Loading...
HomeMy WebLinkAboutItem 13 Approval of Rewis Street Sidewalk Replacement City of Ocoee ▪ 1 N. Bluford Avenue ▪ Ocoee, Florida 34761 Phone: (407) 905-3100 ▪ www.ocoee.org STAFF REPORT Meeting Date: September 16, 2025 Item #: 13 Contact Name: Jen Bolling Department Director: Craig Shadrix Contact Number: Ext. 4021 City Manager: Craig Shadrix Subject: Approval of Rewis Street Sidewalk Replacement. (Utilities Director Bolling) Background Summary: The Lakewood Rewis Asbestos Cement Watermain Replacement Project is nearing completion. The project scope is for the construction of the new watermain and the restoration of areas impacted by the project’s construction activities. Upon completion of this project, Rewis Street and Flewelling Avenue will also be resurfaced. Approximately 1,500 linear feet of sidewalk on Rewis Street outside of the project scope is in extremely poor condition. The complete restoration of the entire street and associated sidewalk will significantly enhance the streetscape and provide a more uniform, long-lasting improvement in this area; however, the replacement of the sidewalk outside the construction limits is not eligible for funding under the project budget. Cathcart Construction, the contractor for the Lakewood Rewis Watermain Replacement Project, is expected to complete construction within the next two weeks and has provided a quote of $85,960 to replace the remaining poor-condition sidewalk outside the project scope. There is available funding to cover $46,400 of the total cost, and following discussions with the City Manager, $39,560 from the Contingency fund is being requested to cover the remaining cost. Issue: Should the Honorable Mayor and City Commissioners approve the Rewis Street sidewalk replacement for a total cost of $85,960 and the use of $39,560 from the Contingency Reserve to fund part of this sidewalk replacement project? Recommendations: Staff recommends that the Honorable Mayor and City Commissioners authorize the City Manager to cause the replacement of sidewalk on Rewis Street by contracting with Cathcart Construction and the use of $39,560 from the Contingency Reserve to fund part of this project. Staff also recommends the City Manager be authorized to approve changes in the contract up to the limit of his purchasing authority for each change. Attachments: 1. 5439 RCO 03 - Sidewalk Repairs on Rewis (003) City of Ocoee ▪ 1 N. Bluford Avenue ▪ Ocoee, Florida 34761 Phone: (407) 905-3100 ▪ www.ocoee.org Financial Impacts: Sidewalk replacement will be funded using $13,000.00 from GL 001-541-10-5303, $15,000.00 from GL 001- 541-10-5313, $18,400.00 from GL 401-533-10-3400, and $39,560 from GL 001-516-00-4900 $39,560.00. Type of Item: Consent CHANGE ORDER 03 - Sidewalk Repair Along Rail Road at Rewis St On Rewis Street from Lakewood Ave to West Ave 7/28/2025 ITEM NO.ITEM DESCRIPTION Qty. Unit of Measure Unit Price, $Total, $ (d x e) CO-31 General Conditions & MOT 1.00 LS 6,905.00$ 6,905.00$ CO-32 Removal of Existing Concrete Sidewalk 675.00 SY 15.00$ 10,125.00$ CO-33 Installation of Concrete Sidewalk, 4" Thick 675.00 SY 65.00$ 43,875.00$ CO-34 Regrade Embankment 675.00 CY 18.00$ 12,150.00$ CO-35 Borrow Excavation, Truck Measure 83.00 CY 35.00$ 2,905.00$ CO-36 Contingency - CFW Coordination & Requirements 1.00 LS 10,000.00$ 10,000.00$ Total 85,960.00$ Notes This will require two weeks additional contract time (14 Days) CO-31: Concrete Crew Mobilization & MOT for Shoulder Closure Includes should closure from Lakewood Ave to West Ave on Rewis CO-32 Removal and Disposal CO-33 675 SY estimated of 4' wide sidewalk CO-34 Required to repair undermined sidewalk CO-35 Estimed 6" of dirt at 3' wide along Proposed Sidewalk Existing soils have washed out down the tracks, displacing dirt CO-36 Contingent apon any requirement or training needed to work in CFW ROW DATE: ENGINEERPROJECT: SHEET: Plan Sheet DESIGNED BY: SCALE: SHEET P1 of 31 Maki Sekine, E.I. July 2025 Lakewood/Rewis Water Main Extension Sidewalk RepairCITY OF OCOEE UTILITIES DEPARTMENT Ocoee, Fl. 34761 (407) 905-3159 1800 A. D. Mims Rd. Key: City of Ocoee: Public Works Cathcart Construction Good Condition Rewis S t . Me l v a A v e . N. L a k e w o o d A v e . DATE: ENGINEERPROJECT: SHEET: Plan Sheet DESIGNED BY: SCALE: SHEET P2 of 32 Maki Sekine, E.I. July 2025 Lakewood/Rewis Water Main Extension Sidewalk RepairCITY OF OCOEE UTILITIES DEPARTMENT Ocoee, Fl. 34761 (407) 905-3159 1800 A. D. Mims Rd. Key: City of Ocoee: Public Works Cathcart Construction Damage 1: 2 Panels Damage 2: 3 Panels Damage 4: 3 Panels Damage 3: 1 Panels Damage 6: 2 Panels Damage 5: 1 Panels Damage 8: 2 Panels Damage 7: 2 Panels Damage 9: 3 PanelsDamage 10: 2 PanelsDamage 11: 2 Panels Damage 12: 1 Panels Damage 13: 3 Panels Damage 14: 11 Panels Damage 15: 2 PanelsDamage 16: 2 Panels Good Condition Rewis S t . Ch r i s t i n e A v e . We s t A v e . DATE: ENGINEERPROJECT: SHEET: Plan Sheet DESIGNED BY: SCALE: SHEET P3 of 33 Maki Sekine, E.I. July 2025 Lakewood/Rewis Water Main Extension Sidewalk RepairCITY OF OCOEE UTILITIES DEPARTMENT Ocoee, Fl. 34761 (407) 905-3159 1800 A. D. Mims Rd. Key: City of Ocoee: Public Works Cathcart Construction Good Condition Rewis S t . We s t A v e . Sp r i n g S t . Flewe l l i n g S t .