Loading...
HomeMy WebLinkAboutItem 09 Approval of the Purchase of a New Pump for Well #2 City of Ocoee ▪ 1 N. Bluford Avenue ▪ Ocoee, Florida 34761 Phone: (407) 905-3100 ▪ www.ocoee.org STAFF REPORT Meeting Date: May 6, 2025 Item #: 9 Contact Name: Trent Hopper Department Director: Jen Bolling Contact Number: Ext. 4306 City Manager: Craig Shadrix Subject: Approval of the Purchase of a New Pump for Well #2 at the South Water Plant. (Utilities Director Bolling) Background Summary: As part of the approved City of Ocoee Budget for Fiscal Year 2023-2024, the Water Facilities Repair & Replacement (R&R) budget includes $65,000.00 to inspect and make necessary repairs to Well #2 at the South Water Plant (SWP). A purchase order in the amount of $14,372.50 was issued to Locke Well & Pump to pull and inspect the pump and 12" flanged pipe, as well as provide a video inspection of the well while the pump was out. After the pump was removed and inspected, it was determined that it would be more cost- effective to replace the pump. In addition, the video inspection of Well #2 revealed damage to the motor shaft assembly and the concrete riser. Locke Well & Pump provided a quote of $62,587.16 to replace the pump and make the necessary structural repairs, bringing the combined cost of this project to $76,959.66. Although this is over the budgeted amount of $65,000.00, the Water Facilities R&R budget has adequate funds available for this project. Issue: Should the Honorable Mayor and City Commissioners approve the structural repairs and purchase a new pump for Well #2 at the SWP with Locke Well & Pump at a cost of $62,587.16? Recommendations: Staff recommends that the Honorable Mayor and City Commissioners authorize the City Manager to cause structural repairs and the purchase of a new pump for Well #2 at the SWP by contracting with Locke Well & Pump at a cost of $62,587.16. Staff also recommends that the City Manager be authorized to approve changes to this contract up to the limit of his purchasing authority for each change order. Attachments: 1. Estimate Financial Impacts: This is adequately funded using Utilities Water Facilities Repair & Replacement Job#RR040-25. Type of Item: Consent Page 449 of 509 Estimate Date 4/9/2025 Estimate # E25-0080 Name / Address City Of Ocoee Attn: Accounts Payable 1 N Bluford Ave. Ocoee, FL 34761 Ship To City Of Ocoee 1 N Bluford Ave. Ocoee, FL 34761 407-427-6336 3685 OLD WINTER GARDEN RD ORLANDO, FL 32805 Terms Net 15 Due Date 4/24/2025 Rep DD Estimate PH: 407-299-8888 / Fax: 407-578-1840 Email: Sales@lockewell.com DescriptionQty 18EKH-1 stage Flowserve pump with Cast Iron Bowls, Standard enclosed style 316 Stainless Steel impeller design, Stainless Steel Collet, (bell turned to 17.50” OD), epoxy coat (OD only) 1 Labor & Material to Sandblast clean and epoxy coat (top coat Safety Blue) existing 12” Fabricated Discharge Head with repairing the existing 1.50” stuffing box (clean, inspect, new bearing, new packing) and epoxy coat (ID/OD). 1.50”-12TPI x (length to be determined) motor shaft assembly 1 Pour 3" concrete riser for discharge head base - Lift & Position dischange head w boom1 (115ft) of 12” Threaded Column (Top 12” x 60” TBE, 10 of 12” x 120” T&C, and Two Bottom 12” x 60” T&C) x 1.50”-12TPI 416SS lineshaft and SS couplings, Bronze Drop-In Spiders, Buna inserts, .375 wall pipe, 1.50”-12TPI x (length to be determined) head shaft, epoxy coat column (ID/OD) 1 18” Stainless Steel Basket Strainer1 5 – 6 weeks (ARO) $62,587.16 $0.00 Page 450 of 509