HomeMy WebLinkAboutItem 12 Approval of Amendment No. 1 for CPH to Provide Design Services for the Ocoee Wastewater Plant Electrical UpgradeMeeting Date: September 19, 2023 Item #: 12 Contact Name: Trent Hopper Department Director: Jamie Croteau Contact Number: Ext. 4306 City Manager: Robert Frank Subject: Approval of Amendment No. 1 for CPH to Provide Design Services for the Ocoee Wastewater Plant Electrical Upgrade. (Utilities Director Croteau) Background Summary: This Ocoee Wastewater Treatment Plant Electrical Upgrade consists of design, construction, and an upgrade to the Wastewater Treatment Plant's existing power supply system. The existing power supply has been in place since 1999, and its electrical capacity has reached its limit. On March 1, 2022, the City Commission approved a proposal from CPH to provide the design services associated with this project at a cost of $246,902.00. In an effort to maximize the long-term benefits this project will provide, Staff explored options that were not included in the initial design scope and determined that relocating the blowers would allow for the use of higher -efficiency blowers. The Electrical Engineer for this project has estimated the use of higher efficiency blowers will provide a cost benefit of $3,594.00 per month. CPH has provided an amendment to the original proposal in order to expand the design scope to include the blower relocation for an additional cost of $27,566.00. Issue: Should the Honorable Mayor and City Commissioners approve the additional funding of $27,566.00 for the design services for the Ocoee Wastewater Plant Electrical Upgrade from CPH? Recommendations: Staff recommends that the Honorable Mayor and City Commissioners approve Amendment No. 1 from CPH to provide the design services required for the Ocoee Wastewater Plant Electrical Upgrade and increase the budget for this project in the amount of $27,566.00. Staff also recommends that the City Manager be authorized to approve change orders to this contract up to the limit of his purchasing authority for each change order, and up to the budgeted project amount for this project for all change orders. Attachments: 1. Ocoee WRF Electical Improvements Amendment 1 (15-Aug-2023) Financial Impacts: None as this project is adequately funded. Type of Item: Consent City of • r_. a i Avenue - • i__ Florida 34761 Page 163 of 193 August 15, 2023 1117 East Robinson St. Orlando, FL 32801 Phone: 407.425,0452 Ms. Jennifer C. Bolling, P.E. Fax:407.648,1036 City of Ocoee Utilities Department 1800 A.D. Mims Road Ocoee, Florida 34761-4001 RE: Amendment No. 1 for Professional Engineering Scope of Services for Additional Electrical Improvements at the Ocoee Water Reclamation Facility (WRF) Dear Ms. Bolling: CPH is pleased to submit this amendment for additional Professional Engineering Services for the Ocoee WRF electrical improvements. This amendment is being submitted in accordance with the City of Ocoee Continuing Consulting Agreement for Professional Utility Engineering Services, Dated May 4, 2021, by and between the City of Ocoee (CITY/CLIENT) and the firm of CPH, LLC (CPH). The intent of this amendment is to define our engineering services for the following: • Additional project review meetings • Add additional subsurface utility locations for the new electrical building. • Revise design plans, technical specifications, and permitting assistance for relocation and replacement of the existing digestor blowers. During review of the new electrical room and generator site plan layout, relocation of the existing sludge holding tank digestor blowers and associated piping offers better electrical connection and stormwater drainage. In addition, replacement with higher efficiency blowers or mixers would lower electrical power costs. Hence, the City Additional services proposed are as follows: A. Additional Project Review Meetings: In order to expedite project the City has requested more frequent project review meetings. B. Additional Geotechnical Services: Prior to drilling boring samples, the Geotechnical subconsultant conducted subsurface utility locations to avoid conflicts during drilling activities. C. Additional Process and Electrical Engineering: Additional engineering and design related to removing and replacing existing sludge holding tank digestor blowers. Ocoee WRF Electical Improvements Amendment 1 (15-Aug-2023).docx Page 165 of 193 Exhibit I presents a detailed scope of services for this amendment. This amendment specifies the required professional engineering services of CPH from the preparation of final plans and specifications to start-up and closeout of the proposed project. Exhibit 11 presents a detailed labor -hour breakdown of task items and associated fee that outlines the man-hours and sub -consultant costs for each task of the project. Amendment No. 1 fees are based on an additional Lump Sum fee of $27,566 for a total adjusted project fee of $274,469. Table A summarizes the revised fee for each Task. TABLE A: Revised Summary of Professional Services Fee Task Description Original Additional Now No. Cost Costs Totals 1 Project Set -Up & Kick- $ 6,382 $ 12,720 $ 19,102 Off Meeting 2 Support Services $ 19,222 $ 1,895 $ 21,117 3 Preliminary Basis of Design Report (30% $ 83,914 $ - $ 83,914 Design) 4 Permitting Assistance $ 12,220 $ - $ 12,220 5 60% Submittal Project $ 21,659 $ 12,951 $ 34,610 Design Documents 6 90% Submittal Project $ 17,789 $ - $ 17,789 Design Documents 7 100% Submittal Project $ 16,266 $ - $ 16,266 Design Documents 8 Bidding Assistance $ 9,251 $ - $ 9,251 9 Construction $ 60,200 $ - $ 60,200 Administration Services TOTAL $ 246,902 $ 27,566 $ 274,469 2 Ocoee WRF Electical Improvements Amendment 1 (15-Aug-2023).docx Page 166 of 193 If the attached Amendment meets with the City's approval, please execute the attached Task Order and provide a purchase order. If you have any questions please feel free to contact me at (407) 425-0452. We look forward to working with the City on this project. Sincerely, CPH Consultants, LLC C(,V%& E. Maw David E. Mahler. P.E. Sr. Vice President IN WITNESS WHEREOF, the parties hereto have made and executed this Task Order. ATTEST ATTEST RA,e� M. (oav z.a&z ATTACHMENTS: Exhibit I: Exhibit 111: Attachment A: Attachment B: CITY: City of Ocoee, Florida In Date: ENGINEER: CPH, LLC Dav> & E. Maher By: Date: 15-Aug-2023 Scope of Services Detailed Labor Hour Breakdown PSI — Proposal for Geotechnical Evaluation EMI - Proposal for Electrical and Instrumentation Services 3�.. Ocoee WRF Electical Improvements Amendment 1 (15-Aug-2023).docx Page 167 of 193 SCOPE OF SERVICES General The purpose of this Amendment is to provide additional Engineering Services to the City of Ocoee for the following: Task 1 Project Set -Up & Kick -Off Meetings Prepare for and conduct up to six (6) additional project review progress meetings. Original scope identified four (4) project progress review meetings. So far, fourteen (14) project progress meetings have been conducted. Task 2 Support Services — Provide Additional Geotechnical Services. Prior to drilling boring samples, the Geotechnical subconsultant conducted subsurface utility locations to avoid conflicts during drilling activities. Task 3 Preliminary Basis of Design Report (30% Design) - No Change Task 4 Permitting Assistance - No Change Task 5 60% Submittal Project Design Documents Provide additional process and electrical engineering design related to relocating and replacing existing sludge holding tank digestor blowers with newer high efficiency blowers. Additional services include: • Revise demolition plans to include demolition of existing digestor blowers and associated piping. • Revise grading plan. • Review owner direct purchase (ODP) digestor blower submittal to size equipment pad and electrical requirements. • Update structural plan to include new blower pad. Assume no building structure for new blowers. • Update electrical plans to include new higher efficiency blowers with variable frequency drives motors. Ocoee WRF Electical Improvements Amendment 1 (15-Aug-2023).docx Page 168 of 193 Task 6 90% Submittal Project Design Documents - No Change Task 7 100% Submittal Project Design Documents - No Change Task 8 Bidding Assistance - No Change Task 9 Construction Administration Services - No Change Services Not Included Services not included are as follows: 1. No blower building. 2. Full -Time Resident Project Representative (RPR). 3. Funding Assistance. 4. Major Stormwater Permitting. 5. SCADA Integration. 6. Start-up services of existing equipment to new electrical equipment. Services to be provide by City Services to be provided by the City include the following: 1. Pay permit fees. 2. Provide daily/resident construction inspection. 3. Integrate SCADA. 4. City to purchase new blowers for contractor to install. END OF SECTION 5 . Ocoee WRF Electical Improvements Amendment 1 (15-Aug-2023).docx Page 169 of 193 Labor Hours and Fee Estimate 6�. Ocoee WRF Electical Improvements Amendment 1 (15-Aug-2023).docx Page 170 of 193 EXHIBIT 11 Budget for Engineering Services for City of Ocoee Water Reclamation Facility Electrical Improvements CPH Job No. Z6582 A I B C D E F I G H I J K L M N O P Q R S T u V �J m IL to W C o w °� r ~ W o" DESCRIPTION g d � W W 1: ° mo Z —TASK F ~ 0 w W m m u m `m iri d m a o m in p 00 W d O •o a 15 .o •� © c :E :E¢ c rn 'c 'o, 'c c a. 'c C1 E rn y 1 rnW n.w a inc¢i a` d ¢ V a`w into ink It � my Q 2 3 1 Project Setup & Kick -Off Meeting 4 1.1 Set -Up Project and Prepare Project Work Plan with Tentative Schedule 0 $ $ $ $ 5 1.2 Conduct Kick -Off Meeting to Identify Roles, Review City Requirements and Request Available Data 0 $ $ $ $ 6 1.3 Prepare and Distribute Kick -Off Meeting minutes to City 0 $ $ $ $ 7 1.4 Prepare for and conduct six (6) additional Project Review Progress Meetings 24 24 24 72 $ 11,520 S $ 1,200 S 12,720 8 Subtotal 24 0 24 0 I 24 0 0 0 ( 0 0 10 0 0 0 72 $ 11,520 $ - $ 1,200 $ 12,720 9 $ 4,320 $ - $ 2,880 $ - $ 4,320 $ - $ - $ - $ - $ - $ - $ - $ - $ - 46% 10 2 Support Services 11 2.1 Coordinate and Conduct Preliminary Ecological Assessment 0 $ - $ $ - 12 2.2 Coordinate and Conduct Topographic Survey 0 $ $ $ 13 2.3 Coordinate and Conduct Subsurface Survey (Southeastern Surveying) 0 $ $ $ 14 2.4 Conduct Geotechnical Evaluation (PSI) 0 $ - $ $ - 15 2.4.1 Amend Geotech Contract to include Subsurface Wilitiy Locations to avoid bare hale drilling conflicts 1 2 1 4 $ 495 $ 1,200 $ 200 $ 1,895 16 Subtotal 1 0 2 0 0 0 0 0 0 0 0 0 0 1 4 $ 495 $ 1,200 $ 200 $ 1,895 17 $ 180 $ - $ 240 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 75 7 % 18 3 Prelimi iary Basis of Design Report (30% Design) 19 3.1 Conduct Site Visit and Evaluate Existing Information to Identify Location of New Electrical Building 0 $ - $ - $ $ 20 3.2 Coordinate with Duke Energy 0 $ $ $ $ 21 3.3 Prepare Preliminary Design Report Project Definition with Summary of Key Design Parameters 0 $ $ $ $ 22 3.4 Prepare 30% Plan Views and Major Elevation Design Drawings 0 $ $ $ $ 23 3.5 Prepare Class 3 Budget Authorization Construction Cost Estimate (30% Contingency) 0 $ $ $ $ 24 3.6 Conduct 30°% Submittal Review Meeting with City 0 $ $ $ $ 25 3.7 Prepare FINAL BODR 0 $ $ $ $ 26 Subtotal 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ - $ - $ - $ - 27 $ _ $ - $ - $ - $ - $ _ $ _ $ - $ _ $ - $ - $ _ $ _ $ _ �- o% 28 4 Permitting Assistance 29 4.1 Conduct Permit Inquiry with FDEP for Permit to Construct 0 $ $ $ $ 30 4.2 Prepare and Submit FDEP Stormwater Minor Permit Modification (ERP) 0 $ $ $ $ 31 4.3 Prepare and Submit Ocoee Building Permit 0 $ $ $ $ 32 4A Conduct Permit Inquiry to Identify Coordination to Remove Existing Diesel Storage Tank and Generator. 0 $ $ $ $ 33 Subtotal 0 0 0 0 0 0 0 0 0 0 ( 0( 0 0 0 0 $ - $ - $ - $ - 34 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 35 5 Project Design Documents (60% Submittal) — - -- - - - - - - - - - -- ---------- - 36 5.1 Prepare 60% Plan Views and Major Elevation Design Drawings 0 $ $ $ $ 37 5.2 Prepare 60% Technical Specifications 0 $ $ $ $ 38 5.3 Prepare Class 2 Budget Control Construction Cost Estimate (20°% Contingency) 0 $ $ $ $ 39 5.4 Conduct 60% Submittal Review Meeting with City 0 $ $ $ $ - 40 5.5 Revise plans to .nclltde replacement and relocation of digester blowers 4 8 16 8 2 4 2 44 $ 5,930 S 5,821 $ 1,200 $ 12.951 41 Subtotal 4 8 16 ( 8 0 0 0 2 4 2 0 0 0 0 44 $ 5,930 $ 5,821 $ 1,200 $ 12,951 42 $ 720 $ 1,280 $ 1,920 $ 840 $ - $ - $ - $ 360 $ 600 $ 210 $ - $ - $ - $ - 47% 43 6 Project Design Documents (90% Submittal) 44 6.1 Prepare 90% Civil Plan Views and Major Elevation Design Drawings 0 $ - $ - $ - $ - 45 6.2 Prepare 90% Front -End and Technical Specifications 0 $ - $ - $ - $ Amendment 1 - Ocoee WRF Electrical Improvments Labor Hour Budget (15-Aug-2023).x1sx 1 of 2 Printed On: 8/15/2023 Page 171 of 193 FA ■ Budget for Engineering Services for City of Ocoee Water Reclamation Facility Electrical Improvements CPH Job No. Z6582 I AI B TASK C DESCRIPTION 1 46 ]6,3 Prepare Classl Bid Construction Cost Estimate (10% Contingency) 476.4 Conduct 90% Submittal Review Meeting with City 48 Subtotal 49 50 7 Project -Design -Development Stage CI00% Submittal) 51 7.1 Prepare 100% Plan Views and Major Elevation Design Drawings 52 7.2 Prepare 100% Front -End and Technical Specifications 53 7.3 Prepare Classl Bid Construction Cost Estimate (10% Contingency) 54 7.4 Conduct 100% Submittal Review Meeting with City 155 Subtotal 56 57 8 Bidding Assistance 58 p 8.1 Prepare for and Attend Pre -Bid Meetingand Site Visit 59 8.2 Assist City with Issuing up to Two (2) Addenda 60 8.3 Prepare Engineer's Letter Recommendation of Apparent Low Bidder 61 Subtotal ' 62 63 9 Construction Administration Services — --- ------ - --- --------------- ---- - - -- ------------- - - - 64 9.1 Prepare Conformed Construction Documents 65 9.2 Set -Up Project and Coordinate Pre -Construction Meeting 66 9.3 Review and Approve Submittals (Up to Twenty (20) Submittals) 67 9.4 Respond to Contractor Requests for Information (RFIs) (Up to five (5) RFIs) 68 9.5 Prepare for and Attend Monthly Project Progress Meeting Site Visits (up to eight (8) Meetings) 69 9.6 Conduct Substantial and Final Walk Throughs 70 9.7 Observe Start-up Events ( up to Two (2) Events) 71 9.8 Prepare and Submit Record Drawings 72 Subtotal D i E F ( G H I J K - L M N 1 O P - i Q R S T U v ' �J m IL W N to W O W F W O J d G U W W O F" g W W L u id o i p v ay oOa o o d ir •d .d oo •C. ` EQZ :` oc _ 0 ° IL o G c EO O Go US IL W a ¢ in c ¢ wrn o 2 i E a � m y Q rn 0 $ $ $ $ 0 $ $ $ $ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ $ $ $ $ - $ $ - $ $ $ $ - $ - $ $ $ $ - 1 0% 0 $ $ $ $ 0 $ $ $ $ 0 $ $ $ $ 0 $ $ $ $ 0 0 ( 0 ( 0 ( 0 0 0 0 0 0 ( 0 0 0 0 0 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0% 0 $ $ $ $ 0 $ $ $ $ 0 $ $ $ $ 0 0 ( 0 0 ( 0 0 0 0 0 0 ( 0( 0 0 0 0 $ - $ - $ - $ - $ $ $ $ $ $ $ $ $ $ $ $ $ $ 0% 0 $ $ $ $ 0 $ $ $ $ 0 $ $ $ $ 0 $ $ $ $ 0 $ $ $ $ 0 $ $ $ $ 0 $ $ $ $ 0 $ $ $ $ - $ $ $ $ $ $ $ $ $ $ $ $ $ $ 0% Amendment 1 - Ocoee WRF Electrical Improvments Labor Hour Budget (15-Aug-2023).xlsx 2 of 2 Printed On: 8/15/2023 Page 172 of 193 ATTACHMENT A Proposal for Additional Geotechnical Subsurface Utility Locates 8�. Ocoee WRF Electical Improvements Amendment 1 (15-Aug-2023).docx Page 173 of 193 intertek Mr. Robbie Gonzalez, P.E. Senior Project Manager CPH, Inc. 1117 East Robinson Street Orlando, Florida 32801 RE: Proposal for Geotechnical Services New Electrical Building and Generator Pads Ocoee Wastewater Treatment Plant 1800 A D Mims Road Ocoee, Florida 34761 Dear Mr. Gonzalez: Proposal Number: 0757-357521 October 26, 2021 Professional Service Industries, Inc. 1748 33rd Street, Orlando, FL 32839 Phone: (407) 304-5560 Fax: (407) 304-5561 Professional Service Industries, Inc. (PSI), an Intertek Company, is pleased to submit the following proposal for performance of a subsurface exploration at the site of the proposed improvements. The subsurface exploration will be completed to provide geotechnical recommendations for site preparation and foundation design for the new electrical building and generator pads. Presented herein is the proposed scope of work, time schedule to complete the work and cost estimate for our services. This proposal is based on the boring locations being readily accessible to our truck -mounted drilling equipment and the drilling services being performed during regular business hours. Protect Information The project site is located within the Ocoee Wastewater Treatment Plant (WWTP) in Ocoee, Orange County, Florida. The site is bordered by an existing building and pavement areas to the north and wastewater treatment systems to the east, south and west. Based on a review of aerial images available through Google Earth Pro, the site is vacant with the ground cover comprising grass. Planned improvements for this facility include two new generator pads plus a one-story electrical building. The generator pads will each have an approximate plan area of 130± square feet. The electrical building will have a plan area of approximately 430± square feet. We assume the generator pads will be designed as slab on grade systems. For the one-story building we expect it to be relatively light with maximum column and wall foundation loads of less than 50 kips and 3 to 5 kips per linear feet, respectively. The listed assumptions have been used for the purpose of preparing this proposal. Adjustments to the scope of services may be necessary if the planned development differs from the noted assumptions. Engineering Certificate of Authorization 3684 www.intertek.com/building Ln) 174 of 193 0 Scope of Geotechnical Services Proposal Number: 0757-357521 CPH, Inc. October 26, 2021 Page 2 of 3 The purpose of PSI's subsurface exploration is to obtain information on the general subsurface soil and groundwater conditions within the proposed development in order to provide geotechnical recommendations for site preparation and foundation design. The following services will be provided in order to achieve the preceding objectives: 1. Review available published geologic and topographic information. This published information will be obtained from the appropriate quadrangle map published by the United States Geological Survey (USGS) and the "Soil Survey of Orange County, Florida" published by the United States Department of Agriculture (USDA) Soil Conservation Service (SCS). 2. PSI will perform three (3) Standard Penetration Test (SPT) borings in the areas requested. It is proposed that the generator pad borings will be extended to depths of 10 feet below existing grade, with the building boring will be extended to a depth of 15 feet below existing grade. 3. Visually classify and stratify representative soil samples in the laboratory using the Unified Soil Classification System. Conduct a limited laboratory testing program, if necessary. Identify soil conditions at each boring location and form an opinion of the site soil stratigraphy. 4. Collect groundwater level measurements in the boreholes and estimate the normal seasonal high groundwater levels. 5. The results of the field exploration and laboratory tests will be used in the engineering analysis and in the formulation of PSI's geotechnical recommendations. The results of the subsurface exploration, including the geotechnical recommendations to support the construction of the proposed electrical building and generator pads, will be presented in a written report supervised by a Professional Engineer licensed in the State of Florida. The report will include the estimated normal seasonal high groundwater levels, site preparation, foundation design, excavation considerations and the data on which they are based Schedule We are in a position to start work on the assignment immediately upon receipt of authorization to proceed. The first tasks will be to coordinate obtaining utility clearances for the borings through Sunshine State One Call of Florida and through the plant operations personnel. If private utilities are not located by others, we can coordinate a private utility location service for our borings for an additional fee. Once utilities have been cleared/located, we anticipate one day to complete the field work. Engineering and laboratory testing will be initiated thereafter, requiring a further 10 workdays to complete. From notice to proceed through submittal of the report will require on the order of 4 weeks. Throughout the course of our work on the project, we will keep you routinely apprised of findings plus be available for consultation and meeting attendance as may be necessary. untertek www.intertek.com/building Page 175 of 193 0 Service Fee Proposal Number: 0757-357521 CPH, Inc. October 26, 2021 Page 3 of 3 It is proposed the fee for performance of the above -outlined services be determined on a lump sum basis and the work being performed in accordance with the conditions of a Professional Services Agreement between CPH and PSI. On the basis of the estimated quantities and the proposed scope of work, our lump sum fee for the assignment is $2,900.00. If private utilities are not located by others, we can coordinate a private utility location service for our borings for an additional fee of $1,200.00. r inctirn We appreciate the opportunity to offer our services to you and look forward to working with you. If this proposal is acceptable, please sign below as notice to proceed and return one copy of this proposal intact to our office. Should you have any questions in regard to this proposal, please do not hesitate to contact this office. Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC. Venkata Prashanth Muppana, P.E. Project Engineer 0757-357521 (Electrical Improvments - WWTP, City of Ocoee).docx AGREED TO THIS BY (Please Print): TITLE: COMPANY: SIGNATURE: o Ian Kinnear, P.E. Chief Geotechnical Engineer Intertek www.intertek.com/building Page 176 of 193 EMI Consulting Specialties Inc. (EMI) Proposal for Additional Electrical and Instrumentation Services 9 Ocoee WRF Electical Improvements Amendment 1 (15-Aug-2023).docx Page 177 of 193 EMI Consulting Specialties, Inc. Fee Estimate 5742 River Bed Rd Groveland, F1 34736 (352) 460-4034 (352) 460-4036 (Fax) CLIENTS NAME / ADDRESS CPH Inc. 500 W. Fulton St. Sanford, Fl. 32771 CATEGORY DESCRIPTION HRS DATE ESTIMATE NO. 8/l/2023 2159 PROJECT Ocoee Supplemental #1 COST TOTAL Clerical General clerical, filing, invoicing, correspondence, etc. 6 48.00 288.00 Engineering Engineering and design related to electrical power and 19 155.00 2,945.00 control for two (2) sludge mixing blowers, Shop Drawing Review and process shop drawings. 4 155.00 620.00 Design (CADD) Design, drafting (CADD), & in -office plotting for EMI 24 82.00 1,968.00 review and coordination. TOTAL $5,821.00 Page 178 of 193