Loading...
HomeMy WebLinkAboutItem 12 Approval of 2023-2024 Traffic Signal Capital Improvement Projects with Control SpecialistsMeeting Date: November 7, 2023 Item #: 12 Contact Name: Stephen Krug Department Director: Stephen Krug Contact Number: Ext. 6002 City Manager: Robert Frank Background Summary: Public Works included the following traffic signal system maintenance projects in the Capital program for the current budget: 1. Replace span and signal wires at Maguire Rd. and Story Rd.- $131,000. 2. Replace video detection system at Mckey St. and Bluford Ave. - $36,900. Both items 1 and 2 are normal lifespan maintenance for the signals on City rights of way. Public Works solicited pricing from the City's Traffic Signal Maintenance Contractor, Control Specialists, for the projects as they will be responsible for maintenance. The attached quotes are in line with FDOT construction industry pricing. Public Works recommends issuing a purchase order to our Traffic Signal Maintenance Contractor, Control Specialists, as they will be responsible for the maintenance of the capital projects which are adequately funded in the budget. Issue: Should the Honorable Mayor and City Commissioners approve issuing a purchase order to Control Specialists Corp. for the traffic signal system maintenance projects incorporated in the current budgeted Capital program? Recommendations: Staff recommends the Honorable Mayor and City Commissioners approve issuing a purchase order to the City's Traffic Signal Maintenance Contractor and Control Specialists, to; 1) replace the span and signal wires at Maguire Rd. and Story Rd. for $131,000, 2) replace the video detection system at Mckey St. and Bluford Ave. for $36,900, and authorize the City Manager and staff to approve and execute change orders to the work in accordance with the limits established in the Purchasing Code. Staff also recommends approval to transfer remaining funds from the Street Operations Capital Improvements line 317-541-10-6302 ($6,900 from Rebuilding 5 Flashing School Zone Lights) to cover the additional $6,900 in costs for replacing the video detection system at Mckey St. and Bluford Ave. City of Ocoee - 1 N. Bluford Avenue - Ocoee, Florida 34761 • ,_ 1 90 10 • •-- • • Page 145 of 241 Attachments: 1. ReyoenMaguire and Story Rd. 2. Replace Video Detection W1okevand B|ufond Financial Impacts: The cost of the vvurh is adequately funded in the Streets Division Capital Program for Public VVorha, with the inclusion of the fOUOvvng request: transfer remaining funds from the Street {)p8r8bOnS Capital |nOprOv8nnentS line 317-541-1O-0302($0.900from Rebuilding 5Flashing School Zone Lights) b)cover the additional $8.900 in costs for replacing the video detection system at Mckey St. and Bluford Ave. Type of Item: Consent City of Ocoee - 1 N. Bluford Avenue - Ocoee, Florida 34761 Page 146 of 241 Traffic and Management, LLC Control Specialists Construction, Service andWdintenawce 707 Nfc let Ave, Suite I 00A, Winter Turk, aT 32789 PIS: (4 7) 62 - 6 ax- 7') 628-1932 Project: OCOEE - MAGUIRE AT GENEVA Description: Maguire Rd at Story Rd / W Geneva St Bid Date: 10/6/2023 12:00:OOAM Estimator: Tony Zirpoli Contract #: N/A ITEM DESCRIPTION BID CITY U/M UNIT BID AMOUNT 101-1 Mobilization 1.000 LS $6,500.00 $6,500.00 102-1 Maintenance of Traffic 1.000 LS $7,000.00 $7,000.00 632-7-1 Signal Cable- New Or 1.000 PI $4,800.00 $4,800.00 Reconstructed Intersection, F&I 634-4-152 Span Wire Assembly, F&I, Two 1.000 PI $6,000.00 $6,000.00 Point, Diagonal 634-4-600 Span Wire Assembly, Remove- 1.000 PI $1,350.00 $1,350.00 Poles Remain 634-5-1 Fiberglass Insulator, F&I 20.000 LF $80.00 $1,600.00 650-1-14 Vehicular Traffic Signal, F&I 4.000 AS $2,200.00 $8,800.00 Aluminum, 3 Section, 1 Way 650-1-19 Vehicular Traffic Signal, F&I 4.000 AS $3,200.00 $12,800.00 Aluminum, 5 Section Cluster, 1 Way 660-4-11 Vehicle Detection System- Video, 1.000 EA $19,750.00 $19,750.00 F&I Cabinet Equipment 660-4-12 Vehicle Detection System- Video, 4.000 EA $4,800.00 $19,200.00 F&I Above Ground Equipment 660-4-60 Vehicle Detection System- Video, 1.000 EA $850.00 $850.00 Remove 663-1-111 Signal Priority And Preemption 1.000 EA $9,500.00 $9,500.00 System, F&I, Optical, Cabinet Electronics 663-1-112 Signal Priority And Preemption 2.000 EA $3,000.00 $6,000.00 System, F&I, Optical, Detector 671-2-50 Traffic Controller, Relocate- 1.000 EA $1,250.00 $1,250.00 Without Cabinet 676-1-117 Traffic Signal Controller Cabinet, 1.000 EA $24,500.00 $24,500.00 F&I Without Controller, NEMA Size6, 44" W X 67" H X 24" D 676-1-600 Traffic Signal Controller Cabinet, 1.000 EA $1,200.00 $1,200.00 Remove 10/6/2023 Traffic Engineering and Management, LLC Page 147 of 241 TOTAL BID: $131,100.00 Project Comments 1. Above pay items and quantities are based on the current configuration at the intersection. 2. No permits are included, if required. 3. This quotation is valid for 60 days after the stated bid date. Please request pricing verification after 60 days. Signature: 10/6/2023 Traffic Engineering and Management, LLC Page 148 of 241 707 Nicolet Ave, Suite I OOA, Winter Park, Fl- 32789 Ph: (407) 628-1965 * Fax: (407) 628-1932 Project: City of Ocoee Description: Bluford Rd. @ McKey St. Iteris Video Detection Quote Date: 10/30/2023 Estimator: Al LaShier ITEM DESCRIPTION Iteris Next Video Detection System Project Comments 1. Bond is not included. 2. This estimate is based on currently contracted rates. 3. This estimate includes utilizing existsin conduit. QTY U/M UNIT PRICE AMOUNT 1 EA $ 36,900.00 $ 36,900.00 TOTAL BID: $ 36,900.00 Signature: ,�, �f / �f.1/.2 10/30/2023 T.E.A.M. / Control Specialists Page 1 of 1 Page 149 of 241