HomeMy WebLinkAboutItem 12 Approval to Rebuiild Bar Screen #2 at the City of Ocoee Wasterwater Treatment Plant City of Ocoee ▪ 1 N. Bluford Avenue ▪ Ocoee, Florida 34761 Phone: (407) 905-3100 ▪ www.ocoee.org STAFF REPORT Meeting Date: October 21, 2025 Item #: 12 Contact Name: Trent Hopper Department Director: Jen Bolling Contact Number: Ext. 4306 City Manager: Craig Shadrix Subject: Approval to Rebuild Bar Screen #2 at the City of Ocoee Wastewater Treatment Plant. (Utilities Director Bolling) Background Summary: The approved City of Ocoee Budget for Fiscal Year 2025-2026 includes $120,000 to rebuild Bar Screen #2 at the Ocoee Wastewater Treatment Plant (WWTP) to extend the bar screen’s lifespan. Bar screens remove large debris, such as plastics and rags, from the wastewater flow at the beginning of the treatment process, and preventing clogs and damage to the WWTP's equipment. Staff contacted FilterONE USA, Inc., a division of Parkson Corporation, the original manufacturer and sole source vendor for the current bar screen, and obtained a quote of $99,111.00 to rebuild the bar screen. Issue: Should the Honorable Mayor and City Commissioners approve to rebuild Bar Screen #2 at the WWTP with Parkson Corporation, at a cost of $99,111.00? Recommendations: Staff recommends that the Honorable Mayor and City Commissioners authorize the City Manager to cause the rebuild of Bar Screen #2 at the WWTP by contracting with Parkson Corporation, at a cost of $99,111.00, and to approve Parkson Corporation as the Sole Source Vendor for bar screen parts and repairs at the WWTP. Staff also recommends that the City Manager be authorized to approve changes to this contract up to the limit of his purchasing authority for each change order. Attachments: 1. Quote Ocoee WWTP, FL Rebuild 2. Sole Source Letter - Ocoee, FL 2025 Financial Impacts: This purchase is adequately funded in the FY 2025-26 budget under Job # RR09-26 GL 407-535-00-4608. Type of Item: Consent Page 699 of 782 Quotation NUMBER: B02011598 Rev 1 DATE: September 17, 2025 TO: Ocoee WWTF Attn: Bruce Chiesa Tel: 407-353-6417 Fax: E-Mail: bchiesa@ocoee.org REF.: Project Name: Ocoee WWTF Project Location: Ocoee, FL Original Serial #: 2015056 Rebuild #: n/a Specification Sec.: n/a Parkson Corporation proposes the reconditioning of your existing Aqua Guard® Continuous Self- Cleaning Bar/Filter Screen and is pleased to provide this Rebuild/Retrofit Quotation for the following: ITEM 1 AQUA GUARD SELF-CLEANING BAR/FILTER SCREEN # Existing Units: 1 Unit #: 2015056 Model: Inflomax 1.A Existing Equipment: Description Screen Width: 2’-10.5” Solids Discharge Height: 8.5 ft. [as measured from the bottom of the channel to the discharge point] Screen Angle: 75 º Screen Opening: 6 mm Application / Industry: Municipal Materials of Construction Elements: high impact polycarbonate alloy Frame: 304 SS Conveyor Chain: 304/410 Filter Element Shafts: 304 SS Side Plate: high impact phenolic Page 700 of 782 1.B The following parts are recommended for replacement on one (1) unit: 2014050 Inflomax B02011598 Ocoee WWTF AG-MN-A 2'-10-1/2"x8.5'DH, 304ss, 6mm Item Description Quantity Crane 2 Motor, Baldor, 2HP 1 Rotating Brush 1 Rotating Guide Rail 1 Upper Guide Rail, 304ss 2 Lower Guide Rail, 304ss 2 Rail, front 6 Rail, rear 4 Discharge Chute Pan Seal, UHMW 1 Side Seals , Neoprene 2 Splash Guard Subassy 1 Flange Bearing, Brush 2 Bearing, Rotating Rail 2 Flange Bearing, Drive shaft 1 Front Seal Brushes 1A-6262 Brush, 2" 1 Brush, 3" 1 Clips Nameplates & Labels set 1 Crane 2 Screen Assembly Side Plates 1A-5766 164 Spacer Washer 164 Conveyor Chain 164 Filter Shaft, solid, (total 80 shafts) 82 Snap Rings 3/4 164 Filter Elements 6mm 3362 Page 701 of 782 ITEM 2 OFFERINGS - PURCHASE PRICE 2.A Parkson Certified On-site Rebuild with OEM Parts & Technicians (Per Unit) ……………………………………………………………………………………$99,111.00 USD 1. Customer/owner is responsible for thoroughly cleaning, pressure washing and disinfecting the unit prior to rebuild. 2. All parts listed in [1B] above. 3. Parts will be shipped F.O.B. Factory, freight included to jobsite. 4. Removal and reinstallation of the unit in the channel is included. 5. Parkson to supply crane. 6. Customer to disconnect electrical prior to rebuild. 7. Work performed by Parkson authorized field technicians, who will test run equipment at completion of rebuild. 8. Taxes excluded. Rebuild / Start-Up Assistance - Included Parkson will furnish one certified crew as required to rebuild unit, provide start -up and operator training. Dates of service to be scheduled upon receipt of Buyer’s written request. Additional start-up service can be purchased for $1,850 per day plus travel and living expenses. ITEM 3 OPTIONS FOR EXISTING UNIT(S) ONLY 1. ………………………………………………. Add/Deduct……. USD ITEM 4 SCHEDULE, VALIDITY, PAYMENT TERMS 4.A Schedule • Submittal Phase not required on this project. • Parts availability: 14-16 weeks following receipt of acceptable written Purchase Order. • Field/on-site rebuild is expected to occur approximately 4-6 weeks after all replacement parts are delivered to the jobsite, subject to mutually approved scheduling. (Prior commitments may dictate schedule variations). However, in no event shall Parkson be the sole cause of delaying the scheduled start of the rebuild more than 90 days after parts delivery. 4.B Validity: Price is valid for thirty (30) calendar days from Quotation date, for shipment of Equipment within the timetable stated above. Page 702 of 782 4.C Payment Terms: • 90% upon shipment of parts; 10% upon rebuild completion, NTE 90-days after shipment should rebuild be delayed by other than Parkson. All payments are NET 30 days. COMMERCIAL ITEMS WARRANTY As defined in Section XVI on the attached Standard Conditions of Sale, Parkson offers a one (1) year mechanical warranty for all new parts installed on the Inflomax by an on-site certified rebuild. Installation labor of parts or parts not ordered as part of a rebuild package have a 90-day warranty. DRAWINGS AND INSTALLATION, OPERATION AND MAINTENANCE (IO&M) MANUALS: 1. Approval Drawings: Not required 2. Certified Drawings: Not required 3. IO&M Manuals: Not required 4. Information Package: Two (2) (Only for UltraClean Retrofit) TERMS AND CONDITIONS: This Quotation is governed by and subject to Parkson’s Standard Conditions of Sale, which are incorporated by reference and accessible at: http://www.parkson.com/files/documents/Sales-conditions.pdf PATENTS: The Equipment and/or process quoted herein may operate under one or more U.S. patents. The Purchase Price includes a one-time royalty payment (if any), which provides the Buyer with immunity to operate the Equipment specified in the Quotation under any applicable patents. CLARIFICATIONS AND EXCEPTIONS: Parkson is not in receipt of any plans and specifications. The equipment quoted above is based upon Parkson’s current standards and may or may not comply with any specification that may exist. Parkson reserves the right to revise this quotation upon receipt of any plans and specifications. Page 703 of 782 BUYER / OWNER RESPONSIBILITY UNLESS OTHERWISE STATED: Getting the Unit ready for the Rebuild/Retrofit • Upon disassembly in our shop or on-site, if any unforeseen parts or structural repairs are discovered, Parkson Corporation will notify the customer prior to commencement of any repairs which will be beyond the originally quoted scope. The costs for these items and any time extension will be added to the scope of work. • Removal and installation of Aqua Guard unit in channel, includes and is not limited to: 1. High pressure washing of the unit / removal of all solids. Additional charges and delays will occur if it is necessary for our crew / factory to send equipment out for cleaning and solids disposal. 2. Disassembling from adjoining equipment / electrical / controls. 3. Disconnecting shower water connections and water supply. 4. Disconnecting controls / electrical connection and interconnecting wiring removal (including any of the following, but not limited to: E-stop button, solenoids, motors, interlock switches, wiring and conduit from each unit-mounted electrical device to a terminal box or control panel). 5. Removing piping connections, platforms, gratings and railings unless stated otherwise. 6. Removing any other auxiliary equipment or service not detailed above. • Readiness of the equipment before requesting [rebuild or start-up] service. Non-readiness may result in additional charges. Getting the Site ready for the Rebuild/Retrofit (Personnel Safety is of utmost importance) • Provide a safe work area around the equipment. 7. If the rebuild is performed with the unit in the channel; customer/owner to cover the channel with minimum ¾” plywood and ensure it is properly secured. 8. If unit is tilted out of the channel customer/owner to supply a brace (spanning the channel) sufficient enough to support the weight of the unit while it is being rebuilt. 9. Whenever possible, unit should be staged away a safe distance away from any currently utilized equipment and/or work areas. • Provide proper ventilation inside the building • Care and storage of rebuild components upon receipt at customer site. • Unloading of replacement parts when they arrive on site. • Delivered material needs to be stored at the same elevation and within 10 feet of the screen (if applicable) • Redirect channel flow. • Provide clean, dry channel. • Old parts weighing 50 lbs or more should be loaded on a customer supplied forklift (or equal) in order to place them in a customer supplied dumpster. Customer must Provide: • At a minimum a forklift. • Manlift, ladders • Dumpster for all old parts [on-site rebuild only]. NOTE REGARDING CA PREVALING WAGES: Parkson, as the original equipment manufacturer, will be servicing/reconditioning its own proprietary equipment, which service may contain our proprietary trade secrets and know-how. No craft or trade would be appropriate for apprentices related to this work. Page 704 of 782 If the awarding body requires apprenticeship coverage, then Parkson would need to amend its quoted pricing and completion time. • Please return one signed copy of this quotation and Purchase Order to Parkson Corporation at the address below. Refer to this quotation, date, and related correspondence. Issued By: Carlos Robaina Accepted By: (Herein called the Buyer) PARKSON CORPORATION 1401 West Cypress Creek Road, Ste. 100 Fort Lauderdale, FL 33309 Name: Marty Unger Title: Regional Sales Manager Phone: 954-383-1757 E-Mail: munger@parkson.com Title: Date: Date: 9-17-2025 Local Rep: Eric Peters, PE MTS Environmental 941-773-5051 www.mts-florida.com cc: 2/13/25 evs Page 705 of 782 Page 1 Fort Lauderdale ♦ Chicago ♦ Montreal ♦ Mumbai www.parkson.com technology@parkson.com Rev 4 AF-008 1401 West Cypress Creek Road Suite 100 Fort Lauderdale FL 33309-1969 Phone 1.888.PARKSON Fax 954.974.6182 Sole Source Letter To: Bruce Chiesa Date: September 17, 2025 Company: Ocoee WWTF 1810 A D Mims Rd Ocoee, FL 34761 From: Marty Unger Tel: 407-353-6417 Tel: 954-383-1757 Fax: Fax: 954-252-3775 Email: BChiesa@ocoee.org Email: munger@parkson.com # Pages: 1 Cc: Subject Project: Inflomax This document is to confirm that Parkson Corporation is the sole source provider for parts for the subject product. Parkson Corporation is the original manufacturer/supplier of the subject product and is the only source for OEM replacement parts. In addition, Parkson is the only company with certified technicians capable of rebuilding/working on the subject product. If I can be of further assistance or should you have any questions, please feel free to contact me. Sincerely, Marty Unger Parkson Corporation Page 706 of 782