to the Partial Pay Request Form shown in Exhibit
"G". Ten percent (10%) retainage shall be held on all payments until the contract is fifty
percent (50%) complete; except, when approved by the Owner, certain suppliers and
subcontractors may be paid the entire amount due when such payment is generally the
practice of the industry. At 50% completion, the Owner may approve a reduction of the
retainage from 10% to 5% at its discretion. Payments by the Owner to the Construction
Manager shall be made as described in Article 12.4 hereinafter. As a condition to the
application for the monthly partial pay requisition, the Construction Manager agrees that
all as-built information will be recorded within 30 days after receipt of information that a
change to the Construction Documents has occurred.
12.2 Final Payment
Final payment constituting the unpaid balance of the Cost of the Work and the
Construction Manager's fee, shall be due and payable as described in Article 12.4 after
Page 357 of 668
Page 47 of 81
Final Completion, provided that the Project be then finally completed, that the
Construction Manager has verified by its signature that it has completed all items
specified on the attached Exhibit "H" and that this Agreement has been finally
performed. However, if there should remain work to be completed, the Construction
Manager, the Owner, and the Engineer shall list those items prior to receiving final
payment and the Owner may retain a sum equal to 200% of the estimated cost of
completing any unfinished work and portion of the Construction Manager's retainage,
provided that said unfinished items are listed separately and the estimated cost of
completing any unfinished items are likewise listed separately. Thereafter, Owner shall
pay to Construction Manager, monthly, the amount retained for each incomplete item
after each of said items is completed.
12.3 Payments to Subcontractors
The Construction Manager shall promptly, within 10 days after receipt of payment from
the Owner, pay all the amount due to subcontractors less a retainage of ten percent
(10%) until the project is fifty percent (50%) complete, and based on Construction
Manager's evaluation of the subcontractor's acceptable performance, the Owner may
approve a reduction in retainage from 10% to 5% thereafter. If there should remain items
to be completed, the Construction Manager, the Owner and Engineer shall list those
items required for completion and the Construction Manager shall require the retainage
of a sum equal to 200% of the estimated cost of completing any unfinished items,
provided that said unfinished items are listed separately and the estimated cost of
completing any unfinished items likewise listed separately. Thereafter, the Construction
Manager shall pay to the subcontractors, monthly, the amount retained for each
incomplete item after each of said items is completed. Before issuance of final payment
without any retainage, the subcontractor shall submit satisfactory evidence that all
payrolls, material bills and other indebtedness connected with the Project have been paid
or otherwise satisfied, warranty information is complete, as-built markups have been
submitted and instruction for the Owner's operating and maintenance personnel is
complete.
Final payment may be made to certain select subcontractors whose work is satisfactorily
completed prior to the total completion of the Project but only upon approval of the
Owner.
12.4 Construction Manager's Payment Rights
Payment for construction services shall be governed and in accordance with Florida
Prompt Payment Act Statute 218.735, Timely Payment for Purchases of Construction
Services.
12.5 Payments for Materials and Equipment
Payments will be made for material and equipment not incorporated in the work but
Page 358 of 668
Page 48 of 81
delivered and suitably stored at the site or another location that is insured to protect the
Owner's assets subject to prior written approval and acceptance by the Owner on each
occasion.
12.6 Withholding Payments to Subcontractors
The Construction Manager shall not withhold payments to subcontractors if such
payments have been made to the Construction Manager. Should this occur, the
Construction Manager shall return such moneys to the Owners, adjusting pay requests
and project bookkeeping as required. However, this provision shall not apply should
payments to Subcontractors be withheld as a result of procuring normal process
paperwork in accordance with the Construction Managers contract with said
Subcontractor. The Construction Manager shall, if requested by the Owner, notify the
Owner in writing as to the reason for withholding payment.
ARTICLE 13
INSURANCE, INDEMNITY AND WAIVER OF SUBROGATION
13.1 Indemnity
The Construction Manager agrees to indemnify and hold the Owner and its agents and
employees harmless from all claims of liability, damages, losses and costs, including but
not limited to reasonable attorney’s fees, to the extent that they are caused by the
negligence, recklessness, or intentional wrongful misconduct of the Construction
Manager or persons employed or utilized by the Construction Manager in the
performance of this Agreement.
13.2 Construction Manager's Insurance
1. The Construction Manager shall not commence any construction work in connection
with this Agreement until it has obtained all of the following types of insurance and
such insurance, naming the City of Ocoee as additional insured, and has been
approved by the Owner, nor shall the Construction Manager allow any subcontractor
to commence work on its subcontract until all similar insurance required of the
subcontractor has been so obtained and approved. All insurance policies shall be with
insurers qualified and doing business in Florida with an A.M. Best & Company rating
of no less than A.
2. Worker's Compensation Insurance - The Construction Manager shall take out and
maintain during the life of this Agreement Worker's Compensation Insurance for all
its employees connected with the work of this Project and, in case any work is sublet,
the Construction Manager shall require the subcontractor similarly to provide
Worker's Compensation Insurance for all of the latter's employees unless such
employees are covered by the protection afforded by the Construction Manager. Such
insurance shall comply with the Florida Worker's Compensation Law. In case any
Page 359 of 668
Page 49 of 81
class of employees engaged in hazardous work under this Agreement at the site of the
Project is not protected under the Worker's Compensation statute, the Construction
Manager shall provide adequate insurance, satisfactory to the Owner, for the
protection of employees not otherwise protected. Employers' liability shall be set at
$1,000,000/1,000,000/1,000,000.
3. Construction Manager's Public Liability and Property Damage Insurance - The
Construction Manager shall take out and maintain during the life of this Agreement
Comprehensive General Liability and Comprehensive Automobile Liability Insurance
as shall protect him from claims for damage for personal injury, including accidental
death, as well as claims for property damages which may arise from operating under
this Agreement, whether such operations are by himself or by anyone directly or
indirectly employed by him, and the amount of such insurance shall be minimum
limits as follows:
a. Construction Manager's Comprehensive General, $1,000,000 Each ($2,000,000
aggregate) Liability Coverages, Bodily Injury Occurrence, & Property Damage
Combined Single Limit
b. Automobile Liability Coverages, $1,000,000 Each Bodily Injury & Property
Damage Occurrence, Combined Single Limit
c. Excess Liability, Umbrella Form $2,000,000 Each Occurrence, Combined Single
Limit Insurance clause for both Bodily Injury and Property Damage shall be
amended to provide coverage on an occurrence basis. The Products and
Completed operations portions of the General Liability and Excess Liability
policies shall extend for a period of ten (10) years after the Final Acceptance of
the Project by the Owner.
4. Subcontractor's Public Liability and Property Damage Insurance - the Construction
Manager shall require each of its subcontractors to procure and maintain during the
life of the subcontract, insurance of the type specified above or insure the activities of
its subcontractors in its policy, as specified above.
5. (Intentionally omitted.)
6. "XCU" (Explosion, Collapse, Underground Damage) - The Construction Manager's
Liability Policy shall provide "XCU" coverage for those classifications in which they
are excluded.
7. Broad Form Property Damage Coverage, Products & Completed Operations
Coverages - The Construction Manager's Liability Policy shall include Broad Form
Property Damage Coverage, Products and Completed Operations Coverages.
8. Contractual Liability Work Contracts - The Construction Manager's Liability Policy
shall include Contractual Liability Coverage designed to protect the Construction
Manager for contractual liabilities assumed by the Construction Manager in the
performance of this Agreement.
Page 360 of 668
Page 50 of 81
9. Indemnification Rider
a. In any and all claims against the Owner or the Engineer or any of their agents or
employees by any employee of the Construction Manager, any subcontractor,
anyone directly or indirectly employed by any of them or anyone for whose acts
any of them may be liable, the indemnification obligations under this Paragraph
shall not be limited in any way by any limitation on the amount or type of
damages, compensation or benefits payable by or for the Construction Manager or
any subcontractor under workers' or workmen's compensation acts, disability
benefit acts or other employee benefit acts.
b. The obligations of the Construction Manager under this Article 13.2.9 shall not
extend to the liability of Engineer, its agents or employees, arising out of (1) the
preparation or approval of maps, drawings, opinions, reports, surveys, change
orders, designs or specifications, or (2) the giving of or the failure to give
directions or instruction by Engineer, its agents or employees, providing such
giving or failure to give is the primary cause of the injury or damage.
10. Builder's Risk Coverage – Not Applicable for this project.
11. Certificate of Insurance - The Owner shall be furnished proof of coverage of
Insurance as follows:
Certificate of Insurance form and the actual policies (if requested) will be furnished
to the Owner. These shall be completed and signed by an authorized Resident
Agent. This Certificate shall be dated and show:
a. The name of the insured Construction Manager, the specific job by name and
job number, the name of the insurer, the number of the policy, its effective date,
and its termination date.
b. Statement that the Insurer will mail notice to the Owner and a copy to the
Engineer at least fifteen (15) days prior to any material changes in provisions or
cancellation of the policy.
c. Certificate of Insurance shall be in the form as approved by Insurance Standards
Office (ISO) and such Certificate shall clearly state all the coverages required in
this Section commencing at 13.2 and ending with 13.3(4).
12. Owner is to be named as an Additional Insured under all policies except for
Worker's Comp.
13. The insurance evidenced by the certificate shall be primary and non-contributory to
any other insurance of the certificate holder.
Page 361 of 668
Page 51 of 81
13.3 Waiver of Subrogation
1. The Owner and the Construction Manager waive all rights against each other, for
damages caused by perils covered by insurance provided under Article 13.2 to the
extent they are covered by such insurance except such rights as they may have to the
proceeds of such insurance held by the Owner and Construction Manager as trustees.
The Construction Manager shall require similar waivers from all subcontractors and
their sub-subcontractors.
2. The Owner and Construction Manager waive all rights against each other for loss or
damage to any equipment used in connection with the Project and covered by any
property insurance. The Construction Manager shall require similar waivers from all
subcontractors and their sub-subcontractors.
3. The Owner waives subrogation against the Construction Manager on all property
and consequential loss policies carried by the Owner on adjacent properties and
under property and consequential loss policies purchased for the Project after its
completion.
4. If the policies of insurance referred to in this Article require an endorsement to
provide for continued coverage where there is a waiver of subrogation, the Owner of
such policies will cause them to be so endorsed. Failure to obtain proper
endorsement nullifies the waiver of subrogation.
13.4 Insurance as Additional Remedy
Compliance with the insurance requirements of this Agreement shall not limit the liability
of the Construction Manager, its subcontractors, sub-subcontractors, material suppliers,
employees, or agents to the Owner or others. Any remedy provided to the Owner, or the
Owner’s officers, employees, agents or assigns, by the insurance shall be in addition to
and not in lieu of any other remedy available under the Agreement or otherwise.
13.5 No Waiver by Approval/Disapproval
Neither approval by the Owner nor failure to disapprove the insurance furnished by the
Construction Manager shall relieve the Construction Manager of its full responsibility to
provide the insurance as required by this Agreement.
ARTICLE 14
TERMINATION OF THE AGREEMENT AND OWNER'S RIGHT TO PERFORM
CONSTRUCTION MANAGER'S OBLIGATION
14.1 Suspension by the Construction Manager
Page 362 of 668
Page 52 of 81
If the Project is stopped for a period of thirty (30) days under an order of any court or
other public authority having jurisdiction or as a result of an act of government, such as
a declaration of a national emergency making materials unavailable, through no act or
fault of the Construction Manager, or if the Project should be stopped for a period of
sixty (60) days by the Construction Manager for the Owner's failure to make payments
thereon, then the Construction Manager may submit a Claim pursuant to Article 16 for
an equitable adjustment to the Project Schedule as well as to the GMP for mobilization
and re-mobilization costs.
14.2 Owner's Right to Perform Construction Manager's Obligations and Termination by
Owner for Cause
The Owner may terminate this Agreement for any of the following reasons:
1. If the Construction Manager is adjudged as bankrupt, or if it makes a general
assignment for the benefit of its creditors, or if a receiver is appointed on account
of its insolvency, or if it persistently or repeatedly refuses or fails, except in case
for which extension of time is provided, to supply enough properly skilled
workmen or proper materials and fails to maintain an established schedule (failure
to maintain schedule shall be defined as any activity on the critical path that falls
45 days or more behind schedule) which has been adopted by the Construction
Team, or if it fails to make prompt payment to subcontractors for materials or
labor, or persistently disregards laws, rules, ordinances, regulations, or orders of
any public authority having jurisdiction, or otherwise materially breaches this
Agreement.
2. The Owner may, without prejudice to any right or remedy and after giving the
Construction Manager and its surety, seven (7) days written notice, during which
period Construction Manager fails to cure the violation, terminate the
employment of the Construction Manager and take possession of the site and of
all materials, equipment, tools, construction equipment and machinery thereon
owned by the Construction Manager, accept assignment of the subcontracts, and
may finish the Project by whatever method Owner may deem expedient In such
case, the Construction Manager shall not be entitled to receive any further
payment until the Project is finished nor shall it be relieved from its obligations
assumed under Article 7. Reasonable terminal expenses incurred by the Owner
may be deducted from any payments left owing the Construction Manager. In the
event the costs for completing the Work, including compensation for any
Engineer services and expenses, exceed the unpaid balance of the Contract Sum,
the Construction Manager shall pay the difference to the Owner. This obligation
for payment shall survive termination of this Agreement. However, no such
notice is required of the Owner if the furnishing of such notice would be futile.
14.3 Termination by Owner for its Convenience
1. The Owner may, at any time, terminate or suspend this Agreement in whole or in
part for the Owner's convenience and without cause. Owner will not incur liability
Page 363 of 668
Page 53 of 81
for the issuance of a stop work order.
2. Upon receipt of written notice from the Owner of such termination for the Owner's
convenience, the Construction Manager shall:
a. Cease operations, as directed by the Owner in the notice;
b. Take actions necessary, or that the Owner may direct, for the protection and
preservation of the Work; and
c. Terminate all existing subcontracts and purchase orders and not enter into
further subcontracts and purchase orders, except for Work directed to be
performed prior to the effective date of termination stated in the notice.
3. In case of such termination for the Owner's convenience, the Construction Manager
shall be entitled to receive payment for any non-deficient Work executed up to the
date of said termination.
ARTICLE 15
ASSIGNMENT AND GOVERNING LAW
15.1 Neither the Owner nor the Construction Manager shall assign its interest in this
Agreement without the written consent of the other except as to the assignment of
proceeds.
15.2 This Agreement shall be governed by the Laws of the State of Florida. Venue shall lie
exclusively in Orange County, or federal court in Orlando, Florida. The parties waive all
rights to trial by jury.
ARTICLE 16
NOTICE OF CLAIM: WAIVER OF REMEDIES
16.1 The Owner's liability to the Construction Manager for any claims arising out of or related
to the subject matter of this Agreement, whether in contract or tort, including, but not
limited to, claims for extension of construction time; for payment by the Owner of the
costs, damages or losses because of changed conditions under which the work is to be
performed; or for additional work; shall be governed by the following provisions:
1. All claims must be submitted as a Request for Change Order in the manner as
provided herein;
2. The Construction Manager must submit a Notice of Claim to Owner within 20
days of the Construction Manager becoming aware of the occurrence, or the
event, giving rise to the claim; and
3. Within 10 days of submitting its Notice of Claim, the Construction Manager shall
submit to the Owner its Request for Change Order, which shall include a written
Page 364 of 668
Page 54 of 81
statement of all the details of the claim, including a description of the work
affected.
The Construction Manager agrees that the Owner shall not be liable for any claim that
the Construction Manager fails to submit as a Request for Change Order as provided in
this paragraph.
16.2 After receipt of a Request for Change Order, the Owner, in consultation with the
Engineer, shall deliver to the Construction Manager its written determination of the
claim. The City Manager has authority to execute changes orders up to the limits
designated in the City of Ocoee Purchasing Code. Above said limits, the City
Commission must authorize the change order.
16.3 For work the Construction Manager performs with its own forces, and in addition to the
adjustments provided for in Article 8, the Construction Manager's exclusive remedy for
delays in performance of the construction caused by events beyond its control, including
delays claimed to be caused by or attributable to the Owner or the Engineer, including
claims based on breach of contract or negligence, shall be a claim submitted in
compliance with Article 16.1 above, for an extension of the scheduled construction time.
In the event of a change in such work, the Construction Manager's claims for adjustments
in the contract sum are limited exclusively to its actual costs for such changes plus 5% for
overhead and profit. The Construction Manager expressly agrees that the foregoing
constitutes its sole and exclusive remedy for delays and changes in such work, and
eliminates any other remedies for claim, for increase in the contract price, delays,
changes in the work, damages, losses or additional compensation.
16.4 In the event the Construction Manager’s work on the Project is delayed, the Construction
Manager’s sole and exclusive remedy is an extension of the construction completion date
regardless of whether delay is caused by any act or neglect of the Owner, Engineer, or is
attributable to the Owner or Engineer.
ARTICLE 17
DISPUTES
17.1 Harmony
The Construction Manager is advised and hereby agrees that he will exert every
reasonable and diligent effort to assure that all labor employed by the Construction
Manager and his Subcontractors for work on the project shall work in harmony with and
be compatible with all other labor being used by building and construction contractors
now or hereafter on the site of the project.
The Construction Manager further agrees that this provision will be included in all
subcontracts of the Subcontractors as well as the Construction Manager's own contract;
provided, however, that this provision shall not be interpreted or enforced so as to deny
Page 365 of 668
Page 55 of 81
or abridge, on account of membership or non-membership in any labor union or labor
organization, the right of any person to work as guaranteed by Article 1, Section 6 of the
Florida Constitution.
17.2 Dispute Resolution
1. All claims, disputes and other matters in question (hereinafter referred to as a
"Controversy") between the parties to this Agreement arising out of or relating to
this Agreement or the breach thereof shall be initially submitted to mediation by a
mediator mutually acceptable to both parties. Otherwise, if the parties cannot agree
on a mediator, mediation shall be in accordance with the Construction Mediation
Rules of the American Arbitration Association ("AAA"). Construction Manager
shall require pre-suit mediation in all of its subcontracts for this Project.
2. Should either the Owner or the Construction Manager feel it necessary and
appropriate to take any legal action to enforce any of the terms or conditions of this
Agreement between said parties, then each party shall be responsible for its own
attorney's fees and costs associated with such litigation.
ARTICLE 18
(Intentionally omitted.)
ARTICLE 19
PUBLIC RECORDS
19.1 The Construction Manager must comply with public records laws, specifically to:
This paragraph will survive termination of this Agreement.
The City of Ocoee (City) is a public agency subject to Chapter 119, Florida Statutes. The
Contractor agrees to comply with Florida’s Public Records Law. Specifically, the Contractor
shall:
1. Keep and maintain public records required by the City to perform the service.
2. Upon request from the City’s custodian of public records, provide the City with a copy of the
requested records or allow the records to be inspected or copied within a reasonable time at a
cost that does not exceed the cost provided in chapter 119, Florida Statutes, or as otherwise
provided by law.
3. Ensure that public records that are exempt or confidential and exempt from the public records
disclosure requirements are not disclosed except as authorized by law for the duration of the
contract term and following completion of the contract if the Contractor does not transfer the
records to the City.
Page 366 of 668
Page 56 of 81
4. Upon completion of the contract, Contractor agrees to transfer at no cost to the City all public
records in possession of the Contractor or keep and maintain public records required by the
City to perform the service. If the Contractor transfers all public record to the City upon
completion of the contract, the Contractor shall destroy any duplicate public records that are
exempt or confidential and exempt from public records disclosure requirements. If the
Contractor keeps and maintains public records upon completion of the contract, the
Contractor shall meet all applicable requirements for retaining public records. All records
stored electronically must be provided to the City, upon request from the City’s custodian of
public records, in a format that is compatible with the information technology systems of the
City.
5. A Contractor who fails to provide the public records to City within a reasonable time may be
subject to penalties under section 119.10, Florida Statutes.
IF THE CONTRACTOR HAS QUESTIONS REGARDING THE
APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE
CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS
RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF
PUBLIC RECORDS AT 407-905-3100, EXTENSION 1022,
CCDL@ci.ocoee.fl.us, WITH AN OFFICE LOCATED AT 1 N BLUFORD
AVENUE, OCOEE, FLORIDA 34761.
ARTICLE 20
ACCOUNTING RECORDS AND AUDIT
20.1 The Construction Manager shall keep full and detailed accounts and exercise such
controls as may be necessary for proper financial management under this Agreement;
the accounting and control systems shall be satisfactory to the Owner. The Owner and
the Owner’s accountants or other duly authorized representatives or agents shall be
afforded access to the Construction Manager’s records, books, correspondence,
instructions, Drawings, receipts, subcontracts, purchase orders, vouchers, memoranda,
and other data relating to this Project for audit purposes, and the Construction Manager
shall preserve these records, documents and data for a period of ten (10) years after final
payment, or for such longer period as may be required by law. The Construction
Manager shall require all of its subcontractors likewise to retain such records,
documents and data. If the Construction Manager receives notification of a dispute or
the commencement of litigation regarding the Project within this four-year period, the
Construction Manager shall continue to maintain all Project records until final resolution
of the dispute or litigation.
20.2 Upon seven calendar days' written notice, from the date of this Agreement to the last
date described in the preceding Article 20.1, the Construction Manager shall make its
records available during normal business hours to the Owner or its authorized
Page 367 of 668
Page 57 of 81
representative(s). Owner and its authorized representative(s) shall be entitled to inspect,
examine, review and copy the Construction Manager’s records at the Owner's
reasonable expense, within adequate work space at the Construction Manager's facilities.
Such rights to inspect, examine, review and copy shall extend to the records and
documentation of subcontractors. Failure by the Construction Manager to supply
substantiating records shall be reason to exclude the related costs from amounts which
might otherwise be payable by the Owner to the Construction Manager pursuant to this
Agreement.
20.3 If at any time, Owner conducts an audit of Construction Manager’s records and
documentation and finds that Construction Manager overcharged Owner, Construction
Manager shall pay to Owner the Overcharged Amount which is defined as the total
aggregate overcharged amount together with interest thereon (such interest to be
established at the rate of 12% per annum). If the Overcharged Amount is equal to or
greater than $10,000.00, Construction Manager shall pay to Owner the Overcharged
Amount and the Audit Amount which is defined as the total aggregate of Owner’s
reasonable audit costs incurred as a result of its audit of Construction Manager. Owner
may recover the Overcharged Amount and the Audit Amount, as applicable, from any
amount due or owing Construction Manager with regard to the Project or under any
other agreement between Construction Manager and Owner. If such amounts owed
Construction Manager are insufficient to cover the Overcharged Amount and Audit
Amount, as applicable, then Construction Manager hereby acknowledges and agrees that
it shall pay such remaining amounts to Owner within seven (7) business days of its
receipt of Owner’s invoice for such remaining amounts. In no event shall the
Overcharged Amount or the Audit Amount be deemed a reimbursable Cost of the Work.
20.4 This Article, “Accounting Records and Audit,” including all access, inspection, copying,
auditing, reimbursement and repayment rights shall survive the termination of this
Agreement.
ARTICLE 21
MISCELLANEOUS
21.1 Limitation of Liability. The Owner shall be liable only to the extent of its interest in
the Project, and no officer, director, partner, agent or employee of the Owner shall ever
be personally or individually liable with respect to this Agreement or the Work. Any
subcontract entered into by the Construction Manager shall include the forgoing
limitation, which shall be effective in the event the Owner ever succeeds to the
Construction Manager’s rights and obligations under a subcontract.
21.2 Unless the context of this Agreement otherwise clearly requires, references to the plural
include the singular, references to the singular include the plural, the term “including”
is not limiting, and the terms “hereof”, “herein”, “hereunder”, and similar terms in the
Contract Documents refer to the Contract Documents as a whole and not to any
Page 368 of 668
Page 58 of 81
particular provision thereof, unless stated otherwise.
21.3 Gender. Unless the context clearly indicates to the contrary, pronouns having a neuter,
masculine or feminine gender shall be deemed to include the others.
21.4 Entire Agreement. This Agreement and the Construction Documents incorporated
herein by reference constitute the entire Agreement between the parties with respect to
the matters covered by this Agreement. All prior negotiations, representations and
agreements not incorporated in this Agreement are cancelled. This Agreement can be
modified or amended only by a written document duly executed by the parties or their
duly appointed representative.
21.5 Binding Effect. Each and all of the covenants, terms, provisions and agreements
contained in this Agreement shall be binding upon and inure to the benefits of the
parties and their respective assigns, successors, subsidiaries, affiliates, holding
companies and legal representatives, as allowed in this Agreement.
21.6 Notices. All notices shall be in writing, and may be served by (a) depositing the same
in the United States mail addressed to the party to be notified, postpaid, and registered
or certified with return receipt requested, (b) by delivering the same in person to such
party, (i) personal delivery, or (ii) overnight courier, or (c) by facsimile transmission
provided that a copy is sent on the same day, by 5 p.m., by either of the methods
described in (a) or (b). Notice deposited in the mail shall be deemed to have been given
on the third day next following the date postmarked on the envelope containing such
notice, or when actually received, whichever is earlier. Notice given in any manner
shall be effective only if and when received by the party to be notified. All notices to
be given to the parties shall be sent to or delivered at the addresses or facsimile
numbers set forth below:
If to Owner: CITY OF OCOEE
Utilities Director
1 N Bluford Avenue
Ocoee, FL 34761
Telephone:
CITY OF OCOEE
Purchasing Technician
1 N Bluford Avenue
Ocoee, FL 34761
Telephone: 407-905-3100 ext. 1524
Construction Manager:
Page 369 of 668
Page 59 of 81
By giving the other party at least 15 days written notice, each party shall have the right
to change its address and specify as its new address any other address in the United
States of America.
21.7 Waiver. No consent or waiver, express or implied, by either party to this Agreement to
or of any breach or default by another in the performance of any obligations shall be
deemed or construed to be consent or waiver to or of any other breach or default by that
party. Except as otherwise provided in this Agreement, failure on the part of any party
to complain of any act or failure to act by another party or to declare the other party in
default, irrespective of how long such failure continues, shall not constitute a waiver of
the rights of that party.
21.8 Captions. The headings used for the various portions of this Agreement and the
Construction Documents are inserted only as a matter of convenience, and for
reference, and in no way define, limit or describe the scope or the intent of this
Agreement, any section of this Agreement, or any section of the Contract Documents.
21.9 Severability. In the event the provisions of this Agreement are determined by a Court
of competent jurisdiction to be illegal or unenforceable, then such unenforceable or
unlawful provision shall be excised from this Agreement, and the remainder of this
Agreement shall continue in full force and effect. Notwithstanding the foregoing, if the
result of the deletion of such provision will materially and adversely affect the rights of
a party, such party may elect, at its option, to terminate this Agreement in its entirety.
21.10 Cumulative Remedies. All rights, powers, remedies, benefits, and privileges are
available under any provision of this Agreement to any party, is in addition to and
cumulative of any and all rights, powers, remedies, benefits and privileges available to
such party under all other provisions of this Agreement, at law or in equity.
21.11 Approval. Whenever any review or approval is required by any party, such party
agrees that such review or approval will be promptly and expeditiously prosecuted to
conclusion.
21.12 Further Assurances. The parties agree to execute any and all further instruments and
documents, and take all such action as may be reasonably required by any party to
effectuate the terms and provisions of this Agreement and the transactions
contemplated in this Agreement.
21.13 No Partnership or Joint Venture. It is understood and agreed that nothing contained in
this Agreement shall be deemed or construed as creating a partnership or joint venture
between the parties or any third party, or cause any party to be responsible in any way
for the debts and obligations of the other party.
21.14 No Construction Against Drafter. Each of the parties have been represented by legal
counsel who have had ample opportunity to, and have, participated in the drafting of
this Agreement. Therefore, this Agreement shall not be construed more favorably or
unfavorably against any party.
21.15 Third Party Beneficiary. This Agreement has been made and entered into for the sole
protection and benefit of the Owner, and its respective successors, and no other person
Page 370 of 668
Page 60 of 81
or entity shall have any right or action under this Agreement.
21.16 Force Majeure. With regard to the performance under this Agreement, a party shall not
be deemed to be in default of this Agreement, or have failed to comply with any term or
conditions if, for reasons beyond the parties reasonable control, including without
limitation acts of God, natural disaster, labor unrest, war, declared or undeclared, the
existence of injunctions or requirements for obtaining licenses, easements, permits or
other compliance with applicable laws, rules and regulations, such performance is not
reasonably possible within such time periods, then the time for such performance shall
be extended until removal of such reasons beyond the parties reasonable control,
provided that the party commences such performance as soon as reasonably possible
and diligently pursues such performance.
21.17 Right to Enter this Agreement. Each party warrants and represents, with respect to
itself, that neither the execution of this Agreement nor the performance of its
obligations under this Agreement shall violate any legal requirement, result in or
constitute a breach or default under any indenture, contract, or other commitment or
restriction to which it is a party or by which it is bound. Each party also warrants and
represents, with respect to itself, that the execution of this Agreement and the
performances and obligations under this Agreement shall not require any consent, vote,
or approval which has not been obtained, or at the appropriate time shall not have been
given or obtained. Each party agrees that it has or will continue to have throughout the
term of this Agreement the full right and authority to enter into this Agreement and to
perform its obligation under this Agreement. Upon written request, each party agrees
to supply the other party with evidence of its full right and authority.
21.18 Public Entity Crime Information Statement and Department. – Section 287.133(2)(a) of
the Florida Statutes states: “A person or affiliate who has been placed on the convicted
vendor list following a conviction for a public entity crime may not submit a bid on a
contract to provide any goods or services to a public entity, may not submit a bid on a
contract with a public entity for the construction or repair of a public building or public
work, may not submit bids on leases of real property to a public entity, may not be
awarded or perform work as a contractor, supplier, subcontractor, or consultant under a
contract with any public entity, and may not transact business with any public entity in
excess of the threshold amount provided in Section 287.017, for CATEGORY TWO
for a period of thirty-six (36) months from the date of being placed on the convicted
vendor list.”
By signing this Agreement, Construction Manager certifies, to the best of its knowledge
and belief, that it and its principals:
a) Are not presently debarred, suspended, proposed for debarment, declared
ineligible or voluntarily excluded from covered transactions by a federal
department or agency.
b) Have not, within a five-year period preceding the issuance of RFQ #23-004 been
convicted of or had a civil judgment rendered against them for commission of
fraud or a criminal offense in connection with obtaining, attempting to obtain, or
performing a public (federal, state or local) transaction or contract under public
Page 371 of 668
Page 61 of 81
transaction; violation of federal or state antitrust statutes or commission of
embezzlement, theft, forgery, bribery, falsification or destruction of records,
making false statements or receiving stolen property.
c) Are not presently indicted or otherwise criminally charged by a governmental
entity (federal, state or local) with commission of any of the offenses
enumerated in the preceding paragraph (b).
d) Have not within a five-year period preceding the issuance of RFQ #23-004 had
one or more public transactions (federal, state or local) terminated for cause or
default.
Construction Manager agrees to notify Owner within 30 days after the occurrence of
any of the events, actions, debarments, proposals, declarations, exclusions, convictions,
judgments, indictments, informations, or terminations as described in paragraphs (a) –
(d) above, with respect to Construction Manager or its principals.
21.19 No Waiver of Sovereign Immunity. Nothing herein is intended to serve as a waiver of
sovereign immunity by any agency or political subdivision to which sovereign
immunity may be applicable.
21.20 Non-Discrimination. The parties shall not discriminate against any employee or
participant in the performance of the duties, responsibilities and obligations under this
agreement because of race, color, religion, gender, age, marital status, disability,
political or religious beliefs, national or ethnic origin.
21.21 Harmony. The Construction Manager is advised and hereby agrees that it will exert
every reasonable and diligent effort to assure that all labor employed by the
Construction Manager and its Subcontractors for work on the project shall work in
harmony with and be compatible with all other labor being used by building and
construction contractors now or hereafter on the site of the project.
The Construction Manager further agrees that this provision will be included in all
subcontracts of the Subcontractors as well as the Construction Manager's own contract;
provided, however, that this provision shall not be interpreted or enforced so as to deny
or abridge, on account of membership or non-membership in any labor union or labor
organization, the right of any person to work as guaranteed by Article 1, Section 6 of
the Florida Constitution.
21.22 Construction Manager's Project Records. The Construction Manager's Project Records
shall be maintained as prescribed herein above for the minimum period required by
State and Federal Law, and shall be made available to the Owner or its authorized
representative at mutually convenient times.
21.23 Consequential Damages. The parties mutually waive all claims for consequential
damages, except to the extent paid for by insurance maintained for this project or for
liquidated damages otherwise recoverable by the Owner and allowed by this
Agreement.
SIGNATURE PAGE TO FOLLOW
Page 372 of 668
Page 62 of 81
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the day and year
first above written.
CONSTRUCTION MANAGER:
BY:_________________________________________
PRINT NAME:
TITLE:
WITNESSES:
NAME: NAME:
TITLE: TITLE:
OWNER: CITY OF OCOEE, FLORIDA
ATTEST: APPROVED:
BY: BY:
Melanie Sibbitt, City Clerk Rusty Johnson, Mayor
(SEAL)
FOR USE AND RELIANCE ONLY BY APPROVED BY CITY OF OCOEE
THE CITY OF OCOEE, FLORIDA COMMISSION AT A MEETING HELD
APPROVED AS TO FORM AND LEGALITY on ____________, under Agenda Item ____.
this day of , 20__
SHUFFIELD, LOWMAN & WILSON, P.A.
BY:
Scott A. Cookson, City Attorney
END OF SECTION
Page 373 of 668
Page 63 of 81
TRUTH-IN-NEGOTIATION CERTIFICATE
The Consultant hereby certifies that all wage rates, and any and all other unit
costs supporting the compensation to be paid to the Consultant pursuant to a Services
Authorization for the Services as set forth therein, will be accurate, complete, and current at the
date of the Services Authorization's execution.
WITNESS:
BY:
Print Name:
Title:
[NAME F FIRM]
BY:
Print Name: [enter name]
Title: [enter title]
STATE OF FLORIDA }
COUNTY OF }
PERSONALLY APPEARED before me, the undersigned authority, ,
[ ] well known to me or [ ] who has produced his/her as identification, and
known by me to be the of the corporation named above, and acknowledged before
me that he/she executed the foregoing instrument on behalf of said corporation as its true act and
deed, and that he/she was duly authorized to do so.
WITNESS my hand and official seal this day of , 20 .
NOTARY PUBLIC
Print Name:
My Commission Expires:
Page 374 of 668
Page 64 of 81
EXHIBIT A
To Be Completed Per Project Assignment
Construction Team Representatives
Owner City of Ocoee, City Commission
City Manager Robert D. Frank
Owner’s Representative Utilities Director
Engineer of Record: Hazen and Sawyer, P.C.
Construction Manager
CM Representative
Page 375 of 668
Page 65 of 81
EXHIBIT B
SAMPLE: To Be Completed per Project Assignment
Construction Manager's Personnel During Construction Phase
(TO BE COMPLETED AT FINAL GMP)
Name Title Duration
(Months) Percentage
Off-Site Staff
On-Site Staff
Page 376 of 668
Page 66 of 81
EXHIBIT C
CERTIFICATE OF SUBSTANTIAL COMPLETION
Project: Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction
RFQ No. 23-004
CONTRACTOR
Contract For
Contract Date
This Certificate of Substantial Completion applies to all Work under the Contract Documents or to
the following specified parts thereof:
To
Owner
And To
Contractor
The Work to which this Certificate applies has been inspected by authorized representatives of
OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially
complete in accordance with the Contract Documents on ______________________________,
(Date of Substantial Completion).
A tentative list of items to be completed or corrected is attached hereto. This list may not be all-
inclusive, and the failure to include an item in it does not alter the responsibility of
CONTRACTOR to complete all the Work in accordance with the Contract Documents. When this
Certificate applies to a specified part of the Work the items in the tentative list shall be completed
or corrected by CONTRACTOR within days of the above date of Substantial Completion.
Page 377 of 668
Page 67 of 81
The date of Substantial Completion is the date upon which all guarantees and warranties begin,
except as follows:
The responsibilities between OWNER and CONTRACTOR for security, operation, safety,
maintenance, heat, utilities and insurance shall be as follows:
RESPONSIBILITIES:
OWNER
CONTRACTOR
The following documents are attached to and made a part of this Certificate:
Page 378 of 668
Page 68 of 81
Executed by OWNER on , 20
(OWNER)
By
The CONTRACTOR accepts this Certificate of Substantial Completion on:
, 20 .
(Contractor)
By
END OF SECTION
Page 379 of 668
Page 69 of 81
EXHIBIT D
Final Completion Forms
CONSTRUCTION MANAGER’S AFFIDAVIT OF CONTRACT COMPLETION
OWNER: City of Ocoee
PROJECT: Floral Street Water, Sewer and Road Reconstruction
CONSTRUCTION MANAGER:
CONTRACT FOR: Construction Manager at Risk
CONTRACT DATE: ________________________________
CONTRACT AMOUNT: ____________________________
CONSTRUCTION MANAGER’S AFFIDAVIT
I solemnly swear and affirm: That the work under the above-named Contract and all amendments
thereto have been completed in accordance with the requirements of said Contract: that except as
noted on the attached sheet, all costs incurred for equipment, materials, labor, and services
against the Project have been paid; that no liens have been attached against the Project; that no
Notices of Non-Payment have been served against the Payment Bond issued for this Project;
that, except as noted on the attached sheet, no suits are pending by reason of work on the Project
under the Contract; that all Workmen's Compensation claims are covered by Workmen's
Compensation insurance as required by law; and that all public liability claims are adequately
covered by insurance.
CONSTRUCTION MANAGER:
___________________________ (Seal)
Title: Date:
STATE OF:
COUNTY OF:
Personally appeared before me this_____ day of _____________20____, known (or made
known) to me to be the of ____________________, who, being by me duly sworn, subscribed to
the foregoing affidavit in my presence.
Notary Public
Typed
My Commission Expires:
Page 380 of 668
Page 70 of 81
EXHIBIT E
SAMPLE: To Be Completed per Project Assignment
Construction Manager's Staff Positions to be Assigned to the Pre-construction/Design Phases
Name Title Duration
(Months) Percentage
Off-Site Staff
On-Site Staff
Page 381 of 668
Page 71 of 81
EXHIBIT F
SAMPLE: To Be Completed per Project Assignment
Owner's Representative(s) and Designee(s)
Owner's Representative(s) .......................Utilities Director or other City Manager designee
Total Dollar Limit per Occurrence, the City Manager in conjunction with the Owner's
Representative(s) is authorized to obligate the Owner: $____________ (To be determined
at Final GMP)
Page 382 of 668
Page 72 of 81
EXHIBIT G
Partial Payment Request Form
APPLICATION AND CERTIFICATE FOR PAYMENT FORM
Application No.____ Progress Payment Final Payment P.O. No.: ____________
Contractor: ________________________________________ Contract Date: ______________
Application Date:__________________________________ For Period Ending_____________
City Project Nos.: RFQ #23-004
Project Name: Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction
Construction Start Date: ____________________ End Date: ___________________________
Construction Days – Total: __________ Elapsed: ________ Remaining: ________
1. Original Contract Amount $
2. Sum of Approved Change Orders to Date (from Table) $
3. Current Contract Amount (Sum of Lines 1 and 2) $
4. Total of Prior Pay Applications (including retainage) $
5. Amount of this Pay Application (including retainage;
from Bid Item Quantity Spreadsheet) $
6. Total Earned to Date (Sum of Lines 4 and 5) $
7. Total of Payments Made by City to Date $
8. Retainage Held from Prior Pay Applications $
9. Retainage to Be Held in this Pay Application $
10. Total Retainage Held to Date (Sum of Lines 8 and 9) $
11. Total Earned to Date less Retainage (Line 6 minus Line 10) $
12. Total Earned less Retainage for this Pay Application
(Line 5 minus Line 9) $
13. Total Amount to Be Paid by City for this Application
(Line 11 minus Line 7) $
Approved Change Orders
Change
Order No.
Date Approved
by City
Date Accepted
by Contractor
Total Change in
Contract Price
Page 383 of 668
Page 73 of 81
Contractor's Certification
The undersigned Contractor hereby swears under penalty of perjury that (1) all previous progress
payments received from the Owner on account of Work performed under the contract referred to
above have been applied by the undersigned to discharge in full all obligations of the
undersigned incurred in connection with Work covered by prior Applications for Payment
numbered 1 through _____ inclusive (not applicable for first application.); and (2) all materials
and equipment incorporated in said Project or otherwise listed in or covered by this Application
for Payment are free and clear of all liens, claims, security interest and encumbrances; (3) all
Work covered by this Application for Payment is in accordance with the Contract Documents
and not defective as that term is defined in the Contract Documents.
Dated _______________, 20__
(Contractor)
By:
(Name)
(Title)
COUNTY OF
STATE OF
Before me on this __________ day of _______________, 20__, personally appeared
__________________________, known to me, who being duly sworn, deposes and says that
(s)he is the ______________________________ of the Contractor above mentioned; that(s) he
executed the above Application for Payment and statement on behalf of said Contractor; and that
all of the statements contained therein are true, correct and complete.
Notary Public
My Commission Expires
Payment shown on Line 13 is recommended by City’s Owner’s Representative and authorized
by the Owner:
By: Date:
Representative’s Authorized Signature
By: Date:
Owner’s Authorized Signature
Title
Page 384 of 668
Page 74 of 81
EXHIBIT H
Final Payment Request Check List
Items to be submitted with General Contractor's Request for Final Payment
1. Pay Request (1 copy with original signatures and original seals, noted as FINAL)
2. Final Schedule of Contract Values
3. Consent of Surety to make Final Payment (signed and sealed)
4. Power of Attorney from Surety for Release of Final Payment (signed, sealed and
dated same as Consent of Surety)
5. Affidavit of Contract Completion (Exhibit D)
6. Satisfactory Conclusion or Release of Lien from all Subcontractors or laborers
who have filed Intent to Lien or have indicated non-payment from the General
Contractor
7. Construction Manager's Guarantee of Construction for one (I) year from the date
of Substantial Completion
8. Copy of the approval by the Engineer and the transmittal to the Owner of
Manuals, Shop Drawings, As-Builts (2 sets of digital media (Flash Drives), two
sets of prints), brochures, warranties, and list of Subcontractors with telephone
numbers and addresses
9. Verification that Owner's personnel has been trained in the operation of their new
equipment, attendance lists and videos
10. Other special Warranties are required by Specifications in the name of the Owner
11. Copy of Certificate of Completion
Page 385 of 668
Page 75 of 81
EXHIBIT I
SAMPLE: To Be Completed per Assignment
Contract Drawings & Specifications
To be completed at Final GMP
Page 386 of 668
Page 76 of 81
EXHIBIT J
GMP Bid Breakdown
To be completed at Final GMP
Page 387 of 668
Page 77 of 81
EXHIBIT K
Clarifications, Assumptions, Exclusions and Allowances
To be completed at Final GMP
Page 388 of 668
Page 78 of 81
EXHIBIT L
PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS that
, (hereinafter referred to as "Principal"), and
, a corporation organized under the laws of the State of
and licensed to do business in the State of , (hereinafter referred to as
"Surety"), and held and firmly bound unto the City of Ocoee, Florida, as Obligee, (hereinafter
referred to as "Obligee"), in the Penal Sum of , for the payment of which
sum well and truly made, Principal and Surety bind themselves, their heirs, personal
representatives, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, Principal has by written agreement dated ,entered into a
contract, (hereinafter referred to as the "Contract") with Obligee for the construction of
___________________________________________ (hereinafter referred to as the "Project") in
accordance with the plans and specifications prepared by ___________________, dated
; and
NOW, THEREFORE, THE CONDITIONS OF THIS OBLIGATION IS SUCH THAT IF
Principal shall well and truly perform all the undertakings, covenants, terms, conditions, and
agreements of said Contract including, but not limited to, the making of payments to persons or
entities providing labor, materials or services to Principal under the Contract, as well as,
fulfilling all warranty obligations required after the Certificate of Completion is issued, within
the time provided therein, and any extensions thereof that may be granted by the Obligee, and
also during the life of any warranty or guaranty required under said Contract, and shall also well
and truly perform all undertakings, covenants, terms, conditions, and agreements of any and all
duly authorized and modifications of said Contract that may hereafter be made, and shall pay,
compensate, indemnify and save harmless the said Obligee of and from any and all loss, damage
and expense, or from any breach or default by Principal under the Contract, including, but not
limited to, liquidated damages, damages caused by delays in performance of the Principal,
expenses, cost and attorneys' fees, including appellate proceedings, that Obligee sustains
resulting directly or indirectly from failure of the Principal to perform the Work identified by the
Contract, then this obligations shall be null and void; otherwise, it shall remain in full force and
effect and Surety shall be liable to Obligee under this Performance Bond.
The Surety's obligations hereunder shall be direct and immediate and not conditional or
contingent upon Obligee's pursuit of its remedies against Principal, and shall remain in full force
and effect notwithstanding (I) amendments or modifications to the contract or contract entered
into by Obligee and Principal without the Surety's knowledge or consent; (ii) waivers of
compliance with or any default under the Contract granted by Obligee to Principal or by
Principal to Obligee without the Surety's knowledge or consent; (iii) the discharge of Principal
from its obligations under the Contract as a result of any proceeding initiated under The
Bankruptcy Code of 1978, as the same may be amended, or any similar state or federal law, or
any limitation of the liability of Principal or its estate as a result of any such proceedings; or (iv)
any other action taken by Obligee or Principal that would, in the absence of this clause, result in
the release or discharge by operation of law of the Surety from its obligations hereunder.
Page 389 of 668
Page 79 of 81
In the event that the Surety fails to fulfill its obligations under this Performance Bond,
then the Surety shall also indemnify and save the Obligee harmless from any and all loss,
damage, cost and expense, including reasonable attorneys' fees and other legal costs for all trial
and appellate proceedings, resulting directly or indirectly from the Surety's failure to fulfill its
obligations hereunder. This paragraph shall survive the termination or cancellation of this
Performance Bond. The obligations set forth in this paragraph shall not be limited by the Penal
Sum of this Bond.
Any changes in or under the Contract or the Contract and compliance or noncompliance
with any formalities connected with the Contract or the Contract or the changes therein shall not
affect Surety's obligations under this bond, and Surety hereby waives notice of any such changes.
Further, Principal and Surety acknowledge that the Penal Sum of this bond shall increase or
decrease in accordance with approved changes or modifications to the Contract.
The said Principal and the said surety agree that this bond shall inure to the benefit of all
persons supplying labor and material in the prosecution of the work provided for in the said
subcontract, as well as to the Obligee, and that such persons may maintain independent actions
upon this bond in their own names.
IN WITNESS WHEREOF, the Principal and Surety have executed this instrument under
their several seals on the day of , 20__, the name and corporate seal
of each corporate party being hereto affixed and these presents fully signed by its undersigned
representative, pursuant to the authority of its governing body.
Signed, sealed and delivered
in the presence of:
Principal
By: (SEAL)
(Official Title)
Surety
By: (SEAL)
(Official Title)
NOTES: If Principal and Surety are corporations, the respective corporate seal should be affixed and
attached.
Surety shall execute and attach a certified copy of Power of Attorney Appointing Individual
Attorney-In-Fact for execution of Performance Bond on behalf of Surety.
END OF SECTION
Page 390 of 668
Page 80 of 81
EXHIBIT L
Statutory Payment Bond
Pursuant to Florida Statutes, 255.05, et seq.
KNOW ALL MEN BY THESE PRESENTS, THAT _________________________________
(hereinafter called the “Principal”), as Principal, and ________________________________, a
corporation organized and existing under the laws of the State of _______________, hereinafter
called the “Surety”), as Surety, are held and firmly bound unto the City of Ocoee, Florida,
(hereinafter called the “Obligee"), by bond number ___________ in the sum of ___________
______________________________________ Dollars and ____ Cents ($ _______ ), for
the payment of which sum well and truly to be made, the said Principal and Surety bind
themselves, and their respective heirs, administrators, executors, successors and assigns, jointly
and severally, firmly by these presents.
WHEREAS, the Principal has entered into a written Contract with the Obligee dated
, 20__ to perform, as Contractor, in accordance with the Contract and
Contract Documents, which Contract and Contract Documents are hereby incorporated herein by
reference.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the
Principal promptly makes payments to all claimants, as defined in Section 255.05 (1), Florida
Statutes, that provide or furnish the Principal with labor, materials, or supplies, used directly or
indirectly by Principal in the prosecution of the work provided for in the contract, then this
obligation shall be null and void; otherwise it shall remain in full force and effect.
The Principal and the Surety agree that this Bond shall inure to the benefit of all
claimants, as defined in Section 255.05 (1), Florida Statutes, that provide or furnish the Principal
with labor, materials, or supplies, used directly or indirectly by Principal in the prosecution of the
work provided for in said Contract, and that any such claimant may maintain an independent
action upon this Bond in its own name.
The provisions of Florida Statutes, Section 255.05, et seq. are hereby incorporated herein
by reference and made a part of this payment bond including, but not limited to, the notice and
time limitation provisions in subsection (2). Any action instituted by a claimant under this bond
for payment must be in accordance with the notice and time limitation provisions in Section
255.05 (2), Florida Statutes.
(Signature page follows.)
Page 391 of 668
Page 81 of 81
IN WITNESS WHEREOF, the above bounden parties have executed this instrument
under their several seals this _______ day of , 20__, the name and
corporate seal of each corporate party being hereto affixed and these presents duly signed by its
undersigned representative, pursuant to authority of its governing body.
(Seal)
(Principal)
By
(Name & Title)
(Signature)
Witness or Secretary’s Attestation
(Seal)
(Surety)
By
(Name & Title*)
(Signature)
Witness or Secretary’s Attestation
*Attach Power-Of-Attorney
END OF SECTION
Page 392 of 668
RFQ #23-004 CONSTRUCTION MANAGER AT RISK FOR
FLORAL STREET WATER, SEWER AND ROAD RECONSTRUCTION
CHECKLIST
2/28/2023 2:00 PM
RESPONDENT
Submission
Requirements- Such as
Qualifications,
References, Project
Approach, Bonding
Capacity Letter from
Surety Co., etc.
Acknowleged
Addendum #1
Company/License
Verification MBE Certification
RFQ Conflict of
Interest
Disclosure form Office Location
J. Malever Construction ✓Yes Active N/A ✓Groveland, FL
Oelrich Construction, Inc.✓Yes Active Respondent ✓Winter Garden, FL
Prime Construction Group, Inc.✓Yes Active N/A ✓Orlando, FL
Page 393 of 668
Page 394 of 668
Page 395 of 668
Page 396 of 668
Page 397 of 668
Page 398 of 668
Page 399 of 668
Page 400 of 668
Page 401 of 668
Page 402 of 668
Page 403 of 668
Page 404 of 668
Page 405 of 668
Page 406 of 668
Page 407 of 668
Page 408 of 668
Page 409 of 668
Page 410 of 668
Page 411 of 668
Page 412 of 668
Page 413 of 668
Page 414 of 668
Page 415 of 668
Page 416 of 668
Page 417 of 668
Page 418 of 668
Page 419 of 668
Page 420 of 668
Page 421 of 668
Page 422 of 668
Page 423 of 668
Page 424 of 668
Page 425 of 668
Page 426 of 668
Page 427 of 668
Page 428 of 668
y
J. Malever Construction Company, Inc.
301 Sampey Road
Groveland, Florida 34736-3311
PHONE: 352-429-9507
FAX: 352-429-8705
Qualification package for:
City of Ocoee RFQ #23-004
Construction Manager at Risk for
Floral Street Water, Sewer & Road
Construction
Page 429 of 668
J. Malever Construction Company, Inc.
301 Sampey Road
Groveland, Florida 34736-3311
FAX: 352-429-8705WEBSITE: JMalever.com GENERAL EMAIL: Office@JMalever.com
Ca.yJMalever, President n (352)267-2083 camiialeverimc4aennh..^^„;i.....Scott Tyre Vi^ President (407) 267-6767 scottimciaemhargn^^ii:;;;^
Christma Lee, Office Manager (352) 429-9507 christina@.Tnialever r-n.n
Cin 'S a Florida Corporation established In 1999riu ffoy-oooloOo.
We perform primarily Underground Utility work.
a. Excavation of Existing Sanitary
b. Bypass Work
0. Excavation of Existing Water and Bypass Work
Ucens^^CUcTaJs^T^ ^Ite Development work.
We are a long-standing business in our community.
Our business location is 301 Sampey Road, Groveland FL 34736-3311
We have been at this location for 19 years (since Aprii 2003).
Our location is approximately 20 miles and 35 minutes from Ocoee City Hall.
P[®sident and owner of J Malever Construction Company is Cary J Malever. who hasbeen the president since inception in 1999 and is involved daily in the operations of the
company J. Malever Construction has had one proprietor since inception.
Cary graduated in 1992 from the University of Alabama.
After graduation, he worked at Ring Power as the Rental Coordinator from 1992-1996
1996-19^^"' for J Mark Builders and Development as a Superintendent from
He then started J Malever Construction In 1999, which continues today.
Scott Tyre serves as Vice President and has been In this role since 2016
Scott graduated from Georgia Tech In 1993 with a degree In Building Construction
fo!2'Ss" Ferguson Underground as an Inside sales representative
f?oti'^20lSl6 1995-2014, and GIbbs and Register
Scott holds an underground Contractors license. Advanced MOT certification and Is a
certified stormwater inspector.
J Malever since Inception, and Inthis line of work for over 40 years. He holds a Confined Space Certification.
Another of our job Superintendents, Robert Solleau has worked for J Malever since 2015
J Malever also has Pipe Foreman, like Hector Mata, Pablo Pena, and Noverto Morales,
Page 430 of 668
fncepfon in 1°99a employees that have been serving alongside us since
Because of our massive equipment and vehicle fleet, number of crews, and on site
''' completely self-sufficient and a turn-key operation able toperform a multitude of projects without the reliance of rental equipment or subcontractors.
Insurance and Bonding with a single job capacity of
$25,000,000 or greater. ^ y
Page 431 of 668
J. Malever Construction Company, Inc.
301 Sampey Road
Groveland, Florida 34736-3311
PHONE: 352-429-9507
FAX: 352-429-8705
J. Malever's approach to the construction of the Floral Street water sewer & mari
•^■srrsrs.r.r.Tit.ES-.-.s.-r'
we of eurteo, ftat -I be
beautiful roadway with ail the charms of the old Florida brick roads
OrianHn Projects that we have done for the City of
wMMimMm-
Page 432 of 668
J. Malever Construction Company, Inc.
301 Sampey Road
Groveland, Florida 34736-3311
PHONE: 352-429-9507 FAX: 352-429-8705
J. Malever Construction Company has completed the following jobs with similar scope
and size in municipalities:
City of Orlando, Lido Street Drainage Improvements
Existing Sanitary
Existing Storm
Existing Water
Roadwork, Asphalt
City of Orlando, Lake of the Woods to A1 Coith Park
Existing Sanitary
Existing Storm
Existing Water
Brick Work
Roadwork, Asphalt
City of Orlando, Colonial Town Drainage Improvements
Existing Sanitary
Existing Storm
Existing Water
Brick Work
Roadwork, Asphalt
City of Orlando, Ivanhoe Boulevard
Existing Sanitary
Existing Storm
Existing Water
Brick Work
Roadwork, Asphalt
City of Orlando, Lake Lucerne to Lake Cherokee
Existing Sanitary
Existing Storm
Existing Water
Brick Work
Roadwork, Asphalt
City of Orlando, Lake Cherokee to Lake Davis
Existing Sanitary
Existing Storm
Existing Water
Brick Work
Roadwork, Asphalt
Page 433 of 668
V J
J. Malever Construction Company, Inc.
301 Sampey Road
Groveland, Florida 34736-3311
PHONE: 352-429-9507 FAX: 352-429-8705
Equipment T,ist
The following is a list of equipment owned by J Malever Construction.
In addition to this list, we also have our own Transport Trucks, Dump Trucks Trailers
ssrirr"• s.
Envirosafe Fuel Tank
Wacker Plate Tamper
1998 Caterpillar 924F Loader
195 6 Kaiser (JMC) Water Truck
Caterpillar CS433C Roller
Caterpillar CS433C Roller
Bros LSPRM-8A Mixer
Leeboy,(Trupac) 915 Roller
Concept Products CP2000T Air Curtain
Caterpillar CS533E Roller
Caterpillar 93 8GII Loader
Caterpillar 928GZQC Loader
Cateipillar 928GZQC Loader
Caterpillar 924G Loader
Caterpillar 12H Grader
Caterpillar D5GLGP Dozer
Caterpillar D5GLGP Dozer
1998 Leeboy RB48 Broom
Laymor 8HC Broom
Leeboy 915 Roller
Rotoflo RWP006 8 Pump Dewatering
Rotoflo RWP006 8 Pump Dewatering
Caterpillar D4KLGP Dozer
Temp barrier K-wall
2015 Kenco KL9000 Barrier Lift
Rotoflo RWP008 Pump 8"
2016 Weber CRicCD-07 Plate Tamp (rev.)
2016 Stone Mizer SM-EWHD-9 Rock Box
2015 Caterpillar 930KFQC Loader
2016 Caterpillar 259D L2 Skid steer
2017 Weber CR6-CCD Plate tamp
2019 Caterpillar 926 Loader
2019 Caterpillar 908 Loader
2002 Caterpillar D3GLGBT Tractor
2018 John Deere 5045E Utility Tractor
2013 Wacker Neuson Light Tower Light Tower Trailer
2017 Caterpillar 725 Truck Articulated Truck
2017 Caterpillar 725 Truck Articulated Truck
2015 Caterpillar 725C Truck Articulated Truck
2019 Caterpillar 926M Wheel Loader
Page 434 of 668
2020 Northern Tool 2750PSI Hot Steam Cleaner
Landpride BB3596 Box Blade Tractor
1955Huber Grader
2017 Caterpillar 349FL Hydraulic Excavator
2017 Caterpillar 31 IF Excavator
Caterpillar 323F Excavator
2018 Caterpillar 330FL Excavator
2007 Caterpillar 12H Motor Grader
2020 Caterpillar D5K2LGP Track Type Tractor
2019 Caterpillar 725C2 Articulated Truck
2020 Caterpillar 330-07 Hydraulic Excavator
2020 Caterpillar 926M Wheel Loader
2019 Caterpillar 259D3 Compact Track Loader
2018 Caterpillar D5K2LGP Track Type Tractor
2016 Caterpillar 3 04E2CR Mini Hydraulic Excavator
2017 Caterpillar 950M Medium Wheel Loader
2019 Caterpillar 335FLCR Medium Hydraulic Excavator
1993 Caterpillar 613C Water Wagon
2021 Rex 20042010 Compactor Rex Plate
2017 Caterpillar CS544B Single Drum Soil Compactor
2021 Caterpillar D4K-15VP Track Type Tractor
Power Screen PowerGrid 1200 Dirt Screener
2018 Caterpillar D3K2LGP Track Type Tractor
2015 Weiler C307 Split Dram Asphalt Roller
Wacker Neuson LTN6L Light Tower 4L Diesel
2015 Wacker Neuson LTN6L Light Tower 4L Diesel 24276797
John Deere 7330 C-18493 Dual Tires Ag Tractor
2022 Caterpillar 336 Hydraulic Excavator
2021 Caterpillar D4K D4 Dozer - JPH00241
2021 Caterpillar 326FLHYDTH Hydraulic Excavator
2021 Caterpillar 308 Mini Excavator
2015 Komatsu PC490LC 320 Hydraulic Excavator
2015 Caterpillar D6H XL Narrow Track Bull Blade Dozer
V
Page 435 of 668
Jennifer Wild
Account Payable
Debbie Wicklander'
Receptionist
Hector Mata, Foreman
(and crew)
Nestor Cavazos, Foreman
(and crew)
Pablo Quintana, Foreman
(and crew)
Pablo Pena, Foreman
(and crew)
David Crosby, Foreman
(and crew)
Chris Hill, Foreman
(and crew)
Gary Gant, Foreman
(and crew)
John Lane, Foreman
(and crew)
Derrick DIxon, Foreman
(and crew)
Dewitt Parsons
Lead Mechanic
Lee Blackledge
Fabricator
David Messer
General Mechanic
Paul Frazier, Lead Driver
(and Drivers)
Quinton Nelson
Transport Driver
4
n
3*
Q K'
S SN^
o
4-
g-
-1 (?
114s a.
S- n
S c
4
Roddy Greeneish, Foreman
(and crew)4
ll<l-
4
4
c n
•o I-
n c
a (0
a o*
o
JD W
a IS
Q.
O
a
a
ID C/)
^ O
•o S
s ®
4
4
•0 ^
5
6 uID STa SjSn>
0
33
Qi
3
n'
01
5'
3
n
3"
Q)
■o
X
i
ra
U)
to
to
^ oO M
3
a
3
e
2.
a
M
><
Oi
to
00
•o
s
n
P er B
3
s
n
ia*«
o
B
n
o
3
'XS
B
i-H
B
rt
3
■3
I
O
B
P
^ 1g ID
u O
3 a.a 3SID »•1 l/>
Page 436 of 668
Job Name;
Customer;
Contact:
Phone:
Email:
Contract A
JMC Past Project List
mount:
Completion
Wharton Smith / City of Ocoee - City Hall Offsite
City of Ocoee- Utilities Dept
1800 A.D. MIms Road
Ocoee, FL 34761
Jamie Croteau
407-905-3159
JcroteauOocose.cQm
$722,000.00
March 2022
Job Name:
Customer:
Contact:
Phone:
Email:
Contract A mount:
Completion
Wharton Smith / City of Ocoee - Misc Projects
City of Ocoee- Utilities Dept
1800 A.D. Mims Road
Ocoee, FL 34761
Jamie Croteau
407-905-3159
jcroie3u@oco5g.com
$353,000.00
March 2022
Job Name
Customer:
Contact:
Phone:
Email:
I
Contract Amount:
Completion:
Pressure Test Wateriine 2nd & 3rd Street
City of Ocoee- Utilities Dept
1800 A.D. Mims Road
Ocoee, FL 34761
Jamie Croteau
407-905-3159
Jcroteau@oco6e.com
Job Name:
Customer:
Contact:
Phone:
Email:
Contract Amount:
(CompletiOQ:
Sewer Manhole Invert Repair at Maguire Rd & Ocoee Business Pkwy
City of Ocoee- Utilities Dept
1800 A.D. Mims Road
Ocoee, FL 34761
Jamie Croteau
407-905-3159
JcrQteau@Qcose.CQm
Pagel
Page 437 of 668
Job Name
Customer
Contact:
Phone:
imail:
Contract A
Completioh:
n
Job Name:
Customer:
ount:
Contact:
Phone:
Email:
Contract AtViount;
Completior
^iJob Name;
Customer;
Contact:
Phone:
Email:
Completlon|:
JMC Past Project List
temp Fire Station Utilities at Vignetti park
City of Ocoee- Utilities Dept
1800 A.D. Mims Road
Ocoee, PL 34761
Jamie Croteau
407-905-3159
Jcroteau@ocoee.com
Concrete Pad Install at the Master Lift Station - N. Lakewood Ave & Security a;'
City of Ocoee-Utilities Dept
1800 A.D. Mims Road
Ocoee, PL 34761
Jamie Croteau
407-905-3159
JcroteaU@ocQee.rnm
Asphalt Road Repair at Clark Rd and Hwy 50
City of Ocoee- Utilities Dept
1800 A.D. Mims Road
Ocoee, FL 34761
Jamie Croteau
407-905-3159
Jcroteau@ocoe5.cDm
Job Name:
Customer:
Contact:
Phone:
Email:
Contract Arhount:
Completion
Force Main Reroute and Road Repair on Clark Rd North of AD Mimms
City of Ocoee- Utilities Dept
1800 A.D. Mims Road
Ocoee, FL 34761
Jamie Croteau
407-905-3159
Jcroteau@ocoee.CQrn
Page ^
Page 438 of 668
Job Namfc
Custome
Contact;
^hone;
Email:
Contract Amount:
Completicn:
Job Name
Customer
Contact:
°hone:
Email;
Contract Ahiount:
Completioo:
Job Name:
Customer:
Contact:
^hone;
Email:
Contract Annount
Completion
JMC Past Project List
Sewer Repair at Hwy 50 & Bluford"
City of Ocoee- Utilities Dept
1800 A.D. Mims Road
Ocoee, PL 34761
Jamie Croteau
407-905-3159
Jcroteau@OCOeta.rnrn
^ west
1800 A.D. Mims Road
Ocoee, FL 34761
Jamie Croteau
407-905-3159
JCi'OteaUfSJocoefi.rnm
Force Main Repair & Road Repair at Silver Star Rd & Clark Rd
City of Ocoee- Utilities Dept
1800 A.D. Mims Road
Ocoee, PL 34761
Jamie Croteau
407-905-3159
Jcrote3u@ocope.cQm
Job Name:
Customer:
Contact-
Phone:
Email:
Contract Amount:
'>mpletlon:
Page • 3
Page 439 of 668
PRI CONSTRUCTION GROUP, INC. ,, .I I I I .I I I .I I�
RFQ#23-004
Construction Manager At Risk for
Floral Street Water, Sewer and Road
Reconstruction
City of Ocoee, FL
Page 440 of 668
PRIIIE CONSTRUCTION GROUP, INC.
"lllllll.11�
Febmary 2g t11, 2023
Shannon Hopper
Purchasing Technician
Finance Department/Purchasing
City of Ocoee
1 North Bluford Avenue
Ocoee, FL, 34761
RE: Letter of Interest
Dear Ms. Hopper,
We hereby express our interest in being selected for RFQ #23-004 Constmction Manager at
Risk For Floral Street Water, Sewer and Road Reconstruction for the City of Ocoee, FL. In the
following documents, please find the required information that you requested.
Throughout our 30+ years in municipal construction, we have been fortunate enough to
expeiience and successfully built over 800 projects within the Central Florida area, including
projects for City of Daytona, Volusia County, City of Orlando, Orange County, Seminole
County, Osceola County, City of Deltona, Tohopekaliga Water Authority, Greater Orlando
Aviation Authoiity, City of Kissimmee, Brevard County, and others.
Our team's experience and skillset allow us to competitively build water & wastewater
treatment facilities, booster pump stations, ground storage tanks, water mains, gravity sewer
mains, lift stations & many other heavy civil projects in and around Central Flmida. We also
have the capability and resources to respond quickly for our customers when requested for
hutTicane response or other emergency responses.
We believe in team building and paiinering with our customers to successfully design, manage,
and constmct their infrastmcture projects in a manner that meets all budget, quality, and
schedule requirements. We thank you for the opportunity to submit our qualifications and look
forward to further developing our strong relationship.
Charles J. Brackett III
President/CEO
Our People Make the Difference with Pride, Integrity and Quality
11000 Jetstream Dr.Orlando, FL 32824 I Phone: 407.856.8180 Fax: 407.856.8182 I primeconstructiongroup.com
Page 441 of 668
CONSTRUCTION GROUP,INC. �III.Ill.Ill�
GENERAL INFORMATION ABOUT COMPANY
PRIME CONSTRUCTION GROUP, INC.
1000 Jetstream Drive, Orlando, FL 32824
www. primeconstructiong roup. com
CGC1526668 CUC1225568
Main Office since 2000
Point of Contact: Chase Brackett , President/CEO
407-856-8180 Ext. 234 407-856-8182 Fax
cb rackett@p ri meconstru ct ion. com
Wyatt H. Hazy, Vice President/COO
407-856-8180 Ext. 246 407-856-8182 Fax
whazy@primeconstructiongroup.com
Originally Founded
State of Florida Corporation
Tax Identification Number
April, 1, 1991
January 1, 1994
59-3210337
Litigation: Prime Construction Group, Inc. has no legal judgments nor contract default
claims involving our team and associated team members.
COMPANY HISTORY
Prime Construction Group, Inc. (PRIME) was founded April 1, 1991. PRIME specializes in
municipal construction in the areas of roadways, underground utilities and water/wastewater
treatment facilities. Our overall experience also includes specialized construction of water &
wastewater treatment facilities, booster pump stations, ground storage tanks, water mains,
gravity sewer mains, lift stations & many other heavy civil projects in and around Central
Florida.
During the past 30 years PRIME has successfully constructed over 800 projects. These
projects range from emergency projects of less than ten thousand dollars completed in a few
days to projects greater than $35 million dollars with a contract time of more than two years.
PRIME has the ability to perform construction management services or general contracting
to manage long range projects as well as emergency/rapid response projects without any
difficulty in scheduling crews or equipment.
We are proud of the close relationships we have developed with many local municipalities
over the years. These relationships have been developed out of the fine character and
workmanship of our employees and management. Our philosophy has always been to
construct the project timely, efficiently and safely while delivering a completed project which
exceeds the owner's expectations.
Page 442 of 668
CONSTRUCTION GROUP,INC. ,,I I I I I I I I I�
Proiect Approach
PRIME'S Approach to City of Ocoee CMAR Floral Street Improvements
This project involves the installation of new gravity sanitary sewer and replacement and
upgrades to the potable water system in the Floral Street, Cumberland Ave and Sills Alley
area of Ocoee. This neighborhood is located near city hall, Ocoee Middle School and the
central business district. Scheduling and coordinating the construction activities to ensure
residence, businesses and school traffic are maintained each day in a safe and secure
manner will be one of the top priorities of our team. The reconstruction of the brick and
asphalt street along with the curb and ADA compliant sidewalk will also be a priority to
ensure the finished product is in conformance with the City's standards and surrounding
streetscape improvements. Our team will conduct a constructability review to ensure the
most effective construction methods are implemented in the design & permitting phase of
the project. This includes identifying all existing underground infrastructure, soil and
groundwater conditions, and conforming with the city's long-term master plan of future
development and infrastructure. The overall construction phasing initially appears that the
project should be constructed by street blocks starting at Floral Street with the new gravity
sewer followed by the potable watermains and streetscape reconstruction. Ensuring
FDEP underground clearances, pressure testing regularly, sanitation and flushing, quality
as-built drawings and FDEP clearances will be critical to completing each phase timely
and allow work to progress to the next segment in an orderly manner. Early and regular
communication between the City, Hazen & Sawyer, Prime, the residents, and businesses
will be important to establish expectations and communication strategy to keep everyone
informed of the construction schedule and progress.
Once selected our team will engage with the City's staff assigned to the project as well as
the staff from Hazen & Sawyer to get up to speed on the projects status. We will develop
a CPM schedule to identify all major preconstruction activities including design
development, permitting, subcontractor/trade engagement, budget development, city's
events schedule, maintenance of traffic needs, material procurement and construction
sequence schedule. Working on a regular basis with the team and maintaining
accountability for all parties is critical to completing the preconstruction phase resulting in a
Guaranteed Maximum Price (GMP) and detailed construction schedule that has taken into
account all critical factors.
Safety of the public and our workforce is the first and highest priority each day. Prime is a
"Safety First" culture company which includes training, up-to-date certifications, regular
safety meetings, and jobsite audits. Every employee has the ability and responsibility to
stop work for safety purposes. Prime's reputation is best-in-class construction of
underground utilities, roadways, sidewalks and streetscape improvements. We install
quality workmanship the first time and work in a partnership manner with our customers,
engineers, and the general public.
Page 443 of 668
CONSTRUCTION GROUP,INC. ,,,,1111111�
Proiect Approach
PRIME'S subcontractor quality control approach.
PRIME'S process for ensuring quality of completed subcontract work starts by
prequalifying our subcontractors in a method very similar to the City's RFQ process.
Subcontractors fill out a preconstruction questionnaire that includes project and
character references that are checked to ensure they meet the credentials to perform the
work the intend to bid and perform on.
After becoming prequalified and pricing finalized, we enter into a contractual agreement
that includes, but not limited to; agreed upon schedule, pass through owner contract
language, contract document expectations, payment and performance bond
requirement, safety program expectations and quality control and quality assurance
expectations. Once the subcontractor has mobilized, our project team will have weekly
progress meetings along with daily quality control/quality assurance checks to ensure the
work product provided meets our high expectations of quality work.
PRIME'S preconstruction cost estimating methods.
PRIME uses HCSS Heavy Bid software with our vast library of historical cost that allow
us to provide reliable cost predictability for our business. Knowing exactly what a project
will cost to construct is imperative to stay in business for almost 30 years. After budgets
are established and construction work starts, we rely on our Vista by Viewpoint
accounting software to provide daily cost reports that allow us to track exactly how
projects are performing daily.
PRIME'S job site safety performance metric.
PRIME believes and strives for zero accidents and/or incidents for our construction
projects. For any project we track the following: safe work hours managed without
incident, safe work hours performed without incident, days worked without incident, and
safety related paperwork completion (weekly toolbox talks and job hazard analysis).
PRIME'S job site controls regarding damage to existing infrastructure adversely
affecting neighboring properties and/or occurring after business hours.
PRIME'S process for managing existing infrastructure starts by doing preconstruction
surveys of all areas within and adjacent to the work areas. Prior to work starting we
communicate our work and proposed schedule to inform all identified resident
stakeholders so they will not be surprised when the jobsite is mobilized.
Upon mobilization several additional measures can be used including but not limited to;
vibration analysis, physical barriers at the right of ways, continuous survey and timely
jobsite restoration measures.
Page 444 of 668
MARK ALLEN
DIRECTOR OF
PRECONSTRUCTION
AND IT
ZACK FIELDS
ESTIMATING ASST.
KEYON BROWN
SUPERINTENDENT
STEVE VERHOEST
FOREMAN
ANDRES NIEVES
FOREMAN
RED=STAFF
ASSIGNED TO
PROJECT
CHASE BRACKITT
CHIEF EXECUTIVE
OFFICER
NAYDA HERNANDEZ
HR MANAGER
MARICE BROWN
SUPERINTENDENT
KAREN FIELDS
CONTROLLER
THERESA LUPFER
AP/AR MANAGER
JAEL TORRES II HARVEY GLADDEN I I FOREMAN FOREMAN
EXCAVATOR
OPERATOR
(11)
PRIIIE CONSTRUCTION GROUP,INC. ,,. .I .I ..I .I .I ..I.I..,..,,,,,,,_
ORGANIZATIONAL CHART
February 24, 2023
KYLE BROOKS
ISRAEL RAMIREZ
SUPERINTENDENT
CHANCE TUBB
FOREMAN
JONATHAN
HERNANDEZ
MA
J. RYAN WINSLOW
PROJECT MANAGER
JENNIFER
MONTGOMERY
PMA
RANDY WEST
SUPERINTENDENT
KENNETH LANE KELII KA-NE
FOREMAN FOREMAN
JEFF HOLADAY
SENIOR PROJECT
ANAGER
WYATTHAZV
CHIEF OPERATIONS
OFFICER
ASMA BOUKADOUM
PROJECT MANAGER
LORA-ANN
MCMILLAN
JOSHUA BAKER
SUPERINTENDENT
JAVIER MENDEZ
FOREMAN
PAESSA HOLLEY
FOREMAN
[ ) [UNIVE
� l PIPELAYER JLOADER OPERA TOR OPERATOR (7) (1) (10)
KIM ALLEN
EQUP. / PAYROLL ADMIN
[
GLENN BOWCOTT
SUPERINTENDENT
MIKE MORRIS
FOREMAN
LABORERS
(22) )
RANDY WHITING
SHOP MANAGER
SHOP MECHANICS
DEMICA HOLLEY
BRYAN BERRIOS
DRIVERS
JOHN CHRISTIAN
GLYNE CHARLES
SUPERINTENDENT
OPEN
NICCO SMITH
FOREMAN
Page 445 of 668
WYATT H. HAZY
CONSTRUCTION GROUP,INC. ,,-111111.1.11�
PRIME CONSTRUCTION GROUP, INC., Orlando, Florida 2014 -Present
COONice-President:
Responsibilities include overall accountability for all Construction Management, Field
Operations and full service Equipment Department. Ensures projects have the proper
manpower, equipment and resources to successfully complete the work safely and within
the contract requirements and local and state building code compliance. Provides expertise
and guidance to operations management team that is consistent with the values and goals
Prime Construction Group has established; continually listening to our employees and
customers on how we can improve our effectiveness and management of our ongoing
projects. Leads the company's safety committee and ensures all safety policies and
procedures are in OSHA compliance and are implemented and followed by staff on a daily
basis. Training and develop is one of Wyatt's passions and he leads and mentors staff as
they advance in their career through our training and development program.
RECENT AND/OR NOTABLE PROJECT EXPERIENCE: •TOHO Wifia LS 42-47P & 54P Basins GS Rehab•Orange County, Winter Garden-Vineland Rd. (CR 535) Force Main Replacement•Orange County, Gravity System Improvement Package #10•Orange County, Y15-779 County Rd. 545-Avalon Rd. Culvert Replacement•Seminole County, Soldier Creek Reg. Nutrient Removal. Stormwater Treatment Facility
JEFF HOLADAY
PRIME CONSTRUCTION GROUP, INC., Orlando, Florida 2008 -Present
Senior Project Manager: Directs and controls projects from contract award through contract
close-out. Supports field supervision by performing plan take-offs, acquiring subcontractors,
vendors and materials, and providing administrative functions required on contract-related
issues. Create and update projects schedules in collaboration with Superintendents and
disseminates schedules information to project owners and company personnel. Budgets
projects and forecast costs to predict overall financial outcome.
RECENT AND/OR NOTABLE PROJECT EXPERIENCE: •GOAA, Brightline Tunnel Interior Drainage Repairs•OUC, Division Avenue Water Main Replacement•TOHO, Michigan Ave Force Main Replacement/Ascot Water Main Ext.•Orange County, Y19-709 Western Regional Water Supply lmprov Ph 3B•City of Orlando, Lift Station #08, #30, 47 and #77•City of Tavares, Downtown CRA Area A SW Treat Improvements•TOHO, Osceola Parkway 20" Force Main Extension•City of Orlando, GOAA Hangars 407 & 431 Fire Protection Source Water Conversion•TOHO, Highlands Gravity Sewer & Water Main Replacement
Page 446 of 668
GILBERT VINCENT
CONSTRUCTION GROUP,INC. �IIIIIIIII�
PRIME CONSTRUCTION GROUP, INC., Orlando, Florida 2008 -Present
Project Manager: Directs and controls projects from contract award through contract close
out. Supports field supervision by performing plan take-offs, acquiring subcontractors,
vendors and materials, and providing administrative functions required on contract-related
issues. Create and update projects schedules in collaboration with Superintendents and
disseminates schedules information to project owners and company personnel. Budgets
projects and forecast costs to predict overall financial outcome.
RECENT AND/OR NOTABLE PROJECT EXPERIENCE: •City of Ocoee, Downtown Master Stormwater Pond and Park•Orange County, OC Clarcona Ocoee Force Main Replacement•Eatonville Park Master Lift Station Replacement•Orange County, PUMP STATION PACKAGE 22 IMPROVEMENTS•Orange County, Y18-792-TA PUMP STATION PKG 20
LORA-ANN MCMILLAN
PRIME CONSTRUCTION GROUP, INC., Orlando, Florida 2018-Present
Administration Assistant, Project Management: Provide support to the Project Manager,
Subcontractors and Suppliers and field from contract award through contract closeout. Setup
jobsite office, call in locates, attend project meetings, route submittals, pay applications,
subcontracts electronically and paper. Prepare owner contracts, bonds and insurance for
execution. Manage any and all correspondence relating to the project. Assist Project
Manager in the materials and subcontract buyout process. Generate Operation and
Maintenance Manuals at contract closeout.
JOHN HERNANDEZ
PRIME CONSTRUCTION GROUP, INC., Orlando, Florida 2022-Present
Administration Assistant, Project Management: Provide support to the Project Manager,
Subcontractors and Suppliers and field from contract award through contract closeout. Setup
jobsite office, call in locates, attend project meetings, route submittals, pay applications,
subcontracts electronically and paper. Prepare owner contracts, bonds and insurance for
execution. Manage any and all correspondence relating to the project. Assist Project
Manager in the materials and subcontract buyout process. Generate Operation and
Maintenance Manuals at contract closeout.
Page 447 of 668
RANDY WEST
CONSTRUCTION GROUP,INC. �I .I.I I.I.I.I .I I�
PRIME CONSTRUCTION GROUP, INC. Orlando, Florida 2010 -Present
Superintendent: Responsibilities include the supervision, coordination and execution of
Field Operation for all assigned projects from contract award to completion including direction
of the personnel, material procurement and management, budget allocation for project,
and overseeing of all day-today operations for the project.
RECENT AND/OR NOTABLE PROJECT EXPERIENCE: •City of Ocoee, Downtown Master Stormwater Pond and Park•TOHO, San Remo Gravity Sewer Rehab•City of St. Cloud, POLISHER UNIT IMPROV WATER TREATMENT PLANT 4•Orange County, Gravity System Improvement Package #10•City of Tavares, Downtown CRA Area A SW Treat Improvements•Orange County, Y15-779 County Rd. 545-Avalon Rd. Culvert Replacement•TOHO, Gravity Sewer Rehab. Replacement Phase 1 & 2
ISRAEL RAMIREZ
PRIME CONSTRUCTION GROUP, INC., Orlando, Florida 2019 -Present
Project Superintendent: Responsible for supervision of all field operations on assigned
projects. Provide over all leadership for on-site field administration, supervision and
technical management for all construction operations, including supervision of assistants,
foremen, subcontractors, vendors and other construction personnel. Ensure certain high
standards for quality, scheduling, safety, budget and customers satisfaction are met. Work
with PM and assist with construction methods and techniques and the project schedule.
Procure construction materials and equipment, handle safety planning and implementation.
RECENT AND/OR NOTABLE PROJECT EXPERIENCE: •City of Casselberry, Howell Park Water Treatment Plant Rehabilitation•Orange County Utilities, Western Regional WTP 3MG GST & Well House Addition•OUC, Division Avenue 20" Water Main Replacement•City of Deltona. Eastern Waste Water Facility Membrane addition and Plant Modifications
Page 448 of 668
CONSTRUCTION GROUP,INC. ,,Ill II I.I.I.I�
MARICE BROWN
PRIME CONSTRUCTION GROUP, INC., Orlando, Florida 1999 -Present
Superintendent: 2009 to Present: Responsible for the supervision, coordination and execution
of Field Operations for all assigned projects from contract award to completion; direction of the
personnel; material procurement and management, budget allocation for project, and
overseeing daily operations for the project.
Foreman: 1999 to 2009: Responsible for directly supervising and coordinating the daily tasks
and activities of laborers, pipe layers, leads, operators, and other similar positions in a manner
which ensures high quality workmanship, efficiency, employee satisfaction, morale,
communication, teamwork and pride. The Foreman may engage in the work of the crews they
supervise when necessary.
RECENT AND/OR NOTABLE PROJECT EXPERIENCE: •Orange County, Clarcona Ocoee Force Main Replacement•Orange County, Y19-709 Western Regional Water Supply lmprov Ph 3B•TOHO Oakwood Drive Gravity Sewer Rehabilitation Project•Seminole County, Soldier Creek Reg. Nutrient Removal. Stormwater Treatment Facility•City of Orlando, GOAA Hangars 407 & 431 Fire Protection Source Water Conversion•Orange County, Y13-7017 Regency Industrial Park Culvert Improvement
KYLE BROOKS
PRIME CONSTRUCTION GROUP, INC., Orlando, Florida 2020 -Present
Project Engineer: Responsibilities include on-site document management, field coordination;
documentation, submittal reviews, managing RFl's, drawing logs, subcontractor coordination,
quality control; daily safety inspections, weekly schedule updates and cost control.
RECENT AND/OR NOTABLE PROJECT EXPERIENCE: •Orange County, Southwest Service Area Water Pumping Station and Avalon Road Master
Pump Station•Orlando Fuel Facilities LLC, T-1734 100k-BBL Tanks 328 & 329 Project-Phase 2•City of Casselberry, Howell Park WTP Rehabilitation
Page 449 of 668
MARK ALLEN
CONSTRUCTION GROUP,INC. ,, I I I I I I I I I�
PRIME CONSTRUCTION GROUP, INC., Orlando, FL 2000 -Present
Director of Preconstruction: 2014 to Present: Responsible to pursue new contract
opportunities through hard bid, cost plus, design-build or other negotiated contract methods.
Works closely with operations team to ensure sufficient backlog for available resources within
the organization. Manages the estimating department staff working with team of estimators
and assistants to maintain a high degree of subcontractor / vendor engagement, including
MWBE, DBE, LDBNBE business partners, to ensure best in class pricing and a high level of
accuracy for all bid packages. Works with various municipalities programs to ensure
compliance with all contract requirements. Works closely with project managers and clients to
provide creative solutions and detailed pricing of alternate construction methods. Upon award
of new contracts, works closely to se amlessly transfer preconstruction information to
operations team assigned to building each project.
Information Technology Manager: 2006 to Present: Analyze, plan, coordinate, and direct
the information and computer-related activities of the Company from an operational and
strategic perspective. Demonstrate how information technology can be used as a competitive
tool that not only cuts costs but also increases revenue and maintains or increases
competitive advantage. Evaluate and recommend hardware and software enhancements
based on the needs of the business, negotiate the best pricing and service agreements,
administer their installation and properly train Company personnel on their full use. Ensure the
availability, stability, integrity and security of data and information technology services at all
times.
ZACHARY FIELDS
PRIME CONSTRUCTION GROUP, INC., Orlando, Florida 2019 -Present
Preconstruction Coordinator 2021-Present: Manage and develop request for quotation lists for
upcoming projects to bid. Organize and maintain active licensing for Prime Construction Group
including Insurance, Business Tax Receipts, General Contracting License, municipality
licensing. Produce responsive bid packages by compiling required information requested by bid
owners. Coordinate with all estimators for needs on getting quotes for full scope coverage on
every bid. Maintain and organize the contact database for Prime Construction, assist ongoing
projects by providing contacts and being knowledgeable for the ongoing operations of all
contacts in Prime Construction's database. Find and present new and upcoming bids by
browsing all formats of bid acquisition daily and present the estimating department with new
bids to pursue.
Project Management Coordinator: 2019-2021 Communicate with stakeholders regarding
project needs and goals. Contribute to the planning and development of projects. Support the
coordination of management of projects: prepare owner contracts, bonds and insurance for
execution. Assist project manager in the material and subcontract buyout process.
Page 450 of 668
WIP
PRIME CONSTRUCTION GROUP, INC. SCHEDULE OF JOBS IN PROGRESS AS OF JAN. 31, 2023
TOTAL PROJECT START PERCENT ESTIMATED
JOB# PROJECT NAME CONTRACT COMPETION OWNER NAME
($) DATE COMPLETED DATE
21789 OC-Wekiwa Sprinas Septic Tank Retrofit Project Phase 1 $ 7,688,000.00 6/28/2021 70.00% 7/31/2023 Oranqe County
21790 Melbourne-Riter Backwash Drain Improvements the JAB Water Treatment Plant $ 1,641,727.27 6/28/2021 90.00% 4/30/2023 City of Melbourne
21791 Toho-Lift Station 57 SW Quad Gravity Sewer Rehabilitation $ 6,143,634.73 5/24/2021 90:00% 4/30/2023 Tohopekaliaa Water Authority
21796 Deltona-Phase 4B Lake Monroe Intake, Pump Station & Raw Water Trans $ 7,806,309.95 11/29/2021 15.00% 3/30/2024 City of Deltona
21797 Ocoee-Downtown Master Stormwater Pond & Park $ 7,677,046.85 9/13/2021 90.00% 4/30/2023 City of Ocoee
21798 Toho-Lift Station 1 P W Industrial Lane Gravity Sewer Rehab $ 2,922,828.43 9/20/2021 80.00% 5/30/2023 Tohopekaliaa Water Authority
21799 OC-SW Service Potable Water Storaae & Repump Facilitv & Avalon Road MPS $18,133,200.00 12/21/2022 50.00% 3/26/2024 Oranae County
21802 QC-Utilities Scada Panel UParades Package 2 $ 2,973,973.00 2/14/2022 85.00% 4/30/2023 Oranqe County
21803 QC-Pump Station Improvements Packaqe 40 $ 1,976,000.00 4/25/2022 6.73% 12/31/2023 Oranae County
21804 QC-Pump Station Improvements Packaae 32 $ 3,935, 190.00 3/14/2022 5.69% 6/30/2024 Oranqe County
21805 Toho-LS 97 Formosa Gardens Gravity Sewer Rehabilitation $ 4,738,934.00 2/9/2022 33.73% 9/30/2023 Tohopekaliqa Water Authority
22810 Deltona-Eastern WRF Membrane Addition & Modifications $ 2,419,000.00 11/7/2022 4.61% 11/8/2023 City of Deltona
22811 OC-Y22-797 Addition of VFD's for Water Supplv Facilities-Oak Meadows & Hidden Sprinas $ 5,969,690.00 11/21/2022 1.31% 3/30/2024 Oranae County
22815 QC-Force Main South Area Package 1 $ 3,555,555.00 12/8/2022 0.97% 12/8/2023 Orange County
22817 QC-Electrical System at Master Pump Station F3146 (Rouse Road North) $ 3,000,000.00 10/7/2022 0.97% 3/30/2024 Oranqe County
22818 OC-36" Gravity Main Replacement South Water Reclamation Facility $ 3,500,000.00 10/7/2022 11.09% 12/31/2023 Oranae County
22819 Tavares-2022-0015 Woodlea Rd Utility Extensions $ 3,977,564.00 12/1/2022 1.06% 4/30/2024 City of Tavares
22824 QC-Pump Station Improvements Packaqe 42 3,525,525.00 3/2/2023 1.00% 3/31/2024 Oranqe County
23827 QC-Hoffner Wall SR 15 1,274,000.00 5/1/2023 1.00% 9/30/2023 Oranae County
Page 1
Page 451 of 668
P 1111 CONSTRUCTION GROOP,INC. ,..,,,,.,,,.,,� "Our People make the difference with Pride, Integrity and Quality"
Completed Projects within the last 5 years (partial):
Job# Project Name
20776 Longdale Septic Abatement Project
� Water D Drainage
� Sewer � General Civil
Owner:
City of Longwood
907 E. SR. 434
Longwood, FL
Contact:
Telephone:
E-Mail:
Scope of Work
Andrew Marsian
(407) 263-2378
amarsian@longwoodfl.org
Engineer:
Project Amt
$3,489,000
NTP
12/7/2020
BFA Environmental Consults
1230 Hillcrest Street, Suite 100
Orlando, FL 32803
Contact: Najee Hunter
Final Contract
$3,638,110
Final Completion
5/6/2022
Telephone:
E-Mail:
(321) 332-1114
nhunter@bfaenvironmental.com
This contract comprises the construction of the wastewater collection and transmission system.
1.Installation of approximately 8,900 feet of 8-inch PVC gravity sanitary sewer, 38 sanitary sewer manholes and all necessary
fittings and incidentals to complete the wastewater system via open cut construction method. The installed gravity sewer
system, consisted of 4600 LF at O' -8' deep, 2400 LF at 8' -12' deep and 1900 LF 12 -16'. 38 manholes installed throughout
the various depths. MOT was setup to ensure safety and to reduce the impact the residents as much as possible. Residential
driveways and walks were reconstructed as required.
Disruption of the roadway was kept to a minimum via mixing and creating stabilized subgrade and base, in place and onsite.
Approximately 12,000 SY of asphalt was milled paved as part of the roadway restoration.
2. Installation of approximately 220 sanitary sewer lateral services (a mix of doubles and singles) to existing residential
buildings on private property including all necessary piping, valves, fittings and incidentals to connect all homes as shown on
the Drawings. After installation, restoration was completed to original or better conditions.
3.Abandonment and demolition of approximately 225 existing septic tanks on private property. Each homeowner agreement
was made and each permit completed -work was completed by state licensed plumber.
4.Installation of one 6' duplex pump station (24' deep) and all necessary structures (valve vault), equipment, accessories,
utility service connections, site work, electrical and instrumentation, start up and testing as shown on the Drawings. Pumps
were 7.5 HP (VFD). Site improvements included, fencing, gates, bollard, stone coverings, misc. concrete pads, new water
service and an antenna with a new RTU panel.
5. Installation of 1,650 feet of 6-inch PVC wastewater force main and all necessary fittings, valves, connecting to existing
piping and incidentals as required.
Page 452 of 668
IIIE CONstRIJCTIOM GROUP. IMC. ,,.., II I.Ill.I.IA "Our People make the difference with Pride, Integrity and Quality"
Completed Projects within the last 5 years (partial):
Job # Project Name
19017 KIEWIT GOAA STC AIRFIELD CIVIL 104205 GREASE TRAPS
Project Amt
$1,242,000
NTP
3/1/2020
D Water D Drainage
� Sewer � General Civil
Owner:
Kiewit Infrastructure South Co.
450 Dividend Dr.
Peachtree City, GA 30269
Contact:
Telephone:
E-Mail:
Scope of Work
David Augello
(410)610-1044
david.augello@kiewit.com
Engineer:
Kiewit Infrastructure South. Co.
450 Dividend Dr.
Peachtree City, GA 30269
Contact:
Telephone:
E-Mail:
David Augello
(410) 610-1044
Final Contract
$1,250,012
Final Completion
10/22/2020
Project consisted of the installation of 44 precast grease traps various groupings prior to the installation of concrete apron
pavement. All traps were plumbed with PVC interior piping and then piped to the terminal building and stubbed up. Each
group of traps were connected in seriers then connected to existing sanitary sewer. Each precast trap was approximately 1 O' x
8' x 6' and weighed 20 tons. Addtionally 2 oil water sepeartors were installed.
Job # Project Name
19015 Eatonville Park Master Lift Station Replacement
D Water D Drainage
� Sewer � General Civil
Owner:
Town of Eatonville
307 E. Kennedy Blvd
Eatonville, FL 32751
Contact:
Telephone:
E-Mail:
Scope of Work
Rhonda Anderson
(407) 623-8900
randerson@townofeatonville.or
Engineer:
CPH Inc.
Project Amt
$748,000
NTP
1/1/2020
Final Contract
$748,000
Final Completion
9/25/2020
1117 E. Robinson St.
Orlando, FL 32801
Contact:
Telephone:
E-Mail:
Scott Breitenstein
(407)425-0452
sBreitenstein@cphcorp.com
Installation of new master lift station for the town of Eatonville. Station was 1 O' diameter, 20' deep with duplex 25HP
submersible pumps, 1 O" SS discharge, flowmeter and 125kw emergency generator with fuel tank. 150 If of new 8" gravity
sewer was installed to redirect sewer to new lift station site. Other site improvements included new chain link fencing, double
s'l'v'ing gates, concrete drive way, stone ground cover, area lighting and restoration of approx. 800 sy of roadway and the
surrounding neighborhood park. Existing lift station was demolished upon completion of new lift station.
All work completed without shutdown
Page 453 of 668
"Our People make the difference with Pride, Integrity and Quality"
Completed Projects within the last 5 years (partial):
Job# Project Name
19009 Casselberry Howell Park WTP Rehab
� Water D Drainage
D Sewer � General Civil
Owner:
City of Casselberry
95 Triplet Lake Drive
Casselberry, FL 32707
Contact:
Telephone:
E-Mail:
Scope of Work
Tara Lamoureux
(407) 262-7725
tlamoureux@casselberry.org
Engineer:
Project Amt
$2,750,000
NTP
1/26/2020
Final Contract
$2,956,740
Final Completion
4/26/2021
CPH Engineers
117 East Robinson Street
Orlando, FL 32801
Contact:
Telephone:
E-Mail:
Scott Breitenstein, PE
(407) 425-0452
SBreitenstein@cphcorp.com
The project consisted of the demolition of several items including existing buildings and office, yard piping, pumps, chemical
skids and tanks, flow meters, fuel tank and piping, fencing, landscaping, and electrical and instrumentation equipment. The
construction of a New Chemical Building -including plumbing, lighting, HVAC, fixtures, roofing system, safety equipment,
concrete formwork, and painting. The construction of a New High Service Pump, Electrical, and Operations Building -
including pulling building permits, plumbing, lighting, HVAC, cabinetry, bathroom fixtures, roofing system, safety equipment,
concrete formwork, and painting. The construction of new site piping to include water main and distribution systems to include
flow meters, vales and fittings. Various site improvements to include Site Restoration, Sodding, Fencing/Wall, Landscaping,
Access Driveway, Access Gate, and Detector Loop. Equipment furnished and installed including; new HSP's, New
Orthopolyphosphate System -Including chemical skids, piping, and injection points; Pre and Post Cl2 System -including
chemical skids, piping, injection points, and chemical storage tanks; Fuel Oil Piping for Relocated Fuel Tank; grinder pump
station and associated piping, including connection to off-site manhole. The project also included; Furnish and Install grinder
pump station and associated piping, including connection to off-site manhole; Furnish and Install Coaling System -Including
all piping, fillings, valves, and pumps; Furnish and Install Coaling System for exterior of 0.25 MGD Ground Storage Tank and
0.5 MGD Ground Storage Tank; Rehabilitate 0.25 MGD Ground Storage Tank and 0.5 MGD Ground Storage Tank. Clean,
furnish and install coating system for interiors of both ground storage tanks. Minor screen and level gauge. Also included;
New Electrical System including main breaker, ATS, Panel P1, VFDs, MCCs, transformer, disconnect switches, circuit breaker
enclosures, starters, panelboards, shunt trips, all conduits and wire for a complete electrical system, and electrical testing.
New complete SCADA system fully integrated into the City System.
Plant remained in use during construction.
Job # Project Name
19008 San Remo Gravity Sewer Rehab
D Water D Drainage
� Sewer � General Civil
Owner:
Toho Water Authority
951 Martin Luther King Blvd.
Kissimmee, FL 34741
Contact:
Telephone:
E-Mail:
Scope of Work
(407) 944-5025
geverso le@tohowater.com
Engineer:
Tetratech
Project Amt
$4,695,876
NTP
7/23/2019
Final Contract
$5,428,620
Final Completion
11/8/2021
201 E. Pine St. Ste 1000
Orlando, FL 32801
Contact:
Telephone:
E-Mail:
Janine Alexander
(321)388-5178
janine.alexander@tetratech.com
The project was to upgrade / repair residential sewer systems and water systems. The project consisted of CIPP lining of 8"
(7793 LF) 10" (1685 LF) and 12" (800 LF) sewer lines, gravity point repairs of approximately 500 LF of 8" 10" and 12" pipe, the
installation of approximately 1200 LF of new 8" gravity sewer and the repair of 11 manholes fro 10' to 20' deep (as well as 350
VF of linings / coatings). Project required other utilities to be relocated road restorations, milling and paving operations.
Project was in a residential neighbor, local MOT required.
Page 454 of 668
COHstRUCllON GROUP,INC. r II I I I II.I I,'-"Our People make the difference with Pride, Integrity and Quality"
Completed Projects within the last 5 years (partial):
Job # Project Name
19003 Michigan Ave Force Main ReplacemenUAscot Water Main Ext.
Project Amt
$602,930
NTP
3/6/2019
Final Contract
$580,255
� Water D Drainage
D Sewer � General Civil
Owner:
Toho Water Authority
951 Martin Luther King Blvd
Kissimmee, FL
Contact:
Telephone:
E-Mail:
Scope of Work
George Eversole
(407)944-5024
geversole@tohowater.com
Engineer:
CPH, Inc.
Final Completion
8/11/2019
117 East Robinson St.
Orlando, FL
Contact:
Telephone:
E-Mail:
James R. Morris
(407)425-0452
jmorris@cphcorp.com
Construct Approx 205 ft of 8" PVC force main by open cut and 1315 ft of 8" HDPO:y horizontal directional drill in an existing
neighborhood, and 120 ft of 8" water main by horizontal direction drill along Ascot Court.
Job # Project Name
18013 Oakwood Drive Gravity Sewer Rehabilitation Project
D Water D Drainage
� Sewer
Owner:
D General Civil
Toho Water Authority
951 Martin Luther King Blvd
Contact:
Telephone:
E-Mail:
Scope of Work
George Eversole
(407) 518-2377
geversole@tohowater.com
Engineer:
Tetratech
Project Amt
$1,183,940
NTP
Final Contract
$1,202,231
Final Completion
951 Martin Luther King blvd
Contact:
Telephone:
E-Mail:
Janine Alexander
(321) 388-5178
janine.alexander@tetratech.com
Replace 915' of combined of 8" & 18" Gravity Sewer, at approximately 16' deep. Replace of a subdivision wall section over
gravity sewer main. Rehabilitation of 1600' of 15"-24" Gravity Sewer Lining. Replace (3) Gravity Sewer Manhole & Rehabss,
and (5) Gravity Sewer Manhoes.
Page 455 of 668
p CONSTRUCTION GROUP. INC. J'.IIIIIIIII-' "Our People make the difference with Pride, Integrity and Quality"
Completed Projects within the last 5 years (partial):
Job # Project Name
18012 Y18-792-TA PUMP STATION PKG 20
D Water D Drainage
� Sewer D General Civil
Owner:
Orange County Utilities
9150 Curry Ford Rd.
Orlando, FL 32825
Contact:
Telephone:
E-Mail:
Scope of Work
James Montalvo
(407) 506-2120
jam es. montalvo@ocfl.net
Engineer:
Project Amt
$2,199,303
NTP
3/25/2019
CPH Engineers
1117 E. Robinson St.
Orlando, FL 32801
Contact: Scott Breitenstein
Final Contract
$2,252,641
Final Completion
5/3/2020
Telephone:
E-Mail:
(407) 425-0452
sBreitenstein@cphcorp.com
Project Consisted of 5 Orange County standard lift stations. 4 Rehab stations and one new. The rehab consisted of various
site improments to include concrete work, stone coverings, fencing and piping. In addition the wet wells were lined with FRP
liners and re-plumbed per the county standards. Plumbing included new base plates, stainless steel risers and pumps from 5
to 12 HP, operated on new electrical systems utilizing VFDs and tied into the county wide SCADA system.
The new station was 6' in diameter and approximately 20' deep.
By passing of the stations were required.
Job # Project Name
18005 OC PUMP STATIONS PACKAGE 18
D Water D Drainage
� Sewer D General Civil
Owner:
Orange County Utilities
9150 Curry Ford Rd.
Orlando, FL 32825
Contact:
Telephone:
E-Mail:
Scope of Work
James Montalvo
(407) 506-2120
james.montalvo@ocfl.net
Engineer:
CPH
Project Amt
$1,994,240
NTP
10/4/2018
Final Contract
$2,068,896
Final Completion
10/28/2019
1117 E. Robinson St.
Orlando, FL 32801
Contact:
Telephone:
E-Mail:
Scott Breitenstein
(407)425-0452
SBre ite nstein@cphcorp .com
Project Consisted of 5 Orange County standard lift stations all were Rehab stations. The rehabs consisted of various site
improments to include concrete work, stone coverings, fencing and piping. In addition the wet wells were lined with FRP liners
and re-plumbed per the county standards. Plumbing included new base plates, stainless steel risers and pumps from 5 to 12
HP, operated on new electrical systems utilizing VFDs and tied into the county wide SCADA system.
By passing of the stations were required.
Page 456 of 668
CONSTRIJCTIOM. GROU�lltC. Y II I I.I II I IA "Our People make the difference with Pride, Integrity and Quality"
Completed Projects within the last 5 years (partial):
Job # Project Name
18002 Y18-736 Pump Stations Package 5
D Water D Drainage
� Sewer D General Civil
Owner:
Orange County Utilities
9150 Curry Ford Rd
Orlando, FL 32825
Contact:
Telephone:
E-Mail:
Scope of Work
James Montalvo
(407) 506-2120
james.montalvo@ocfl.net
Engineer:
CPH, Inc.
Project Amt
$1,749,479
NTP
7/19/2018
Final Contract
$1,825,218
Final Completion
8/12/2019
1117 E. Robinson St.
Orlando, FL 32801
Contact:
Telephone:
E-Mail:
Scott Breitenstein
(407) 425-0452
sbreitenstein@cphcorp.com
Project includes Construction of a new duplex pump station with a new wet well to replace an existing pump station that will be
demolished. Improvements will be made to the station including installation of liners in wet wells, replacement of pumps
(greater than 5 HP), riser and discharge, electrical systems, and improve site access and security. Emergency generator
install, 40 KW.
Job # Project Name
17720 Gravity System Improvement Package #10
D Water D Drainage
� Sewer D General Civil
Owner:
Orange County Utilities
9150 Curry Ford Road
Orlando, FL 32825
Contact:
Telephone:
E-Mail:
Scope of Work
James Montalvo
(407) 506-2120
james.mon talvo@ocfl.net
Engineer:
CPH, Inc.
Project Amt
$4,844,776
NTP
10/10/2017
Final Contract
$5,043,580
Final Completion
12/31/2019
1117 East Robinson St.
Orlando, FL 32801
Contact:
Telephone:
E-Mail:
Scott Breitenstein
(407) 425-0452
sbreitenstein@cphcorp.com
Installation of 3,291 LF of 8" Gravity Sanitary Sewer, 2,800 LF of 4" Sanity Sewer Force Main, 38,000 LF of 8" and 1 O" GIPP
Liner, 4,046 LF of 4"-8" Potable Water Main and Replacement of two (2) duplex and one (1) triplex pump station. Project
inclued the removal and replacemnt of 14 sewer manholes of various depths from 10' to 16'. Several manole rehabiltaions
were required. 21 sewer laterals were removed and replaced. Several elements were preformed inside the FOOT right of
way. The above referenced 3,291 LF of 8" Gravity Sanitary Sewer was installed via the open cut method.
Page 457 of 668
"Our People make the difference with Pride, Integrity and Quality"
Completed Projects within the last 5 years (partial):
Job # Project Name
17719 Lift Station #08, #30, 47 and #77
D Water D Drainage
� Sewer D General Civil
Owner:
City of Orlando
400 South Orange Avenue
Orlando, FL 32801
Contact:
Telephone:
E-Mail:
Scope of Work
Kristi Fries
(407) 246-2291
krisli na. fries@cityoforland o. net
Engineer:
Project Amt
$2,146,776
NTP
3/16/2018
City of Orlando
400 South Orange Avenue
Orlando, FL 32801
Contact:
Telephone: (407) 246-2291
E-Mail:
Final Contract
$2,277,142
Final Completion
12/26/2018
Furnish and install lift station #08, #30, #47 & #77 including demolition of existing, tree removal/trimming, sanitary sewer
piping, electrical service, control panels, instrumentation, RTU communication, grounding, wet well construction, jack and bore
trenchless pipe installations underneath the CSXT railroad crossing and silver star road at lift station 77 location, horizontal
directional drilling at lift station #08 location. Removed existing wet well structure tops and installed a manhole cone, frame
and cover (wet well conversion to a manhole), installed manholes, installed pipes, bypass pumping, plugging and filled
abandoned pipes. Furnished and installed new pumps, valves and controls, concrete slabs, curbs and driveways, sodding,
fences and gates, erosion and sediment control, MOT. Returned salvaged equipment to the wastewater storage yard,
prepared as-built survey drawings. Change order that included the installation of one 40 KW enclsosed emergency generator
Job # Project Name
17718 Y17-770 Pump Station Package#14
D Water D Drainage
� Sewer D General Civil
Owner:
Orange County Utilities
9150 Curry Ford Road
Orlando, FL 32825
Contact:
Telephone:
E-Mail:
Scope of Work
Ray Rice
(407)254-9900
ray.rice@ocfl.net
Engineer:
Neel-Schaffer
Project Amt
$1,054,940
NTP
12/11/2017
Final Contract
$1,054,940
Final Completion
12/19/2018
125 S. Congress St. #1100
Jackson, MS, 39201
Contact:
Telephone:
E-Mail:
Charles Hill
(601) 948-3071
charles.hill@nell-schaffer.com
PS 3004 -Rehabilitate an existing 15HP duplex pump station in accordance with current OCU standards, including FRP Lining
6' Wet Well 30' Deep, concrete access drive, fencing, and curbing. Remove and replace the existing 6-inch aboveground
discharge piping and concrete slab. Connect the new 6-inch force main to the existing 6-inch force main at the pump station.
GIPP the gravity sewer from MH30040074 to the wetwell.
PS 3005 -Rehabilitate an existing 7.5HP duplex pump station in accordance with current OCU standards, including FRP
Lining 6' Wet Well 20' Deep, concrete access drive, fencing, and curbing. FRP Line existing manhole 30050001.
PS 3277R -Construct a new 1 0HP duplex pump station in accordance with current OCU standards, including a new 6' Wet
Well 20' Deep, concrete access drive, fencing, and curbing. The existing wet well was converted by removing the pumps and
appurtenances and filling in the lower portion of the wet well and coring the wet well to provide a new 8-inch gravity sewer to
the master manhole for the new pump station. Construct a new 4-inch force main from the new pump station to the existing 4-
inch force main on Falling Leaf Lane
Page 458 of 668
p I CONSTRUCTIOk GROUP,INC. ,-I I I I I I I I I"' "Our People make the difference with Pride, Integrity and Quality"
Completed Projects within the last 5 years (partial):
Job# Project Name
17716 Pump Station Improvements -PS3187R, PS 3951, PS3586,
Project Amt
$1,248,776
NTP
8/15/2017
Final Contract
$1,288,879
D Water PS3278 -Pkg 6 D Drainage
� Sewer
Owner:
Orange County Utilities
9150 Curry Ford Rd.
Orlando, FL 32825
Contact: James Montalvo
D General Civil
Telephone:
E-Mail:
(407)506-2120
james.montalvo@ocfl.net
Scope of Work
Engineer:
CPH, Inc.
1117 East Robinson St.
Orlando, FL 32801
Contact:
Telephone:
E-Mail:
Scott Breitenstein
(407)425-0452
Final Completion
10/3/2018
PS3187R -Lake Berge: Omo existing tab slab, convert wet well to Manhole and Line, grout abandon 4" FM, F&I new Wet
Well, Valve Vault, pumps and associated piping, control panels and assocated electrical equipment, F&I 50' Scada pole, F&I
28LF 8" PVC Gravity Main, Install 257LF new 4" PVC FM; duplex, 23", 300 GPM, 5 HP, 6' diameter wet well & 13'57" depth.
PS3951 Colonial Landings -Remove & replace existing valve vault and associated 6" discharge pipe, fittings & valves, remove
and upgrade control panel and electrical components, remove water service and install new 2" water meter with RPZ, F&I new
wet well access hatch and top slab, F&I 50' Scada Pole; duplex, 23", 338-GPM, 10-HP 6' diameter wet well & 17'16" depth.
PS3586 Donny Brooke -Remove existing water service and meter, install new 2" water meter and service, remove and
replace 4" discharge pipe, fittings and valves, remove and upgrade control panel and associated electrical components, F&I
new wet well access hatch and top slab, replace and existing pumps with 2 downsized 122 GPM pumps and riser pipes;
duplex, 23" 115 GPM, 15 HP, 8' diameter & 14 '45" depth.
PS3278 Tree Ridge Lane -remove and replace existing alue fault and associated 6" discharge piple fitting and valves. Remote
relocate and upgrade control panels and associated eletrical components, demo existing top slab. F&I new wet well access
hatch & top slab, remove existing pumps and replace with 2 upsided 291 GPM pumps and riser pipes, remove existing water
service and install new 2" water service and meter with RPZ, F&I Scada Pole: duplex, 23", 300 GPM, 15 HP, 6" diameter and
& 22'55" depth.
Job# Project Name
17713 H-294 S. Cell Lot Access Rd. lmprovemenst for S. Park Place &
Project Amt
$1,959,052
NTP
4/26/2018
Final Contract
$2,196,373
D Water Travel Plaza � Drainage
D Sewer
Owner:
� General Civil
Grater Orlando Aviation Authority
1107 4 Canal Road
Orlando
Contact:
Telephone:
E-Mail:
Scope of Work
Benjamin Brown
(407)825-4155
brown@a2qroup.com
Engineer:
Final Completion
3/4/2019
American Infrastructure Development, Inc.
37 n. Orange Ave. #500
Orlando, FL 32801
Contact:
Telephone:
E-Mail:
Mark Jensen
(621) 695-5061
mjansen@aidinc.us
Construct new asphalt concrete paved north/south roadway west of the south Taxi/Bus Hold Lot, including stormwater pond
modification, clearing and grubbing, roadway subgrade and base course. Relocation of S. Park Place entrance and exit
plazas. Construction two (2) toll booths and utilities. Construction new canopies at the new S. Park Place entrance and exits,
reconfigure the S. Park Place and Taxi/Bus Hold Lot entrance and exit, including geometric changes, drainage system
modification.
Page 459 of 668
I E COHSTROCTION GROUP,lltC. r II I II I I I I� "Our People make the difference with Pride, Integrity and Quality"
Completed Projects within the last 5 years (partial):
Job # Project Name
17712 CIP-0032_P Vineland Rd. Drainage Improvements
D Water � Drainage
D Sewer � General Civil
Owner:
City of Orlando
400 S. Orange Avenue
Orlando, FL 32801
Contact: Mr. Howard Elkins
Engineer:
CDM Smith
Project Amt
$3,449,940
NTP
7/17/2017
101 Southhall Lane# 200
Maitland, FL 32751
Contact: Terry Simpson
Final Contract
$3,778,390
Final Completion
11/20/2018
Telephone:
E-Mail:
(407)246-2289
howard.elkin@cityoforlando.co
Telephone:
E-Mail:
(407)622-9476
simpsont@cdmsmith.com
Scope of Work
Construction of a storm drainage system along the Vineland Road & Peregrine Ave., consisting of 3 LF of 12" RCP, 25 LF of
18" RCP, 3 LF of 24" RCP, 60 LF of 54" RCP, 28 LF of 60 RCP, 1,786 LF of 66" RCP, 1,426 of 72" RCP, Excavation Depth of
12', 15 manholes, 1,170 LF of Curb & Gutter, Type F, 334 LF of Curb, Type A, 880 LF of Curb, Type D, 6,637 SY of 1-1/2
asphalt pavement, 394 SY of 4" Sidewalk, MOT and 1,660 SY of sod.
Job # Project Name Project Amt
711 OC Y17-722 SWRF Sodium Hypochlorite Storage & Feed System $2,764,940
� Water D Drainage NTP
D Sewer � General Civil 7/10/2017
Owner:
Orange County Utilities
9150 Curry Ford Road
Orlando,FL 32825
Engineer:
Reiss Engineering, Inc.
1016 Spring Vallas Pt.
Winter Springs, FL 32708
Final Contract
$2,775,868
Final Completion
12/31/2018
Contact:
Telephone:
E-Mail:
Terra Reffitt
(407)947-9802
terra.reffitt@ocft.net
Contact:
Telephone:
E-Mail:
Melanie Peckham, P.E.
(407)679-5358
mdpeckham@reisseng.com
Scope of Work
Orange County building permit was required and obtained for the construction of Sodium Hypochlorite Storage & Feed S
ystems: North System -Installation of three (3) new 15,600 gal. single-wall, vertical fiberglass reinforced plastic storage tanks
under new metal roofed structure, three (3) simplex metering pump skids and one (1) triplex meting pump skid. South
System -Installation of two (2) 9,900 gal. single-wall vertical fiberglass reinforced plastic storge tank under new metal roofed
structure with concrete containment system, two (2) duplex metering pump skinds. Both systems include dosing points to the
chlorine contact chamber and ROF controllers.
Page 460 of 668
E COfCSTI\IJC TION GROUP, INC. r I.I I I .I I I.I .I� "Our People make the difference with Pride, Integrity and Quality"
Completed Projects within the last 5 years (partial):
Job # Project Name
695 Rio Pinar Water & Wastewater System Improvements Package 5
Project Amt
$6,249,990
NTP
11/14/2016
Final Contract
$6,479,632
� Water D Drainage
� Sewer � General Civil
Owner:
Orange County Utilities
9150 Curry Ford Rd
Orlando, FL 32825
Contact:
Telephone:
E-Mail:
Scope of Work
James Montalvo
(407) 506-2120
james.montalvo@ocfl.net
Engineer:
Woolpert
11486 Corporate Blvd, Suite 190
Orlando, FL 32817
Contact:
Telephone:
Kent Veech
(407)591-5094
Final Completion
12/9/2017
E-Mail: kent. veech@woolpert.com
Installation of 23,200LF of Gravity Sewer Mains Various Sizes (8"-24") at Various Depths (6'-20'), remove & replace 90 Sewer
Laterals with cleanouts, 75 Rehab Manholes, and lining of 30 Sanitary Sewer Manholes. Remove & Install of Gravity Main
including 805' of 18" Gravity Sewer (16' deep) 900LF of point repairs, 35 laterals, and 11 manholes removed and replaced
(depth 6' to 20'). Installation of 8,575LF of 4", 2,285LF of 6" & 5, 165LF of 8" of potable water main, 7 hydrants, 84 sidewalk
ADA curb ramps, 3490 SY of 4" concrete sidewalk, 2221 SY of 6" concrete sidewalk, 140 6' concrete driveways aprons, 619
LF of curb and gutter, asphalt milling & resurfacing of roadway disturbed by construction. All construction completed within the
existing Rio Pinar Neighborhoods. Several elements within and along side the FOOT ROW. The above referenced pipe
23,200 LF of 8"-24" pipe was installed via the open cut method.
Job # Project Name
691 Downtown CRA Area A SW Treat Imps
� Water � Drainage
� Sewer � General Civil
Owner:
City of Tavares
201 East Main Street
Tavares, FL
Contact:
Telephone:
E-Mail:
Scope of Work
Phil Clark
(352) 742-6485
pclark@tavares.org
Engineer:
ARCADIS
Project Amt
$5,328,306
NTP
7/13/2016
Final Contract
$7,241,245
Final Completion
4/30/2019
14025 Riveredge Drive, Ste. 600
Tampa, FL 33637
Contact:
Telephone:
E-Mail:
Sean Chaparro
(813)353-5808
sean.chaparro@arcadis.com
The project consisted of nearly 4,000 LF of storm collection pipe including of 1,250 LF of 24" RCP, 1,057 LF of 30" RCP, 346
LF of 36" RCP, 239 LF of 15" RCP & 44 LF of 18" RCP, 710 LF of various sized ERCP (12"x18" to 29" x 45"), 170 LF of 24"
(42" casing) & 117 LF of 30" (48" casing) jack and bores,4,536 SY of brick roadway and new concrete curb & gutter the length
of the project. Installation of 600 LF of gravity system (8" to 15") and redirecting the force main from the lift station (900) LF of
8" PVC) with an excavation depth of 15'. Storm pipe oul falls to the lake on one end of the downtown area and into a storm
water treatment pond on the other.
An 8 acre area was cleared and grubbed the storm water treatment pond was constructed of a series of cells that were
specifically designed to treat the water prior to the out fall into the lake. Specific water plants were installed, along with a
series of Bee Mats, a fountain, pedestrian bridge on piles, area lighting and security cameras, multiple landscape areas, park
equipment and benches. Installed 4,606 LF of concrete curb (type F, D and Misc.), 31 SY of 6" concrete sidewalks and 1,016
SY of 4" concrete sidewalks.
Page 461 of 668
P I E
CONSTRUCllOM GROUP,1-C. ,, ..I I ..I II ..I I I I� "Our People make the difference with Pride, Integrity and Quality"
Completed Projects within the last 5 years (partial):
Job# Project Name
689 Southwest Rd Drainage Improvements
D Water � Drainage
D Sewer
Owner:
Seminole County
1301 East 2nd. Street
Sanford, FL 32771
Contact: Stephen Miller
� General Civil
Telephone:
E-Mail:
(407)665-5654
smiller@seminolecounty.gov
Scope of Work
Engineer:
Project Amt
$1,326,834
NTP
5/9/2016
Inwood Engineers
3000 Dovera Dr., #200
Oviedo, FL 32765
Final Contract
$1,351,842
Final Completion
11/22/2016
Contact:
Telephone:
Steven Sommerfeldt
(407)971-8550
E-Mail:
The Southwest Road drainage improvement project is designed to eliminate localized flooding and positive drainage to the
roadway. The proposal inclused the installation of approximately 814 LF of 48" RCP, 1,585 LF of 42" RCP, 225 LF of 18"
RCP, 930 LF of 43" x 68" ERCP 33 LF of 38" x 60" ERCP concete pipe with a depth of 10 feet, eleven (11) manholes and
twenty (20) inlets, 1648 LF of 8" underdrain pipe, 59 LF of PVC Pipe Culvert 6" to 8".
Job# Project Name
685 East Side Wastewater Improvements
D Water D Drainage
� Sewer
Owner:
Town of Eatonville
307 E. Kennedy Blvd.
Eatonville, FL 32751
Contact: Katrina Gibson
D General Civil
Telephone:
E-Mail:
(407)623-8905
kgibson@townofeatonv ille.org
Scope of Work
Engineer:
CPH, Inc.
Project Amt
$1,819,776
NTP
7/8/2016
Final Contract
$1,915,852
Final Completion
6/3/2017
1117 East Robinson Street
Orlando, FL 32801
Contact:
Telephone:
E-Mail:
Scott Breitenstein
(407)425-0452
sbreitenstein@cphcorp.com
Construction includes 3,500 LF of 8" gravity sanitary sewer at a depth of 14 feet, 46 LF of 48" x 76" ERCP, 65 LF of 24" RCP,
84 LF of 18" RCP and 208 LF of 15" RCP storm sewer replacement, remove and replace 87 laterals with cleanouts, force
main relocations, water main relocations, roadway restoration and replacement and lift station rehabilitation. Remove and
replace 16 ea sewer manholes from 9' to 14' deep. The above referenced 3,500 LF of 8" Gravity Sanitary Sewer was installed
via the open cut method.
Page 462 of 668
"Our People make the difference with Pride, Integrity and Quality"
Completed Projects within the last 5 years (partial):
Job # Project Name
677 Y15-779 -County Rd. 545-Avalon Rd. Culvert Replacement
Project Amt
$1,438,665
NTP
11/30/2015
D Water � Drainage
D Sewer � General Civil
Owner:
Orange County Utilities
400 E. South Street
Orlando, FL 32801
Contact:
Telephone:
E-Mail:
Scope of Work
Shawn Logan
(407) 836-5515
shawn.logan@ocfl.net
Engineer:
Pegasus Engineering, LLC
301 West State Rd. 343, Ste. 309
Winter Springs, FL 32708
Contact:
Telephone:
E-Mail:
Greg A. Teague
(407) 992-9160
Final Contract
$1,634,165
Final Completion
11/14/2016
Removal and replacement of existing structurally deficient triple 78" CMP culverts with a prcast 9' x 5' double concrete box
culverts, cast in place headwalls, installation of 1,728 SY of 7.5 to 12" Soil Cement base, 5,005 SY asphalt pavement, 363 SY
of 4" concrete sidewalk, 200 SY of 6" concrete sidewalks and driveways, 270 LF of FOOT guardrail, 750 LF of corb and gutter,
fencing, sod, asphalt markings and associated traffic signage.
Job# Project Name
676 Westside Wastewater Improvements Eastside
D Water D Drainage
� Sewer � General Civil
Owner:
Town of Eatonville
307 E. Kennedy Blvd.
Eatonville, FL 32751
Contact:
Telephone:
E-Mail:
Scope of Work
Katrina Gibson
(407) 623-8905
kg ibson@townofeastonville.org
Engineer:
CPH, Inc.
Project Amt
$2,599,940
NTP
11/2/2015
Final Contract
$2,733,469
Final Completion
1/4/2017
1117 East Robinson Street
Orlando, FL 32801
Contact:
Telephone:
E-Mail:
Scott Breitenstein
(407) 425-0452
sbreitenstein@cphcorp.com
Installation of 5,235 LF new 8' gravity sanitary sewer system, 10 LF of 24" x 36" ERCP, 21 LF of 12" x 18" ERCP, 30 LF of
18" RCP, 1 O LF of 15" RCP, 1 O LF of 12" RCP, 10 LF of 36" RCP storm water system, construction of a new lift station
(duplex 21 LF deep, 8' diameter wet well) and force main to replace the existing wastewater facilities in the western service
area of the town of Eatonville. Demolition of the Campus View lift station and the Katherine Avenue lift station. Restoration
including removal and replacement of 13,830 SY of roadways, 10,664 LF of concrete curb, 2,973 LF of concrete sidewalk,
service connection for 146 residential services. Project included the removal and replacement of 24 Manholes from 6' to 14'
deep. All residential sanitary sewer laterals with cleanouts were replaced as part of the improvement (142 EA). The above
referenced 5,235 of 8" gravity sanitary sewer was installed via the open cut method.
Page 463 of 668
IIE
"Our People make the difference with Pride, Integrity and Quality"
Completed Projects within the last 5 years (partial):
Job# Project Name
675 Osceola Parkway 20" Force Main Extension
� Water D Drainage
D Sewer
Owner:
Tohopekaliga Water Authority
951 Martin Luther King Blvd.
Kissimmee, FL 34741
Contact: George Eversole
Telephone: (407)944-5025
� General Civil
E-Mail: rpelham@tohowater.com
Scope of Work
Engineer:
Project Amt
$1,089,535
NTP
11/9/2015
Final Contract
$1,181,437
Final Completion
7/5/2016
Boyd Environmental Engineering, Inc.
798 Executive Dr., Ste. B
Oviedo, FL 32765
Contact: Jim Boyd
Telephone: (407)542-4919
E-Mail:
Project consisted the construction of approximately 5,000 LF of 20" force-main. Originally designed as 2540 LF of open cut
and 2100 LF of directional drill, fusible PVC. The project was completed with 2159 LF of open cut and 2660 LF of directional
drill. Saving the owner additional restoration as well as reducing the required fittings. As part of this project several 20" and
24" fittings and gate valves were installed, ARVs were installed as well as miscellaneous restoration to include asphalt /
concrete driveways and sod.
Job# Project Name
674 CC-0194-15 Soldier Creek Reg. Nutrient Rmv. Stormwater
Project Amt
$6,696,716
NTP
12/25/2015
Final Contract
$6,693,165
Treatment Facility GI D . D Water t,li raInage
D Sewer
Owner:
Seminole County
100 E. First Street
Sanford, FL 32771
Contact: Stephen L. Miller
� General Civil
Telephone:
E-Mail:
(407)665-5654
smiller02@seminolecountyfl.go
Scope of Work
Engineer:
England-Thims & Miller, Inc.
15265 E. Colonial Drive
Orlando, FL 32826
Final Completion
3/23/2017
Contact:
Telephone:
Robert Weinbender
(407)415-2274
E-Mail:
Site work included, clearing and grubbing for new (larger) storm water retention pond access roads and misc site
improvements. Seminole County building permit were required and obtained for a new treatment structure. Retrofit the
existing retention pond at CR427 and Country Club Road using an Aluminum Sulfate Injection system. Redirecting Soldiers
Creek via a diversion weir and intake structure to the facility through a box culvert. Installation of 300 LF of 48" RCP with MES,
storm manholes and control structures. Additional RCP pipe was installed from 18" to 60" with connecting structures and MES
at outfall into pond. Concrete walks, driveways and truck loading area were also installed. 720 SY of ACB mat was
constructed (open/closed cell) while riprap, headwalls and 3,200 SY of stabilized access road were installed.
Page 464 of 668
I E
"Our People make the difference with Pride, Integrity and Quality"
Completed Projects within the last 5 years (partial):
Job# Project Name
669 Lake Angel Drainage Expansion
D Water � Drainage
D Sewer � General Civil
Owner:
City of Orlando
400 S. Orange Avenue
Orlando, FL 32801
Contact:
Telephone:
E-Mail:
Scope of Work
Howard Elkin
(407)246-3751
howard.elkin@cityoforlando.ne
Engineer:
WBQ. Inc.
Project Amt
$1,899,900
NTP
2/16/2015
201 N. Magnolia Ave. #200
Orlando, FL 32801
Contact:
Telephone:
E-Mail:
Jason Vargas
(407)839-4300
jvargas@wbq.com
Final Contract
$2,125,198
Final Completion
9/30/2015
Excavation to expand Lake Angel from 3.5 acres to 8.5 acres to support 1-4 expansion. I installation of three (3) nutrient
Separating Baffle Boxes with capacities of 533 CUFT storage, 107 CUFT storage and 238 CUFT storage, restoration including
sidewalk, curb. Construction of new drainage inlet, manholes and 107 LF of 18" RCP, 40 LF of 15" RCP 12 LF of 42" RCP
and 60 LF of 49" to 60" RCP with of depth of 13 feet. Adjustment of manhole top at 26th. Street & Lee Ave. Construct ditch
pavement with 300 SY of rubble rip rap from existing headwall along 1-4. Modify existing drain well outfall structure with new
control structures and removable stop logs.
Job# Project Name
663 Y14-7035 Pump Station Pkg. #1 -PS #3293A, #3887, #3590,
#3365 & 3309 D Water D Drainage
Project Amt
$1,695,000
NTP
2/16/2015 � Sewer
Owner:
Orange County Utilities
9150 Curry Ford Road
Orlando, FL 32825
Contact: James Montalvo
� General Civil
Telephone:
E-Mail:
(407)506-2120
james.montalvo@ocfl.net
Scope of Work
Engineer:
BFA Environmental Consultants
1230 Hillcrest Street
Orlando, FL 32803
Contact:
Telephone:
E-Mail:
Geoff Hennessy
(407)896-8608
Final Contract
$1,695,000
Final Completion
1/31/2016
Improvements to five (5) duplex pump stations including replacement and installation of a new wet well, installation of wet well
liners, replacement of pumps (submersible -ABS pumps), piping, valves and electrical systems. Sewer by-pass was required
on all stations. All wet wells were 6' diameter (15' deep and 22' deep). Pumps are 28 HP each.
Page 465 of 668
"Our People make the difference with Pride, Integrity and Quality"
Completed Projects within the last 5 years (partial):
Job# Project Name
661 #6280 GOAA Hangars 407 & 431 Fire Protection Source Water
Project Amt
$4,098,493
NTP
6/30/2014
Final Contract
$4,060,393 □ Conversion D O . Water raInage
� Sewer
Owner:
City of Orlando
� General Civil
400 South Orange Avenue
Orlando, FL 32801
Contact:
Telephone:
E-Mail:
Scope of Work
Ron Proulx
(407)246-2291
ron.proulx@cityoforlando.net
Engineer:
COM Smith
Final Completion
3/1/2016
2301 Maitland Center Parkway #300
Maintland, FL 32751
Contact:
Telephone:
E-Mail:
David Prah
(407) 660-2552
prahdi@cdmsmith.com
Construction of a prefabricated fire suppression system Booster Pump Station, approximately 5,355 LF of 16" DIP fire water
main, 6,305 LF of 20" DIP potable water main. Abandoned approximately 8,350 LF of various sized existing water main.
Installed a Fire Protection Diesel Engine Driven Packaged Fire Pump Sy stem rated at 5000 GPM Prepackaged pump station
was 45' L x 12' W' x 10' H.
New electrical services and controls installed also.
Job# Project Name
659 TOHO 1 Gravity Sewer Rehab. Replacement Phase 1 & 2
Project Amt
$3,395,000
NTP
7/28/2014
Final Contract
$3,987,755
D Water D Drainage
� Sewer � General Civil
Owner:
Tohopekaliga Water Authority
951 Martin Luther King Blvd.
Kissimmee, FL 34741
Contact:
Telephone:
E-Mail:
Scope of Work
George Eversole
(407)518-2377
qeversole@tohowater.com
Engineer:
CPH Inc.
Final Completion
3/20/2016
1117 E. Robinson St.
Orlando, FL 32801
Contact:
Telephone:
E-Mail:
Jay Morris
(407) 420-0452
imorris@cphcorp.com
Installation of approximately 7,900 LF of 8",800 LF of 10", 860 LF of 12", 350 LF of 24" (various depths 8'-20') gravity sewer
pipe, 100 LF of 12" PVC force main, 4,250 LF of 8" gravity sewer main CIPP lined, 2,950 LF of 12" gravity sewer main CIPP
lined and 360 LF of 24" gravity sewer main CIPP lined. Remove and replace 191 sanitary sewer laterals. Install 4,250 LF of 8"
gravity, 2,950 LF 12" gravity and 650 LF 15" gravity, 360 LF 24" gravity CIPP Lining, Restore approximately 21,150 SY of
asphalt. Replace approximately 4,890 LF of concrete curb, 615 SY of concrete driveway and 3,900 SY of brick roadway. Clean
and coat 3 sanitary sewer manholes. Replace 26 sanitary sewer manhole less than 1 O feet deep and 3 ea. Greater than 1 O
feet deep. The above referenced 7,900 LF of 8" gravity sewer was installed via the open cut method.
Page 466 of 668
I E COHSTRIJCllON GROUP,IMC. r.1.1.1.1..1.1.1.1.1� "Our People make the difference with Pride, Integrity and Quality"
Completed Projects within the last 5 years (partial):
Job # Project Name
599 Y10-704 NWWRF Reclaimed Water Storage & Repump Facility
Project Amt
$2,017,000
NTP
4/1/2010
� Water D Drainage
D Sewer � General Civil
Owner:
Orange County Utilities
9150 Curry Ford Road
Orlando, FL 32825
Contact:
Telephone:
E-Mail:
Scope of Work
James Montalvo
(407)506-2120
james.montalvo@ocfl.net
Engineer:
CPH Engineers, Inc.
1117 E. Robinson Street
Orlando, FL 32801
Contact:
Telephone:
E-Mail:
Mr. Jay Morris
(407)425-0452
Final Contract
$2,054,687
Final Completion
5/25/2011
Installation of a new reclaimed water storage and pumping system including new 2 MG ground storage tank, three vertical
turbine distribution pumps (2-50 HP -750 GPM & 1-100 HP -1500 GPM), variable frequency drive units, electrical and control
building, clearing, grading, stormwater swales, approximately 3800 LF of 24" reclaimed water main.
Job# Project Name Project Amt
574 #2379 Water Conserv II Master Pump Station & Flow Equalization $12,537,000
D Water D Drainage NTP
� Sewer � General Civil 1/5/2010
Owner:
City of Orlando
400 S. Orange Avenue
Orlando, FL 32801
Engineer:
Brown & Caldwell
850 Trafalgar Court
Maitland, FL 32751
Final Contract
$13,763,395
Final Completion
3/5/2012
Contact:
Telephone:
Steve Shelnutt
(407)509-5597
steve.shelnutt@cityoforlando.n
Contact:
Telephone:
Mr. R. Scott Smith, PE
( 407)661-9500
E-Mail:E-Mail:
Scope of Work
New 3-level 35' deep cast-in-place wet piUdry raw sewage master pump station with five (five plex) 9,975 GPM (250 HP) raw
sewage submersible pumps with variable frequency drives; 3.5 mg flow ground storage tanks, new precast concrete electrical
bldg. (30' L x 21' W) , new master pump station influent junction box; modifications & rehabilitation of existing master pumping
station systems with 54" x 24" RS Suction Header/Manifold & conversion to a transfer pumping station, modifications to the
existing primary clarifiers and associated site, electrical, controls, mechanical, odor control unit with associated FRP pipe
installed.
New primary treatment odor control system as well as treatment rehab.
Page 467 of 668
Refonmce No. 1 Orange County Utilities Address 9150 Curry Ford Rd. City, State, ZIP Orlando, FL, 32825 Contact Person James Montalvo Telephone & E-mail 407-506-2120 I james.montalvo@ocfl.netDate(s) of Service 1994-Present Type of Service General Civil, Water, Sewer, Drainage Comments: Refore11ct\ No. 2 City of Tavares, FL Address 201 E. Main Street City, State, ZIP Tavares, FL, 32778 Contact Person Phil Clark Telephone & E-mail 352-742-6485 I pclark@tavares.orgDate(s) of Service 2016-Present Type of Service General Civil, Water, Sewer, Drainage Comments: Rd'enmce No. 3 TOHO Water Authority Address 500 Martin Luther King Jr. Blvd. City, State, ZIP Kissimmee, FL, 34741 Contact Person George Eversole Telephone & E-mail 407-944-5025 I geversole@tohowater.comDate(s) of Service 1994-Present Type of Service General Civil, Water, Sewer, Drainage Comments: Page 468 of 668
CONSTRUCTION GROUP,INC. ,,111111111�
Prime's Location and Distance to City Hall
Prime Construction Group, Inc. is located at 1000 Jetstream Drive, Orlando, FL, 32824.
This location is approximately 23.7-30.3 miles from Ocoee City Hall at 1 North Bluford Ave,
Ocoee, FL, 34761. Travel times for the routes indicated below are 28-35 minutes.
� 28 min
23.7 miles
Tildenvill@
@ j
I
Lockhart (ii4)
Universal Orlando Resort
Doctor Phillips
MaitlandI Berti
Goldenrod
Winter Park
1:1 Orlando Science Center
®
Azalea Park @
Conway
Belle Isle 11ST A El
Orlando
International
Airport
01000 Jetstteam Drive
@)
LAKE
REG
Page 469 of 668
CONSTRUCTION GROUP,INC. �IIIIIIIII�
Certified Minority/Small Business Enterprise
Prime Construction Group, Inc. is committed diversity in our workforce. We are also committed to
providing equal opportunity to all small, minority, women's and/or disadvantaged business
enterprises. Attached is our equal opportunity workforce schedule and the following procedures
are part of our pre-construction and ongoing project processes.
1.Follow all recommendations of Owner Standard MBE Program.
2.Reach out via phone and/or email immediately to all MBEs who are registered that fit the
scope of the project.
3.Publish advertisements in local newspapers to contact us regarding the project. This is done
early enough to ensure potential MBEs have time to respond
4.Provide access to all bid documents at no cost to MBEs
5.Have webinars and/or workshops to allow MBEs to familiarize themselves with scope
opportunities.
6.Provide bid package sizes that encourage MBE participation.
7.Create flexible scope packages to ensure maximum MBE participation
8.Negotiate in good faith with all MBEs to maximize their ability to win a subcontract or purchase
order.
Page 470 of 668
� . ®' .ACORD �-CERTIFICATE OF LIABILITY INSURANCE I PATE iMM/PP/YYYY) 12/ 4/2022
THIS CERTIFICATE IS ISSUED AS A MATTEI'{ OF INFORMATION ONLY ANO CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER, THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGA TIVELY AMEND, EXTEND OR ALTER THE COVl::RAGE AFFORDED ElY THE POLICIES BELOW. THIS CERTIFICATE: OF INSURANCE DOES NOT OONSTITUTI:: A CONTRAC'f aETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER,
IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED, the polloy(les) must have ADDITIONAL INSURED provisions or be endorsed. If SUSROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this oertlfloate does not confer rights to the certificate holder In lieu of such endorsement(s), PROOUCl:R l."813-229-8021 NAAAE�CT Cierra Lewis, CISR M, m. Wilson Company, ItLC PHONe )• 8:I.3-349-224.0 j r� Nol• 813-354.-4.607
300 W, Platt St, ifcf.J\;.,s: alewis®mewilson,aom Ste 200 INSURl!R/Sl AF�ORPING COVERAGE NAICII Tampa, l!L 33606 INSURER A I CHJ\R'J.'ER OAK l"IRE INS 00 256:I.5 INSUltlltl INSURER B: 'rl<AVELER.S IND CO 01" AMUR 25656 Prime Conatruation Group, Ino, INSURER c 1 'l.'RAVELJllRS PROP CJ\.S CO OF AMER 25674
1000 Jetstream Dr, INSURER O 1 1100:C INS CO 10176 ll'ISURER e 1 HIGHLANDS INS CO 224.89 Orlando, l"L 32824 ll'ISURl!R F
COVERAGES CERTIFICATE NUMBER· 6130?368 REVISION NUMBER·
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LIS'fl5D BELOW HAVE BEEN ISSUED TO THE INSURED NAMSD ABOVE FOR THI:: POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PE:RTAIN, THE INSURANCE AFFORDE:D BY THE: POLICIES DESCRIS!:;0 Hl::REIN IS SUBJE:CT TO ALL THE: Tl::RMS, EXCLUSIONS ANO CONDITIONS OF SUCH POLICl\::S. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID Cl.AIMS.
INSR TYPll OF INSURANCE 1.�.:'.!-SUBR POI.JOY NUMBER I.TR "'""
A :x. COMMERCIAL GENSRAL LIABILITY DTC05R235?11COF23 □ CLAIMS-MADE 0 OCCUR
f--� GEN'L AGGREGATE! LIMIT APPLIES PER: R POLICY 0 �f8f □ LOO OTHER: B AUTOMOlllLE LIABILITY 810SR2360372326G
:x.ANY AUTO -OWNl<P -SCHElPULED -AUTOS ONLY -AUTOS
X HIRE;D X NON,OWNEO AUTOS ONLY AUTOS ONLY
C X UMBRELLA LIAII H OCCUR CUP5R23664.02S26 l!XCESS LIA!il CLAIMS-MADE DED IX I R E T E NTI ON $ 10000 WORK!aRS COMPENSATION W00100064.l.9202 D AND l'!MPL OYERS' LIAll lLITY V/N ANYPROPRIETORIPARTNl=R/1:XECUilVE � NIA OFl'IO�R/MEMBEREXCLUDEO? (Mandatory In NH) g�fc��{f&� �?�PERATIONS below m Pollution Liability 7930106530002
1�10LICY 11.V\'I M/00/YY POLICjyEXP /MM/DD YYYl 01/01/23 01/01/24.
01/01/23 01/01/24
01/01/23 01/0l/24
01/0l/23 01/01/24
Ol/Ol/23 01/0],/24.
LIMllG EACH OCCURRl::NCE �(;��mI9s�EtcJ,?r�ancal MED EXP (Any one parson) PERSONAL & ADV INJURY GENERAL AGGREGATE PRODUCTS • COMP/OP AGG
Pe���rd��tf "'GLI': UMIT BODILY INJURY (Par parson) SODILY INJURY (Per aooldant) FfeOPERTY �AMAGE er aocldanl PIP EACH OCCURRSNCE AGGREGATE
x I �¥frnTE I JOTH-ER E.L, EACH ACCIDENT E,L, DISEASE• EA EMPLOYEE S.L DISEASE• POLICY LIMIT Per Eaah Condition Aggregate .. '
. '
$ 1000000 $ 300000 $ 5000 $ ·1000000 $ 2000000
$ 2000000 $ $ 1000000 $ $ $ $ 10,000 $ 6000000 $ 5000000 $
$ 500000 $ 500000 $ 500000 l,000,000 2,000,000
DESCRIPTION OF OPERATIONS I LOCATIONS /VEHICLES (ACORD 101, Addlllonal Remarks Sohedule, may be atlaohed II more spaoo Is req11lred)
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE Dl=SCRll3EP POLICIES BE CANCELLED BEFORE Bid Purposes o/o Prime Construction Group THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
1000 Jetatreron Ddve Orlando, FL 32824-7106 AUTHORIZED REPRESl::NTATIVE
Orlando, FL 32B24 r1<.��. (\()��. I USA @ 1988-20�5 ACORD CORPORATION, All rights reserved.
ACORD 25 (2016/03) CL001 The ACORD name and logo are registered marks of ACORD
67307368
Page 471 of 668
WALDORFF
INSURANCE & BONDING
M.E. Wilson Company, LLC
February 22, 2023
RE: Prime Cons truction Group, Inc.
For Prequalification Purposes Only
To Whom It May Concern:
This is to advise you that M.E. Wilson Company, LLC dba Waldorff Insurance & Bonding provides bonding
for Prime Construction Group, Inc. Their Surety is Travelers Casualty and Surety Company of America, which
has an A.M. Best Rating of A++ XV and is listed in the Department of the Treasury's Federal Register with
an underwriting limit of $782,997,000. The home office address is One Tower Square, Hartford, CT 06183.
Prime Construction Group, Inc. is a financially strong, well-managed company and it is a pleasure to
recommend them to you for your consideration. They have an excellent reputation with
architects/engineers, owners, subcontractors, and suppliers and are considered to be an exceptional
contractor in the area.
At this time, we would not anticipate a problem in bonding our client in the amount of $40,000,000 for a
single project or $80,000,000 aggregately. The surety reserves the right to perform normal underwriting at
the time of any bond request, including, without limitation, prior review and approval of relevant contract
documents, bond forms, and project financing.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Benjamin French
Partner
1110 NORTHWEST 6 th STREET
GAINESVILLE, FL 32601
WWW.WALDORFFINSURANCE.COM
PHONE 352-374-7779
FAX 850-581-4930
Page 472 of 668
September 6, 2022
Re: Bank Reference Letter-Prime Construction Group
To whom it may concern,
At the request of the above-mentioned customer, this letter is to acknowledge the customer's
relationship with Cogent Bank. The customer currently has funds on deposit with the bank in the low
seven figures with no history of overdrafts. Additionally, the customer has a line of credit in the low
seven figures. The line of credit has been handled as agr eed with no history of late payments .
. If you have any questions, you may reach me at my contact information below.
n Lalikos
Cogent Bank
Senior Market Leader
420 s. Orange Ave, Suite 850
Orlando, FL 32801
321-233-8658 {Direct)
407-802-4464 (Fax)
Page 473 of 668
Form W-9 Request for Taxpayer Give Form to the
requester. Do not (Rev. January 2011) Identification Number and Certification Department of the Treasury send to the IRS. Internal Revenue Service
Name (as shown on your Income tax return)
Prime Construction Group, Inc.
t\i Business name/disregarded entity name, if different from above
Q) 0)
Check appropriate box for federal tax C 0 classification (required): D Individual/sole proprlelor D C Corporation 0 s Corporation D Partnership D Trust/estate
Q) 1/1 0. 5 D Exempt payee �+: D Limited liability company. Enter the tax classlficalion (C=C corporation, S=S corporallon, P=partnership) ►... 0 0::, -----....................... -----.... -........ ----
'i:� 't: .E D Other (see Instructions)► D.. 0 :E Address (number, st reet, and apt or suite no.) Requester's name and address (optional) 0
Q) 1000 Jetstream Drivea.
Cl) City, state, and ZIP codeQ) Q) Orlando, FL 32824(/)
List account number(s) here (optional)
■:m ••Taxpayer Identification Number (TIN)
Enter �our TIN in t�e app�oprlate �ox, The TIN �r�vided mus_t match the name given on the "Name" line
to avoid backup w1thhold111g. For individuals, this 1s your soe1al security number (SSN). However, for a
resident alien, sole proprietor, or disregarded entity, see the Part I Instructions on page 3. For other
entities, it is your employer identification number (EIN). If you do not have a number, see How to get a TIN on page 3.
I Socfal security number I ITIJ -OJ -I I I I I
Note. If the account Is in more than one name, see the cha1t on page 4 for guidelines on whose
number to enter. 9-3210337
Certification
Under penalties of perjury, I certify that:
1. The number shown on this form is my correct taxpayer identification number (or I am waiting for a number to be Issued to me), and
2. I am not subject to backup withholding because: (a) I am exempt from backup withholding, or (b) I have not been notified by the Internal RevenueService (IRS) that I am subject to backup withholding as a result of a failure to report all interest or dividends, or (c) the IRS has notified me that I am
no longer subject to backup withholding, and
3. I am a U.S. citizen or other U.S. person (defined below).
Certification Instructions. You must cross out item 2 above if you have been notified by the IRS that you are currently subject to backup withholding
because you have failed to report all Interest and dividends on your tax return. For real estate transactions, Item 2 does not apply. For mortgage
Interest paid, acquisition or abandonment of secured properly, cancellation of debt, contributions to an individual retirement arrangement (IRA), and
generally, payments other than interest and dividends, you are not required to sign the certification, but you must provide your correct TIN. See the
Instructions on page 4.
General Instructions
Section references are to the Inter nal Revenue Code unless otherwise
noted.
Purpose of Form
A person who Is required to file an Information return with the IRS must
obtain your correct taxpayer Identification number (TIN) to report, for
example, Income paid to you, real estate transactions, mortgage Interest
you paid, acquisition or abandonment of secured property, cancellation
of debt, or contributions you made to an IRA.
Use Form W-9 only if you are a U.S. person (Including a resident
alien), to provide your correct TIN to the person requesting it (the
requester) and, when applicable, to:
1.Certify that the TIN you are giving Is correct (or you are waiting for a
number to be issued),
2. Certify that you are not subject to backup withholding, or
3.Claim exemption from backup withholding if you are a U.S. exempt
payee. If applicable, you are also certifying that as a U.S. person, your
allocable share of any partnership Income from a U.S. trade or business
is not subject to the withholding tax on foreign partners' share of
effectively connected Income.
Note. If a requester gives you a form other than Form W-9 to request
your Tl N, you must use the requester's form if It is substantially similar
to this Form W-9.
Definition of a U.S. person. For federal tax purposes, you are
considered a U.S. person if you are:
•An individual who Is a U.S. citizen or U.S. resident alien,
• A partnership, corporation, company, or association created or
organized In the United States or under the laws of the United States,
• An estate (other than a foreign estate), or
• A domestic trust (as defined in Regulations section 301. 7701-7).
Special rules for partnerships. Partnerships that conduct a trade or
business In the United States are generally required to pay a withholding
tax on any foreign partners' share of Income from such business.
Further, in certain cases where a Form W-9 has not been received, a
partnership is required to presume that a partner is a foreign person,
and pay the withholding tax. Therefore, if you are a U.S. person that is a
partner In a partnership conducting a trade or business In the United States, provide Form W-9 to the partnership to establish your U.S.
status and avoid withholding on your share of partnership Income.
Cat. No. 10231X Form W-9 (Rev. 1-2011)
Page 474 of 668
EGENE
PROVIS
Do not alter this document in any form.
unlawful for anyone other than the licen
Page 475 of 668
DEPARTMENI�·0F BUSINESS AND�BROEESSION
ONSTRUCTION.J MJ,tJS+R��lC_ENSI NG BOA
GRou No UTI �l}Y,� ;�.!� �Tl��o;:1-:1_.�RJI N� 1s CERTI FIE
PRov1s1o�s.-9:f�C£1f PTERi4a�fr:olroJ�t5!ATUTEs
EXPIRATION DATE: AUGUST 31, 2024
rify licenses online at MyFloridalicense.co
-Do not alter this document in any form.
nlawful for anyone other than the licens
Page 476 of 668
THIS CERTIFIES THAT:
BUSINESS ORGANIZATION:
Jimmy Patronis
CHIEF FINANCIAL OFFICER
Julius Halas
DIVISION DIRECTOR
.John Gatlin
BUREAU CHIEF
Catherine Thrasher SAFETY PROGRAM MANAGER
FLORIDA DEPARTMENT OF FINANCIAL SERVICES
DIVISION OF STATE FIRE MARSHAL
Wyatt Hazy 1000 Jetstream Drive
Orlando FL 32824
Prime Constructhon Group Inc
200E.t\ST GA1NES S'IREET-Tallahassee.Florida 32399-0342 Tel850-413-3644
CERTIFICATE OF COMPETENCY OFFICIAL COPY
Contractor V means a contractor whose business is limited to the execution of contracts requiring the ability to fabricate, install, inspect, alter, repair and service the underground piping for a fire protection system using water as the extinguishing agent
beginning at the point of service as defined in the act and ending no more than 1 foot above the finished floor.
Issue Date:
Type:
Class:
County:
License/Permit #:
Expirathon Date:
��Chief Financial Officer
07/01/2022
09
14
Orange
FPC19-000066
06/30/2024
Page 477 of 668
State of Florida
Department of State
I certify from the records dthis office that PRIME CONSTRUCTION GROUP,
INC. is a corporation organized under the laws of the State of Florida, filed on
November 8, 1993, effective January 1, 1994.
The document number of this corporation is P93000078767.
I further certify that said corporation has paid all fees due this office through
December 31, 2023, that its most recent annual report/uniform business report
was filed on January 24, 2023, and that its status is active.
I further certify that said corporation has not filed Articles of Dissolution.
Given under my lza11d mu/ the
Great Seal of the State of Florida
at Tallahassee, the Capital, this
the Twenty-fourth day of Ja1111my,
2023
Tracking Number: 1884831295CC
Tu authenticate this certificatc,visit the following sire,enter this number, and then
follow the Instructions displayed.
https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication
Page 478 of 668
FOO]\) .........-:: ...
Florida Department of Transportation
RON DESANTIS
GOVERNOR 605 Suwannee Street
Tallahassee, FL 32399-0450
April 11, 2022
PRIME CONSTRUCTION GROUP, INC.
1000 JETSTREAM DRIVE
ORLANDO, FLORIDA 32824
RE: CE RTIFICATE OF QUALIFICATION
JARED W. PERDUE, P.E.
SECRETARY
The Department of Transportation has qualified your company for the type of work
indicated below.
FDOT APPROVED WORK CLASSES:
DEBRIS REMOVAL (EMERGENCY), DRAINAGE, FLEXIBLE PAVING, GRADING, GRASSING, SEEDING AND SODDING, INTERMEDIATE BRIDGES, MINOR BRIDGES, PORTLAND CEMENT CONCRETE ROADWAY PAVING,
SIDEWALK, WASTEWATER, UNDERGROUND UTILIT IES, STORM WATER PUMP SYSTEMS, RIP RAP AND
CONCRETE RUBBLE
Unless notified otherwise, this Certificate of Qualification will expire 6/30/2023.
In accordance with Section 337.14(4), Florida Statutes, changes to Ability Factor or
Maximum Capacity Rating will not take effect until after the expiration of the current
certificate of prequalification (if applicable).
In accordance with Section 337.14(1), Florida Statutes, an application for
qualification must be filed within (4) months of the ending date of the applicant's
audited annual financial statements.
If the company's maximum capacity has been revised, it may be accessed by logging into
the Contractor Prequalification Application System via the following link:
HTTPS://fdotwpl.dot.state.fl.us/ContractorPreQualification
Once logged in, select "View" for the most recently approved application, and then
click the "Manage" and "Application Summary" tabs.
The company may apply for a Revised Certificate of Qualification at any time prior to
the expiration date of this certificate according to Section 14-22.0041(3), Florida
Administrative Code (F.A.C.), by accessing the most recently approved application as
shown above and choosing "Update" instead of "View." If certification in additional
classes of work is desired, documentation is needed to show that the company has
performed such work.
All prequalified contractors are required by Section 14-22.006(3), F.A.C., to certify
their work underway monthly in order to adjust maximum bidding capacity to available
bidding capacity. You can find the link to this report at the website shown above.
AA:cg
Sincerely,
£61., Alan Autry, Manager
{) Contracts Administration Office
Improve Sc(f'ety, Enhance Jvlobi!ity, Inspire Innovation www.fdot.gov Page 479 of 668
---.-c_-_
.: ~----__ -:>;�---,-,"'-_
1 ooojlitT$TREArloR lJ -.OR¼NDQ; 32&24:
PAID:
This[ocatBusin
ro11rffAX . . lL -PRE\IIOlJSINPA.1b ·-.-TOTAL 1:JUE
�- �\_ �-, --_ �-:-�--��:�L---�;:/:�-:-::--�-�
-1&oo JETifREAM [);· __ >u.·� QRhANPO; :fa�24.
_::,"_�---
·_ •-_-_-'�PAID: ·i�b,00 Ji�{:91 os�Jia
_-_ -- -__ , :-;;!.;���r!"'��t�,:��m,�•.
2022
1§14 CEF{:f UNDERGR.OUNDUTI
JOTAtiAx· REGULATE6WASTE PREVIOU.SLYPAlD TOJALDUE
_--C -�a-_ -,__--
1000 JETSTR.EAM DR_.-
lJ-()RlAN1J<;f :32a24 ·-·-
--
pft.;o: $80.00 0099.rN05s92s -_ 1,1a12022
3��1M���ON�tf{l;JCtl(tN§R60[JN¢·BRAGK_�'TT C;H1BLES:.IO�EPHJ]f . 1000 JETSTREAM,DR •-
1> OR!:{\NDQ)Il 32824�7106 _
---���-"�
--t_�_ -- -:�:-- _ '\c k�J1t" Rafcirdlrian8e eiJ�fpr y�r: •
i--_'c_ __ -, ---->-�---: ���;_�_ -
.Jk1MECONSTRuciI6NGROup INC
HAZXvVYATT�IAYAI0 1 ooo}ETS1:REAM DR
_·. fORIANDOFL3282'f.71b6'·--
Page 480 of 668
C E= � �c Certified �nvironmentally� 1111� � Responsible Contractor
Certified Contractor Prime Construction Group
Insurance Carrier Homeland Insurance Company of New York
Policy# 793-01-06-53-0002 I Policy Period 11/1/2023. -1/1/2024
Certification # 993438
Expires 1/1/2024
The potential risk of a pollution event is inherent in all construction work. Such an event can cause significant financial loss for project owners and other contractors at the site and can even impact the community and environment. Some contractors actively manage this risk, while others do not. Environmental Risk Professionals, LLC hereby certifies that the above referenced contractor has distributed protocols to avoid pollution incidents on job sites and has purchased a comprehensive pollution liability insurance policy to provide financial responsibility should an accident arise.
Training -The above referenced contractor has distributed "Pollution Prevention Practices" designed to mitigate commonenvironmental risks associated with their contracting operations. Examples of these written protocols may include, but are not limited to, the following activities:
Chemical Storage Solid and Hazardous Waste Management General Housekeeping Mold Identification and Abatement Responding to Spills
Fugitive Dust Control Stormwater Pollution Prevention Personal Protective Equipment Deterring Illicit Abandonment Asbestos and Lead Based Paint
Insurance-Even when Pollution Prevention Practices are followed, accidents still happen. Property owners bear the ultimate responsibility for a pollution problem at their site, even if caused by a contractor working on their behalf. A contractor needs to purchase a true pollution liability policy in order to properly protect the entities for whom they perform operations. Environmental Risk Professionals, LLC has reviewed the above referenced pollution liability policy and hereby confirms that it provides the following important financial responsibility provisions:
1.A policy limit of at least $1,000,0002.Coverage is primary and non-contributory, with the certificate holders included as Additional Insureds and carrierrights to subrogation waived In their favor 3.On-site and off-site remediation expense for pollution conditions arising from contracting operations4.No mold exclusion on policy5.A pollution event includes damage to natural resources6.Coverage for transportation and disposal of pollutants7.No limitation to sudden and accidental pollution release only
� ENVIRONMENTAL /)CM-�7
RI S PROFESSIONALS Signed Environmental Risk Professionals, LLC
This certificate was Issued on 1/3/2023 and serves as a matter of information only, The Certificate Is only valid through the current policy period with an active policy,
This certificate confers no rights upon the certificate holder and does not affirmatively or negatively amend, extend or alter the coverage afforded by the policy listed
above. This certificate does not constitute a contract between the Issuing Insurer and the certificate holder.
visit c-e-r-c,com to learn more
Page 481 of 668
florid o
RFQ CONFLICT OF INTEREST DISCLOSURE FORM
The award of this contra ct is subject to the provisions of Chapter 112, Florida Statutes. All Proposers must
disclose within their Proposal: the name of any City of Ocoee employee, Mayor or City Commissioner,
other City Official, or City Consultants, who owns assets or capital stock, directly or indirectly, in the
Proposer's firm or any of its branches, or would directly or indirectly benefit by the profits or emoluments
of thfa proposal. (Indirect ownership or benefit applies to any members of his or her immediate family.)
Proposer certifies that no member of the entity's ownership or management is presently applying for an
employee position or actively seeking an elected position with the City. In the event that a conflict of
interest is identified in the provision of services, Proposer agrees to immediately notify the City in writing.
The purpose of this disclosure form is to give the City the information needed to identify potential conflicts
of interest for the City Commission, Evaluation Committee members, and other key City employees and
consultants involved in the award of this contract.
According to Chapter 112, Florida Statutes, the term "conflict of interest" "means a situation in which
regard for a private interest tends to lead to disregard of a public duty or interest", and refers to situations
in which financial or other personal considerations may adversely affect, or have the appearance of
adversely affecting, an employee's professional judgment in exercising any City duty or responsibility in
administration, management, instruction, research, or other professional activities.
Please check one of the following statements and attach additional documentation if necessary:
__ X ___ To the best of our knowledge, the undersigned firm has no potential conflict of interest for
this Proposal.
____ The undersigned firm, by attachment to this form, submits information which may be a
potential conflict of interest for this Proposal.
Acknowledged by:
Prime Construction Group, Inc.
Firm Name 4sr£� Signature
Charles J. Brackett III, President/CEO
Name and Title (Print or Type)
2/27/2023
Date
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 20
Page 482 of 668
DRUG-FREE WORKPLACE CERTIFICATION
The undersigned Respondent, in accordance with Florida Statute 287.087 hereby certifies that it
has a drug-free workplace program. In order to have a drug-free workplace program, a business
shall:
1.Publish a statement notifying employees that the unlawful manufacture, distribution,
dispensing, possession, or use of a controlled substance is prohibited in the workplace and
specifying the actions that will be taken against employees for violations of such
prohibition.
2.Inform employees about the dangers of drug abuse in the workplace, the business's policy
of maintaining a drug-free workplace, and available drug counseling, rehabilitation, and
employee assistance programs, and the penalties that may be imposed upon employees for
drug abuse violations.
3.Give each employee engaged in providing the commodities or contractual services that are
under bid a copy of the statement specified in subsection (1 ).
4.In the statement specified in subsection (1), notify the employees that, as a condition of
working on the commodities or contractual services that are under bid, the employee will
abide by the terms of the statement and will notify the employer of any conviction of, or
pleas of guilty or nolo contendere to, any violation of Chapter 893 or of any controlled
substance law of the United States or any state, for a violation occurring in the workplace
no later than five (5) days after such conviction.
5.Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or
rehabilitation program is such is available in the employee's community, by any employee
who is so convicted.
6.Make a good faith effort to continue to maintain a drug-free workplace through
implementation of this section.
As the person authorized to sign the statement, I certify that this firm complies fully with the above
requirements.
Respondent:
Signed:
By:
Title:
Date:
Charles J. Brackett III
(Print or Type Name)
President/CEO
2/27/2023
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 21
Page 483 of 668
COMPANY INFORMATION/SIGNATURE SHEET RFQ #23-004
FAILURE TO COMPLY WITH THESE RFQ INSTRUCTIONS WILL RESULT IN
DISQUALIFICATION OF YOUR QUALIFICATION PACKAGE. PLEASE SIGN BELOW
ATTESTING THAT YOU HAVE READ AND UNDERSTAND ALL RFQ INSTRUCTIONS,
AND THAT YOU UNDERSTAND THAT THE SUCCESSFUL RESPONDENT WILL BE
REQUIRED TO ENTER INTO A LEGALLY BINDING CONTRACT WITH THE CITY OF
OCOEE.
Prime Construction Group, Inc.
COMP ANY NAME
AUTHORIZED SIGNATURE (manual)
Charles J. Brackett III, President/CEO
NAME/TITLE (PLEASE PRINT)
1000 Jetstream Drive STREET ADDRESS
Orlando FL CITY STATE 32824 ZIP
FEDERAL ID# 59-3210337
407-856-8180
TELEPHONE (INCLUDE AREA CODE)
407-856-8182
FAX (INCLUDE AREA CODE)
cbrackett@primeconstructiongroup.com
E-MAIL ADDRESS
IF REMITTANCE ADDRESS IS
DIFFERENT FROM PURCHASE ORDER
ADDRESS, PLEASE INDICATE BELOW:
__ Individual � Corporation __ Partnership __ Other (Specify) ________ _
Sworn to and subscribed before me by means of� physical presence or □ online notarization this 27th day of February , 20 �-
Personally Known __ x ___ or
Produced Identification ----
(Type ofldentification)
.•·s.�• •v�ZACHARY DAVID FIELDS
;'f�f-.\ Notary Public· State of Florida
\'1.�l! Commission# HH 130374
..._�-'fon,l/ My Comm. Expires May 16, 2025
.... ·""Bonded through National Notary Assn.
Zachary Fields, Notary Public Printed, typed or stamped Commissioned name of Notary Public
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 22
Page 484 of 668
SUMMARY OF LITIGATION
Summary of Litigation: State "None" if no litigation. Provide a summary of any litigation claim(s), bid or
contract dispute(s) filed by or against the CMR firm in the past five (5) years which is related to the services
that the CMR firm provides in the regular course of business. The summary shall state the nature of the
litigation, claim, or contract dispute, a brief description of the case, the outcome or projected outcome, and
the monetary amounts involved, in accordance with the guidelines below:
Claims/Litigations
1.Within the past 5 years, has your organization filed suit or a formal claim against a project owner (as a
prime or subcontractor) or been sued by or had a formal claim filed by an owner, subcontractor or supplier
resulting from a construction dispute? Yes ____ No x If yes, please attach additional sheet(s)
to include:
Description of every action Captions of the Litigation or Arbitration
Amount at issue: NIA----------Name (s) of the attorneys representing all parties:
Amount actually recovered, if any: _N_/A _____________ _
Name(s) of the project owner(s)/manager(s) to include address and phone number:
2.List all pending litigation and or arbitration.None
3.List and explain all litigation and arbitration within the past five (5) years -pending, resolved,
dismissed, etc.NIA
4.Within the past 5 years, please list all Liens, including Federal, State and Local, which have been filed
against your Company. List in detail the type of Lien, date, amount and current status of each Lien.
None
5.Have you ever abandoned a job, been terminated or had a performance/surety bond called to complete
a job? Yes ____ No x If yes, please explain in detail:
6.For all claims filed against your company within the past five (5) years, have all been resolved
satisfactorily with final judgment in favor of your company within 90 days of the date the judgment
became final? Yes x No ___ If no, please explain why?
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 23
Page 485 of 668
7.List the status of all pending claims currently filed against your company:None
8.In the last ten (10) years, has the CMR Firm/Team ever been in bankruptcy or receivership?
Yes ____ No_x __ _
If yes, please explain in detail:
9.In the last five (5) years, has OSHA cited and assessed penalties against the CMR Firm/Team for
violations of its safety or health regulations? Yes ____ No_.,..__ __
If yes, please explain in detail:
10.Has the Environmental Protection Agency or any Florida Water Management District cited and
assessed penalties against the CMR Firm/Team or the owner of a project during the time in which the parties
were performing on a contract? Yes ____ No_x __ _
If yes, please explain in detail:
11.Has any insurance carrier, for any form of insurance, refused to renew the insurance policy for the
CMR Firm/Team due to non-payment or contractor losses? Yes ____ No_x�--
If yes, please explain in detail:
Liquidated Damages
1.Has a project owner ever withheld retainage, issued liquidated damages or made a claim against any
Performance and Payment Bonds? Yes ____ No __ x __
If yes, please explain in detail:
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 24
Page 486 of 668
FEBRUARY 28, 2023 OELRICH CONSTRUCTION, INC.
428 S. Dillard St. Suite 103 I Winter Garden, FL 34787
Phone: 352.745.7877 Fax: 352.745.7878
www.oelrichconstruction.com
RFQ # 23-004, CM AT-RISK FOR
Floral Street Water, Sewer, and
Road Reconstruction
Page 487 of 668
Letter of Intent......................................................................................................pg. 01
I. CMR’s Qualifications..............................................................................................pg. 03
1. Key Project Team Members......................................................................................pg. 03
2. Successfully Completed Similar Projects.............................................................pg. 15
3. Client References.......................................................................................................pg. 21
4. Current & Projected Workload...............................................................................pg. 24
5. Project Approach........................................................................................................pg. 25
II. CMR’s Office Location & Other Forms..............................................................pg. 41
1. Office Location.............................................................................................................pg. 41
2. Proposal Forms...........................................................................................................pg. 42
TABLE OF CONTENTS
RFQ # 23-004, CM AT-RISK FOR
Floral Street Water, Sewer, and
Road Reconstruction
Page 488 of 668
pg. 1
Gainesville Office:
275 NW 137th Drive, Suite A
Jonesville, FL 32669
Orlando Office:
428 S. Dillard St., Suite 103
Winter Garden, FL 34787
oelrichconstruction.com
tel: 352-745-7877
CGC1510579
February 28, 2023
Shannon Hopper, Purchasing Technician
City of Ocoee Finance Department
150 N. Lakeshore Drive, Ocoee, FL 34761
Phone: (407) 905-3100 x 1513
shopper@ci.ocoee.fl.us
Re: RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer, And
Road Reconstruction.
Dear Shannon Hopper and Selection Committee Members:
As the City of Ocoee grows, so must its improvements to its infrastructure. Floral
Street is an important roadway, providing access for residential areas and businesses,
all of which have seen exponential growth in recent years. When selecting a
Construction Manager for such a project, it will be essential that the firm chosen be
familiar with the surrounding area and all involved entities. It will also be important
that the chosen firm have the capability to perform roadway improvements with
the delicacy required near residential & commercial areas without causing undue
interruptions to daily life and activities.
We understand that the scope of work for the RFQ#23-004 project involves
upgrading the current water & sewer infrastructure as well as improving this area’s
capability for stormwater management . This project will alleviate current issues as
well as greatly improve its capability to facilitate the city’s growth as anticipated in
Ocoee’s Downtown Master Plan. Oelrich Construction has the vision and technical
expertise required to construct infrastructure enhancements of this caliber. Why
partner with us?
1. Our Emphasis on Safety, Communication, and Maintenance of Business
We understand that Floral Street is a busy road linking many residents and
businesses to other areas in downtown Ocoee. It is vital that this roadway not be
shut down to mitigate interruptions to daily traffic flow. Our team is committed to
keeping this roadway open throughout construction. During preconstruction, our
team will develop a sequenced roadway construction phasing plan that allows us
to keep lanes open at all times. With popular schools, churches, businesses, and
homes located along the corridor, it will be critical to develop a strong wayfinding
strategy that ensures safety and maintains accessibility for all stakeholders. Your
project team, Ethan Newport and Cozart Lawrence, both carry FDOT Advanced
Maintenance of Traffic (M.O.T.) certifications which give them the authority to make
safe temporary traffic control decisions. We will set up highly-visible detours at the
appropriate distance to ensure safe passage. Our team will go door-to-door to keep
all stakeholders informed about construction progression.
Page 489 of 668
pg. 2
Gainesville Office:
275 NW 137th Drive, Suite A
Jonesville, FL 32669
Orlando Office:
428 S. Dillard St., Suite 103
Winter Garden, FL 34787
oelrichconstruction.com
tel: 352-745-7877
CGC1510579
2. Our Experience on Similar Roadway Projects in the Region
Our proposed team for this project includes the same team members that the City
of Ocoee has worked with over on the $9.8 million Bluford Avenue project. Bluford
Avenue is the backbone of the City of Ocoee’s $45 million Downtown Master Plan.
This major infrastructure project required the consolidation and upgrade of 3,000
linear feet of water main, a new gravity sewer system, 3,000 linear feet of new 16”
force main, reconstruction of 3,000 linear feet of roadway and asphalt pavement,
storm drainage, concrete curbs, brick pavers, sidewalks, landscaping, and LED Street
lighting. Our team faithfully championed the city’s interests throughout the project
and worked around the clock to keep the project on track throughout hurricanes,
design changes, and school openings. We always provided customer access through
temporary driveways or alternative access points and adapted our schedule to meet
their needs. For instance, we got roadwork done around the local flower shop in
time for Valentine’s Day and provided access to the Downtown tax preparer prior
to tax season. Our team would bring this same work ethic and customer service
attitude to the RFQ#23-004 project.
3. Our Ability to Overcome Field Challenges
Roadway projects can have a tremendous impact on the daily lives of community
members, which often makes them the focus of intense scrutiny from citizens and
elected officials. From utility undergrounding to road resurfacing and pedestrian
overpass construction, our team has talented professionals experienced at delivering
highly-visible public works projects. Our ability to overcome initial budgetary
challenges of the Fullers Cross & Apopka Road Intersection, and rework exisiting
utility infrastructure speak to our capabilities to navigate challenging conditions.
Oelrich Construction has more than 18 years of experience delivering challenging
construction management projects. Our Winter Garden office is located 3 miles
away from Ocoee City Hall... guaranteeing a swift response to any project needs.
You can trust our team to offer value engineering solutions that fit your budget;
proactively coordinate the design team and field operations; manage a safe, well-
organized job site; and deliver a high-quality final product.
It would be an honor to work with the City of Ocoee to deliver another successful
roadway infrastructure enhancement.
Thank you for your time and consideration of our qualifications.
Ivan Oelrich, President
Oelrich Construction, Inc.
ivan@oelrichconstruction.com
352-745-7877
Page 490 of 668
pg. 3
TAB I QUALIFICATIONS 1. KEY PROJECT TEAM MEMBERS
Since our establishment in 2004 by our comapany president, Ivan Oelrich, OCI has completed hundreds of major
municipal construction projects across the North Central & Central Florida regions. We are proudly veteran-
owned and operated and specialize in helping cities, counties, and townships in our areas of service integrate
new development ideas and enact individual “master plans” to facilitate Florida’s booming growth in recent
years.
In our 18 years of operation as a construction managment firm, we have overseen the successful completion of
municpal projects of every kind. From the expansion and improvements to Bluford Avenue & Fullers Crossing in
Ocoee, Fl, to the South Main Street expansion in Gainesville, Fl, our experience is diverse and understanding of
the unique to needs of each municipality which we have served.
We would serve the City of Ocoee through our Orlando-area Winter Garden office. Oelrich Construction is
ultimately responsible for maintaining your project’s overall pace and cost. Effective construction management
is all about logistics and relationships. Overseeing as many as 30 separate subcontractors, plus architect/
engineering partners in addition to coordinating with municipalities and regulatory agencies requires a
consistent, organized approach. Our proven success with these project types promises the City of Ocoee an
excellent experience during this next phase of your downtown improvement Master Plan.
OELRICH CONSTRUCTION, INC. COMPANY HISTORY
Page 491 of 668
pg. 4
TAB I QUALIFICATIONS 1. KEY PROJECT TEAM MEMBERS
OELRICH CONSTRUCTION, INC. ORGANIZATIONAL CHART
JOHN HUNNICUTT
Field Operations Manager
MATTHEW MARINO
Preconstruction Manager
IVAN OELRICH
IAN BROWN
ETHAN NEWPORT
COZART LAWRENCE
ALEX EDWARDS
President & Principal
Field Operations Manager
Project Manager
Superintendent
Asst Project Manager
Page 492 of 668
pg. 5
ALEX EDWARDS
ASST PROJECT MANAGER + Support site logistics +Quality Control +Materials ordering/submittals +Communication support +Field Supervisory support
PROPOSED CMAR TEAM: FLORAL STREET RECONSTRUCTION
IVAN OELRICH
EXECUTIVE MANAGER +Executive management, vision & direction +Quality control/assurance +Client support
ETHAN NEWPORT
PROJECT MANAGER +Primary contact from design to post-occupancy +Biweekly project meetings +Schedule Oversight +Phasing Strategy
COZART LAWRENCE
SUPERINTENDENT +Site logistics and preparation +Safety education +Quality control +Subcontract management
JOHN HUNNICUTT
OPERATIONS MANAGER +Value engineering analysis +Construction Document review +Cost control
MATTHEW MARINO
PRECONSTRUCTION MGR +Preconstruction management +Cost control & VE strategy +Milestone schedule development +Contract review
TAB I QUALIFICATIONS 1. KEY PROJECT TEAM MEMBERS
IAN BROWN
FIELD OPERATIONS
MANAGER +Safety Training +Site Protocol Management +Quality Control +Schedule Oversight
Page 493 of 668
pg. 6
TAB I QUALIFICATIONS 1. KEY PROJECT TEAM MEMBERS
IVAN OELRICH
President & Principal | 23 Years of Experience
Role/Background
Military veteran Ivan Oelrich is the founding member of the Oelrich Construction team. With more than 23 years of construction leadership expertise, Ivan has boots-on-the-ground experience supervising multi million dollar capital projects. His military background influences his approach to business management, team building, quality assurance, safety, and project operations. As the President/Principal, Ivan provides executive direction for all corporate project management and field capabilities, guaranteeing that all processes move efficiently, consistently achieve high quality standards, and surpass client expectations.
Certifications
Education
+Certified FL General Contractor,
CGC1510579
+ASHE Health Care Construction
Certification
+OSHA 30-Hour Certification
+First Aid/CPR Certification
Colorado State University
Bachelor of Science in Construction
Management
Military
Community Service
+U.S. Army Infantry, Schofield
Barracks, HI
+Operation Restore Democracy
Port-Au-Prince, Haiti
+Builders Association of North
Central Florida, Past President
+Citizens State Bank, Board
Member
+Boys & Girls Club of Alachua
County, Board Member
+Business Community Coalition,
Board Member
+Greater Gainesville Chamber of
Commerce Board Member
South Main St Reconstruction I $7 million I Gainesville CRA Executive Manager I June 2019 The South Main Street Reconstruction project included undergrounding utilities between Depot Avenue and South 16th Avenue in Downtown Gainesville. The connectivity and accessibility improvements include reconstruction of 3,200 linear feet of right-of-way features such as pavement, lighting, drainage, sidewalks, utilities, furnishings, hardscape, and landscape.
Annual Pavement Preservation I $1.8 million I City of Gainesville Executive Manager I September 2017 Oelrich Construction provided iterative cost estimates and overall project management for roadway milling, repaving, cap sealing, and microsurfacing. Our team addressed numerous roadway concerns including: asphalt grading, stormwater modifications, insufficient limerock base compaction, cracked sidewalks, broken curbs, tree root damage, and vehicular wear and tear.
13th Street Helyx Overpass & Plaza I $2.3 million I Gainesville CRA Executive Manager I October 2012Oelrich Construction constructed a functional, iconic gateway for the College Park/ University Heights district. This multi-modal transportation project required utility coordination, advanced maintenance of traffic, specialty stormwater collection, retaining walls, and landscaping. Notable sustainability features included recycling 30 tons of steel, installing long-life LED lighting, and incorporating a tiered rain garden. This innovative project won national and state American Public Works Association awards for projects <$5 million.
Ben Hill Griffin Stadium Sky Box Expansion I $75 million I UAA Superintendent I September 2001 Scope of work for this major collegiate football stadium expansion included adding 60 private and corporate sky boxes, concession facilities, a catering kitchen and support space. Television and print media facilities were renovated to add 200 seats and six radio and television booths. The project included a new elevator and escalator tower, expansion of a public plaza, and the relocation of underground utilities.
Relevant Projects
Page 494 of 668
pg. 7
TAB I QUALIFICATIONS 1. KEY PROJECT TEAM MEMBERS
Relevant Projects
MATTHEW MARINO
Preconstruction Mgr. | 19 Years of Experience
Role/Background
As Preconstruction Manager, Matthew Marino supervises cost estimating, milestone schedule development, subcontractor bid package/scope strategy, and project estimating. With nearly two decades of experience supervising complex construction projects as a seasoned field superintendent, Matthew’s practical insight will align client needs within budget, schedule, and constructability constraints. As Oelrich Construction’s Safety Coordinator, he also supervises jobsite safety across Gainesville and Orlando. While everyone on our management team is charged with enforcing jobsite safety, Matthew is the eyes and ears onsite to ensure safety is the number one priority.
Certifications
Education
Community Service
+Builders Association of North Central Florida –Past President +Rotary Club of Gainesville – Member +SFC Master Trades Advisory Board +Williston Central Christian Academy – President of the Board
+OSHA 30-Hour Certification
+First Aid/CPR Certification
+FDOT Maintenance of Traffic
Adv. Certification
+Heavy Equipment Operator
Powder Actuated Tool
Certification
+Infection Control Risk
Assessment
+Stormwater Certification
+HAZWOPER 40-Hour
Certification
+Frame, Tube & Coupler, and
System Scaffolding Certification
+First Aid Mental Health Training
University of Florida
Bachelor of Science in Business
Administration
NW 16th Terrace Resurfacing I $505,823 I City of GainesvillePreconstruction Manager I April 2019Supervise estimating and preconstruction services for a 0.5 mile road job. Scope involves milling approximately 2” of existing asphalt, resurfacing, and FDOT compliance upgrades for signing/markings.
New Animal Shelter I $7 million I Lake CountyPreconstruction Manager I February 2019Supervise preconstruction strategy and cost estimates for a 31,000 sf municipal animal shelter in Tavares. The building will feature an education room, a surgery room, cat and dog isolation areas, and adoption areas.
Downtown Bo Diddley Plaza I $1.86 million I Gainesville CRASenior Superintendent I March 2016Improvements including a new café space, airport style restrooms, a water wall with 250 LED light combinations, a welcoming informational kiosk, and a green room for enhanced performances.
New City Hall Design-Build I $2.5 million I City of Williston Senior Superintendent I October 2018 This Downtown Williston project involved the ground-up construction of a new 12,000 square foot city hall. Oelrich Construction worked closely with the Owner to deliver a high-value new facility with local elements.
NW 8th Avenue Reconstruction I $5.2 million I City of Gainesville Senior Superintendent I November 2016The reconstruction of NW 8th Avenue involved extensive wetlands restoration and sediment control within Hogtown Creek. Four new 24-inch RCP culvert crossings with a new stormwater structure were set and modified to tie into existing stormwater pipes. The project included stabilization and creek repair by using new steel sheet piling and concrete to stabilize the creek bank and bottom around the roadway culvert.
Page 495 of 668
pg. 8
Relevant Projects
TAB I QUALIFICATIONS 1. KEY PROJECT TEAM MEMBERS
JOHN HUNNICUTT
Operations Manager | 10 Years of Experience
Role/Background
Having started at Oelrich Construction as a field superintendent, John has hands-on experience working in congested environments, coordinating with regulatory agencies, and overcoming unforeseen conditions. As Operations Director his key duties will involve providing leadership and insight for OCI’s construction management teams, ensure smooth team transtions between project phases (preconstruction, construction, and postconstruction). Ultimately John’s mission is to ensure the success of the project on behalf of the client from the first meeting, to final walk through, and beyond.
New Animal Shelter I $7 million I Lake CountyOperations Manager I January 2019 Prepare estimates and value engineering recommendations for a 31,000 sf municipal animal shelter in Tavares. The shelter was designed to provide additional capacity for animals since Lake County’s 2017 designation as a no-kill facility.
UF Broward Hall I $8 million I UF Project Manager I July 2020Oelrich Construction has renovated each wing of Broward Residence Hall in the past few years. Each project was completed as a fast-track project over the summer so as not to disrupt students and staff. Projects included renovated restrooms, student rooms, lounges, and resident apartments.
UF Veterinary Medicine Surgical Renovation I $2 million I UFOperations Manager I January 2023Renovation and expansion of an active use veterinary facility on UF’s campus. This project was fast-tracked and completed in a busy campus setting with limited lay-down area.
UF Radio Road Roundabout I $5.2 million I UFProject Manager I September 2020Located near several athletic hubs as well as the Harn Museum on UF’s campus, this major road expansion and renovation alleviated issues caused by frequent flooding of Lake Alice. Scope included expanded allowances for pedestrian and vehicular traffic.
STT Lab Buildout I $7 million I UF Thermo Fisher Scientific Operations Manager I May 2022Scope of project included the renovation and expansion of a lab research facility. This project included a major overhaul of the HVAC system and required temporary HVAC equipment installation to contend with supply chain issues.
Certifications
Education
Community Service
+Associated Builders &
Contractors Future Leaders
Program
+Builders Association of North
Central Florida, Member
+FDOT TTC
+OSHA 30-Hour Certification
+CPR Certification
University of Florida
Bachelor of Science in Construction
Management
Page 496 of 668
pg. 9
TAB I QUALIFICATIONS 1. KEY PROJECT TEAM MEMBERS
Relevant Projects
IAN BROWN
Field Operations Manager | 5 Years of Experience
Role/Background
Beginning his career in education, Ian has leveraged skills developed as a teacher, coach, and athletic director assistant to strengthen the development of his skills with facilities construction and renovation projects. A confident and clear communicator, Ian excels at unifying teams. As the Field Operations Manager, Ian will be responsible for supporting the needs of the field team, ensuring on-site project needs are addressed. Oelrich Construction’s Safety Director, Ian is also responsible for overseeing the team’s focus on safety, driving andsupporting OSHA, The City of Ocoee, and Oelrich Construction safety guidelines.
UF Vet Med Surgical Expansion I $258,000 I UFField Operations Manager I February 2023 Renovation and expansion of an active use veterinary facility on UF’s campus. This project was fast-tracked and completed in a busy campus setting with limited lay-down area.
UF Small Animal Care & Dentistry ExpansionI $9.8 million I UFField Operations Manager I January 2019 This project included the renovation and addition to an active use veterinary facility. This project was fast tracked to accomodate semester occupancy, and daily construction was scheduled to proceed without interruption to lecture & research hours.
STT Lab Buildout I $7 million I Thermo Fisher Scientific Field Operations Manager I May 2022Scope of project included the renovation and expansion of a lab research facility. This project included a major overhaul of the HVAC system and required temporary HVAC equipment installation to contend with supply chain issues.
City of Williston Arcade & Main St Enhancements I $740,000 I City of Williston Field Operations Manager I January 2023Part of the City of Williston’s Downtown Revitilization efforts, the project included the conversion of a historic building into a public park as well as the renovation of an arcade leading from Main St. to the Firemen’s Park recreational area.
UF Veterinary Anatomy Lab Addition I $2 million I UF Field Operations Manager I 2012 - 2015Scope of this project required that a 4 story addition be built above a completed building. This project required careful safety coordination for the protection of students and staff.
Certifications
Education
Community Service
+Associated Builders and
Contractors (ABC) of Central
Florida, Member
+Builders Association of
North Central Florida,
Member
+OSHA 30-Hour Certification
+FDOT TTC
+LEED Accredited Professional
+First Aid/CPR Certification
University of Florida
Bachelor of Science in Building
Construction
Page 497 of 668
pg. 10
TAB I QUALIFICATIONS 1. KEY PROJECT TEAM MEMBERS
Relevant Projects
ETHAN NEWPORT
Project Manager | 14 Years of Experience
Role/Background
Ethan Newport has 14 years of leadership in the building construction industry. He owned his own residential remodeling business before transitioning to commercial construction. His experience working in the trenches as a self-employed trade contractor has paved his management style, technical understanding, and field operations approach. As Project Manager, Ethan ensures that all major projects are delivered on time, on budget, and to the finest quality standards. He supervises all building trades, manages logistics, communicates relevant project information to trades, and records jobsite activities.
Certifications
Education
Community Service
+Builders Association of North
Central Florida, Member
+Rebuilding Together North
Central Florida, Volunteer
Associated
+Builders and Contractors (ABC)
of Central Florida, Member
+OSHA 30-Hour Certification
+Heavy Equipment Operator –
Class 5 Certification
+First Aid/CPR Certification
+Powder-Actuated Tool Certified
+Forklift Operator II
+OSHA-designated Scaffolding
Inspector
Santa Fe College
Building Construction Ocoee Fullers Crossing I $2.8 million I Ocoee, FlSenior Superintendent I July 2021Part of the City of Ocoee Master Plan, this major intersection was updated to facilitate increased traffic. Scope of project included added turn lanes, improved traffic lights, and expanded pedestrian walkways.
Bluford Avenue Phase I & II Reconstruction I $9.8 million I City of OcoeeSenior Superintendent I October 2018 Scope of work for the Bluford Avenue improvements includes 3,000 linear feet of water main upgrades, new gravity sewer system and approximately 3,000 linear feet of a new 16” force main.
South Main Street Reconstruction I $7 million I Gainesville CRASenior Superintendent I December 2017 The connectivity and accessibility improvements include reconstruction of 3,200 linear feet of right-of-way features such as pavement, lighting, drainage, sidewalks, utilities, furnishings, hardscape, and landscape.
Cade Museum for Creativity and Invention I $8.3 million I Cade Foundation Senior Superintendent I October 2017Oelrich Construction overcame a high-water table, coal tar and arsenic contaminated soils, and contaminated groundwater when installing the 25,474 sf museum’s massive concrete foundations.
Dr. Phillips Ballfields I $4.5 million I Orange CountySenior Superintendent I May 2023This 16 acre athletic complex is a long sought after project by the Dr. Phillips Foundation, Orange County Public Schools, and the Orange County Board of County Commissioners. The project includes 4 new ballfields, concession facility, recreational areas, and expanded parking.
Page 498 of 668
pg. 11
TAB I QUALIFICATIONS 1. KEY PROJECT TEAM MEMBERS
Relevant Projects
COZART LAWRENCE
Superintendent | 7 Years of Experience
Role/Background
Cozart Lawrence has ten years of experience performing residential and institutional construction. Prior to working for Oelrich Construction, he served Central Florida as a Fire Fighter and Paramedic for 9 years. Cozart’s experiences rescuing fire victims and providing stabilizing medical care in crisis situations informs his proactive leadership style. Cozart is punctual, methodical, and effective under pressure. As Superintendent for this project, he will support the project manager and guide the field superintendent. His responsibilities include supervising field safety protocol, reviewing shop drawings, processing RFI’s, compiling monthly O/A/E meeting minutes, and coordinating
Certifications
Education
Community Service
+First Aid/CPR Certification
+Infection Control Risk
Assessment Certification
+FDOT Temporary Traffic
Control Adv. Certification
+OSHA 30-Hour Certification
Orlando Medical Institute
Paramedic: Emergency Medicine
Seminole Community College
Emergency Medical Technician
Fire Science
+International Association of
Fire Fighters (IAFF), Member
+Associated Builders and
Contractors (ABC) of Central
Florida, Member
+Builders Association of North
Central Florida, Member
South Lake Regional Park I $2.8 million I Lake CountySuperintendent I April 2021Oelrich Construction is actively working on the 141-acre South Lake Regional Park project, which requires heavy civil earthwork. Future amenities will include multipurpose fields, baseball, softball, and little league fields; cricket fields; playground area; dog park; pavilions; path system and trailhead; exercise stations; etc.
Bluford Avenue Phase I & II Reconstruction I $9.8 million I City of OcoeeAssistant Superintendent I October 2018 The intent of the Bluford Avenue streetscape project is to develop enhanced stormwater/utility capacity with a boulevard appearance, that will support Downtown Ocoee’s economic growth and future high density development. Scope of work for the Bluford Avenue improvements includes 3,000 linear feet of water main upgrades, new gravity sewer system and approximately 3,000 linear feet of a new 16” force main.
Valencia EC Building 1B Remodel I $1.39 million I Valencia CollegeSuperintendent I August 2018Oelrich Construction completed an interior renovation totaling approximately 13,000 SF. Located in the busy Valencia East Campus, the second and part of the third floor were closed for the spring and summer semesters and re-opened in time for the fall. The scope included new class rooms, offices, equipment rooms & the new UCF Valencia East Center.
Orange County Multicultural Center I $4.9 millionI Orange County Superintendent I May 2023 Scope of project includes converting a former grocery store into a community outreach facility equipped to house classes, administration offices, and other community programs.
Page 499 of 668
pg. 12
TAB I QUALIFICATIONS 1. KEY PROJECT TEAM MEMBERS
Relevant Projects
ALEX EDWARDS
Assistant Project Manager | 2 Years of Experience
Role/Background
With a background in Bussiness Development & Administration, Alex brings a long term vision to his role at OCI & his Assistant Project Manager role. Assistant Project Manager, Alex will review and enact project plans, oversee QA/QC implementation, coordinate withproject subcontractors, and produce documentation throughout the duration of construction. His responsibilities also include resource coordination and providing feedback to project managers and supervisors, and is responsible for monthly financial projections for all assigned projects. He also provides analysis of all subcontractor submittals and is responsible for all subcontractor and general contractor monthly billings to the selected client.
Certifications
Education
Community Service
+First Aid/CPR Certification
+Certified Associate in Project
Management
Florida International Univeristy
B.S International Relations
+Associated Builders and
Contractors (ABC) of Central
Florida – Member
+Builders Association of North
Central Florida – Member
BSL-3 Lab HVAC & Controls Renovation I $1.5 million IFL Dept. of Agriculture & Consumer ServicesAssistant Project Manager I January 2023 This renovation included major repairs to the exisiting roof, installation of new HVAC equipment. Construction took place within an active use lab and research facility so material containment practices and site safety protocol were of the upmost importance
Dr. Phillips Ballfields I $4.5 million I Orange CountyAssistant Project Manager I May 2023This 16 acre athletic complex is a long sought after project by the Dr. Phillips Foundation, Orange County Public Schools, and the Orange County Board of County Commissioners. The project includes 4 new ballfields, concession facility, recreational areas, and expanded parking.
Orange County Multicultural Center I $4.9 millionI Orange County Assistant Project Manager I May 2023 Scope of project includes converting a former grocery store into a community outreach facility equipped to house classes, administration offices, and other community programs.
Page 500 of 668
pg. 13
TAB I QUALIFICATIONS 1. CERTIFICATIONS & LICENSES
State of Florida
Department of State
I certify from the records of this office that OELRICH CONSTRUCTION,INC.
is a corporation organized under the laws of the State of Florida,filed on
October 20,2004.
The document number of this corporation is P04000144764.
I further certify that said corporation has paid all fees due this office through
December 31,2023,that its most recent annual report/uniform business report
was filed on January 26,2023,and that its status is active.
I further certify that said corporation has not filed Articles of Dissolution.
Given under my hand and the
Great Seal of the State of Florida
at Tallahassee,the Capital,this
the Tenth day of February,2023
Tracking Number:2660954856CU
To authenticate this certificate,visit the following site,enter this number,and then
follow the instructions displayed.
https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication
Veteran Business Certification
Oelrich Construction, Inc.
01/22/2021 01/22/2023
Melanie S. Griffin, SecretaryRon DeSantis, Governor
STATE OF FLORIDA
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION
CONSTRUCTION INDUSTRY LICENSING BOARD
THE GENERAL CONTRACTOR HEREIN IS CERTIFIED UNDER THE
PROVISIONS OF CHAPTER 489, FLORIDA STATUTES
OELRICH, IVAN ALEXANDER
Do not alter this document in any form.
OELRICH CONSTRUCTION INC
LICENSE NUMBER: CGC1510579
EXPIRATION DATE: AUGUST 31, 2024
This is your license. It is unlawful for anyone other than the licensee to use this document.
275 137TH DRIVE
SUITE A
NEW BERRY FL 32669
Always verify licenses online at MyFloridaLicense.com
Page 501 of 668
pg. 14
TAB I QUALIFICATIONS 1. CERTIFICATIONS & LICENSES
This Certifies that
Cozart C.Lawrence
Has Completed a Florida Department of Transportation Approved
Temporary Traffic Control (TTC)Advanced Course.
Date Expires:06/14/2023 Certificate #52606
Instructor:Jack Luckhardt FDOT Provider #110
Safety Links
Phone:800-768-7036
1855 W State Rd 434 Ste.283
Longwood,FL 32750
www.safetylinks.net
ghansen@safetylinks.net
This Certifies that
ETHAN NEWPORT
Has Completed a Florida Department of Transportation Approved
Temporary Traffic Control (TTC)Advanced (Refresher)Course.
Date Expires:01/26/2025 Certificate #70160
Instructor:Jasper Masciocchi FDOT Provider #36
T2 Centers University of Florida
Phone:352-273-1670
2100 NE Waldo Road
Gainesville,FL 32609
techtransfer.ce.ufl.edu
j.masciocchi@ufl.edu
TRAINING & EDUCATION
Our team strives to give our personnel the tools
they need to be successful. We back up that
commitment with a professional development
program that regularly invests in continuing
education programs for our staff members. Our
members regularly attend workshops/lunches held
by associations such as the Builders Association
of North Central Florida, Associated Builders and
Contractors of Central Florida, and the American
Public Works Association. Our training is used by
personnel in the field each and every day. Our
superintendents impart this knowledge to the
tradesmen and laborers working on every job site.
Staff host site-specific safety meetings where
they review common injury causes such as falls,
improper hand tool operation and more. Workers
are contractually obligated to wear proper personal
protective equipment (PPE) such as hardhats,
steel-toed boots, safety glasses, gloves, etc.
Page 502 of 668
pg. 15
TAB I QUALIFICATIONS 2. COMPLETED SIMILAR PROJECTS
BLUFORD AVENUE RECONSTRUCTION
LOCATION
Ocoee, FL
SERVICES PROVIDED
CM At-Risk
SUBSTANTIAL COMPLETION
November 2018
SIZE OF PROJECT
3,000 linear feet
FINAL CONTRACT VALUE
$8.97 million
CLIENT
City of Ocoee Public Works
Steve Krug
301 Maguire Rd
Ocoee, FL 34761
Phone: (407) 905-3170
skrug@ci.ocoee.fl.us
SCOPE OF WORK
WON 2019 ASSOCIATE BUILDERS & CONTRACTORS
EXCELLENCE IN CONSTRUCTION EAGLE AWARD
The intent of the Bluford Avenue Reconstruction project was to develop enhanced stormwater/utility capacity with a boulevard appearance, that will support Downtown Ocoee’s economic growth and future high density development. Scope of work was composed of two primary components: Sewer and Western Transmission Main consolidation and the Stormwater-Streetscape improvements. Deliverables included 3,000 linear feet of water main upgrades, new gravity sewer system and approximately 3,000 linear feet of new 16” force main. Other elements included: storm drainage, concrete curbs, asphalt pavement, brick pavers, sidewalks and landscaping.
Page 503 of 668
pg. 16
TAB I QUALIFICATIONS 2. COMPLETED SIMILAR PROJECTS
FULLERS CROSS & OCOEE APOPKA INTERSECTION
LOCATION
Ocoee, FL
SERVICES PROVIDED
CM At-Risk
SUBSTANTIAL COMPLETION
July 2021
SIZE OF PROJECT
2,500 linear feet
FINAL CONTRACT VALUE
$2.38 million
CLIENT
City of Ocoee Public Works
Steve Krug
301 Maguire Rd
Ocoee, FL 34761
Phone: (407) 905-3170
skrug@ci.ocoee.fl.us
SCOPE OF WORK
Part of the City of Ocoee’s on-going “Master Plan” for the expansion of exisiting infrastructure, the Fullers Cross & Ocoee Apopka improvements successfully resulted in a safer, more easily navigatable roadway to sustain Ocoee’s recent population boom and anticipated future growth. Scope of work included the addition of both left & right turn lanes, improved grading for stormwater drainage, and well-marked pedestrian sidewalks & crosswalks. In order to facilitate traffic flow on this major intersection, OCI utilized a research driven approach to facilitate a traffic management system to ensure limited delays to normal traffic patterns.
Page 504 of 668
pg. 17
TAB I QUALIFICATIONS 2. COMPLETED SIMILAR PROJECTS
SOUTH MAIN STREET RECONSTRUCTION
LOCATION
Gainesville, FL
SERVICES PROVIDED
CM At-Risk
SUBSTANTIAL COMPLETION
December 2017
SIZE OF PROJECT
.75 miles
FINAL CONTRACT VALUE
$7.5 million
CLIENT
Gainesville CRA
Sarah Vidal-Finn
802 NW 5th Ave
Gainesville, FL 32601
Phone: (352)-8203
vidalsc@cityofgainesville.org
SCOPE OF WORK
The South Main Street roadway improvements integrated the community’s priorities into a tailored, context-sensitive design. Project scope inclided undergrounding ultilities between Depot Ave and South 16th Ave. This multi-phased project involves the construction of pavement, lighting, drainage, sidewalks, utilities, furnishings, hardscape, and landscape elements. This complex reconstruction project required coordination efforts with 40 businesses and 2 adjoining neighborhoods. OCI was limited to working within the exisiting 100 ft right-of-way along the .75 mile corridor. The Maintenence of Traffic (M.O.T) plan was divided into 5 primary phases, and exisiting roadway remained open through duration of the project.
Page 505 of 668
pg. 18
TAB I QUALIFICATIONS 2. COMPLETED SIMILAR PROJECTS
Transforming Duckpond
Questions, Concerns? Please contact:
Javell Woods
Project Manager
Oelrich Construction
352-474-1735
Brad Patterson
Senior Superintendent
Oelrich Construction
352-514-7987
Justin Dean
Field Engineer
Oelrich Construction
352-660-4600
For progress updates visit:
The GRU Duckpond Water
Main Replacement project is
underway!
Expect exciting new changes
around the Duckpond area!
GRU DUCKPOND WATER MAIN IMPROVEMENTS
LOCATION
Gainesville, FL
SERVICES PROVIDED
CM At-Risk
SUBSTANTIAL COMPLETION
February 2021
SIZE OF PROJECT
1,500 linear feet
FINAL CONTRACT VALUE
$1.13 million
CLIENT
Gainesville Regional Utilities
Andy Roberts
4747 N. Main Street
Gainesville, FL. 32609
Phone: (352) 393-1639
robertsas@gru.com
SCOPE OF WORK
Located in one of Gainesville’s most historic neighborhoods near downtown, this project involved the major renovation of aging infrastructure and improvements to roads and pedestrian walkways. OCI was specifically selected for this project due to our capabilities for neighborhood communication and our proven expertise with utility coordination. Scope of work was primarly focused on the replacement of the water main and required that OCI provide consistent updates for residents of this quiet neighborhood in order to limit pedestrian & vehicular traffic delays. Our community communications approach allowed OCI & GRU to complete these improvements without any residential complaints regarding noise or traffic interruptions.
Page 506 of 668
pg. 19
TAB I QUALIFICATIONS 2. COMPLETED SIMILAR PROJECTS
UNIVERSITY OF FLORIDA RADIO ROAD ROUNDABOUT
LOCATION
Gainesville, FL
SERVICES PROVIDED
CM At-Risk
SUBSTANTIAL COMPLETION
August 2020
SIZE OF PROJECT
70,000 square feet
FINAL CONTRACT VALUE
$1.8 million
CLIENT
UF Planning, Design &
Construction
Stuart Cullen
245 Gale Lemerand Dr.
Gainesville, FL. 32611
Phone: (352) 375-8999
SCOPE OF WORK
Being the first round-a-about construction on the University of Florida Campus, one would think that the primary goal of the project was traffic improvement when in fact the project’s main objective was the management of flood waters stemming from Lake Alice. The box culvert beneath the Radio Road improvements project was designed to allow Lake Alice to discharge to the low natural depression behind the UF Golf Course. During weather events in the past, this lake rose high enough to flood Museum road, a major traffic area on UF campus, which caused delays and other issues. In addition, this design allowed existing utilities to pass through, untouched, in an effort to avoid re-routing these critical campus components. This project utilized a specialized M.O.T which allowed OCI to operate and complete this project without causing delays to daily traffic.
Page 507 of 668
pg. 20
TAB I QUALIFICATIONS 3. CLIENT REFERENCES
1. STEVE KRUG
Ocoee Public Works Department
Public Works Director
Skrug@ci.ocoee.fl.us
407-905-3170
2. PHIL MANN
City of Gainesville Public Works
Director
mannpr@cityofgainesville.org
352-334-5070
3. RACHEL LOCKHART
Gainesville Regional Utilities
Supervising Engineer
lockhartra@gru.com
352-383-1618
4. SARAH VIDAL-FINN
Gainesville CRA
Former CRA Director
vidalsc@cityofgainesville.org
352-393-8203
5. FRANCISCO OQUENDO
University of Florida
Assistant Director for Construction
foquendo@ufl.edu
352-273-4012CLIENT REFERENCESPage 508 of 668
pg. 21
TAB I QUALIFICATIONS 3. CLIENT REFERENCES
Page 509 of 668
pg. 22
TAB I QUALIFICATIONS 3. CLIENT REFERENCES
GAINESVILLE REGIONAL UTILITIES WATER/WASTEWATER ENGINEERING
P.O. Box 147117, Station E3-F, Gainesville, Florida 32614-7117, Phone: (352) 393-1600, Fax: (352) 334-2752
December 22, 2022
To Whom It May Concern;
Gainesville Regional Utilities is a publicly owned, multi-service utilities provider proudly serving The
City of Gainesville for over 100 years. Our services are used by over 93,000 residential and commercial
customers across the greater Gainesville area. For over 13 years Oelrich Construction has been a trusted partner
of GRU through a diversity of utility projects. In recent years, our collaborations have ranged from occupied
building improvements to rehabilitation and replacements of wastewater collection system.
• Kanapaha Water Reclamation Facility, Operations Center Expansion: $1.3M, Rehabilitation of existing
operations area and addition of approximately 2,500 sf of new building.
• Kanapaha Water Reclamation Facility, Headworks Structure Concrete Rehabilitation: $1.5M,
Rehabilitation of deteriorated concrete channels at the headworks.
• Kanapaha Water Reclamation Facility, Roofing Improvements: $ 300K – Facilitate roof coatings and/or
replacement for multiple buildings on the KWRF site.
• South Main Street Wastewater Collection Improvements: $1.4M, Upgrades of existing gravity sewer
mains in conjunction with roadway improvements. Included bypassing of 3,000 gpm flows from two
directions into the Main Street Water Reclamation Facility.
• Duckpond Water Main Replacement, Phase 1: $1.2M, Replacement of 3,000 lf of existing water main,
services, and meters in historic Duckpond area of Gainesville.
• Elevated Tank #1, Fencing Replacement: $180K, replacement of existing fence with new high security
specialty fencing.
Our partnership with Oelrich Construction has been successful largely due to effective communication
skills and creative approaches to complicated projects. Oelrich Construction is conscientious when working on
our sites with operations staff and also interacts positively with our customers. We can rely on Oelrich
Construction to maintain professionalism and to complete work within budget and on time.
GRU looks forward to our continued strong partnership with Oelrich Construction for many years in the
future. Should you have any questions about Oelrich Construction and their project history with GRU, please do
not hesitate to contact us:
Debbie Daugherty Rachel Lockhart
Director of Engineering Supervising Engineer
Water and Wastewater Systems Treatment Plants & Large Construction
daughertydd@gru.com lockhartra@gru.com
352-393-1622 352-393-1618
Sincerely,
Rachel Lockhart
Supervising Engineer, Treatment Plants and Large Construction
Page 510 of 668
pg. 23
TAB I QUALIFICATIONS 3. CLIENT REFERENCES
June 10, 2021
RE: Letter of Reference for Oelrich Construction, Inc.
To Whom It May Concern,
Please accept this letter as a testament to my support of Oelrich Construction, Inc. and their ability to deliver an
impressive final product, on budget and on time.
As part of our pursuit to further strengthen the Gainesville, Florida community, the Gainesville Community
Reinvestment Area (GCRA) has been working with Oelrich Construction for more than 10 years. Our partnership
with Oelrich Construction is truly dynamic. From completing $10M roadway and landscape projects, to converting
a 20+ year old brownfield remediation into an $8M, 32-acre stormwater park that serves as a community
gathering place and public amenity, the Oelrich team has always delivered.
In the history of our partnership, we have completed a total of 13 projects. Each project was finished on time, on
budget, and exceeded our expectations of quality. The versatility and problem-solving skills of the Oelrich team
has proved valuable on multiple occasions. When an unforeseen problem arose on a project, the project
managers and superintendents proposed multiple solutions which considered the schedule and budget for each
project.
With each project, the Oelrich team served as an extension of our project management staff, believing in the
project as much as we did and they truly understanding the “big picture” of what we were trying to accomplish,
how special and unique each project was and how important it was for them to act as ambassadors for us – not
only on-site but in the community as well. This shared vision infiltrated their work, their subcontractor’s work, and
in the culmination of the project.
I could go on, as there are so many stories that would exemplify the excellent partnership we have with Oelrich
Construction. We continue to make strides in pursuit of our goal to reinvest and redevelop the urban core of the
city of Gainesville. Please feel free to contact me directly with more specific questions at
vidalsc@gainesvillecra.com or (352) 393-8203 and I would be happy to share.
Best wishes for a successful project for your community!
Kind regards,
Sarah Vidal, Director
Sarah Vidal-Finn
2021.06.10 14:40:03 -04'00'
Page 511 of 668
pg. 24
TAB I QUALIFICATIONS 4. CURRENT & PROJECTED WORKLOAD
PROJECT NAME CLIENT NAME PROJECT
COMMENCEMENT
PROJECTED
COMPLETION
CONSTRUCTION
$ VALUE
Orange County
Multicultural Center
Orange County
BOCC March 28, 2022 March 31, 2023 $4.9 million
Orange County Dr.
Phillips Ballfield
Orange County
BOCC August 29, 2022 May 19, 2023 $7.5 million
City of Orlando Art^2
Development City of Orlando January 4, 2023 June 16, 2023 $3.1 million
Chi University Small
Animal Hospital Chi University July 25, 2022 July 10, 2023 $5.1 million
Page 512 of 668
pg. 25
TAB I QUALIFICATIONS 5. PROJECT APPROACH
EXECUTIVE SUMMARY
OF CM APPROACH
FLORAL STREET WATER,
SEWER, & ROAD
RECONSTRUCTION
Our team reviewed the city’s
design documents and reports to
familiarize ourselves with the site’s
existing conditions. Successful
management of the RFQ#23-
004 utility & road improvements
project will require special care to
several aspects, particularly:
• Site Safety
• Coordination &
Communication
• Timeliness
• Cost Effectiveness
• Quality Control
SITE SAFETY
This project is located in a rapidly
growing area near S. Bluford
Ave, Ocoee Middle School, and
multiple commercial & residential
properties. OCI has previous
experience with the Bluford Rd
& Fullers Crossing improvements
and our team has developed a
site-specific approach based off
our previous successful projects
in the adjoining area:
Commercial areas are anticipated
to grow significantly over the
coming years, and residential areas
will soon follow this projected
growth. A responsive Temporary
Traffic Control plan will be a
critical safety criterion on this
project. Project Manager, Ethan
Newport and Superintendent
Cozart Lawrence are certified in
the FDOT’s advanced temporary
traffic control. They are prepared
to develop a comprehensive plan
to limit interruptions to daily area
activities.
PERMITTING & COORDINATION
Our experience constructing
similar local projects with the
City of Ocoee like the Bluford
Avenue Reconstruction project
have prepared us to supervise a
civil/infrastructure project of this
size. Our management team is
well-aquainted with the project
stakeholders involved and can
accurately forecast the steps
needed to execute the project on
time. Our team will coordinate
with decision-makers within city
agencies during the document
review stage. We will adhere to
the standards identified in the City
of Ocoee’s Engineering Standards
Manual as well as pertinent
county/state best practices. Our
experience with both Bluford Rd
& Fullers Crossing introduced
us to the permitting process
for several potentially involved
entities such as the St. Johns
River Water Management District
(SJRWMD) and the U.S. Army
Corps of Engineers (USACE).
During the Fullers Crossing
project, our team also coordinated
with the surrounding property
owners including: Daryl Carter
Trust, City of Ocoee, Chevron
Land & Development Co, and
Crown Point Woods Homeowners
Association. OCI will apporach
the Floral Street Improvements
with the same stakeholder
coordination & communication.
An excerpt from the City of Ocoee Master Plan
Page 513 of 668
pg. 26
TAB I QUALIFICATIONS 5. PROJECT APPROACH
SCHEDULE IMPACTS
Obtaining federal/state permits,
selecting finish materials (i.e.
pavers & landscaping elements),
coordination of utility outages for
new service tie-in, and delivery
of long lead items to the site (i.e.
storm and sewer structures) are
long-lead items for this project.
Reviewing locations of unsuitable
soils and planning for possible
mitigation or dewatering of
excavations can be planned for
early on in the project.
We recognize that this is a busy
neighborhood that will need to
remain accessible throughout
construction. Our team will
maintain access to residences
& bussinesses at all times
throughout the course of this
project to keep traffic moving
smoothly.
SUBCONTRACTOR
COORDINATION
Our onsite superintendent is
responsible for coordinating
and planning the day-to-day
activities and operations. A
formal coordination meeting is
held with all subcontractors on
a weekly basis, to supplement
daily communications. At this
meeting, topics discussed
include critical path scheduling
using the Bi-Weekly Look-Ahead
(BWLA) schedule, RFI’s, returned
submittals, work flow, and safety.
The BWLA is a schedule created
by the superintendent that
expands on the long-line project
schedule and details the specific
activities occurring each day over
the next two weeks. This allows
both subcontractors and owner’s
representatives to understand
who will be onsite and what
they will be doing over a specific
period of time.
STORMWATER BEST
MANAGEMENT PRACTICES
(BMPS)
Oelrich Construction is responsible
for identifying and implementing
Best Management Practices
(BMPs) using our credentials as
certified Stormwater Erosion &
Sediment Control Inspectors.
The RFQ#23-004 project will
require managing stormwater
run-off and erosion control. The
use of silt-fences and immediate
stabilization of disturbed surfaces
with seed & mulch or sod will
reduce the possibility of rills or
gullies. Our team will regularly
inspect and maintain all systems.
Page 514 of 668
pg. 27
TAB I QUALIFICATIONS 5. PROJECT APPROACH
SURVEYING & MATERIALS
TESTING
Oelrich Construction is responsible
for identifying and laying out the
limits of construction, horizontal
and vertical elevations, and
locations of existing and new
construction. This project will
require careful coordination of
existing and new underground
utilities. In addition, setting
precise points for the horizontal
construction on the surface will
ensure the proper placement and
drainage of the asphalt pavement,
sidewalks, and landscaping. At
the conclusion of the project,
a final survey of the project
will submitted with the O&Ms.
Oelrich Construction will conduct
any necessary third-party that
are not already performed by the
engineering team. Establishing
correct lime-rock bearing ratio’s
(LBRs) and fill material proctors
will be a critical part of the
preconstruction/design process.
BID MARKETPLACE EFFORT
If selected as the construction
manager for this project, we
would strive to hire 100% of the
subcontracting team from the
Orange County region, granted
that the bids meet the City of
Ocoee’s objectives of cost, time,
and quality. We have access to more
than 560 subcontractors around
the State of Florida through our
Building Connected integrated
bid management system. This
cloud-based platform securely
centralizes bid information, stores
historical cost information for
future benchmarking, and hosts an
up-to-date contact database. Our
team utilizes this preconstruction
tool for cost aggregation,
performance analytics and
relationship tracking. With our
leadership in the Associated
Builders and Contractors (ABC) of
Central Florida and the Builders
Association of North Central
Florida (BANCF), our team has
built lasting relationships with
quality subcontractors all across
the region.
QA/QC ITEMS
This project will require careful
checking of all utility installations
and roadway construction.
Standard FDOT items will be
checked including spread rate,
batch temperatures, rolling
straight-edge, cross-slope, and
sample cores. Once completed,
permanent striping will be
applied, the site demobilized, and
the surveyor will complete a final
survey.
Page 515 of 668
pg. 28
TAB I QUALIFICATIONS 5. PROJECT APPROACH
Our team understands what it takes to deliver a successful intersection improvement project. We have sufficient corporate resources and capacity to complete this project on time and on budget. Project Manager Ethan Newport will serve as the City of Ocoee’s primary contact for the Floral Street improvements. He will be supported by six other highly qualified senior staff project engineers, assistant project managers, and superintendents who will help coordinate project delivery. Should a high volume of projects arise, our company’s full personnel resources will be at Ocoee’s disposal. Oelrich Construction employs 34 full-time permanent employees
and 3 part-time employees. Staff include: project managers, project engineers, estimators, accountants, marketers, and field superintendents. Our corporate office is located in Jonesville, FL and our central Orlando area office is located in Winter Garden, FL. We share staff resources between locations. Markets include: Education, Government, Healthcare/Research, Parks & Recreation, Civil & Infrastructure, and Commercial. We’re familiar with the compressed timeline needed to complete capital projects on tight timelines. Additionally we are highly experienced in the field of road reconstruction and stormwater management and consider this
PMIS PROGRAMS:
►Vista Teams (Project Management)
►ProEst/Excel (Estimating)
►Bluebeam (2D Takeoff Estimating)
►NavisWorks (3D Takeoff Estimating)
►Microsoft Project (Scheduling)
►Building Connected (Bid Outreach
and Vendor Management)
►Vista Viewpoint (SQL Financial
Database)
►Revit (BIM Coordination)
RELATIONSHIP-DRIVEN CONTRACTINGWe understand the time and resources required to effectively lead civil & infrastructure projects for public sector clients. Oelrich Construction has maintained long-term continuing services contracts with several local government agencies including:
►18 Years with the Alachua County School Board
►16 Years with the University of Florida
►14 Years with the City of Gainesville
►14 Years with Gainesville Regional Utilities
►14 Years with Alachua County Facilities
►3 Years with Orange County
STAFFING RESOURCES & IT
DOCUMENT MANAGEMENT: We utilize Vista Team’s leading construction project management software to maintain design documents, project scheduling, budget, and technical documents for all of our capital projects. This cloud-based platform is optimized for mobile devices like smart phones and tablets for easy access in the field and on the go. Vista Teams was also used to ensure subcontractor adherence to schedule. All owner representatives have access to Vista Teams at all times during the project--this means that they had daily visibility of all pending RFI’s, photos, documents, scheduling, as-built drawings,
Page 516 of 668
pg. 29
►Faster design development through BIM/
Real-Time Cost Modeling: Our estimating team coordinates our budget with the architect’s building information model (BIM) to rapidly interpret modifications to details like concrete quantities, assess the implications, and send a cost-update report immediately. This technical capability gives the Owner/user group the information they need to make rapid and confident design decisions based on a thorough understanding of any and all associated cost implications.
►Final Budget Estimating: As we eliminate “unknowns” about project scope and product selection, we reach consensus on the construction documents (CD’s). The construction documents package respects the scope boundaries established during the DD phase but fully incorporates user group/architect/engineering/constructibility feedback for a fully coordinated construction document.
PRECONSTRUCTION &
COST ESTIMATING
The most accurate system to account for project costs in the early design phases is our wealth of experience with similar systems. From neighborhood road repavement jobs to 32-acre stormwater parks, our team has developed a reputation for delivering high-value municipal projects on time and on budget. Preparing a comprehensive Guaranteed Maximum Price (GMP) is a critical responsibility. Generally, our GMP development process follows the following steps:
►Concept Validation and Design Development: Oelrich Construction will partner with the architect/engineering team to specify a preliminary design development (DD) package for the facility. We populate the DD package using preliminary sizing provided by the design team and incorporate costing information for unknown design elements.
►Populating Baseline Pricing: We will identify the project’s main systems with respect to structural elements, a finish level, and MEP systems, and begin to evaluate the overall needs with respect to the space. Once we settle on a mutual conceptual understanding with the design team and Owner, our estimating staff will price the DD package using our vast database of project cost information (based on similar facility jobs and our understanding of current market values).
►Adjusting Project Budget Using Real-Time Cost
Estimating: We then validate these experience-based figures by a quantity take off analysis (e.g. linear footage of pipe), while managing other items with an average cost per square foot analysis (e.g. asphalt, sod). We can address most aspects of the construction process in this format without extensive fabrication details.
TAB I QUALIFICATIONS 5. PROJECT APPROACH
EXAMPLES OF OELRICH PROJECTS REQUIRING BIM COORDINATION
▶UF Veterinary Medicine Clinical Skills Lab Addition
▶UF Broward Hall Renovations
▶UF Veterinary Medicine Surgical Renovations
▶UF Veterinary Medicine Anatomy Lab Addition
▶Thermo Fisher STT Lab Build Out
Oelrich Construction built Gainesville’s iconic 13th Street Pedestrian Overpass Bridge.
Page 517 of 668
pg. 30
TAB I QUALIFICATIONS 5. PROJECT APPROACH
Value Engineering - Client Success at City Park When the project documents for the 32-acre Downtown Depot Park project reached 100% the total projected cost was around $8 million. Oelrich Construction worked with the CRA to propose alternative materials that could still achieve the community’s vision for this vibrant, railroad-inspired Central park. The VE items focused on modifying the following items: pond railing design, the playground fence manufacturer, the restroom and pavilion design and finishes, and the total amount of turf. This methodical approach allowed us to shave approximately $2 million off the projected park cost and lower the GMP to $6 million.
Value Engineering - Client Success at Fraternity House Oelrich Construction was selected to provide value engineering services for an upscale new residence at the University of Florida. The original UF Pi Kappa Phi GMP came in over budget. Through careful plan review and needs analysis, Oelrich Construction brought the client a 20% cost reduction through value engineering (a $800,087 value) to bring the Pi Kappa Phi Housing Corporation’s new fraternity house within budget.
Value Engineering - Client Success at Elementary School When Micanopy Area Cooperative School hired Oelrich Construction to construct their new cafeteria/auditorium building, budget was their foremost concern. Considering that the rural charter school had to crowd-fund a portion of the project cost from parents and alumni to make ends meet, we recognized how crucial it was to build an affordable, high-quality facility for the community. Our team went through each line item with the client to identify priorities and offer sound alternative material recommendations. We successfully cut costs
Fast-Tracked Scheduling - Collaboration Commons UF introduced this 26,537 square foot interior renovation project to our team in mid-January 2014 and needed completion by mid-August. No design or accompanying documents existed, creating a situation in which construction started in early March while our designers continued to work on design concepts and provided documents showing what we could go ahead and accomplish at the site. We successfully met the six month timeline by implementing this flexible, iterative approach. We were able to deliver $400,000 in owner direct purchases on this $1.96 million LEED Gold building renovation.
Stewardship of project funds is an integral project responsibility that we take seriously. If selected as CM for Ocoee RFQ #24-004, our estimating team will work closely with The City to ensure that the project budget meets all project needs. Our team can also provide detailed preconstruction services like alternate material recommendations and value engineering reviews to ensure that the project lives up to the Owner
COST CONTROL CASE STUDIES
Page 518 of 668
pg. 31
EXCERPTS FROM A
SAMPLE BID MANUAL
It is essential to
clearly communicate
expectations upfront.
That’s why we prepare
a tailored project bid
manual and host regular
clarifying meetings and
conference calls.
TAB V APPROACH TO PROJECT
SCHEDULING & SUBCONTRACTOR COORDINATION
Communication, consistency, and control are the three guiding principles we follow when managing a capital project. It is essential to provide trade subcontractors with clear and complete scopes of work on day one, so they can properly allocate resources for each project. Document/scope review and scheduling are two critical areas. We issue a custom, detailed bid manual at the beginning of the project to inform stakeholders of all requirements. Then, we host an in-person meeting and weekly field meetings to clarify questions as they arise.
Oelrich Construction is very sensitive to the message that is delivered to the End Users and is diligent in determining any potential material delivery pitfall prior to disseminating the final project schedule. Our schedules are organized into three major categories Preconstruction, Construction, and Project Closeout. This allows us to identify early any potentially long-lead items such as specialty traffic equipment or streetscape finishes. Once construction starts, the schedule is maintained with a team approach between the project manager and the
project superintendent. They work together to improve the daily flow of work and the overall project delivery. Schedule is the first topic of discussion at every OAC Meeting and weekly Subcontractor Coordination Meeting throughout the entire construction process. Once established, the final schedule is distributed to all concerned so that everyone involved has an understanding and expectation of coming events. This work breakdown schedule also allows us to incorporate the input of key potential subcontractors to accurately identify material lead times and activity durations. Once the project has been bid out and the newly identified subcontractors have been brought on to the team, this schedule is then modified again to accommodate actual delivery timelines.
Based in North Central Florida, we are extremely aware of the challenges of local weather patterns (especially during the summer months), and our schedules reflect the typical rainfall amounts that we will experience in the course of the year. Of course, we will make up any lost time beyond our control
in order to maintain the project schedule.
BIWEEKLY LOOK AHEAD
SCHEDULE (BWLA)
In addition to developing the overall milestone schedule in Microsoft Project, hosting regular OAC meetings, and updating project progress in Procore, we also prepare a Bi-Weekly Look Ahead (BWLA) schedule for the benefit of all stakeholders.
The BWLA gives all the workers onsite a day-to-day milestone schedule for a two-week project period. This snapshot is taken from the milestone schedule and helps keep the on-site workers tuned in and focused to their tasks for each day. This BWLA schedule is updated every week and sent out to all the subcontractors involved on the project whether on-site or projected to be on-site soon. The project team also gets a copy which allows them to see which activities are being conducted throughout the week. Planned
Page 519 of 668
pg. 32
EXCERPTS FROM A
SAMPLE BID MANUAL
TAB I QUALIFICATIONS 5. PROJECT APPROACH
Once the project breaks ground, our experienced field superintendents supervise jobsite logistics, ensuring that all materials are installed properly, all safety regulations are met, and that the overall project is completed on time. Consistent collaboration from project design through construction eliminates scope holes, solves ambiguities, optimizes resources, and ultimately results in a more successful project that achieves client needs and exceeds expectations.
Oelrich Construction provides seamless service from preconstruction through construction. Field services include: coordinating materials deliveries and labor logistics; maintaining as-built documents; scheduling subcontractors; coordinating inspections; supervising site safety; verifying material installations; supervising work quality; and more. Oelrich Construction field superintendents follow a 500+ item Quality Control Checklist. Items are based on FDOT, FDEP, ASHE and ICRA best practices. Oelrich Construction maintains
aggressive quality control standards. It is our policy to conduct an internal company walk-through and separate punch-list prior to the Owner’s substantial completion punch list date. On each project, our superintendents strive to deliver as complete of a project as possible. If any outstanding items are identified, our team calls the trade subcontractor to rectify the concern the same day. Touch-up work is scheduled as soon as possible. From start to finish, there is nothing more important than safety—for Ocoee citizens, staff, the project team, subcontractors, and any other person affected by a construction project.
Weekly safety meetings, toolbox talks, and regular inspections with an eye for safety are all tools we use to help maintain this culture of safety. Your superintendent maintains a copy of our safety program and all required OSHA forms in the field. In addition, everyone on our field team has a minimum of 30-hour certified OSHA training and we contractually require all
SAFETY & FIELD MANAGEMENT
subcontractors to participate in our safety program. If we recognize a concern in the field, all work stops and the concern is addressed immediately.
Maintaining a safe job-site for Ocoee will require front-end planning with design professionals, and user groups. This involves taking into consideration the concerns and issues that directly affect a facility’s operations, including personnel’s daily practices and procedures, schedules, heavy traffic times, and flow of traffic around and within a building.
Public safety drives all aspects of achieving an incident-free job-site and each project presents unique challenges. Upfront coordination allows us to integrate the needs of all involved to eliminate public exposure to hazards. Working to incorporate all issues discussed during pre-planning provides a workable structure for governing job-site safety. After identifying safety concerns, we create a site utilization plan communicated
In 2017 & 2018, Oelrich Construction’s safety program earned Platinum recognition from the Associated Builders and Contractors’ National STEP evaluation program.
Oelrich Construction carefully completed this LEED Silver Food Court Addition at UF’s
Turlington Plaza – one of UF’s most crowded plazas by density of pedestrians and cyclists.
Page 520 of 668
pg. 33
Reference: *Stephen R. Pettee, “Constructability Reviews- Construction Management Association of America Southern California Chapter seminar.”
TAB I QUALIFICATIONS 5. PROJECT APPROACH
QUALITY CONTROL
QUALITY CONTROL IN DESIGN PHASEIndustry case studies show that constructability reviews can save as much as 3 to 5 percent* of the entire construction cost by minimizing RFI’s, preventing change orders in the field, and reducing the risk of conflicts between engineering/design documents.
Your project manager will work with your project architect and engineer to systematically review all emerging design documents. They will pro-actively identify any inconsistencies or ambiguity in the design documents by reviewing drawings in the following order: structural elements; building envelope integrity; interior build-out/architectural details; mechanical, electrical and plumbing systems (MEP); and sitework. They will work closely with Ocoee’s selected architect and engineering team to not only uncover areas of concern, but to offer viable solutions based on their years of professional experience. Your field superintendent will partner with your project manager to produce a tailored means and methods strategy that maximizes product quality, while reducing labor costs, optimizing scheduling/logistics, and ensuring subcontractor safety. Your field superintendent’s safety review will determine required separations to keep the public out of harm’s way. Using his certifications in ICRA, OSHA30, HAZWOPER, and MOT, he will identify potential hazards such as noise, dust, or other environmental concerns, creating project-specific standard operating procedures communicated to all involved prior to construction start. As part of this plan, understanding current pedestrian patterns and establishing effective Interim Life Safety Measures (ILSM) will solidify best practices for maintaining safety.
QUALITY CONTROL DURING CONSTRUCTIONOelrich Construction will coordinate extensively with the architect and engineer to ensure that all design specifications are met and installed properly. Each material submittal is crosschecked by multiple parties. We understand how critical it is to verify that design review comments are fully implemented into the design documents. Prior to construction, all comments from the start of the project are reviewed to validate that the issue has been addressed or to document how the issue was modified by more recent changes. During construction, Ethan Newport will be your primary contact for ensuring the fit and finish of each roadwork component. For the Floral Street project, a sample quality assurance check would involve testing questions like:
• Is the sidewalk level and installed at the proper inclination for proper drainage during storm events? Does the ADA ramp meet the required slope percentage? • Are the inlets correct on the stormwater and sewer? Does the installed product meet FDOT requirements and City design standards? Was the concrete properly poured and jointed to prevent cracking?
QA/QC APPROACH POST-CONSTRUCTIONA quality construction manager doesn’t disappear after the ribbon-cutting. Oelrich Construction understands the importance of maintaining an open line of communication after project completion. During post-construction occupancy, your project manager will be responsible for coordinating with Ocoee’s facilities department to maintain our firm’s one year warranty on the project’s guaranteed fit and finish. Our team always checks in 8 months after construction to allow ample time to inspect and review the project’s condition. We will work with building commissioning agents as well as the City to schedule periodic reviews of operation and function.
Adhering to a structured quality control program on the Floral Street Improvements
project is essential. Oelrich Construction field superintendents follow a 500+ item
QA/QC Checklist based on regular quality control inspections. This 100-page
resource was produced in-house, based on lessons learned from our field and
project management teams. The QA Manual divides each CSI Division down into
inspections required, tasks to be performed for a successful inspection, and items
QUALITY CONTROL CHECKLISTS
Page 521 of 668
pg. 34
TAB I QUALIFICATIONS 5. PROJECT APPROACH
CIVIL & INFRASTRUCTURE
PROJECT CASE STUDIES
SIMILAR TO THE SCOPE OF
WORK FOR THE RFQ#23-004
WATER, SEWER, AND ROAD
RECONSTRUCTION
Page 522 of 668
pg. 35
TAB I QUALIFICATIONS 5. PROJECT APPROACH
PROJECT OVERVIEW
The $9.8 million Bluford Avenue
Reconstruction project consisted
of reconstruction of the 0.6-mile
corridor between the Delaware
Street and Silver Star Road
intersections. The project solved
several major infrastructural
needs including: consolidation
and expansion of Downtown
wastewater treatment, enhanced
stormwater treatment, improved
safety/accessibility, and
facilitation of more infill economic
development. The Bluford
Avenue reconstruction public
roadway project involved careful
coordination with residents,
churches, businesses, municipal
departments, and a local middle
school. There are 9 businesses,
6 institutional facilities, and 18
residences located in the primary
impact zone for the 15 month
Bluford Avenue reconstruction
project. Our team went door-to-
door to each property to assist with
converting each business from
overhead lines to underground
utility tie-ins. This was a big effort
that required communicating with
each individual entity, to work tie-
ins around their schedule. This
project involved coordinating
with FDOT, Florida Department
of Environmental Protection
(FDEP), Duke Energy, Century
Link, and AT&T. We worked with
the City of Ocoee Public Works on
stormwater and the City of Ocoee
Utility Department on sanitary/
water. Despite scope changes and
hurricane impacts throughout the
course of this multi-phased effort,
we still achieved our substantial
completion date for the Bluford
Avenue Reconstruction project.
Time was of the essence on this
project. Our trade subcontractors
laid down 200,000 brick pavers in
less than a month!
OCOEE’S FOUNDER’S DAY
FESTIVAL PREPARATIONS
Oelrich Construction temporarily
suspended construction operations
and opened up the Downtown
Bluford Avenue roadway to
accommodate the needs of the
City of Ocoee’s popular annual
Founder’s Day Festival with
20,000 annual attendees. We
opened up the entire thoroughfare
again just for that day. This
required temporary tie-ins, and
repatching and repaving certain
sections for that major weekend.
We provided the egresses needed
to make the street operable
and fully-functional to festival
vendors/guests. An important
staging area for event was also
one of our material laydown
areas so had to clean up the
property and laydown fresh mulch
for vendors/event organizers.
CASE STUDY: DOWNTOWN OCOEE BLUFORD AVENUE
Page 523 of 668
pg. 36
TAB I QUALIFICATIONS 5. PROJECT APPROACH
SOLVING CONFLICTS BEFORE
THE OCPS SCHOOL YEAR
In Fall 2018, we had to install
a major force main tie-in prior
to the beginning of the Orange
County Public Schools’ (OCPS) fall
semester. Oelrich Construction
worked closely with OCPS to
alert them of changes to Bluford
Avenue’s traffic patterns. We laid
out the project in four phases to
minimize disruption and worked
with Orange County Schools to
ensure that school buses could
navigate in and out of the site
for their scheduled stops. Senior
Superintendent Ethan Newport
went door-to-door along the
corridor to answer questions
and let all parties know what to
expect during construction. Due
to the City’s overloaded sewer
system we could not shut down
the municipal force main system
for more than a few hours and
only after 11pm. To overcome
this challenge, we rented 6 large
vacuum trucks for the surrounding
City’s Lift Stations in order to keep
the entire downtown sewer system
active. The excavation revealed a
conflicting 18”+ Storm Pipe and 4”
Water Main which required us to
re-route the existing force main.
The team came together and
completed this critical connection
before dawn. This major task was
completed without disruption
to the all-important first day of
school for Ocoee Middle School
bus drivers, students, parents,
and staff. Communication and
pre-planning led to a smooth
construction process for the City
of Ocoee.
SIMILARITIES TO
RFQ#23-004:
• Completed for the City of Ocoee
• Coordination with similar AHJ
(FDOT, SJRWMD, etc)
• Advanced temporary traffic
control measures
• Constructed in Orange County
• Roadway infrastructure project
• Extensive stakeholder
coordination
Page 524 of 668
pg. 37
TAB I QUALIFICATIONS 5. PROJECT APPROACH
CASE STUDY: SOUTH MAIN STREET
WORKING WITHIN A DENSE,
CONGESTED CORRIDOR
South Main Street is a highly-active
roadway with an average daily
traffic count of 13,100 vehicles.
This complex reconstruction
project required coordination
with 40 business stakeholders
and 2 neighborhoods. Due to
the complexity of overlapping
road utilities and right-of-ways,
our team coordinated with 13
different municipal entities over
the course of the project.
MULTI-PHASED PROJECT
Oelrich Construction was limited
to working within the existing
100-foot right-of-way along the
¾-mile corridor. The project
maintenance of traffic (M.O.T)
plan was designed into 5 primary
phases. The roadway was never
shut down during construction.
We always maintained a north-
bound and south-bound lane for
uninterrupted vehicular flow.
CONFLICT RESOLUTION
One of the most difficult
aspects of the project involved
constructing a new roundabout
between the north and south ends
of the project, while maintaining
on-going traffic flows. It was
particularly challenging to provide
appropriate turning radiuses for
18-wheelers and 35-foot city
buses during the roundabout
construction. In addition, the
new roundabout ties into a
Gainesville-Hawthorne State
Trail connector, which required
careful monitoring of bicyclist
activity. Oelrich Construction
implemented an extensive road
barricade and wayfinding plan to
maintain access to all businesses
on the corridor. Our on-site
superintendent had to continually
reconfigure subcontractor/
labor work zones within these
narrow gaps between traffic and
business entrances/exits. His
FDOT advanced M.O.T. training
prepared him for this project’s
safety complications. Our on-site
superintendent went door-to-door
to the 40 business stakeholders
on the corridor to inform them of
traffic pattern changes.
SIMILARITIES TO
RFQ#23-004:
• Roadway infrastructure
project
• Advanced temporary
traffic control measures
• Extensive stakeholder
coordination
• Coordination with similar
AHJ (FDOT, SJRWMD, etc)
Page 525 of 668
pg. 38
TAB I QUALIFICATIONS 5. PROJECT APPROACH
This $1.8 million roadway project was completed
under a continuing services contract with the City
of Gainesville’s Public Works Department. Oelrich
Construction provided iterative cost estimates and
overall project management for roadway milling,
repaving, capsealing, and microsurfacing. Our team
addressed numerous roadway concerns including:
asphalt grading, stormwater modifications,
insufficient limerock base compaction, cracked
sidewalks, broken curbs, tree root damage, and
vehicular wear and tear. Various roadway and
stormwater improvements were completed in
numerous residential areas. Oelrich Construction’s
field team coordinated closely with residents to
schedule roadwork while maintaining driveway/
parking access during critical windows. Regular
inspections to verify quality/compliance were
essential—unevenly milled asphalt or insufficiently
compacted limerock could disrupt stormwater flows
or impact the roadway’s projected lifespan. Most
of the roadway improvements were completed in
narrow residential areas with limited site laydown
zones.
COORDINATION SPOTLIGHT:
ANNUAL PAVEMENT PRESERVATION
The City of Gainesville wanted to create a basin
where Hogtown Creek crosses NW 8th Avenue in
order to remove built-up sediment that accumulates
throughout the year. Unfortunately, the design
team’s concept did not fall within budget limits
established by the City Commission. The City’s
Public Works Department then asked Oelrich
Construction to develop a strategy for achieving the
design team’s goals while keeping to the allocated
budget. Preconstruction Manager Matt Marino
met with the design team and various contractors
onsite to discuss options for reducing maintenance
costs associated with creek sedimentation buildup.
Eliminating items such as shore piles and cast-in-
place concrete spillways on the north creekside
while focusing on reworking existing berms and
natural drainage features of Loblolly Woods allowed
us to achieve the City’s goals. This plan enables
future maintenance equipment to enter the creek
bed without major setup costs and helps to preserve
the site’s natural beauty. Ultimately, we returned
the street reconstruction to budget limits while
sustaining the project’s original intent.
COST CONTROL SPOTLIGHT:
NW 8TH AVENUE RECONSTRUCTION
Page 526 of 668
pg. 39
TAB I QUALIFICATIONS 5. PROJECT APPROACH
Renovating the Depot Avenue Rail-Trail pedestrian
overpass into a more functional and iconic gateway
feature required extensive FDOT coordination. We
constructed a plaza and staircase adjacent to the
overpass to establish street, sidewalk, and transit
connections to link the rail-trail system to an
extensive network of multimodal access points.
The project involved coordination with utilities, a
maintenance of traffic plan for U.S. Highway 441,
a new stormwater collection system, construction
of new retaining walls, and new landscaping.
Complete demolition of existing walkways, utilities,
curbs, retaining walls, and landscaping was required
to provide updated water service, stormwater
collection system, street lighting, increased walkway
width, new retaining walls, new concrete sub-base,
brick pavers at walkways, and concrete driveways
for residences and active businesses. All work
was completed with an approved maintenance of
traffic plan and the project was phased to allow all
businesses, residents, pedestrians, bus passengers,
and vehicle traffic to maintain activities and
operations as required.
LOGISTICS SPOTLIGHT:
13TH ST HELYX OVERPASS & MEDIANS
We coordinated with GRU, GRUCom, AT&T, Cox
Communications, and many others to manage
installation of new utility crossings onsite. Because
of a main communications line underground encased
in a brittle asbestos material, we quickly ruled out
traditional approaches and used instead a jack
bore to push a 72” storm pipe underneath the old
communications line. Adjusting the original plans
allowed us to add scope items and work around
other activities surrounding the site. Monitoring
the environmental impact of construction involved
dust and sediment control, especially considering
the project’s downtown location and proximity to
Hogtown Creek and Bivens Arm Lake.
UTILITIES SPOTLIGHT:
SW 9TH ST AT INNOVATION SQUARE
Page 527 of 668
pg. 40
TAB I QUALIFICATIONS 5. PROJECT APPROACH
2019 Eagle Award for Heavy
Infrastructure $5-$10 million
ABC of Central Florida
BLUFORD AVENUE
RECONSTRUCTION
2015 Florida APWA Project
of the Year
American Public Works
Association (APWA)
SW 9TH STREET AT
INNOVATION SQUARE
2014 National & Florida
Project of the Year
American Public Works
Association (APWA)
13TH STREET HELYX PEDESTRIAN
OVERPASS & MEDIANS
2017 Award for Excellence
in Public/Nonprofit
Development
Urban Land Institute of NF
DEPOT PARK AWARD-WINNING CRAFTSMANSHIPPage 528 of 668
pg. 41
OCOEE CITY HALL
OELRICH OFFICE
TAB II OFFICE LOCATION 1. CMR OFFICE LOCATION
We would serve the City of
Ocoee through our Orlando-
area Winter Garden office.
Our Winter Garden office
is approximately 3 miles
from the City of Ocoee City
Hall, which is a less than 10
minute drive.
OELRICH CONSTRUCTION, INC. OFFICE LOCATION
Page 529 of 668
pg. 42
M.E. Wilson Company, LLC
1110 NORTHWEST 6th STREET PHONE 352-374-7779
GAINESVILLE, FL 32601 FAX 850-581-4930
WWW.WALDORFFINSURANCE.COM
February 23, 2023
City of Ocoee
150 Lakeshore Drive
Ocoee, FL 34761
RE: Oelrich Construction, Inc.
Project: RFP name/Number: RFQ #23-004, Construction Manager at Rusk for Floral Street
Water, Sewer, and Road Reconstruction
To Whom It May Concern:
This is to advise you that M.E. Wilson Company, LLC dba Waldorff Insurance & Bonding provides bonding
for Oelrich Construction, Inc. Their Surety is Philadelphia Indemnity Insurance Company, which has an A.M.
Best Rating of A++ XV and is listed in the Department of the Treasury’s Federal Register with an underwriting
limit of $304,546,000. The home office address is One Bala Plaza, Suite 100, Bala Cynwyd, PA 19004-0950.
Oelrich Construction, Inc. is a financially strong, well-managed company and it is a pleasure to recommend
them to you for your consideration. They have an excellent reputation wit h architects/engineers, owners,
subcontractors, and suppliers and are considered to be an exceptional contractor in the area.
At this time, we would not anticipate a problem in bonding our client in the amount of $15,000,000 for a
single project or $30,000,000 aggregately. The surety reserves the right to perform normal underwriting at
the time of any bond request, including, without limitation, prior review and approval of relevant contract
documents, bond forms, and project financing.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Paul Locascio
Agent
TAB II OTHER FORMS BONDING CAPACITY
Page 530 of 668
TAB II
pg. 49
OTHER FORMS CONFLICT OF INTEREST
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 20
RFQ CONFLICT OF INTEREST DISCLOSURE FORM
The award of this contract is subject to the provisions of Chapter 112, Florida Statutes. All Proposers must
disclose within their Proposal: the name of any City of Ocoee employee, Mayor or City Commissioner,
other City Official, or City Consultants, who owns assets or capital stock, directly or indirectly, in the
Proposer’s firm or any of its branches, or would directly or indirectly benefit by the profits or emoluments
of this proposal. (Indirect ownership or benefit applies to any members of his or her immediate family.)
Proposer certifies that no member of the entity’s ownership or management is presently applying for an
employee position or actively seeking an elected position with the City. In the event that a conflict of
interest is identified in the provision of services, Proposer agrees to immediately notify the City in writing.
The purpose of this disclosure form is to give the City the information needed to identify potential conflicts
of interest for the City Commission, Evaluation Committee members, and other key City employees and
consultants involved in the award of this contract.
According to Chapter 112, Florida Statutes, the term “conflict of interest” “means a situation in which
regard for a private interest tends to lead to disregard of a public duty or interest”, and refers to situations
in which financial or other personal considerations may adversely affect, or have the appearance of
adversely affecting, an employee’s professional judgment in exercising any City duty or responsibility in
administration, management, instruction, research, or other professional activities.
Please check one of the following statements and attach additional documentation if necessary:
_________ To the best of our knowledge, the undersigned firm has no potential conflict of interest for
this Proposal.
_________ The undersigned firm, by attachment to this form, submits information which may be a
potential conflict of interest for this Proposal.
Acknowledged by:
____________________________________________________________________________
Firm Name
____________________________________________________________________________
Signature
____________________________________________________________________________
Name and Title (Print or Type)
____________________________________________________________________________
Date
X
Ivan Oelrich
Ivan Oelrich, President
February 28,2023
Page 531 of 668
pg. 44
TAB II OTHER FORMS DRUG-FREE WORKPLACE STATEMENT
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 21
DRUG-FREE WORKPLACE CERTIFICATION
The undersigned Respondent, in accordance with Florida Statute 287.087 hereby certifies that it
has a drug-free workplace program. In order to have a drug-free workplace program, a business
shall:
1. Publish a statement notifying employees that the unlawful manufacture, distribution,
dispensing, possession, or use of a controlled substance is prohibited in the workplace and
specifying the actions that will be taken against employees for violations of such
prohibition.
2. Inform employees about the dangers of drug abuse in the workplace, the business's policy
of maintaining a drug-free workplace, and available drug counseling, rehabilitation, and
employee assistance programs, and the penalties that may be imposed upon employees for
drug abuse violations.
3. Give each employee engaged in providing the commodities or contractual services that are
under bid a copy of the statement specified in subsection (1).
4. In the statement specified in subsection (1), notify the employees that, as a condition of
working on the commodities or contractual services that are under bid, the employee will
abide by the terms of the statement and will notify the employer of any conviction of, or
pleas of guilty or nolo contendere to, any violation of Chapter 893 or of any controlled
substance law of the United States or any state, for a violation occurring in the workplace
no later than five (5) days after such conviction.
5. Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or
rehabilitation program is such is available in the employee's community, by any employee
who is so convicted.
6. Make a good faith effort to continue to maintain a drug-free workplace through
implementation of this section.
As the person authorized to sign the statement, I certify that this firm complies fully with the above
requirements.
Respondent:
Signed:
By:
(Print or Type Name)
Title:
Date:
Ivan Oelrich
Ivan Oelrich
President
February 28, 2023
Page 532 of 668
pg. 45
TAB II OTHER FORMS COMPANY INFORMATION/SIGNATURES
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 22
COMPANY INFORMATION/SIGNATURE SHEET RFQ #23-004
FAILURE TO COMPLY WITH THESE RFQ INSTRUCTIONS WILL RESULT IN
DISQUALIFICATION OF YOUR QUALIFICATION PACKAGE. PLEASE SIGN BELOW
ATTESTING THAT YOU HAVE READ AND UNDERSTAND ALL RFQ INSTRUCTIONS,
AND THAT YOU UNDERSTAND THAT THE SUCCESSFUL RESPONDENT WILL BE
REQUIRED TO ENTER INTO A LEGALLY BINDING CONTRACT WITH THE CITY OF
OCOEE.
__________________________________ __________________________________
COMPANY NAME TELEPHONE (INCLUDE AREA CODE)
__________________________________
FAX (INCLUDE AREA CODE)
__________________________________
E-MAIL ADDRESS
_________________________________ IF REMITTANCE ADDRESS IS
AUTHORIZED SIGNATURE (manual) DIFFERENT FROM PURCHASE ORDER
ADDRESS, PLEASE INDICATE BELOW:
________________________________
NAME/TITLE (PLEASE PRINT) ____________________________________________
________________________________ ____________________________________________
STREET ADDRESS
_________________________________
CITY STATE ZIP
FEDERAL ID #____________________
_____Individual _____Corporation _____Partnership _____Other (Specify)________________________
Sworn to and subscribed before me by means of physical presence or online notarization this
________day of ____________________, 20____.
Personally Known___________ or
Produced Identification_________
____________________________ Notary Public - State of _______
(Type of Identification) County of __________________
___________________________
Signature of Notary Public
___________________________
Printed, typed or stamped
Commissioned name of Notary Public
Oelrich Construction (352) 745-7877
ivan@oelrichconstruction.
Ivan Oelrich, President
275 NW 137th Drive, Suite A
Jonesville FL 32669
X
28 February 23
X
FLAlachua
Christina Sapp
32-0128914
Page 533 of 668
pg. 46
TAB II OTHER FORMS SUMMARY OF LITIGATION
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 23
SUMMARY OF LITIGATION
Summary of Litigation: State “None” if no litigation. Provide a summary of any litigation claim(s), bid or
contract dispute(s) filed by or against the CMR firm in the past five (5) years which is related to the services
that the CMR firm provides in the regular course of business. The summary shall state the nature of the
litigation, claim, or contract dispute, a brief description of the case, the outcome or projected outcome, and
the monetary amounts involved, in accordance with the guidelines below:
Claims/Litigations
1. Within the past 5 years, has your organization filed suit or a formal claim against a project owner (as a
prime or subcontractor) or been sued by or had a formal claim filed by an owner, subcontractor or supplier
resulting from a construction dispute? Yes________ No_____X____ If yes, please attach additional
sheet(s) to include:
Description of every action Captions of the Litigation or Arbitration
Amount at issue: ______________________
Name (s) of the attorneys representing all parties:
________________________________________________________________________________
Amount actually recovered, if any: ____________________________________
Name(s) of the project owner(s)/manager(s) to include address and phone number:
________________________________________________________________________________
2. List all pending litigation and or arbitration.
_____________________________________________________________________________________
_____________________________________________________________________________________
3. List and explain all litigation and arbitration within the past five (5) years - pending, resolved,
dismissed, etc.
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
4. Within the past 5 years, please list all Liens, including Federal, State and Local, which have been filed
against your Company. List in detail the type of Lien, date, amount and current status of each Lien.
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
5. Have you ever abandoned a job, been terminated or had a performance/surety bond called to complete
a job? Yes________ No________ If yes, please explain in detail:
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
6. For all claims filed against your company within the past five (5) years, have all been resolved
satisfactorily with final judgment in favor of your company within 90 days of the date the judgment
became final? Yes ______ No_______ If no, please explain why?
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
X
X
N/A
N/A
Joel Enterprises v. Oelrich Construction.
Lease Dispute
Suit Dismissed
Page 534 of 668
pg. 47
TAB II OTHER FORMS SUMMARY OF LITIGATION
RFQ #23-004 Construction Manager at Risk for Floral Street Water, Sewer and Road Reconstruction 24
7. List the status of all pending claims currently filed against your company:
_____________________________________________________________________________________
_____________________________________________________________________________________
8. In the last ten (10) years, has the CMR Firm/Team ever been in bankruptcy or receivership?
Yes________ No________
If yes, please explain in detail:
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
9. In the last five (5) years, has OSHA cited and assessed penalties against the CMR Firm/Team for
violations of its safety or health regulations? Yes________ No________
If yes, please explain in detail:
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
10. Has the Environmental Protection Agency or any Florida Water Management District cited and
assessed penalties against the CMR Firm/Team or the owner of a project during the time in which the
parties were performing on a contract? Yes__X______ No________
If yes, please explain in detail:
___________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
11. Has any insurance carrier, for any form of insurance, refused to renew the insurance policy for the
CMR Firm/Team due to non-payment or contractor losses? Yes________ No_____X___
If yes, please explain in detail:
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
Liquidated Damages
1. Has a project owner ever withheld retainage, issued liquidated damages or made a claim against any
Performance and Payment Bonds? Yes________ No___X_____
If yes, please explain in detail:
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
A civil citation was issued by the Alachua County Department of Environmental protection for a sewage
spill on the Possum Creek Project for Gainesville Regional Utilities in April of 2018. The citation was paid
in full and and all mitigation efforts were satisfactorily completed.
X
X
N/A
Page 535 of 668
pg. 48
TAB II OTHER FORMS ADDENDUM ACKNOWLEDGEMENT
Mayor Commissioners Rusty Johnson Larry Brinson Sr, District 1
Rosemary Wilsen, District 2
City Manager Richard Firstner, District 3 Robert Frank
George Oliver III, District 4
January 25, 2023
ADDENDUM NO. ONE (1)
CITY OF OCOEE
RFQ #23-004
CONSTRUCTION MANAGER AT RISK FOR
FLORAL STREET WATER, SEWER AND ROAD RECONSTRUCTION
This addendum shall modify and become a part of the original RFQ Documents for RFQ #23-004. This
addendum consists of two (2) pages, including attachments. Respondents should acknowledge receipt
of this addendum in their qualification package submission. Failure to do so may subject the Respondent
to disqualification. The RFQ submission deadline has changed.
Subsequent to the solicitation for RFQ #23-004 going live on Bonfire, the city was made aware that
the required advertisement did not publish in the Orlando Sentinel on January 22, 2023 as
indicated in the RFQ Documents. In order to comply with the advertising requirements of
§ 255.0525 (2), Florida Statutes, the submission deadline has changed. Additionally, the deadline
for questions has changed. The new dates are as follows:
Deadline for Questions: February 15, 2023, 2:00 p.m. local time
Submission Deadline: February 28, 2023, 2:00 p.m. local time
SShhaannnnoonn HHooppppeerr
Shannon Hopper
Purchasing Technician
cc: Jamie Croteau, Utilities Director
Attachment: Legal Advertisement
Page 536 of 668
pg. 49
TAB II OTHER FORMS MWBE CERTIFICATION
Veteran Business Certification
Oelrich Construction, Inc.
01/22/2021 01/22/2023
Page 537 of 668
THANK YOU FOR YOUR
Time & Consideration
OELRICH CONSTRUCTION, INC.
428 S. Dillard St. Suite 103 I Winter Garden, FL 34787
Phone: 352.745.7877 Fax: 352.745.7878
www.oelrichconstruction.com
Page 538 of 668
Page 539 of 668
Page 540 of 668
Page 541 of 668
Page 542 of 668
Page 543 of 668
Page 544 of 668
Page 545 of 668
Page 546 of 668
Page 547 of 668
Page 548 of 668
Page 549 of 668
Page 550 of 668
Page 551 of 668
Page 552 of 668
Page 553 of 668
Page 554 of 668
Page 555 of 668
Page 556 of 668
Page 557 of 668
Page 558 of 668
Page 559 of 668
RFQ #23-004
CONSTRUCTION MANAGER AT RISK FOR FLORAL STREET
WATER, SEWER, AND ROAD RECONSTRUCTION
EVALUATION FORM/SHORTLIST FOR RECOMMENDATION OF AWARD AFTER INTERVIEWS
Respondent J. Malever Construction, Inc.Oelrich Construction, Inc. Prime Construction Group, Inc.
Evaluator 1 1 3 2
Evaluator 2 1 3 2
Evaluator 3 1 3 2
Evaluator 4 1 3 2
TOTAL 4 12 8
RANKING 1 3 2
Note: Lowest Total is Highest Ranking
After interviewing the three responding firms, the Evaluation Committee recommends award to the top ranked firm J. Malever Construction, Inc.
Page 560 of 668
RFQ #23-004 CONSTRUCTION MANAGER AT RISK
FOR
FLORAL STREET WATER, SEWER AND ROAD RECONSTRUCTION
INDIVIDUAL EVALUATION FORM
Individual Evalution Form
Evaluation Criteria J. Malever Construction, Inc.Oelrich Construction, Inc.Prime Construction Group, Inc.
Overal expertise of the CMR to provide
reqeusted services: General Civil;
Roadway and other transportation;
Environmental and stormwater; Potable
water, sanitary sewer, and reclaimed water
utilities
(0-30 Points)
2.8
2i 1-U>
Past performance and experience of the
CMR Project Team
(0-30 Points)
2^1 i£>
Project approach and understanding of
the project
(0-20 Points)W m n
Current and projected workload of the
CMR
(0-10 Points)
B S
CMR's Office location and proximity to
Ocoee City Hall
(0-5 Points)4 4 4
Certified small or minority business,
women's business enterprise, or labor
surplus area firm
(0-5 Points)0 5 0
TOTAL POINTS
(0-100 Points)2%8t %
Member Ranking (1-3)1 5 -2-
Evaiuator's Name A
Evaiuator's Signature EvoJ I
Page 561 of 668
Individual Evalution Form
RFQ #23-004 CONSTRUCTION MANAGER AT RISK
FOR
FLORAL STREET WATER, SEWER AND ROAD RECONSTRUCTION
INDIVIDUAL EVALUATION FORM
Evaluation Criteria J. Maiever Construction, Inc.Oelrich Construction, Inc.Prime Construction Group, Inc.
Overal expertise of the CMR to provide
reqeusted services: General Civil;
Roadway and other transportation;
Environmental and stormwater; Potable
water, sanitary sewer, and reclaimed water
utilities
(0-30 Points)2$
Past performance and experience of the
CMR Project Team
(0-30 Points)21
Project approach and understanding of
the project
(0-20 Points)jsr \3
Current and projected workload of the
CMR
(0-10 Points)?n
CMR's Office location and proximity to
Ocoee City Hall
(0-5 Points)4 4 4
Certified small or minority business,
women's business enterprise, or labor
surplus area firm
(0-5 Points)0 5 0
TOTAL POINTS
(0-100 Points)4 . T/4 31
Member Ranking (1-3)/3
Evaluator's Name
Evaluator's Signature
IP'.
Page 562 of 668
Individual Evalution Form
RFQ #23-004 CONSTRUCTION MANAGER AT RISK
FOR
FLORAL STREET WATER, SEWER AND ROAD RECONSTRUCTION
INDIVIDUAL EVALUATION FORM
Evaluation Criteria J. Malever Construction, Inc.Oelrich Construction, Inc.Prime Construction Group, Inc.
Overal expertise of the CMR to provide
reqeusted services: General Civil;
Roadway and other transportation;
Environmental and stormwater; Potable
water, sanitary sewer, and reclaimed water
utilities
(0-30 Points)28 25 27
Past performance and experience of the
CMR Project Team
(0-30 Points)29 15 23
Project approach and understanding of
the project
(0-20 Points)15 19 17
Current and projected workload of the
CMR
(0-10 Points)9 8 7
CMR's Office location and proximity to
Ocoee City Hall
(0-5 Points)4 4 4
Certified small or minority business,
women's business enterprise, or labor
surplus area firm
(0-5 Points)0 5 0
TOTAL POINTS
(0-100 Points)85 76 78
Member Ranking (1-3)1 3 2
Evaluator's Name
Evaluator's Signature.
Page 563 of 668
Individual Evalution Form
RFQ #23-004 CONSTRUCTION MANAGER AT RISK
FOR
FLORAL STREET WATER, SEWER AND ROAD RECONSTRUCTION
INDIVIDUAL EVALUATION FORM
Evaluation Criteria J, Malever Construction, Inc.Oelrlch Construction, Inc.Prime Construction Group, Inc.
Overal expertise of the CMR to provide
reqeusted services: General Civil;
Roadway and other transportation;
Environmental and stormwater; Potable
water, sanitary sewer, and reclaimed water
utilities
(0-30 Points)
\hi 56? CyJTHL^
Z7
Past performance and experience of the
CMR Project Team
(0-30 Points)7
Project approach and understanding of
the project
(0-20 Points)
1 ^/-f
Current and projected workload of the
CMR
(0-10 Points)8 6 5
CMR's Office location and proximity to
Ocoee City Hail
(0-5 Points)4 4 4
Certified small or minority business,
women's business enterprise, or labor
surplus area firm
(0-5 Points)0 5 0
TOTAL POINTS
(0-100 Points).«3 ,1^O 1
4 ^ '
Member Ranking (1-3)1 3
Evaiuator's Name
Evaiuator's Signature,
Page 564 of 668
Mayor Commissioners
Rusty Johnson Scott R. Kennedy, District 1
Rosemary Wilsen, District 2
City Manager Richard Firstner, District 3
Robert Frank , District 4
City of Ocoee ▪ 1 North Bluford Ave ▪ Ocoee, Florida 34761
phone: (407) 905-3100 ▪ fax: (407) 905-3167 ▪ www.ocoee.org
_____________
MEMORANDUM
TO: Shannon Hopper, Purchasing Technician
FROM: Jamie Croteau, Utilities Director
DATE: April 3, 2023
RE: Contract Award Recommendation
RFQ #23-004 Construction Manager at Risk
Floral Street Water, Sewer, and Road Reconstruction
Utilities recommends award of the Construction Manager at Risk (CMR) for the Floral
Street Water, Sewer, and Road Reconstruction, RFQ No. 23-004, to J. Malever
Construction, Inc., of Groveland, Florida. The City received qualification packages
from J. Malever Construction, Inc., Oelrich Construction, Inc., and Prime
Construction Group and interviewed each company. The evaluation committee
unanimously selected J. Malever Construction, Inc., for the project based on their
full understanding of the project scope and their project approach. The City has
had numerous positive work experiences with J. Malever Construction, Inc.,
including (2) of the prior projects in downtown Ocoee. Their experience includes
the completion of municipal projects throughout Florida that are similar to this
project in both size and scope.
Utilities requests City Commission approval for the City Manager and staff to
negotiate up to, but not exceeding, a budget amount of $45,000.00 for
preconstruction and design services and up to, but not to exceed, a percentage
rate of 9% for the construction management fee. The next step in the CMR process
will be to negotiate the Guaranteed Maximum Price (GMP) and completion date
for the various elements of construction, which will be brought before the City
Commission for approval at a later date.
This project will extend the gravity sewer system and water main, as well as upgrade
the existing potable water system in this area, all of which are part of the Downtown
Master Plan and are vital to stimulate the development in the downtown Ocoee
area. This project will be funded by bond proceeds and other dollars appropriated
by the City Commission.
Page 565 of 668