Loading...
HomeMy WebLinkAboutItem 14 Approval of Stormwater Improvement Projects for 2024-2025 with Inliner Solutions City of Ocoee ▪ 1 N. Bluford Avenue ▪ Ocoee, Florida 34761 Phone: (407) 905-3100 ▪ www.ocoee.org STAFF REPORT Meeting Date: August 20, 2024 Item #: 14 Contact Name: Milen Womack Department Director: Stephen Krug Contact Number: Ext. 6013 City Manager: Robert Frank Subject: Approval of Stormwater Improvement Projects for 2024-2025 with Inliner Solutions. (Public Works Director Krug) Background Summary: The Stormwater Division was approved at the January 17, 2023, City Commission meeting to work with American In-line Inspection, Inc. to repair 540 feet of failing stormwater pipelines on Flewelling Ave and Ocoee Hills Road for a total of $182,175.00. The approved contractor was unable to complete the repairs within a year of the proposal. City staff has since coordinated with a new contractor in our area, Inliner Solutions LLC, to complete the repairs for $99,570.00. Public Works is requesting City Commission approval to utilize Inliner Solutions LLC to complete the project as incorporated in the Stormwater Operating Budget. Issue: Should the Honorable Mayor and City Commissioners approve a contract with Inliner Solutions LLC, to complete the pipe lining project included in the Stormwater Operating Budget? Recommendations: Staff recommends the Honorable Mayor and City Commissioners approve to issue a purchase order to Inliner Solutions LLC, for the pipe lining of Flewelling Ave. and Ocoee Hills Rd. for $99,570.00, and authorize the City Manager and staff to approve and execute change orders to the work in accordance with the limits established in the Purchasing Code. Attachments: 1. Ocoee 30 Inch Proposal Financial Impacts: The work is adequately funded in the Stormwater Division Operating Budget. Type of Item: Consent DATE: SUBMITTED TO: City of Ocoee 301 Maguire Rd Ocoee, FL 34761 Attention: Russel Oliver JOB LOCATION: 30" lines Ocoee Hills Rd and Fleweling Ave Payment terms - 100% within thirty (30) days upon completion and acceptance. We hereby submit specifications and estimates as follows: Inliner Solutions, LLC shall supply all equipment, materials and labor to perform the work as follows: QTY UNIT PRICE TOTAL 540 LF 10.00$ 5,400.00$ 540 LF 157.00$ 84,780.00$ 540 LF 16.00$ 8,640.00$ 3 DAY 250.00$ 750.00$ -$ -$ -$ TOTAL $99,570.00 NOTES: 1 Pricing based on pricing contained in contract between Inliner and St. Augustine Beach 23-07-MCA-ILS 2 Inliner to be installed as per ASTM & manufacturer's specifications. 3 Payment shall be based on actual field measurements from center of inlet to center of outlet. 4 This proposal is subject to Pre-TV inspection indicating the line conditions is acceptable in installation of Inliner 5 Price quoted does not include point repairs if required prior to installing Inliner. 6 Contractor shall furnish Owner with a Final Inspection (Digitial) of the rehabilitated sewer(s) Signature Date of Acceptance 2531 Jewett Lane, Sanford, FL 32771 l Office: 407-472-0014 l Fax: 407-472-0097 l inliner.com April 2, 2024 PROPOSAL Authorized Signature Daniel Banken, Area Director Acceptance of Proposal - The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Ninety-Nine Thousand Five Hundred Seventy Dollars and No Cents ($99,570.00) A-69. 30" Diameter CIPP Liner 12.0 MM Thickness C-9. 30" Diameter By-Pass Pumping & Dewatering C-11. Traffic Control MOT Index 601 or 602 We propose hereby to furnish material and labor-complete in accordance with specifications below, for the sum of All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from specifications below involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Workman's Compensation insurance. Note: This proposal may be withdrawn by us if not accepted within thirty (30) days. DESCRIPTION A-4. 27" - 42" Diameter Light Cleaning and CCTV Inspection