Loading...
HomeMy WebLinkAboutItem 10. Approval to Purchase a 2023 Ford Transit Build-Out and Rovver X Crawler Camera Inspection System City of Ocoee ▪ 1 N. Bluford Avenue ▪ Ocoee, Florida 34761 Phone: (407) 905-3100 ▪ www.ocoee.org STAFF REPORT Meeting Date: April 18, 2023 Item #: 10 Contact Name: Gary Gleason Department Director: Jamie Croteau Contact Number: Ext. 4302 City Manager: Robert Frank Subject: Approval to Purchase a 2023 Ford Transit Build-Out and Rovver X Crawler Camera Inspection System. (Utilities Director Croteau) Background Summary: The Utilities Department utilizes a 34-year-old camera inspection system to inspect the City’s water and wastewater pipelines. The current system has outlived its useful lifespan, is in a constant state of disrepair, and uses out-of-date software that stores the inspection video onto VHS tapes. The new 2023 Ford CCTV Transit van will house the vehicle mounted TV inspection equipment. It will be used during preventative maintenance inspections and will also allow for immediate camera investigations of pipelines in the event of a failure. The digital video files of inspections will be incorporated into the GIS database so that managers and/or engineers can review new CCTV inspections in context with other inspection and repair data, which will allow for a better understanding of the condition of the system and a more strategic management of the operation, maintenance and rehabilitation needs for each area. The approved City of Ocoee Budget for Fiscal Year 2022-2023 includes the funds to purchase a new camera truck. Staff was able to utilize the Sourcewell Purchase Contract and obtain a quote from Envirosight at a cost of $243,173.82 for the new camera truck, which is below the budgeted amount of $250,000.00. Issue: Should the City Commission approve the purchase of a 2023 Ford Transit Build-Out and Rovver X Crawler Camera Inspection System? Recommendations: Staff recommends the Honorable Mayor and City Commissioners authorize the City Manager to purchase the new camera truck from Envirosight at a cost of $243,173.82. Attachments: 1. Envirosight Truck Proposal Financial Impacts: None as this is a budgeted item Type of Item: Consent Page 593 of 668 Proposal Summary Prepared for: Ocoee, FL 03/09/2023 Envirosight Sewer Inspection Cameras Rovver X Crawler Camera Inspection System and 2023 Ford Transit Build-Out Brian Stewart | (407) 608-0544 | BStewart@myEPG.com Page 594 of 668 Brian Stewart | (407) 608-0544 | BStewart@myEPG.com City of Ocoee, FL 03/09/2023 Page 595 of 668 Brian Stewart | (407) 608-0544 | BStewart@myEPG.com Page 596 of 668 Brian Stewart | (407) 608-0544 | BStewart@myEPG.com Page 597 of 668 Brian Stewart | (407) 608-0544 | BStewart@myEPG.com CITY OF OCOEE, FL Envirosight Pipeline CCTV Truck Build 2/13/2023 ALL PRICING DIRECT FROM SOURCEWELL CONTRACT #120721-EVS Systems Description Sourcewell Price Chassis Ford Transit (W3X) 2023 Ford Transit Cargo Van (W3X), Upgrade to T-350 148” EL High Roof 9500 GVWR RWD, automatic transmission, gas engine, color Oxford White. $ 66,895.00 Internal Build-Out Transit MEPS Build Preferred Build-Out which includes: $ 49,862.00 MEPS Power Unit Package 6.3Kw MEPS Power Unit Package Corner Mounted Spotlights (2) Corner mounted LED Work Area Spotlights Rear Arrow Board Rear Roof Mounted Arrow Board Front Roof Mounted Strobe Front Roof Mounted Strobe Backup Alarm Back-up Alarm Backup Camera Back-up Camera Tool Package Shovel, Pick, Sledge Hammer, & Manhole Hook File Cabinet 2 Drawer Filing Cabinet with Formica Top Front Bumper Cone Storage Front Bumper Cone Storage Roof mounted AC Roof Mounted AC unit - includes Wiring Harness, Digital Thermostat, and Installation Sink Sink with Installation and Grey Water Tank $ 2,140.00 Additional Viewing Monitor 19" Tru-Vu Viewing Monitor for Rackmount Computer $ 1,243.24 Keyboard Tray Under-desk mounted Keyboard Tray for computer $ 244.57 E-PA-RACKMOUNT-01 Rackmount Computer $ 3,026.57 E-AVERCARD Aver Media Card for Digital Capture on computer $ 478.95 VX-EXPERT-1 SUB Annual WinCan VX Expert License pipeline reporting software $ 5,146.19 Envirosight CCTV Equipment E-RX-SYS-Pro-21 Standard Rovver X System includes DCX5000 Desktop Controller with Vision Report Software installed, RAX300 Automatic Cable Reel with 1000 FT cable, wireless remote controller, reel mounting frame, emergency stop cable, RX130 Quick Change version crawler with 3 sets of rubber wheels for 6” to 16” pipe diameter. RCX90 pan, tilt, zoom camera, and Pressurization Kit. $ 103,484.29 E-080-0709-00 (4) Small Carbide Metal wheels for 6” dia. pipes $ 1,956.56 E-080-0711-00 (4) Medium Carbide Metal wheels for 8” dia. pipes $ 2,547.60 E-080-0710-00 (4) Large Carbide Metal wheels for 10”/12” dia. pipes $ 2,608.76 E-000-0035-00 Top manhole roller $ 458.57 E-000-0036-00 Tiger tail cable protector $ 81.52 Transport Transport to Ocoee, FL (includes training) $ 3,000.00 Subtotal $ 243,173.82 Sales Tax $ 0.00 Total $ 243,173.82 Page 598 of 668 TOTAL SALE PRICE = $243,173.82 *Quote Valid 90 Days* Thanks for the opportunity to earn your business! Please reply to: Brian Stewart, Inspection Division Manager Environmental Products Group, Inc. 2525 Clarcona Road Apopka, FL 32703 Cell: (407) 608-0544 Email: bstewart@myEPG.com Link to Sourcewell Purchase Contract: https://www.sourcewell-mn.gov/cooperative-purchasing/120721-evs Please don’t hesitate to call with questions, or if you need any additional information. Thank you for your interest and the opportunity to earn your business. Brian Stewart | (407) 608-0544 | BStewart@myEPG.com Page 599 of 668