HomeMy WebLinkAboutItem 07 Approval of Change Order No. 3 for Contract ITB #21-008 Downtown Master Stormwater Pond & ParkMeeting Date: October 3, 2023
Item #: 7
Contact Name: Milen Womack Department Director: Stephen Krug
Contact Number: Ext. 6013 City Manager: Robert Frank
Subject: Approval of Change Order No. 3 for Contract ITB #21-008 Downtown Master
Stormwater Pond & Park. (Public Works Director Krug)
Background Summary:
The City Commission awarded the construction contract for construction of Unity Park (FKA Downtown Master
Stormwater Pond & Park) at the July 20, 2021, meeting to Prime Construction Group. Over the course of
construction, various solutions were implemented to achieve the park vision presented to the City
Commission. Below is a list of the various items included in this change order:
• W. Franklin Street — Sidewalk Demolition & Roadway Improvements
The original design for Unity Park did not include improvements to the area on the north side of Franklin St.
City Staff worked with the contractor to demolish the old existing sidewalk and makeshift curbing. The area of
concrete removal was replaced with bahia sod.
• Electrical Conduits and Outlets
The original design for Unity Park included two landing areas between the stairways on Franklin St. These
landing areas were determined to be the best location for the future memorial wall to remember and honor the
African Americans who lived in Ocoee during the 1920 Election Day Massacre. Electrical conduits and
weatherproof electrical outlets were added to facilitate the future lighting needs for the memorial wall.
• Landscaping & Irrigation Improvements
The property formerly located at 180 N Bluford Ave was purchased by the City after Unity Park was designed
and the bid contract executed. Therefore, in order to harmonize Unity Park with this adjacent property and to
connect the park to Bluford Ave., additional landscaping and irrigation was requested and installed.
Supplementary landscaping items include additional Florida Field stones boulders added in areas that were
exhibiting serious erosion and a change in mulch material from pine bark to pine needles to prevent erosion on
the stream banks.
• Asphalt Quantity Overrun & Additional Concrete
The original profile section for W Franklin St was crowned. This profile section was changed to have the
roadway drain from north to south, providing more stormwater treatment for this section of roadway. This
change in roadway profile also helped to alleviate some stormwater pooling at the W Franklin St / N Bluford
Ave intersection. The additional asphalt necessary to change the profile of W Franklin St is included in this
change order. Moreover, additional concrete was added to the project to provide driveway access to the
property at 110 N Cumberland Ave and to fix a grading issue in the curb around the rain collection garden in
the center of the parking cul-de-sac on N Cumberland Ave.
City of Ocoee • • Avenue - Ocoee, Florida 34761
Phone: .1 91 11 • •-• • a
Page 56 of 253
Issue:
Should the Honorable Mayor and City Commissioners approve Change Order No. 3 for Contract ITB #21-008
Downtown Master Stormwater Pond & Park?
Recommendations:
Staff recommends the Honorable Mayor and City Commissioners to approve Change Order No. 3 for Contract
ITB #21-008 Downtown Master Stormwater Pond & Park with Prime Construction, Inc., for the amount of
$301,445.44
Attachments:
1. Change Order No. 3
Financial Impacts:
The available funding for the contract increase of Three Hundred One Thousand Four Hundred Fourty-Five
Dollars And Fourty-Four Cents ($301,45.44 ) comes from the project budget (Job Number 18501).
Type of Item: Consent
City of • •e- a • • _ • t__ Florida 34761
• - (4 90 1i • •-- • a
Page 57 of 253
CITY OF OCOEE
1 North Bluford Avenue
Ocoee, Florida 34761
*This Change Order Requires Action by the City Commission*
ITB #21-008 DOWNTOWN MASTER STORMWATER POND & PARK
CHANGE ORDER NO. 03
DATE: 9/26/2023
PURCHASE ORDER: 1427493
The following changes are hereby made to the CONTRACT DOCUMENTS.
Original CONTRACT PRICE $7,445,818.50
Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDERS $8,028,720.11
Net Increase (Decrease) Resulting from this CHANGE ORDER
The current CONTRACT PRICE including this CHANGE ORDER
Original CONTRACT COMPLETION DATE:
Current CONTRACT COMPLETION DATE adjusted by previous
CHANGE ORDERS
Net Increase Resulting from this CHANGE ORDER
Current CONTRACT COMPLETION DATE including this
CHANGE ORDER
$301,445.44
$8,330,165.55
5/ 11 /22
8/ 17/22
380 Days
011119 1
ITB #21-008 DOWNTOWN MASTER STORMWATER POND & PARK CHANGE ORDER
NO. 03 1
Page 58 of 253
CHANGES ORDERED:
REQUIRED CHANGES
The original contract price needs to be revised. The contract price change is required for a range
of items modified or added to the project over the course of final construction. The changes in
total amount to $301,445.44. This change order request seeks to add the appropriate number of
days to change the final completion date.
II. JUSTIFICATION
Over the course of construction, various solutions were implemented to achieve the park vision
presented to the City Commission. Below is a list of the various items included in this change
order:
• W. Franklin Street — Sidewalk Demolition & Roadway Improvements
o The original design for Unity Park did not include improvements to the area on
the north side of Franklin St. City Staff worked with the contractor to demolish
the old existing sidewalk and makeshift curbing. The area of concrete removal
was replaced with bahia sod.
Electrical Conduits and Outlets
o The original design for Unity Park included two landing areas between the
stairways on Franklin St. These landing areas were determined to be the best
location for a future memorial wall to remember and honor the African Americans
who lived in Ocoee during the 1920 Election Day Massacre. Electrical conduits
and weatherproof electrical outlets were added to facilitate the future lighting
needs for the memorial wall.
Landscaping & Irrigation Improvements
o The property formerly located at 180 N Bluford Ave was purchased by the City
after Unity Park was designed and the bid contract executed. Therefore, in order
to harmonize Unity Park with this adjacent property, additional landscaping and
irrigation was requested and installed. Supplementary landscaping items include
additional Florida Field stones boulders added in areas that were exhibiting
serious erosion and a change in mulch material from pine bark to pine needles to
prevent erosion on the stream banks.
Asphalt Quantity Overrun & Additional Concrete
o The original profile section for W Franklin St was crowned. This profile section
was changed to have the roadway drain from north to south, providing more
stormwater treatment for this section of roadway. The additional asphalt
necessary to change the profile of W Franklin St is included in this change order.
Moreover, additional concrete was added to the project to provide driveway
access to the property at 110 N Cumberland Ave and to fix a grading issue on the
parking cul-de-sac rain garden curb.
ITB #21-008 DOWNTOWN MASTER STORMWATER POND & PARK CHANGE ORDER
NO. 03 2
Page 59 of 253
III. NARRATIVE OF NEGOTIATIONS
Public Works negotiated with Prime Construction Group, Inc to determine the final cost of the
added items and agreed to the final change order amount.
In accordance with the contract.
V. APPROVAL AND CHANGE AUTHORIZATION
The original project and funding allocation was established by issuance of a CITY purchase
order, subject to the terms and conditions contained in the CITY's solicitation, Project Manual,
Drawings, Specifications, and/or the CONTRACTOR's service and price proposal, which
collectively form the terms of an agreement between the CITY and the CONTRACTOR for the
performance of the Work. This proposed change to the agreement requires approval by the City
Commission under the CITY's Purchasing Rules and Regulations and is consistent with any
prior action by the City Commission to award the Work to the CONTRACTOR. It is expressly
understood and agreed that the approval of the Change Order shall have no effect on the original
agreement other than matters expressly provided herein.
CONTRACTOR acknowledges, by its execution and acceptance of this Change Order, that the
adjustments in contract price and time shown hereon constitute full and complete compensation
and satisfaction for all costs and modifications of performance time incurred by the
CONTRACTOR as a result of this Change Order. No other claim for increased costs of
performance or modifications of time will be granted by the CITY for the Work covered by this
Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or
time against the CITY arising from or relating to the matters or Work set forth or contemplated
by this Change Order.
[Balance of this page was left blank intentionally]
ITB #21-008 DOWNTOWN MASTER STORMWATER POND & PARK CHANGE ORDER
NO. 03 3
Page 60 of 253
RECOMMENDED BY:
CITY OF OCOEE. FLORIDA
By:
Signature
Date: 5.7
Title: (""'�7'v
APPROVED BY:
CITY OF OCOEE. FLORIDA
0
Rusty Johnson, Mayor
FOR USE AND RELIANCE ONLY BY THE
CITY OF OCOEE, APPROVED AS TO FORM
AND LEGALITY THIS DAY OF
,20
FISHBACK DOMINICK
By:
Richard Geller, City Attorney
ACCEPTED BY:
Prime Construction Grout), Inc.
BY:
Signature
Date:
Title: Frl-loli'5--.C-.�
ct—
Date:
Attest:
Melanie Sibbitt, City Clerk
APPROVED BY THE CITY OF OCOEE
COMMISSION IN A MEETING HELD ON
,20 UNDER
AGENDA ITEM NO.
ITI3 #21-008 DOWNTOWN MASTER STORMWATER POND & PARK CHANGE ORDER
NO. 03 4
Page 61 of 253
PRIMEOcoee Stormwater Pond and Park
CONSTRUCTION GROUP, INC. Date: 8/22/2023
V,drAr.ArAKAVAdFAVrArA4rA
Change Order Summary
PCO-008: $87,534.12 W. Franklin North Sidewalk Demo & Roadway/Sod Improvements
PCO-009a: $42,786.42 Electrical Conduits and Outlets at Steps & Planter Area
PCO-009b: $71,462.73 Landscaping & Irrigation Changes
PCO-009c: $99,662.17 Asphalt Quantity Overrun & Additional Concrete
Total: $301,445.44 Total
Please see the detailed change order breakdowns on the next 4 pages
380 Days: Time Extension For This Extra Work.
Page 62 of 253
Page 1 of 1
Project: Ocoee Stormwater Pond and Park
Date: 8/22/2023
Change Request #: PCO-008
Owner Reference: W. Franklin St Northside Roadway Improvements
Description: Remove sidewalk and concrete/asphalt curb along north side of Franklin
Street. Install new D curb along northside of road and install Bahia sod
north of D curb to cover where sidewalk was removed.
Crew
Quantity Unit
Hours
Unit Price
Extension
PCG Labor Rates:
General Foreman
1 EA
80
$71.72
$5,737.60
Operators
2 EA
80
$42.60
$6,816.00
Laborers
2 EA
80
$33.74
$5,398.40
15.00%
Total Crew Cost
Quantity Unit Unit Price Extension
Materials
Roadbase, Limerock 12" D 180 TN $28.75 $5,175.00
Sod, Bahia 842 SY $6.75 $5,683.50
Tax on Materials 6.00%
15.00%
Material Subtotal
Quantity
Unit
Unit Price
Extension
Equipment and Other Rentals
PC78 Excavator
80
Hour
$82.90
$6,632.00
Loader WA-200
80
Hour
$62.50
$5,000.00
CC122 Roller
40
Hour
$41.34
$1,653.60
CV713 Dump Truck
40
Hour
$122.20
$4,888.00
EC Foreman
80
Hour
$6.38
$510.40
Foreman Truck
80
Hour
$27.13
$2,170.40
Rental Tax
6.00%
Markup on Equipment
15.00%
Equipment Subtotal
Quantity
Unit
Unit Price
Extension
Subcontractors
Form and pour Type-D Curb
700
LF
$30.00
$21,000.00
2" Asphalt Paving, SP 12.5 (no add'I mob)
200
SY
$20.24
$4,047.06
Markup on Subcontractors
7.00%
Subcontrctor Subtotal
Subtotal
Bond Amount & Insurance
Change Order Grand Total
2.00%
$2,692.80
$20,644.80
$651.51
$1,628.78
$13,138.79
$1,251.26
$3,128.16
$25,233.82
$1,753.29
$26,800.35
$85,817.76
$1,716.36
$87,534.12
Page 2 of 5
Page 63 of 253
PIRINE
CONSTRUCTIOV GROUP.j W.
Project: Ocoee Stormwater Pond
and Park
Date: 8/22/2023
Change Request #: PCO-009a
Owner Reference: Electrical Conduits and Outlets
at Steps & Planter Area
Description: Underground Conduits from Main Control Panel to Steps Area
Weatherproof Electrical Outlets
Weatherproof Electrical Outlets
Tunnel Bore at Existing Sidewalks
and Curbs
Core Existing Concrete Walls
Crew
Quantity Unit Hours
Unit Price
Extension
Holiday/Overtime Premium Labor Hours - Trenching for Conduits 6/19/23, 6/20/23:
General Foreman
2 EA 9.5
$107.58
$2,044.02
Operators
2 EA 9.5
$63.90
$1,214.10
Laborers
4 EA 9.5
$50.61
$1,923.18
15.00%
$777.20
Total Crew Cost
$5,958.50
Quantity Unit
Unit Price
Extension
�
Materials
Road base, Limerock 12" D
40 TN
$28.75
$1,150.00
Stainless Steel Back Covers for Type
C Light Fixtures 18
$563.50
$10,143.00
Tax on Materials 6.00%
$677.58
15.00%
$172.50
Material Subtotal
$12,143.08
Quantity Unit
Unit Price
Extension
Equipment for buried Conduit Install;
JD 35G COMPACT EXC
9.5 Hour
$50.30
$477.85
GR15 GENERATOR
9.5 Hour
$13.41
$127.40
L110E WHEEL LOADER
9.5 Hour
$76.76
$729.22
Roller Compactor
9.5 Hour
$24.21
$230.00
SM300 BROOM
9.5 Hour
$83.22
$790.59
EC Foreman
9.5 Hour
$6.38
$60.61
Foreman Truck
19 Hour
$27.13
$515.47
Rental Tax 6.00%
$175.87
Markup on Equipment 15.00%
$353.26
Equipment Subtotal
$3,460.26
Quantity Unit
Unit Price
Extension
Subcontractors
Installation Credit for 35 C-Type
Light Fixtures -1 LS
$2,100.00
($2,100.00)
Chinchor Electric (see Chinchow's attached breakdown) 1 LS
$18,824.00
$18,824.00
PRT Staffing Inv 3411422 - Trenching
& Coring 1 LS
$2,328.00
$2,328.00
Markup on Subcontractors 7.00%
$1,333.64
Subcontrctor Subtotal
$20,385.64
Subtotal
$41,947.47
Bond Amount & Insurance 2.00%
$838.95
Change Order Grand Total
$42,786.42
Page 64 of 253
Page 3of5
PRIME
CONSTRUCTION d
Project:
Ocoee Stormwater Pond and Park
Date:
8/22/2023
Change Request #:
PCO-009b
Owner Reference:
Landscaping & Irrigation Changes
Description:
Additional Florida Field Stones
Additional Grading and Sodding Railroad area (LaCosta Sod)
Additional Landscaping and Irrigation Near Bluford/W Franklin Intersection
Cod Grass Credit (Down-2-Earth)
Aquatic Plants Maintenance (Down-2-Earth)
Pine Needle Mulching at Ditch Bank (Down-2-Earth)
Additional Plants from Punch List Walkthrough (Down-2-Earth)
Crew
Quantity Unit Hours Unit Price Extension
PCG Labor Rates:
General Foreman
1 EA 40 $71.72 $2,868.80
Operators
2 EA 40 $42.60 $3,408.00
Laborers
2 EA 40 $33.74 $2,699.20
15.00% $1,346.40
Total Crew Cost
$10,322.40
Quantity
Unit
Unit Price
Extension
Materials
Florida Field Stone Materials
1
LS
$28.75
$3,083.40
Tax on Materials
6.00%
$185.00
15.00%
$462.51
Material Subtotal
$3,730.91
Quantity
Unit
Unit Price
Extension
Equipment and Other Rentals
Loader WA-200
40
Hour
$62.50
$2,500.00
CV713 Dump Truck
40
Hour
$122.20
$4,888.00
EC Foreman
40
Hour
$6.38
$255.20
Foreman Truck
40
Hour
$27.13
$1,085.20
Rental Tax
6.00%
$523.70
Markup on Equipment
15.00%
$1,309.26
Equipment Subtotal
$10,561.36
Quantity
Unit
Unit Price
Extension
Subcontractors
LaCosta Sod Railroad Tracks
1
LS
$6,755.00
$6,755.00
Down-2-Earth Walkthrough Note Proposal
1
LS
$5,888.86
$5,888.86
Down-2-Earth Cod Grass Credit for 1 Gallon instead of 3 Gall
-1
LS
$5,890.92
($5,890.92)
Down-2-Earth Added Irrigation and Sod at Bluford/Franklin
1
LS
$14,824.38
$14,824.38
Down-2-Earth Aquatic Plants -Added Maintenance
1
LS
$8,728.00
$8,728.00
Down-2-Earth Pine Needles at Ditch Bank instead of Pine Bark
1
LS
$6,658.75
$6,658.75
PRT Staffing Inv 3411572 - Temp Labor - Sod Prep RR Track
1
LS
$2,328.00
$2,328.00
PRT Staffing Inv 3411423 - Temp Labor -Florida Field Stones
1
LS
$3,181.60
$3,181.60
Markup on Subcontractors
7.00%
$2,973.16
Subcontrctor Subtotal
$45,446.83
Subtotal
$70,061.50
Bond Amount & Insurance
2.00%
$1,401.23
Change Order Grand Total
$71,462.73
Page 65 of 253
Page 4 of 5
Project: Ocoee Stormwater Pond and Park
Date: 8/22/2023
Change Request #: PCO-009c
Owner Reference: Asphalt Quantity Overrun & Additional Concrete
Description: Asphalt Quantity Overrun (Kissimmee Rd + W Franklin slope)
Additional Driveways (Cumberland Ave)
Ribbon Curb at Traffic Circle demo/Re-grade/Repour
Crew
Quantity Unit
Hours
Unit Price
Extension
PCG Labor Rates:
General Foreman
1 EA
80
$71.72
$5,737.60
Operators
2 EA
80
$42.60
$6,816.00
Laborers
2 EA
80
$33.74
$5,398.40
15.00%
$2,692.80
Total Crew Cost
$20,644.80
Quantity
Unit
Unit Price
Extension
Materials
Tax on
Materials
6.00%
$0.00
15.00%
$0.00
Material Subtotal
$0.00
Quantity
Unit
Unit Price
Extension
Equipment and Other Rentals
PC78 Excavator
80
Hour
$82.90
$6,632.00
Loader WA-200
80
Hour
$62.50
$5,000.00
CC122 Roller
80
Hour
$41.34
$3,307.20
CV713 Dump Truck
80
Hour
$122.20
$9,776.00
EC Foreman
80
Hour
$6.38
$510.40
Foreman Truck
80
Hour
$27.13
$2,170.40
Rental Tax
6.00%
$1,643.76
Markup on Equipment
15.00%
$4,109.40
Equipment Subtotal
$33,149.16
Quantity
Unit
Unit Price
Extension
Subcontractors
Asphalt Overrun
126.85
Tons
$233.00
$29,556.05
Ribbon Curb Replacement at Cul-de-sac
60
LF
$65.00
$3,900.00
Additional Concrete Driveways
83
SY
$126.00
$10,458.00
No Markup on Contract Unit Prices
0.00%
$0.00
Subcontrctor Subtotal
$43,914.05
Subtotal
$97,708.01
Bond Amount & Insurance
2.00%
$1,954.16
Change Order Grand Total
$99,662.17
Page 66 of 253
Page 5of5
PC -009
FLORIDA METAL CRAFT, INC
PO BOX 771179
WINTER GARDEN, FL 34777-1179
407.656.1100 407.656.6970 FAX
BILL TO
PRIME CONSTRUCTION GROUP
1000 JETSTREAM DRIVE
ORLANDO, FL 32824
INVOICE
DATE INVOICE #
8/21/2023 46440-1
E-mail
dawn@floridametalcraft.com
Web Site
W W W .FLORIDAMETALCRAFT.COM
SHIP TO
PRIME CONSTRUCTION GROUP, INC.
1000 JETSTREAM DRIVE
ORLANDO FL 32824
***EMAIL INVOICES***
REP PO # TERMS CUSTOMER CONTACT
AJ 217970011 NET 30
DESCRIPTION QUANTITY AMOUNT
FRONT SHROUD FOR POST, WELD IN PLACE 104 7,280.00T
BACK COVER FOR POST, DRILL AND TAP TO MOUNT 104 58,604.00T
SIGNATURE: DATE: CREDITS $0.00
PRINTED NAME: SUBTOTAL $65,884.00
THANK YOU FOR YOUR BUSINESS! I hereby acknowledge the satifactory
completion of the above described work. A finance charge of 1 1/2% per
month (18% per annum) will be charged on all past due invoices. Buyer shall SALES TAX $4,282.46
pay all collection cost and resonable attorney fees if it becomes necessary for
Seller to place any past due account with an attorney, either directly or through TOTAL $70,166.46
a collection agency.
*Credit card transactions required to be manually entered will incur a 4% fee* BALANCE DUE $70,166.46
92 YEARS IN BUSINESS THANKS TO YOU!
Page 67 of 253
PCO- O (For Reference Only)
FLORIDA METAL CRAFT, INC
PO BOX 771179
WINTER GARDEN, FL
34777-1179
NAME/ADDRESS
PRIME CONSTRUCTION GROUP
1000 JETSTREAM DRIVE
ORLANDO, FL 32824
Estimate
DATE ESTIMATE NO.
12/16/2022
Ship To
PRIME CONSTRUCTION GROUP, INC.
1000 JETSTREAM DRIVE
ORLANDO FL 32824
***EMAIL INVOICES***
TERMS REP
FOB
NET 30 AJ
FLORIDA METAL
DESCRIPTION QTY
COST
..................................................................................................................................................................................................................................
CABLE PAIL QUICK CONNECT FITTINCS
.....
2,236 ': 31.71
6°,C-A
1.52 I
`3PE"d UP IIOLE•9 IN L.C.IT POS7 I PiEA141. i y IMATET3 QTY:115.�)0'.
E.
*6
h iLD lQl ANT �•
`:i,.i:I,a°uM�
h
*INSTALLATION TO BE DONE BY OTHERS*
**FMC WILL BUILD ONE UNIT FOR QUALITY CONTROL
AND INSPECTION PURPOSES. PRICE SUBJECT TO CHANGE
UPON ANY REQUESTED CHANGES**
**LEAD TIME APPROXIMATELY 3-6 WEEKS**
FMC REQUESTS A DE -POSIT OF TIIE FIRST LINE ITEM IN—::
OPDEn TO PROCTUPE NIIATL— IAL& THE DEPOSIT AN19T_ 1'�_
LL BE $77,67°:61 PL? TS TAX."
i....................................................................................................................................................................................................................................
***ESTIMATES VALID FOR 5 BUSINESS DAYS***
***DUE TO THE INCREASE OF MATERIALS, ESTIMATE MAY VARY 20%, AT
TIME OF ACCEPTANCE***
-(C.rZ°/a)
! .l
SIGNATURE
43378
$12,641.57
Phone # Fax # E-mail Web Site
407.656.1100 407.656.6970 FAX dawnLtloridametalcraft.com WWW.FLORIDAMETALCPAFT.COM
1-17-.-24
.
Page 68 of 253
Gilbert Vincent
From:
David Morris <dmorris@chinchorelectric.com>
Sent:
Thursday, January 26, 2023 3:15 PM
To:
Gilbert Vincent
Cc:
Randy West
Subject:
RE: Ocoee Downtown Stormwater Pond - Light Fixture A Change Order
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
Gilbert,
As we previously discussed at one of the meetings, the work to install the light fixtures on the wall would have been labor as we are still having to run conduit around
the pond for the new "Type A" light fixtures, so I did not include that in the CO I sent you. I did not include any conductors in the CO either as this basically a wash as
well.
Chinchor can provide the following credit assuming two guys would spend 1 hour installing the lights at each location:
=M1�?M":far"w'
Please review and get back to me or we can discuss at the next progress meeting.
We should be receiving the extra pole bases in the next week or so, so we really need to discuss the change order being approved by the city.
Thanks,
David Morris
Project Manager
Chincor Electric, lace
1460 S. Leavitt Ave.
Orange City, FL 32763
0 — 386.774.1020, Ext. 218
F — 386.774.7223
C — 321.403.5591
dmorris@chinchorelectric.com
1
Page 69 of 253
l
Pay Item & Description
Item# ( Labor Cost
Protect Manager
11-meyman Ilectncian
Apprenebce
{Apple-ove
I
{
I
I
1
Pay Item & Description
Item If I Material Breakdown
114/2" Sch 40 PVC Conduit
IS-1/2' Sch 80 PVC Conduit
1-1/2" Sch 40 PVC 90 degree long radius bend
PVC Couplings
11-1/2"Male Adapters
1-1/2" PVC Factory 90 degree bends
i-S/2" Myers Hubs
Ralntight Double Gang Box
Die Cast Heavy Duty in -use Cover
2OA GET Receptacle
IUG Round Box W/GRN Electric Cover
�2/0-14 One Side Polaris Taps
#2 THHN Black Stranded Copper
42 THHN White Stranded Copper
142 THHN Green Stranded Copper
I 1
j)j)1
I
i
Pay Item & Description
Item# I �F550 Flatbed Truck Equipment Cost
1 {
E� I
I �
Pay Item & Description
Item# 1 5u1scomraccors
TOTAL COSTS!
(
IMARKUP
( (SUBCONTRACTOR MARKUP
ISURTAX Rate
(SUBTOTAL
(GENERAL LIABILITY & BOND
(TOTAL COST THIS CHANGE
Basic Oty
Basic City
800
MATT W/O
Tax
MATT W/O
Tax
($ 210
LF I $ 2.89
EA ( $ 109
EA { $ 1.36
EA 1 $ 2.60
EA 1 $ 9.84
EA 1 $ 1546
EA { $ 98
EA _{ $ 2708
EA ($ 2.98
EA { $ 50.04
EA I $ 12.11
LF ($ 142
LF { $ 1.42
IS I $ 1.42
i
MATT W/O
Basic Dry Tax
I 1
20 IHR
1 I
MATL W/O
Tax
UNIT PRICES
TOTAL COSTS
Total
Crew Rate
Material W/O
w/o
Crew Ratel
Tax 1
Burden
w/Burden
SUB In.
Equip Rate MATT W/Tax
LABOR
SUBS
Equip
TOTAL COSTS
I i
Is Is
3
($
I $ $
$
$
$
$
30
$
$$
$ 7
$
$ 15.0O0 161
57
$
3,573, 704
$
$
$
2,796.84 $
$
,68439.84
$ 900I 8
2,796. 84 $ -
-
$ 2,796.84I
$
$ -
i$ $
$
$
$
$
$ 1$
I 1$ $
$
$
$ I
$
$ - i$ _
I is $
$
$
$
$
$ - I$
I I$ $
$
$
$
1$
I$
$ ($
( $
$
$
$
$
$ I$
I ($ $
$
$
$ I
$
$ - I$
Total
Crew Rate
j
Material
w/o
Crew Rate
I
I
Tax
Burden
Burden
w/Burdenl
SUB Price
Equip, Rate
MATL W/Tax i
LABOR
1U85
Equip
TOTAL COSTS
l
_
i
$ 1,679.76
I $ -
I $ 1,78894 $
-
$ -
$ -
$ 1,83&94
$ 28.91
$ -
I $ 30,79 $
-
$ -
$ -
$ 30.79
$ 61A3
$ -
{ { $ 6596 $
-
$ -
$ -
$ 65.96
$ 19.04
$ -
{ $ 20.28 $
$
$
$ 20.268
$ 520
($ -
{$ 554 $
-
$ -
$ -
$ 5541
$ 39.36
I $ -
I I $ 41.92 $
$
$
$ 41.92
$ 30.96
1 $ -
1 { $ 3297 $
- $ -
$ -
$ 32A7
$ 15.96
($ -
{ ($ 17.00 $
- '$ -
$ -
$ 17.001
$ 5416
{ $ -
1 1 $ 57 68 $
-
$ -
$ -
$ 57.68
$1 51.92
$ -
I $ 55.29 $
$ -
$ 55.29
$ 100.08
10659$
-
$ -
$ -
$ 106.59
$ 109.35
$ -
I
$ 116.46 $
-
$ -
$ -
$ 116.46
J $ 1,224.
$
$ 1,303 76 $
$
$ 103.76
$ 1,2249
1,3076I
I $ 1,224.19
$ -
3 $ 1,303 76 $
-
$ -
$ -
$ 1,303.76
$
_
i$
$ $
$
$
$
$
$
11$
I I$ $
$
$
$
$
1s -
I i$ $
'$
$
$ I
$
Is _
is 5
$
$
$
I$
I
�$ $
'$
$
$
$ I
Total I
Crew Rate
Material W/Ol
w/o
Crew Rate
(
Tax
Burden
w/Burden SUB Price
Equip Rate
I
MATL W/Tax
LABOR
SU85
Equip
TOTAL COSTS
I
$
{
{{ $ -
I $ 64.03
I $ $
$
$ 1,280.60
$ 1,280.60
$
Is
I$ i$ $
$
$
$ I
I$ $
$
$
$
$
_
I$ 1$ $
$
$ I
$
�$
$
I$ $
,$
$
$
$ l
J$
is -
,$
$ i$ $
s
$
s
I$ 1$
Total
Crew Rate
Material W/O
w/o Crew Rate
Tax
Burden w/Burden SUB Price
Equip, Rate MATL W/Tax
LABOR
SUBS
Equip
TOTAL COSTS
s
�$ - $
I
i$ $
�$
s
$
$
I$ $
is $
$
$
$ I
$
s $
I IS $
$
$
$ I
5 - '
�$ S -
II 5 - S
-
$ -
$ -
$ -
I$
is -$
I 1$ $
s
s I
$ '
$ - $
I$ s
'$
$
$
$
$
$ _ $
I 3$ $
$
$ I
'
$
$ $
1 I$ $
'$
$
$
$
$ 5.869.19)
{
I $ 6,250.69 . $
9,400.49
1 $
$ 1,280,60 . $ 16,981.78 I
10.0%I I ' ' ' ' $ 62507 $ 940.05 $ $ 12&06 $ 1,693.18
$ I
0.5%I 29.3459661'
( ( ( ($ 6,875.76 I $ 10,340.54 ($ - I $ 1,408.66 $ 18,674.96 I
1 0.800%1 1 $ 149.40 1
I
1 $ 18,824.36 I
Page 70 of 253
PCO-ao a
6)
GrwjbaR.
930 MASON COURT
DAYTONA BEACH FL 32117-4723
Phone:407835
Fax: 386-252-2962
To:
CHINCHOR ELECTRIC INC.
Date:
06/21/2023
386-774-1020
Proj Name:
OCOEE STORMWATER POND -
1460 SOUTH LEAVITT AVE
GB Quote #:
0243695380
ORANGE CITY FL 32763
Release Nbr:
Attn:
DAVID MORRIS
Purchase Order Nbr:
Phone:
386-774-1020
Additional Ref#
Fax:
386-774-7223
Email:
john.coakley@graybar.com
Valid From:
06/2
Valid To:
06/28/2023
/2023
Contact:
JOHN COAKLEY
Email:
john.coakley@graybar.com
Proposal
We Appreciate Your Request and Take Pleasure in Responding As Follows
Item
Item/Type Quantity Supplier
Catalog Nbr Description
Price Unit Ext.Price
100
862 EA WIRE
THHN-2-STR- THHN/THWN-2 19
$1,420.17 1000 $1,224.19
BLK-CUT REEL STIR 600V 90DEG
CU
GB Part #: 22061504 UPC #: 98022061504
***Item Note:*** 1 @ 412 FEET
1 @ 450 FEET
'01111]
862 EA WIRE
GB Part #: 22061510 UPC #: 98022061510
***Item Note:*** CURRENTLY NO STOCK
2-3 DAY LEAD TIME
1 @ 412 FEET
1 @ 450 FEET
300
862 EA WIRE
GB Part #: 22061507 UPC #: 98022061507
***Item Note:*** 1 @ 412 FEET
1 @ 450 FEET
THHN-2-STR- THHN/THWN-219
WHT-CUT REEL CUR 600V 90DEG
THHN-2-STR- THHN/THWN-219
GRN-CUT REEL CUR 600V 90DEG
500 3 EA NSI INDUSTRI ISPB2/0-2 2 PORT
SUBMERSIBLE
CONNECTOR
GB Part #: 25720726 UPC #: 66238178783
$1,420.17 1000
$1,420.17 1000
$41.24 1
$1,224.19
$1,224.19
$123.72
This equipment and associated installation charges may be financed for a low monthly payment through Graybar Financial Services (subject to credit approval). For more information call 1-800-241-7408
to speak with a leasing specialist.
To learn more about Graybar, visit our website at www.graybar.com 24-Hour Emergency Phone#: 1-800-GRAYBAR
Subject to the standard terms and conditions set forth in this document. Unless otherwise noted,freight terms are F.O.B. shipping point prepaid and bill.
Unless noted the estimated ship date will be determined at the time of order placement.
Page 1 of 3
Page 71 of 253
To: CHINCHOR ELECTRIC INC. Date: 06/21/2023 PCO-009a
386-774-1020 Proj Name: OCOEE STORMWATER POND -
1460 SOUTH LEAVITT AVE GB Quote M 0243695380
ORANGE CITY FL 32763
Attn: DAVID MORRIS
Proposal
We Appreciate Your Request and Take Pleasure in Responding As Follows
Total in USD (Tax not included): $3,796.29
This equipment and associated installation charges may be financed for a low monthly payment through Graybar Financial Services (subject to credit approval). For more information call 1-800-241-7408
to speak with a leasing specialist.
To learn more about Graybar, visit our website, at www.graybar.com 24-Hour Emergency Phorll 1-800-GRAYBAR
Subject to the standard terms and conditions set forth in this document. Unless otherwise noted,freight terms are F.O.B. shipping point prepaid and bill.
Unless noted the estimated ship date will be determined at the time of order placement.
Page 2 of 3
Page 72 of 253
L9
PCO-00
GrwwbaR.
INVOICE Invoice Questions Please Call
r ,
wo
386-944-3200
Remit
e t to:
GRAYBAR ELECTRIC COMPANY, INC.
PO BOX 403062
Invoice No: 9332797448
ATLANTA GA 30384-3062
Invoice Date: 06/28/2023
Account Number: JP8967520
Account Name: CHINCHOR/OCOEE
Bill -To:
Ship -To:
CHINCHOR ELECTRIC INC.
CHINCHOR/OCOEE DOWNTOWN
1460 SOUTH LEAVITT AVE
OCOEE DOWNTOWN
ORANGE CITY FL 32763
1460 S LEAVITT AVE
USA
ORANGE CITY FL 32763
USA
Page 1
of 2
hDO # : 221PCG09
SO#:
382578356I
Del .Doc . # :
PRO #
I RGRAYBAR
Shippedouting Date
I
S ON
I
Rt . To
8048734948
TRUCK
06/27/202
P AM PAr FL
S P _B /A
' Signed/Ordered By:
ROBERT/Robert Young
lQuantityl Catalog
# / Description
I Unit Price / Unitl
Amount)
* *DO NOT SELL LT SERIES SEALTITE; ONLY SELL LA SERIES (UL
APPROVED)* *
862 THHN-2-STR-BLK-CUT REEL GENERIC VENDOR WIRE-WYRPA
THHN/THWN-2 19 STR 600V 90DEG CU
862 THHN-2-STR-WHT-CUT REEL GENERIC VENDOR WIRE-WYRPA
THHN/THWN-2 19 STR 600V 90DEG CU
862 THHN-2-STR-GRN-CUT REEL GENERIC VENDOR WIRE-WYRPA
THHN/THWN-2 19 STR 600V 90DEG CU
1,420.17 / 1000 # 1,224.19
1,420.17 / 1000 # 1,224.19
1,420.17 / 1000 # 1,224.19
Del. Doc.#:IPRO # IRouting (Date ShippedlShipped From IF.0.B. IRt. To
8048735076 I 8048734948 I GRAYBAR TRUCK I 06/28/2023 I DAYTONA BEACH, FL I S/P - F/A
Signed/Ordered By: ROBERT/Robert Young
Quantityl Catalog # / Description I Unit Price / Unit) Amount
3 ISPB2/0-2 NSI INDUSTRIES 41.24 / 1 # 123.72
SUBJECT TO THE STANDARD TERMS AND CONDITIONS LISTED ON WWW.GRAYBAR.COM
Page 73 of 253
W Wn=
Remit to: L9
GraybaR.
GRAYBAR ELECTRIC COMPANY, INC.
PO BOX 403062
ATLANTA GA 30384-3062
Bill -To:
CHINCHOR ELECTRIC INC.
1460 SOUTH LEAVITT AVE
ORANGE CITY FL 32763
USA
INVOICE ( Invoice Questions Please Call
386-944-3200
Invoice No: 9332797448
Invoice Date: 06/28/2023
Account Number: JP8967520
Account Name: CHINCHOR/OCOEE
Ship -To:
CHINCHOR/OCOEE DOWNTOWN
OCOEE DOWNTOWN
1460 S LEAVITT AVE
ORANGE CITY FL 32763
USA
Page 2 of 2
hDO # : 221PCG09 SO#: 382578356
IDel. Doc. #:IPRO # (Routing Date ShippedIShipped From IF.0.B. IRt. To
8048735076 I 8048734948 I GRAYBAR TRUCKI 06/28/2023 I DAYTONA BEACH, FL I S/P - F/A
Signed/Ordered By: ROBERT/Robert Young
(Quantity) Catalog # / Description I Unit Price / Unit) Amount
2 PORT SUBMERSIBLE CONNECTOR
_2�
# - Indicates Taxable Item
Terms of Payment
Sub Total:
3,796.29
1°, loth Fr„_:., —t.
15t_. Y,,>_.
Freight:
0.00
n:, ; . ,,,ai .i<„ .,r t:,e
, a 1-:: r „e„t, .x -h__
Handling:
0.00
of the
-s..�r .if 1-11_ .,_ till 11111in "v
Tax:
246.76
re „ itte,l 1;, 1aw ,,,.x_:
1- -1dea ,_ all a : c u n, n:,t pail
Total Due:
4,043.05
1, , , t ,_,,, _ ae. vi.,:3,
Mastercarol, A.-ra, E__1,
Cash Discount(if paid within terms):
37.96-
.1 G: " :'%er r-d it
"dills ar. ,a."13t eel
put ch a .ul_i.
SUBJECT TO THE STANDARD TERMS AND CONDITIONS LISTED ON WWW.GRAYBAR.COM
Page 74 of 253
EED CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
CED BLUE SPRINGS
1377 S LEAVITT AVE
ORANGE CITY, FL 32763
T:3863821180 F:9999999999
SOLD TO:
CHINCHOR ELECTRIC
1440 S LEAVITT AVE
ORANGE CITY, FL 32763
XV-81447
QTY
ORDERED
T 3 NSI
IT3/0
ACCOUNT #/NAME
CHINCHOR
SALESPERSON
1494 RM
PRODUCT CODE
FCC)®009a
Invoice Page 1 of 1
INVOICE NO. INVOICE DATE
0742-1000090 06/29/2023
PLEASE SHOW INVOICE NO. AND REMIT TO:
PO Box 936240
Atlanta, GA 31193-6240
SHIP TO:
CHINCHOR ELECTRIC
1440 S LEAVITT AVE
ORANGE CITY, FL 32763
JOB NAME CUSTOMER ORDER NO.
221 PCG09
SHIPPING INFORMATION SHIP VIA SHIP DATE
PREPAID OUR TRUCK 06/29/2023
C P C
DESCRIPTION p QTY PRICE E DISC. EXTENSION /
E SHIPPED R D
3/0-6AWG INSD-TAP CONN 3 26.97 E 80.91 0.0
TITLE TO MERCHAN)ISE AND RISK LOSS OR DAMAGE PASSES AT OF SHI'MENT CLAIMS
TO ADVISE YOU INVOIC CONCERNING YOUR JRDEF,
FOR SHORT OR DAMAGED MERCHAOF RNT
NDISE SHOULD BE MADE TO CARRIER
IS CODE IS USED ON OURNPTLY
THHID
MERCHANDISE
80.91
MERCHANDISE RETURNED CONSENT NOT
ECg ACCEPTED
R RESTOCKING
CHARGE WILL BEMADE ON RE URNED GOODS UN ESS DEFDEFECTIVE OTHROUGHERRORON OUR
ORDERED WILL SHIP AS SOON AS RECEIVED UNLESS INSTRUCTED
TO CANCEL
SALES TAX 6.50000
5.26
PART.
A SERVICE CHARGE OF i',%PER MONTH, BUT NOT TO EXCEED THE HIGHEST AMOUNT LAWFULLY
C- CANCELLED NOT IN STOCK. UNABLE TO PURCHASE LOCALLY
SHIPPING CHARGE
0.00
ALLOWED BY APPLICABLE STATE LAW, WILL BE MADE ON ALL PAST DUE ACCOUNTS
THIS SALE IS SUBJECT TO OUR TERMS LOCATED AT SALES.OUR-TERMS COM, WHICH WE MAY
CHANGE FROM TIME TO TIME WITHOUT PRIOR NOTICE NET PAYMENT IS DUE BY THE 15TH OF THE MONTH TOTAL DUE Yrrril 86.17
FOLLOWING PURCHASE
Page 75 of 253
CO-009a
L9
GrwwbaR. INVOICE
Invoice Questions Please Call
Remit
e t to:
386-944-3200
GRAYBAR ELECTRIC COMPANY, INC.
PO BOX 403062
Invoice No: 9332659473
ATLANTA GA 30384-3062
Invoice Date: 06/20/2023
Account Number: 221841
Account Name: CHINCHOR ELECTRIC INC.
Bill -To:
Ship -To:
CHINCHOR ELECTRIC INC.
CHINCHOR ELECTRIC INC.
1460 SOUTH LEAVITT AVE
386-774-1020
ORANGE CITY FL 32763
1460 SOUTH LEAVITT AVE
USA
ORANGE CITY FL 32763
USA
Page 1
of 2
hDO # : 221PCG09
SO#:
382548180I
Del .Doc . # :
PRO #
Roting
I
Date Shipped
I
hipped From
SORLAN
0.
I
Rt. To
8048614518
WILL CALL ORD
06/20/202
O,
S P _B /A
' Signed/Ordered By: MICAH MW/DAVID MORRIS
IQuantityl Catalog # / Description
I Unit Price / Unitl
Amount)
* *DO NOT SELL LT SERIES SEALTITE; ONLY SELL LA SERIES (UL
APPROVED)* *
2 21113-2 ABB INSTALLATION PRODUCTS INC
798.18 / 100 #
15.96
LE 21H32 RAINTIGHT DEV BOX-2 GANG
2 WP1030MXD INTERMATIC INC 27.08 / 1 # 54.16
DIE CAST XDUTY 2G VERT - (NORM)
4 GFT20W HUBBELL WIRING DEVICES 12.98 / 1 # 51.92
20A PRO GFR TR WHITE
2 09101012 OLDCASTLE PRECAST INC 50.04 / 1 # 100.08
ROUND UNGRND BX W/CVR GRN ELEC
6 BIT2/0 BURNDY LLC 12.15 / 1 # 72.90
2/0-14 ONE -SIDE UNI-TAP
# - Indicates Taxable Item
SUBJECT TO THE STANDARD TERMS AND CONDITIONS LISTED ON WWW.GRAYBAR.COM
Page 76 of 253
Remit to: L9
GraybaR.
GRAYBAR ELECTRIC COMPANY, INC.
PO BOX 403062
ATLANTA GA 30384-3062
Bill -To:
CHINCHOR ELECTRIC INC.
1460 SOUTH LEAVITT AVE
ORANGE CITY FL 32763
USA
hDO # : 221 PCG09
Terms of Payment
1`, I L1, F'_n�_ , ,. L 15 L_. F,_.,
As a ,on lii i-n ,>E Lhr ..ala._ x ra, i_, .a m., n ! h
._11 ,i,. - c h a r�_:a of Lne =-_s. cf 1-1, _ o_ Lha ,.ia,_in:um
1.rr_ iL1_e1 1y law mn', ba a 1,1 1 t all .>_t'punt-n nit 1—i l
1y i,,L civa -1.7!_ _. Visa, M- tAn— -an E�_p, ,
,,,,I Di F_, _1 1iL as ds a— b t. d at L 1n t-
b. t,, 211— cn11
INVOICE Invoice Questions Please Call
386-944-3200
Invoice No: 9332659473
Invoice Date: 06/20/2023
Account Number: 221841
Account Name: CHINCHOR ELECTRIC INC.
Ship -To:
CHINCHOR ELECTRIC INC.
386-774-1020
1460 SOUTH LEAVITT AVE
ORANGE CITY FL 32763
USA
Sub Total:
Freight:
Handling:
Tax:
Total Due:
Cash Discount(if paid within terms):
Page 2 of 2
SO#: 382548180
295.02
0.00
0.00
19.18
314.20
2.95-
SUBJECT TO THE STANDARD TERMS AND CONDITIONS LISTED ON WWW.GRAYBAR.COM
Page 77 of 253
L9 PCO-009a
Grw-ibaR. INVOICE Invoice questions Please Cali
Remit � 386-944-3200
e t to:
GRAYBAR ELECTRIC COMPANY, INC.
PO BOX 403062 Invoice No: 9332638948
ATLANTA GA 30384-3062 Invoice Date: 06/19/2023
Account Number: 221841
Account Name: CHINCHOR ELECTRIC INC.
Bill -To: Ship -To:
CHINCHOR ELECTRIC INC. CHINCHOR ELECTRIC INC.
1460 SOUTH LEAVITT AVE 386-774-1020
ORANGE CITY FL 32763 1460 SOUTH LEAVITT AVE
USA ORANGE CITY FL 32763
USA
Page 1
of 1
hDO # : 221PCG09
SO#:
3825368871
Del .Doc . # :
PRO #
Roting
I
t Shipped
I
hipped From
SORLAN
I
Rt. To
8048593675
WILL CALL ORD
� 9/Z
O,
S P _B /A
' Signed/Ordered By:
MICHAEL MW/DAVID MORRIS
l
lQuantityl Catalog
# / Description
l Unit Price / Unitl
Amount)
* *DO NOT SELL LT SERIES SEALTITE; ONLY SELL LA SERIES (UL
APPROVED)* *
2 ELL-90-1-1/2-36R GENERIC VENDOR-PVCPA 3,096.60 / 100 # 61.93
SPC RAD SCH40 1-1/21N 90DEG 36RAD ELBOW
Inbound Freight # 5.00
# - Indicates Taxable Item
Terms of Payment
Sub Total:
66.93
1'd I L L h P_r._ , ,. L 15Lr Pig_..
Freight:
0.00
A,, li_i_,, .,r Lhe sa1-2
Handling:
0.00
--ire chair <r the _-s-r 1 1-1,_• "_ Lh- r,u_..i�, ,n
Tax:
4.35
r. 11iLt-1 L,y law 1, , h- addcI L„ all �cuntc n D L 1—i_1
Total Due:
71.28
1y « L due lat ,i,a, mast xcarl, An— _an E_1,_ s.,
Cash Discount(if paid within terms):
0.62-
a-1 D-s_oaei _x adiL ca de axe acse,Lad at F._,int
1— Chace cnly.
SUBJECT TO THE STANDARD TERMS AND CONDITIONS LISTED ON WWW.GRAYBAR.COM
Page 78 of 253
7
�d I U11Mo
INVOICE
SEND ALL PAYMENTS TO:
somoscr nswrxLs INC.
po uox 4092�l
xrLxwrx. sx 90984-9211
140955254-000I
0urelreriffini
`°,',zo',zv
PRIME CONSTRUCTION GROUP INC
ja� 1000JETSTREAMDR
ORLANOO.FL 32824-7100
JOB ADDRESS
[UM8ERLAND AVE O[OEE
180 N [UM8ERLAND AVE
O[OEE, FL 3476I 2204
8I3-576-0655
WEST. RANDY
4097
� 6/20/23
�
I of l
140955254
(0UANnOPCOI2
I272 ]ETPURT nV
ORLANnU, FL 32809 7826
407-855-0050
' 0TY
EQUIPMENT #
Min Day Week
4 week
Amount
1'00
185[FM 125PSI DIESEL AIR
COMPRESSOR
175'00 175'00 475'00
950.00
175'00
1061719I make: D0OSAN
model: [I05WD0 Ser #: 507069UFA5H88
HR OUT: 268'600 HR IN:
271'200
TOTAL: 2'600
Billed from 6/18/23 thru
6/20/33
I.00
3/4" X 50' AIR COMPRESSOR
HOSE
14.00 14'00 35'00
89'00
14'00
1'00
MISCELLANEOUS
245.00 245'00 670.00
1580'00
245'00
#ditchwitch boring tool
unit 10792834
Rental sub -total:
434'00
SALES
ITEMS:
0ty
Item number
Unit
Price
l
DLPKSR[H6
B\
78.000
78'00
TRANSPORTATION SURCHARGE
I
ENVIRONMENTAL
EA
6.470
6'47
ENVIRONMENTAL/HAZM/Q' FEE
2133XXX000U
I7'4
DIESEL
EA
10'500
102'70
DIESEL 2I4IXXX0000
DELIVERY [*xR6E
200'00
. 0TY
EQUIPMENT #
Min Day week
4 week
Amount
'
FINAL BILL: 6/I9/23 13:00
PM THRU 6/20/23 I0:53 AM.
REMIT TO:
sowoecr newrA|S, INC. wurso
PO a0x 4092II Invoices not paid within mdays may uvsubject m^|'um
ATLANTA, GA 30384-9211 per month charge.
-- - -- '- -
901.17
45.59
946.76
newrAL neromv
[_PC[)-009a
�d I U11Mo
INVOICE
SEND ALL PAYMENTS TO:
somoscr nswrxLs INC.
po uox 4092�l
xrLxwrx. sx 90984-9211
140955254-000I
0urelreffliffif]
,°"',zo',zv
PRIME CONSTRUCTION GROUP INC
ja� 1000JETSTREAMDR
ORLANOO.FL 32824-7100
JOB ADDRESS
[UM8ERLAND AVE O[OEE
180 N [UM8ERLAND AVE
O[OEE, FL 3476I 2204
8I3-576-0655
WEST. RANDY
4097
� 6/20/23
�
I of l
140955254
(0UANnOPCOI2
I272 ]ETPURT nV
ORLANnU, FL 32809 7826
407-855-0050
' 0TY
EQUIPMENT #
Min Day Week
4 week
Amount
1'00
185[FM 125PSI DIESEL AIR
COMPRESSOR
175'00 175'00 475'00
950.00
175'00
1061719I make: D0OSAN
model: [I05WD0 Ser #: 507069UFA5H88
HR OUT: 268'600 HR IN:
271'200
TOTAL: 2'600
Billed from 6/18/23 thru
6/20/33
I.00
3/4" X 50' AIR COMPRESSOR
HOSE
14.00 14'00 35'00
89'00
14'00
1'00
MISCELLANEOUS
245.00 245'00 670.00
1580'00
245'00
#ditchwitch boring tool
unit 10792834
Rental sub -total:
434'00
SALES
ITEMS:
0ty
Item number
Unit
Price
l
DLPKSR[H6
B\
78.000
78'00
TRANSPORTATION SURCHARGE
I
ENVIRONMENTAL
EA
6.470
6'47
ENVIRONMENTAL/HAZM/Q' FEE
2133XXX000U
I7'4
DIESEL
EA
10'500
102'70
DIESEL 2I4IXXX0000
DELIVERY [*xR6E
200'00
. 0TY
EQUIPMENT #
Min Day week
4 week
Amount
'
FINAL BILL: 6/I9/23 13:00
PM THRU 6/20/23 I0:53 AM.
REMIT TO:
sowoecr newrA|S, INC. wurso
PO a0x 4092II Invoices not paid within mdays may uvsubject m^|'um
ATLANTA, GA 30384-9211 per month charge.
-- - -- '- -
901.17
45.59
946.76
newrAL neromv
PCO-009a
11MOU61
STAFFING
122 Alt 19
PaI��Mlm Harbor, F1 34683
Phone 727-772-1274
Bill To:
Prime Construction Group
Roy
1000 Jetstreani Dr
Orlando, FL, 32824
Pho= 4078568180
Invoice NUniber:
3411422
Invoice Date:
W28/2023
Customer Number
PR1380
Page #:
I
Ternis:
Net Due Upon Receipt
PO Number:
Work Site:
Ocoee Storm Water ;-21797
180 N CUmbefland Ave
Ocoee, FL 34761
Lii 808-561-2610
Description
Date
Ticket tt
1-10LIr5
Bill Rate
Arnount
DIAZ, YAIMEG
6/191/2023
1111136
30M0
Re-
S19.40
$582.00
Hernandez, Kevina J
6/19/2023
1111136
30.00
Re -L,
S 1 9A0
S82.00
RINCON, JOSE
6/1 912)023
1111127
30.00
Rea
S 1 9A0
S582.00
RINCON, PAOLA
6/19/2023
1111152
30.00
Reg
S 1 9A0
S582.00
Current BillinL), Aualvsis
I fours 13illina
ReMflar: 120.00 S2,328.00
Overtime: OM SO.00
E`Xpenses: � OMO
I-6tals 120.00 $2328.00
Roy
Prime Construction Group
1000 Jetstreani Dr
Orlando, FL 32824
Send RemittanceTo:
PRT Staffing N Tricom
P.O. Box 13188
Milwaukee, Wl 53213-0188
Rernittance Stub
InvoiceDate, ClientNurnber InvolceNurnber
6/2 8/2) 02-3 PRI-380 3.411,422
PayThis Aniount: S2,328.00
THANK YOU FOR, YOUR BUSINESS!
The monies represented by this billing are subject to as security interest by the remittance addressee.
Remittances may not be sent to any other address except the one appearing on this in -voice.
Page 81 of 253
Roane G,�tfJ V4vl;,wj (% ',9 f, ,
orm A
Page 82 of 253
PCB?-009a
Fj,,,- Silt, Na c
SH
vrrTo
"Umber
� 6
N
Page 83 of 253
PCO-009a
Li C,
14...
I L.
10cue
5fQY,4t--LL1t)crt,?r
✓
C7) --el jh�
L-Ine Number
ase Call With Any Comments or, Questions Job
Purchase Order 0
re Phone:
",;ec- t2mo lertr— �d COW40" —I (w1h On it& le'VOSO S," lea 0 4 P&W'(: , fins <r,: T, I na p:9 I I:e a' "T'
-[�Jm. "qc, lir �;,"I
flr-K.';'UNNF� R�I--'sIQrjSC
-,eL�jEL: 77t) Tr c):
t:F :5 1, f 3 =4'
Autharized SjUnagUfO
print Name & TWO
w
Foini A
Page 84 of 253
PCO-009a
CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
_ CED BLUE SPRINGS
1377 S LEAVITT AVE
ORANGE CITY, FL 32763
sR %�. RRRiRR••. f
SOLD O:
38661 AB 0.507 E0126X 10220 011254741391 S2 P9742095 0001:0002
I' III I III, I I I I I 111111111 11111 I1I I111I I[ I' 1 l 1' I I I 1111' I
CHINCHOR ELECTRIC
1440 S LEAVITT AVE
ORANGE CITY FL 32763-7117
Invoice M.
INVOICE NO. INVOICE DATE
0 001rt 06/14/2023
TO -
PO Box 936240
Atlanta, GA • _,R 4 !
SHIP TO:
CHINCHOR ELECTRIC
1440 S LEAVITT AVE
ORANGE CITY, FL 32763
ACCOUNT #INAME JO NAME
XV-81447 CHINCHOR JUSTIN
:SALESPERSON SHIPPING INFORMATION
1481 SM PREPAID
QTY PRODUCT CODE DESCRIPTION
ORDERED
TI, 650 COND PVC 1-1J2" SCH-40 (2250')
PVC112
T 3 XMISC LOW VOC GLUE F'IRT
GLPTS-1
T'I 2 PVC PVC 1-1/2" 90 DEG ELBOW (59592)
112EL
T', 2 XMISC DUCT TAPE 2X60
DUCT TAPE TD60
CUSTOMER ORDER NO.
21 PCGO1
SHIP VIA
SHIP DATE
OUR TRUCK
06/1512023
C
0 CITY PRICE
D
P
ER
C
DISC. EXTENSION
SHIPPED
Ii
E
650 209.97
C
_
1364.81 O.O
3 497.97
C
14.94 0.0
2 340.97
C
6.82 O.O
2 397A7
C
7.96 O.0
TITLE TO MERCANDISE AND RISK OF LOSS OR DAMAGE PASES AT OF SHI.>MENT. GLAIMB
TO ADVISE YOUR ORDEF.,
1
FOR SHORT ORHLIN RAGED MERCHANUISE SHCULD BE MADEBTO CARR6IHNT
� 3 COD: USED ON OUR INVOICEgNGERNING
-ERi+CHA N DISE
1 394.53
MERCHANDISE RTURNECHARGE WILL BEE
EMADE OON RETURNED GOODS UNLESS DE ECWITHOUT OUR CONNT WILL NOTTNE OCR THROUGH HSTOCKING
ERROR ON OUR
6 - BACK WILL SHIP AS SOON AS RECEIVED UNLESS INSTRU:TED
70 CANCEL.
SALES
SALES TAX 6.50000
90.641
PART.
A SERVICE CHARGE OF 1 %% PER MONTH, BUT NOT TO EXCEED THE HIGHEST AMOUNT LAWFULLY
C CANCELLED. NOT IN STOCK. UNABLE TO PURCHASE LOCALLY.
SHIPPING CHARGE
0.001
ALLOWED BY APPLICABLE STATE LAW. WILL BE MADE ON ALL PAST DUE ACCOUNTS.
THIS SALE IS SUBJECT TO OUR TERMS LOCATED AT SALES.OUR-TERMS.COM, WHICH WE MAY
CHANGE FROM TIME TO TIME WITHOUT PRIOR NOTICE. NET PAYMENT IS DUE BY THE 15TH OF THE MONTHTOTAL DUE 1 ,485. 1 f
FOLLOWING PURCHASE -
0001:0002 Page 85 of 253
PC ®009a
www.equipmentwatch.com
All prices shown in US dollars ($)
Adjustments for 928321- 2021550 Flatbed in All Saved Models July 26, 2022
Configuration for F450SD XL 4x4 Diesel
Power Mode
Diesel
Wheelbase
142 Inches
Axle Configuration
4x4
Complete / Incomplete
C
Gross Vehicle Weight
14000 Pounds
Blue Book Rates
** FHWA Rate is equal to the
monthly ownership cost divided by 176 plus the hourly estimated operating cost,
Ownership Costs
Estimated Operating
FHWA Rate**
Costs
Monthly
Weekly
Daily Hourly
Hourly
Hourly
Published Rates
USD $3,880.00
USD $1,085.00
USD $270.00 USD $41.00
USD $43.06
USD $65.11
Adjustments
Region ( Florida: 96.5%)
(USD $135.80)
(USD $37.97)
(USD $9.45) (USD $1.43)
Model Year (2021: 98.57%)
(USD $53.57)
(USD $14.98)
(USD $3.73) (USD $0.57)
Adjusted Hourly Ownership
- -
Cost (100%)
Hourly Operating Cost (100%)
-
Total:
USD $3,690.63
USD $1,032.05
USD $256.82 USD $39.00
USD $43.06
USD $64.03
Non -Active Use Rates
Standby Rate
Idling Rate
Rate Element Allocation
Hourly
USD $10.48
USD $51.08
Element
Percentage
Value
Depreciation (ownership)
32%
USD $1,241.60/mo
Overhaul (ownership)
42%
USD $1,629.60/mo
CFC (ownership)
5%
USD $194.00/mo
Indirect (ownership)
21%
USD $814.80/mo
Fuel (operating) @ USD 5.70
70%
USD $30.11/hr
Revised Date: 3rd quarter 2022
These are the most accurate rates for the selected Revision
Date(s). However, due to more frequent online updates, these rates may not match Rental Rate Blue
Book Print. Visit the Cost Recovery Product Guide on our
Help page for more information.
The equipment represented in this report has been exclusively prepared for DON HASCO
(dhasco@chinchorelectric.com)
All material herein @ 2003-2022 Randall -Reilly All rights reserved.Page 1 of 1 Page 86 of 253
O-009b
Z; ;* ...... I Down to Earth
Landscape &Irrigation
2701 Maitland Center Pkwy.
Suite 200
Maitland, Florida 32751
(321) 263-2700
Customer Address
Billina Address
Prime Construction
Gilbert Vincent
Gilbert Vincent
Prime Construction
1000 Jetstream Drive
1000 Jetstream Drive
Orlando, Florida 32824
Orlando, FL 32824
gvincent@primeconstructiongroup.com
407-856-8180
Project Estimated Project Start Date Proaosed By
Change order #3 Slope Area
February 1, 2022 Steve Holland
Change from Pine Bark to Pine
Straw
Estimate: #55026
Phvsical Proiect Address
Ocoee Stormwater Pond & Park -
Construction
180 N. Cumberland Ave.
Ocoee, FL 34761
Due Date
September 22, 2021
Construction Installation
Credit for Pine Bark CY 1 ($17,482.50) ($17,482.50)
Add Pine Straw Bale 1 $24,141.25 $24,141.25
Subtotal $6,658.75
Project Total $6,658.75
This proposal is to change out from pine bark to pine straw from the top of the slope to waters edge.
Proposed By: Agreed & Accepted By:
Steve Holland 05/19/2023
Down to Earth
Landscape & Irrigation Date Prime Construction Date
We hereby propose to provide all labor, materials and equipment necessary to complete the following work as per plans and specifications, including the installation
of the above, for all other Terms & Conditions please visit h,q s:i(cirelandsczzpe.comaenns-ar;U-co id :ions!.
1of1
Page 87 of 253
PCO-O 9b
Down to Earth
Landscape & Irrigation
2701 Maitland Center Pkwy.
Suite 200
Maitland, Florida 32751
(321) 263-2700
Customer Address
Billina Address
Prime Construction
Gilbert Vincent
Gilbert Vincent
Prime Construction
1000 Jetstream Drive
1000 Jetstream Drive
Orlando, Florida 32824
Orlando, FL 32824
gvincent@primeconstructiongroup.com
407-856-8180
Project Estimated Project Start Date Proaosed By
Ocoee Stormwater Pond & Park
February 1, 2022 Steve Holland
Estimate: #52123
Phvsical Proiect Address
Ocoee Stormwater Pond & Park -
Construction
180 N. Cumberland Ave.
Ocoee, FL 34761
Due Date
September 22, 2021
Subcontracted Service (Do Not Schedule)
Aquatic Maintenance Dollar 1 $8,728.00 $8,728.00
Subtotal $8,728.00
Project Total $8,728.00
Proposed By:
Steve Holland 04/14/2023
Down to Earth
Landscape & Irrigation Date
Agreed & Accepted By:
Prime Construction Date
We hereby propose to provide all labor, materials and equipment necessary to complete the following work as per plans and specifications, including the installation
of the above, for all other Terms & Conditions please visit h,q s:i(cirelandsczzpe.comaenns-ar;U-co id :ions!.
1of1
Page 88 of 253
t-UU-=JD
Green Isle Gardens, Inc.
gignatives@gmail.com 1407-948-8980
11% 1- MO I I
Uown To Earth - Pick up or Delivery - 8-26-22
Thanks for your order!
Please review and pay at your earliest convenience.
We appreciate your business.
Customer Invoice Details
Amanda Perez PDF created March 27, 2023
Down To Earth $824.00
Amanda.perez@down2earthinc.com
321-689-4632
Storage/Maintenance fee
Subtotal
Square Fees (3%)
Total Paid
Payments
Aug 30, 2022 (American Express 1590)
Payment
Due August 26, 2022
$824.00
1 $800.00
view online
To view your invoice go to https://gosq.me/u/qfRYidnd
I Or open the camera on your mobile device and place the QR code in the camera's
O1C view.
Invoice #01326
Issue date
Aug 26, 2022
F-IT, T= Im
Page 89 of 253
Fj(-;U-Uuul)
Green Isle Gardens, Inc.
gignatives@gmail.com 1407-948-8980
Amanda - 9-23-22
Thanks for your order!
Please review and pay at your earliest convenience.
We appreciate your business.
Customer Invoice Details
Amanda Perez PDF created March 27, 2023
Down To Earth $824.00
Amanda.perez@down2earthinc.com
321-689-4632
Storage/Maintenance fee
Subtotal
Square Fees (3%)
Total Paid
Payments
Sep 30, 2022 (American Express 1590)
Payment
Due September 23, 2022
$824.00
Quantity Price
1 $800.00
0 View online
To view your invoice go to https://gosq.me/u/DgS8iLWe
O Or open the camera on your mobile device and place the QR code in the camera's
view.
Invoice #01417
Issue date
Sep 23, 2022
UTITISMIM
Page 90 of 253
r^'u-uv�v
Green Isle Gardens, Inc.
oignatkmx@nmaiioom|4n7'e*n'aean
� �� N� � �� ���� ����
������ �� ���~���� � � �
J=�"~.~=" °��=� �—=~° ~��_ ���� ���� ����
Thanks for your order!
Please review and pay atyour earliest convenience.
VVeappreciate your business.
Customer Invoice Details Payment
Amanda Perez PDFcreated March Z7,2U23 Due October 25,2O22
Down ToEarth $83480 $824.00
Amanda.perez@dmwn2earthin
o.com
321-689-4032
Items
Stomge/K8eintenancefee
Subtotal
Square Fees (3%)
Total Paid
Payments
view online
roview your invoice ovuzxupa://gosu.mo/u/oq,rmsva
-' o,open the camera onyour mobile device and place the Wncode inthe camera's
view.
invoice#u14e4-R«x0n1
Issue date
Oct zn'zozx
Recurring
Repeats monthly on the 25th
Repeats indefinitely
Price Amount
$800.00 *800.00
$800.00
Page 91 of 253
Green Isle Gardens, Inc.
oignatkmx@nmaiioom|4n7'e*n'aean
A �� �� � �� ���� ����
������ �� ���~���� � � �
Jp�°~,°=� °��°= Perez ���� ���� ����
Thanks for your order!
Please review and pay atyour earliest convenience.
VVeappreciate your business.
|n,oice#n14o4e+0oou
Issue date
Nov zn'uuuc
Customer Invoice Details Payment Recurring
Amanda Perez PDFcreated March 27,2O23 Due November 25i2O22 Repeats monthly onthe 25th
Down ToEarth $82480 $824.00 Repeats indefinitely
Amanda.perez@dmwn2earthin
o.com
321-689-4032
Items Quantity Price Amount
Stomge/K8eintenancefee
Subtotal
Square Fees (3%)
Payments
Km view online
~ roview your invoice ovuzxupa://gosu.m*/u/omwJsrov
o,open the camera onyour mobile device and place the Wncode inthe camera's
0 JENA view.
Page 92 of 253
Green Isle Gardens, Inc.
oignatkmx@nmaiioom|4n7'e*n'aean
������� �"����� ������������������
Jp��""=°� °��~= �-=~ ~� ����==�"�08� Storage ° �_ .� " ��~�
Thanks for your order!
Please review and pay atyour earliest convenience.
VVeappreciate your business.
mvoice#01494-R-o00a
Issue date
Dec zn'zozc
Customer Invoice Details Payment Recurring
Amanda Perez PDFcreated March 27,2O23 Due December 25i2O22 Repeats monthly onthe 25th
Down ToEarth $834.00 $82480 Repeats indefinitely
Amanda.perez@dmwn2earthin
o.com
321-689-4032
Items Quantity Price Amount
Stomge/K8eintenancefee
Subtotal
Square Fees (3%)
Payments
1
K��^^ view online
Toview your invoice gouzxupa://gosq.m*/u/vx,LcVoy
''- o,open the camera onyour mobile device and place the QRcode inthe camera's
view.
S0��
Page 93 of 253
Green Isle Gardens, Inc.
oignatkmx@nmaiioom|4n7'e*n'aean
������� ������� �������0����������
Jp��"°==�°��== �—=~ ~� ����=�"°���0 Storage ° °_ .� " ��==
Thanks for your order!
Please review and pay atyour earliest convenience.
VVeappreciate your business.
Customer
Amanda Perez
Down ToEarth
Amanda.perez@dmwn2earthin
o.com
321-689-4032
Stomge/K8eintenancefee
Subtotal
Square Fees (3%)
Invoice Details Payment
PDFcreated March 27,2O23 Due January 25.2823
1
Pay online
ropay your invoice mvu,xups//woaqm*/u/uooz/vo|
o,open the camera onyour mobile device and place the QRcode inthe camera's
view.
|n,oice#n14o4e+0oo4
Issue date
Jan zo'zUu3
Recurring
Repeats monthly onthe 25th
Repeats indefinitely
Page 94 of 253
Green Isle Gardens, Inc.
oignatkmx@nmaiioom|4n7'e*n'aean
A �� �� � �� ���� ����
������ �� ���~���� � � �
���°°�=°"��=� �—=~"~�°_ ���� ���� ����
Thanks for your order!
Please review and pay atyour earliest convenience.
VVeappreciate your business.
Customer
Amanda Perez
Down ToEarth
Amanda.perez@dmwn2earthin
o.com
321-689-4032
Stomge/K8eintenancefee
Subtotal
Square Fees (3%)
Invoice Details Payment
PDFcreated March 27,2O23 Due February 25,2O23
$82480 $824D0
1
Pay online
ropay your invoice mvu,xups//woaqm*/u/sz/ooHrp
o,open the camera onyour mobile device and place the WRcode inthe camera's
|nvuice#o14e4R-0moa
Issue date
Feb zo'uozn
Recurring
Repeats monthly onthe 25th
Repeats indefinitely
Page 95 of 253
Green Isle Gardens, Inc.
oignatkmx@nmaiioom|4n7'e*n'aean
A �� N� � �� ���� ����
������ �� ���~���� � � �
Jp�°~,~=" °��== �_~,, ~�°_ ���� ���� ����
Thanks for your order!
Please review and pay atyour earliest convenience.
VVeappreciate your business.
Customer
Amanda Perez
Down ToEarth
Amanda.perez@dmwn2earthin
o.com
321-689-4032
Stomge/K8eintenancefee
Subtotal
Square Fees (3%)
Invoice Details Payment
PDFcreated March 27,2O23 Due March 25i2023
1
%eL,
PayunUne
ropavyou,in,nim*mvu,xups//woaqm*/u/norL�ou
o,oponthooamomonyuurmubi|ode�oeendp|aoothoQRoodointhenamom'o
mvoice#01494-R-o00o
Issue date
Mar 2o'uncn
Recurring
Repeats monthly onthe 25th
Repeats indefinitely
Page 96 of 253
Green Isle Gardens, Inc.
oignatkmx@nmaiioom|4n7'e*n'aean
A �� �� � �� ���� ����
������ �� ���~���� � � �
Jp�°~°��� °��~= Perez ���� ���� ����
Thanks for your order!
Please review and pay atyour earliest convenience.
VVeappreciate your business.
Customer
Amanda Perez
Down ToEarth
Amanda.perez@dmwn2earthin
o.com
321-689-4032
Stomge/K8eintenancefee
Subtotal
Square Fees (3%)
Invoice Details Payment
PDFcreated March 27,2O23 Due April 25,2023
$83480 $824.00
1
view online
Toview your invoice gouzxupa://Qnxqme/u/Euxvp4qvv
''- o,open the camera onyour mobile device and place the Qncode inthe camera's
view.
mvoice#01494-goo07
Recurring
Repeats monthly onthe 25th
Repeats indefinitely
Page 97 of 253
Down to Earth
Landscape & Irrigation
2701 Maitland Center Pkwy.
Suite 200
Maitland, Florida 32751
(321) 263-2700
Customer Address
Billina Address
Prime Construction
Gilbert Vincent
Gilbert Vincent
Prime Construction
1000 Jetstream Drive
1000 Jetstream Drive
Orlando, Florida 32824
Orlando, FL 32824
gvincent@primeconstructiongroup.com
407-856-8180
Project Estimated Project Start Date Proaosed By
CO #5 - Added Irrigation Area
February 1, 2022 Steve Holland
Estimate: #55032
Phvsical Proiect Address
Ocoee Stormwater Pond & Park -
Construction
180 N. Cumberland Ave.
Ocoee, FL 34761
Due Date
September 22, 2021
Construction Installation
Irrigation Foreman
Hours
30
$75.00
$2,250.00
Irrigation Pipe Fitter
Hours
30
$50.00
$1,500.00
Irrigation Laborers
Hours
60
$45.00
$2,700.00
1 1/2" Class 200 Laterals
Linear Feet
100
$2.36
$236.25
14-1 Wire
Linear Feet
100
$1.66
$166.25
1 1 /2" Valve
Each
1
$185.00
$185.00
MISC Irrigation Parts
Each
1
$428.75
$428.75
Pine Bark Mulch
BG
30
$5.69
$170.63
TIF Bermuda
SF
5750
$1.25
$7,187.50
Proposed By:
Steve Holland
Down to Earth
Landscape & Irrigation
06/09/2023
Date
Subtotal $14,824.38
Project Total $14,824.38
Agreed & Accepted By:
Prime Construction Date
We hereby propose to provide all labor, materials and equipment necessary to complete the following work as per plans and specifications, including the installation
of the above, for all other Terms & Conditions please visit h,q s:i(cirelandsczzpe.comaenns-ar;U-co id :ions!.
1of1
Page 98 of 253
Customer Address
13111111no Address
Prime Construction
Gilbert Vincent
Gilbert Vincent
Prime Construction
1000 Jetstream Drive
1000 Jetstream Drive
Orlando, Florida 32824
Orlando, FL 32824
gvincent@pCimeconstructiongroup.com
407-856-8180
Project Estimated Proiect Start Date Pr000sed By
CO #1 Change Cordgrass from 3
February 1, 2022 Steve Holland
Galion to I Gallon
Tree/Plant Installation
Sand Cordgrass
2Eff -f�
Steve Holland
Down to Earth
ft(K.
=T
Phvsical Proiect Address
4.Gi,6a7-34rmwa'c6r rorrid-&F-ark -
Construction
180 N. Cumberland Ave.
Ocoee, FIL 34761
Due Date
Se,gte-aber 22. 2021
-1567.00 $10.50 ($16,453.5"M
1567.00 $6.74 $10,562.m
Subtotal ($5,890.92)
Project Total ($5,390.92)
Agreed &Accepted By:
Prime Construction Date
We hereby propose to provide all labor, materials and equipment necessary to complete the following work as per plans and specifications, including the installation
of the above, for all other Terms & Conditions please visit hth)vJicftelandscaue-comlnd-condftnsi.
1 Of 1
Page 99 of 253
Down to Earth
Landscape & Irrigation
2701 Maitland Center Pkwy.
Suite 200
Maitland, Florida 32751
(321) 263-2700
Customer Address
Billina Address
Prime Construction
Gilbert Vincent
Gilbert Vincent
Prime Construction
1000 Jetstream Drive
1000 Jetstream Drive
Orlando, Florida 32824
Orlando, FL 32824
gvincent@primeconstructiongroup.com
407-856-8180
Project Estimated Project Start Date Proaosed By
CO#6 Added Request generated
February 1, 2022 Steve Holland
from final walk through
Construction Installation
Estimate: #60067
Phvsical Proiect Address
Ocoee Stormwater Pond & Park -
Construction
180 N. Cumberland Ave.
Ocoee, FL 34761
Due Date
September 22, 2021
Landscape Foreman
EA
1
$1,050.00
$1,050.00
Landscape Equipment Operator
EA
1
$875.00
$875.00
Landscape Laborer
EA
1
$2,362.50
$2,362.50
Spartina Bakeri- 3 GAL
EA
52
$6.75
$351.00
Pine straw touch up
EA
30
$5.95
$178.50
Dwarf Fakahatchee 3 GAL
EA
45
$6.75
$303.75
15% Mark Up
EA
1
$768.11
$768.11
Subtotal
$5,888.86
Project Total
$5,888.86
Proposed By:
Steve Holland
Down to Earth
Landscape & Irrigation
08/09/2023
Date
Agreed & Accepted By:
Prime Construction Date
We hereby propose to provide all labor, materials and equipment necessary to complete the following work as per plans and specifications, including the installation
of the above, for all other Terms & Conditions please visit h,q s:i(cirelandsczzpe.comaenns-ar;U-co id :ions!.
1of1
Page 100 of 253
Gilbert Vincent
From: Erin Coates <Erin.Coates@down2earthinc.com>
Sent: Wednesday, August 9, 2023 3:28 PM
To: Gilbert Vincent
Subject: Proposal
Attachments: Ocoee Walkthrough note proposal.pdf
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.
Good afternoon, Gilbert.
I tried to call you a couple of times today to talk you through what I did on this proposal. So according to GAI's inspection and notes for the additional plants for the
slope over at the "boat ramp" there is no irrigation in that area, and we are not able to install any unless there is some sleeve the is potentially running through the
wall. So, what I did instead of added the dwarf fakahatchee in this area along with the spartina bakeri, I just made the entire bed spartina bakeri. This plant does not
require long term watering so we can water them in a couple of time and let the rainwater take it from there. Unless you can provide me with a sleeve that I can access
then I would have to revise this proposal.
Call me so that we can discuss it further so that you understand what I did here. Thanks!
Erin A. Coates
Re iorial Landscape Construction Mar.iager.
352-630-5049
Call — 352-4E -82 0
Erin.coates@down2earthinc.com
Page 101 of 253
PCB-009b
PEBBLE JUNCTION INC.
702 SOUTH FRENCH AVE
HIGHWAY 17-92
SANFORD, FL 32771
(407)323-3838
1-800-541-8996
FAX 407-323-5413
SOLD TO:
PRIME CONSTRUCTION GROUP
1000 JETSTREAM DR.
Orlando, FL 32824
Phone: 407-856-8180
Fax:
CUSTOMER P.O.
2nd of 25 - Deliveries
ITEM NO.
8230-T
FLORIDA FIELDSTONE BOULDERS
This Florida Field Stone would be
12" - 18" in Diameter. This Delivery would
take place on a Tandem ( Tri - Axle) Dump
Truck
Invoice
W. "Your One Stop Rock Shop"
PEBBLE
NCTIOM4,".M
oA>oAU
Page:
INVOICE NUMBER: 0415807-IN
INVOICE DATE: 11/28/2022
ORDER NUMBER: 0107189
ORDER DATE: 8/11/2022
SALESPERSON: 0002
CUSTOMER NO: PRIO072
SHIP TO:
Intersection of Cumberland
Drive and West Franklin St.
Ocoee, FL 34761
SHIP VIA
MIGUEL TRUCKING
UNIT ORDERED SHIPPED
TN S 18.000 11.460
Deposit Ref Total
CC #130699 3.083.04
TERMS
NO TERMS
0
BACK ORD PRICE AMOUNT
0.000 236.1300 2.706.05
Net Invoice: 2,706.05
Less Discount: 0.00
Freight: 201.10
Sales Tax: 175.89
Invoice Total: 3,083.04
Change Less Deposit: 3,083.04
0.00 Invoice Balance: 0.00
30% RESTOCKING FEE ONALL A UTHORIZED RETURNS!
THERE ARE NO RETURNS AFTER 30 DAYS!
ALL RETURNS MUST BE IN ORIGINAL PACKAGING!
VALID RECEIPT MUSTACCOMPANYALL RETURNS!
THERE IS NO RETURN ON THIN STONE VENEER PRODUCTS!
THERE IS NO RETURNS ON CONCRETE GOODS!
Stone is a product of nature so the color of the stone may vary according to the area it is quarried or mined in.
Also, the thickness of the stone may vary plus or minus from
what is stated on the price list with each new shipment. Bulk gravel stone sizes
are based on a range of sizes and may run bigger or smaller than size stated on price list.
Page 102 of 253
La Costa Sod LLC
23632 Kays Way
Astatula, FL 34705
+1 4072712991
BILL TO SHIP TO
Prime Construction Group, Inc. Ocoee
1000 Jetstream Drive
Orlando, FL 32824
•mm �Imouulllu �� .�.
WORK IS NOT GUARANTEED IF AREA IS NOT IRRIGATED
CONTRACTOR IS RESPONSIBLE FOR ALL WATERING.
SUBTOTAL 6,755.00
TAX 0.00
TOTAL 6,755.00
III...
Page 103 of 253
PCO-009b
T0901M
Bill To:
Prime Coostruction Group
Rov
1060 Jetstrearn Dr
Oflaiido, Fl, 32824
Phone: 4078 568180
luvoice Number: 3411423
itivoice Date: 6/2812023
CUstorner NUrnber- 1IR1380
flage #: I
Terms: Net Due Upon Receipt
PO Nuinbei-:
Work Site:
Ocoee Storm Water
103 West Frat)klio
Ocoee, FL 34761
Erick 407-686-25 16
Description
Date
Ticket h
flours
Bill Rate
A111011nt
GOMEZ, SANTIAGO JOSE
6 / 19 /2) 02 3
1118011
30,00
1ic-
SNAO
S582.00
MikTOS, JESUS JOSE
6/19PI2023
1118011
30,00
Re-
519.40
S58100
pEREZ, NE'l-SY
6/19/2023
1118011
30.00
Reg
S1 9A0
$582.00
[iODRIG(A`X LUCAS
6/19/2023
1111671
30.00
Re-
S 19.40
$582.00
Current Bi11in2 Anah,sis
Hours Billing
RC-Uklr; 120.00 S2,32SM
Overtillic: 0.00 S(M)()
Expenses: S0.00
Totals 120.00 $2.328.00
Roy Remittance Stub
Prime CoostrLICtion Group InvoiceDate ClientNumber InvoiceNumber
1000 J etstream Dr
Orlando, IL 32824 6/28/2023) P R13) 80 33,411,423
Setid Remittatice To- Pay This Amount: S2,328.00
PINT Staffing X Tricom THANK YOU FOR YOUR BUSINESS!
P.O. Box 13188
Milwaukee, Wl 53213-0188
The monies represented by this billing are subject to a security interest by the remittance addressee.
Remittances may not be sent to any other address except the one appearing on this invoice.
Page 104 of 253
PCO-009b
T
- - W114-1
Page 105 of 253
PCO-009b
daunt
'il Ay"
44
'Work Order L4'jl-WAI�
g"g-ogg
tilgim
-1,111, F
Page 106 of 253
PCO-009b
INVOICE
Bill To:
Prime Comtructioa GI-OLIP
Roy
1000 Jetsti-eam W
Odmido, 11- 32824
Phoile: 4078568180
Description
Date Ticket 4
I iivo ice X Umber: 3411572
Invoice Date: 7 /6 121 0 2 3
Customer NUMber: PRI380
Page #: I
Terms: Net Due Upon Receipt
PO Number:
Work Site:
Ocoee Storm Water 921797
180 N' Cumberland Ave
Ocoee, Fl, 3,1761
Lii 808-561-2610
I lours Bill Ratc Amowit
DIAZ, YAIMEG
6/261,2023
1111134
40.00
Reg
519.40
S776.00
I lertmodez, Kevin- J
6/26/2023
1111134
40.00
Re-
$19AO
5776M
RINCON, JOSE
6/26/2023
1111133
30.00
Reg
$19.40
558100
RINCON,, PAOLA
6/26/2023
1111133
30.00
Re-
$19.40
5582.00
DIAZ. YAIMEG
7/1/2023
1111139
8,00
OT
529.10
S232.80
Hernandez, Kevin- J
7/1/2023
1111139
8.00
OT
529. 10
$232.190
Current 1lillin2 Analvsis
Hours Billie-,
Reaular: 140.00 S2,716.00
Ovellime: 16.00 $465.60
I'Apenses: $(M)()
Totals 156.00 S3,181.60
Rov
Prime Construction Group
1000 J etstrcam 1) r
Orlando, Fl- 32824
Seiid Remittance To:
PRT Staffing \ Tricom
P.O. Box 13188
Milwaukee, Wl 53213-0188
Remittance Stub
Tnvoicef)atc ClientNumber InvoiceNumber
7/6/2023 PR1380 33,411 572
1"ay This Amount: 53,181.60
THANK YOU FOR YOUR BUSINESS!
T lie monies represented by this billing are subject to a security interest by the remittance addressee.
Remittances may not be sent to any other address except the one appearing on this invoice.
Page 107 of 253
PCO-009b
Efate
2-1
Company
JOb Site Name
Job Site Address
Report. To "".)/ //
0.7,
Phone Number �4'
L6 1)-014,
jo,
1', 6r,Questio'ns''' ob If
MY—
please Call With
Purchas order
Store Phone:
and„oonrt to�ak foAh on the laYMO 5.de hereOf and cerfilie�', that k��e listed employees have satisfactud,y podormed Services Tor the hours shoviR
GUS!", -'eed Pr" CLS!Omer also a-4 r'c.Naed@ez that if is pc'=)nrt R��sponte Tflam's NlIcy to Pr
ovide equaliky 01 opportunWy lot ZT1 a, btf wT S' P 41 c6g�n' 290� OYE�CW W m;-Mal di"Utilies, or se,.�tjsj orienja�%srmnel esPonseTearn's -Apkeyees
flo'4' R
L'O for Q Orld, %j�j be: sld policy epplIes with equal force lc� the
of di 4 mod, PERSONNEL RESPON�E TEAM Stafting �vjjll 1101 Idjefate d scjf,�jn
raq3rdjc�' %D CL14 allion arlat sk�or Ila
13
afflpl'�OL"
AN
'Authoeized,
re
7 or,
natum,
"'Q: ww -N
Page 108 of 253
�Mw
Page 109 of 253
F' ®009b
ui
e a
w
Y
5„ tiS
31,
vy
'
A
SY
S
Page 110 of 253
Ocoee asphalt tickets - Tabulation
7/14/2023
7/17/2023
TICKET # NET TONNAGE
TIME
TICKET #
NET TONNAGE
TIME
605393
22.48
7:21
605667
21.28
7:26
605397
20.53
7:27
605670
21.03
7:30
605399
21.37
7:30
605674
22.6
7:35
605428
22.45
9:18
605713
20.1
8:47
605441
21.09
9:47
605727
21.32
9:49
605447
21.64
10:00
605764
21.11
11:37
605463
21.16
10:34
605766
20.21
11:39
605473
21.64
11:00
605779
21.19
12:32
605474
21.46
11:02
605783
22.56
12:51
605490
21.34
11:30
605798
21.12
14:38
605493
20.38
11:39
605494
22.79
11:44
Total
258.33
Tons
Total
212.52
Tons
470.85 Tons Installed
344 Tons Bid
126.85 Tons Change Order
Page 111 of 253
%I L O FL 32824
—-007
Date: 07/14/23 FOOT Plant #: A055C Ticket #; 605494
Time; 11:44 FDOT FIN C Plant; 12
*** Silo 2 Loadout
Customer; 4 Ja ; 42394
Middlesex Paving LLC Ocoee Master Stem
10501 Cosmonaut Blvd
Orlando , FL 32524
407-206-0077
P.O.#. 43 94
2r1jell 13479
Massive Transportation , Paving
Truck, MA7666 Greg Pyle
License:
z_0a@j 0
o c � 2121 Default
SP 12.5 C
JMF. SP20--18324A
(daily) Leads: 12 Amount: 256.33 TN 23C 36 Mg
(To -Date) Loads: 12 Amount: 258a33 TN 234.36 Mg
Gross: 3C 99 TN 69960 lb 31�74 Mg
Tare, 12,20 TN 24400 lb 11.07 M9
Net: 22.79 TN 45560 lb & 6a6 Mg
Received
Orlando Scale
Page 112 of 253
PCO-009C
MIDDLESEX ASPHAL-T LLC
10801 COSMONAUT BLVD
ORLANDO . F1_ 32824
407-206-0077
Date; 07/14/23 FDOT Plant #; AMU Ticket #; 605493
Time: 11:39 FDOT FIN #: Plant. 12
*** Silo 2 Loadout
Lusto jLe r: 4 Jo L 4,B94
Middlesex Paving LLC Ocoee Maser Storm
10801 Cosmonaut Blvd
Orlando , FL 32824
407-206-0077
KDA: 43E94
UrLi@L:, 111901
CAC Transport Corporation Eb§sa- Paving
Truck: EAC7023 Greg Pyle
License:
BUAU c t : 2121 Default
SP 12.5 C
JMF: SP20-18324A
(Daily) Loads: 11 Amount: 235.54 TN 213.68 Mg
(To -Date) Loads: 11 Amount: 235.54 TN 213,68 Mg
Gross: 34.66 TN 69320 lb 31,44 Mg
Tare: 14.28 TN 28560 lb 12.96 M9
Net: 20.38 TN 40760 lb 18d49 M9
Received By:
Weighmaster: Orlando Scal.-
Page 113 of 253
PC P009C
10801 COSMONAUT NAUTBLVD
407-206-0077
Cate: 07/14/23 FDOT Plant #: aOSC: Ticket #: 60549O
Time: 11:30 FDOT PIN #A Plant: 12
*** Silo 2 Loadout
C s° ' 4 Ja : 411394
Middlesex Paving 11C Ocoee Maser Storm
1O8O1 Cosmonaut Blvd
Orlando t FL 32824
407-20-0077
P X : 43394
1
Middlesex Company
True: 5O4059
License;
E_rqALjct= 2121
6P 12,5 C
JMF; 3P2O-18324A
(Daily) loads: 10
(To -Date) Loads: 10
Etg—se*. Paying
Greg Pyle
Amount: 215.16 TN 1,95.19 Mg
Amount: 215.16 TN 195.19 M9
Gross: 3C 33 TN 68660 lb 31,14 Mg
Tare: 12A9 TN 25980 lb 11.76 M
Net: 21A4 TN 42680 lb 19,36 Mg
Received By:
r
Page 114 of 253
PCO-00 C
R L. CE O � FL 32824
407-206-007-7
Date; 07/14/23 FDOT Punt #: A0560 Ticket #: 605474
Time 11:02 FDOT FIN #: Plant: 12
)P* Silo 2 Loadout
Lajoe 4 Jo ° 4-894
Middlesex Paving LLC Ocoee Master Storm
10801 Cosmonaut Blvd
Orlando a FL 32B24
407-206-0077
P.0 A . 43594
Cr e: 1
Middlesex Company
Track: 504050
License:
E o cL� 2121
SP 12>5 C
,JMF. SP 0-18324A
(Daily) Loads: 9
(To --Date) Loads: 9
Ebagel Paving
Greg Pyle
Amount: 193.82 TN 175.83 Mg
Amount: 193,52 TN 175.83 Mg
Grass: 34A1 TN 68820 lb 31.22 Mg
Tare: ILK TN 25900 lb 11,75 Mg
Net: 2% 46 TN 42920 lb 19,47 Mg
�Aeceived BY:
highmaster: Orlando Scale
Page 115 of 253
10801 COSMONAUT BLVD
L D O FL 32824
407-206-0077
Date: 07/14/23 FOOT Plant #, A0561 Ticket #: 605473
Time: 11:00 FDOT FIN ; Plant, 12
*** Silo 2 Loadout
C s o r° 4 So L 43304
Middlesex Paving LLC Ocoee Master Storm
10801 Cosmonaut Blvd
Orlando m FL 32824
407-206-0077
P.O.#, 429
', 168905
Wubay Services LLC ELaqK. Paving
Truck; N003 Greg Pyle
License:
Z2261 0
Ero cct° 2121 Default
SP 12.5 C
,IMF; SP20-18324A
(lady) Loads: 6 Amount, 172.36 TN 156.36 Mg
(To -Date) Loads: B Amount: 172,36 TN 156s36 Mg
Gross: 34.73 TN 69460 lb 31,51 Mg
Tare; 13>09 TN 26180 lb 11.88 Mg
Net; 21>64 TN 432BO Ib 10a63 Mg
Received By:
Page 116 of 253
MIDDLESEX ASPHALT LLC
10801 COSMONAUT BLVD
ORLANDO . FL 32824
407-206-0077
Date; 07/14/23 FDOT Plant C A0560 Ticket #: 605463
Time: 10:34 FOOT FIN #: Plant: 12
)w Silo 2 Loadout
L49cEgn 4 Lohl 43894
Middlesex Paving LLC Ocoee Master Storm
10801 Cosmonaut Blvd
Orlando , FL 32824
407-206-0077
P.Q. 43894
GArrigi Nala
Nala Trucking Eb&sL Paving
Truck: NT916 Greg Pyle
License:
Z-OnK 0
Er2dLLoL 2121 Default
SP 12.5 C
JMF: SP20-18324A
(Daily) Loads: 7 Amount: 150.72 TN 136.73 Mg
(To -Date) Loads: 7 Amount: 150.72 TN 136.73 Mg
Gross: 34,60 TN 69200 lb 31.39 Mg
Tare: 13.44 TN 26880 lb 12.19 Mg
Net: 21.16 TN 42320 lb 19.20 Mg
Received By:
Weighmaster: Orlando Scah
Page 117 of 253
407-206-0077
Date: 07/14/23 FDOT Plant #; A056Ticket #: 605447
Time: 10:00 FOOT FIN #/ Plant: 12
*** Silo 10 Lomdout **�
Customer� 4 Lohl 43894
Middlesex Paving LLC Ocoee Master Storm
10801 Cosmonaut Blvd
Orlando . FL 32824 .
407-206-0077
Levis Transport LLC pjjs@, Paving
Truck: L713 Greg Pyle
License:
Zoae- O
9LoQdgct, 2121 Default
SP 12.5 O
JMF: SP28-18324A
(Daily) Loads: 8 Amount;129.56 TN 117.54Mg
(To -Date) Loads: 8 Amount: 129.58 TN 117.54 NB
_
Gross: 35.22 TN 70440 lb 31.95 Mg
Tare: 13.58 TN 27160 lb 12.32 Mg
Net: 21.84 TN 48280 ]b 19.63 Mg
Received By:
Page 118 of 253
7——007
Date: 07/14/23 FDOT Plant #: A056,' Ticket #> 605441
Time; 09:47 FDOT FIN #: Plant: 12
** Silo 10 Loadout ,***
LqLtomger, 4 Jo 43594
Middlesex Paving LLC Ocoee Master Storm
10501 Cosmonaut Blvd
Orlando , FL 32824
407-206-0077
P , O A - 43394
g4r,jer, 111901
EAC Transport Corporation P s : Paving
Truck; EAC7013 Greg Pyle
Licenses
,o 0
2121 Default
SP 12.5 C
JMF: SP20-18324A
(Daily) Loads: 5 Amounts 107.92 TM 97 A0 M9
(To -Date) Loads: 5 Amount. 107,92 TN 97 AO Mg
Gass: 34.74 TN 69460 lb 31,52 Mg
Tare: 13.65 TN 27300 In 12.38 Mg
Nets 21,09 TN 42130 l5 19.13 Mg
Received By:
Page 119 of 253
O L. D L 32824
�"'c - 2 0 —
Date: 07/14/23 FDOT Plant #: AO561i Ticket #: 600426
Time: 09:16 FDOT FIN #: Plant: 12
*)�* Silo 10 Loadout **�
Custo e 4 Jo 43334
Middlesex Paving LLG Ocoee Mas°er Storm
10801 Cosmonaut Blvd
Orlando a FL 32824
407-206-0077
P.O.: 43664
C•a r° 13470
Massive Transportation soa Paving
Truck: M,AS7866 Drag Pyle
Licensee
10-M 0
EEgduct' 2121 Default
SP 12 A C
JMF: SP2O-18324A
(Daily) Loads: 4 Amount: 86=83 TN 76.77 Mg
(To -Date) Loads: 4 Amount; 66.83 TN 78.77 Mg
Gross: 3C 6O TN 6936O )b 31A6 Mg
Tare: 12.23 TN 24460 lb 11.10 Mg
Net: 22.45 TN 440O0 lb 20.37 Mg
Received By:
Weighmaster: Orlando Scale
Page 120 of 253
10801 COSMONAUT BLVD
L FL 32824
—7
Date: 07/14/23 FDOT Plant #; A0560 Ticket : 605399
Time; 07:30 FOOT FIN #; Piano 12
*** Silo 7 Loadout
Lqktm@Lj 4 Job, 43594
Middlesex Paving LLC Ocoee Master Storm
10801 Cosmonaut Blvd
Orlando m FL 32624
407-206-0077
P.O,#; 4394
Middlesex Company P se; Paving
Truck: 504059 Greg Pyle
License;
Zo e. 0
r uctc 2121 Default
SP 12�5 C
JMF; SP20-16324A
(Daily) Loads 3 Amount: 64.36 TM 56.41 M
(To --Date) Loads: 3 Amount: 64.36 TN 56.41 Mg
Gross: 34A3 TN 69660 lb 31.24 Mg
Tare, 13>06 TN 26120 lb 11.35 Mg
Net: 21.37 TN 42740 lb 19.39 Mg
OrlandoReceived By:,
Page 121 of 253
407-206-0077
Date; 07/14/23 FDDT Plant #: A0560 Ticket #: 605387
Time: 07:27 FQOT FIN Plant: 12
*** Silo 7 Loadmut ***
Customer: 4 Jo&- 43894
Middlesex Paving LLO Ocoee Master Storm
10801 Cosmonaut Blvd
Orlando , FL 32024 .
407-206-0877
P.O.#: 43894
Ca2LLqu 111901
EAC Transport Corporation Ebgse, Paving
Truck: EAC7023 Greg Pyle
License:
LoQRe. O
PIgdWkt 2121 Default
8P 12.5 C
JNF: 3P20-18324A
(Daily) Loads: 2 Amount: 43.01 TN 39.02 Ng
(To -Date) Loads: 2 Amount/ 43.01 TN 39,02 MS
Gross: 34.83 TN 69660 lb 31.60 Mg
Tare: 14.30 TN 28600 lb 12.97 Mg
Net: 20.53 TN 41060 lb 18.63 Mg
Received By:
Page 122 of 253
MIDDLESEX ASPHALT LLC
10801 COSMONAUT BLVD
ORLANDO . FL 32824
407-206-0077
Date: 07/14/23 FDOT Plant #: A056,' Ticket #. 605393
Time: 07:21 FDOT FIN #: Punta 12
Silo 7 Loadout r**
Cusco e � 4
Middlesex Paving LLC
10801 Cosmonaut Blvd
Orlando , FL 32824
407-206-0077
kCrj&U 136479
Massive Transportation
Truck: HAS7866
License:
Jo a 43894
Ocoee Master Storm
Lane. -1 0
eLgLuc_t: 2121 Default
SP 12, 6 C
JMF: SP20-18324A
(Daily) Loads: 1 Amount: 22,48 TN 20.39 Mg
(To -Date) Loads: 1 Amount: 22.48 TN 20.39 M9
Gross: 34.74 TN 69480 lb 31.52 Mg
Tars: 12.26 TN 24520 lb 11,12 M9
Net: 2L48 TN 44960 lb 20.39 Mg
Received By:
U,2&.12_&L,k,E214 ff-LAW&O—L
Page 123 of 253
PCO-009C
MIDDLESEX ASPHALT LLG
10801 COSMONAUT BLVD
ORLANDO . FL 32824
7—
Date: 07/17/23 FDOT plant #: A0560 Ticket #; 60579128
Time: 14:38 FDOT FIN #: Plant:
Silo 10 Loadout
4 Jo 43894
Middlesex Paving LLC Ocoee Master Storm
10801 cosmonaut Blvd
Orlando , FL 32824
407-206-0077 P.O.: 43894
garrieu 111901
EAC Transport Corporation
Truck: EAC7013
License:
Eno� "c- 2121
SP 12.5 C
JMF: SP20-18324A
(Daily) Loads: 10
(To -Date) Loads: 22
WWI
Amount: 212.52 TN 192.80
Amount: 470.85 TN 4 1
Gross: 34.77 TN 69540 lb 31.54 Mg
Tare: 13.65 TN 27300o lb 12.38 Mg
Net: 21.12 TN 42240 lb 19-16 Mg
Received By:
Weighmaster: Orlando Scale
Page 124 of 253
MIDDLESEX ASPHALT LLG
10801 COSMONAUT BLVD
ORLANDO32824
407-206-0077
Date: 07/17/23 FDOT Plant #: A0560 Ticke6 t #: 05783
Time: 12:51 FDOT FIN #: Plant: 12
*** Silo 10 Loadout
ajjMjU 4 Lot 43894
Middlesex Paving LLC Ocoee Master Storm
lowl cosmonaut Blvd
Orlando , FL 32824
407-206-0077 P.O.: 43894
CAELLea 136479
massive Transportation
Truck: MAS7866
License:
EU.d "c 2121
SP 12.5 C
JMF: SP20-18324A
(Daily) Loads: 9
(To -Date) Loads: 21
ROW
Amount: 191.40 TN 173.69"Ag
Amount: 449.73 TN 40799 Mg
Gross: 34,74 TN 69480 lb 31.52 Mg
Tars: 12.18 TN 24360 lb 11.05 Mg
Net: 22.56 TN 45120 lb 20.47 Mg
Received By:
Weighmaster: Orlando Scale
Page 125 of 253
407-206-0077
Date: 07/17/23 FOOT Plant #: A8560 Ticket #: 605779
Time: 12:32 FDOT FIN Plant: 12
*** Silo 10 Lomdout *�*
CQ=ea4 LoL 43894
Middlesex Paving LLC Ocoee Master Storm
18801 Cosmonaut Blvd
Orlando . FL 32824 .
407-206-0077
LUOLLQU 111901
EACTransport Corporation Pbgse-paving
Truck: EAO7000 Greg Pyle
License:
10y08,_ O
D f�ult
EZ���� Q12� �
QP 12.5 C
JMF: GP20-18324A
(Daily) Loads: 8 Amount; 168.84 TN 153.17 Mg
(To -Date) Loads: 20 Amount: 427.17 TN 387.53 Mg
Gross: 34.65 TN 69300lb 31.43 Mg
Tare: 13.46 TN 26920 lb 12.21 Mg
Net: 21.19 TN 42880 lb 19,22 Mg
Received By:
Page 126 of 253
FIDDERM
MIDDLESEX ASPHALT LLC
10801 COSMONAUT BLVD
ORLANDO , FL 32824
407-206-0077
Date; 07/17/23 FDOT Plant A0560 Ticket #; 605768
Time: 11:39 FOOT FIN #: Plant: 12
*** Silo 10 Loadout
C4Ltmu - 4
Job® 43894
Middlesex Paving LLC Ocoee Master Storm
10801 Cosmonaut Blvd
Orlando , FL 32824
407-206-0077
P.O.: 43894
EC Transport Corporation Ebjqel Paving
Truck: EAC7017 Greg Pyle
License:
Lai
ELodggt 2121 Default
SP 12.5 C
JMF: SP20-18324A
(Daily) Loads: 7 Amount: 147.65 TN 133.95 Mg
(To -Date) Loads: 19 Amount: 405.98 TN 368.30 Mg
Gross: 34.42 TN 68840 lb 31.23 Mg
Tare: 14.21 TN 28420 lb 12.89 Mg
Net: 20.21 TN 40420 lb 18.33 Mg
Aeceived By:
L& I dffre�pl&nl �1, '".9W8
Page 127 of 253
KANORM
MIDDLESEX ASPHALT LL*
10801 COSMONAUT BLVD
ORLANDO , FL 32824
407-206-0077
Date; 07/17/23 FDOT
Plant #: A0560 Ticket #; 605764
Time: 11:37 FOOT FIN #: Plant: 12
*** Silo 10 Loadout
LL Ls c: 4
JoL 43894
Middlesex Paving LLC
Ocoee Master Storm
10801 Cosmonaut Blvd
Orlando , FL 32824
407-206-0077
P.O.: 43894
corrie - 111901
EAC Transport Corporation
Ebgse-, Paving
Truck: EAC7013
Greg Pyle
License:
LOU@! 0
eLodwkt, 2121
Default
SP 12.5 C
JMF: SP20-18324A
(Daily) Loads: 6 Amount: 127.44 TN 115.61 Mg
(To -Date) Loads: 18 Amount: 385.77 TN 349.97 Mg
Gross: 34.77 TN 69540 lb 31.54 Mg
Tars: 13.66 TN 27320 lb 12.39 Mg
Aet: 21.11 TN 42220 Ib 19.15 Mg
Received By:_
Weighmaster: Orlando Scalt
Page 128 of 253
407-206-0077
Date: 07/17/23 F&OT Plant #: A0560 Ticket #: 005727
Time: 09:49 FOOT FIN #: Plant: 12
*** Silo 10 Loadout
Iu&toLe 4 Job: 43884
Middlesex Paving LLC Ocoee Master Storm
10801 Cosmonaut Blvd
Orlando , FL 32824 .
407-206-0077
EAC Transport Corporation Eh_@sw. Paving
Truck: EAC7008 Greg Pyle
License:
zom O
pUJMct 2121 Default
DP 12.5 C
JNF: gP20-18324A
(Daily) Loads/ S Amount/ 106.33 TN 88.46 M0
(To -Date) Loads: 17 Amount: 384.88 TN 330.82 Mg
Gross: 34.82 TN 69640 lb 31.59 Mg
Tare: 13.50 TN 27000 lb 12.25 Mg
Net: 21.32 TN 42640 lb 19.34 Mg
Received By:
Weighmaster: Orlando Scale
Page 129 of 253
407-206-0077
Date: 07/17/23 FQOT Plant #: A0560 Ticket #: 805713
Time: 08:47 FOOT FIN #; Plant: /2
*** Silo 10 Lomdout ***
�sbo�� � �L43884
Middlesex Paving LL8 Ocoee Master Storm
10801 Cosmonaut Blvd
Orlando . FL 32824 .
407-288-0077
2ACTransport Corporation EbAse- Paving
Truck: EAO7017 Greg Pyle
License:
zgnei. U
ftod&l 2121 Default
8P 12.5 C
JMF: SP88-18324A
(Daily) Loads: 4 Amount: 85.01 TN 77.12 M8
(To -Date) Loads: 16 Amount: 343.34 TN 311.48 NB
Tare: 14.31 TN 28620 lb 12.98 Mg
Net: 20.10 TN 40200 lb 18.24 Mg
Received By: ___
Page 130 of 253
MIDDLESEX ASPHALT LLC
10801 COSMONAUT BLVD
ORLANDO , FL 32824
407-206-0077
Date: 07/17/23 FDOT Plant #: A0560 Ticket #: 605674
Time: 07:35 FDOT FIN #: Plant: 12
*** Silo 10 Loadout
Customer: 4 joj?j 43894
Middlesex Paving LLC Ocoee Master Storm
10801 Cosmonaut Blvd
Orlando , FL 32824
407-206-0077
P.O.: 43894
ggffjxj 136479
Massive Transportation ablLe. Paving
Truck: MAS7866 Greg Pyle
License:
ZonK. 0
ErLct: 2121 Default
SP 12.5 C
JMF: SP20-18324A
(Daily) Loads: 3 Amount: 64.91 TN 58.89 Mg
(To -Date) Loads: 15 Amount: 323.24 TN 293.24 Mg
Gross: 34.64 TN 69280 lb 31.43 Mg
Tare: 12.04 TN 24080 lb 10.92 Mg
Net: 22.60 TN 45200 lb 20.50 Mg
- MM
Page 131 of 253
407-206-0077
Date: 07/17/23 FDUT Plant #: A0550 Ticket #: 005670
Time: 07:30 FOOT FIN #: Plant: 12
*** Silo 10 Lomduut
Mimn 4 JnL 43894
Middlesex Paving LLC Ocoee Master Storm
10801 Cosmonaut Blvd
Orlando . FL 32824 .
407-206-0877
P.D-#; 43094
EAC Transport Corporation fhjsjj Paving
Truck: EAD7013 Greg Pyle
License:
3joIe- O
E[gduIL 2121 Default
SP 12.5 D
J#F: 3P20-10324A
(Daily) Loads: 2 Amount; 42-31 TN 38.38 Mg
(To -Date) Loads: 14 Amount: 300.64 TN 272.74 Mg
Tars: 13.71 TN 27420 lb 12.44 Mg
Received By:
Page 132 of 253
MIDDLESEX ASPHALT LLC
10801 COSMONAUT BLVD
ORLANDO , FL 32824
407-206-0077
Date; 07/17/23 FDOT Plant #: A0560 Ticket #: 605667
Time: 07:26 FDOT FIN #: Plant: 12
*** Silo 10 Loadout
4 J_gb-, 43894
Middlesex Paving LLC Ocoee Master Storm
10801 Cosmonaut Blvd
Orlando , FL 32824
407-206-0077
P.O.: 43894
Efflie .0 111901
EAC Transport Corporation Eb&sK Paving
Truck: EAC7000 Greg Pyle
License:
LOOL 0
ftodggt, 2121 Default
SP 12.5 C
JMF: SPO-18324A
(Daily) Loads: 1 Amount: 21.28 TN 19.31 Mg
(To -Date) Loads: 13 Amount: 279.61 TN 253.66 Mg
Gross: 34.81 TN 69620 lb 31.58 Mg
Tars: 13.53 TN 27060 lb 12.27 Mg
Not: 21.28 TN 42560 lb 19.31 Mg
Received By:
Weighmaster: Orlando Scale
Page 133 of 253