HomeMy WebLinkAboutItem 04 Approval to Award Invitation to Bid (ITB) #26-004 Lakewood Avenue North Gravity Sewer Project Phase 1 & 2 City of Ocoee ▪ 1 N. Bluford Avenue ▪ Ocoee, Florida 34761 Phone: (407) 905-3100 ▪ www.ocoee.org STAFF REPORT Meeting Date: April 21, 2026 Item #: 4 Contact Name: Alexis Chentouf, Joyce Tolbert Department Director: Steven Weber Contact Number: Ext. 3111, Ext. 1516 City Manager: Craig Shadrix Subject: Approval to Award Invitation to Bid (ITB) #26-004 Lakewood Avenue North Gravity Sewer Project Phase 1 & 2. (Procurement Manager Tolbert) Background Summary: The City of Ocoee solicited bids from qualified contractors for Phase 1 of the project, which is federally funded through an Environmental Protection Agency (EPA) grant in the amount of $1,408,412.00. Phase 1of the project consists of the installation of a gravity sewer system, including new manholes, stub outs, service laterals, and cleanouts, to be constructed by open-cut methods. Phase 1 of the project is federally funded through an Environmental Protection Agency (EPA) grant. Phase 2 of the project will be funded by the Owner’s capital funds. The second phase includes the installation of additional gravity sewer infrastructure, as well as segments of forcemain, associated appurtenances, and related utility components. This phase also includes the installation of a watermain system. In addition to piping installation, the project includes connections to existing water mains and manholes, installation of hydrants, valves, and fittings, pressure testing, and restoration of affected areas, including roadway, driveways, curb, sodding, seeding, and other associated improvements as required. All work shall comply with the City of Ocoee Engineering Standards Manual (see Section 02100) and must be performed in accordance with all applicable permits issued by the respective agencies. All work shall be performed while maintaining the functional operation of the existing reclaim mains. The ITB was publicly advertised on February 15, 2026, and opened on March 31, 2026. There were a total of seven (7) bids received and all were deemed responsive. The bids ranged from $4,516,700.00 to $6,177,423.00 and are available in the finance department for review. Staff recommends awarding ITB #26- 004 Lakewood Avenue North Gravity Sewer Project Phase 1 & 2 to the lowest bidder, J. Malever Construction Company, for the total bid of $4,516,700.00 per the attached Award Recommendation from Utilities' Director Jen Bolling. The Utilities Department has a good working relationship with J. Malever Construction Company on multiple projects under Contract RFQ #22-005 Continuing Contract to Bid Small Construction Projects. This total bid comes in under the Engineer's Estimate of $5,044,000.00. Bidder Phase 1 Phase 2 Total Bid 1. J. Malever Construction Company $1,173,150.00 $3,343,550.00 $4,516,700.00 2. APEC, LLC $954,550.00 $4,024,000.00 $4,978,550.00 3. DB Civil Construction, LLC $1,411,900.00 $3,586,950.00 $4,998,850.00 Page 176 of 576 City of Ocoee ▪ 1 N. Bluford Avenue ▪ Ocoee, Florida 34761 Phone: (407) 905-3100 ▪ www.ocoee.org Issue: Should the Honorable Mayor and City Commission award the bid for the Lakewood Avenue North Gravity Sewer Project Phase 1 and Phase 2 to J. Malever Construction Company and approve the associated funding changes? Recommendations: Staff recommends the Honorable Mayor & City Commission: 1. Award ITB #26-004 Lakewood Avenue North Gravity Sewer Project Phase 1 & 2 to J. Malever Construction Company for the amount of $4,516,700.00, and authorize the Mayor, City Clerk, and Staff to execute the required contract documents once the required bonds and insurance are received. 2. Approve the necessary funding changes. 3. Authorize the City Manager to approve change orders to this contract up to the limit of his purchasing authority for each change order and up to the budgeted amount for this project for all change orders. Attachments: 1. Award Recommendation 2. Bid Tabulation 3. Invitation to Bid 4. J. Malever Bid Submission 5. Addendum 01 6. Addendum 02 / Amended Plans 7. Addendum 03 Financial Impacts: The Lakewood Avenue North Gravity Sewer Project Phase 1 is funded by an EPA Federal Grant in the amount of $1,408,412.00. Phase 1 & 2 has been budgeted for Fiscal Year 2025-2026 in the amount of $3,500,000.00 from the Wastewater Capital Improvements Carry Forward Fund (408-535-10-6302) under Job Number P000435. This construction project will have a total budget of $5,396,778.62, with additional funding in the amount of $1,896,778.62, which will be reallocated from the following job numbers and funding sources. • $115,781.78 from the Wastewater Capital Improvements Carry Forward Fund (408-535-10-6302), Job Number P000252 • $15,312.44 from the Water Capital Improvements Carry Forward Fund (408-533-10-6302), Job Number P000252 • $361,224.00 from the Water Capital Improvements Carry Forward Fund (408-533-10-6302), Job Number P000284 • $704,984.80 from the Water Capital Improvements Carry Forward Fund (408-533-10-6302), Job Number T5023 • $150,000.00 from the Water Capital Improvements Fund (404-533-10-6302), Job Number T5035 • $549,475.60 from the Water Capital Improvements Carry Forward Fund (408-533-10-6302), Job Number T5035 Type of Item: Consent Page 177 of 576 Page 178 of 576 Page 179 of 576 BID TABULATION ITB #26-004 Lakewood Avenue North Gravity Sewer Project Phase 1 Phase 2 03/31/26 2:00 P.M. BIDDER Acknowledgement of Addendum 1,2, & 3 Bid Security Exceptions Company Verification Required Forms DESCRIPTION UNITS EST'D QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE PHASE 1 - GRANT FUNDED Mobilization/Demobilization Lump Sum 1 $150,000.00 $150,000.00 $140,000.00 $140,000.00 $58,325.00 $58,325.00 $59,700.00 $59,700.00 $75,000.00 $75,000.00 $489,000.00 $489,000.00 $54,600.00 $54,600.00 Maintenance of Traffic Lump Sum 1 $30,000.00 $30,000.00 $250,000.00 $250,000.00 $152,000.00 $152,000.00 $46,100.00 $46,100.00 $250,000.00 $250,000.00 $32,500.00 $32,500.00 $164,580.00 $164,580.00 As-Built Survey ($8,500 minimum bid) Lump Sum 1 $30,000.00 $30,000.00 $10,000.00 $10,000.00 $12,000.00 $12,000.00 $13,000.00 $13,000.00 $50,000.00 $50,000.00 $32,500.00 $32,500.00 $26,100.00 $26,100.00 12" PVC Sewer Pipe 0'-6' Linear Feet 740 $120.00 $88,800.00 $150.00 $111,000.00 $240.00 $177,600.00 $412.00 $304,880.00 $345.00 $255,300.00 $210.00 $155,400.00 $382.25 $282,865.00 12" PVC Sewer Pipe 6'-8' Linear Feet 290 $140.00 $40,600.00 $170.00 $49,300.00 $275.00 $79,750.00 $466.00 $135,140.00 $385.00 $111,650.00 $258.00 $74,820.00 $382.25 $110,852.50 12" PVC Sewer Pipe 8'-10' Linear Feet 245 $170.00 $41,650.00 $220.00 $53,900.00 $375.00 $91,875.00 $620.00 $151,900.00 $425.00 $104,125.00 $318.00 $77,910.00 $382.25 $93,651.25 12" PVC Sewer Pipe 10'-12' Linear Feet 50 $210.00 $10,500.00 $300.00 $15,000.00 $515.00 $25,750.00 $1,430.00 $71,500.00 $450.00 $22,500.00 $354.00 $17,700.00 $382.25 $19,112.50 Remove 8" PVC Sewer and Replace with 12" PVC Sewer Pipe Linear Feet 80 $300.00 $24,000.00 $900.00 $72,000.00 $745.00 $59,600.00 $1,076.00 $86,080.00 $650.00 $52,000.00 $354.00 $28,320.00 $497.75 $39,820.00 8" PVC Sewer Pipe 0'-6' Linear Feet 35 $200.00 $7,000.00 $230.00 $8,050.00 $640.00 $22,400.00 $584.00 $20,440.00 $330.00 $11,550.00 $195.00 $6,825.00 $367.45 $12,860.75 8" PVC Sewer Pipe 6'-8' Linear Feet 65 $200.00 $13,000.00 $240.00 $15,600.00 $690.00 $44,850.00 $583.00 $37,895.00 $375.00 $24,375.00 $243.00 $15,795.00 $367.45 $23,884.25 8" PVC Sewer Pipe 8'-10' Linear Feet 45 $200.00 $9,000.00 $340.00 $15,300.00 $740.00 $33,300.00 $667.00 $30,015.00 $410.00 $18,450.00 $303.00 $13,635.00 $367.45 $16,535.25 Sewer Manholes 0'-4', 4'-8', 8'- 10'' Depth Vertical Feet 90 $2,500.00 $225,000.00 $1,500.00 $135,000.00 $1,200.00 $108,000.00 $2,608.00 $234,720.00 $2,400.00 $216,000.00 $1,170.00 $105,300.00 $1,026.28 $92,365.20 Sanitary Service Connections and Cleanouts Each 19 $2,500.00 $47,500.00 $6,000.00 $114,000.00 $5,000.00 $95,000.00 $10,460.00 $198,740.00 $5,000.00 $95,000.00 $1,736.00 $32,984.00 $2,233.60 $42,438.40 Initial Pavement Ton 340 $300.00 $102,000.00 $850.00 $289,000.00 $275.00 $93,500.00 $373.00 $126,820.00 $340.00 $115,600.00 $227.00 $77,180.00 $290.40 $98,736.00 Final Pavement Ton 200 $300.00 $60,000.00 $275.00 $55,000.00 $275.00 $55,000.00 $306.00 $61,200.00 $410.00 $82,000.00 $227.00 $45,400.00 $312.00 $62,400.00 1” Pavement Milling Square Yards 3,500 $10.00 $35,000.00 $10.00 $35,000.00 $9.00 $31,500.00 $6.00 $21,000.00 $15.00 $52,500.00 $19.00 $66,500.00 $12.40 $43,400.00 Concrete Work Square Yards 35 $300.00 $10,500.00 $130.00 $4,550.00 $120.00 $4,200.00 $163.00 $5,705.00 $125.00 $4,375.00 $162.00 $5,670.00 $114.00 $3,990.00 Material Above Pipe Bedding and Initial Backfill Cubic Yards 300 $60.00 $18,000.00 $80.00 $24,000.00 $45.00 $13,500.00 $183.00 $54,900.00 $80.00 $24,000.00 $162.00 $48,600.00 $27.25 $8,175.00 Replace with 15" RCP Storm Sewer Pipe Linear Feet 40 $300.00 $12,000.00 $380.00 $15,200.00 $375.00 $15,000.00 $1,070.00 $42,800.00 $400.00 $16,000.00 $194.00 $7,760.00 $142.85 $5,714.00 TOTAL PHASE 1 BID $954,550.00 $1,411,900.00 $1,173,150.00 $1,702,535.00 $1,580,425.00 $1,333,799.00 $1,202,080.10 PHASE 2 - NOT GRANT FUNDED Mobilization/Demobilization Lump Sum 1 $150,000.00 $150,000.00 $340,000.00 $340,000.00 $165,000.00 $165,000.00 $179,690.00 $179,690.00 $210,000.00 $210,000.00 $489,000.00 $489,000.00 $132,000.00 $132,000.00 Maintenance of Traffic Lump Sum 1 $30,000.00 $30,000.00 $290,000.00 $290,000.00 $152,000.00 $152,000.00 $66,280.00 $66,280.00 $250,000.00 $250,000.00 $32,500.00 $32,500.00 $152,862.00 $152,862.00 As-Built Survey Lump Sum 1 $30,000.00 $30,000.00 $15,000.00 $15,000.00 $12,000.00 $12,000.00 $19,500.00 $19,500.00 $50,000.00 $50,000.00 $65,000.00 $65,000.00 $53,436.00 $53,436.00 12" PVC Sewer Pipe 0'-6'Linear Feet 540 $120.00 $64,800.00 $150.00 $81,000.00 $240.00 $129,600.00 $460.00 $248,400.00 $345.00 $186,300.00 $210.00 $113,400.00 $412.25 $222,615.00 12" PVC Sewer Pipe 6'-8'Linear Feet 1,150 $140.00 $161,000.00 $170.00 $195,500.00 $275.00 $316,250.00 $403.00 $463,450.00 $385.00 $442,750.00 $258.00 $296,700.00 $412.25 $474,087.50 8" PVC Sewer Pipe 0'-6'Linear Feet 80 $140.00 $11,200.00 $230.00 $18,400.00 $640.00 $51,200.00 $416.00 $33,280.00 $330.00 $26,400.00 $195.00 $15,600.00 $397.45 $31,796.00 8" PVC Sewer Pipe 6'-8'Linear Feet 110 $140.00 $15,400.00 $240.00 $26,400.00 $690.00 $75,900.00 $431.00 $47,410.00 $375.00 $41,250.00 $243.00 $26,730.00 $397.45 $43,719.50 8" PVC Sewer Pipe 8'-10'Linear Feet 70 $210.00 $14,700.00 $340.00 $23,800.00 $740.00 $51,800.00 $677.00 $47,390.00 $410.00 $28,700.00 $303.00 $21,210.00 $397.45 $27,821.50 Sewer Manholes 0'-4', 4'-8', 8'- 10' Depth Vertical Feet 90 $2,500.00 $225,000.00 $1,500.00 $135,000.00 $1,200.00 $108,000.00 $2,440.00 $219,600.00 $2,400.00 $216,000.00 $1,170.00 $105,300.00 $1,025.28 $92,275.20 12' PVC Force Main Via Open Cut Linear Feet 400 $350.00 $140,000.00 $150.00 $60,000.00 $300.00 $120,000.00 $383.00 $153,200.00 $290.00 $116,000.00 $249.00 $99,600.00 $151.85 $60,740.00 12 Tapping Sleeve and Valve Each 2 $15,000.00 $30,000.00 $30,000.00 $60,000.00 $16,000.00 $32,000.00 $20,360.00 $40,720.00 $17,000.00 $34,000.00 $25,000.00 $50,000.00 $15,031.00 $30,062.00 Sanitary Service Connections and Cleanouts Each 19 $400.00 $7,600.00 $6,000.00 $114,000.00 $5,000.00 $95,000.00 $10,010.00 $190,190.00 $5,000.00 $95,000.00 $2,386.00 $45,334.00 $6,898.60 $131,073.40 Initial Pavement Ton 535 $300.00 $160,500.00 $850.00 $454,750.00 $275.00 $147,125.00 $365.00 $195,275.00 $340.00 $181,900.00 $227.00 $121,445.00 $290.40 $155,364.00 Final Pavement Ton 320 $300.00 $96,000.00 $275.00 $88,000.00 $275.00 $88,000.00 $303.00 $96,960.00 $410.00 $131,200.00 $227.00 $72,640.00 $306.00 $97,920.00 1” Pavement Milling Square Yards 5,700 $10.00 $57,000.00 $10.00 $57,000.00 $9.00 $51,300.00 $6.00 $34,200.00 $15.00 $85,500.00 $19.00 $108,300.00 $12.40 $70,680.00 Concrete Work Square Yards 1,600 $110.00 $176,000.00 $90.00 $144,000.00 $120.00 $192,000.00 $144.00 $230,400.00 $125.00 $200,000.00 $162.00 $259,200.00 $114.00 $182,400.00 Material Above Pipe Bedding and Initial Backfill Cubic Yards 1100 $250.00 $275,000.00 $40.00 $44,000.00 $45.00 $49,500.00 $180.00 $198,000.00 $80.00 $88,000.00 $39.00 $42,900.00 $27.10 $29,810.00 Contaminated Soil Excavation With Offsite Disposal Cubic Yards 50 $500.00 $25,000.00 $50.00 $2,500.00 $400.00 $20,000.00 $1,036.00 $51,800.00 $350.00 $17,500.00 $104.00 $5,200.00 $637.35 $31,867.50 WEST2WEST CONSTRUCTION, LLC Bid Bond SANPIK INC.PRIME CONSTRUCTION GROUP, INC. Bid Bond Bid Bond  No Bid Bond  J MALEVER CONSTRUCTION  DB CIVIL CONSTRUCTION MIDSOUTH INC. No  Bid Bond   APEC LLC **303 - Drug Free  Bid Bond  No Bid Bond 1 Page 180 of 576 BID TABULATION ITB #26-004 Lakewood Avenue North Gravity Sewer Project Phase 1 Phase 2 03/31/26 2:00 P.M. Management of Contaminated Materials and Soils/Fill Lump Sum 1 $5,000.00 $5,000.00 $1,000.00 $1,000.00 $14,000.00 $14,000.00 $26,000.00 $26,000.00 $15,000.00 $15,000.00 $32,500.00 $32,500.00 $118,200.00 $118,200.00 Removal and Disposal of Contaminated Groundwater Lump Sum 1 $16,000.00 $16,000.00 $20,000.00 $20,000.00 $23,000.00 $23,000.00 $104,910.00 $104,910.00 $20,000.00 $20,000.00 $32,500.00 $32,500.00 $429,066.00 $429,066.00 Ductile Iron Water Main via Open Cut Linear Feet 2,900 $350.00 $1,015,000.00 $130.00 $377,000.00 $140.00 $406,000.00 $140.00 $406,000.00 $250.00 $725,000.00 $206.00 $597,400.00 $130.85 $379,465.00 Furnish and Install 8-inch Ductile Iron Water Main via Open Cut Linear Feet 400 $325.00 $130,000.00 $110.00 $44,000.00 $100.00 $40,000.00 $181.00 $72,400.00 $195.00 $78,000.00 $158.00 $63,200.00 $97.40 $38,960.00 Furnish and Install 6-inch Ductile Iron Water Main via Open Cut Linear Feet 180 $260.00 $46,800.00 $100.00 $18,000.00 $95.00 $17,100.00 $171.00 $30,780.00 $165.00 $29,700.00 $130.00 $23,400.00 $75.05 $13,509.00 Polyethylene Water Main via Open Cut Linear Feet 80 $260.00 $20,800.00 $30.00 $2,400.00 $80.00 $6,400.00 $54.00 $4,320.00 $95.00 $7,600.00 $41.00 $3,280.00 $31.40 $2,512.00 Ductile Iron Fittings Ton 18 $25,000.00 $450,000.00 $5,000.00 $90,000.00 $14,000.00 $252,000.00 $13,080.00 $235,440.00 $5,000.00 $90,000.00 $11,400.00 $205,200.00 $8,771.05 $157,878.90 12-inch Gate Valve and Box Each 22 $6,600.00 $145,200.00 $9,000.00 $198,000.00 $5,500.00 $121,000.00 $5,850.00 $128,700.00 $6,650.00 $146,300.00 $5,745.00 $126,390.00 $7,301.30 $160,628.60 8-inch Gate Valve and Box Each 9 $6,900.00 $62,100.00 $5,000.00 $45,000.00 $3,300.00 $29,700.00 $3,600.00 $32,400.00 $4,850.00 $43,650.00 $3,333.00 $29,997.00 $3,849.70 $34,647.30 6-inch Gate Valve and Box Each 3 $6,200.00 $18,600.00 $4,000.00 $12,000.00 $2,400.00 $7,200.00 $2,810.00 $8,430.00 $3,650.00 $10,950.00 $2,310.00 $6,930.00 $2,807.55 $8,422.65 2-inch Gate Valve and Box Each 3 $3,200.00 $9,600.00 $1,800.00 $5,400.00 $1,800.00 $5,400.00 $2,140.00 $6,420.00 $3,350.00 $10,050.00 $1,343.00 $4,029.00 $1,799.65 $5,398.95 8-inch Single Linestop Each 2 $10,000.00 $20,000.00 $16,000.00 $32,000.00 $10,500.00 $21,000.00 $16,590.00 $33,180.00 $16,250.00 $32,500.00 $11,198.00 $22,396.00 $12,300.00 $24,600.00 6-inch Single Linestop Each 6 $12,000.00 $72,000.00 $12,000.00 $72,000.00 $9,400.00 $56,400.00 $15,460.00 $92,760.00 $14,000.00 $84,000.00 $9,865.00 $59,190.00 $10,047.00 $60,282.00 2-inch Single Linestop Each 9 $3,500.00 $31,500.00 $7,500.00 $67,500.00 $2,500.00 $22,500.00 $8,870.00 $79,830.00 $5,700.00 $51,300.00 $2,679.00 $24,111.00 $4,828.00 $43,452.00 Fire Hydrant Assembly Each 7 $8,000.00 $56,000.00 $12,000.00 $84,000.00 $10,000.00 $70,000.00 $10,480.00 $73,360.00 $12,500.00 $87,500.00 $8,371.00 $58,597.00 $8,440.00 $59,080.00 2-inch Air Release Valve Assembly Each 2 $8,000.00 $16,000.00 $10,000.00 $20,000.00 $10,000.00 $20,000.00 $13,760.00 $27,520.00 $12,000.00 $24,000.00 $7,549.00 $15,098.00 $8,440.20 $16,880.40 8-inch PVC Water Main Connection Each 9 $2,500.00 $22,500.00 $4,500.00 $40,500.00 $4,500.00 $40,500.00 $7,710.00 $69,390.00 $5,500.00 $49,500.00 $7,572.00 $68,148.00 $3,946.95 $35,522.55 6-inch PVC Water Main Connection Each 4 $2,500.00 $10,000.00 $3,800.00 $15,200.00 $3,500.00 $14,000.00 $7,440.00 $29,760.00 $5,000.00 $20,000.00 $7,373.00 $29,492.00 $3,179.50 $12,718.00 2-inch GS Water Main Connection Each 4 $1,500.00 $6,000.00 $1,800.00 $7,200.00 $1,500.00 $6,000.00 $4,060.00 $16,240.00 $2,500.00 $10,000.00 $4,042.00 $16,168.00 $1,768.75 $7,075.00 1-inch Single Service Connection, Short Each 12 $1,200.00 $14,400.00 $1,800.00 $21,600.00 $1,500.00 $18,000.00 $2,220.00 $26,640.00 $4,500.00 $54,000.00 $2,207.00 $26,484.00 $1,305.30 $15,663.60 1-inch Single Service Connection, Long Each 14 $2,800.00 $39,200.00 $3,000.00 $42,000.00 $8,000.00 $112,000.00 $5,540.00 $77,560.00 $5,000.00 $70,000.00 $3,150.00 $44,100.00 $1,337.40 $18,723.60 1-inch Double Service Connection, Short Each 4 $350.00 $1,400.00 $2,600.00 $10,400.00 $1,500.00 $6,000.00 $3,020.00 $12,080.00 $6,000.00 $24,000.00 $2,375.00 $9,500.00 $1,714.75 $6,859.00 1-inch Double Service Connection, Long Each 1 $550.00 $550.00 $3,500.00 $3,500.00 $15,000.00 $15,000.00 $10,230.00 $10,230.00 $6,500.00 $6,500.00 $3,245.00 $3,245.00 $1,676.20 $1,676.20 Backflow Preventer Service Connection Each 1 $18,500.00 $18,500.00 $7,000.00 $7,000.00 $7,500.00 $7,500.00 $12,080.00 $12,080.00 $3,100.00 $3,100.00 $6,782.00 $6,782.00 $3,578.00 $3,578.00 Grout and Abandon Existing Water Main (2-inch to 8-inch)Linear Feet 3,690 $10.00 $36,900.00 $10.00 $36,900.00 $20.00 $73,800.00 $28.70 $105,903.00 $20.00 $73,800.00 $39.00 $143,910.00 $21.25 $78,412.50 Removal and Disposal of Existing Fire Hydrants Each 3 $4,500.00 $13,500.00 $2,500.00 $7,500.00 $7,500.00 $22,500.00 $3,560.00 $10,680.00 $4,200.00 $12,600.00 $1,105.00 $3,315.00 $1,940.00 $5,820.00 Driveway Restoration for Dirt and Gravel Driveways Square Yards 150 $115.00 $17,250.00 $50.00 $7,500.00 $25.00 $3,750.00 $40.00 $6,000.00 $35.00 $5,250.00 $65.00 $9,750.00 $85.15 $12,772.50 Sod Square Yards 600 $10.00 $6,000.00 $12.00 $7,200.00 $7.00 $4,200.00 $27.00 $16,200.00 $8.00 $4,800.00 $11.00 $6,600.00 $4.45 $2,670.00 Demolish Existing LS 46 Lump Sum 1 $8,500.00 $8,500.00 $100,000.00 $100,000.00 $25,025.00 $25,025.00 $159,730.00 $159,730.00 $25,000.00 $25,000.00 $58,500.00 $58,500.00 $112,200.00 $112,200.00 4' PVC Force Main Via Open Cut Linear Feet 40 $250.00 $10,000.00 $120.00 $4,800.00 $160.00 $6,400.00 $54.00 $2,160.00 $200.00 $8,000.00 $44.00 $1,760.00 $34.90 $1,396.00 12" Blowoff Assembly Each 1 $7,500.00 $7,500.00 $6,000.00 $6,000.00 $2,000.00 $2,000.00 $7,020.00 $7,020.00 $6,000.00 $6,000.00 $3,670.00 $3,670.00 $4,932.30 $4,932.30 8" Blowoff Assembly Each 2 $6,500.00 $13,000.00 $5,000.00 $10,000.00 $1,500.00 $3,000.00 $5,720.00 $11,440.00 $4,000.00 $8,000.00 $3,404.00 $6,808.00 $3,214.10 $6,428.20 12-inch Single Linestop Each 1 $15,000.00 $15,000.00 $22,000.00 $22,000.00 $15,500.00 $15,500.00 $23,580.00 $23,580.00 $20,700.00 $20,700.00 $21,500.00 $21,500.00 $20,720.00 $20,720.00 TOTAL PHASE 2 BID $4,024,000.00 $3,586,950.00 $3,343,550.00 $4,474,888.00 $4,257,300.00 $3,734,009.00 $3,920,679.85 TOTAL BASE BID: PHASE 1 & PHASE 2 $4,978,550.00 $4,998,850.00 $4,516,700.00 $6,177,423.00 $5,837,725.00 $5,067,808.00 $5,122,759.95 231 Yellow highlighted cells indicates discrepancies on bid form Bidders listed in alphabetical order. *Missing forms considered a minor irregularity **License check, submitted forms & references verified only on lowest three firms. 2 Page 181 of 576 Lakewood Avenue North Gravity Sewer – Ph.1 & 2 ITB #26-004 00020-1 SECTION 00020 INVITATION TO BID ITB #26-004 Lakewood Avenue North Gravity Sewer Project Phase 1 & Phase 2 The City of Ocoee, Florida (“City”, “Owner”) is soliciting sealed Bids for the Project ITB #26-004 26-004 Lakewood Avenue North Gravity Sewer Project Phase 1 & Phase 2. Phase 1 of this project is funded by an EPA federal grant. All work performed under Phase 1 shall comply with the requirements outlined in Appendix C – Federal Grant Compliance Documents. These include Davis-Bacon labor standards, AIS/BABA domestic material provisions, and other EPA grant conditions. Contractors shall account for these requirements in their bids. Phase 2 is not grant funded; therefore, is not subject to these requirements . Description of Work: All Work for the Project shall be constructed in accordance with the drawings and specifications and the Contact Documents prepared by Wright Pierce and the City of Ocoee Utilities Department. The proposed project will be awarded and constructed, in conformance with the plans, specifications, and City of Ocoee Engineering Standards Manual. Bids shall be deemed to include all items necessary for the furnishing, delivering, and installing of all materials, equipment, incidentals, and services, including all labor for the work which is generally described as the following: A. Phase 1 will be solely funded by a grant received by the Owner. Phase 1 of the project will include approximately 1,350 LF of 12-inch polyvinyl chloride (PVC) PVC-SDR 26 gravity sewer system by open cut installation, ten (10) new manholes, four (4) 8-inch PVC-SDR 26 stub outs, service laterals and cleanouts. B. Phase 2 of the project will be funded by the Owners capital funds. The second phase of this project includes the installation of approximately 1,650 linear feet of 12-inch PVC-SDR 26 gravity sewer system and approximately 400 linear feet of 12-inch PVC-DR18 forcemain by open-cut installation, nine (9) new manholes, five (5) 8-inch PVC-SDR 26 stub outs, one (1) 4-inch PVC-DR18 forcemain stub out, service laterals and cleanouts. This phase also includes 2,900 linear feet of 12-inch ductile iron watermain installed by open cut. Along with the installation of the piping the project consists of connections to existing water mains and manholes, installation of hydrants, valves, fittings, pressure testing, open cut and restoration of associated roadway, driveways, curb, sodding, seeding and other restoration as may be required. C. All work must be in compliance with the City of Ocoee Engineering Standards Manual. See Section 02100. All work activities shall be required to be in accordance with the permits issued by the respective agencies. All work performed will be required to be done while maintaining the functional operation of the existing reclaim mains. The City is ONLY accepting electronic solicitation responses online through the City’s Bonfire platform at https://ocoee.bonfirehub.com. This link can also be accessed through the City’s website Page 182 of 576 Lakewood Avenue North Gravity Sewer – Ph.1 & 2 ITB #26-004 00020-2 at https://www.ocoee.org/323/Purchasing under the Current Open Solicitations menu. All Bid submissions for this ITB MUST be submitted electronically through the Bonfire Platform. Bid submissions received in any other format will not be accepted; no paper, fax, or e-mailed submissions will be accepted. There is no charge for bidders to use the Bonfire e-procurement platform. Bonfire platform’s minimum system requirements: Microsoft Edge, Google Chrome, Safari, or Mozilla Firefox. JavaScript and browser cookies must be enabled. Registration with Bonfire is free and is required prior to submitting a bid. It is suggested that prospective bidders register no later than 24 hours in advance of the bid submission deadline to ensure proper registration. Should a Bidder need assistance with registering, please contact the Bonfire Support Desk by emailing support@gobonfire.com. Support by email is provided Monday to Friday from 8:00 a.m. – 8:00 p.m. EST/EDT. Upon completing the registration with Bonfire, bidders will be able to submit a bid securely, any time before the bid submission deadline, at https://ocoee.bonfirehub.com by clicking the “PREPARE YOUR SUBMISSION” under the solicitation. An instructional video is provided for an overview of the submission process. Once the bid has been submitted, the Bidder will receive a date/time stamp confirmation within the Bonfire platform and an email confirmation of the bid submission. Bids submitted on the Bonfire Platform will remain locked and inaccessible by City staff until the bid deadline. Bidders are encouraged to allow ample time to upload and submit their Bid as the system will automatically lock upon the bid submission deadline. The actual contract award will be made by the Ocoee City Commission at a later date. Please be aware that all City Commission meetings are duly noticed public meetings and all documents submitted to the City as a part of a bid constitute public records under Florida law. Bid Submission Deadline: Bids will only be accepted electronically through the Bonfire Platform until 2:00 p.m., local time, on March 31, 2026. Bidders shall submit one (1) complete electronic copy, preferably in a single file, of their Bid on the Bonfire Platform. Bids must be received by Bonfire no later than the bid submission deadline. It shall be the sole responsibility of the Bidder to have its Bid uploaded and submitted on the Bonfire Platform prior to the due date and time. Any attempt to submit a bid after the submission deadline will not be accepted under any circumstances. Any uncertainty regarding the time a bid is received will be resolved against the Bidder. A virtual public bid opening will be held at approximately 2:01 pm. or as soon thereafter. Once available, the details on how to access the virtual bid opening will be posted in the project file on Bonfire and available on the City’s website at https://www.ocoee.org/959/Public-Bid-Meetings. Deadline for Receipt of Questions: The City will receive questions regarding this ITB only through written inquires directed to Alexis Chentouf, Purchasing Technician at achentouf@ocoee.org OR through the questions and answer section of the project file on Bonfire until March 17, 2026, at 2:00 p.m., local time. Any clarifications/changes will be made by way of written addenda only, issued by Purchasing and posted on Bonfire. Bidders should not contact City staff, with the exception of the Purchasing Technician, or other City consultants for information regarding this ITB before the Bid award date. Any contact with any other member of City Staff, City Commission, or its agents during the solicitation, award, and protest period may be grounds for disqualification. Page 183 of 576 Lakewood Avenue North Gravity Sewer – Ph.1 & 2 ITB #26-004 00020-3 Pre-Bid Conference: A non-mandatory pre-bid conference is scheduled for 10:00 a.m. local time on Tuesday, March 3, 2026 at the City of Ocoee Commissions Chambers, 1 N. Bluford Ave, Ocoee, FL 34761. Bid Bond: A certified check or bid bond shall accompany each Bid. The certified check or bid bond shall be for an amount not less than five percent (5%) of the bid price, and shall be made payable to the City of Ocoee as a guarantee that the Bidder will not withdraw for a period of ninety (90) days after bid closing time. A copy of the bid security is to be included with the bid submitted electronically Bonfire. The original bid security is to be mailed within five (5) business days after the bid opening to: City of Ocoee, Finance Department/Purchasing, Attention: Alexis Chentouf, Purchasing Technician, 1 N. Bluford Avenue, Ocoee, FL 34761. Failure to provide the original will cause your bid to be deemed non-responsive. Convicted Vendor List (Public Entity Crime). A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on an award to provide any goods or services to a public entity, may not submit a bid on an award with a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not be awarded or perform work as a Contractor, Supplier, Subcontractor, or Consultant under a award with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in section 287.017 for Category Two for a period of 36 months from the date of being placed on the convicted vendor list. [See s. 287.133(2)(a), Florida Statutes.] Florida Public Records Law. In accordance with Chapter 119, Florida Statutes, and, except as may be provided by Chapter 119, Florida Statutes, and other applicable State and Federal Laws, all Bidders should be aware that the Bid and the responses thereto are in the public domain and are available for public inspection. Bidders are requested, however, to identify specifically any information contained in their bids that they consider confidential and/or proprietary and that they believe to be exempt from disclosure, citing specifically the applicable exempting law. All bids received in response to this Invitation to Bid become the property of the City and will not be returned. In the event of an award, all documentation produced as part of the contract will become the exclusive property of the City. Prohibition Against Considering Social, Political or Ideological Interests in Government Contracting: Bidders are hereby notified of the provisions of section 287.05701, Florida Statutes, as amended, that the City will not request documentation of or consider a Bidder's social, political, or ideological interests when determining if the Bidder is a responsible Bidder. Bidders are further notified that the City's governing body may not give preference to a Bidder based on the Bidder's social, political, or ideological interests. The City reserves the right to accept or reject any or all bids, to waive formalities, technicalities or irregularities, to request clarification of information submitted in any bid, or to re-advertise for new bids. The City may accept any item or group of items of any bid, unless the Bidder qualifies its bid by specific limitations. The City may accept one or more bids if, in the City’s discretion, the City determines that it is in the City’s best interest to do so. Page 184 of 576 Lakewood Avenue North Gravity Sewer – Ph.1 & 2 ITB #26-004 00020-4 The City reserves the right to award the contract to the Bidder which, in the City’s sole discretion, is the most responsive and responsible Bidder. The City reserves the right, as an aid in determining which bid is responsible, to require a bidder to submit such additional evidence of Bidder’s qualifications as the City may deem necessary, and may consider any evidence available to the City of the financial, technical, and other qualifications and abilities of a Bidder, including past performance (experience) with the City and others. The City Commission shall be the final authority in the selection of any and all bids. END OF SECTION Page 185 of 576 Page 186 of 576 Page 187 of 576 Page 188 of 576 Page 189 of 576 Page 190 of 576 Page 191 of 576 Page 192 of 576 Page 193 of 576 Page 194 of 576 Page 195 of 576 Page 196 of 576 Page 197 of 576 Page 198 of 576 Page 199 of 576 Page 200 of 576 Page 201 of 576 Page 202 of 576 Page 203 of 576 Page 204 of 576 Page 205 of 576 Page 206 of 576 Page 207 of 576 Page 208 of 576 Page 209 of 576 Page 210 of 576 Page 211 of 576 Page 212 of 576 Page 213 of 576 Page 214 of 576 Page 215 of 576 Page 216 of 576 Page 217 of 576 Page 218 of 576 Page 219 of 576 Page 220 of 576 Page 221 of 576 Page 222 of 576 Page 223 of 576 Page 224 of 576 Page 225 of 576 Page 226 of 576 Page 227 of 576 Page 228 of 576 Mayor Commissioners Rusty Johnson Scott R. Kennedy, District 1 Rosemary Wilsen, District 2 City Manager Richard Firstner, District 3 Craig Shadrix George Oliver III, District 4 Addendum No.1 ITB #26-004 Lakewood Avenue North Gravity Sewer Project Phase 1 & Phase 2 Page 1 March 10, 2026 ADDENDUM NO. ONE (1) CITY OF OCOEE ITB #26-004 Lakewood Avenue North Gravity Sewer Project Phase 1 & Phase 2 This addendum shall modify and become a part of the original ITB Documents for ITB #26-004. This addendum consists of eighty-eight (88) pages. Bidders should acknowledge receipt of this addendum in the space provided in the Bid Form. Failure to do so may subject the Bidder to disqualification. Answers to questions received and/or Amendments to the ITB Documents are as follows 1.Revised Bid Form •The Bid Form has been revised. All Bidders must submit the revised Bid Form attached to this addendum. 2.Wright-Pierce Section 01150 – Measurement and Payment •The revised Section 01150 will be attached to this addendum. 3.Revised Contract Drawings •The revised drawings will be attached to this addendum. 4.Questions / Answers Q1. What is the engineer’s estimate for this project? A1. The estimated cost of the project is $5,044,000.00. Page 229 of 576 Addendum No.1 ITB #26-004 Lakewood Avenue North Gravity Sewer Project Phase 1 & Phase 2 Page 2 Alexis Chentouf Alexis Chentouf Purchasing Technician cc: Jen Bolling, Utilities Director Attachments: Bid Form – Revised Wright-pierce Section 01150 – Measurement and Payment Revised Contract Drawings Page 230 of 576 Lakewood Avenue North Gravity Sewer – Ph.1 & 2 ITB #26-004 00300-1 SECTION 00300 BID FORM SUBMITTED: _________________________ (Date) PROJECT IDENTIFICATION: CITY OF OCOEE ITB #26-004 LAKEWOOD AVENUE NORTH GRAVITY SEWER PROJECT PHASE 1 & 2 NAME OF BIDDER: ___________________________________________________________ BUSINESS ADDRESS: _____________________________PHONE NO.: _______________ CITY, STATE, ZIP: _____________________________ CONTRACTOR’S FEDERAL I.D. NUMBER ______________________________________ CONTRACTOR'S FLORIDA LICENSE NO.: THIS BID IS SUBMITTED TO: City of Ocoee, Florida (hereinafter called Owner) 1.The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Contract Documents to perform and furnish all Work, as specified or indicated in the Contract Documents for the Contract Price and within the Contract Times indicated in this Bid Form and in accordance with the other terms and conditions of the Contract Documents. 2.Bidder accepts all of the terms and conditions of the Bidding Documents, including, without limitation, those dealing with the disposition of Bid Bond. This Bid will remain open for ninety (90) calendar days after the day of Bid opening. Bidder will sign and deliver the required number of counterparts of the Amendment to the Agreement with the Bonds and other documents required by the Bidding Requirements within ten (10) days after the date of Owner's Notice of Intent to Award. 3.In submitting this Bid, Bidder makes all representations required by the Instructions to Bidders and the Agreement and further warrants and represents that: a.Bidder has examined copies of all the Bidding Documents and of the following Addenda: No. ________ Dated _____________ No. __________ Dated: ____________ No. ________ Dated _____________ No. __________ Dated: ____________ No. ________ Dated _____________ No. __________ Dated: ____________ No. ________ Dated _____________ No. __________ Dated: ____________ (Receipt of all which is hereby acknowledged) and also copies of the Invitation to Bid and the Instructions to Bidders. Page 231 of 576 Lakewood Avenue North Gravity Sewer – Ph.1 & 2 ITB #26-004 00300-2 b. Bidder has familiarized itself with the nature and extent of the Contract Documents, work, site, locality, and all local conditions and laws and regulations that in any manner may affect cost, progress, performance or furnishing the Work. c. Bidder has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface of subsurface structures at or contiguous to the site (except Underground Facilities) which have been identified in the Supplementary Conditions, as provided in paragraph 4.02.1 of the General Conditions. Bidder accepts the determination set forth in paragraph SC-4.02 of the Supplementary Conditions of the extent of the "technical data" contained in such reports and drawings upon which Bidder is entitled to rely, as provided in paragraph 4.02 of the General Conditions. Bidder acknowledges that such reports and drawings are not Contract Documents and may not be complete for Bidder's purposes. Bidder acknowledges that Owner and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Bidding Documents with respect to Underground Facilities at or contiguous to the site. d. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the Work, or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by Bidder and safety precautions and programs incident thereto. Bidder does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the times, price and other terms and conditions of the Contract Documents. e. Bidder understands the full extent and scope of Work to be performed by Owner and others at the site that relates to Work for which this Bid is submitted. f. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations, explorations, tests, studies and date with the Contract Documents. g. Bidder has given Engineer written notice of all conflicts, errors, ambiguities or discrepancies that Bidder has discovered in the Contract Documents and the written resolution thereof by Engineer is acceptable to Bidder, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted. Page 232 of 576 Lakewood Avenue North Gravity Sewer – Ph.1 & 2 ITB #26-004 00300-3 h. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a farce or sham Bid; Bidder has not solicited or induced any person, firm or corporation to refrain from bidding; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner. i. Bidder hereby agrees to commence Work under this contract on the date to be specified in the Notice to Proceed and to fully complete all work of the project within the Contract Time specified in the Contract for Construction (Section 00500). Bidder further accepts the provisions of the Contract for Construction as to liquidated damages and agrees to pay as liquidated damages the amount stated in the Contract for Construction (Section 00500), for each consecutive calendar day completion of the Work is delayed. Completion Schedule: 1) The Work shall be Substantially Complete within the Contract Time specified in Article 3.1 of the Proposed Contract for Construction (Section 00500). 2) The Work shall be finally complete within the Contract Time specified in Article 3.1 of the Proposed Contract for Construction (Section 00500). 4. All bid items shall include all materials, equipment, labor, permit fees, taxes, tests, miscellaneous costs of all types, overhead, and profit for the item to be complete, in place, and ready for operation in the manner contemplated by the Contract Documents. Bidder submits the TOTAL BID OR TOTAL BASE BID to perform all the Work, as required by the Drawings and Specifications. 5. This Invitation to Bid is for the Lakewood Avenue Gravity Sewer Extension, which includes Phase 1 (Grant Funded) and Phase 2 (Not Grant Funded). The City intends to award one contract for the entire project to the bidder submitting the lowest combined total bid for Phase 1 and Phase 2. Bidders shall provide separate pricing for each phase as shown on the Bid Form, but the award will be based on the combined total of both phases. Partial awards will not be given. 6. The Contractor shall submit separate pay applications for Phase 1 and Phase 2 throughout the project, even if identical materials or equipment are used in both phases. Each pay application shall clearly identify the phase to which the work applies. Combined pay applications for both phases will not be accepted. Page 233 of 576 Lakewood Avenue North Gravity Sewer – Ph.1 & 2 ITB #26-004 00300-4 7. The following documents are made a condition of this Bid: a.Bidding Documents and shall include the following: 1.Bid Forms (entire Section 00300, 00301, 00301A, 00302, and 00303) 2.Human Trafficking Affidavit (Section 00308) 3.Company Not Entity of Foreign Country of Concern (Section 00309) 4.E-Verify Affidavit (Section 00310) 5.Sam.gov Registration Information (Section 00311) 6.Byrd Anti Lobbying (Section 00312) 7.Bid Bond (Surety Bond or Cashier's Check). (Section 00410) 8.Non-Collusion Affidavit (Section 00480) 9.Conflict of Interest Disclosure Form (Section 00480A) 10.Certification of Non-Segregated Facilities (Section 00481) 11.Sworn Statement on Public Entity Crimes (Section 00482) 12.Certification of Nondiscriminatory Labor Practices (Section 00483) 13.Certification Regarding Scrutinized Companies’ Lists (Section 00484) (Remainder of page intentionally left blank) Page 234 of 576 Lakewood Avenue North Gravity Sewer – Ph.1 & 2 ITB #26-004 00300-5 Bid Form: Lakewood Avenue Gravity Sewer Extension: Phase 1 - Grant Funded Item No. Description Units Contract Quantity Unit Price Total Cost 1 Mobilization/Demobilization Lump Sum 1 2 Maintenance of Traffic Lump Sum 1 3 As-Built Survey ($8,500 minimum bid) Lump Sum 1 4 12" PVC Sewer Pipe 0'-6' Linear Feet 740 5 12" PVC Sewer Pipe 6'-8' Linear Feet 290 6 12" PVC Sewer Pipe 8'-10' Linear Feet 245 7 12" PVC Sewer Pipe 10'-12' Linear Feet 50 8 Remove 8" PVC Sewer and Replace with 12" PVC Sewer Pipe Linear Feet 80 9 8" PVC Sewer Pipe 0'-6' Linear Feet 35 10 8" PVC Sewer Pipe 6'-8' Linear Feet 65 11 8" PVC Sewer Pipe 8'-10' Linear Feet 45 12 Sewer Manholes 0'-4', 4'-8', 8'-10'' Depth Vertical Feet 90 13 Sanitary Service Connections and Cleanouts Each 19 14A Initial Pavement Ton 340 14B Final Pavement Ton 200 14C 1” Pavement Milling Square Yards 3,500 15 Concrete Work Square Yards 35 16 Replacement of unsuitable Material Above Pipe Bedding and Initial Backfill Cubic Yards 300 17 Remove 15" Storm Sewer and Replace with 15" RCP Storm Sewer Pipe Linear Feet 40 Total Phase 1 Bid Page 235 of 576 Lakewood Avenue North Gravity Sewer – Ph.1 & 2 ITB #26-004 00300-6 Bid Form: Lakewood Avenue Gravity Sewer Extension: Phase 2 - Not Grant Funded Item No. Description Units Contract Quantity Unit Price Total Cost 18 Mobilization/Demobilization Lump Sum 1 19 Maintenance of Traffic Lump Sum 1 20 As-Built Survey Lump Sum 1 21 12" PVC Sewer Pipe 0'-6' Linear Feet 540 22 12" PVC Sewer Pipe 6'-8' Linear Feet 1,150 23 8" PVC Sewer Pipe 0'-6' Linear Feet 80 24 8" PVC Sewer Pipe 6'-8' Linear Feet 110 25 8" PVC Sewer Pipe 8'-10' Linear Feet 70 26 Sewer Manholes 0'-4', 4'-8', 8'-10' Depth Vertical Feet 90 27A 12' PVC Force Main Via Open Cut Linear Feet 400 27B 12 Tapping Sleeve and Valve Each 2 28 Sanitary Service Connections and Cleanouts Each 19 29A Initial Pavement Ton 535 29B Final Pavement Ton 320 29C 1” Pavement Milling Square Yards 5,700 30 Concrete Work Square Yards 1,600 31 Replacement of unsuitable Material Above Pipe Bedding and Initial Backfill Cubic Yards 1100 32 Contaminated Soil Excavation With Offsite Disposal Cubic Yards 50 33 Management of Contaminated Materials and Soils/Fill Lump Sum 1 34 Removal and Disposal of Contaminated Groundwater Lump Sum 1 35 Furnish and Install 12-inch Ductile Iron Water Main via Open Cut Linear Feet 2,900 36 Furnish and Install 8-inch Ductile Iron Water Main via Open Cut Linear Feet 400 37 Furnish and Install 6-inch Ductile Iron Water Main via Open Cut Linear Feet 180 38 Furnish and Install 2-inch Polyethylene Water Main via Open Cut Linear Feet 80 39 Ductile Iron Fittings Ton 18 40 12-inch Gate Valve and Box Each 22 41 8-inch Gate Valve and Box Each 9 Page 236 of 576 Lakewood Avenue North Gravity Sewer – Ph.1 & 2 ITB #26-004 00300-7 Bid Form: Lakewood Avenue Gravity Sewer Extension: Phase 2 - Not Grant Funded Item No. Description Units Contract Quantity Unit Price Total Cost 42 6-inch Gate Valve and Box Each 3 43 2-inch Gate Valve and Box Each 3 44 8-inch Single Linestop Each 2 45 6-inch Single Linestop Each 6 46 2-inch Single Linestop Each 9 47 Fire Hydrant Assembly Each 7 48 2-inch Air Release Valve Assembly Each 2 49 8-inch PVC Water Main Connection Each 9 50 6-inch PVC Water Main Connection Each 4 51 2-inch GS Water Main Connection Each 4 52 1-inch Single Service Connection, Short Each 12 53 1-inch Single Service Connection, Long Each 14 54 1-inch Double Service Connection, Short Each 4 55 1-inch Double Service Connection, Long Each 1 56 Backflow Preventer Service Connection Each 1 57 Grout and Abandon Existing Water Main (2-inch to 8-inch) Linear Feet 3,690 58 Removal and Disposal of Existing Fire Hydrants Each 3 59 Driveway Restoration for Dirt and Gravel Driveways Square Yards 150 60 Sod Square Yards 600 61 Demolish Existing LS 46 LS 1 62 4' PVC Force Main Via Open Cut Linear Feet 40 63 12" Blowoff Assembly Each 1 64 8" Blowoff Assembly Each 2 65 12-inch Single Linestop Each 1 Total Phase 2 Bid Total Bid: Phase 1 + Phase 2 Page 237 of 576 Lakewood Avenue North Gravity Sewer – Ph.1 & 2 ITB #26-004 00300-8 Note: The combined total bid for Phase 1 and Phase 2 will be used to determine the lowest responsive bidder for award. COMPANY NAME: ___________________________________________________ BID PREPARED BY (PRINT): ___________________________________________ Page 238 of 576 Lakewood Avenue North Gravity Sewer – Ph.1 & 2 ITB #26-004 00300-9 6. The Bidder acknowledges that the City specifically reserves the right to accept and make an award to a Bidder that has not submitted the lowest Bid when, in Owner’s sole and absolute discretion, it determines that action to be in its best interest. The terms used in this Invitation to Bid, which are defined in the General Conditions and included as part of the Contract Documents, have the meanings assigned to them in the General Conditions. 7. The work shall be performed under a Florida Underground Utility or General Contractor license. Contract shall not be awarded unless proof of valid license(s) is provided. 8. It is understood that where quantities for unit price work have been presented on the Bid Form, they are approximate only and are solely for the purpose of facilitating the comparison of bids, and that the Contractor's compensation will be computed upon the basis described in the measurement and payment clauses in the specifications contained herein. 9. BASE BID - SCHEDULE OF MANUFACTURERS/SUPPLIERS If the foregoing Schedule of Bid Items is presented in a Base Bid format, the undersigned as Bidder, agrees that the Contract, if awarded, will be on the basis of the materials and equipment named in the Contract Documents, in accordance with Article 10 of the Instructions to Bidders (Section 00100). The undersigned, as Bidder, also agrees that the Total Bid reflects the equipment and material supplied by one of the manufacturers/suppliers listed in the City’s Approved Materials List. If the Bidder desires to propose an alternate manufacturer/supplier, he may write in the name of such alternate in the substitution list included within this Bid Form, but he must, nevertheless, also choose an approved manufacturer/supplier. If the proposed alternate manufacturer/supplier is determined "not equivalent" by the Engineer, the Bidder must furnish equipment and/or material items by the Bidder’s chosen approved manufacturer/supplier. If the Bidder fails to indicate which listed manufacturer/supplier he intends to use if an alternate is rejected, he must use the manufacturer/supplier chosen by the City. Also, if the Bidder choses more than one approved manufacturer/supplier, he must use the first manufacturer/supplier written in the schedule of Base/Alternative Bid Manufactures/Suppliers table within this Bid Form (unless an alternate is approved). 10. SUBSTITUTIONS AND "OR EQUAL" The undersigned as Bidder agrees that substitutions, or "equal," items will not be considered until after the effective date of the Agreement and will be evaluated in accordance with paragraphs 6.05.1 and 6.05.2 of the General Conditions. In addition to the reimbursement required under the General Conditions, the Contractor shall also reimburse the Owner for any engineering costs directly attributable to the change in manufacturers/suppliers caused by the acceptance of proposed alternates, such as, additional field trips for the Engineer, additional redesign costs, additional review costs, etc. Other costs directly attributable to the change in manufacturers/suppliers caused by the acceptance of proposed alternates, such as; increased electrical requirements, larger building, additional pumps or tankage, etc., shall be borne by others and not the Owner. If Page 239 of 576 Lakewood Avenue North Gravity Sewer – Ph.1 & 2 ITB #26-004 00300-10 Bidder intends to propose substitutions or "equal" items after the effective date of the Agreement, it is agreed that these items must be listed on the Substitution List included within this Bid Form, with a deductive amount representing 50 percent of the total savings between the named Base Bid/Alternative Bid item and the proposed item. "Base Bid/Alternative Bid" item substitutions providing to the Owner equipment or material cost savings of less than $1,000 will not be considered. The undersigned, as Bidder, also agrees that if a substitution or "equal" item is not listed on the Substitution List included with the Bid, all of the savings between the named item and the proposed item will go to the Owner, if the Owner accepts the proposed item in accordance with paragraphs 6.05.1 and 6.05.2 of the General Conditions. The Owner may request, and the undersigned Bidder shall supply, complete information on proposed substitutions. Such information shall be the manufacturer's current published or preprinted information for the specific substitution. 11.As Bidder, I hereby certify that I am aware and understand that the City of Ocoee in its sole discretion reserves the right to waive technicalities or irregularities, to reject any or all Bids, and/or to accept that Bid which is in the best interest of the City. The award of this Bid, if made, may be based on considerations other than total cost, and may be awarded based on various considerations, including but not limited to: Bidder experience and whether the Bid, in the judgment of the City, is the most responsive to the City’s needs. (Remainder of page intentionally left blank) Page 240 of 576 Lakewood Avenue North Gravity Sewer – Ph.1 & 2 ITB #26-004 00300-11 SCHEDULE OF BASE BID/ALTERNATIVE BID MANUFACTURERS/SUPPLIERS Specification Section and Equipment Item Approved Manufacturer/Supplier First Choice Second Choice Third Choice HDPE Pipe PVC Pipe DI Pipe Fittings Valves (Actuator & Gate) Valve Boxes Valve Markers Trace Wire Air Release Valves MJ Restraints Hydrant Assembly Blow Off Assembly Page 241 of 576 Lakewood Avenue North Gravity Sewer – Ph.1 & 2 ITB #26-004 00300-12 SUBSTITUTION LIST Bidder offers the following substitutions and "equal" items. Equipment Item or Material Spec Section Alternative Manufacturer/Supplier (List One Only) Deductible Amount* (Indicate Whether Lump Sum or Unit Price) Represents 50 percent of the difference in cost in accordance with the General Conditions (Minimum Deductible Amount per Substitution Item shall be $1,000) (Bidder may make additional copies of this page as required.) Page 242 of 576 Lakewood Avenue North Gravity Sewer – Ph.1 & 2 ITB #26-004 00300-13 Strike out (X) non-applicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: SOLE PROPRIETORSHIP (SEAL) (Individual's Signature) (Individual's Name) doing business as Business Address: Phone No.: Florida License No.: _________________________________ A PARTNERSHIP (SEAL) (Partnership Name) (General Partner's Signature) (General Partner's Name) Business address: Phone No.: Florida License No.: ____________________________________ Page 243 of 576 Lakewood Avenue North Gravity Sewer – Ph.1 & 2 ITB #26-004 00300-14 Strike out (X) non-applicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: A CORPORATION (Corporation Name) (State of Incorporation) By (Name of person authorized to sign) (Title) (Authorized Signature) (Corporate Seal) Attest (Secretary) Business address: Phone No.: Corporation President: Florida License No.: Page 244 of 576 Lakewood Avenue North Gravity Sewer – Ph.1 & 2 ITB #26-004 00300-15 Strike out (X) non-applicable signature block and complete applicable block. (ALL SIGNATORIES MUST HAVE THEIR NAMES PRINTED OR TYPED BELOW THEIR SIGNATURES) If Bidder is: A JOINT VENTURE By (Name) (Address) By (Name) (Address) Business Address: Phone No.: Florida License No.: (Each joint venturer must sign. The manner of signing for each individual, partnership, and corporation that is a party to the joint venture should be in the manner indicated above.) Florida License No.: Page 245 of 576 Lakewood Avenue North Gravity Sewer – Ph.1 & 2 ITB #26-004 00300-16 12 List the following in connection with the Surety which is providing the Bid Bond: Surety's Name: Surety's Address: 14. Name and address of Surety's resident agent for service of process in Florida: (Remainder of page intentionally left blank.) Page 246 of 576 Lakewood Avenue North Gravity Sewer – Ph.1 & 2 ITB #26-004 00300-17 CORPORATE AUTHORITY TO EXECUTE DOCUMENTS I HEREBY CERTIFY that a meeting of the Board of Directors of , a corporation under (Contractor's Corporate Name) the laws of the State of , held on the day of , 20__, the following resolution was duly passed and adopted: "RESOLVED, that (signature of individual) (typed name of individual) as of the corporation, is hereby authorized to execute and all documents required to be signed by an officer of the Corporation in order to submit a valid bid, contract and bond for CITY OF OCOEE ITB #26-004 LAKEWOOD AVENUE NORTH GRAVITY SEWER PROJECT PHASE 1 & PHASE 2 between the CITY OF OCOEE, a municipal corporation, and this corporation, and that his execution thereof, attested by the Secretary of the corporation and with corporate seal affixed shall be the official act and deed of this corporation." I FURTHER CERTIFY that said resolution is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the corporation this day of , 202__. (CORPORATE SEAL) (Corporate Secretary) STATE OF COUNTY OF The foregoing instrument was acknowledged before me this day of , 20__ by (name of officer or agent, title of officer or agent), by means of ☐ physical presence or ☐ online notarization, of (name of corporation acknowledging), a (state or place of incorporation) corporation, on behalf of the corporation. He/She is personally known to me or has produced (type of identification) as identification and did/did not take an oath. (Seal) (Notary Public) My Commission Expires: END OF SECTION Page 247 of 576 01150B-1 21787 SECTION 01150B MEASUREMENT AND PAYMENT PART 1 - GENERAL 1.1 DESCRIPTION A. For lump sum items, payment shall be made to the Contractor in accordance with an accepted progress schedule and schedule of values on the basis of actual work completed. B. For unit-price items, payment shall be based on the actual amount of work accepted and for the actual amount of materials in place, as shown by final measurements. 1. All units of measurement shall be standard United States convention as applied to the specific items of work by tradition and as interpreted by the Owner. 2. At the end of each day's work, the Contractor's Superintendent or other authorized representative of the Contractor shall meet with the Resident Project Representative and determine the quantities of unit price work accomplished and/or completed during the workday. 3. The Resident Project Representative will then prepare one "Technical Daily Report (TDR)" which shall be signed by both the Resident Project Representative and Contractor's Representative. 4. Once each month the Owner will use the accumulation of the TDRs to generate a summary of values, which will accompany the partial payment application. This summary of values will be signed by both the Resident Project Representative and Contractor's Representative. 5. These completed summary of values will provide the basis of the Owner's monthly quantity estimate upon which payment will be made. Items not appearing on the TDR’s will not be included for payment. Items appearing on forms not properly signed by the Contractor will not be included for payment. 6. After the work is completed and before final payment is made, the Owner will make final measurements to determine the quantities of various items of work accepted as the basis for final settlement. 7. The Contractor shall submit separate pay applications for Phase 1 and Phase 2 throughout the project, even if identical materials or equipment are used in both phases. Each pay application shall clearly identify the phase to which the work applies. Combined pay applications for both phases will not be accepted. This requirement is necessary for grant compliance and proper accounting. 1.2 REQUIREMENTS SPECIFIED ELSEWHERE A. Additional Requirements are specified elsewhere including, but not necessarily limited to, General Conditions, Supplementary Conditions, and Division 1, 2 and 15. Page 248 of 576 01150B-2 MEASUREMENT AND PAYMENT 21787 1.3 SCOPE OF PAYMENT A. Payments to the Contractor will be made for the actual quantities of the Contract items performed and accepted in accordance with the Contract Documents. Upon completion of construction, if these actual quantities show either an increase or decrease from the quantities given in the Proposal Form, the Contract Unit Prices will still prevail. B. The Contractor shall accept in compensation, as herein provided, in full payment for furnishing all materials, labor, tools, equipment, and incidentals necessary to the completed work and for performing all work contemplated and embraced by the Contract; also for all loss or damage arising from the nature of the Work, or from the action of the elements, or from any unforeseen difficulties which may be encountered during the prosecution of the Work and until its final acceptance by the Owner, and for all risks of every description connected with the prosecution of the work, except as provided herein, also for all expenses incurred in consequence of the suspension of the Work as herein authorized. C. The payment of any partial estimate or of any retained percentage except by and under the approved final invoice, in no way shall affect the obligation of the Contractor to repair or renew any defective parts of the construction or to be responsible for all damage due to such defects. D. All work items and associated payments for Phase 1 (items 1 through 17) are subject to the requirements outlined in Appendix C – Federal Grant Compliance Documents. Compliance with Davis-Bacon prevailing wage provisions, AIS/BABA domestic material requirements, and other EPA grant conditions is mandatory. Costs associated with meeting these requirements shall be considered incidental to the work and included in the unit or lump sum prices bid. No separate payment will be made for compliance with these requirements. 1.4 PAYMENT FOR INCREASED OR DECREASED QUANTITIES A. When alterations in the quantities of work not requiring supplemental agreements, as hereinbefore provided for, are ordered and performed, the Contractor shall accept payment in full at the Contract price for the actual quantities of work done. No allowance will be made for anticipated profits. Increased or decreased work involving supplemental agreements will be paid for as stipulated in such agreements. 1.5 OMITTED ITEMS A. Should any items contained in the bid form be found unnecessary for the proper completion of the work contracted, the Owner may eliminate such items from the Contract, and such action shall in no way invalidate the Contract, and no allowance will be made for items so eliminated in making final payment to the Contractor. 1.6 PARTIAL PAYMENTS A. Partial payments shall be made monthly as the work progresses. Partial payments shall be made subject to the provisions of the Supplemental and General Conditions. Contractor's Partial Payment Requests shall be submitted in two parts; one part for EPA/DEP grant eligible quantities and one part for non-eligible quantities. The breakdown of quantities will be determined by the Owner. Page 249 of 576 01150B-3 MEASUREMENT AND PAYMENT 21787 1.7 PAYMENT FOR MATERIAL DELIVERED A. When requested by the Contractor and at the discretion of the Owner, payment may be made for all or part of the value of acceptable, non-perishable materials and equipment which are to be incorporated into bid items, have not been used and have been delivered to the construction site, or placed in storage places acceptable to the Owner. Payment shall be subject to the provisions of the General and Supplemental Conditions. B. No payment shall be made upon fuels, supplies, lumber, false work, or other materials, or on temporary structures of any kind which are not a permanent part of the Contract. 1.8 FINAL PAYMENT A. After final measurements are made by the Owner, the Contractor will prepare a final quantity invoice of the amount of the Work performed and the value of such Work. Owner shall make final payments of the sum found due less retainages subject to provisions of the General and Supplemental Conditions. 1.9 INCIDENTAL WORK A. Incidental work items for which separate payment will not be made includes, but is not limited to, the following items: 1. Signs 2. Clean-up and restoration of all property affected by construction activities. 3. Restoration of fences and other structures. 4. Cooperation and coordination with other Contractors and utility companies including related inspection costs and other costs (Refer to Section 01050). 5. Utility crossings and relocations, unless otherwise paid for. 6. Temporary utility services to buildings, as required to maintain service during construction. 7. Minor Items--such as relocation of sign posts, guard rails, rock wall, mail boxes, curbs, traffic loop detectors, pavement markings, etc., damaged as a result of construction activities. 8. Trench boxes, steel and/or wood sheeting as required, including that left in place. 9. Maintenance of all existing water and sewer flows and repair of existing water and sewer pipes. 10. Temporary Construction Dewatering as necessary. 11. Dust control. 12. Erosion control. 13. Quality assurance testing. 14. Construction schedules, bonds, insurance, shop drawings, warranties, guarantees, certifications and other submittals required by the Contract Documents. 15. Repair and replacement of water lines under 2-inches in size, culverts, underdrains, rock lined drainage trenches in streets and other utilities damaged by construction activities and corresponding proper disposal of removed materials unless otherwise paid for. Page 250 of 576 01150B-4 MEASUREMENT AND PAYMENT 21787 16. Temporary construction necessary for construction sequencing and other facilities not permanently incorporated into the work. 17. Weather protection. 18. Permits not otherwise paid for or provided by the Owner. 19. Visits to the project site or elsewhere by personnel or agents of the Contractor, including manufacturer's representatives, as may be required. 20. All excavation except the test pits specifically shown or ordered by the Owner to establish sewer line and water line locations. 21. Contract administration and insurance. 22. Test pits to establish in place field soils density, groundwater conditions, or requirements for dewatering. 23. Pipe markings. 24. Temporary Field Office. 25. Earthwork 26. Test Pits for the Contractor’s Benefit 27. Sewer service risers. 28. Temporary resetting or replacement of existing street and traffic signs and temporary traffic signals where necessary. 29. Disconnecting and reconnecting traffic signal power to accommodate the work. 30. Horizontal adjustment of existing frames, covers and grates to match final grades and curb faces. 31. Removing and replacing existing SMH inverts to accommodate new and replacement pipes. 32. Removing and resetting of existing steps, guard rails, fences, walls and non- paved brick or paver walkways disturbed during construction, other than those identified on the Drawings to be replaced. 33. Protection of existing block and stone retaining walls unless otherwise identified to be removed, relocated or modified in the Drawings. 34. Cross-over channels and underdrains for sewer, storm drain and water excavation pits, and check dams for all excavated channels. 35. Installing temporary pavement markings on binder course that will not be surfaced within 14 days of installation. 36. Installing raised pavement markers and temporary symbols on the binder course within 48 hours of installing any section of the binder course and maintaining these throughout the project duration. 37. Locating and verifying the locations of water and sewer services within the limits of work. Capping or plugging existing underground utilities as shown on the plans and Dye testing as required to determine bulkheading and reconnection requirements. 38. Removal and subsequent delivery of replaced or obsolete frames, covers, grates, hydrants curbstones and signs to a location within the City limits designated by the Owner. 39. Leak testing of all existing sewer manholes whose frames and covers have been replaced. Page 251 of 576 01150B-5 MEASUREMENT AND PAYMENT 21787 40. Removal of temporary or permanent pavement markings, prior to paving. This includes removing markings that are applied on the winter binder layer, prior to installation of the wearing course. 41. Clay (impervious material) trench dams. Concrete Trench Dams are a unit price item. 42. Relocation, replacement and extension of all underground telephone, power, cable, data, gas and all other private utility services from within the Rights of Way to the dwellings, structures or meters. 43. Flushing and final cleaning of storm drain system. 44. Completion of the Storm Water Pollution Prevention Plan as well as required inspections, monitoring and reporting. 45. All damages near the project area due to or incidental to the project activities. 1.10 DESCRIPTION OF PAY ITEMS A. The following sections describe the measurement of and payment for the work to be done under the respective items listed in the Bid Form. B. Each unit or lump-sum price stated in the Bid Form shall constitute full compensation, as herein specified, for each item of the work completed. C. Measurement and Payment items 1-17 listed below are Phase 1 and the remaining items are for Phase 2. (01) – Mobilization/Demobilization A. Method of Measurement: Lump sum. Total of bid item shall not exceed [5%] of Total Amount of the Bid. B. Basis of Payment: Mobilization/demobilization costs are those costs of initiating and ending the contract. Payment for mobilization/demobilization shall be a lump sum at the price as stated in the Bid Form. Seventy-Five percent (75%) of the lump sum will be payable when the Contractor is operational on the site and the remaining 25% of the lump sum will be payable when the Contractor leaves the site following the completion of all contract work. For purposes of payment on this item, "Operational" shall mean the Contractor has provided all required and properly executed bonds and insurance certificates and the owner has approved the following: Construction Schedule, Erosion Control Plan, Pre-Blast Survey and Blasting Plan, Traffic Control Plan, Project Sign (and installed), Temporary Facilities, and Pre-Construction photographs/videos. "Operational" shall also mean Contractor has performed the pre- construction television sewer inspection, delivered the records of it to the Owner and the Owner has acknowledged the records are accurate and of use. “Operational” shall mean the temporary field office is fully functional and power, phone and internet are functioning. Only one lump sum payment divided into the two partial payments described herein shall be made to cover all mobilization/demobilization costs throughout the entire contract. (02) – Maintenance of Traffic A. Method of Measurement: Traffic regulation and control will be paid for at the Lump Sum unit price as stated in the Bid Schedule. Page 252 of 576 01150B-6 MEASUREMENT AND PAYMENT 21787 B. Basis of Payment: Payment for traffic regulation and control shall constitute full compensation for all traffic regulation and control efforts and including all labor, materials, equipment, signage and supervision required to provide comprehensive and professional traffic regulation and control at all project locations. The traffic control plan, temporary pavement markings for traffic re-routing and pedestrian safety are included in this item. The lump sum shall be paid in partial payments over the course of the project, where the percentage paid is equal to the percentage of completion of the entire Contract. (03) - As-Built Survey ($8,500 minimum bid) A. Method of Measurement: The As-built Survey will be paid for at the lump sum unit price as stated in the Bid Schedule. The minimum required bid for this item is $8,500. B. Basis of Payment: 1. Payment for the As-built Survey shall constitute full compensation for all field survey and processing, recording and delivery of data, including all labor, materials, equipment and supervision required to provide a complete as-built survey and complete GIS database in the specified format. 2. Payment for this Lump Sum work on interim requisitions shall be according to the following proceedings: a. Electronic version of the draft (ninety percent (90%) complete) survey and GIS database submitted and approved by the Owner - thirty percent (30%) payment. Electronic and paper versions of the final survey and GIS database submitted and approved by the Owner – seventy percent (70%) payment. (04), (05), (06) and (07) – 12” PVC Sewer Pipe @ 0’-6’, 6’-8’, 8’-10’, 10’-12’ Depth A. Method of Measurement: Sewer pipe measured for payment shall be the number of linear feet installed measured along the center line of the pipe as laid including fittings. Pipes shall be measured between centers of the manholes minus half the inside diameter of each manhole. Pipe installed into the manhole will not be measured for payment. B. Basis of Payment: 1. The contract unit price per linear foot for sewer pipe shall be full compensation for all labor, materials, and equipment necessary to complete this work including sawcut, management, removal and disposal of pavement; excavation, dewatering, bedding, furnishing and installing pipe and fittings, making connections to new and existing manholes, installation of impervious material dams, backfill including aggregate base and subbase material compaction, testing; air testing and light cleaning prior to each CCTV inspection; post- CCTV inspection of the sewer, providing video files, database, and written logs on external hard drives; maintaining existing flows during construction of new facilities, and all else incidental thereto for which payment is not provided under other items. 2. Payment for this work on interim requisitions shall be according to the following percentages: a. Sewer pipe acceptably set in place and backfilled - 90 percent. Page 253 of 576 01150B-7 MEASUREMENT AND PAYMENT 21787 b. Sewer pipe successfully tested - 10 percent. (08) Remove 8” PVC Sewer and Replace with 12-inch PVC Sewer Pipe A. Method of Measurement: Sewer pipe measured for payment shall be the number of linear feet removed and replaced measured along the center line of the pipe as laid including fittings. Pipes shall be measured between centers of the manholes minus half the inside diameter of each manhole. Pipe installed into the manhole will not be measured for payment. B. Basis of Payment: 1. The contract unit price per linear foot for sewer pipe shall be full compensation for all labor, materials, and equipment necessary to complete this work including sawcut, management, removal and disposal of pavement; excavation, dewatering, bedding, furnishing and installing pipe and fittings, making connections to new and existing manholes, installation of impervious material dams, backfill including aggregate base and subbase material, compaction, testing; air testing and light cleaning prior to each CCTV inspection; post- CCTV inspection of the sewer, providing video files, database, and written logs on external hard drives; maintaining existing flows during construction of new facilities, and all else incidental thereto for which payment is not provided under other items. 2. Payment for this work on interim requisitions shall be according to the following percentages: a. Sewer pipe acceptably removed and set in place and backfilled - 90 percent. b. Sewer pipe successfully tested - 10 percent. (09), (10) and (11) – 8” PVC Sewer Pipe 0’-6’, 6’-8’, 8’-10’ Depth A. Method of Measurement: Sewer pipe measured for payment shall be the number of linear feet installed measured along the center line of the pipe as laid including fittings. Pipes shall be measured between centers of the manholes minus half the inside diameter of each manhole. Pipe installed into the manhole will not be measured for payment. B. Basis of Payment: 1. The contract unit price per linear foot for sewer pipe shall be full compensation for all labor, materials, and equipment necessary to complete this work including sawcut, management, removal and disposal of pavement; excavation, dewatering, bedding, furnishing and installing pipe and fittings, making connections to new and existing manholes, installation of impervious material dams, backfill including aggregate base and subbase material, compaction, testing; air testing and light cleaning prior to each CCTV inspection; post- CCTV inspection of the sewer, providing video files, database, and written logs on external hard drives; maintaining existing flows during construction of new facilities, and all else incidental thereto for which payment is not provided under other items. 2. Payment for this work on interim requisitions shall be according to the following percentages: Page 254 of 576 01150B-8 MEASUREMENT AND PAYMENT 21787 a. Sewer pipe acceptably set in place and backfilled - 90 percent. b. Sewer pipe successfully tested - 10 percent. (12) - Sewer Manholes 0’-4, 4’-8’, 8’-10’, 10’-12’ Depth A. Method of Measurement: Sewer manholes accepted for payment shall be the actual vertical feet of structures installed and accepted complete in place, from the lowest invert to finish grade as indicated in the Contract Documents, or as directed by the Owner. B. Basis of Payment: 1. The contract unit price per vertical foot shall be full compensation for all labor, materials, tools and equipment necessary to complete this work including sawcut, management, removal and disposal of pavement; excavation, dewatering, removal and disposal of existing manhole, frame and cover; bedding; furnishing and installing precast concrete sections, frames, and covers and furnishing; masonry materials; waterproofing; constructing inverts; manhole coring, connection to sewer pipes; backfilling including aggregate base and subbase material; compaction; cleaning; testing; vacuum testing; maintaining existing flows/temporary bypass pumping; and all else incidental thereto for which payment is not provided under other items. 2. Payment for this item shall be as follows: a. Manhole acceptably set in place and backfilled - 90 percent. b. Manhole successfully cleaned and tested - 10 percent. (13) - Sanitary Service Connections and Cleanouts A. Method of Measurement: This item shall consist of installing house or property sanitary service leads from sanitary sewer mains to the edge of right-of-way and installing cleanouts as shown on the Drawings and/or as determined in the field. The quantity to be paid for under this item shall be the actual number of sanitary service connections and cleanouts supplied and installed, measured in place and accepted by the Owner. B. Basis of Payment: 1. The contract unit price per each shall be full compensation for all labor, materials, and equipment necessary to complete this work including sawcut, management, removal and disposal of pavement; excavation, dewatering, bedding; furnishing and installing pipe, fittings, caps, plugs, and screened stone; adequately capping service connection and marking location as specified and shown on the Drawings or connection to existing service; backfilling including aggregate base and subbase material, compaction; raising cleanouts to final grade; cleaning, testing, air testing; maintaining existing flows during construction of new facilities; and all else incidental thereto for which payment is not provided under other items. 2. Payment for this work on interim requisitions shall be according to the following percentages: a. Service pipe acceptably set in place and backfilled - 90 percent. b. Service pipe successfully cleaned and tested - 10 percent. Page 255 of 576 01150B-9 MEASUREMENT AND PAYMENT 21787 (14A) and (14B) - Initial Pavement and Final Pavement A. Method of Measurement: 1. The quantity of bituminous concrete pavement to be paid for under this item includes: a. Initial Pavement - The number of tons of initial pavement placed and removed at the direction of the Engineer, calculated as described below, within the payment limits shown on the Drawings. b. Final Pavement - The number of tons of final pavement placed at the direction of the Engineer, calculated as described below, within the payment limits shown on the Drawings. 2. Actual widths will be used in computing area wherever the width of pavement removed and replaced is less than the limits indicated on the Drawings. 3. The conversion factor to change volume of bituminous concrete pavement measured in place to tons will be 0.055 tons per square yard per inch of thickness. B. Basis of Payment: 1. Pavement shall be paid for at the Contract unit price per ton stated in the Bid Schedule. 2. Said unit price shall be full compensation for furnishing all materials, labor, equipment and tools necessary for the placement and removal of pavement, preparation of base material, application of tack coat, placement and grading of gravel shoulder material to back up overlay pavement, and installation of pavement markings. No additional payment will be made to the Contractor for repair work done by them in maintaining bituminous concrete pavement. (14C) – 1” Pavement Milling A. Method of Measurement: The quantity of pavement milled to be paid for under this item shall consist of the square yards of milled pavement within the payment limits shown on the Drawings or as directed by the engineer B. Basis of Payment: The contract unit price per square yard of milling of pavement shall be full compensation for all labor, materials, tools and equipment necessary to complete this work including milling and removal of the old pavement, broom cleaning existing grinded surfaces prior to paving, and all else incidental thereto for which payment is not provided under other items. (15) – Concrete Work A. Method of Measurement: The concrete constructed, removed, and replaced to be paid for will be determined by the actual square yards of concrete constructed, replaced, and accepted. Page 256 of 576 01150B-10 MEASUREMENT AND PAYMENT 21787 B. Basis of Payment: Payment for Concrete Work will be made at the Contract unit price per square yard per item, which price and payment shall be full compensation and shall include construction of all concrete structures and pads unless otherwise paid under a separate pay item; removal and disposal of existing concrete at driveways and sidewalks as required for installation of sewer systems and service laterals; grading, all reinforcement/wire mesh for driveways, sidewalks, pads, and expansion joints; all saw-cutting, milling, paving, re-striping, and sealing; all subbase, concrete, sidewalks, curbs, gutters and miscellaneous driveway components; compaction and testing. (16) - Replacement of Unsuitable Material A. Method of Measurement: Quantity to be paid for under this item shall be the number of cubic yards of material removed and replaced with materials from off-site as authorized by the Owner. The payment limit for this item shall be between vertical planes that are a distance apart equal to a maximum of 6-feet extending from the top of the undisturbed earth layer to the bottom of the trench backfill layer as called out in the contract drawings for the length of the excavation as directed by the Owner. B. Basis of Payment: 1. Excavated unsuitable materials shall be paid for at the unit price per cubic yard stated in the Bid Schedule. Said unit price shall be full compensation for furnishing all labor, equipment, and tools necessary for the excavation of unsuitable material including the disposal of materials; furnishing installing and compacting replacement suitable backfill, and for all other work and expenses incidental thereto for which payment is not provided under other items. 2. Material excavated that could have, in the opinion of the Owner, remained in place through the use of adequate dewatering efforts shall be replaced by the Contractor at no additional cost to the Owner. 3. Excess backfill material may be available during the Contract. This item shall be used to pay for excavation of unsuitable materials in the pipe bedding layer only if no suitable backfill material previously excavated under this Contract is available. (17) Remove 15” Storm Sewer and Replace with 15-inch RCP Storm Sewer Pipe A. Method of Measurement: Sewer pipe measured for payment shall be the number of linear feet removed and replaced measured along the center line of the pipe as laid including fittings. Pipes shall be measured between centers of manholes or structures minus half the inside diameter of each structure. Pipe installed into the structure will not be measured for payment. B. B. Basis of Payment: The contract unit price per linear foot for storm drain pipe removed and replaced shall be full compensation for all labor, materials, and equipment necessary to complete this work including sawcut, management, removal and disposal of pavement; excavation, dewatering, bedding, furnishing and installing pipe and fittings, backfill including aggregate base and subbase material, compaction, cleaning pipes and sumps, connection to existing piping and structures as required, and all else incidental thereto for which payment is not provided under other items. Page 257 of 576 01150B-11 MEASUREMENT AND PAYMENT 21787 (18) – Mobilization/Demobilization A. Method of Measurement: Lump sum. Total of bid item shall not exceed [5%] of Total Amount of the Bid. B. Basis of Payment: Mobilization/demobilization costs are those costs of initiating and ending the contract. Payment for mobilization/demobilization shall be a lump sum at the price as stated in the Bid Form. Seventy-Five percent (75%) of the lump sum will be payable when the Contractor is operational on the site and the remaining 25% of the lump sum will be payable when the Contractor leaves the site following the completion of all contract work. For purposes of payment on this item, "Operational" shall mean the Contractor has provided all required and properly executed bonds and insurance certificates and the owner has approved the following: Construction Schedule, Erosion Control Plan, Pre-Blast Survey and Blasting Plan, Traffic Control Plan, Project Sign (and installed), Temporary Facilities, and Pre-Construction photographs/videos. "Operational" shall also mean Contractor has performed the pre- construction television sewer inspection, delivered the records of it to the Owner and the Owner has acknowledged the records are accurate and of use. “Operational” shall mean the temporary field office is fully functional and power, phone and internet are functioning. Only one lump sum payment divided into the two partial payments described herein shall be made to cover all mobilization/demobilization costs throughout the entire contract. (19) – Maintenance of Traffic A. Method of Measurement: Traffic regulation and control will be paid for at the Lump Sum unit price as stated in the Bid Schedule. B. Basis of Payment: Payment for traffic regulation and control shall constitute full compensation for all traffic regulation and control efforts and including all labor, materials, equipment, signage and supervision required to provide comprehensive and professional traffic regulation and control at all project locations. The traffic control plan, temporary pavement markings for traffic re-routing and pedestrian safety are included in this item. The lump sum shall be paid in partial payments over the course of the project, where the percentage paid is equal to the percentage of completion of the entire Contract. (20) - As-Built Survey ($8,500 minimum bid) A. Method of Measurement: The As-built Survey will be paid for at the lump sum unit price as stated in the Bid Schedule. The minimum required bid for this item is $8,500. B. Basis of Payment: 1. Payment for the As-built Survey shall constitute full compensation for all field survey and processing, recording and delivery of data, including all labor, materials, equipment and supervision required to provide a complete as-built survey and complete GIS database in the specified format. 2. Payment for this Lump Sum work on interim requisitions shall be according to the following proceedings: Page 258 of 576 01150B-12 MEASUREMENT AND PAYMENT 21787 a. Electronic version of the draft (ninety percent (90%) complete) survey and GIS database submitted and approved by the Owner - thirty percent (30%) payment. Electronic and paper versions of the final survey and GIS database submitted and approved by the Owner – seventy percent (70%) payment. (21), (22) – 12” PVC Sewer Pipe @ 0’-6’, 6’-8’ Depth A. Method of Measurement: Sewer pipe measured for payment shall be the number of linear feet installed measured along the center line of the pipe as laid including fittings. Pipes shall be measured between centers of the manholes minus half the inside diameter of each manhole. Pipe installed into the manhole will not be measured for payment. B. Basis of Payment: 1. The contract unit price per linear foot for sewer pipe shall be full compensation for all labor, materials, and equipment necessary to complete this work including sawcut, management, removal and disposal of pavement; excavation, dewatering, bedding, furnishing and installing pipe and fittings, making connections to new and existing manholes, installation of impervious material dams, backfill including aggregate base and subbase material, compaction, testing; air testing and light cleaning prior to each CCTV inspection; post- CCTV inspection of the sewer, providing video files, database, and written logs on external hard drives; maintaining existing flows during construction of new facilities, and all else incidental thereto for which payment is not provided under other items. 2. Payment for this work on interim requisitions shall be according to the following percentages: a. Sewer pipe acceptably set in place and backfilled - 90 percent. b. Sewer pipe successfully tested - 10 percent. (23), (24), and (25) – 8” PVC Sewer Pipe 0’-6’, 6’-8’, 8’-10’ Depth A. Method of Measurement: Sewer pipe measured for payment shall be the number of linear feet installed measured along the center line of the pipe as laid including fittings. Pipes shall be measured between centers of the manholes minus half the inside diameter of each manhole. Pipe installed into the manhole will not be measured for payment. B. Basis of Payment: 1. The contract unit price per linear foot for sewer pipe shall be full compensation for all labor, materials, and equipment necessary to complete this work including sawcut, management, removal and disposal of pavement; excavation, dewatering, bedding, furnishing and installing pipe and fittings, making connections to new and existing manholes, installation of impervious material dams, backfill including aggregate base and subbase material, compaction, testing; air testing and light cleaning prior to each CCTV inspection; post- CCTV inspection of the sewer, providing video files, database, and written logs on external hard drives; maintaining existing flows during construction of new Page 259 of 576 01150B-13 MEASUREMENT AND PAYMENT 21787 facilities, and all else incidental thereto for which payment is not provided under other items. 2. Payment for this work on interim requisitions shall be according to the following percentages: a. Sewer pipe acceptably set in place and backfilled - 90 percent. b. Sewer pipe successfully tested - 10 percent. (26) - Sewer Manholes 0’-4, 4’-8’, 8’-10’ Depth A. Method of Measurement: Sewer manholes accepted for payment shall be the actual vertical feet of structures installed and accepted complete in place, from the lowest invert to finish grade as indicated in the Contract Documents, or as directed by the Owner. B. Basis of Payment: 1. The contract unit price per vertical foot shall be full compensation for all labor, materials, tools and equipment necessary to complete this work including sawcut, management, removal and disposal of pavement; excavation, dewatering, removal and disposal of existing manhole, frame and cover; bedding; furnishing and installing precast concrete sections, frames, and covers and furnishing; masonry materials; waterproofing; constructing inverts; manhole coring, connection to sewer pipes; backfilling including aggregate base and subbase material; compaction; cleaning; testing; vacuum testing, maintaining existing flows/temporary bypass pumping; and all else incidental thereto for which payment is not provided under other items. 2. Payment for this item shall be as follows: a. Manhole acceptably set in place and backfilled - 90 percent. b. Manhole successfully cleaned and tested - 10 percent. (27A) – 12” PVC Force Main via Open Cut A. Method of Measurement: Force main pipe measured for payment shall be the number of linear feet installed measured along the center line of the pipe as laid including fittings to the terminus manhole. B. Basis of Payment: 1. The contract unit price per linear foot for force main pipe shall be full compensation for all labor, materials, and equipment necessary to complete this work including sawcut, management, removal and disposal of all landscape (pavement, sidewalk and sod); excavation, dewatering, bedding, furnishing and installing pipe and fittings, root barriers, making connections to new and existing manholes, installation of impervious material dams, backfill including aggregate base and subbase material, compaction, cleaning, testing, maintaining existing flows during construction of new facilitiesand all else incidental thereto for which payment is not provided under other items. 2. Payment for this work on interim requisitions shall be according to the following percentages: a. Force main acceptably set in place and backfilled - 90 percent. b. Force main successfully tested - 10 percent. Page 260 of 576 01150B-14 MEASUREMENT AND PAYMENT 21787 (27B): 12” Tapping Sleeve and Valve A. Method of Measurement: The quantity of 12” tapping sleeves and valves to be paid under this item shall be the number of units, installed and accepted complete in place. B. Basis of Payment: Number of units shall be paid for at the unit price for each as stated in the Bid Schedule. Said unit price shall be full compensation for all labor, materials, equipment, and supervision necessary to compete the installation including saw cutting, removing and disposal of pavement, excavation, dewatering, bedding, furnishing and installing fittings, pipe cutting services, backfilling, compaction, and all else incidental thereto for which payment is not provided under other items. (28) - Sanitary Service Connections and Cleanouts A. Method of Measurement: This item shall consist of installing house or property sanitary service leads from sanitary sewer mains to the edge of right-of-way and installing cleanouts as shown on the Drawings and/or as determined in the field. The quantity to be paid for under this item shall be the actual number of sanitary service connections and cleanouts supplied and installed, measured in place and accepted by the Owner. B. Basis of Payment: 1. The contract unit price per each shall be full compensation for all labor, materials, and equipment necessary to complete this work including sawcut, management, removal and disposal of pavement; excavation, dewatering, bedding; furnishing and installing pipe, fittings, caps, plugs, and screened stone; adequately capping service connection and marking location as specified and shown on the Drawings or connection to existing service; backfilling including aggregate base and subbase material, compaction; raising cleanouts to final grade; cleaning, testing, air testing; maintaining existing flows during construction of new facilities; and all else incidental thereto for which payment is not provided under other items. 2. Payment for this work on interim requisitions shall be according to the following percentages: a. Service pipe acceptably set in place and backfilled - 90 percent. b. Service pipe successfully cleaned and tested - 10 percent. (29A) and (29B) - Initial Pavement Repair and Final Pavement Repair A. Method of Measurement: 1. The quantity of bituminous concrete pavement to be paid for under this item includes: a. Initial Pavement - The number of tons of initial pavement placed and removed at the direction of the Engineer, calculated as described below, within the payment limits shown on the Drawings. b. Final Pavement - The number of tons of final pavement placed at the direction of the Engineer, calculated as described below, within the payment limits shown on the Drawings. 2. Actual widths will be used in computing area wherever the width of pavement removed and replaced is less than the limits indicated on the Drawings. Page 261 of 576 01150B-15 MEASUREMENT AND PAYMENT 21787 3. The conversion factor to change volume of bituminous concrete pavement measured in place to tons will be 0.055 tons per square yard per inch of thickness. B. Basis of Payment: 1. Pavement shall be paid for at the Contract unit price per ton stated in the Bid Schedule. 2. Said unit price shall be full compensation for furnishing all materials, labor, equipment and tools necessary for the placement and removal of pavement, preparation of base material, application of tack coat, placement and grading of gravel shoulder material to back up overlay pavement, and installation of pavement markings. No additional payment will be made to the Contractor for repair work done by them in maintaining bituminous concrete pavement. (29C) – 1” Pavement Milling A. Method of Measurement: The quantity of pavement milled to be paid for under this item shall consist of the square yards of milled pavement within the payment limits shown on the Drawings or as directed by the engineer B. Basis of Payment: The contract unit price per square yard of milling of pavement shall be full compensation for all labor, materials, tools and equipment necessary to complete this work including milling and removal of the old pavement, broom cleaning existing grinded surfaces prior to paving, and all else incidental thereto for which payment is not provided under other items. (30) – Concrete Work A. Method of Measurement: The concrete constructed, removed, and replaced to be paid for will be determined by the actual square yards of concrete constructed, replaced, and accepted. B. Basis of Payment: Payment for Concrete Work will be made at the Contract unit price per square yard per item, which price and payment shall be full compensation and shall include construction of all concrete structures and pads unless otherwise paid under a separate pay item; removal and disposal of existing concrete at driveways and sidewalks as required for installation of watermains, sewer systems and service laterals; grading, all reinforcement/wire mesh for driveways, sidewalks, pads, and expansion joints; all saw-cutting, milling, paving, re-striping, and sealing; all subbase, concrete, sidewalks, curbs, gutters and miscellaneous driveway components; compaction and testing. (31) - Replacement of Unsuitable Material in Pipe Bedding Layer A. Method of Measurement: Quantity to be paid for under this item shall be the number of cubic yards of material removed and replaced with materials from off-site as authorized by the Owner. The payment limit for this item shall be between vertical planes that are a distance apart equal to a maximum of 6-feet extending from the top of the undisturbed earth layer to the bottom of the trench backfill layer as called out in the contract drawings for the length of the excavation as directed by the Owner. B. Basis of Payment: Page 262 of 576 01150B-16 MEASUREMENT AND PAYMENT 21787 1. Excavated unsuitable materials shall be paid for at the unit price per cubic yard stated in the Bid Schedule. Said unit price shall be full compensation for furnishing all labor, equipment, and tools necessary for the excavation of unsuitable material including the disposal of materials; furnishing installing and compacting replacement suitable backfill, and for all other work and expenses incidental thereto for which payment is not provided under other items. 2. Material excavated that could have, in the opinion of the Owner, remained in place through the use of adequate dewatering efforts shall be replaced by the Contractor at no additional cost to the Owner. 3. Excess backfill material may be available during the Contract. This item shall be used to pay for excavation of unsuitable materials in the pipe bedding layer only if no suitable backfill material previously excavated under this Contract is available. (32) - Contaminated Soil Excavation with Offsite Disposal A. Method of Measurement: 1. Contaminated Soil Excavation with offsite disposal measured for payment shall be the actual number of cubic yards of material excavated and shall be field measured by multiplying the average width, depth and length of the excavation(s). 2. Removal of existing curbing, catch basins, manholes, culverts and sewers are to be considered incidental to this item if they are located within the contaminated soil zone. B. Basis of Payment: 1. The contract unit price per cubic yard for Contaminated Soil Excavation with Offsite Disposal shall be made on a cubic yard basis for the volume of material transported from the project and disposed of offsite. Price and payment for this item shall include the furnishing of all labor, materials, equipment and incidentals necessary to complete the work as specified by the Owner during construction. Work shall include excavation to clean materials, compaction of the resulting excavation sub grade, replacement of the removed contaminated soil with properly compacted sub-base, transport to a FL State approved disposal location, cost of the disposal, and providing to the Owner manifests from the receiving facility for all contaminated material. The manifests shall provide the quantity of material that was legally disposed of and location(s) of where the soil was disposed. (33) - Management of Contaminated Materials and Soils/Fill A. Method of Measurement: Management of contaminated materials measured for payment shall be based on the lump sum price stated in the Bid Schedule. B. Basis of Payment: Management of contaminated materials and soil/fill shall be paid for at the lump sum price stated in the Bid Schedule. Said lump sum price shall constitute full compensation for providing the services of an Environmental Professional and soil management, for furnishing all labor, materials, tools, equipment, and incidentals required for managing contaminated materials and soil/fill; segregating, handling, staging, testing, and characterization of all soil and fill Page 263 of 576 01150B-17 MEASUREMENT AND PAYMENT 21787 material suspected of being contaminated as well as the costs associated with characterizing the destination site as required to assess background conditions; all controls necessary to maintain compliance with regulatory requirements relative to handling contaminated soils and materials; submittal and approval of all required and specified Plans; analytical testing and characterization of all excavated soil and fill material handled; health and safety equipment; securing a staging area for stockpiling soil pending analytical testing, reuse, or disposal; protecting the excavation and stockpile areas; controlling the spread of airborne contaminants; all notifications, fees, permits, and taxes; and all other requirements specified in other sections of the Contract Documents; and any other work not covered by other bid items. All costs related to transporting soils to and, if not disposed of offsite, and reused, from the staging area shall be included for payment in this item. 1. The lump sum shall be paid in partial payments over the course of the project where the percentage paid is equal to the percentage of completion of the excavation required from Station 31+61 to 32+07. This stationing corresponds with the requirement in Section 02080 to have a Environmental Professional on-site for monitoring of the excavation. (34) - Removal and Disposal of Contaminated Groundwater A. Method of Measurement: Contaminated groundwater handling with onsite treatment and disposal or offsite disposal at a licensed facility during excavation activities measured for payment paid for at the Lump Sum unit price as stated in the Bid Schedule. B. Basis of Payment: The lump sum shall be paid in partial payments over the course of the project where the percentage paid is equal to the percentage of completion of the dewatering activities required are taking place within the areas identified in the specifications as having the potential for contamination. Price and payment shall be full compensation for all labor, equipment, and materials necessary to complete the work including environmental controls to safely handle the material, and disposal of the material, offsite in accordance with all federal, state, and local regulations. (35), (36), (37) and (38) – Furnish and Install Ductile Iron Water Main via Open Cut A. Method of Measurement: Ductile iron pipe via open cut measured for payment shall be by the size and number of linear feet installed and measured horizontally, at ground elevation, running a measure along the center line of the pipe as laid including fittings installed and accepted complete in place for all work to the limits of work as shown on the Drawings. Branch pipes will be measured along their centerlines from the centerline of the main pipe. B. Basis of Payment: 1. Ductile iron pipe shall be paid for at the unit price per diameter of horizontal linear foot stated in the Bid Schedule. Said unit price shall be full compensation for sawcut, management, removal and disposal of all landscape (pavement, sidewalk and sod); excavation; root barriers; dewatering, backfill; furnishing all pipes, cement mortar lining, polywrap, labor, equipment, tools, and other materials required for the installation of the pipelines; for installing the polywrap; for utility crossings and relocations, laying, setting, and jointing all Page 264 of 576 01150B-18 MEASUREMENT AND PAYMENT 21787 pipes and fittings; for connections and couplings to existing pipes; for furnishing and placing all bedding, haunching and initial backfill; for backfilling including aggregate base and subbase material; for restraining joints; for furnishing and placing all temporary sheeting and bracing; for clearing and grubbing; for cleaning and testing; for all labor, tools and construction equipment; flushing, pigging, pressure testing, temporary sampling taps, disinfection and bacteriological testing, temporary utilities for construction and to maintain existing service during construction including any materials, labor, and equipment the Contractor needs to provide regardless of the construction sequence, pipe and buried utility markings and location tape, cross-over channels and underdrains for sewer, storm drain and water excavation pits, and check dams for all excavated channels and for all other work and expenses incidental thereto for which payment is not provided under other items. This price shall include clean-up and restoration of the right-of- way or private property including property boundary monuments and markers, protection of trees, replacement of shrubs, fences, mailboxes, poles, sign, and mulch which are displaced to construct the water main. 2. Payment for this work on interim requisitions shall be according to the following percentages: a. Water main successfully set in place and backfilled - 80 percent. b. Water main pressure tested - 20 percent. (39) – Restrained Ductile Iron Fittings A. Method of Measurement: The quantity of restrained mechanical joint ductile iron fittings to be paid for under this item shall be the actual weight in tons provided by the manufacturer of all ductile iron fittings including tees, bends, reducers, caps, plugs, sleeves, etc. B. Basis of Payment: Payment shall include furnishing all labor, equipment, polywrap, restraints, cement mortar lining, excavation, dewatering, backfill, testing, tools and materials necessary for installing mechanical joint fittings. Unit of measurement is tons. The weight shall be as indicated in the manufacturing standards and shall include the weight of accessories including thrust restraint. (40), (41), (42) and (43) - Gate Valve and Box A. Method of Measurement: The quantity of resilient seated gate valves to be paid for under this item shall be the actual size and number of valves and valve boxes installed completely in place. B. Basis of Payment: Resilient seated gate valves shall be paid for at the unit price per each stated in the Bid Schedule. Said unit price shall be full compensation for furnishing all materials, labor, equipment, polywrap, and tools; sawcut, management, removal and disposal of pavement; excavation; dewatering; backfill; for installing, setting, and jointing the valve and valve box; for restraining joints; for thrust blocks and supports; disinfection, cleaning and testing of installed mains, for valve box extensions; for testing all valves and valve boxes; and for all other work and expenses incidental thereto for which payment is not provided under other items. Page 265 of 576 01150B-19 MEASUREMENT AND PAYMENT 21787 (44), (45), (46) and (65) – Temporary Line Stop A. Method of Measurement: The number of line stops to be paid for under this item shall be per each according to the type and size line stop installed. B. Basis of Payment: Line stops shall be paid for at the unit price per each size stated in the Bid Schedule. Said unit price shall be full compensation for all materials, labor, and equipment required to perform the work in accordance with the Contract Documents. The work includes all line stops, bypasses, cutting and capping of pipe, restraints, hardware excavation, dewatering, backfill, compaction, testing, work, and for all other work and expenses incidental thereto for which payment is not provided under other items. (47) – Fire Hydrant Assembly A. Method of Measurement: The quantity of hydrant assemblies to be paid for under this item shall be the actual number and type installed complete in place. B. Basis of Payment: 1. Hydrant assemblies shall be paid for at the unit price per each stated in the Bid Schedule. Said unit price shall be full compensation for furnishing all materials, labor, equipment, and tools; for installing, setting, and jointing; for excavation; for removal of existing hydrants where directed; for all thrust blocks and concrete supports; restraining joints; for the hydrant branch gate valve, tee, pipe and hydrant; hydrant markers; polywrap; location tape; testing of all other work and expenses incidental thereto for which payment is not provided under other items. 2. Payment for this work on interim requisitions shall be according to the following proceedings: a. Hydrant assembly successfully set in place and backfilled - 80 percent b. Hydrant assembly pressure tested - 20 percent. (48) - 2-inch Automatic Air Release Valve C. Method of Measurement: The number of 2-inch automatic gas release valves to be paid for will be determined by the actual unit and type installed and accepted. D. Basis of Payment: Payment for Furnish and Install 2-inch automatic air release valve shall be paid for at the Contract unit price per item, which price and payment shall be full compensation and shall include the cost: to obtain and review all manufacturer’s data and specifications for valves, stainless steel piping, air release valve, and valve enclosure; receiving, unloading, inspecting, storing and installing automatic air release valve; all ancillary fittings and appurtenances and installation of said materials including #57 stone, filter fabric, concrete pad, reinforcement bars, warning tape, all other items required per the ARV detail shown on the drawings, all clearing and grubbing, stripping, proof rolling, trenching, dewatering, suitable backfill material, backfilling, surface and pavement restoration, compaction, and testing; flushing, and pressure testing the automatic air release valve. Page 266 of 576 01150B-20 MEASUREMENT AND PAYMENT 21787 (49), (50), and (51) – Connection to Existing Water Main A. Method of Measurement: The number of connections to existing water mains to be paid for under this item shall be per each according to the actual size connection installed. B. Basis of Payment: Connections shall be paid for at the unit price per each size stated in the Bid Schedule. Said unit price shall include all labor, materials, and equipment required for the open cut connections to the existing water mains. This includes but is not limited to; clearing and grubbing, dewatering, excavation, tree and landscape protection, utility support and protection, sheeting, shoring, bracing, backfilling including aggregate base and subbase material, grading, compaction, pavement, sidewalk, flushing cleaning, disinfection, testing, cleanup, restrained couplings, adapters, sodding, existing pipe restraints, removal of existing pipe as needed for connection, and additional work or incidentals thereto for which payment is not provided under other items. (52), (53), (54), (55), and (56) - Water Service Connections A. Method of Measurement: The number of new water service connections to be paid for under this item shall be per each according to the connection size and type (short, long, double or single) installed. B. Basis of Payment: Service connections shall be paid for at the unit price per each type and size stated in the Bid Schedule. Said unit price shall be full compensation for all service pipe, connection to water main, pipe saddles, corporation stop, curb stop, adapters, fittings, labor, equipment, tools, and other materials required for open cut or jetting of service connections including locating and verifying the locations of water services to be connected to; sawcutting, removal and disposal of pavement or sidewalk; excavation; trenching; dewatering; the installation of service pipes; utility crossings and relocations, laying, setting, and jointing all pipes and fittings; for making all connections to existing services; for cleaning, testing, and disinfecting; for backfilling including aggregate base and subbase material; pipe and buried utility markings and location tape, for replacing or rebuilding shrubs, fences, lawns, trees, or other materials, except other such items specifically included in the Bid Schedule; and for all other work and expenses incidental thereto for which payment is not provided under other items to provide a complete water service from the main to the meter location. (57) – Grout and Abandon Existing Water Main (2-inch to 8-inch) A. Method of Measurement: The quantity of abandoned pipe measured for payment shall be per linear feet of 2-inch to 8-inch pipe abandoned and grouted in place as measured horizontally at ground elevation. B. Basis of Payment: Pay item shall include furnishing all labor, materials, and equipment for the complete abandonment of the existing pipeline including, but not limited to; clearing and grubbing (unless otherwise covered), dewatering, excavation, tree and landscaping protection, utility support and protection, sheeting, shoring, bracing, draining, grout filling, plugging or capping existing pipes, backfilling, rough grading, compaction, finish grading, pavement, sidewalk, flushing, cleaning, pressure testing, disinfection, cleanup, and additional work incidental thereto. Page 267 of 576 01150B-21 MEASUREMENT AND PAYMENT 21787 (58) – Remove and Dispose of Existing Fire Hydrants A. Method of Measurement: The quantity of removal and disposal of existing fire hydrants for payment shall be per each removed. B. Basis of Payment: Pay item shall include furnishing all labor, materials, and equipment for the complete removal and disposal of existing fire hydrants and appurtenances attached to the existing water main to be abandoned, closing and abandoning hydrant valve, cutting and capping of piping, backfill and compaction, restoration, temporary debris protection, loading, and hauling to a disposal site, excavations, and all other work incidental thereto. (59) – Driveway Restoration A. Method of Measurement: The quantity of driveway restoration shall be per square yard per type of driveway restored. B. Basis of Payment: Pay Item shall include furnishing all labor, materials, equipment, and tools required for the replacement of driveways in-kind including but not limited to excavation, sawcutting, stockpiling, compaction, decorative pavers, joint filler, gravel, finishing, removal and disposal of materials, and all other incidentals required for the driveway restoration. (60) – Sod A. Method of Measurement: The quantity of sod shall be per square yard of sod installed and accepted. B. Basis of Payment: Pay Item shall include furnishing and installing all labor, materials, equipment, and tools necessary for the placement of sod including rolling, tamping, disposal of surplus material, watering and fertilizing to assure sod takes root and maintains coverage throughout the maintenance period. Areas to be sodded shall match the existing adjacent sod. (61) – Demolish Existing Lift Station 46 A. Method of Measurement: Demolishing of existing Lift Station 46 will be paid for at the Lump Sum unit price as stated in the Bid Schedule. B. Basis of Payment: 1. Said lump sum price shall constitute full compensation for furnishing all labor, materials, tools, and equipment necessary for the demolition, removal, cutting, loading, transporting and disposal of the existing lift station and top concrete slab including all equipment to be demolished and indicated on the Drawings. 2. Said lump sum price shall constitute full compensation for furnishing all labor, materials, tools, and equipment necessary for loading, transporting, and unloading all salvage equipment including control panels, pumps, and valve assembly to the Owner’s facilities located at 1800 A.D. Mims Rd, Ocoee, FL. 3. Payment shall be made with each pay application and prorated over the duration of the contract and based on the total work completed to date. Page 268 of 576 01150B-22 MEASUREMENT AND PAYMENT 21787 (62) – 4” PVC Force Main via Open Cut A. Method of Measurement: Force main pipe measured for payment shall be the number of linear feet installed measured along the center line of the pipe as laid including fittings, tapping sleeves and valves to the terminus manhole. B. Basis of Payment: 1. The contract unit price per linear foot for force main pipe shall be full compensation for all labor, materials, and equipment necessary to complete this work including sawcut, management, removal and disposal of all landscape (pavement, sidewalk and sod); excavation, dewatering, bedding, furnishing and installing pipe and fittings, root barriers, making connections to new and existing manholes, installation of impervious material dams, backfill including aggregate base and subbase material, compaction, cleaning, testing, maintaining existing flows during construction of new facilities, and all else incidental thereto for which payment is not provided under other items. 2. Payment for this work on interim requisitions shall be according to the following percentages: a. Force main acceptably set in place and backfilled - 90 percent. b. Force main successfully tested - 10 percent. (63) and (64) - Blow-off Assembly A. Method of Measurement: The quantity of blow off assemblies to be paid for under this item shall be the actual number of assemblies installed completely in place. B. Basis of Payment: Blow off assemblies shall be paid for at the unit price per each stated in the Bid Schedule. Said unit price shall be full compensation for furnishing all materials, labor, equipment, and tools; sawcut, management, removal and disposal of pavement; excavation; for installing, setting, and jointing the assembly; testing of installed reclaimed water mains; for testing all assemblies; and for all other work and expenses incidental thereto for which payment is not provided under other items. END OF SECTION Page 269 of 576 N PENSACOLA TALLAHASSEE JACKSONVILLE ORLANDO MIAMI TAMPA FLORIDA CITY OF OCOEE, FLORIDA CONTRACT DRAWINGS FOR LAKEWOOD AVENUE NORTH GRAVITY SEWER PHASE 1 MARCH 2026 AMENDED CONTRACT DOCUMENTS WP PROJECT No. 21787 LOCATION PLAN SCALE: 1"=15,000' ---COVER SHEET C-1 GENERAL NOTES, LEGEND, ABBREVIATIONS AND KEY PLAN C-2 PLAN AND PROFILE STA 1+00 TO STA 7+00 C-3 PLAN AND PROFILE STA 7+00 TO STA 13+00 C-4 PLAN AND PROFILE STA 13+00 TO STA 15+00 C-5 STUB-OUT PLANS AND PROFILES C-6 DETAILS I C-7 DETAILS II C-8 STORMWATER POLLUTION PREVENTION NOTES I C-9 STORMWATER POLLUTION PREVENTION NOTES II C-10 STORMWATER POLLUTION PREVENTION DETAILS C-11 SEPARATION TABLES 407.906.1776 | www.wright-pierce.com DRAWING INDEX GENERAL CIVIL PROJECT LOCATION OCOEE CITY OF OCOEE 1 N BLUFORD AVE, OCOEE, FL 34761 407-905-3100 MAYOR:RUSTY JOHNSON DISTRICT 1 COMMISSIONER: SCOTT R. KENNEDY DISTRICT 2 COMMISSIONER: ROSEMARY WILSEN DISTRICT 3 COMMISSIONER: RICHARD FIRSTNER DISTRICT 4 COMMISSIONER: GEORGE OLIVER III CITY MANAGER: CRAIG SHADRIX ASSISTANT CITY MANAGER: MICHAEL RUMER CITY OF OCOEE UTILITIES DEPARTMENT 1800 A.D. MIMS ROAD, OCOEE, FL, 34761 407-905-3159 DIRECTOR:JENNIFER BOLLING, P.E. ASSISTANT DIRECTOR:TRENT HOPPER Page 270 of 576 SE C U R I T Y C I R C L E MO B I L E L A N E LY M A N S T R E E T ( F ) PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1544881.6580 E:482058.2010 ELEV:127.89' (NAVD 1988) PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1543687.5510 E:482075.0300 ELEV:126.20' (NAVD 1988) PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1544507.0780 E:482027.9150 ELEV:125.44' (NAVD 1988) BU R N T T R E E C O U R T PROJECT BENCHMARK SET NAIL & DISK L&S LB 7829 N:1544174.3590 E:482061.4690 ELEV:125.22' (NAVD 1988) NORTH LAKEWOOD AVENUE (OCOEE CLARCONA ROAD)C-2 C-3 C-4 CO CO CO CO CO CO CO CO CO COCO CO CO CO COCO CO CO CO J: \ E N G \ F L \ O C O E E \ 2 1 7 8 7 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 1 \ _ D R A W I N G S \ C I V \ 2 1 7 8 7 - C S - G E N E R A L N O T E S . D W G | 21 7 8 7 - C S - G e n e r a l N o t e s | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 4 / 2 0 2 6 5 : 2 6 : 4 6 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 1/ 2 1 / 2 0 2 6 1 : 5 1 P M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 GE N E R A L N O T E S , L E G E N D , A B B R E V I A T I O N S A N D K E Y P L A N CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 1 C-1                D. M E T Z 21 7 8 7 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   LEGEND PROPERTY/ROW LINE SETBACK LINE EASEMENT LINE CONTOUR122 LIMIT OF WORK SILT FENCE SPOT ELEVATION UNDERGROUND ELECTRIC OVERHEAD ELECTRIC DRAINAGE FLOW SEWER RIPRAP SIGN TEMPORARY BENCH MARK BUILDING STONEWALL CULVERT12" CMP SURVEY CONTROL POINT IRON PIPE/REBAR DRILLHOLE MONUMENT SEWER MANHOLE DRAINAGE MANHOLE CATCH BASIN SHUTOFF VALVE HYDRANT EXISTING EDGE OF PAVEMENT EDGE OF GRAVEL RETAINING WALL SEWER FORCE MAIN GAS STORM DRAIN WATER G G UGE UGE UTILITY POLE UTILITY POLE W/ GUY LIGHT POLE UTILITY POLE W/ LIGHT BOLLARD CONIFEROUS TREE DECIDUOUS TREE SHRUB TEST PIT TEST BORING TEST PROBE MONITORING WELL WETLANDS EDGE OF WETLANDS TELEPHONE MANHOLE ELECTRIC MANHOLE PAVEMENT MARKINGS CENTERLINE WATER SERVICE SHUTOFF YARD HYDRANT EDGE OF WATER STREAM DRAINAGE SWALE CURBING GUARDRAIL UNDERDRAINUDUD RAILROAD MATCHLINE ROCK OUTCROP MAILBOX TREELINE CHAIN LINK FENCE STOCKADE FENCE BARB WIRE FENCExx EDGE OF CONCRETE 8" 4" 4" 15" 6" FLAGPOLE FLOODPLAIN 124.6 8" OHE OHE CBCB DMH MB SMH EMH TMH B TP P MW T UNDERGROUND TELEPHONEUGTUGT UNDERGROUND CABLE TVCATVCATV CB GAS GAS SERVICE SHUTOFF GAS GATE VALVEG WETLAND FLAG PROPOSED 4"FM 8"S 8"W 15"SD 12" CMP 4"G 6"UD x 123 UGE UGE OHE OHE x 134.5 SMH DMH CB CB EMH TMH x UGT UGT CATV CATV NATIONAL GEODETIC VERTICAL DATUM W/ W POTABLE WATER WITH SMH TBM THK TYP UD SQ STA T, XFMR SD SF S PSI PVC RCP RD REQ'D OD PC PSF NTS NGVD SANITARY SEWER MANHOLE STATION TEMPORARY BENCH MARK THICKNESS UNDERDRAIN TYPICAL SQUARE TRANSFORMER STORM DRAIN SQUARE FEET SLOPE, SEWER POUNDS PER SQUARE INCH POLYVINYL CHLORIDE REINFORCED CONCRETE PIPE REQUIRED ROOF DRAIN OUTSIDE DIAMETER POUNDS PER SQUARE FOOT PERFORATED CLAY NOT TO SCALE FT INV MH MIN MAX HYD INF IN FM DR DWG EL EMH CY DEMO DMH DI FEET MANHOLE MINIMUM MAXIMUM INCH INFLUENT HYDRANT INVERT FORCE MAIN DRAIN ELECTRIC MANHOLE ELEVATION DRAWING DRAIN MANHOLE CUBIC YARD DUCTILE IRON DEMOLITION CIVIL ABBREVIATIONS CEN CO CONC CI CMP CB BLDG & Ø, DIA CENTER CAST IRON CORRUGATED METAL PIPE CLEANOUT CONCRETE CATCH BASIN BUILDING AND DIAMETER PS PRIMARY SLUDGE VC VITRIFIED CLAY UG UNDERGROUND UGE UNDERGROUND ELECTRIC #, NO NUMBER APP'D APPROVED G GAS N N/A NORTH NOT AVAILABLE/APPLICABLE LB POUNDS TOS TOP OF STRUCTURE MW MONITORING WELL CL CENTERLINE CORNERCOR CFS CUBIC FEET PER SECOND PT POINT OF TANGENCY AC ASBESTOS CEMENT BR BRICK CIPP CURED-IN-PLACE-PIPE HDPE HIGH DENSITY POLYETHYLENE LF LINEAR FOOT OUT OUTFALL VF VERTICAL FOOT CPE CORRUGATED POLYETHYLENE PIPE KEY PLAN SCALE: 1"=80' N 800 160 GENERAL NOTES 1.THE OWNER WILL BE RESPONSIBLE FOR OBTAINING THE PERMITS LISTED IN THE GENERAL REQUIREMENTS (01001). IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO BE FAMILIAR WITH THE APPLICABLE PROVISIONS OF EACH PERMIT AS THEY APPLY TO THE WORK PRIOR TO BIDDING AND ABIDE BY THOSE PROVISIONS DURING CONSTRUCTION . COPIES OF ALL OBTAINED PERMITS ARE AVAILABLE FOR REVIEW FROM THE OWNER. ALL OTHER PERMITS ARE THE RESPONSIBILITY OF THE CONTRACTOR. 2.THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING TRAFFIC FLOW AT ALL TIMES. CONTRACTOR SHALL INSTALL AND MAINTAIN TRAFFIC CONTROL SIGNS IN ACCORDANCE WITH THE MUTCD (MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES) AND ALL STATE AND LOCAL REGULATIONS. THE CONTRACTOR IS REQUIRED TO SUBMIT A TRAFFIC CONTROL PLAN TO THE OWNER PRIOR TO COMMENCING CONSTRUCTION. THE POLICE DEPARTMENT AND FIRE DEPARTMENT ARE TO BE NOTIFIED AT LEAST 24-HOURS IN ADVANCE OF ANY STREET CLOSING OR DETOUR. REFER TO SPECIFICATION SECTION 01570. 3.CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE REGULATIONS OF THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA). 4.CONTRACTOR SHALL COMPLY WITH THE COORDINATION REQUIREMENTS AND RELATED COSTS, IF ANY, AS SPECIFIED IN SPECIFICATION SECTION 01050. 5.STANDARD CONSTRUCTION HOURS: CONSTRUCTION ACTIVITIES SHALL BE PERMITTED BETWEEN 10:00 AM AND 8:00 PM, MONDAY THROUGH FRIDAY. MAINTENANCE OF TRAFFIC (MOT) SETUP: MOT SETUP MAY BEGIN NO EARLIER THAN 9:00 AM. SEASONAL ADJUSTMENT (JUNE 1ST - AUGUST 1ST): DURING THE PERIOD FROM JUNE 1ST THROUGH AUGUST 1ST, CONSTRUCTION ACTIVITIES MAY BEGIN AT 7:00 AM AND SHALL END NO LATER THAN 7:00 PM. 6.CONTRACTOR SHALL NOTE THAT, IN GENERAL, ALL EXISTING CONDITION INFORMATION ON THE DRAWINGS ARE SHOWN WITH A LIGHTER LINE WEIGHT AND WITH A SLANTED TYPE TEXT. 7.ALL EXISTING SEWER AND STORM DRAIN LINES ENCOUNTERED DURING CONSTRUCTION ARE TO REMAIN IN SERVICE. ANY EXISTING SEWERS, STORM DRAIN LINES OR CULVERTS DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER, EXCEPT WHEN IN DIRECT CONFLICT WITH THE NEW SEWER OR WHEN NOT SHOWN OR INDICATED. 8.ALL STRUCTURES AND PIPELINES LOCATED ADJACENT TO TRENCH EXCAVATION SHALL BE PROTECTED AND FIRMLY SUPPORTED BY THE CONTRACTOR UNTIL THE TRENCH IS BACKFILLED. INJURY TO ANY SUCH STRUCTURES CAUSED BY OR RESULTING FROM THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE . ALL UTILITIES REQUIRING REPAIR, RELOCATION OR ADJUSTMENT AS A RESULT OF THE PROJECT SHALL BE COORDINATED THROUGH THE RESPECTIVE UTILITY. 9.ALL TEST PITS SHALL BE EXCAVATED PRIOR TO CONSTRUCTION LAYOUT AND RESULTS REPORTED TO THE ENGINEER FOR REVIEW FOR CONFORMANCE WITH THE PLANS. TESTS PITS ARE REQUIRED WHERE SHOWN ON THE DRAWINGS AND AS DIRECTED BY THE ENGINEER. TEST PITS WILL BE DUG AT LEAST 10 CALENDAR DAYS PRIOR TO CONNECTING PROPOSED SEWERS TO EXISTING SEWERS. THE RESULTS OF TEST PITS DUG TO DETERMINE EXISTING SEWER ELEVATIONS AND LOCATIONS WILL BE REPORTED TO THE ENGINEER AT LEAST 10 CALENDAR DAYS PRIOR TO ANY WORK. ADJUSTMENTS TO INVERTS. LENGTHS, AND SLOPES OF PROPOSED SEWER MAY BE REQUIRED AS DIRECTED BY THE ENGINEER. THE HORIZONTAL ALIGNMENT OF THE NEW SEWERS AND FORCE MAINS MAY BE ADJUSTED IN THE FIELD SUBJECT TO PRIOR APPROVAL OF THE ENGINEER. 10.INITIAL PAVING SHALL BE CONDUCTED WITHIN TWO WEEKS OF COMPLETION OF PLACEMENT OF FINAL BACKFILL UNLESS OTHERWISE AUTHORIZED BY ENGINEER. INITIAL PAVEMENT SHALL BE INSTALLED AND MAINTAINED BY CONTRACTOR FOR A MINIMUM PERIOD OF TWO MONTHS BEFORE FINAL PAVEMENT IS PLACED. FINAL PAVEMENT MAY BE PLACED OVER THE INITIAL PAVING PROVIDED INITIAL PAVING COURSE IS IN GOOD REPAIR. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING AND SHIMMING THE INITIAL PAVEMENT AS NECESSARY TO ACCEPT THE FINAL PAVING COURSE. IF CONDITIONS WARRANT, THE CONTRACTOR MAY BE REQUIRED TO REMOVE AND REPLACE INITIAL PAVING PRIOR TO FINAL PAVING. 11.ALL IMPROVEMENTS SHALL BE IN CONFORMANCE WITH THE CURRENT CITY OF OCOEE ENGINEERING STANDARDS MANUAL, MATERIALS LIST, AND DETAILS. 12.ANY DEVIATION FROM THE CITY OF OCOEE ENGINEERING STANDARDS MUST BE REQUESTED AND APPROVED IN WRITING PRIOR TO CONSTRUCTION. 13.THE MOST STRINGENT STANDARDS BETWEEN THE CITY OF OCOEE AND FDEP STANDARDS SHALL BE FOLLOWED FOR ALL PUBLIC UTILITIES. 14.CONTRACTOR SHALL REFER TO THE CITY OF OCOEE ENGINEERING STANDARDS MANUAL, LAND DEVELOPMENT CODE, APPROVED MATERIALS LIST, AND CITY DETAILS. THE MOST STRINGENT STANDARDS BETWEEN THE CITY OF OCOEE STANDARDS AND STANDARDS SET FORTH IN THESE NOTES SHALL BE FOLLOWED. WHEN CROSSING INTO ORANGE COUNTY ROW, REFER TO ORANGE COUNTY'S STANDARD ENGINEERING STANDARDS MANUAL. 15.AS-BUILTS NEED TO BE SUBMITTED TO THE CITY, SIGNED AND SEALED BY A FLORIDA REGISTERED SURVEYOR IN ACCORDANCE WITH SECTION 3.01.05 OF THE ENGINEERING STANDARDS MANUAL IN THE FOLLOWING FORMATS: a.ONE PDF COPY b.ONE CAD COPY DRAWN IN STATE PLANE COORDINATES EXISTING SITE CONDITIONS 1.THE LOCATIONS OF UNDERGROUND UTILITIES AND STRUCTURES, AS SHOWN ON THE DRAWINGS, ARE APPROXIMATE AND MAY NOT BE COMPLETE. NO GUARANTEE IS MADE THAT UTILITIES OR STRUCTURES WILL BE ENCOUNTERED WHERE SHOWN, OR THAT ALL UNDERGROUND UTILITIES AND STRUCTURES ARE SHOWN. ALL LOCATIONS AND SIZES OF EXISTING UTILITIES AND STRUCTURES SHALL BE VERIFIED IN THE FIELD WITH TEST PITS AS REQUIRED PRIOR TO BEGINNING CONSTRUCTION OF NEW FACILITIES OR PIPING THAT MAY BE AFFECTED. THE CONTRACTOR WILL REALIGN NEW PIPE LOCATIONS AS REQUIRED TO CONFORM TO EXISTING LINES AND AS APPROVED BY THE ENGINEER. 2.BELOW GRADE UTILITY INFORMATION IS BASED ON INFORMATION PROVIDED BY EACH UTILITY. LOCATION OF PUBLIC UTILITIES SHOWN IS ONLY APPROXIMATE AND MAY NOT BE COMPLETE. PRIVATE UNDERGROUND UTILITIES SUCH AS, BUT NOT LIMITED TO, SEWER LINES, WATER LINES AND BURIED ELECTRICAL SERVICE ENTRANCES ARE NOT SHOWN. THE CONTRACTOR SHALL ASCERTAIN THE LOCATION AND SIZE OF EXISTING UTILITIES IN THE FIELD WITH THE RESPECTIVE UTILITY COMPANY REPRESENTATIVE PRIOR TO COMMENCING WORK. REFER TO SPECIFICATION SECTION 01050. ADDITIONAL TEST PITS, BEYOND THOSE SHOWN, MAY BE REQUIRED. UTILITY CONTACTS ARE AS FOLLOWS: 3.THERE ARE NO KNOWN HAZARDOUS ENVIRONMENTAL CONDITIONS WITHIN THE AREA OF WORK. IF THE PRESENCE OF HAZARDOUS ENVIRONMENTAL CONDITIONS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE OWNER AND THE ENGINEER IMMEDIATELY. ALL ACTIVITIES, HANDLING AND DISPOSAL OF HAZARDOUS ENVIRONMENTAL CONDITIONS AND MATERIALS SHALL BE IN ACCORDANCE WITH OSHA, FEDERAL, STATE, AND LOCAL REGULATIONS. 4.THIS PROJECT REQUIRES A PRE-CONSTRUCTION VIDEO WITH A CITY REPRESENTATIVE PRESENT. PRIOR TO SCHEDULING THE VIDEO WITH THE CITY, THE ENTIRE PROJECT SHALL BE SURVEYED, STAKED AND/OR ASPHALT PINS WITH STATION NUMBERS, FUTURE PIPE ALIGNMENT, AND END OF LATERALS AT THE RIGHT-OF-WAY LINE. VIDEO SHALL SHOW ROAD CONDITIONS, RIGHT-OF-WAY CONDITIONS, DRIVEWAYS, AND THE FIRST 25’ OF SIDE STREETS. FEDERAL GRANT COMPLIANCE – PHASE 1 ONLY: ALL WORK PERFORMED UNDER PHASE 1 SHALL COMPLY WITH THE APPLICABLE FEDERAL GRANT REQUIREMENTS REFERENCED IN SECTION 01001 – GENERAL REQUIREMENTS AND DETAILED IN APPENDIX C – FEDERAL GRANT COMPLIANCE DOCUMENTS. THESE INCLUDE DAVIS-BACON LABOR STANDARDS AND AIS/BABA DOMESTIC MATERIAL SOURCING REQUIREMENTS. THESE REQUIREMENTS DO NOT APPLY TO PHASE 2. SITE DEMOLITION 1.REFER TO THE EXISTING SITE PLAN, FOR ADDITIONAL INFORMATION REGARDING EXISTING FACILITIES. REFER TO THE LAYOUT DRAWING FOR LIMITS OF WORK. 2.REFER TO SPECIFICATION SECTION 01010A, WHICH CONTAINS INFORMATION ON CONSTRAINTS OF CONSTRUCTION SEQUENCING. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND DISPOSING OF ALL DEMOLISHED PIPING, EQUIPMENT AND MATERIALS. DISPOSAL SHALL BE IN ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS. 4.THE CONTRACTOR SHALL KEEP A RECORD OF DEMOLITION AS PART OF THE PROJECT RECORD DOCUMENTS IN ACCORDANCE WITH SPECIFICATION SECTION 01720. 5.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE APPROPRIATE DISPOSAL OF FLOWS RESULTING FROM PRECIPITATION AND GROUNDWATER DEWATERING OPERATIONS. SITE CLEARING, GRUBBING AND GRADING 1.CONTRACTOR SHALL PROVIDE PROPER EROSION CONTROL AND DRAINAGE MEASURES IN ALL AREAS OF WORK, AND CONFINE SOIL SEDIMENT TO WITHIN THE LIMITS OF EXCAVATION AND GRADING. PRIOR TO BEGINNING EXCAVATION WORK, EROSION CONTROL FENCE SHALL BE INSTALLED AT THE DOWN GRADIENT PERIMETER OF THE ACTUAL LIMITS OF GRADING, AND AS SHOWN ON THE DRAWINGS. EROSION CONTROL MEASURES SHOWN ON THE DRAWINGS ARE A MINIMUM, CONTRACTOR SHALL TAKE ALL OTHER NECESSARY MEASURES. EROSION CONTROL FENCE SHALL ALSO BE INSTALLED AT THE DOWN GRADIENT PERIMETER OF THE SOIL STOCKPILES. ALL DISTURBED EARTH SURFACES SHALL BE STABILIZED IN THE SHORTEST PRACTICAL TIME AND TEMPORARY EROSION CONTROL DEVICES SHALL BE EMPLOYED UNTIL SUCH TIME AS ADEQUATE SOIL STABILIZATION HAS BEEN ACHIEVED. TEMPORARY STORAGE OF EXCAVATED MATERIAL SHALL BE STABILIZED IN A MANNER THAT WILL MINIMIZE EROSION. ALL INSTALLED EROSION CONTROL FACILITIES SHALL BE REMOVED AT THE END OF THE PROJECT. REFER TO SPECIFICATION SECTION 02270. 2.ALL STORM DRAINAGE INLETS SHALL BE PROTECTED BY HAY BALE FILTERS TO PREVENT ENTRY OF SEDIMENT FROM RUNOFF WATERS DURING CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND DISPOSAL OF ALL COLLECTED SEDIMENT, AND THAT WHICH COLLECTS IN THE STORM DRAIN SYSTEM. REFER TO THE CIVIL DETAIL DRAWINGS. 3.THE GEOTECHNICAL DATA REPORT FOR THE PROJECT SITE IS INCLUDED IN APPENDIX A OF THE SPECIFICATIONS. 4.CONTRACTOR SHALL CONTROL DUST ON THE CONSTRUCTION SITE TO A REASONABLE LIMIT, AS DETERMINED BY THE ENGINEER, AND AS OUTLINED IN SPECIFICATION SECTION 01562. 5.CONTRACTOR SHALL NOT TRACK OR SPILL EARTH, DEBRIS OR OTHER CONSTRUCTION MATERIAL ON PUBLIC OR PRIVATE STREETS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE IMMEDIATE ASSOCIATED CLEAN UP. 6.ALL CATCH BASINS, MANHOLES, VALVE PITS, VALVE BOXES AND OTHER BURIED FACILITIES WITH SURFACE ACCESS SHALL BE ADJUSTED TO MATCH FINAL GRADES, UNLESS OTHERWISE INDICATED. 7.THE CONTRACTOR SHALL NOT HAVE ANY RIGHT OF PROPERTY IN ANY MATERIALS TAKEN FROM ANY EXCAVATION. SUITABLE EXCAVATED MATERIAL MAY BE INCORPORATED IN THE PROJECT, WITH EXCESS MATERIAL DISPOSED OF AT A LOCATION PROVIDED BY THE CONTRACTOR. THESE PROVISIONS SHALL IN NO WAY RELIEVE THE CONTRACTOR OF OBLIGATIONS TO PROPERLY DISPOSE OF AND REPLACE ANY MATERIAL DETERMINED BY THE ENGINEER TO BE UNSUITABLE FOR BACKFILLING. THE CONTRACTOR SHALL DISPOSE OF UNSUITABLE AND EXCESS MATERIAL IN ACCORDANCE WITH THE APPLICABLE SECTIONS OF THE CONTRACT DOCUMENTS. 8.CONTRACTOR SHALL REMOVE AND REPLACE, OR REPAIR, ALL CURBS, SIDEWALKS, PAVEMENT AND OTHER ITEMS DAMAGED BY CONSTRUCTION ACTIVITIES TO AT LEAST THEIR ORIGINAL CONDITION, TO THE SATISFACTION OF THE OWNER AND ENGINEER. 9.WHERE EXISTING PAVEMENT IS REMOVED AND REPLACED, MATCH EXISTING GRADES TO THE EXTENT POSSIBLE. COORDINATE FINE GRADING WITH THE ENGINEER. 10.ALL ROAD AND DRIVE CROSS SLOPES SHALL MATCH EXISTING PITCH. REFER TO THE CIVIL DETAIL DRAWINGS. CIVIL SITE LAYOUT 1.THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THIS PROVIDED LAYOUT INFORMATION THROUGHOUT THE COURSE OF CONSTRUCTION. REPORT ANY LAYOUT DISCREPANCIES IMMEDIATELY TO THE ENGINEER. 2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RE-ESTABLISHING AND RESETTING ALL EXISTING PROPERTY MONUMENTATION DISTURBED BY CONSTRUCTION. THIS WORK SHALL BE DONE BY A LAND SURVEYOR REGISTERED IN THE STATE OF FLORIDA, AT NO ADDITIONAL COST TO THE OWNER. 3.WRITTEN DIMENSIONS SHALL PREVAIL. DO NOT SCALE DISTANCES FROM THE DRAWINGS. REPORT ANY DISCREPANCIES IMMEDIATELY TO THE ENGINEER. 4.HORIZONTAL POSITIONS FOR ALL FEATURES SHOWN ON THE MAP ARE RELATIVE TO NORTH AMERICAN DATUM OF 1983 (NAVD83), WITH 2012 ADJUSTMENTS, STATE PLANE COORDINATE SYSTEM, FLORIDA EAST ZONE. VERTICAL ELEVATIONS ARE RELATIVE TO NORTH AMERICAN VERTICAL DATUM (NAVD 88) AND IS RELATIVE TO THE ORANGE COUNTY BENCHMARK #S695015. 5.EXISTING CONDITIONS SITE PLAN DEVELOPED FROM SURVEY DRAWING PREPARED BY L&S DIVERSIFIED, LLC, DATED JUNE 11, 2024, AND EXISTING RECORD DRAWING INFORMATION. SEWER, FORCEMAIN AND DRAIN PIPING NOTES 1.SEWER, FORCEMAIN AND DRAIN PIPING REQUIREMENTS ARE SHOWN ON THE PIPE SCHEDULE ON THE DRAWINGS, IN SPECIFICATION SECTION 15050 AND AS REFERENCED. 2.SEWER, FORCE MAIN AND DRAIN PIPE SCHEDULE (UNLESS OTHERWISE INDICATED): ·GRAVITY SEWER MAINS - PVC SDR-26 AS SPECIFIED IN SPECIFICATION SECTION 02622 3.MANHOLES ARE 4-FEET IN DIAMETER UNLESS OTHERWISE NOTED. THE TOP OF MANHOLE FRAMES SHALL BE SET FLUSH WITH FINISH GRADE, UNLESS OTHERWISE NOTED ON DRAWINGS. SEWER MANHOLE INVERTS SHOWN ON THE DRAWINGS ARE TO THE INSIDE FACE OF THE MANHOLE. 4.CONTRACTOR SHALL RE-SHAPE INVERTS AS REQUIRED WHEN CONNECTING INTO EXISTING MANHOLES. ALL TERMINAL MANHOLES (APART FROM SMH-11) SHALL HAVE A FLAT CONCRETE FLOOR POURED WITH A 1% SLOPE TO THE OUT FLOWING PIPE INVERT. THE EXISTING MANHOLES ON SECURITY CIRCLE IS LINED/COATED; CONTRACTOR SHALL ADD COATING TO THE DISTURBED AREAS AFTER RE-SHAPING THE INVERT. 5.REFER TO SPECIFICATION SECTION 02200 FOR PIPE AND STRUCTURE BEDDING AND BACKFILL REQUIREMENTS. 6.COMPACTION TESTS WILL BE PERFORMED IN ACCORDANCE WITH SPECIFICATION SECTION 02200. ANY SETTLEMENT OCCURRING WITHIN ONE-YEAR OF FINAL COMPLETION OF THE WORK SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST. 7.OPEN TRENCHES IN THE ROADWAY MUST BE BACKFILLED AT THE END OF THE WORKDAY. 8.ALL EXISTING UTILITIES ENCOUNTERED DURING CONSTRUCTION ARE TO REMAIN IN SERVICE UNLESS OTHERWISE NOTED ON THE CIVIL EXISTING CONDITIONS AND DEMOLITION PLAN. ANY EXISTING UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 9.CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND DISPOSAL OF ALL DEMOLITION MATERIALS IN ACCORDANCE WITH SPECIFICATION SECTION 02050. 10.WHENEVER SEWER AND WATER MAINS MUST CROSS, WATER LINES SHOULD BE INSTALLED ABOVE WASTEWATER OR SLUDGE LINES. A MINIMUM SEPARATION OF 18-INCHES BETWEEN THE BOTTOM OF THE WATER LINE AND THE TOP OF THE WASTEWATER OR SLUDGE LINE SHALL BE MAINTAINED. WHERE A WATER LINE CROSSES UNDER A WASTEWATER OR SLUDGE LINE, A FULL LENGTH OF PIPE SHALL BE CENTERED ABOVE THE WATER LINE SO THAT BOTH JOINTS WILL BE AS FAR FROM THE WATER LINE AS POSSIBLE. 11.CONTRACTOR SHALL COORDINATE WITH THE CITY OF OCOEE TO ARRANGE FOR THE BYPASS OF LS63 AND ALL LIFT STATIONS NORTH OF WURST ROAD. 12.ALL NON-ROADWAY AREAS OUTSIDE THE RIGHT-OF WAY THAT ARE EXCAVATED, FILLED, OR OTHERWISE DISTURBED BY THE CONTRACTOR SHALL BE LOAMED, GRADED, LIMED, FERTILIZED, SEEDED AND MULCHED, UNLESS OTHERWISE NOTED. THE TOP 4 INCHES OF SOIL SHALL BE LOAM. ALL NON-ROADWAY AREAS WITHIN THE RIGHT-OF-WAY THAT ARE EXCAVATED, FILLED OR OTHERWISE DISTURBED BY THE CONTRACTOR SHALL BE SODDED WITH TURF GRASS. REFER TO SPECIFICATION SECTION 02480, LANDSCAPING. 13.UNDER NO CIRCUMSTANCE SHOULD A CLEAN OUT BE INSTALLED IN THE SIDEWALK OR A DRAINAGE SWALE. RESTORATION NOTES: 1.RIGHT-OF-WAY (ROW) OWNERSHIP AND MAINTENANCE RESPONSIBILITIES VARY ALONG THE PROJECT CORRIDOR. THE CITY OF OCOEE MAINTAINS ROW OWNERSHIP FROM STATION 0+00 TO STATION 20+98. FROM STATION 20+98 TO THE END OF THE PROJECT, ROW OWNERSHIP AND MAINTENANCE ARE UNDER ORANGE COUNTY JURISDICTION. ON INTERSECTING SIDE STREETS, THE CITY OF OCOEE OWNS AND MAINTAINS MACK STREET, SECURITY CIRCLE, MOBILE LANE, LYMAN STREET, BURNT TREE COURT, LAUREL RIDGE AVENUE, AND CLINGER COVE ROAD. ORANGE COUNTY OWNS AND MAINTAINS 15TH AVENUE, 16TH AVENUE, 17TH AVENUE, AND WURST ROAD. 2.WORK WITHIN THE NORTHBOUND TRAVEL LANE SHALL BE LIMITED TO A MAXIMUM OF ONE (1) BLOCK AT A TIME. THE PIPE TRENCH FOR THE MAINLINE GRAVITY SEWER AND ASSOCIATED CONSTRUCTION SETBACKS SHALL REMAIN FULLY WITHIN THE LIMITS OF THE NORTHBOUND TRAVEL LANE; AT NO TIME SHALL CONSTRUCTION ACTIVITIES FOR THE MAINLINE GRAVITY SEWER ENCROACH INTO THE SOUTHBOUND TRAVEL LANE. GRAVITY SEWER LATERALS AND WATER SERVICES ARE ALLOWED TO CROSS INTO THE SOUTHBOUND TRAVEL LANE. UPON INSTALLATION OF THE PROPOSED PIPE AND COMPLETION OF BACKFILLING AND COMPACTION, INITIAL PAVEMENT RESTORATION SHALL BE PLACED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. FOLLOWING COMPLETION OF ALL UTILITY WORK WITHIN THE LANE, THE ENTIRE NORTHBOUND TRAVEL LANE SHALL BE MILLED AND REPAVED IN ACCORDANCE WITH THE PUBLIC ROADWAY PAVEMENT REPAIR DETAIL SHOWN ON SHEET C-6. 3.WHERE PROPOSED UTILITIES CROSS PERPENDICULAR TO TRAFFIC SOUTH OF STATION 20+98, WITHIN THE CITY OF OCOEE RIGHT-OF-WAY, THE CONTRACTOR SHALL RESTORE THE SOUTHBOUND TRAVEL LANE BY MILLING AND REPLACING A MINIMUM OF 25 FEET ON EACH SIDE OF THE PIPE TRENCH. PAVEMENT RESTORATION SHALL CONFORM TO THE PUBLIC ROADWAY PAVEMENT REPAIR DETAIL SHOWN ON SHEET C-6. 4.WHERE PROPOSED UTILITIES CROSS PERPENDICULAR TO TRAFFIC NORTH OF STATION 20+98, WITHIN ORANGE COUNTY RIGHT-OF-WAY, THE CONTRACTOR SHALL RESTORE THE SOUTHBOUND TRAVEL LANE BY MILLING AND REPLACING A MINIMUM OF 50 FEET ON EACH SIDE OF THE PIPE TRENCH. PAVEMENT RESTORATION SHALL CONFORM TO THE APPLICABLE ORANGE COUNTY ROADWAY PAVEMENT REPAIR STANDARDS AND THE PUBLIC ROADWAY PAVEMENT REPAIR DETAIL SHOWN ON SHEET C-6. 5.FOR UTILITY WORK WITHIN SIDE STREETS UNDER THE CITY OF OCOEE RIGHT-OF-WAY, INCLUDING MACK STREET, SECURITY CIRCLE, MOBILE LANE, LYMAN STREET, BURNT TREE COURT, LAUREL RIDGE AVENUE, AND CLINGER COVE ROAD, THE ENTIRE WIDTH OF THE AFFECTED ROADWAY SHALL BE MILLED AND REPAVED. PAVEMENT RESTORATION SHALL EXTEND A MINIMUM OF 25 FEET BEYOND THE LIMITS OF THE UTILITY TRENCH. ALL PAVEMENT RESTORATION SHALL BE PERFORMED IN ACCORDANCE WITH THE PUBLIC ROADWAY PAVEMENT REPAIR DETAIL SHOWN ON SHEET C-6. 6.FOR UTILITY WORK WITHIN SIDE STREETS UNDER ORANGE COUNTY RIGHT-OF-WAY, INCLUDING 15TH AVENUE, 16TH AVENUE, 17TH AVENUE, AND WURST ROAD, THE ENTIRE WIDTH OF THE AFFECTED ROADWAY SHALL BE MILLED AND REPAVED FOLLOWING COMPLETION OF UTILITY INSTALLATION. PAVEMENT RESTORATION SHALL EXTEND A MINIMUM OF 50 FEET BEYOND THE LIMITS OF THE UTILITY TRENCH. ALL PAVEMENT RESTORATION SHALL BE PERFORMED IN ACCORDANCE WITH THE PUBLIC ROADWAY PAVEMENT REPAIR DETAIL SHOWN ON SHEET C-6. 7.WHERE PROPOSED UTILITIES PASS BENEATH EXISTING CONCRETE PAVEMENT, SIDEWALK, CURB, CURB AND GUTTER, DRIVEWAY, OR OTHER CONCRETE FEATURES, CONCRETE RESTORATION SHALL BE REQUIRED. LIMITS OF CONCRETE REMOVAL AND REPLACEMENT SHALL BE AS INDICATED BY THE CONCRETE RESTORATION HATCHING SHOWN ON THE DRAWINGS. ALL CONCRETE SHALL BE REMOVED AND REPLACED TO MATCH THE EXISTING THICKNESS, JOINTING PATTERN, FINISH, AND ALIGNMENT, UNLESS OTHERWISE NOTED. 8.ALL CONSTRUCTION ACTIVITIES WITHIN THE PHASE 1 RIGHT-OF-WAY LIMITS SHALL BE FULLY COMPLETED, INCLUDING UTILITY INSTALLATION, PAVEMENT RESTORATION, AND FINAL SURFACE RESTORATION, PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITIES WITHIN THE PHASE 2 RIGHT-OF-WAY. SEQUENCE OF CONSTRUCTION: A.WORK IN NO MORE THAN 1 BLOCK AT A TIME; WORK SHALL BE LIMITED TO 1 LANE AT A TIME, USING APPROPRIATE MEANS AND METHODS. B.INSTALL PIPE & BACKFILL THROUGH LIME ROCK BASE LAYER. C.RESTORE ROAD UP TO ONE COURSE OF PAVEMENT. D.OVERLAY ENTIRE LANE UPON COMPLETION OF CONSTRUCTION. ERCP ELLIPTICAL REINFORCED CONCRETE PIPE WATER/SEWER: CITY OF OCOEE UTILITIES 1800 A.D. MIMS ROAD OCOEE, FL 34761 (407) 905-3159 DRAIN: CITY OF OCOEE PUBLIC WORKS 301 MAGUIRE ROAD OCOEE, FL 34761 (407) 905-3170 ELECTRIC: DUKE ENERGY 452 E CROWN POINT RD WINTER GARDEN, FL 34787 (800) 700-8744 DIG SAFE SUNSHINE 811 GAS: LAKE APOPKA NATURAL GAS 1320 WINTER GARDEN VINELAND ROAD WINTER GARDEN, FL 34787 (407) 656-2734 MILL AND REPLACE UTILITY TRENCH CONCRETE REPAIR Page 271 of 576 1+ 0 0 2+00 3+00 4+00 5+00 6+00 7+00 MA T C H LI N E DW G   C- 2 DW G   C- 3 CO COCO CO CO CO COCO CO CO 68" 76" 44" 20" X UG F B O UG F B O UGFBO UGFBO UGFBO UGFBO UGFBO X XXXXXXXXXXXXXXXXXXXXXXXX X X X X X XXXX UGFBO OH E OHE OHE OH E OHE OH E OH E OH E OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OH E OH E OH E OH E O H E O H E OHE OHE OHE OHE OHE OHE OHE UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO G G G G G BE UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UG F B O UGFBO UGFBO UGFBO UGFBO U G F B O 20/9" STOP NO OUTLETSTOP SCB TOP OF GRATE ELEV=126.11' BOTTOM OF STRUCTURE ELEV=121.76 24" CMP RECESSED SCB TOP OF GRATE ELEV=125.78' OPEN CHANNEL INV ELEV= 125.16 N INV (18"RCP) ELEV= 121.66 SCB TOP OF GRATE ELEV=125.58' NW INV (18"RCP) ELEV=121.82 SCB TOP OF GRATE ELEV=125.86' N INV (18"CMP) ELEV=122.16 SCB TOP OF GRATE ELEV=125.49' N INV (24"RCP) ELEV= 121.14 SE INV (18"RCP) ELEV= UNK S INV (18"RCP) ELEV= 121.20 MPH 25 IP 2" (fnd)IR 1/2" (fnd) IR 1/2" (fnd) N&D L&S LB 7829 (fnd) STOP STOP FM ARV 4' BARB-WIRE FENCE 6' CHAIN LINK FENCE 4' WOOD PANEL FENCE 6'WOOD PANEL FENCE4' BARB-WIRE FENCE 4' CHAIN LINK FENCE TRACT "A" RETENTION AREA 25 7.5' DRAINAGE, UTILITY, INGRESS & EGRESS EASEMENT(P) SE C U R I T Y C I R C L E N O T I N C L U D E D MO B I L E L A N E 1458 9 12 LY M A N S T R E E T ( F ) 1 2 1 2 1 DIRT DRIVEWAY PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1543687.5510 E:482075.0300 ELEV:126.20' (NAVD 1988) EDGE OF ASPHALT ROAD 5' WIDE CONC SIDEWALK 5' WIDE CONC SIDEWALK 5' WIDE CONC SIDEWALK 5' WIDE CONC SIDEWALK CONCRETE DRIVEWAY BU R N T T R E E C O U R T FMFM FM FM SMH TOP OF LID ELEV=126.14' N INV (8"PVC) ELEV= 115.38 E INV (8"PVC) ELEV= 115.42 S INV (8"PVC) ELEV= 115.40 SMH TOP OF LID ELEV=126.14' N INV (20"PVC) ELEV=113.72 SW INV (20"PVC) ELEV=113.86 W INV (8"PVC) ELEV=114.66 DMH TOP OF LID ELEV=126.39' N INV (15"CMP) ELEV=123.32 SW INV (15" CMP) ELEV=121.91' SCB TOP OF GRATE ELEV=125.27' NE INV (18"RCP) ELEV= 120.68 E INV (18"RCP) ELEV= 122.14 S INV (18"RCP) ELEV= 120.76 SCB TOP OF GRATE ELV=125.42' W INV (18"RCP) ELEV= 122.24 NW INV (36"RCP8"PVC) ELEV=120.35 DMH TOP OF LID ELEV=126.45' NE INV (15"CMP) ELEV=119.75 S INV (15"CMP) ELEV=123.10 PROJECT BENCHMARK SET NAIL & DISK L&S LB 7829 N:1544174.3590 E:482061.4690 ELEV:125.22' (NAVD 1988) SCB TOP OF GRATE ELEV=125.63' N INV (18"RCP) ELEV= 121.22 S INV (24"RCP) ELEV= 120.97 MPH 25 5' WIDE CONC SIDEWALK 126 126 126 127 126 127 126 126 125 126 126 12 6 127 12 6 SMH-1 SMH-3SMH-2 12" PVC S12" PVC S12" PVC S 12 " P V C S 8" PVC S 12" PVC S 8" PVC S SMH-12 SMH-14 SMH-13 B-9 B-10 REPLACE EXISTING 8" PVC SEWER WITH WITH 12" PVC SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-7 SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-7 SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-7 SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-7 CORE AND CONNECT TO EXISTING SMH A AT INVERT 114.66 TO FIT 12" PIPE 24 " P V C F M CONTRACTOR TO COORDINATE WITH CITY TO DIVERT FLOW FROM MH REMOVE AND REPLACE CONCRETE SIDEWALK, SEE DETAIL PW005 ON SHEET C-7 REMOVE AND REPLACE CONCRETE SIDEWALK, SEE DETAIL PW005 ON SHEET C-7 REMOVE AND REPLACE CONCRETE SIDEWALK, SEE DETAIL PW005 ON SHEET C-7 REMOVE AND REPLACE CONCRETE SIDEWALK, SEE DETAIL PW005 ON SHEET C-7 CORE AND CONNECT TO EXISTING SMH B AT N INVERT 115.38 AND E INVERT 115.32 TO FIT 12" PIPES 716 N LAKEWOOD AVE 730 N LAKEWOOD AVE 728 N LAKEWOOD AVE 736 N LAKEWOOD AVE 720 N LAKEWOOD AVE PID:18-22-28-0000-00-066 DOC#20180256405 782 N LAKEWOOD AVE PID:18-22-28-0000-00-055 ORB 9110, PG 845 792 N LAKEWOOD AVE PID:18-22-28-0000-00-054 ORB 5932, PG 239 102 SECURITY CIR SECURITY MOBILE HOME PARK PLAT BOOK Z, PAGE 93 729 LAKEWOOD AVE 102 MOBILE LN FIRST ADDITION T0 SECURITY MOBILE HOME PARK PLAT BOOK 1, PAGE 132 100 MOBILE LN 101 BURNT TREE CT 98 BURNT TREE CTEXISTING SMH A EXISTING SMH B 8" P V C S 6" CLEANOUT 6" CLEANOUT 6" CLEANOUT 6" CLEANOUT SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-7 6" CLEANOUT 6" CLEANOUT 6" CLEANOUT REMOVE AND REPLACE CONCRETE SIDEWALK, SEE DETAIL PW005 ON SHEET C-7 MILL AND REPLACE MILL AND REPLACE MILL AND REPLACE MILL AND REPLACE SCB TOP OF GRATE ELEV=125.86' BOTTOM OF STRUCTURE ELEV=121.66 18" CMP RECESSED NORTH LAKEWOOD AVENUE (OCOEE CLARCONA ROAD) REMOVE AND REPLACE DRIVEWAY (TYP) 6" CLEANOUT SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-7 SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-7 6" CLEANOUT REMOVE AND REPLACE CONCRETE SIDEWALK, SEE DETAIL PW005 ON SHEET C-7 MILL AND REPLACESCB TOP OF GRATE ELEV=125.68' BOTTOM OF STRUCTURE ELEV=121.33 24" & 18" CMP RECESSED 25 ' MILL AND REPLACE 25 ' MILL AND REPLACE 2' - 3 " MILL AND REPLACE 12 6 . 6 12 6 . 1 12 6 . 1 12 6 . 0 12 6 . 0 12 6 . 0 12 6 . 0 12 6 . 0 12 6 . 0 12 6 . 0 12 5 . 9 12 5 . 9 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 9 12 5 . 8 12 5 . 8 12 5 . 8 EXISTING GRADE SM H - 1 RI M E L . = 1 2 5 . 9 5 ST A 3 + 9 0 6 ' R 12 " I N V I N ( N ) = 1 1 5 . 9 5 8" I N V I N ( E ) = 1 1 5 . 9 5 12 " I N V O U T ( S ) = 1 1 5 . 8 5 SM H - 3 RI M E L . = 1 2 5 . 7 3 ST A 6 + 3 7 5 ' R 12 " I N V I N ( N ) = 1 1 8 . 7 3 8" I N V I N ( E ) = 1 1 8 . 7 3 12 " I N V O U T ( S ) = 1 1 8 . 6 3 SM H - 2 RI M E L . = 1 2 5 . 7 5 ST A 4 + 4 1 6 ' R 12 " I N V I N ( N ) = 1 1 7 . 7 5 8" I N V I N ( W ) = 1 1 7 . 7 5 12 " I N V O U T ( S ) = 1 1 7 . 6 5 CROSSING 1: SEE SEPARATION TABLE ON SHEET C-11 1/2" UGFBO 1/2" UGFBO 1/2" UGFBO 18" SD 24" SD 20" FM 6" W CROSSING 2: SEE SEPARATION TABLE ON SHEET C-11 CROSSING 3: SEE SEPARATION TABLE ON SHEET C-11 CROSSING 4: SEE SEPARATION TABLE ON SHEET C-11 CROSSING 5: SEE SEPARATION TABLE ON SHEET C-11 CROSSING 6: SEE SEPARATION TABLE ON SHEET C-11 CROSSING 7: SEE SEPARATION TABLE ON SHEET C-11 12" S L=197' S=0.45% 12" S L=51' S = 3 . 3 6 % 12" S L=79' S=0.83% 105 110 115 120 125 130 135 105 110 115 120 125 130 135 1+00 2+00 3+00 4+00 5+00 6+00 7+00 EX I S T I N G S M H B RI M E L . = 1 2 6 . 1 4 12 " I N V I N ( N ) = 1 1 5 . 3 8 8" I N V I N ( S ) = 1 1 5 . 4 0 12 " I N V O U T ( E ) = 1 1 5 . 3 2 12 " I N V I N ( N ) = 1 1 5 . 3 8 EX I S T I N G S M H A RI M E L . = 1 2 6 . 1 4 12 " I N V I N ( W ) = 1 1 4 . 6 6 12 " I N V O U T ( N ) = 1 1 3 . 7 2 12 " I N V I N ( W ) = 1 1 4 . 6 6 SE R V I C E L A T E R A L W Y E ST A 2 + 1 9 . 3 3 SE R V I C E L A T E R A L W Y E ST A 6 + 4 4 . 5 8 SE R V I C E L A T E R A L W Y E ST A 4 + 7 8 . 0 0 SE R V I C E L A T E R A L W Y E ST A 4 + 8 2 . 4 8 SE R V I C E LA T E R A L W Y E ST A 4 + 0 3 . 1 0 SE R V I C E L A T E R A L W Y E ST A 3 + 3 2 . 8 1 SE R V I C E L A T E R A L W Y E ST A 3 + 3 7 . 6 0 12" S L=202' S=0.23% 12 " I N V O U T ( E ) = 1 1 5 . 3 2 SE R V I C E L A T E R A L W Y E ST A 5 + 9 7 . 0 0 SE R V I C E L A T E R A L W Y E ST A 1 + 4 8 . 7 1 J: \ E N G \ F L \ O C O E E \ 2 1 7 8 7 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 1 \ _ D R A W I N G S \ C I V \ 2 1 7 8 7 - C S - P L A N P R O F I L E I . D W G | 21 7 8 7 - C S - P l a n P r o f i l e I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 4 / 2 0 2 6 5 : 2 7 : 5 7 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 2/ 2 3 / 2 0 2 6 1 0 : 3 3 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 PLAN SCALE: 1"=20' PROFILE SCALES VERT:1"=4' HORIZ:1"=20' N 0 20 40 PL A N A N D P R O F I L E S T A 1 + 0 0 T O S T A 7 + 0 0 CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 1 C-2 RE V I S I O N S   P E R   C I T Y   C O M M E N T S   A F T E R   B I D   I S S U A N C E     AS         02 / 2 6 D. M E T Z 21 7 8 7 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   A B A EXISTING MANHOLE IS LINED/COATED; CONTRACTOR SHALL ADD COATING TO THE DISTURBED AREAS AFTER RE-SHAPING THE INVERT B EXISTING MANHOLE SHALL BE LINED AND COATED WITH APPROVED EPOXY COATING 1 1 1 Page 272 of 576 7+00 8+00 9+00 10+00 11+00 12+00 13+00 MA T C H LI N E DW G   C- 2 DW G   C- 3 MA T C H LI N E DW G   C- 3 DW G   C- 4 CO CO CO CO CO 50 + 0 0 50 + 2 8 CO 18"20" 42" 20" 22" 20"10" 15"12"12" 20"24" OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UG F B O U G F B O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO OHE OHE OH E OH E O H E O H E OH E OHE OHE OHE OHE OHE UGFBO UGFBO UGFBO UG F B O G G G G G G G G G G G G G G G G G G G G G G G G G G G G G SCB TOP OF GRATE ELEV=125.51' N INV (24"RCP) ELEV=122.98 S INV (24"RCP) ELEV=122.96 SCB TOP OF GRATE ELEV=125.19' W INV (15"CMP) ELEV= 123.57 SCB TOP OF GRATE ELEV=125.43' N INV (15"RCP) ELEV= 123.89 S INV (15"RCP) ELEV= 123.80 ARV BT PRESSURE RELEASE VALVE DMH TOP OF LID ELEV=125.48' N (UNKNOWN) ELEV=123.52 W(18"RCP) ELEV=123.34 SCB TOP OF GRATE ELEV=125.78' N (24"RCP) ELEV= 122.70 E (18"RCP) ELEV= 122.73 S (24"RCP) ELEV= 122.64 N INV (24"CMP) ELEV=120.89 S INV (24"CMP) ELEV=120.68 IRC 1/2" RLS 2142 (fnd) E INV (15" CMP) ELEV=122.20 S INV (24" RCP) ELEV=122.06 N&D REF PT (fnd) TRACT "A" RETENTION AREA 904 N LAKEWOOD AVE PID:7-22-28-0000-00-047 DOC#20230691880 870 CLARCONA OCOEE RD PID:7-22-28-0000-00-040 DOC#20230691880 880 CLARCONA OCOEE RD PID:7-22-28-0000-00-080 DOC#20180520082 905 N LAKEWOOD AVE PID:08-22-28-0000-00-046 ORB 6633, PG 788 903 N LAKEWOOD AVE PID:08-22-28-0000-00-022 DOC#20190761043 821 N LAKEWOOD AVE PID:08-22-28-0000-00-027 DOC#20040577026 815 CLARCONA OCOEE RD PID:08-22-28-0000-00-028 DOC#20230197294 FLUME 5' WIDE CONC SIDEWALK 5' WIDE CONC SIDEWALK PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1544507.0780 E:482027.9150 ELEV:125.44' (NAVD 1988) FLUME DIRT DRIVEWAY EDGE OF ASPHALT ROAD IR 1/2" BENT (fnd) CONCRETE DRIVEWAY CONCRETE DRIVEWAY MON 4"X4" (fnd) FLUME CONCRETE DRIVEWAY CONCRETE DRIVEWAY OVERGROWN GRAVEL DRIVEWAY AN D E R S O N P L SE INV (36"RCP) ELEV=122.89' SW INV (15" CMP) ELEV=121.91' NO DUMPING SCB TOP OF GRATE ELEV=125.27' NE INV (18"RCP) ELEV= 120.68 E INV (18"RCP) ELEV= 122.14 S INV (18"RCP) ELEV= 120.76 SCB TOP OF GRATE ELV=125.42' W INV (18"RCP) ELEV= 122.24 NW INV (36"RCP) ELEV=120.35 PROJECT BENCHMARK SET NAIL & DISK L&S LB 7829 N:1544174.3590 E:482061.4690 ELEV:125.22' (NAVD 1988) DMH TOP OF LID ELEV=126.01' SW INV (18"RCP) ELEV= 120.30 E INV (15"RCP) ELEV= 120.40 NORTH LAKEWOOD AVENUE (OCOEE CLARCONA ROAD) 125 124 123 122 122 123 124 125 12 1 126 125 124 123 122 123 124 125 123 124 125 126 125 124 123 123 126 125126 126 SMH-5SMH-4 12" PVC S12" PVC S 12" PVC SB-7 B-8 SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-7 SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-7 REMOVE AND REPLACE CONCRETE SIDEWALK, SEE DETAIL PW005 ON SHEET C-7IRC 1/2" ILL (fnd) 6" CLEANOUT 6" CLEANOUT6" CLEANOUT SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-7 6" CLEANOUT SMH-15 MILL AND REPLACEMILL AND REPLACEMILL AND REPLACE 25' FROM TRENCH BOTH DIRECTION DMH TOP OF LID ELEV=125.43' NE INV (18"RCP) ELEV = 120.05 S INV (24"CMP) ELEV = 120.51 NW INV (36"RCP) ELEV = 120.07 REMOVE AND REPLACE 15" CMP WITH 15" RCP REMOVE AND REPLACE CONCRETE SIDEWALK SEE DETAIL PW005 ON SHEET C-7 6" CLEANOUT SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-7 REMOVE AND REPLACE CONCRETE SIDEWALK SEE DETAIL PW005 ON SHEET C-7 CLEAR AND GRUB SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-7 CONCRETE ENCASED SERVICE LATERAL 110 115 120 125 130 135 140 110 115 120 125 130 135 140 7+00 8+00 9+00 10+00 11+00 12+00 13+00 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 9 12 6 . 0 12 6 . 0 12 5 . 9 12 5 . 9 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 6 . 0 12 6 . 2 12 6 . 4 12 6 . 6 EXISTING GRADE SM H - 5 RI M E L . = 1 2 5 . 8 8 ST A 1 1 + 7 0 7 ' R 12 " I N V I N ( N ) = 1 2 0 . 3 8 12 " I N V O U T ( S ) = 1 2 0 . 2 8 SM H - 4 RI M E L . = 1 2 5 . 9 6 ST A 9 + 0 7 7 ' R 12 " I N V I N ( N ) = 1 1 9 . 3 5 8" I N V I N ( E ) = 1 1 9 . 3 5 12 " I N V O U T ( S ) = 1 1 9 . 2 5 1/2" UGFBO 1/2" UGFBO 36" SD 15" SD 24" SD CROSSING 8: SEE SEPARATION TABLE ON SHEET C-11 CROSSING 10: SEE SEPARATION TABLE ON SHEET C-11 CROSSING 11: SEE SEPARATION TABLE ON SHEET C-11 CROSSING 12: SEE SEPARATION TABLE ON SHEET C-11 CROSSING 13: SEE SEPARATION TABLE ON SHEET C-11 12" S L=263' S=0.35% 12" S L=269' S=0.19% 12" S L=258' S=0.57% SE R V I C E L A T E R A L W Y E ST A 8 + 3 5 . 0 0 SE R V I C E L A T E R A L W Y E ST A 1 1 + 4 7 . 0 0 SE R V I C E L A T E R A L W Y E ST A 1 2 + 2 6 . 3 1 SE R V I C E L A T E R A L W Y E ST A 1 2 + 5 4 . 3 3 SE R V I C E L A T E R A L W Y E ST A 1 0 + 5 2 . 0 0 1/2" UGFBO CROSSING 9: SEE SEPARATION TABLE ON SHEET C-11 12" MIN J: \ E N G \ F L \ O C O E E \ 2 1 7 8 7 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 1 \ _ D R A W I N G S \ C I V \ 2 1 7 8 7 - C S - P L A N P R O F I L E I I . D W G | 21 7 8 7 - C S - P l a n P r o f i l e I I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 4 / 2 0 2 6 5 : 2 8 : 4 4 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 12 / 8 / 2 0 2 5 2 : 1 8 P M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 PLAN SCALE: 1"=20' PROFILE SCALES VERT:1"=4' HORIZ:1"=20' N 0 20 40 PL A N A N D P R O F I L E S T A 7 + 0 0 T O S T A 1 3 + 0 0 CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 1 C-3                D. M E T Z 21 7 8 7 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   Page 273 of 576 13+00 14+00 15+00 MA T C H LI N E DW G   C- 3 DW G   C- 4 CO CO CO 54" 20/10" TWIN20" OH E OH E OH E UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UG F B O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO OHE OHE OHE OHE OHE O H E OHE OHE OHE OHE OHE OHE OHE UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO G G G G G G G G G G G G G G UGFBO UGFBO UGFBO SCB TOP OF GRATE ELEV=128.65' S INV (15"RCP) ELEV= 126.18 IRC 1/2" LB 4596 (fnd) IP 1" (fnd)STONE PLATER 5' METAL FENCE 922 N LAKEWOOD AVE PID:07-22-28-0000-00-048 DOC#20180344043 914 N LAKEWOOD AVE PID:07-22-28-0000-00-062 DOC#20190549959 880 CLARCONA OCOEE RD PID:7-22-28-0000-00-080 DOC#20180520082 ZACK INVESTMENTS LAKEWOOD AVE LLC PID:7-22-28-0000-00-090 DOC#20180523897 915 CLARCONA OCOEE RD PID:08-22-28-0000-00-017 DOC#20120018967 911 CLARCONA OCOEE RD PID:08-22-28-0000-00-018 DOC#20020623775 907 N LAKEWOOD AVE PID:08-22-28-0000-00-021 NO DOC FOUND 905 N LAKEWOOD AVE PID:08-22-28-0000-00-046 ORB 6633, PG 788 PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1544881.6580 E:482058.2010 ELEV:127.89' (NAVD 1988) 5' WIDE CONC SIDEWALK 5' WIDE CONC SIDEWALK N&D NO ID (fnd) CONCRETE DRIVEWAY DIRT DRIVE WAY CONCRETE CONCRETE DRIVEWAY SCB TO OF GRATE ELEV=127.09' N INV (24"RCP) ELEV=124.29 S INV (24"RCP) ELEV=124.19 NORTH LAKEWOOD AVENUE (OCOEE CLARCONA ROAD) DIRT DRIVEWAY 127 128 128 129 128 129 12" PVC S SMH-6 PHASE 1 DESIGN SEE PHASE 2 DRAWING SET FOR CONTINUATION SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-7 SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-7 REMOVE AND REPLACE CONCRETE SIDEWALK, SEE DETAIL PW005 ON SHEET C-7 REMOVE AND REPLACE CONCRETE SIDEWALK, SEE DETAIL PW005 ON SHEET C-7 6" CLEANOUTSERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-7 6" CLEANOUT 6" CLEANOUT MILL AND REPLACE EDGE OF ASPHALT ROAD 110 115 120 125 130 135 140 110 115 120 125 130 135 140 13+00 14+00 15+00 12 6 . 6 12 6 . 9 12 7 . 3 12 7 . 6 12 7 . 8 12 8 . 0 12 8 . 2 12 8 . 4 12 8 . 7 EXISTING GRADE 12" S L=258' S=0.57% SE R V I C E L A T E R A L W Y E ST A 1 3 + 9 0 . 7 8 SE R V I C E L A T E R A L W Y E ST A 1 4 + 1 9 . 5 1 SE R V I C E L A T E R A L W Y E ST A 1 3 + 4 5 . 5 5 SM H - 6 RI M E L . = 1 2 7 . 9 4 ST A 1 4 + 2 8 6 ' R 12 " I N V O U T ( S ) = 1 2 1 . 8 4 J: \ E N G \ F L \ O C O E E \ 2 1 7 8 7 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 1 \ _ D R A W I N G S \ C I V \ 2 1 7 8 7 - C S - P L A N P R O F I L E I I I . D W G | 21 7 8 7 - C S - P l a n P r o f i l e I I I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 4 / 2 0 2 6 5 : 2 9 : 3 4 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 12 / 8 / 2 0 2 5 2 : 2 0 P M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 PLAN SCALE: 1"=20' PROFILE SCALES VERT:1"=4' HORIZ:1"=20' N 0 20 40 PL A N A N D P R O F I L E S T A 1 3 + 0 0 T O S T A 1 5 + 0 0 CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 1 C-4                D. M E T Z 21 7 8 7 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   Page 274 of 576 OH E OH E OH E OH E OH E OH E OH E 1 2 6 12 6 U G F B O 4+ 0 0 20+00 20+37 SCB TOP OF GRATE ELEV=125.78' OPEN CHANNEL INV ELEV= 125.16 N INV (18"RCP) ELEV= 121.66 SCB TOP OF GRATE ELEV=125.58' NW INV (18"RCP) ELEV=121.82 SCB TOP OF GRATE ELEV=125.49' N INV (24"RCP) ELEV= 121.14 SE INV (18"RCP) ELEV= UNK S INV (18"RCP) ELEV= 121.20 4' WOOD PANEL FENCE MOBILE LANE B-10 SMH-1 SMH-12 12 " P V C S 8" PVC S NO R T H L A K E W O O D A V E N U E (O C O E E C L A R C O N A R O A D ) 105 110 115 120 125 130 135 105 110 115 120 125 130 135 20+00 20+37 12 5 . 9 12 5 . 8 12 5 . 8 8" S L=37' S=0.65% SM H - 1 RI M E L . = 1 2 5 . 9 5 ST A 3 + 9 0 6 ' R 12 " I N V I N ( N ) = 1 1 5 . 9 5 8" I N V I N ( E ) = 1 1 5 . 9 5 12 " I N V O U T ( S ) = 1 1 5 . 8 5 SM H - 1 2 RI M E L . = 1 2 5 . 7 2 ST A 3 + 9 0 4 3 ' R 8" I N V O U T ( W ) = 1 1 6 . 1 9 EXISTING GRADE 18" SD 18" SD 6" W CROSSING 1: SEE STUB OUT SEPARATION TABLE ON SHEET C-11 CROSSING 2: SEE STUB OUT SEPARATION TABLE ON SHEET C-11 CROSSING 3: SEE STUB OUT SEPARATION TABLE ON SHEET C-11 IR 1/2" (fnd) IR 1/2" (fnd) X X X X X X X X X X X OH E OH E OHE OHE 12 6 UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O U G F B O 4+ 0 0 30+0030+36 CO CO SCB TOP OF GRATE ELEV=125.49' N INV (24"RCP) ELEV= 121.14 SE INV (18"RCP) ELEV= UNK S INV (18"RCP) ELEV= 121.20 LYMAN STREET 5' W I D E C O N C S I D E W A L K B-10 SMH-2SMH-13 12 " P V C S 8" PVC S NO R T H L A K E W O O D A V E N U E (O C O E E C L A R C O N A R O A D ) 105 110 115 120 125 130 135 105 110 115 120 125 130 135 30+0030+36 12 5 . 7 12 5 . 4 12 5 . 1 SM H - 2 RI M E L . = 1 2 5 . 7 5 ST A 4 + 4 1 6 ' R 12 " I N V I N ( N ) = 1 1 7 . 7 5 8" I N V I N ( W ) = 1 1 7 . 7 5 12 " I N V O U T ( S ) = 1 1 7 . 6 5 8" S L=36' S=0.50% SM H - 1 3 RI M E L . = 1 2 4 . 9 6 ST A 4 + 4 1 - 3 0 ' L 8" I N V O U T ( E ) = 1 1 7 . 9 3 EXISTING GRADE 1/2" UGFBO 20" FM CROSSING 5: SEE STUB OUT SEPARATION TABLE ON SHEET C-11 CROSSING 4: SEE STUB OUT SEPARATION TABLE ON SHEET C-11 OH E OH E OH E OH E OH E OH E UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O G G G G G B E B E 1 2 6 126 UGF B O UGFBO UGFBO 6+ 0 0 40+00 40+24 CO BURNT TREE COURT DMH TOP OF LID ELEV=126.39' N INV (15"CMP) ELEV=123.32 DMH TOP OF LID ELEV=126.45' NE INV (15"CMP) ELEV=119.75 S INV (15"CMP) ELEV=123.10 B-9 SMH-14SMH-3 8" PVC S NO R T H L A K E W O O D A V E N U E (O C O E E C L A R C O N A R O A D ) 105 110 115 120 125 130 135 105 110 115 120 125 130 135 40+00 40+24 12 5 . 7 12 6 . 0 SM H - 3 RI M E L . = 1 2 5 . 7 3 ST A 6 + 3 7 5 ' R 12 " I N V I N ( N ) = 1 1 8 . 7 3 8" I N V I N ( E ) = 1 1 8 . 7 3 12 " I N V O U T ( S ) = 1 1 8 . 6 3 8" S L=24' S=0.78% SM H - 1 4 RI M E L . = 1 2 6 . 0 2 ST A 6 + 3 7 3 0 ' R 8" I N V O U T ( W ) = 1 1 8 . 9 2 EXISTING GRADE 2" GAS 18" SD 6" W CROSSING 6: SEE STUB OUT SEPARATION TABLE ON SHEET C-11 CROSSING 7: SEE STUB OUT SEPARATION TABLE ON SHEET C-11 CROSSING 8: SEE STUB OUT SEPARATION TABLE ON SHEET C-11 105 110 115 120 125 130 135 105 110 115 120 125 130 135 50+00 50+30 12 5 . 8 12 5 . 7 SM H - 4 RI M E L . = 1 2 5 . 9 6 ST A 9 + 0 7 7 ' R 12 " I N V I N ( N ) = 1 1 9 . 3 5 8" I N V I N ( E ) = 1 1 9 . 3 5 12 " I N V O U T ( S ) = 1 1 9 . 2 5 8" S L=28' S=0.25% SM H - 1 5 RI M E L . = 1 2 5 . 7 5 ST A 9 + 0 6 3 5 ' R 8" I N V O U T ( W ) = 1 1 9 . 4 2 EXISTING GRADE 2" GAS 6" W CROSSING 9: SEE STUB OUT SEPARATION TABLE ON SHEET C-11 CROSSING 10: SEE STUB OUT SEPARATION TABLE ON SHEET C-11 20" 24" OH E OH E OH E OH E OH E OH E OH E UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O G G G G G G G 9+ 0 0 50+00 50+28 5' W I D E C O N C SI D E W A L K ED G E O F A S P H A L T R O A D SMH-4 SMH-15 J: \ E N G \ F L \ O C O E E \ 2 1 7 8 7 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 1 \ _ D R A W I N G S \ C I V \ 2 1 7 8 7 - S T U B P R O F I L E S . D W G | 21 7 8 7 - S t u b P r o f i l e s | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 4 / 2 0 2 6 5 : 3 0 : 1 9 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 12 / 4 / 2 0 2 5 4 : 1 4 P M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 PROFILE SCALES VERT:1"=4' HORIZ:1"=10' N 0 10 20 ST U B - O U T P L A N S A N D P R O F I L E S CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 1 C-5                D. M E T Z 21 7 8 7 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   PROFILE SCALES VERT:1"=4' HORIZ:1"=10' PLAN SCALE: 1"=10' PROFILE SCALES VERT:1"=4' HORIZ:1"=10' PLAN SCALE: 1"=10' PLAN SCALE: 1"=10' 0 10 2001020 NN N 0 10 20 PLAN SCALE: 1"=10' PROFILE SCALES VERT:1"=4' HORIZ:1"=10' Page 275 of 576 J: \ E N G \ F L \ O C O E E \ 2 1 7 8 7 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 1 \ _ D R A W I N G S \ C I V \ 2 1 7 8 7 - C S - D E T A I L S I . D W G | 21 7 8 7 - C S - D e t a i l s I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 4 / 2 0 2 6 5 : 3 0 : 3 7 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 1/ 1 9 / 2 0 2 6 4 : 3 1 P M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 DE T A I L S I CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 1 C-6                D. M E T Z 21 7 8 7 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   TO NEAREST JOINT COMPACTED SUBGRADE UTILITY TRENCH, SEE DETAIL TO NEAREST JOINT ROAD EXISTING PAVEMENT 6" THICK 3,000 PSI CONCRETE EXISTING CONCRETE DRIVEWAY PAVEMENT SAWCUT CL SAWCUT CL CONCRETE DRIVEWAY PAVEMENT REPAIR SCALE: NOT TO SCALE NOTES: 1.CONCRETE TO HAVE A 28-DAY COMPRESSIVE STRENGTH OF 3,000 PSI. 2.USE 1/2" EXPANSION JOINT (PREFORMED JOINT FILLER) BETWEEN CONCRETE AND ALL OTHER FIXED OBJECTS. MATCH EXISTING GRADE PUBLIC ROADWAY PAVEMENT REPAIR DETAILS SCALE: NOT TO SCALE NOTES: 1.PAVEMENT REPAIR, PAVEMENT STRIPING, AND PAVEMENT MARKINGS TO BE CONSTRUCTED IN ACCORDANCE WITH SECTION 02000. 2.MILLED SURFACE SHALL BE PROTECTED FROM TRAFFIC AND RAIN. IN ADDITION, THE PLACEMENT OF THE FIRST LIFT OF STRUCTURAL COURSE SHALL OCCUR NO LATER THAN THE DAY AFTER THE SURFACE IS MILLED. 3.RESTORE PAVEMENT STRIPING AND PAVEMENT MARKINGS BACK TO ORIGINAL LAYOUT AND COLOR. 4.SP-19.0 STRUCTURAL COURSE LIFTS SHALL BE A MINIMUM OF 2 INCHES AND A MAXIMUM OF 4 INCHES 5.25' MINIMUM IS ACCEPTABLE SOUTH OF STA 21+00. 2"2" 3" TYPE SP-19.0 STRUCTURAL COURSE (TRAFFIC C) EXISTING PAVEMENT AGGREGATE SUB-BASE LAYER: 7" TYPE B-12.5 SUPERPAVE ASPHALT BASE OR 14" LIMEROCK, LBR100 OR 5" TYPE SP-19.0 STRUCTURAL COURSE (TRAFFIC C) UTILITY TRENCH SEE CITY OF OCOEE PIPE BEDDING AND TRENCH DETAIL UT001 INITIAL PAVEMENT REPAIR EXISTING PAVEMENT FINAL PAVEMENT REPAIR UTILITY PARALLEL TO ROADWAY ℄ INITIAL PAVEMENT REPAIR RO A D ℄ EDGE OF TRAVELED WAY 1" MILLING AND TACK COAT 1" TYP SP-9.5 STRUCTURAL COURSE (TRAFFIC C) EXISTING PAVEMENT FINAL PAVEMENT REPAIR UTILITY PERPENDICULAR TO ROADWAY ℄ INITIAL PAVEMENT REPAIR 1" MILLING AND TACK COAT 1" TYP SP-9.5 STRUCTURAL COURSE (TRAFFIC C) 50' (MIN) SEE NOTE 5 50" (MIN) SEE NOTE 5 ONE TRAVEL LANE ONLY Page 276 of 576 J: \ E N G \ F L \ O C O E E \ 2 1 7 8 7 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 1 \ _ D R A W I N G S \ C I V \ 2 1 7 8 7 - C S - D E T A I L S I I . D W G | 21 7 8 7 - C S - D e t a i l s I I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 4 / 2 0 2 6 5 : 3 0 : 5 6 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 8/ 1 2 / 2 0 2 5 1 0 : 2 6 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 DE T A I L S I I CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 1 C-7                D. M E T Z 21 7 8 7 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   Page 277 of 576 J: \ E N G \ F L \ O C O E E \ 2 1 7 8 7 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 1 \ _ D R A W I N G S \ C I V \ 2 1 7 8 7 - C S - S W P P N O T E S I . D W G | 21 7 8 7 - C S - S W P P N o t e s I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 4 / 2 0 2 6 5 : 3 1 : 1 6 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : DA N I E L . M E T Z 5/ 5 / 2 0 2 5 1 0 : 5 6 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 ST O R M W A T E R P O L L U T I O N P R E V E N T I O N N O T E S I CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 1 C-8                D. M E T Z 21 7 8 7 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   NARRATIVE 1.DESCRIPTION OF CONSTRUCTION ACTIVITY: INSTALLATION OF A NEW 12" GRAVITY SEWER LINE IN THE NORTH BOUND LANE OF LAKEWOOD AVENUE, FROM SECURITY CIRCLE TO LAUREL RIDGE. 2.SITE AREA INFORMATION: TOTAL AREA OF THE SITE = 1.79 ACRES TOTAL DISTURBANCE AREA = 0.5 ACRES RUNOFF DATA: RUNOFF COEFFICIENTS: BEFORE = 0.75 DURING = VARIES FROM 0.75 TO 0.80 AFTER = 0.75 3.PROPOSED SEQUENCE OF LAND DISTURBING ACTIVITIES, INCLUDING SEQUENCE DURING THE CONSTRUCTION PROCESS IN WHICH THE MEASURES WILL BE INSTALLED. THE CONTRACTOR SHALL FOLLOW THE SEQUENCE OF MAJOR ACTIVITIES DESCRIBED BELOW, UNLESS THE CONTRACTOR PROPOSES A DIFFERENT SEQUENCE THAT IS EQUAL OR APPROVED BY THE ENGINEER. FOR EACH CONSTRUCTION PHASE, INSTALL PERIMETER CONTROLS AFTER CLEARING AND GRUBBING NECESSARY FOR INSTALLATION OF CONTROLS BUT BEFORE BEGINNING OTHER WORK FOR THE CONSTRUCTION PHASE. REMOVE PERIMETER CONTROLS ONLY AFTER ALL UPSTREAM AREAS ARE STABILIZED. A.CONSTRUCTION OF A GRAVITY SEWER SYSTEM B.CONSTRUCTION OF STUB-OUTS FROM MAIN LINE 4.DESCRIPTION OF THE SOILS AND AN IDENTIFICATION OF THOSE THAT ARE HIGHLY ERODIBLE: 44 - SMYRNA-SMYRNA, WET, FINE SAND 48 - TAVARES, FINE SAND-URBAN LAND COMPLEX 5.AFFECTED DRAINAGE AREAS AND MAJOR DISCHARGE POINTS: N/A 6.LATITUDE AND LONGITUDE OF EACH MAJOR DISCHARGE POINT: N/A 7.NAMES OF RECEIVING WATER(S): STARKE LAKE 8.DESCRIPTION OF PROPOSED POLLUTION CONTROL MEASURES OR BMPS TO BE USED: a.EROSION AND SEDIMENT CONTROL PRACTICES MAINTAINING BUFFERS WITH ADJACENT WETLANDS, MAINTAINING HYDROLOGY OF ADJACENT WETLAND b.STRUCTURAL CONTROL PRACTICES THE FOLLOWING STRUCTURAL CONTROL PRACTICES HAVE BEEN DESIGNED INTO THIS PROJECT: SLIT FENCE, CATCH BASIN FILTERS, LEVEL SPREADER, VEGETATED DRAINAGE SWALE 9.ESTIMATED CONSTRUCTION SCHEDULE: START DATE = TBD COMPLETION DATE = TBD STABILIZATION SCHEDULE CONSTRUCTION ACCESS ROAD = TBD CLEARING AND GRUBBING = TBD INSTALLATION OF TEMPORARY EROSION CONTROL MEASURES = TBD CONSTRUCTION OF SEDIMENT BASIN = TBD SITE CONSTRUCTION & INTERIM EROSION CONTROL MEASURES = TBD FINAL VEGETATION = TBD 10.THE CONTRACTOR RESPONSIBLE FOR THE BMP IMPLEMENTATION, INSPECTION, AND MAINTENANCE: CONTRACTOR TO BE DETERMINED AT A LATER DATE THROUGH A PUBLIC BID PROCESS. 11.CALCULATIONS: SUPPORTING CALCULATIONS FOR THE EROSION AND SEDIMENT CONTROL CAN BE FOUND WITHIN THE PROJECTS' ENVIRONMENTAL RESOURCE PERMITS APPLICATION. 12.CERTIFICATION OF COMPLIANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS. IN AN EFFORT TO ENSURE COMPLIANCE WITH FEDERAL, STATE, AND LOCAL LAWS REGARDING EROSION AND TURBIDITY CONTROLS: THE FOLLOWING PERMITS HAVE BEEN OBTAINED. PERMIT # TBD ACOE PERMIT # TBD ENVIRONMENTAL RESOURCE PERMIT # TBD 13.INVENTORY FOR POLLUTION PREVENTION PLAN: THE MATERIAL OR SUBSTANCES LISTED BELOW ARE EXPECTED TO BE PRESENT ONSITE DURING CONSTRUCTION: CONCRETE, WOOD, FERTILIZERS, ASPHALT, MASONRY BLOCKS, PETROLEUM BASED PRODUCTS, TAR, ROOFING MATERIALS, CLEANING SOLVENTS, DETERGENTS, METAL STUDS, PAINTS RECORD REQUIREMENTS THE CONTRACTOR SHALL, AT A MINIMUM, PERFORM AND DOCUMENT THE FOLLOWING RECORD KEEPING TASKS IN A REGULAR AND EXPEDIENT MANNER WHILE CONSTRUCTION ACTIVITIES ARE OCCURRING. 1.CONTRACTORS MUST RECORD THE FOLLOWING DATES: A)WHEN MAJOR GRADING ACTIVITIES OCCUR B)WHEN CONSTRUCTION ACTIVITIES TEMPORARILY OR PERMANENTLY CEASE ON A PORTION OF THE SITE C)WHEN STABILIZATION (I.E. EROSION CONTROL) MEASURES BEGIN 2.CONTRACTORS ARE TO PROVIDE QUALIFIED INSPECTORS WHO HAVE KNOWLEDGE AND EXPERIENCE IN THE PRINCIPLES AND PRACTICE OF SEDIMENT AND EROSION CONTROL AND CAN COMPLETE PROJECT SITE INSPECTIONS: A)AT LEAST ONCE EVERY SEVEN (7) DAYS B)WITHIN 24 HOURS AFTER THE END OF A STORM EVENT OF 0.50-INCHES OR MORE. TO COMPLY, THE CONTRACTOR SHALL INSTALL AND MAINTAIN RAIN GAUGES AND RECORD THE DAILY RAINFALL. C)WHERE SITES HAVE BEEN PERMANENTLY STABILIZED, INSPECTIONS SHALL BE CONDUCTED AT LEAST ONCE EVERY MONTH. THE CONTRACTOR SHALL ALSO INSPECT THAT CONTROLS INSTALLED IN THE FIELD AGREE WITH THE LATEST STORMWATER POLLUTION PREVENTION PLAN. 3. A MAINTENANCE INSPECTION REPORT WILL BE MADE AFTER EACH INSPECTION. THE REPORTS WILL BE KEPT ON SITE DURING CONSTRUCTION AND AVAILABLE UPON REQUEST TO THE OWNER, ENGINEER OR ANY FEDERAL, STATE, AND LOCAL AGENCY APPROVING SEDIMENT AND EROSION PLANS, OR STORM WATER MANAGEMENT PLANS. COPIES OF THE INSPECTION REPORTS WILL BE SUBMITTED TO THE OWNER AND INCLUDE DOCUMENTATION OF REMEDIAL ACTION TO ADDRESS SYSTEM FAILURES. THE REPORTS SHALL BE MADE AND RETAINED AS PART OF THE STORM WATER POLLUTION PREVENTION PLAN FOR AT LEAST THREE YEARS FROM THE DATE THAT THE SITE IS FINALLY STABILIZED AND THE NOTICE OF TERMINATION IS SUBMITTED. THE REPORTS SHALL IDENTIFY ANY INCIDENTS OF NON-COMPLIANCE. 4.THE CONTRACTOR WILL PROVIDE THE OWNER A COPY OF THE NPDES PERMIT AND THE SWPPP. INSPECTION AND MAINTENANCE REQUIREMENTS EROSION AND SEDIMENT CONTROL INSPECTION AND MAINTENANCE PRACTICES THE FOLLOWING ARE INSPECTION AND MAINTENANCE PRACTICES THAT WILL BE USED TO MAINTAIN EROSION AND SEDIMENT CONTROLS: 1.ALL TURBIDITY CONTROL MEASURES WILL BE MAINTAINED IN GOOD WORKING ORDER; IF A REPAIR IS NECESSARY, IT WILL BE INITIATED WITHIN 24 HOURS OF REPORT. 2.BUILT UP SEDIMENT WILL BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD THE HEIGHT OF THE FENCE. 3.SILT FENCE WILL BE INSPECTED FOR DEPTH OF SEDIMENT, TEARS, TO SEE IF THE FABRIC IS SECURELY ATTACHED TO THE FENCE POSTS, AND TO SEE THAT THE FENCE POSTS ARE FIRMLY IN THE GROUND. 4.CONSTRUCTION ENTRANCES WILL BE INSPECTED FOR DEPTH OF CRUSHED STONE BED AND FILTER FABRIC CONDITION. 5.THE SEDIMENT BASINS WILL BE INSPECTED FOR DEPTH OF SEDIMENT, AND BUILT UP SEDIMENT WILL BE REMOVED WHEN IT REACHES 10 PERCENT OF THE DESIGN CAPACITY OR AT THE END OF THE JOB. 6.DIVERSION DIKES/SWALES WILL BE INSPECTED AND ANY BREACHES PROMPTLY REPAIRED. 7.TEMPORARY AND PERMANENT SEEDING AND PLANTING WILL INSPECTED FOR BARE SPOTS, WASHOUTS, AND HEALTHY GROWTH. UPDATING REQUIREMENTS 1.THE STORMWATER POLLUTION PREVENTION PLANS (SWPPP) AND EROSION AND SEDIMENT CONTROL (E&SC) PLANS CONTAINED HEREIN PROVIDE ONLY THE INITIAL AND MINIMUM REQUIREMENTS, AND PROJECT SPECIFIC STRUCTURAL BMPS NECESSARY FOR THIS PROJECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MODIFY AND UPDATE THESE PLANS ACCORDING TO THEIR OPERATIONS ON SITE. IN ADDITION, THE CONTRACTOR SHALL REVISE THESE DOCUMENTS: a)WITHIN SEVEN CALENDAR DAYS FOLLOWING AN INSPECTION WHEN ADDITIONS AND/OR MODIFICATIONS TO BMPS ARE NECESSARY TO CORRECT OBSERVED PROBLEMS. b)WHENEVER A CHANGE IN THE DESIGN, CONSTRUCTION, OPERATION, OR MAINTENANCE AT THE CONSTRUCTION SITE HAS A SIGNIFICANT EFFECT ON THE DISCHARGE OF POLLUTANTS TO THE WATERS OF THE UNITED STATES NOT PREVIOUSLY ADDRESSED IN THE DOCUMENTS. c)WHENEVER DISCHARGES ARE CAUSING WATER QUALITY “EXCEEDANCES” (AN EPA TERM) OR THE BMPS ARE INEFFECTIVE (TO AN EXTENT PRACTICAL) IN MINIMIZING POLLUTANTS IN STORMWATER DISCHARGING FROM THE CONSTRUCTION SITE. Page 278 of 576 J: \ E N G \ F L \ O C O E E \ 2 1 7 8 7 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 1 \ _ D R A W I N G S \ C I V \ 2 1 7 8 7 - C S - S W P P N O T E S I I . D W G | 21 7 8 7 - C S - S W P P N o t e s I I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 4 / 2 0 2 6 5 : 3 1 : 2 9 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : DA N I E L . M E T Z 5/ 5 / 2 0 2 5 1 0 : 5 6 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 ST O R M W A T E R P O L L U T I O N P R E V E N T I O N N O T E S I I CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 1 C-9                D. M E T Z 21 7 8 7 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   EROSION AND SEDIMENT CONTROL NOTES AND REQUIREMENTS GENERAL REQUIREMENTS 1.THIS PLAN UTILIZES BEST MANAGEMENT PRACTICES TO CONTROL EROSION AND TURBIDITY CAUSED BY STORM WATER RUN OFF. AN EROSION CONTROL PLAN HAS BEEN PREPARED TO INSTRUCT THE CONTRACTOR ON PLACEMENT OF THESE CONTROLS. IT IS THE CONTRACTORS RESPONSIBILITY TO INSTALL AND MAINTAIN THE CONTROLS AS PER PLAN AS WELL AS ENSURING THE PLAN IS PROVIDING THE PROPER PROTECTION AS REQUIRED BY FEDERAL, STATE, AND LOCAL LAWS. REFER TO THESE EROSION AND SEDIMENT STABILIZATION PRACTICES FOR THE CONTROLS THAT MAY BE IMPLEMENTED. 2.THE CONTRACTOR SHALL AT A MINIMUM IMPLEMENT THE CONTRACTOR'S REQUIREMENTS OUTLINED HEREIN AND THOSE MEASURES SHOWN IN THE PLANS. IN ADDITION, THE CONTRACTOR SHALL UNDERTAKE ADDITIONAL MEASURES REQUIRED FOR COMPLIANCE WITH APPLICABLE PERMIT CONDITIONS AND STATE WATER QUALITY STANDARDS DEPENDING ON THE NATURE OF MATERIALS AND METHODS OF CONSTRUCTION. THE CONTRACTOR SHALL APPLY FOR AND COMPLY WITH A FLORIDA NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY. THE CONTRACTOR SHALL OBTAIN WATER MANAGEMENT DISTRICT APPROVAL FOR DEWATERING PER FAC 40C22. 3.THE CONTRACTOR WILL BE RESPONSIBLE FOR APPLYING FOR AND PAYING FOR THE PERMIT FEE FOR THE NOTICE OF INTENT (NOI) AND THE NOTICE OF TERMINATION (NOT) FORMS. 4.TIMING OF CONTROLS/MEASURES. AS INDICATED IN THE SEQUENCE OF MAJOR ACTIVITIES, THE SILT FENCES AND HAY BALES, STABILIZED CONSTRUCTION ENTRANCE AND SEDIMENT BASINS WILL BE CONSTRUCTED PRIOR TO CLEARING OR GRADING OF ANY OTHER PORTIONS OF THE SITE. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICAL IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED. AFTER THE ENTIRE SITE IS STABILIZED, THE ACCUMULATED SEDIMENT SHALL BE REMOVED FROM THE SEDIMENT BASINS AND THE EARTH BERM/SWALES REGRADED/REMOVED AND STABILIZED IN ACCORDANCE WITH THE EROSION CONTROL PLAN. 5.IT IS THE CONTRACTOR'S RESPONSIBILITY TO IMPLEMENT THE EROSION AND TURBIDITY CONTROLS AS SHOWN ON THE SEDIMENT AND EROSION CONTROL PLAN. IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THESE CONTROLS ARE PROPERLY INSTALLED, MAINTAINED AND FUNCTIONING PROPERLY TO PREVENT TURBID OR POLLUTED WATER FROM LEAVING THE PROJECT SITE. THE CONTRACTOR WILL ADJUST THE EROSION CONTROL PLAN AND ADD ADDITIONAL CONTROL MEASURES, AS REQUIRED, TO ENSURE THE SITE MEETS ALL FEDERAL STATE AND LOCAL EROSION AND SEDIMENT CONTROL PLAN AND AS REQUIRED TO MEET THE SEDIMENT AND TURBIDITY REQUIREMENTS IMPOSED ON THE PROJECT SITE BY THE REGULATORY AGENCIES, AND ORANGE COUNTY CODE CHAPTER 21. EROSION AND SEDIMENT CONTROL - STABILIZATION PRACTICES 1.LOCATION OF STAKED SILT FENCE. STAKED SILT FENCE SHALL BE PLACED ALONG THE BOUNDARY OF FILL SLOPES, ALONG THE LIMITS OF CONSTRUCTION, AND AROUND ALL PROPOSED INLETS AND STRUCTURES. SILT FENCE SHALL BE USED AROUND ALL EXCAVATED MATERIAL IN THEIR TEMPORARY LOCATIONS DURING CONSTRUCTION. 2.LOCATION OF FLOATING TURBIDITY BARRIERS. FLOATING TURBIDITY BARRIERS SHALL BE PLACED DOWNSTREAM OF THE CULVERT REPLACEMENTS. 3.OFF-SITE VEHICLE TRACKING. LOADED HAUL TRUCKS SHALL BE COVERED WITH TARPAULIN. EXCESS DIRT ON THE ROAD SHALL BE REMOVED DAILY. AREAS WITHIN THE LIMITS OF CONSTRUCTION SHALL BE DAMPENED WITH WATER AS REQUIRED FOR DUST CONTROL. 4.THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTENANCE AND REPAIRS OF EROSION AND SEDIMENT CONTROL DEVICES, AND REMOVAL OF EROSION AND SEDIMENT CONTROL DEVICES AFTER THE NOTICE OF TERMINATION. MAINTENANCE AND REPAIR REQUIRED FOR THE CONTROL AND ABATEMENT OF EROSION AND WATER POLLUTION SHALL BE INCLUDED IN THE PROJECT COST. 5.DISTURBED, GRADED OR REGRADED AREAS SHALL BE STABILIZED IMMEDIATELY AFTER GRADING IS COMPLETE, OR WITHIN 7 DAYS IF SUCH AREAS ARE TO REMAIN IDLE FOR MORE THAN 7 DAYS. 6.STRAW BALE BARRIER: STRAW BALE BARRIERS CAN BE USED BELOW DISTURBED AREAS SUBJECT TO SHEET AND RILL EROSION WITH THE FOLLOWING LIMITATIONS: A.WHERE THE MAXIMUM SLOPE BEHIND THE BARRIER IS 33 PERCENT. B.IN MINOR SWALES OR DITCH LINES WHERE THE MAXIMUM CONTRIBUTING DRAINAGE AREA IS NO GREATER THAN 2.0 ACRES. C.WHERE EFFECTIVENESS IS REQUIRED FOR LESS THAN 3 MONTHS. D.EVERY EFFORT SHOULD BE MADE TO LIMIT THE USE OF STRAW BALE BARRIERS CONSTRUCTED IN LIVE STREAMS OR IN SWALES WHERE THERE IS THE POSSIBILITY OF A WASHOUT. IF NECESSARY, MEASURES SHALL BE TAKEN TO PROPERLY ANCHOR BALES TO INSURE AGAINST WASHOUT. 7.FILTER FABRIC BARRIER: FILTER FABRIC BARRIERS CAN BE USED BELOW DISTURBED AREAS SUBJECT TO SHEET AND RILL EROSION WITH THE FOLLOWING LIMITATIONS: a.WHERE THE MAXIMUM SLOPE BEHIND THE BARRIER IS 33 PERCENT. b.IN MINOR SWALES OR DITCH LINES WHERE THE MAXIMUM CONTRIBUTING DRAINAGE AREA IS NO GREATER THAN 2.0 ACRES. 8.BRUSH BARRIER WITH FILTER FABRIC: BRUSH BARRIER MAY BE USED BELOW DISTURBED AREAS SUBJECT TO SHEET AND RILL EROSION WHERE ENOUGH RESIDUE MATERIAL IS AVAILABLE ON SITE. 9.LEVEL SPREADER: A LEVEL SPREADER MAY BE USED WHERE SEDIMENT-FREE STORM RUNOFF IS INTERCEPTED AND DIVERTED AWAY FROM THE GRADED AREAS ONTO UNDISTURBED STABILIZED AREAS. THIS PRACTICE APPLIES ONLY IN THOSE SITUATIONS WHERE THE SPREADER CAN BE CONSTRUCTED ON UNDISTURBED SOIL AND THE AREA BELOW THE LEVEL SPREADER IS STABILIZED. THE WATER SHOULD NOT BE ALLOWED TO RECONCENTRATE AFTER RELEASE. 10.STOCKPILING MATERIAL: NO EXCAVATED MATERIAL SHALL BE STOCKPILED IN SUCH A MANNER AS TO DIRECT RUNOFF DIRECTLY OFF THE PROJECT SITE INTO ANY ADJACENT WATER BODY OR STORM WATER COLLECTION FACILITY. 11.EXPOSED AREA LIMITATION: THE SURFACE AREA OF OPEN, ERODIBLE SOIL EXPOSED BY CLEARING GRUBBING OPERATIONS OR EXCAVATION AND FILLING OPERATIONS SHALL NOT EXCEED 2.0 ACRES. THIS REQUIREMENT MAY BE WAIVED FOR LARGE PROJECTS WITH AN EROSION CONTROL PLAN WHICH DEMONSTRATES THAT OPENING OF ADDITIONAL AREA WILL NOT SIGNIFICANTLY AFFECT OFF-SITE DEPOSIT OF SEDIMENTS. 12.TEMPORARY SEEDING: AREAS OPENED BY CONSTRUCTION OPERATIONS AND THAT ARE NOT ANTICIPATED TO BE RE-EXCAVATED OR DRESSED AND RECEIVE FINAL GRASSING TREATMENT WITHIN 21 DAYS SHALL BE SEEDED WITH A QUICK GROWING GRASS. SPECIES WHICH WILL PROVIDE AN EARLY COVER DURING THE SEASON IN WHICH IT IS PLANTED AND WILL NOT LATER COMPLETE WITH THE PERMANENT GRASSING. 13.TEMPORARY SEEDING AND MULCHING: SLOPES STEEPER THAN 6:1 THAT FALL WITHIN THE CATEGORY ESTABLISHED IN PARAGRAPH 7 ABOVE SHALL ADDITIONALLY RECEIVE MULCHING OF APPROXIMATELY 150 MM LOOSE MEASURE OF MULCH MATERIAL CUT INTO THE SOIL OF THE SEEDED AREA ADEQUATE TO PREVENT MOVEMENT OF SEED AND MULCH OR HYDROMULCHED. 14.TEMPORARY GRASSING: THE SEEDED OR SEEDED AND MULCHED AREA(S) SHALL BE ROLLED AND WATERED OR HYDROMULCHED OR OTHER SUITABLE METHODS IF REQUIRED TO ASSURE OPTIMUM GROWING CONDITIONS FOR THE ESTABLISHMENT OF A GOOD GRASS COVER. 15.TEMPORARY REGRASSING: IF, AFTER 14 DAYS FROM SEEDING, THE TEMPORARY GRASSED AREAS HAVE NOT ATTAINED A MINIMUM OF 75 PERCENT GOOD GRASS COVER, THE AREA WILL BE REWORKED AND ADDITIONAL SEED APPLIED SUFFICIENT TO ESTABLISH THE DESIRED VEGETATIVE COVER. 16.MAINTENANCE: ALL FEATURES OF THE PROJECT DESIGNED AND CONSTRUCTED TO PREVENT EROSION AND SEDIMENT SHALL BE MAINTAINED DURING THE LIFE OF THE CONSTRUCTION SO AS TO FUNCTION AS THEY WERE ORIGINALLY DESIGNED AND CONSTRUCTED. 17.PERMANENT EROSION CONTROL: THE EROSION CONTROL FACILITIES OF THE PROJECT SHOULD BE DESIGNED TO MINIMIZE THE IMPACT ON THE OFFSITE FACILITIES. 18.PERMANENT SEEDING: ALL AREAS WHICH HAVE BEEN DISTURBED BY CONSTRUCTION WILL, AS A MINIMUM, BE SEEDED. THE SEEDING MIX MUST PROVIDE BOTH LONG-TERM VEGETATION AND RAPID GROWTH SEASONAL VEGETATION. SLOPES STEEPER THAN 6:1 SHALL BE SODDED. 19.WHERE SODDING IS CALLED FOR IN THE PLANS, SOD THAT IS PLACED ON SLOPES OF 3:1 OR GREATER SHALL BE PEGGED. 20.OFFSITE VEHICLE TRACKING: STABILIZED CONSTRUCTION ACCESS DRIVES SHALL BE CONSTRUCTED AT ALL POINTS ENTERING AND EXITING THE PROJECT SITE FROM PAVED ROADS. CONSTRUCTION ACCESS DRIVES SHALL HAVE A MINIMUM 6 INCH THICKNESS OF DURABLE ROCK OVER A FILTER FABRIC FREE OF TEARS AND FIRMLY SECURED. ACCESS DRIVES SHALL BE REMOVED AND RESTORED AT THE COMPLETION OF THE PROJECT. EROSION AND SEDIMENT CONTROL - WASTE AND MATERIAL CONTROLS 1.WASTE MATERIALS: ALL WASTE MATERIALS EXCEPT LAND CLEARING DEBRIS SHALL BE COLLECTED AND STORED IN A METAL DUMPSTER. THE DUMPSTER WILL MEET ALL LOCAL AND STATE SOLID WASTE MANAGEMENT REGULATIONS. THE DUMPSTER WILL BE EMPTIED AS NEEDED AND THE TRASH WILL BE HAULED TO A STATE APPROVED LANDFILL ALL PERSONNEL WILL BE INSTRUCTED REGARDING THE CORRECT PROCEDURE FOR WASTE DISPOSAL. NOTICES STATING THESE PRACTICES WILL BE POSTED AT THE CONSTRUCTION SITE BY THE CONSTRUCTION SUPERINTENDENT, THE INDIVIDUAL WHO MANAGES THE DAY-TO-DAY SITE OPERATIONS WILL BE RESPONSIBLE FOR SEEING THAT THESE PROCEDURES ARE FOLLOWED. LAND CLEARING DEBRIS CAN BE BURNED IN ACCORDANCE WITH STATE AND ORANGE COUNTY CODE CHAPTER 15. 2.HAZARDOUS WASTE: ALL HAZARDOUS WASTE MATERIALS WILL BE DISPOSED OF IN THE MANNER SPECIFIED BY LOCAL OR STATE REGULATION OR BY THE MANUFACTURER. SITE PERSONNEL WILL BE INSTRUCTED IN THESE PRACTICES AND THE SITE SUPERINTENDENT, THE INDIVIDUAL WHO MANAGES DAY-TO-DAY SITE OPERATIONS, WILL BE RESPONSIBLE FOR SEEING THAT THESE PRACTICES ARE FOLLOWED. THE CONTRACTOR SHALL PROVIDE A LIST OF TOXIC SUBSTANCES THAT ARE LIKELY TO BE USED ON THE JOB AND PROVIDE A PLAN ADDRESSING THE GENERATION, APPLICATION, MIGRATION, STORAGE, AND DISPOSAL OF THESE SUBSTANCES. 3.SANITARY WASTE: ALL SANITARY WASTE WILL BE COLLECTED FROM THE PORTABLE UNITS AS NEEDED TO PREVENT POSSIBLE SPILLAGE. THE WASTE WILL BE COLLECTED AND DISPOSED OF IN ACCORDANCE WITH STATE AND LOCAL WASTE DISPOSAL REGULATIONS FOR SANITARY SEWER OR SEPTIC SYSTEMS. 4.PAVED AREAS ADJACENT TO ALL CONSTRUCTION ACCESS POINTS SHALL BE SWEPT DAILY TO REMOVE ANY EXCESS MUD, DIRT OR ROCK TRACKED FROM THE SITE. DUMP TRUCKS HAULING MATERIAL FROM THE CONSTRUCTION SITE WILL BE COVERED WITH A TARP. 5.SPILL PREVENTION: THE FOLLOWING ARE THE MATERIAL MANAGEMENT PRACTICES THAT WILL BE USED TO REDUCE THE RISK OF SPILLS OR OTHER ACCIDENTAL EXPOSURE OF MATERIALS AND SUBSTANCES TO STORMWATER RUNOFF. a.GOOD HOUSEKEEPING: THE FOLLOWING GOOD HOUSEKEEPING PRACTICES WILL BE FOLLOWED ONSITE DURING THE CONSTRUCTION PROJECT. i.AN EFFORT WILL BE MADE TO STORE ONLY ENOUGH PRODUCT REQUIRED TO DO THE JOB. ii.ALL MATERIALS STORED ONSITE WILL BE STORED IN A NEAT, ORDERLY MANNER IN THEIR APPROPRIATE CONTAINERS AND, IF POSSIBLE, UNDER A ROOF OR OTHER ENCLOSURE. iii.PRODUCTS WILL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE ORIGINAL MANUFACTURER'S LABEL. iv.SUBSTANCES WILL NOT BE MIXED WITH ONE ANOTHER UNLESS RECOMMENDED BY THE MANUFACTURER. v.WHENEVER POSSIBLE, ALL OF A PRODUCT WILL BE USED UP BEFORE DISPOSING OF THE CONTAINER. vi.MANUFACTURER'S RECOMMENDATIONS FOR PROPER USE AND DISPOSAL WILL BE FOLLOWED. vii.THE SITE SUPERINTENDENT WILL INSPECT DAILY TO ENSURE MATERIALS ONSITE RECEIVE PROPER USE AND DISPOSAL. b.HAZARDOUS MATERIALS: THESE PRACTICES ARE USED TO REDUCE THE RISKS ASSOCIATED WITH HAZARDOUS MATERIALS. i.HAZARDOUS MATERIALS AND/OR TOXIC SUBSTANCES SHALL BE DISPOSED OF BY THE CONTRACTOR ACCORDING TO THE EPA'S STANDARD PRACTICES, THE MANUFACTURER'S RECOMMENDATION OR IN ACCORDANCE WITH STATE AND LOCAL REQURIEMENTS. ii.THE CONTRACTOR SHALL MAINTAIN COPIES OF THE MATERIAL SAFETY DATA SHEET (MSDS) FOR EACH HAZARDOUS MATERIAL PROPOSED FOR USE ON THE PROJECT. BECAUSE STATE LAW DOES NOT TREAT PETROLEUM PRODUCTS THAT ARE PROPERLY CONTAINERIZED AND INTENDED FOR EQUIPMENT USE ON THE PROJECT AS A HAZARDOUS MATERIAL, SUCH PRODUCTS DO NOT NEED A MSDS SUBMITTAL. iii.PRODUCTS WILL BE KEPT IN ORIGINAL CONTAINERS. iv.MATERIALS WILL BE STORED IN ACCORDANCE WITH ORANGE COUNTY CODE CHAPTER 32. v.ORIGINAL LABELS AND MATERIAL SAFETY DATA SHALL BE RETAINED AND AVAILABLE ON SITE. c.PRODUCT SPECIFIC PRACTICES: THE FOLLOWING PRODUCT SPECIFIC PRACTICES WILL BE FOLLOWED ONSITE: i.PETROLEUM AND LUBRICANT PRODUCTS. ALL ONSITE VEHICLES AND EQUIPMENT (I.E. - DEWATERING PUMPS) WILL BE MONITORED FOR LEAKS AND RECEIVE REGULAR PREVENTATIVE MAINTENANCE TO REDUCE THE CHANCE OF LEAKAGE. FLUID PRODUCTS WILL BE STORED IN TIGHTLY SEALED CONTAINERS WHICH ARE CLEARLY LABELED. CONTAINMENT BERMS WILL WE CONSTRUCTED AROUND ALL FUEL STORAGE TANKS USED FOR CONSTRUCTION. ANY ASPHALT SUBSTANCES USED ONSITE WILL BE APPLIED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS. ii.FERTILIZERS. FERTILIZERS USED WILL BE APPLIED ONLY IN THE MINIMUM AMOUNTS RECOMMENDED BY THE MANUFACTURER AND IN ACCORDANCE WITH ORANGE COUNTY CODE CHAPTER 15 ONCE APPLIED, FERTILIZER WILL BE WORKED INTO THE SOIL TO LIMIT EXPOSURE TO STORM WATER. STORAGE WILL BE IN A COVERED AREA. THE CONTENTS OF ANY PARTIALLY USED BAGS OF FERTILIZER WILL BE TRANSFERRED TO A SEALABLE PLASTIC BIN TO AVOID SPILLS. iii.PAINTS. ALL CONTAINERS WILL BE TIGHTLY SEALED AND STORED WHEN NOT REQUIRED FOR USE. EXCESS PAINT WILL BE PROPERLY DISPOSED OF ACCORDING TO MANUFACTURERS' INSTRUCTIONS OR STATE AND LOCAL REGULATIONS. iv.CONCRETE TRUCKS. CONCRETE TRUCKS WILL NOT BE ALLOWED TO WASH OUT OR DISCHARGE SURPLUS CONCRETE OR DRUM WASH WATER TO DITCHES, PONDS OR OTHER WATERWAYS. WASHWATER SHALL BE COLLECTED IN A TEMPORARY SETTLING POND. EROSION AND SEDIMENT CONTROL - SPILL CONTROLS 1.SPILL CONTROL PRACTICES: IN ADDITION TO THE GOOD HOUSEKEEPING AND MATERIAL MANAGEMENT PRACTICES DISCUSSED IN THIS PLAN, THE FOLLOWING PRACTICES WILL BE FOLLOWED FOR SPILL PREVENTION AND CLEANUP: A.MANUFACTURERS' RECOMMENDED METHODS FOR SPILL CLEANUP SHALL BE CLEARLY POSTED ON SITE AND SITE PERSONNEL WILL BE MADE AWARE OF THE METHODS AND POSTED LOCATION. 2.MATERIALS AND EQUIPMENT NECESSARY FOR SPILL CLEANUP WILL BE KEPT IN THE MATERIAL STORAGE AREA ONSITE. EQUIPMENT AND MATERIALS WILL INCLUDE, BUT NOT BE LIMITED TO BROOMS, DUST PANS, MOPS, RAGS, OIL BLANKETS, GLOVES, GOGGLES, LIQUID ABSORBENT (I.E. KITTY LITTER OR EQUAL), SAND SAWDUST, AND PLASTIC AND METAL TRASH CONTAINERS SPECIFICALLY FOR THIS PURPOSE. ALL SPILLS WILL BE CLEANED UP IMMEDIATELY AFTER DISCOVERY, BY THE CONTRACTOR. 3.THE SPILL AREA WILL BE KEPT WILL VENTILATED AND PERSONNEL WILL WEAR APPROPRIATE PROTECTIVE CLOTHING TO PREVENT INJURY FROM CONTACT WITH A HAZARDOUS SUBSTANCE. 4.SPILL OF TOXIC OR HAZARDOUS MATERIAL WILL BE REPORTED IMMEDIATELY TO OWNER AND ENGINEER. 5.THE SPILL PREVENTION PLAN WILL BE ADJUSTED TO INCLUDE MEASURES TO PREVENT THIS TYPE OF SPILL FROM REOCCURRING AND HOW TO CLEAN UP THE SPILL IF THERE IS ANOTHER ONE. A DESCRIPTION OF THE SPILL, WHAT CAUSED IT AND THE CLEANUP MEASURES WILL ALSO BE INCLUDED. 6.THE SITE SUPERINTENDENT RESPONSIBLE FOR THE DAY-TO-DAY SITE OPERATIONS SHALL BE THE SPILL PREVENTION AND CLEANUP COORDINATOR. HE/SHE SHALL DESIGNATE AT LEAST ONE OTHER SITE PERSONNEL, WHO WILL RECEIVE SPILL PREVENTION AND CLEANUP TRAINING. THESE INDIVIDUALS SHALL EACH BECOME RESPONSIBLE FOR A PARTICULAR PHASE OF PREVENTION AND CLEANUP, THE NAMES OF RESPONSIBLE SPILL PERSONNEL WILL BE POSED IN THE MATERIAL STORAGE AREA AND IF APPLICABLE, IN THE OFFICE TRAILER ONSITE. Page 279 of 576 J: \ E N G \ F L \ O C O E E \ 2 1 7 8 7 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 1 \ _ D R A W I N G S \ C I V \ 2 1 7 8 7 - C S - S W P P D E T A I L S . D W G | 21 7 8 7 - C S - S W P P D e t a i l s | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 4 / 2 0 2 6 5 : 3 1 : 4 3 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : DA N I E L . M E T Z 5/ 5 / 2 0 2 5 1 0 : 5 6 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 ST O R M W A T E R P O L L U T I O N P R E V E N T I O N D E T A I L S CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 1 C-10                D. M E T Z 21 7 8 7 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   SECTION B SECTION A SECTION BSECTION A JOINING SILT FENCE SECTIONS SCALE: "NTS" SILT FENCE INSTALLATION DETAIL SCALE: NTS 6'-0"(MAX)6'-0"(MAX) 2' - 6 " 1' - 0 " (M I N ) 3' - 6 " ( M I N ) 3'-0" WIRE REINFORCED SILTATION FABRIC W/ WIRE MESH BACKING ATTACHED TO WOOD POST EXCAVATE TRENCH FOR MIN 6"-OVERLAP FABRIC AND BACKFILL WITH EXCAVATED MATERIALS WOOD POSTS EXISTING GRADE COUPLER POLES RUNOFF FABRIC WIDT H = W L E N G T H = L DE P T H = D NOTE: INSTALL SILT SACK PER MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS. EMPTY OR REMOVE SEDIMENT FROM SILT SACK WHEN RESTRAINT CORD IS NO LONGER VISIBLE. CLEAN, RINSE, AND REPLACE AS NEEDED. SILT SACK CATCH BASIN INLET SCALE: NTS 1" REBAR FOR LIFTING AND REMOVAL DUMP STRAPPING, TYP SILT SACK AREA TO BE PROTECTED WATER FLOW WORK AREA AREA TO BE PROTECTED NOTES: 1.ALL MATERIAL TO MEET SPECIFICATIONS 2.SILT SOCK COMPOST/SOIL/ROCK/SEED FILL TO MEET APPLICATION REQUIREMENTS 3.SILT SOCK DEPICTED IS FOR MINIMUM SLOPES. GREATER SLOPES MAY REQUIRE LARGER SOCKS PER THE ENGINEER 4.COMPOST MATERIAL TO BE DISPERSED ON SITE, AS DETERMINED BY ENGINEER. WORK AREA COMPOST SILT SOCK SCALE: NTS SECTION PLAN 3' - 4 " 12 " ± COMPOST SILT SOCK STAKE ON 10' LINEAL SPACING 2"x2' WOODEN STAKE SILT SOCK (12" TYP) Page 280 of 576 J: \ E N G \ F L \ O C O E E \ 2 1 7 8 7 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 1 \ _ D R A W I N G S \ C I V \ 2 1 7 8 7 - C S - S E P A R A T I O N T A B L E . D W G | 21 7 8 7 - C S - S e p a r a t i o n T a b l e | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 4 / 2 0 2 6 5 : 3 1 : 5 8 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 12 / 8 / 2 0 2 5 9 : 5 1 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 SE P A R A T I O N T A B L E S CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 1 C-11                D. M E T Z 21 7 8 7 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   NOTES: 1.ELEVATION IS APPROXIMATE AND NEEDS TO BE FIELD VERIFIED. SEPARATION TABLE STUB OUT SEPARATION TABLE Sheet Number Crossing Number Stationing Pipe Being Crossed Pipe Material Pipe Size (in)Top of Pipe EL Bottom of Pipe EL Proposed Separation to GS (ft)Proposed top EL of GS Minimum Seperation (ft) C-5 1 20+12.89 Storm Drain RCP 18 123.00 121.50 4.77 116.73 1.0 C-5 2 20+12.89 Water Main (1)PVC 6 120.00 119.50 2.77 116.73 1.5 C-5 3 20+21.39 Storm Drain RCP 18 122.93 121.43 4.65 116.78 1.0 C-5 4 30+18.85 Force Main (1)DI 20 123.05 121.38 2.84 118.54 1.0 C-5 5 30+19.62 UGFBO (1)Cable 0.5 123.05 123.01 4.47 118.54 1.0 C-5 6 40+08.36 Gas (1)PVC 2 123.64 123.47 3.98 119.49 1.0 C-5 7 40+14.29 Water Main (1)PVC 6 124.41 123.91 4.38 119.53 1.5 C-5 8 40+14.29 Storm Drain RCP 18 122.41 120.91 1.38 119.53 1.0 C-5 9 50+05.94 Gas (1)PVC 2 123.80 123.63 3.56 120.07 1.0 C-5 10 50+16.70 Water Main (1)PVC 6 123.05 122.55 2.47 120.08 1.5 Sheet Number Crossing Number Stationing Pipe Being Crossed Pipe Material Pipe Size (in)Top of Pipe EL Bottom of Pipe EL Proposed Separation to GS (ft)Proposed top EL of GS Minimum Seperation (ft) C-2 1 1+55.2 Storm Drain CMP 18 123.41 121.91 6.16 115.75 1 C-2 2 1+66.79 Water Main (1)DI 6 123.14 122.64 6.70 115.94 1.5 C-2 3 1+68.15 Storm Drain CMP 24 123.55 121.55 5.78 115.77 1 C-2 4 2+13.94 UGFBO (1)Cable 0.5 123.05 123.01 6.56 116.45 1 C-2 5 2+41.99 Force Main DI 20 122.98 121.31 4.78 116.53 1 C-2 6 5+42.30 UGFBO (1)Cable 0.5 122.70 122.66 3.50 119.16 1 C-2 7 5+98.40 UGFBO (1)Cable 0.5 122.73 122.69 3.24 119.45 1 C-3 8 7+44.84 Storm Drain (1)RCP 36 124.23 121.23 1.23 120.00 1 C-3 9 7+56.06 UGFBO (1)Cable 0.5 122.80 121.23 1.13 120.10 1 C-3 10 10+43.54 Storm Drain (1)CMP 15 124.47 123.22 2.32 120.90 1 C-3 11 11+82.51 Storm Drain (1)RCP 18 124.97 123.47 1.52 121.95 1 C-3 12 11+88.17 UGFBO (1)Cable 0.5 122.84 122.80 1.32 121.48 1 C-3 13 12+36.13 UGFBO (1)Cable 0.5 123.05 123.01 1.26 121.75 1 Page 281 of 576 N PENSACOLA TALLAHASSEE JACKSONVILLE ORLANDO MIAMI TAMPA FLORIDA CITY OF OCOEE, FLORIDA CONTRACT DRAWINGS FOR LAKEWOOD AVENUE NORTH GRAVITY SEWER PHASE 2 AMENDED CONTRACT DOCUMENTS WP PROJECT No. 21788 LOCATION PLAN SCALE: 1"=15,000' ---COVER SHEET C-001 GENERAL NOTES, LEGEND, ABBREVIATIONS AND KEY PLAN C-100 PROPOSED WATER MAIN PLAN AND PROFILE STA 0+00 TO STA 1+50 C-101 PROPOSED WATER MAIN PLAN AND PROFILE STA 1+50 TO STA 7+00 C-102 PROPOSED WATER MAIN PLAN AND PROFILE STA 7+00 TO STA 13+00 C-103 PROPOSED WATER MAIN PLAN AND PROFILE STA 13+00 TO STA 19+00 C-104 PROPOSED WATER MAIN PLAN AND PROFILE STA 19+00 TO STA 25+00 C-105 PROPOSED WATER MAIN PLAN AND PROFILE STA 25+00 TO STA 29+50 C-201 PROPOSED GRAVITY SEWER PLAN AND PROFILE STA 14+25 TO STA 20+25 C-202 PROPOSED GRAVITY SEWER PLAN AND PROFILE STA 20+25 TO STA 26+25 C-203 PROPOSED GRAVITY SEWER PLAN AND PROFILE STA 26+25 TO STA 32+25 C-204 PROPOSED GRAVITY SEWER PLAN AND PROFILE STA 32+25 TO STA 33+75 C-211 STUB-OUT AND FORCE MAIN PLANS AND PROFILES I C-212 STUB-OUT AND FORCE MAIN PLANS AND PROFILES II C-221 LIFT STATION 46 DEMOLITION PLAN C-301 DETAILS I C-302 DETAILS II C-303 DETAILS III C-304 DETAILS IV C-305 DETAILS V C-401 STORMWATER POLLUTION PREVENTION NOTES I C-402 STORMWATER POLLUTION PREVENTION NOTES II C-403 STORMWATER POLLUTION PREVENTION DETAILS C-501 SEPARATION TABLES 407.906.1776 | www.wright-pierce.com DRAWING INDEX GENERAL CIVIL PROJECT LOCATION OCOEE MARCH 2026 CITY OF OCOEE 1 N BLUFORD AVE, OCOEE, FL 34761 407-905-3100 MAYOR:RUSTY JOHNSON DISTRICT 1 COMMISSIONER: SCOTT R. KENNEDY DISTRICT 2 COMMISSIONER: ROSEMARY WILSEN DISTRICT 3 COMMISSIONER: RICHARD FIRSTNER DISTRICT 4 COMMISSIONER: GEORGE OLIVER III CITY MANAGER: CRAIG SHADRIX ASSISTANT CITY MANAGER: MICHAEL RUMER CITY OF OCOEE UTILITIES DEPARTMENT 1800 A.D. MIMS ROAD, OCOEE, FL, 34761 407-905-3159 DIRECTOR:JENNIFER BOLLING, P.E. ASSISTANT DIRECTOR:TRENT HOPPER Page 282 of 576 PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1545170.7030 E:482058.1970 ELEV:130.40' (NAVD 1988) PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1545497.1210 E:482028.4270 ELEV:132.68' (NAVD 1988) PROJECT BENCHMARK SET NAIL & DISK L&S LB 7829 N:1546051.7920 E:482123.7180 ELEV:139.72' (NAVD 1988) PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1546358.9390 E:482064.2430 ELEV:142.01' (NAVD 1988) PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1546773.1960 E:482015.0010 ELEV:144.71' (NAVD 1988) CO CO CO CO CO CO COCO CO CO CO CO CO CO CO CO COCO COCO C-201 C-202 C-203 C-204C-101 C-102 C-103 C-104 C-105 LA U R E L R I D G E A V E N U E 16 T H A V E N U E 15 T H A V E N U E WU R S T R O A D ( F ) 14 T H A V E N U E ( P ) 17 T H A V E N U E NORTH LAKEWOOD AVENUE (OCOEE CLARCONA ROAD) CL I N G E R C O V E R O A D SE C U R I T Y C I R C L E MO B I L E L A N E LY M A N S T R E E T ( F ) BU R N T T R E E C O U R T PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1544881.6580 E:482058.2010 ELEV:127.89' (NAVD 1988) PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1543687.5510 E:482075.0300 ELEV:126.20' (NAVD 1988) PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1544507.0780 E:482027.9150 ELEV:125.44' (NAVD 1988) PROJECT BENCHMARK SET NAIL & DISK L&S LB 7829 N:1544174.3590 E:482061.4690 ELEV:125.22' (NAVD 1988) C-100 J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - G E N E R A L N O T E S . D W G | 21 7 8 8 - C S - G e n e r a l N o t e s | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 6 / 2 0 2 6 3 : 0 9 : 1 5 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 1/ 1 9 / 2 0 2 6 2 : 2 1 P M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 GE N E R A L N O T E S , L E G E N D , A B B R E V I A T I O N S A N D K E Y P L A N CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2 C-001                D. M E T Z 21 7 8 8 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   LEGEND PROPERTY/ROW LINE SETBACK LINE EASEMENT LINE CONTOUR122 LIMIT OF WORK SILT FENCE SPOT ELEVATION UNDERGROUND ELECTRIC OVERHEAD ELECTRIC DRAINAGE FLOW SEWER RIPRAP SIGN TEMPORARY BENCH MARK BUILDING STONE WALL CULVERT12" CMP SURVEY CONTROL POINT IRON PIPE/REBAR DRILLHOLE MONUMENT SEWER MANHOLE DRAINAGE MANHOLE CATCH BASIN SHUTOFF VALVE HYDRANT EXISTING EDGE OF PAVEMENT EDGE OF GRAVEL RETAINING WALL SEWER FORCE MAIN GAS STORM DRAIN WATER G G UGE UGE UTILITY POLE UTILITY POLE W/ GUY LIGHT POLE UTILITY POLE W/ LIGHT BOLLARD CONIFEROUS TREE DECIDUOUS TREE SHRUB TEST PIT TEST BORING TEST PROBE MONITORING WELL TELEPHONE MANHOLE ELECTRIC MANHOLE PAVEMENT MARKINGS CENTERLINE WATER SERVICE SHUTOFF YARD HYDRANT DRAINAGE SWALE CURBING GUARDRAIL UNDERDRAINUDUD MATCHLINE MAILBOX TREELINE CHAIN LINK FENCE STOCKADE FENCE BARB WIRE FENCExx EDGE OF CONCRETE 8" 4" 4" 15" 6" FLAGPOLE 124.6 8" OHE OHE CBCB DMH MB SMH EMH TMH B TP P MW T UNDERGROUND TELEPHONEUGTUGT UNDERGROUND CABLE TVCATVCATV CB GAS GAS SERVICE SHUTOFF GAS GATE VALVEG PROPOSED 4"FM 8"S 8"W 15"SD 12" CMP 4"G 6"UD x 123 UGE UGE OHE OHE x 134.5 SMH DMH CB CB EMH TMH x UGT UGT CATV CATV CIVIL ABBREVIATIONS KEY PLAN SCALE: 1"=150'N 1500 300 GENERAL NOTES 1.THE OWNER WILL BE RESPONSIBLE FOR OBTAINING THE PERMITS LISTED IN THE GENERAL REQUIREMENTS (01001). IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO BE FAMILIAR WITH THE APPLICABLE PROVISIONS OF EACH PERMIT AS THEY APPLY TO THE WORK PRIOR TO BIDDING AND ABIDE BY THOSE PROVISIONS DURING CONSTRUCTION . COPIES OF ALL OBTAINED PERMITS ARE AVAILABLE FOR REVIEW FROM THE OWNER. ALL OTHER PERMITS ARE THE RESPONSIBILITY OF THE CONTRACTOR. 2.THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING TRAFFIC FLOW AT ALL TIMES. CONTRACTOR SHALL INSTALL AND MAINTAIN TRAFFIC CONTROL SIGNS IN ACCORDANCE WITH THE MUTCD (MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES) AND ALL STATE AND LOCAL REGULATIONS. THE CONTRACTOR IS REQUIRED TO SUBMIT A TRAFFIC CONTROL PLAN TO THE OWNER PRIOR TO COMMENCING CONSTRUCTION. THE POLICE DEPARTMENT AND FIRE DEPARTMENT ARE TO BE NOTIFIED AT LEAST 24-HOURS IN ADVANCE OF ANY STREET CLOSING OR DETOUR. REFER TO SPECIFICATION SECTION 01570. 3.CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE REGULATIONS OF THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA). 4.CONTRACTOR SHALL COMPLY WITH THE COORDINATION REQUIREMENTS AND RELATED COSTS, IF ANY, AS SPECIFIED IN SPECIFICATION SECTION 01050. 5.STANDARD CONSTRUCTION HOURS: CONSTRUCTION ACTIVITIES SHALL BE PERMITTED BETWEEN 10:00 AM AND 8:00 PM, MONDAY THROUGH FRIDAY. MAINTENANCE OF TRAFFIC (MOT) SETUP: MOT SETUP MAY BEGIN NO EARLIER THAN 9:00 AM. SEASONAL ADJUSTMENT (JUNE 1ST – AUGUST 1ST): DURING THE PERIOD FROM JUNE 1ST THROUGH AUGUST 1ST, CONSTRUCTION ACTIVITIES MAY BEGIN AT 7:00 AM AND SHALL END NO LATER THAN 7:00 PM. 6.CONTRACTOR SHALL NOTE THAT, IN GENERAL, ALL EXISTING CONDITION INFORMATION ON THE DRAWINGS ARE SHOWN WITH A LIGHTER LINE WEIGHT AND WITH A SLANTED TYPE TEXT. 7.ALL EXISTING SEWER AND STORM DRAIN LINES ENCOUNTERED DURING CONSTRUCTION ARE TO REMAIN IN SERVICE. ANY EXISTING SEWERS, STORM DRAIN LINES OR CULVERTS DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER, EXCEPT WHEN IN DIRECT CONFLICT WITH THE NEW SEWER OR WHEN NOT SHOWN OR INDICATED. 8.ALL STRUCTURES AND PIPELINES LOCATED ADJACENT TO TRENCH EXCAVATION SHALL BE PROTECTED AND FIRMLY SUPPORTED BY THE CONTRACTOR UNTIL THE TRENCH IS BACKFILLED. INJURY TO ANY SUCH STRUCTURES CAUSED BY OR RESULTING FROM THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE . ALL UTILITIES REQUIRING REPAIR, RELOCATION OR ADJUSTMENT AS A RESULT OF THE PROJECT SHALL BE COORDINATED THROUGH THE RESPECTIVE UTILITY. 9.ALL TEST PITS SHALL BE EXCAVATED PRIOR TO CONSTRUCTION LAYOUT AND RESULTS REPORTED TO THE ENGINEER FOR REVIEW FOR CONFORMANCE WITH THE PLANS. TESTS PITS ARE REQUIRED WHERE SHOWN ON THE DRAWINGS AND AS DIRECTED BY THE ENGINEER. TEST PITS WILL BE DUG AT LEAST 10 CALENDAR DAYS PRIOR TO CONNECTING PROPOSED SEWERS TO EXISTING SEWERS. THE RESULTS OF TEST PITS DUG TO DETERMINE EXISTING SEWER ELEVATIONS AND LOCATIONS WILL BE REPORTED TO THE ENGINEER AT LEAST 10 CALENDAR DAYS PRIOR TO ANY WORK. ADJUSTMENTS TO INVERTS. LENGTHS, AND SLOPES OF PROPOSED SEWER MAY BE REQUIRED AS DIRECTED BY THE ENGINEER. THE HORIZONTAL ALIGNMENT OF THE NEW SEWERS AND FORCE MAINS MAY BE ADJUSTED IN THE FIELD SUBJECT TO PRIOR APPROVAL OF THE ENGINEER. 10.INITIAL PAVING SHALL BE CONDUCTED WITHIN TWO WEEKS OF COMPLETION OF PLACEMENT OF FINAL BACKFILL UNLESS OTHERWISE AUTHORIZED BY ENGINEER. INITIAL PAVEMENT SHALL BE INSTALLED AND MAINTAINED BY CONTRACTOR FOR A MINIMUM PERIOD OF TWO MONTHS BEFORE FINAL PAVEMENT IS PLACED. FINAL PAVEMENT MAY BE PLACED OVER THE INITIAL PAVING PROVIDED INITIAL PAVING COURSE IS IN GOOD REPAIR. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING AND SHIMMING THE INITIAL PAVEMENT AS NECESSARY TO ACCEPT THE FINAL PAVING COURSE. IF CONDITIONS WARRANT, THE CONTRACTOR MAY BE REQUIRED TO REMOVE AND REPLACE INITIAL PAVING PRIOR TO FINAL PAVING. 11.ALL IMPROVEMENTS SHALL BE IN CONFORMANCE WITH THE CURRENT CITY OF OCOEE ENGINEERING STANDARDS MANUAL, MATERIALS LIST, AND DETAILS. 12.ANY DEVIATION FROM THE CITY OF OCOEE ENGINEERING STANDARDS MUST BE REQUESTED AND APPROVED IN WRITING PRIOR TO CONSTRUCTION. 13.THE MOST STRINGENT STANDARDS BETWEEN THE CITY OF OCOEE AND FDEP STANDARDS SHALL BE FOLLOWED FOR ALL PUBLIC UTILITIES. 14.CONTRACTOR SHALL REFER TO THE CITY OF OCOEE ENGINEERING STANDARDS MANUAL, LAND DEVELOPMENT CODE, APPROVED MATERIALS LIST, AND CITY DETAILS. THE MOST STRINGENT STANDARDS BETWEEN THE CITY OF OCOEE STANDARDS AND STANDARDS SET FORTH IN THESE NOTES SHALL BE FOLLOWED. WHEN CROSSING INTO ORANGE COUNTY ROW, REFER TO ORANGE COUNTY'S STANDARD ENGINEERING STANDARDS MANUAL. 15.AS-BUILTS NEED TO BE SUBMITTED TO THE CITY, SIGNED AND SEALED BY A FLORIDA REGISTERED SURVEYOR IN ACCORDANCE WITH SECTION 3.01.05 OF THE ENGINEERING STANDARDS MANUAL IN THE FOLLOWING FORMATS: a.ONE PDF COPY b.ONE CAD COPY DRAWN IN STATE PLANE COORDINATES 15.ON SHEETS C-203 AND C-204, NATURAL ATTENUATION DEFAULT CONCENTRATION (NADC) REFERS TO THE AMOUNT OF CONCENTRATION SPREAD WITH ONLY NATURAL REMEDIATION. GROUNDWATER CLEANUP TARGET LEVEL (GCTL) REFERS TO THE CALCULATED AREA OF POSSIBLE GROUNDWATER DISCHARGE INTO SURFACE WATER. SEE ATTACHED REPORT IN APPENDIX A FOR MORE INFORMATION REGARDING THE CONTAMINATION PLUME. EXISTING SITE CONDITIONS 1.THE LOCATIONS OF UNDERGROUND UTILITIES AND STRUCTURES, AS SHOWN ON THE DRAWINGS, ARE APPROXIMATE AND MAY NOT BE COMPLETE. NO GUARANTEE IS MADE THAT UTILITIES OR STRUCTURES WILL BE ENCOUNTERED WHERE SHOWN, OR THAT ALL UNDERGROUND UTILITIES AND STRUCTURES ARE SHOWN. ALL LOCATIONS AND SIZES OF EXISTING UTILITIES AND STRUCTURES SHALL BE VERIFIED IN THE FIELD WITH TEST PITS AS REQUIRED PRIOR TO BEGINNING CONSTRUCTION OF NEW FACILITIES OR PIPING THAT MAY BE AFFECTED. THE CONTRACTOR WILL REALIGN NEW PIPE LOCATIONS AS REQUIRED TO CONFORM TO EXISTING LINES AND AS APPROVED BY THE ENGINEER. 2.BELOW GRADE UTILITY INFORMATION IS BASED ON INFORMATION PROVIDED BY EACH UTILITY. LOCATION OF PUBLIC UTILITIES SHOWN IS ONLY APPROXIMATE AND MAY NOT BE COMPLETE. PRIVATE UNDERGROUND UTILITIES SUCH AS, BUT NOT LIMITED TO, SEWER LINES, WATER LINES AND BURIED ELECTRICAL SERVICE ENTRANCES ARE NOT SHOWN. THE CONTRACTOR SHALL ASCERTAIN THE LOCATION AND SIZE OF EXISTING UTILITIES IN THE FIELD WITH THE RESPECTIVE UTILITY COMPANY REPRESENTATIVE PRIOR TO COMMENCING WORK. REFER TO SPECIFICATION SECTION 01050. ADDITIONAL TEST PITS, BEYOND THOSE SHOWN, MAY BE REQUIRED. UTILITY CONTACTS ARE AS FOLLOWS: 3.HAZARDOUS ENVIRONMENTAL CONDITIONS HAVE BEEN IDENTIFIED WITHIN THE AREA OF WORK. REFER TO SPECIFICATION SECTION 01001-SC-1.15. IF THE PRESENCE OF ADDITIONAL HAZARDOUS ENVIRONMENTAL CONDITIONS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE OWNER AND THE ENGINEER IMMEDIATELY. ALL ACTIVITIES, HANDLING AND DISPOSAL OF HAZARDOUS ENVIRONMENTAL CONDITIONS AND MATERIALS SHALL BE IN ACCORDANCE WITH OSHA, FEDERAL, STATE, AND LOCAL REGULATIONS. 4.THIS PROJECT REQUIRES A PRE-CONSTRUCTION VIDEO WITH A CITY REPRESENTATIVE PRESENT. PRIOR TO SCHEDULING THE VIDEO WITH THE CITY, THE ENTIRE PROJECT SHALL BE SURVEYED, STAKED AND/OR ASPHALT PINS WITH STATION NUMBERS, FUTURE PIPE ALIGNMENT, AND END OF LATERALS AT THE RIGHT-OF-WAY LINE. VIDEO SHALL SHOW ROAD CONDITIONS, RIGHT-OF-WAY CONDITIONS, DRIVEWAYS, AND THE FIRST 25’ OF SIDE STREETS. SITE DEMOLITION 1.REFER TO THE EXISTING SITE PLAN, FOR ADDITIONAL INFORMATION REGARDING EXISTING FACILITIES. REFER TO THE LAYOUT DRAWING FOR LIMITS OF WORK. 2.REFER TO SPECIFICATION SECTION 01010A, WHICH CONTAINS INFORMATION ON CONSTRAINTS OF CONSTRUCTION SEQUENCING. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND DISPOSING OF ALL DEMOLISHED PIPING, EQUIPMENT AND MATERIALS. DISPOSAL SHALL BE IN ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS. 4.THE CONTRACTOR SHALL KEEP A RECORD OF DEMOLITION AS PART OF THE PROJECT RECORD DOCUMENTS IN ACCORDANCE WITH SPECIFICATION SECTION 01720. 5.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE APPROPRIATE DISPOSAL OF FLOWS RESULTING FROM PRECIPITATION AND GROUNDWATER DEWATERING OPERATIONS. SITE CLEARING, GRUBBING AND GRADING 1.CONTRACTOR SHALL PROVIDE PROPER EROSION CONTROL AND DRAINAGE MEASURES IN ALL AREAS OF WORK, AND CONFINE SOIL SEDIMENT TO WITHIN THE LIMITS OF EXCAVATION AND GRADING. PRIOR TO BEGINNING EXCAVATION WORK, EROSION CONTROL FENCE SHALL BE INSTALLED AT THE DOWN GRADIENT PERIMETER OF THE ACTUAL LIMITS OF GRADING, AND AS SHOWN ON THE DRAWINGS. EROSION CONTROL MEASURES SHOWN ON THE DRAWINGS ARE A MINIMUM, CONTRACTOR SHALL TAKE ALL OTHER NECESSARY MEASURES. EROSION CONTROL FENCE SHALL ALSO BE INSTALLED AT THE DOWN GRADIENT PERIMETER OF THE SOIL STOCKPILES. ALL DISTURBED EARTH SURFACES SHALL BE STABILIZED IN THE SHORTEST PRACTICAL TIME AND TEMPORARY EROSION CONTROL DEVICES SHALL BE EMPLOYED UNTIL SUCH TIME AS ADEQUATE SOIL STABILIZATION HAS BEEN ACHIEVED. TEMPORARY STORAGE OF EXCAVATED MATERIAL SHALL BE STABILIZED IN A MANNER THAT WILL MINIMIZE EROSION. ALL INSTALLED EROSION CONTROL FACILITIES SHALL BE REMOVED AT THE END OF THE PROJECT. REFER TO SPECIFICATION SECTION 02270. 2.ALL STORM DRAINAGE INLETS SHALL BE PROTECTED BY HAY BALE FILTERS TO PREVENT ENTRY OF SEDIMENT FROM RUNOFF WATERS DURING CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND DISPOSAL OF ALL COLLECTED SEDIMENT, AND THAT WHICH COLLECTS IN THE STORM DRAIN SYSTEM. REFER TO THE CIVIL DETAIL DRAWINGS. 3.THE GEOTECHNICAL DATA REPORT FOR THE PROJECT SITE IS INCLUDED IN APPENDIX A OF THE SPECIFICATIONS. 4.CONTRACTOR SHALL CONTROL DUST ON THE CONSTRUCTION SITE TO A REASONABLE LIMIT, AS DETERMINED BY THE ENGINEER, AND AS OUTLINED IN SPECIFICATION SECTION 01562. 5.CONTRACTOR SHALL NOT TRACK OR SPILL EARTH, DEBRIS OR OTHER CONSTRUCTION MATERIAL ON PUBLIC OR PRIVATE STREETS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE IMMEDIATE ASSOCIATED CLEAN UP. 6.ALL CATCH BASINS, MANHOLES, VALVE PITS, VALVE BOXES AND OTHER BURIED FACILITIES WITH SURFACE ACCESS SHALL BE ADJUSTED TO MATCH FINAL GRADES, UNLESS OTHERWISE INDICATED. 7.THE CONTRACTOR SHALL NOT HAVE ANY RIGHT OF PROPERTY IN ANY MATERIALS TAKEN FROM ANY EXCAVATION. SUITABLE EXCAVATED MATERIAL MAY BE INCORPORATED IN THE PROJECT, WITH EXCESS MATERIAL DISPOSED OF AT A LOCATION PROVIDED BY THE CONTRACTOR. THESE PROVISIONS SHALL IN NO WAY RELIEVE THE CONTRACTOR OF OBLIGATIONS TO PROPERLY DISPOSE OF AND REPLACE ANY MATERIAL DETERMINED BY THE ENGINEER TO BE UNSUITABLE FOR BACKFILLING. THE CONTRACTOR SHALL DISPOSE OF UNSUITABLE AND EXCESS MATERIAL IN ACCORDANCE WITH THE APPLICABLE SECTIONS OF THE CONTRACT DOCUMENTS. 8.CONTRACTOR SHALL REMOVE AND REPLACE, OR REPAIR, ALL CURBS, SIDEWALKS, PAVEMENT AND OTHER ITEMS DAMAGED BY CONSTRUCTION ACTIVITIES TO AT LEAST THEIR ORIGINAL CONDITION, TO THE SATISFACTION OF THE OWNER AND ENGINEER. 9.WHERE EXISTING PAVEMENT IS REMOVED AND REPLACED, MATCH EXISTING GRADES TO THE EXTENT POSSIBLE. COORDINATE FINE GRADING WITH THE ENGINEER. 10.ALL ROAD AND DRIVE CROSS SLOPES SHALL MATCH EXISTING PITCH. REFER TO THE CIVIL DETAIL DRAWINGS. CIVIL SITE LAYOUT 1.THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THIS PROVIDED LAYOUT INFORMATION THROUGHOUT THE COURSE OF CONSTRUCTION. REPORT ANY LAYOUT DISCREPANCIES IMMEDIATELY TO THE ENGINEER. 2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RE-ESTABLISHING AND RESETTING ALL EXISTING PROPERTY MONUMENTATION DISTURBED BY CONSTRUCTION. THIS WORK SHALL BE DONE BY A LAND SURVEYOR REGISTERED IN THE STATE OF FLORIDA, AT NO ADDITIONAL COST TO THE OWNER. 3.WRITTEN DIMENSIONS SHALL PREVAIL. DO NOT SCALE DISTANCES FROM THE DRAWINGS. REPORT ANY DISCREPANCIES IMMEDIATELY TO THE ENGINEER. 4.HORIZONTAL POSITIONS FOR ALL FEATURES SHOWN ON THE MAP ARE RELATIVE TO NORTH AMERICAN DATUM OF 1983 (NAVD83), WITH 2012 ADJUSTMENTS, STATE PLANE COORDINATE SYSTEM, FLORIDA EAST ZONE. VERTICAL ELEVATIONS ARE RELATIVE TO NORTH AMERICAN VERTICAL DATUM (NAVD 88) AND IS RELATIVE TO THE ORANGE COUNTY BENCHMARK #S695015. 5.EXISTING CONDITIONS SITE PLAN DEVELOPED FROM SURVEY DRAWING PREPARED BY L&S DIVERSIFIED, LLC, DATED JUNE 11, 2024, AND EXISTING RECORD DRAWING INFORMATION. SEWER, FORCEMAIN AND DRAIN PIPING NOTES 1.SEWER, FORCEMAIN AND DRAIN PIPING REQUIREMENTS ARE SHOWN ON THE PIPE SCHEDULE ON THE DRAWINGS, IN SPECIFICATION SECTION 15050 AND AS REFERENCED. 2.SEWER, FORCE MAIN AND DRAIN PIPE SCHEDULE (UNLESS OTHERWISE INDICATED): ·GRAVITY SEWER MAINS - PVC SDR-26 AS SPECIFIED IN SPECIFICATION SECTION 02622 3.MANHOLES ARE 4-FEET IN DIAMETER UNLESS OTHERWISE NOTED. THE TOP OF MANHOLE FRAMES SHALL BE SET FLUSH WITH FINISH GRADE, UNLESS OTHERWISE NOTED ON DRAWINGS. SEWER MANHOLE INVERTS SHOWN ON THE DRAWINGS ARE TO THE INSIDE FACE OF THE MANHOLE. 4.CONTRACTOR SHALL RE-SHAPE INVERTS AS REQUIRED WHEN CONNECTING INTO EXISTING MANHOLES. ALL TERMINAL MANHOLES (APART FROM SMH-11) SHALL HAVE A FLAT CONCRETE FLOOR POURED WITH A 1% SLOPE TO THE OUT FLOWING PIPE INVERT. 5.REFER TO SPECIFICATION SECTION 02200 FOR PIPE AND STRUCTURE BEDDING AND BACKFILL REQUIREMENTS. 6.COMPACTION TESTS WILL BE PERFORMED IN ACCORDANCE WITH SPECIFICATION SECTION 02200. ANY SETTLEMENT OCCURRING WITHIN ONE-YEAR OF FINAL COMPLETION OF THE WORK SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST. 7.OPEN TRENCHES IN THE ROADWAY MUST BE BACKFILLED AT THE END OF THE WORKDAY. 8.ALL EXISTING UTILITIES ENCOUNTERED DURING CONSTRUCTION ARE TO REMAIN IN SERVICE UNLESS OTHERWISE NOTED ON THE CIVIL EXISTING CONDITIONS AND DEMOLITION PLAN. ANY EXISTING UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 9.CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND DISPOSAL OF ALL DEMOLITION MATERIALS IN ACCORDANCE WITH SPECIFICATION SECTION 02050. 10.WHENEVER SEWER AND WATER MAINS MUST CROSS, WATER LINES SHOULD BE INSTALLED ABOVE WASTEWATER OR SLUDGE LINES. A MINIMUM SEPARATION OF 18-INCHES BETWEEN THE BOTTOM OF THE WATER LINE AND THE TOP OF THE WASTEWATER OR SLUDGE LINE SHALL BE MAINTAINED. WHERE A WATER LINE CROSSES UNDER A WASTEWATER OR SLUDGE LINE, A FULL LENGTH OF PIPE SHALL BE CENTERED ABOVE THE WATER LINE SO THAT BOTH JOINTS WILL BE AS FAR FROM THE WATER LINE AS POSSIBLE. 11.CONTRACTOR SHALL COORDINATE WITH THE CITY OF OCOEE TO ARRANGE FOR THE BYPASS OF LS63 AND ALL LIFT STATIONS NORTH OF WURST ROAD. 12.THE CONTRACTOR SHALL USE SPRAYROQ AS A LINER FOR MANHOLES 11 AND 12. 13.ALL NON-ROADWAY AREAS OUTSIDE THE RIGHT-OF WAY THAT ARE EXCAVATED, FILLED, OR OTHERWISE DISTURBED BY THE CONTRACTOR SHALL BE LOAMED, GRADED, LIMED, FERTILIZED, SEEDED AND MULCHED, UNLESS OTHERWISE NOTED. THE TOP 4 INCHES OF SOIL SHALL BE LOAM. ALL NON-ROADWAY AREAS WITHIN THE RIGHT-OF-WAY THAT ARE EXCAVATED, FILLED OR OTHERWISE DISTURBED BY THE CONTRACTOR SHALL BE SODDED WITH TURF GRASS. REFER TO SPECIFICATION SECTION 02480, LANDSCAPING. 14.UNDER NO CIRCUMSTANCE SHOULD A CLEAN OUT BE INSTALLED IN THE SIDEWALK OR A DRAINAGE SWALE. WATER MAIN GENERAL NOTES 1.WHERE NEW PIPING IS TO BE CONNECTED TO EXISTING PIPING, THE CONTRACTOR SHALL FURNISH AND INSTALL ALL ADAPTERS, FITTINGS, RESTRAINTS, AND ADDITIONAL PIPE AS REQUIRED TO COMPLETE THE CONNECTION. CONTRACTOR SHALL VERIFY LOCATION, ELEVATION, ORIENTATION, AND MATERIAL OF CONSTRUCTION. TEST PITS SHALL BE USED AS REQUIRED. CONTRACTOR SHALL RESTRAIN EXISTING PIPING AT CONNECTIONS PER RESTRAINED JOINT TABLE. 2.ANY UNDERGROUND STRUCTURES, CABLES, AND PIPELINES LOCATED ADJACENT TO THE TRENCH EXCAVATIONS SHALL BE PROTECTED AND FIRMLY SUPPORTED BY THE CONTRACTOR UNTIL THE TRENCH IS BACKFILLED. DAMAGE TO ANY SUCH STRUCTURES, CABLES, AND PIPELINES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE AND TO THE SATISFACTION OF THE OWNERS OF THE STRUCTURES, CABLES, AND PIPELINES. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LAYOUT OF THE WATER MAIN. LAYOUT SHALL BE REVIEWED AND ACCEPTED BY THE OWNER AND ENGINEER. THE NEW WATER MAIN MUST BE LOCATED WITHIN THE RIGHTS-OF-WAY SHOWN ON THE DRAWINGS. 4.MINIMUM DEPTH OF COVER SHALL BE 3'-0". THE NEW WATER MAIN SHALL GENERALLY FOLLOW THE GROUND CONTOUR, HOWEVER, ABRUPT CHANGES IN GRADE SHADE SHALL BE AVOIDED. AT LOCAL HIGH POINTS OR WHERE AIR RELEASE VALVES ARE SHOWN, THE CONTRACTOR SHALL SLOPE NEW MAIN AS NEEDED TO MAINTAIN HIGH POINT AT AIR RELEASE VALVE. 5.ALL VALVES, BENDS, TEES, REDUCERS, HYDRANTS, CAPS, AND PLUGS SHALL BE MECHANICALLY RESTRAINED. 6.TEST PRESSURES FOR THE COMBINATION PRESSURE AND LEAKAGE TESTS SHALL BE 150 PSI. TEST DURATION SHALL BE TWO HOURS. 7.CONNECTIONS TO EXISTING WATER MAIN SHALL BE COORDINATED WITH THE OWNER. 8.ALL EXISTING UTILITIES ENCOUNTERED DURING CONSTRUCTION ARE TO REMAIN IN SERVICE UNLESS OTHERWISE NOTED. AT NO ADDITIONAL COST TO THE OWNER THE CONTRACTOR SHALL REPAIR OR COORDINATE WITH THE RESPECTIVE UTILITY ON DAMAGE TO EXISTING UTILITIES. 9.CONTINUOUS WATER SERVICE MUST BE MAINTAINED DURING CONSTRUCTION. ACCESS TO ROAD AND DRIVEWAYS SHALL ALSO BE MAINTAINED. 10.ALL VALVES SHALL OPEN COUNTER CLOCKWISE (LEFT). 11.ASBESTOS CEMENT WATER MAINS MAY BE PRESENT WITHIN THE PROJECT LIMITS. THE CONTRACTOR SHALL CONFORM TO ALL APPLICABLE PROVISIONS OF OSHA AND ALL OTHER FEDERAL, STATE, AND LOCAL REGULATIONS WHEN CUTTING, HANDLING, REMOVING, AND DISPOSING OF ASBESTOS CEMENT PIPES. 12.ANY PIPING LOCATED WITHIN 10 FEET OF ANY TREES AND 5 FT OF ANY SHRUBS SHALL HAVE A ROOT BARRIER INSTALLED PER THE DETAILS SHOWN ON SHEET C-304. RESTORATION NOTES: 1.RIGHT-OF-WAY (ROW) OWNERSHIP AND MAINTENANCE RESPONSIBILITIES VARY ALONG THE PROJECT CORRIDOR. THE CITY OF OCOEE MAINTAINS ROW OWNERSHIP FROM STATION 0+00 TO STATION 20+98. FROM STATION 20+98 TO THE END OF THE PROJECT, ROW OWNERSHIP AND MAINTENANCE ARE UNDER ORANGE COUNTY JURISDICTION. ON INTERSECTING SIDE STREETS, THE CITY OF OCOEE OWNS AND MAINTAINS MACK STREET, SECURITY CIRCLE, MOBILE LANE, LYMAN STREET, BURNT TREE COURT, LAUREL RIDGE AVENUE, AND CLINGER COVE ROAD. ORANGE COUNTY OWNS AND MAINTAINS 15TH AVENUE, 16TH AVENUE, 17TH AVENUE, AND WURST ROAD. 2.WORK WITHIN THE NORTHBOUND TRAVEL LANE SHALL BE LIMITED TO A MAXIMUM OF ONE (1) BLOCK AT A TIME. THE PIPE TRENCH FOR THE MAINLINE GRAVITY SEWER AND ASSOCIATED CONSTRUCTION SETBACKS SHALL REMAIN FULLY WITHIN THE LIMITS OF THE NORTHBOUND TRAVEL LANE; AT NO TIME SHALL CONSTRUCTION ACTIVITIES FOR THE MAINLINE GRAVITY SEWER ENCROACH INTO THE SOUTHBOUND TRAVEL LANE. GRAVITY SEWER LATERALS AND WATER SERVICES ARE ALLOWED TO CROSS INTO THE SOUTHBOUND TRAVEL LANE. UPON INSTALLATION OF THE PROPOSED PIPE AND COMPLETION OF BACKFILLING AND COMPACTION, INITIAL PAVEMENT RESTORATION SHALL BE PLACED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. FOLLOWING COMPLETION OF ALL UTILITY WORK WITHIN THE LANE, THE ENTIRE NORTHBOUND TRAVEL LANE SHALL BE MILLED AND REPAVED IN ACCORDANCE WITH THE PUBLIC ROADWAY PAVEMENT REPAIR DETAIL SHOWN ON SHEET C-305. 3.WHERE PROPOSED UTILITIES CROSS PERPENDICULAR TO TRAFFIC SOUTH OF STATION 20+98, WITHIN THE CITY OF OCOEE RIGHT-OF-WAY, THE CONTRACTOR SHALL RESTORE THE SOUTHBOUND TRAVEL LANE BY MILLING AND REPLACING A MINIMUM OF 25 FEET ON EACH SIDE OF THE PIPE TRENCH. PAVEMENT RESTORATION SHALL CONFORM TO THE PUBLIC ROADWAY PAVEMENT REPAIR DETAIL SHOWN ON SHEET C-305. 4.WHERE PROPOSED UTILITIES CROSS PERPENDICULAR TO TRAFFIC NORTH OF STATION 20+98, WITHIN ORANGE COUNTY RIGHT-OF-WAY, THE CONTRACTOR SHALL RESTORE THE SOUTHBOUND TRAVEL LANE BY MILLING AND REPLACING A MINIMUM OF 50 FEET ON EACH SIDE OF THE PIPE TRENCH. PAVEMENT RESTORATION SHALL CONFORM TO THE APPLICABLE ORANGE COUNTY ROADWAY PAVEMENT REPAIR STANDARDS AND THE PUBLIC ROADWAY PAVEMENT REPAIR DETAIL SHOWN ON SHEET C-305. 5.FOR UTILITY WORK WITHIN SIDE STREETS UNDER THE CITY OF OCOEE RIGHT-OF-WAY, INCLUDING MACK STREET, SECURITY CIRCLE, MOBILE LANE, LYMAN STREET, BURNT TREE COURT, LAUREL RIDGE AVENUE, AND CLINGER COVE ROAD, THE ENTIRE WIDTH OF THE AFFECTED ROADWAY SHALL BE MILLED AND REPAVED. PAVEMENT RESTORATION SHALL EXTEND A MINIMUM OF 25 FEET BEYOND THE LIMITS OF THE UTILITY TRENCH. ALL PAVEMENT RESTORATION SHALL BE PERFORMED IN ACCORDANCE WITH THE PUBLIC ROADWAY PAVEMENT REPAIR DETAIL SHOWN ON SHEET C-305. 6.FOR UTILITY WORK WITHIN SIDE STREETS UNDER ORANGE COUNTY RIGHT-OF-WAY, INCLUDING 15TH AVENUE, 16TH AVENUE, 17TH AVENUE, AND WURST ROAD, THE ENTIRE WIDTH OF THE AFFECTED ROADWAY SHALL BE MILLED AND REPAVED FOLLOWING COMPLETION OF UTILITY INSTALLATION. PAVEMENT RESTORATION SHALL EXTEND A MINIMUM OF 50 FEET BEYOND THE LIMITS OF THE UTILITY TRENCH. ALL PAVEMENT RESTORATION SHALL BE PERFORMED IN ACCORDANCE WITH THE PUBLIC ROADWAY PAVEMENT REPAIR DETAIL SHOWN ON SHEET C-305. 7.WHERE PROPOSED UTILITIES PASS BENEATH EXISTING CONCRETE PAVEMENT, SIDEWALK, CURB, CURB AND GUTTER, DRIVEWAY, OR OTHER CONCRETE FEATURES, CONCRETE RESTORATION SHALL BE REQUIRED. LIMITS OF CONCRETE REMOVAL AND REPLACEMENT SHALL BE AS INDICATED BY THE CONCRETE RESTORATION HATCHING SHOWN ON THE DRAWINGS. ALL CONCRETE SHALL BE REMOVED AND REPLACED TO MATCH THE EXISTING THICKNESS, JOINTING PATTERN, FINISH, AND ALIGNMENT, UNLESS OTHERWISE NOTED. 8.ALL CONSTRUCTION ACTIVITIES WITHIN THE PHASE 1 RIGHT-OF-WAY LIMITS SHALL BE FULLY COMPLETED, INCLUDING UTILITY INSTALLATION, PAVEMENT RESTORATION, AND FINAL SURFACE RESTORATION, PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITIES WITHIN THE PHASE 2 RIGHT-OF-WAY. SEQUENCE OF CONSTRUCTION: A.WORK IN NO MORE THAN 1 BLOCK AT A TIME; WORK SHALL BE LIMITED TO 1 LANE AT A TIME USING APPROPRIATE, MEANS AND METHODS. B.INSTALL PIPE & BACKFILL THROUGH LIME ROCK BASE LAYER. C.RESTORE ROAD UP TO ONE COURSE OF PAVEMENT. D.OVERLAY ENTIRE LANE UPON COMPLETION OF CONSTRUCTION.WATER/SEWER: CITY OF OCOEE UTILITIES 1800 A.D. MIMS ROAD OCOEE, FL 34761 (407) 905-3159 DRAIN: CITY OF OCOEE PUBLIC WORKS 301 MAGUIRE ROAD OCOEE, FL 34761 (407) 905-3170 ROADS AND DRAINAGE: ORANGE COUNTY PUBLIC WORKS 4200 S JOHN YOUNG PARKWAY ORLANDO, FL 32839 (407) 836-7900 ELECTRIC: DUKE ENERGY 452 E CROWN POINT RD WINTER GARDEN, FL 34787 (800) 700-8744 GAS: LAKE APOPKA NATURAL GAS 1320 WINTER GARDEN VINELAND ROAD WINTER GARDEN, FL 34787 (407) 656-2734 DIG SAFE SUNSHINE 811 &AND Ø, DIA DIAMETER #, NO NUMBER AC ASBESTOS CEMENT APP'D APPROVED ARV AIR RELEASE VALVE BR BRICK BLDG BUILDING CB CATCH BASIN CEN CENTER CFS CUBIC FEET PER SECOND CI CAST IRON CIPP CURED-IN-PLACE-PIPE CL CENTERLINE CMP CORRUGATED METAL PIPE CO CLEANOUT CONC CONCRETE COR CORNER CPE CORRUGATED POLYETHYLENE PIPE CY CUBIC YARD DEMO DEMOLITION DMH DRAIN MANHOLE DI DUCTILE IRON DR DRAIN DWG DRAWING EL ELEVATION EMH ELECTRIC MANHOLE ERCP ELLIPTICAL REINFORCED CONCRETE PIPE FM FORCE MAIN FT FEET G GAS GV GATE VALVE HDPE HIGH DENSITY POLYETHYLENE HORIZ HORIZONTAL HYD HYDRANT IN INCH INF INFLUENT INV INVERT LB POUNDS LF LINEAR FOOT MAX MAXIMUM MH MANHOLE MIN MINIMUM MW MONITORING WELL N NORTH NGVD NATIONAL GEODETIC VERTICAL DATUM N/A NOT AVAILABLE/APPLICABLE NTS NOT TO SCALE OD OUTSIDE DIAMETER OUT OUTFALL PC PERFORATED CLAY PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCH PS PRIMARY SLUDGE PT POINT OF TANGENCY PV PLUG VALVE PVC POLYVINYL CHLORIDE RCP REINFORCED CONCRETE PIPE RCW RECLAIMED WATER RD ROOF DRAIN RED REDUCER REQ'D REQUIRED S SLOPE, SEWER SD STORM DRAIN SF SQUARE FEET SMH SANITARY SEWER MANHOLE SQ SQUARE STA STATION T, XFMR TRANSFORMER TBM TEMPORARY BENCH MARK THK THICKNESS TOS TOP OF STRUCTURE TYP TYPICAL UD UNDERDRAIN UG UNDERGROUND UGE UNDERGROUND ELECTRIC VC VITRIFIED CLAY VERT VERTICAL VF VERTICAL FOOT W POTABLE WATER W/WITH W/I WITHIN AIR RELEASE VALVE ROOT BARRIER MILL AND REPLACE UTILITY TRENCH CONCRETE REPAIR Page 283 of 576 CO -0+25 0+00 1+00 X XXXX SCB TOP OF GRATE ELEV=126.11' BOTTOM OF STRUCTURE ELEV=121.76 24" CMP RECESSED N&D L&S LB 7829 (fnd) 4' BARB-WIRE FENCE 12 1 716 N LAKEWOOD AVE EXISTING SMH A MA T C H LI N E DW G   C- 1 0 0 DW G   C- 1 0 1 12" x 2" SERVICE SADDLE CUT, GROUT FILL, AND CAP EXISTING 2" GALVANIZED STEEL LINE CONTRACTOR TO FIELD VERIFY LOCATION 6" 90° BEND 6" TEE MILL AND REPLACE 6" GV 12" DI W HORIZONTALLY DIRECTIONAL DRILL 2" PE W ENCASED IN A 4" PE SLEEVE MA C K S T R E E T (2) 2" LINESTOPS CONNECT TO EXISTING 2" PIPE USING TRANSITION COUPLING 12" x 6" TEE 12" GV AND BLOW OFF ASSEMBLY (2) 6" 45° BENDS 110 115 120 125 130 135 -0+25 0+00 1+00 1+75 12 6 . 1 EXISTING GRADE (ASSUMED) 12" GV AND BLOWOFF ASSEMBLY 12" DI W 57.35'12" DI W 152.37' 12" x 6" TEE STA 0+41 J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - W A T E R M A I N P L A N P R O F I L E 0 . D W G | 21 7 8 8 - C S - W M P l a n P r o f i l e 0 | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 6 / 2 0 2 6 3 : 1 0 : 2 4 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 2/ 2 6 / 2 0 2 6 1 0 : 2 2 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 PLAN SCALE: 1"=20' PROPOSED WATER MAIN PROFILE SCALES VERT:1"=4' HORIZ:1"=20' N 0 20 40 CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2 PR O P O S E D W A T E R M A I N PL A N A N D P R O F I L E S T A 0 + 0 0 T O S T A 1 + 5 0 C-100 RE V I S I O N S   P E R   C I T Y   C O M M E N T   A F T E R   B I D   I S S U A N C E     AS         02 / 2 6 J. P I C K E R I N G 21 7 8 8 D. M E T Z A. S T E W A R T CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   X CROSSING NUMBER: SEE 12" WATER MAIN SEPARATION TABLE ON SHEET C-501 6" LINE STOPS 1 1 1 Page 284 of 576 CO COCO CO CO CO COCO CO CO 2+00 3+00 4+00 5+00 6+00 7+00 STOP NO OUTLETSTOPSCB TOP OF GRATE ELEV=125.78' OPEN CHANNEL INV ELEV= 125.16 N INV (18"RCP) ELEV= 121.66 SCB TOP OF GRATE ELEV=125.58' NW INV (18"RCP) ELEV=121.82 SCB TOP OF GRATE ELEV=125.49' N INV (24"RCP) ELEV= 121.14 SE INV (18"RCP) ELEV= UNK S INV (18"RCP) ELEV= 121.20 MPH 25 IP 2" (fnd)IR 1/2" (fnd) IR 1/2" (fnd) STOP STOP FM ARV 6' CHAIN LINK FENCE 4' WOOD PANEL FENCE 6'WOOD PANEL FENCE 4' BARB-WIRE FENCE 4' CHAIN LINK FENCE TRACT "A" RETENTION AREA 25 7.5' DRAINAGE, UTILITY, INGRESS & EGRESS EASEMENT(P) SE C U R I T Y C I R C L E N O T I N C L U D E D MO B I L E LA N E 1458912 LY M A N S T R E E T ( F ) 1 2 1 2 1 DIRT DRIVEWAY PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1543687.5510 E:482075.0300 ELEV:126.20' (NAVD 1988) EDGE OF ASPHALT ROAD 5' WIDE CONC SIDEWALK 5' WIDE CONC SIDEWALK 5' WIDE CONC SIDEWALK 5' WIDE CONC SIDEWALK CONCRETE DRIVEWAY BU R N T T R E E C O U R T FMFM FM FM SCB TOP OF GRATE ELEV=125.68' BOTTOM OF STRUCTURE ELEV=121.33 24" & 18" CMP RECESSED DMH TOP OF LID ELEV=126.39' N INV (15"CMP) ELEV=123.32 SW INV (15" CMP) ELEV=121.91' SCB TOP OF GRATE ELEV=125.27' NE INV (18"RCP) ELEV= 120.68 E INV (18"RCP) ELEV= 122.14 S INV (18"RCP) ELEV= 120.76 SCB TOP OF GRATE ELV=125.42' W INV (18"RCP) ELEV= 122.24 NW INV (36"RCP8"PVC) ELEV=120.35 DMH TOP OF LID ELEV=126.45' NE INV (15"CMP) ELEV=119.75 S INV (15"CMP) ELEV=123.10 PROJECT BENCHMARK SET NAIL & DISK L&S LB 7829 N:1544174.3590 E:482061.4690 ELEV:125.22' (NAVD 1988) SCB TOP OF GRATE ELEV=125.63' N INV (18"RCP) ELEV= 121.22 S INV (24"RCP) ELEV= 120.97 MPH 25 5' WIDE CONC SIDEWALK 126 126 126 127 126 127 126 126 125 126 126 12 6 127 12 6 SMH-1 SMH-3SMH-2 12" PVC S12" PVC S12" PVC S 12 " P V C S 8" PVC S 12" PVC S 8" P V C S SMH-12 SMH-14 SMH-13 B-9 B-10 24 " P V C F M 716 N LAKEWOOD AVE 730 N LAKEWOOD AVE 728 N LAKEWOOD AVE 736 N LAKEWOOD AVE 720 N LAKEWOOD AVE PID:18-22-28-0000-00-066 DOC#20180256405 782 N LAKEWOOD AVE PID:18-22-28-0000-00-055 ORB 9110, PG 845 792 N LAKEWOOD AVE PID:18-22-28-0000-00-054 ORB 5932, PG 239 102 SECURITY CIR SECURITY MOBILE HOME PARK PLAT BOOK Z, PAGE 93 729 LAKEWOOD AVE 102 MOBILE LN FIRST ADDITION T0 SECURITY MOBILE HOME PARK PLAT BOOK 1, PAGE 132 100 MOBILE LN 101 BURNT TREE CT 98 BURNT TREE CT EXISTING SMH A EXISTING SMH B 8" P V C S SCB TOP OF GRATE ELEV=125.86' BOTTOM OF STRUCTURE ELEV=121.66 18" CMP RECESSED NORTH LAKEWOOD AVENUE (OCOEE CLARCONA ROAD) 1" POLYETHYLENE SINGLE METER RESIDENTIAL SERVICE CONNECTION ENCASED IN A 2" POLYETHYLENE SLEEVE SEE DETAILS UT206, UT207, AND UT208a MA T C H LI N E DW G   ## # # # DW G   C- 1 0 2 12" x 8" TEE 12" GV 8" GV 6' 8" P V C W M (C O N T R A C T O R T O FI E L D V E R I F Y ) 2" G A L V A N I Z E D S T E E L W M (C O N T R A C T O R T O F I E L D V E R I F Y ) 8" LINESTOP 12" x 6" TEE 2" G A L V A N I Z E D S T E E L W M (C O N T R A C T O R T O F I E L D V E R I F Y ) 8" LINESTOP CUT AND CAP 20 " D I F M (2) 12" 45° BENDS CONNECT TO EXISTING 2" WM WITH TRANSITION COUPLING CUT, GROUT FILL, AND CAP EXISTING 2" GALVANIZED STEEL LINE 2" P E W 3' MIN 6' MIN 2" GALVANIZED STEEL WM (CONTRACTOR TO FIELD VERIFY) REMOVE 6" CAP AND CONNECT TO EXISTING 6" TEE 3' MIN 12" x 8" TEE 12" GV 6' MIN 1" POLYETHYLENE DOUBLE METER RESIDENTIAL SERVICE CONNECTION ENCASED IN A 2" POLYETHYLENE SLEEVE SEE DETAILS UT206, UT207, AND UT208a 3' MIN 3' MIN 3' MIN REMOVE AND REPLACE DRIVEWAY (TYP) 12" DI W ROOT BARRIER SEE DETAIL ON SHEET C-304 1" POLYETHYLENE DOUBLE METER RESIDENTIAL SERVICE CONNECTION SEE DETAILS UT206, UT207, AND UT208a REMOVE AND REPLACE EXISTING HYDRANT 8" x 6" RED 6" D I W CONNECT TO EXISTING 6" WM ABANDON EXISTING 2" LINE WEST OF NEW CONNECTION 8" D I W (4) 12" 45° BENDS(4) 12" 45° BENDS MA T C H LI N E DW G   C- 1 0 0 DW G   ## # # # 4' BARB-WIRE FENCE 12" GV 12" x 8" TEE 1" POLYETHYLENE SINGLE RESIDENTIAL SERVICE CONNECTION SEE DETAILS UT206, UT207, AND UT208a (2) 12" 45° BENDS CUT, GROUT FILL AND FIT 2" CAP 6"GV 6" GV (2) 12" GV 8" GV 12" DI W CUT, GROUT FILL AND FIT 2" CAP 8" GV 1" SERVICE CONNECTION TO EXISTING METER ENCASED IN A 2" POLYETHYLENE SLEEVE SEE DETAIL UT206 2" LINESTOP (2) 8" 22.5° BENDS 6' MIN CONTRACTOR TO FIELD VERIFY CROSSING LOCATIONS CONTRACTOR TO FIELD VERIFY CONTRACTOR LOCATIONS MILL AND REPLACE CONTRACTOR TO ENSURE SERVICE CONNECTION IS NOT INTERRUPTED BY PROVIDING TEMPORARY BYPASS WATER TO CUSTOMERS DURING CONSTRUCTION 8" x 2" SERVICE SADDLE 6" x 2" SERVICE SADDLE 6" LINESTOP CONNECT TO EXISTING 2" WM WITH TRANSITION COUPLING (2) 2" LINESTOPS CONNECT TO EXISTING 2" WM CONTRACTOR TO ENSURE SERVICE CONNECTION IS NOT INTERRUPTED BY PROVIDING TEMPORARY BYPASS WATER TO CUSTOMERS DURING CONSTRUCTION CONNECT TO EXISTING METER SEE DETAIL UT2062" TAPPING SADDLE 12" x 2" SERVICE SADDLE HORIZONTALLY DIRECTIONAL DRILL 1" POLYETHYLENE SERVICE CONNECTION ENCASED IN A 2" POLYETHYLENE SLEEVE TO EXISTING METER SEE DETAIL UT206 1" POLYETHYLENE CONNECTION TO EXISTING METER SEE DETAIL UT206 25'-0" 68" 76" 44" 20" X UG F B O UG F B O UGFBO UGFBO UGFBO UGFBO UGFBO X XXXXXXXXXXXXXXXXXXXXXXXX X X X X X XXXX UGFBO OH E OHE OHE OH E OHE OH E OH E OH E OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OH E OH E OH E OH E O H E O H E OHE OHE OHE OHE OHE OHE OHE UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO G G G G G BE UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UG F B O UGFBO UGFBO UGFBO UGFBO U G F B O 20/9" HORIZONTALLY DIRECTIONAL DRILL 1" POLYETHYLENE SINGLE METER RESIDENTIAL SERVICE CONNECTION ENCASED IN A 2" POLYETHYLENE SLEEVE SEE DETAILS UT206, UT207, AND UT208a (2) 8" 45° BENDS CONNECT TO EXISTING 2" WM WITH TAPPING SADDLE (2) 8" 45° BENDS 8" GV AND BLOWOFF ASSEMBLY 8" x 2" SERVICE SADDLE 110 115 120 125 130 110 115 120 125 130 1+25 2+00 3+00 4+00 5+00 6+00 7+00 12 6 . 1 12 6 . 1 12 6 . 0 12 6 . 0 12 6 . 0 12 6 . 0 12 6 . 0 12 6 . 0 12 6 . 0 12 5 . 9 12 5 . 9 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 9 12 5 . 8 12 5 . 8 12 5 . 8 24" FM 1/2" UGFBO 20" FM 6" SS LATERAL 8" S STUB OUT 6" SS LATERAL 1/2" UGFBO 1/2" UGFBO 8" S STUB OUT 12" S STUB OUT EXISTING GRADE WA T E R S E R V I C E C O N N E C T I O N ST A 6 + 5 4 . 0 0 12" MIN 3' MIN 12" MIN12" MIN 3' MIN 3' MIN 12" MIN 3' MIN 4 7 8 9 13 12 " x 2 " S E R V I C E S A D D L E ST A 5 + 1 0 . 0 0 12 " x 2 " S E R V I C E S A D D L E ST A 2 + 0 9 . 8 0 3' MIN 3' MIN 3' MIN 45.00° BEND STA 2+49 45.00° BEND STA 2+4745.00° BEND STA 2+02 45.00° BEND STA 1+99 12" MIN 3 12" GV 3' MIN 65 12" DI W 43.94' 12" DI W 3.79' 12" DI W 1.90' 12" DI W 1.99' 10 45.00° BEND STA 5+94 45.00° BEND STA 5+96 45.00° BEND STA 6+06 45.00° BEND STA 6+07 45.00° BEND STA 5+34 45.00° BEND STA 5+35 45.00° BEND STA 5+45 45.00° BEND STA 5+47 12" DI W 1.27' 12" DI W 9.16' 12" DI W 1.50' 12" DI W 36.56' 12" DI W 8.98' 12 6" SS LATERAL 11 12 " x 2 " S E R V I C E S A D D L E ST A 4 + 3 2 . 8 5 12 " x 2 " S E R V I C E S A D D L E ST A 2 + 7 0 . 2 1 12" DI W 75.61' 12 " x 2 " S E R V I C E S A D D L E ST A 3 + 7 9 . 0 0 12" GV 12" DI W 17.34' 12 " x 2 " S E R V I C E S A D D L E ST A 6 + 2 0 . 0 0 12" x 6" TEE STA 3+73 12" x 8" TEE STA 4+53 12" DI W 1.05'12" DI W 0.94' 12" DI W 152.37'12" DI W 78.00' 12" GV 12" GV 12" x 8" TEE STA 6+26 12" GV 12" DI W 108.32'12" DI W 121.89' 12 " x 2 " S E R V I C E S A D D L E ST A 1 + 7 3 . 9 2 12 " x 2 " S E R V I C E S A D D L E ST A 1 + 6 7 . 3 4 6" MIN 3' MIN3' MIN CUT, GROUT FILL, AND CAP EXISTING 2" GALVANIZED STEEL LINE REMOVE 6" CAP AND CONNECT TO EXISTING 6" TEE REMOVE AND REPLACE EXISTING HYDRANT 8" x 6" RED 6" LINESTOP 2" LINESTOP J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - W A T E R M A I N P L A N P R O F I L E I . D W G | 21 7 8 8 - C S - W M P l a n P r o f i l e I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 6 / 2 0 2 6 3 : 1 1 : 4 3 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 2/ 2 6 / 2 0 2 6 1 0 : 4 5 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 PLAN SCALE: 1"=20' PROPOSED WATER MAIN PROFILE SCALES VERT:1"=4' HORIZ:1"=20' N 0 20 40 CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2 PR O P O S E D W A T E R M A I N PL A N A N D P R O F I L E S T A 1 + 5 0 T O S T A 7 + 0 0 C-101 RE V I S I O N S   P E R   C I T Y   C O M M E N T S   A F T E R   B I D   I S S U A N C E     AS         02 / 2 6 J. P I C K E R I N G 21 7 8 8 D. M E T Z C. S T A N L E Y CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   X CROSSING NUMBER: SEE 12" WATER MAIN SEPARATION TABLE ON SHEET C-501 CONTRACTOR TO FIELD VERIFY CROSSING LOCATIONS HORIZONTALLY DIRECTIONAL DRILL 2" POLYETHYLENE SERVICE CONNECTION ENCASED IN A 4" POLYETHYLENE SLEEVE SEE DETAIL UT206 1 1 1 1 1 Page 285 of 576 7+00 8+00 9+00 10+00 11+00 12+00 13+00 CO CO CO CO CO 50 + 0 0 50 + 2 8 CO 7+00 8+00 9+00 10+00 11+00 12+00 13+00 B-7B-8 18"20" 42" 20" 22" 20"10" 15"12"12" 20"24" OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UG F B O U G F B O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO OHE OHE OH E OH E O H E O H E OH E OHE OHE OHE OHE OHE UGFBO UGFBO UG F B O G G G G G G G G G G G G G G G G G G G G G G G G G G G G SCB TOP OF GRATE ELEV=125.51' N INV (24"RCP) ELEV=122.98 S INV (24"RCP) ELEV=122.96 SCB TOP OF GRATE ELEV=125.43' N INV (15"RCP) ELEV= 123.89 S INV (15"RCP) ELEV= 123.80 ARV BT PRESSURE RELEASE VALVE DMH TOP OF LID ELEV=125.48' N (UNKOWN) ELEV=123.52 W(18"RCP) ELEV=123.34 SCB TOP OF GRATE ELEV=125.78' N (18"RCP) ELEV= 122.70 E (24"RCP) ELEV= 122.73 S (24"RCP) ELEV= 122.64 N INV (24"CMP) ELEV=120.89 S INV (24"CMP) ELEV=120.68 IRC 1/2" RLS 2142 (fnd) E INV (15" CMP) ELEV=122.20 S INV (24" RCP) ELEV=122.06 N&D REF PT (fnd) TRACT "A" RETENTION AREA FLUME 5' WIDE CONC SIDEWALK 5' WIDE CONC SIDEWALK 5' WIDE CONC SIDEWALK PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1544507.0780 E:482027.9150 ELEV:125.44' (NAVD 1988) FLUME IRC 1/2" ILL (fnd) DIRT DRIVEWAY EDGE OF ASPHALT ROAD IR 1/2" BENT (fnd) CONCRETE DRIVEWAY CONCRETE DRIVEWAY MON 4"X4" (fnd) FLUME CONCRETE DRIVEWAY DIRT DRIVEWAY CONCRETE DRIVEWAY OVERGROWN GRAVEL DRIVEWAY AN D E R S O N P L SE INV (36"RCP) ELEV=122.89' NO DUMPING SCB TOP OF GRATE ELEV=125.27' NE INV (18"RCP) ELEV= 120.68 E INV (18"RCP) ELEV= 122.14 S INV (18"RCP) ELEV= 120.76 SCB TOP OF GRATE ELV=125.42' W INV (18"RCP) ELEV= 122.24 NW INV (36"RCP8"PVC) ELEV=120.35 PROJECT BENCHMARK SET NAIL & DISK L&S LB 7829 N:1544174.3590 E:482061.4690 ELEV:125.22' (NAVD 1988) DMH TOP OF LID ELEV=126.01' SW INV (18"RCP) ELEV= 120.30 E INV (15"RCP) ELEV= 120.40 127 SMH-5 SMH-4 12" PVC S12" PVC S B-7B-8 792 N LAKEWOOD AVE PID:18-22-28-0000-00-054 ORB 5932, PG 239 98 BURNT TREE CT SMH-15 ARV AND VENT ENCLOSURE SEE DETAIL UT204A (2) 12" 45° BENDS (2) 12" 45° BENDS 12" 11.25° BEND MA T C H LI N E DW G   C- 1 0 1 DW G   C- 1 0 2 MA T C H LI N E DW G   C- 1 0 2 DW G   C- 1 0 3 1" POLYETHYLENE SINGLE METER RESIDENTIAL SERVICE CONNECTION SEE DETAILS UT206, UT207, AND UT208a 1" POLYETHYLENE SINGLE METER RESIDENTIAL SERVICE CONNECTION ENCASED IN A 2" POLYETHYLENE SLEEVE SEE DETAILS UT206, UT207, AND UT208aHORIZONTALLY DIRECTIONAL DRILL 1" POLYETHYLENE SINGLE METER RESIDENTIAL SERVICE CONNECTION ENCASED IN A 2" POLYETHYLENE SLEEVE SEE DETAILS UT206, UT207, AND UT208a 1" DOUBLE SERVICE CONNECTION SEE DETAILS UT206, UT207, AND UT208a 1" POLYETHYLENE SINGLE METER RESIDENTIAL SERVICE CONNECTION ENCASED IN A 2" POLYETHYLENE SLEEVE SEE DETAILS UT206, UT207, AND UT208a 12" GV REMOVE AND REPLACE 15" CMP WITH 15" RCP 12" x 6" HYDRANT TEE, VALVE, AND ASSEMBLY PER DETAIL UT201 (2) 12" 22.5° BENDS1° VERT DEFLECTION REMOVE AND DISPOSE OF EXISTING FIRE HYDRANT 12" 11.25° BEND REMOVE AND REPLACE DRIVEWAY (TYP) (2) 12" 45° BENDS (2) 12" 45° BENDS 1" POLYETHYLENE SINGLE METER RESIDENTIAL SERVICE CONNECTION SEE DETAILS UT206, UT207, AND UT208a SCB TOP OF GRATE ELEV=125.19' W INV (15"CMP) ELEV= 123.57 ROOT BARRIER SEE DETAIL ON SHEET C-304 ROOT BARRIER SEE DETAIL ON SHEET C-304 ROOT BARRIER SEE DETAIL ON SHEET C-304 3' MIN 3' MIN 904 N LAKEWOOD AVE PID:7-22-28-0000-00-047 DOC#20230691880 870 CLARCONA OCOEE RD PID:7-22-28-0000-00-040 DOC#20230691880 880 CLARCONA OCOEE RD PID:7-22-28-0000-00-080 DOC#20180520082 905 N LAKEWOOD AVE PID:08-22-28-0000-00-046 ORB 6633, PG 788 903 N LAKEWOOD AVE PID:08-22-28-0000-00-022 DOC#20190761043 821 N LAKEWOOD AVE PID:08-22-28-0000-00-027 DOC#20040577026 815 CLARCONA OCOEE RD PID:08-22-28-0000-00-028 DOC#20230197294 12" DI W 12" DI W 8" DI WM 8" CAP 12" x 8" TEE 12" GV 8" GV GROUT FILL EXISTING WATER MAIN (2) 12" 22.5° BENDS NEW WM TO GO BELOW EXISTING. PROTECT AND SUPPORT EXISTING WATER MAIN WHILE NEW WATER MAIN IS CONSTRUCTED BELOW. CLEAR AND GRUB (2) 12" 22.5° BENDS CONTRACTOR TO FIELD VERIFY CROSSING LOCATIONS 110 115 120 125 130 135 110 115 120 125 130 135 7+00 8+00 9+00 10+00 11+00 12+00 13+00 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 9 12 6 . 0 12 6 . 0 12 5 . 9 12 5 . 9 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 5 . 8 12 6 . 0 12 6 . 2 12 6 . 4 12 6 . 6 22.50° BEND STA 7+80 6" SS LATERAL 1/2" UGFBO 1/2" UGFBO 8" S STUB OUT 36" SD 6" W EXISTING GRADE 45.00° BEND STA 7+39 2" ARV WA T E R S E R V I C E C O N N E C T I O N ST A 8 + 5 5 . 0 0 WA T E R S E R V I C E CO N N E C T I O N ST A 1 0 + 4 4 . 5 9 WA T E R S E R V I C E C O N N E C T I O N ST A 1 0 + 9 5 . 0 0 WA T E R S E R V I C E C O N N E C T I O N ST A 1 2 + 2 0 . 0 0 WA T E R S E R V I C E C O N N E C T I O N ST A 1 2 + 2 5 . 0 0 WA T E R S E R V I C E C O N N E C T I O N ST A 1 2 + 8 2 . 0 0 11.25° BEND STA 12+79 12" MIN 12" MIN 3' MIN 15 17 21 12 " x 6 " T E E F O R H Y D R A N T ST A 9 + 2 5 . 0 0 12" GV 45.00° BEND STA 7+42 45.00° BEND STA 7+57 22.50° BEND STA 11+56 22.50° BEND STA 11+60 45.00° BEND STA 7+61 16 20 2" GAS 14 6" SS LATERAL 18 12" DI W 141.66' 12" DI W 3.22' 12" DI W 14.19' 12" DI W 2.90' 19 12" DI W 5.86' 45.00° BEND STA 10+33 45.00° BEND STA 10+35 45.00° BEND STA 10+48 45.00° BEND STA 10+50 12" DI W 12.08' 12" DI W 105.19' WA T E R S E R V I C E C O N N E C T I O N ST A 1 1 + 4 8 . 0 0 12" DI W 12.73' 22.50° BEND STA 7+68 12" DI W 5.99' 12" DI W 1.70' 12" DI W 3.49' 12" DI W 66.22' 12" MIN 3' MIN 22.50° BEND STA 12+27 12" DI W 1.84' 22.50° BEND STA 12+30 12" DI W 48.25' 6" SS LATERAL 22 12" DI W 60.29' 3' MIN 12" x 8" TEE STA 9+30 12" GV 12" DI W 100.49' J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - W A T E R M A I N P L A N P R O F I L E I I . D W G | 21 7 8 8 - C S - W M P l a n P r o f i l e I I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 6 / 2 0 2 6 3 : 1 2 : 3 8 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 2/ 2 3 / 2 0 2 6 3 : 0 8 P M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 PLAN SCALE: 1"=20' PROPOSED WATER MAIN PROFILE SCALES VERT:1"=4' HORIZ:1"=20' N 0 20 40 CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2 PR O P O S E D W A T E R M A I N PL A N A N D P R O F I L E S T A 7 + 0 0 T O S T A 1 3 + 0 0 C-102 RE V I S I O N S   P E R   C I T Y   C O M M E N T S   A F T E R   B I D   I S S U A N C E     AS         02 / 2 6 J. P I C K E R I N G 21 7 8 8 D. M E T Z C. S T A N L E Y CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   X CROSSING NUMBER: SEE 12" WATER MAIN SEPARATION TABLE ON SHEET C-501 1 Page 286 of 576 13+00 14+00 15+00 MA T C H LI N E DW G   C- 3 DW G   C- 4 CO CO CO 13+00 14+00 15+00 16+00 17+00 18+00 19+00 B-5 B-6 CO CO CO CO 30 + 0 0 30 + 7 7 34"54" 20/10" TWIN 20" OH E OH E OH E X X UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UG F B O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO OHE OHE OHE OHE OHE O H E OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE O H E O H E O H E OH E OH E OHE UGFBO UGFB O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO G G G G G G G G G G G G G G G G G G G G G G G G G G G G G UGE UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO 18" S INV (18"RCP) ELEV=128.78' MEMORIAL MARKERMPH 25 SCB TOP OF GRATE ELEV=128.65' S INV (15"RCP) ELEV= 126.18 IRC 1/2" LB 4596 (fnd) X-CUT (fnd) WATER WATER WATER WATER MON 4"X4" (fnd) IP 1" (fnd) WATER WATER X-CUT (fnd) MEMORIAL MARKER FM FM STONE PLATER 5' METAL FENCE 4' BARBED-WIRE FENCE PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1544881.6580 E:482058.2010 ELEV:127.89' (NAVD 1988) 5' METAL FENCE N&D NO ID (fnd) N&D NO ID (fnd) 5' WIDE CONC SIDEWALK 5' WIDE CONC SIDEWALK N&D NO ID (fnd) EDGE OF ASPHALT ROAD EDGE OF ASPHALT ROAD CONCRETE DRIVEWAY DIRT DRIVE WAY CONCRETE CONCRETE DRIVEWAY DIRT DRIVEWAY CONCRETE DRIVEWAY SCB TO OF GRATE ELEV=127.09' N INV (24"RCP) ELEV=124.29 S INV (24"RCP) ELEV=124.19 SCB TOP OF GRATE ELEV=129.34' N INV (18"RCP) ELEV=126.79 E INV (24"RCP) ELEV=126.70 S INV (24"RCP) ELEV=126.59 NORTH LAKEWOOD AVENUE (OCOEE CLARCONA ROAD) PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1545170.7030 E:482058.1970 ELEV:130.40' (NAVD 1988) 10' LANDSCAPE, UTILITY, WALL & SIGNAGE EASEMENT(P) B-5 B-6 MA T C H LI N E DW G   C- 1 0 3 DW G   C- 1 0 4 1" POLYETHYLENE SINGLE METER RESIDENTIAL SERVICE CONNECTION SEE DETAILS UT206, UT207, AND UT208a 1" POLYETHYLENE SINGLE METER RESIDENTIAL SERVICE CONNECTION SEE DETAILS UT206, UT207, AND UT208a SMH-6 1" POLYETHYLENE SINGLE METER SERVICE CONNECTION SEE DETAILS UT206, UT207, AND UT208a 1" POLYETHYLENE SERVICE CONNECTION ENCASED IN A 2" POLYETHYLENE SLEEVE TO EXISTING METER SEE DETAIL UT206 (2) 8" 45° BENDS, TIE IN TO EXISTING 1" POLYETHYLENE SINGLE METER RESIDENTIAL SERVICE CONNECTION ENCASED IN A 2" POLYETHYLENE SLEEVE SEE DETAILS UT206, UT207, AND UT208a 12" GV (2) 8" 22.5° BENDS 6" P V C W M 12" x 6" HYDRANT TEE, VALVE, AND ASSEMBLY PER DETAIL UT201 12" 11.25° BEND 12" 11.25° BEND LAUREL RIDGE AVENUE 50'R/W PLAT BOOK 54, PAGE(S) 47-50 12" x 8" TEE 12" x 8" TEE, 12" GV SEE PLAN DETAIL SHEET C-221 6" CUT AND CAP SMH C 8" CUT AND CAP 12" 11.25° BEND SMH-7 REMOVE AND REPLACE DRIVEWAY (TYP) 3' MIN 12" DI W 8" GV ROOT BARRIER SEE DETAIL ON SHEET C-304 ROOT BARRIER SEE DETAIL ON SHEET C-304 5' ADDITIONAL R/W(P) 12" DI W 1" POLYETHYLENE SINGLE METER SERVICE CONNECTION SEE DETAILS UT206, UT207, AND UT208a 12" DI W TRACT C LIFT STATION 950 N LAKEWOOD AVE PID:07-22-28-0000-00-049 DOC#20180344043 922 N LAKEWOOD AVE PID:07-22-28-0000-00-048 DOC#20180344043 914 N LAKEWOOD AVE PID:07-22-28-0000-00-062 DOC#20190549959 ZACK INVESTMENTS LAKEWOOD AVENUE LLC PID:7-22-28-0000-00-090 DOC#20180523897 1094 N LAKEWOOD AVE PID:08-22-28-0000-00-072 DOC#20240000886 915 CLARCONA OCOEE RD PID:08-22-28-0000-00-017 DOC#20120018967 911 CLARCONA OCOEE RD PID:08-22-28-0000-00-018 DOC#20020623775 109 LAUREL RIDGE AVE 107 LAUREL RIDGE AVE 880 CLARCONA OCOEE RD PID:7-22-28-0000-00-080 DOC#20180520082 907 N LAKEWOOD AVE PID:08-22-28-0000-00-021 NO DOC FOUND 905 N LAKEWOOD AVE PID:08-22-28-0000-00-046 ORB 6633, PG 788 GROUT FILL EXISTING WATER MAIN 8" x 6" RED CONNECT TO EXISTING 6" WM (2) 12" 11.25° BENDS 12" 11.25° BEND REMOVE AND REPLACE EXISTING HYDRANT CONTRACTOR TO FIELD VERIFY CROSSING LOCATIONS HORIZONTALLY DIRECTIONAL DRILL 1" POLYETHYLENE SERVICE CONNECTION ENCASED IN A 2" POLYETHYLENE SLEEVE TO EXISTING METER SEE DETAIL UT206 CONTRACTOR TO ENSURE SERVICE CONNECTION IS NOT INTERRUPTED BY PROVIDING TEMPORARY BYPASS WATER TO CUSTOMERS DURING CONSTRUCTION 115 120 125 130 135 140 115 120 125 130 135 140 13+00 14+00 15+00 16+00 17+00 18+00 19+00 12 6 . 6 12 6 . 9 12 7 . 3 12 7 . 6 12 7 . 8 12 8 . 0 12 8 . 2 12 8 . 4 12 8 . 7 12 8 . 9 12 9 . 2 12 9 . 4 12 9 . 6 12 9 . 9 13 0 . 0 13 0 . 3 13 0 . 4 13 0 . 6 13 0 . 8 13 1 . 0 13 1 . 2 13 1 . 4 13 1 . 5 13 1 . 7 13 2 . 0 6" SS LATERAL 6" SS LATERAL6" SS LATERAL 1/2" UGFBO 1/2" UGFBO 1/2" UGFBO 2.5" W24" SD 8" W 6" FM6" W EXISTING GRADE 6" MIN 3' MIN11.25° BEND STA 13+40 12" MIN 12" MIN 3' MIN 3' MIN 12" MIN 8" S STUB OUT 12" MIN11.25° BEND STA 17+30 11.25° BEND STA 15+43 6" MIN 12" MIN 2" W 6" MIN 23 26 27 30 32 33 34 35 WA T E R S E R V I C E C O N N E C T I O N ST A 1 3 + 5 5 . 0 0 WA T E R S E R V I C E C O N N E C T I O N ST A 1 4 + 3 0 . 0 0 WA T E R S E R V I C E C O N N E C T I O N ST A 1 5 + 2 0 . 2 9 WA T E R S E R V I C E C O N N E C T I O N ST A 1 5 + 5 0 . 0 0 WA T E R S E R V I C E C O N N E C T I O N ST A 1 3 + 7 2 . 0 0 12 " x 6 " T E E F O R H Y D R A N T ST A 1 3 + 6 3 . 0 0 12" GV WA T E R S E R V I C E CO N N E C T I O N ST A 1 7 + 4 6 . 4 0 6" MIN 3' MIN 3' MIN 3' MIN 24 25 28 29 31 11.25° BEND STA 17+92 11.25° BEND STA 18+26 12" DI W 4.04' 11.25° BEND STA 18+31 12" DI W 206.75' 12" DI W 61.58' 12" DI W 153.88'12" DI W 182.70' 12" DI W 18.98' 12" DI W 6 0 . 2 9 ' 3' MIN 12" x 8" TEE STA 17+96 12" DI W 28.16' 12" GV 12" x 8" TEE STA 17+22 12" DI W 6.73' J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - W A T E R M A I N P L A N P R O F I L E I I I . D W G | 21 7 8 8 - C S - W M P l a n P r o f i l e I I I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 6 / 2 0 2 6 3 : 1 4 : 1 7 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 1/ 2 1 / 2 0 2 6 3 : 5 1 P M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 PLAN SCALE: 1"=20' PROPOSED WATER MAIN PROFILE SCALES VERT:1"=4' HORIZ:1"=20' N 0 20 40 CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2 PR O P O S E D W A T E R M A I N PL A N A N D P R O F I L E S T A 1 3 + 0 0 T O S T A 1 9 + 0 0 C-103                J. P I C K E R I N G 21 7 8 8 D. M E T Z C. S T A N L E Y CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   X CROSSING NUMBER: SEE 12" WATER MAIN SEPARATION TABLE ON SHEET C-501 Page 287 of 576 19+00 20+00 21+00 22+00 23+00 24+00 25+00 B-4 CO CO CO CO CO CO CO 40 + 0 0 40 + 8 2 12"12" O H E O H E UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UG F B O UG F B O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO OHE OHE OHE OHE O H E OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE G G G G G G G G G G G G G G G G G G G G G G G G G G G G UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO IRC 1/2" LB 7833 (fnd)IRC 1/2" LB 7833 (fnd) ENTRANCE ONLY ENTRANCE ONLY MEMORIAL MARKER STOP N&D LB 6987 (fnd) SCB TOP OF GRATE ELEV=134.83' S INV (15"RCP) ELEV=131.54 DMH TOP OF LID ELEV=134.98' N INV (34"X53"ERCP) ELEV=130.73 W INV (18"RCP) ELEV=130.93 E INV (48"CMP) ELEV=130.44 PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1545497.1210 E:482028.4270 ELEV:132.68' (NAVD 1988) FM ARV SCB TOP OF GRATE ELEV=134.62' N INV (15"RCP) ELEV=130.82 E INV (38"X60" RCP) ELEV=130.82 S INV (34"X53"ERCP) ELEV=130.75 LIL LIGHTS PRESCHOOL OCOEE CHURCH OF GOD 4' WOOD PICKET FENCE 4' WOOD PICKET FENCE 4' CHAIN LINK FENCE 4' CHAIN LINK FENCE GATE GATE 4' PVC FENCE 4' PVC FENCE 4' BARBED-WIRE FENCE DIRT DRIVE WAY 7891011 IR 1/2" (fnd) 5' WIDE CONC SIDEWALK MITERED END SECTION W INV (38"X60"ERCP) ELEV=131.10' 5' CHAIN-LINK FENCE 5' CHAIN-LINK FENCE CONCRETE DRIVEWAY CONCRETE DRIVEWAY BACK OF CURB CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY 17 T H A V E N U E CONCRETE DRIVEWAY ASPHALT DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY NORTH LAKEWOOD AVENUE (OCOEE CLARCONA ROAD) B-4 MA T C H LI N E DW G   C- 1 0 3 DW G   C- 1 0 4 MA T C H LI N E DW G   C- 1 0 4 DW G   C- 1 0 5 HORIZONTALLY DIRECTIONAL DRILL 1" POLYETHYLENE SINGLE METER RESIDENTIAL SERVICE CONNECTION ENCASE IN A 2" POLYETHYLENE SLEEVE SEE DETAILS UT206, UT207, AND UT208aSMH-17 SMH-8 SMH-16 1" POLYETHYLENE SINGLE METER RESIDENTIAL SERVICE CONNECTION SEE DETAILS UT206, UT207, AND UT208a 1" POLYETHYLENE SINGLE METER RESIDENTIAL SERVICE CONNECTION ENCASED IN A 2" POLYETHYLENE SLEEVE SEE DETAILS UT206, UT207, AND UT208a 12" GV 12" x 6" HYDRANT TEE, VALVE, AND ASSEMBLY PER DETAIL UT201 12" GV 1" POLYETHYLENE SINGLE METER RESIDENTIAL SERVICE CONNECTION SEE DETAILS UT206, UT207, AND UT208a 1" POLYETHYLENE SERVICE CONNECTION TO EXISTING METER SEE DETAIL UT206 12" x 6" HYDRANT TEE, VALVE, AND ASSEMBLY PER DETAIL UT201 (2) 12" 45° BENDS (2) 12" 45° BENDS 12" 11.25° BEND12" 11.25° BEND REMOVE AND REPLACE DRIVEWAY (TYP) 12" DI W 12" DI W ROOT BARRIER SEE DETAIL ON SHEET C-304 12" x 12" TEE 12" x 8" TEE 8" GV 8" DI W 8" MJ CAP 12 " D I W M 12" GV AND BLOWOFF ASSEMBLY CUT, GROUT FILL, AND CAP 6" PIPE 950 N LAKEWOOD AVE PID:07-22-28-0000-00-049 DOC#20180344043 1094 N LAKEWOOD AVE PID:08-22-28-0000-00-072 DOC#20240000886 1079 N LAKEWOOD AVE PID:08-22-28-0000-00-082 DOC#20140212727 NORTH OCOEE ADDITION NO. 1 PLAT BOOK 0, PAGE 68 1108 N LAKEWOOD AVE PID:07-22-28-0000-00-050 DOC#20040681218 1104 N LAKEWOOD AVE PID:07-22-28-0000-00-057 DOC#20190801059 1102 N LAKEWOOD AVE PID:07-22-28-0000-00-060 DOC#20190801059 1079 N LAKEWOOD AVE PID:08-22-28-0000-00-082 DOC#20140212727 1081 N LAKEWOOD AVE PID:08-22-28-0000-00-053 ORB 49661, PG 4184 1085 N LAKEWOOD AVE PID:08-22-28-0000-00-051 DOC#20160289785 950 N LAKEWOOD AVE PID:07-22-28-0000-00-049 DOC#20180344043 1105 N LAKEWOOD AVE (2) 12" 11.25° BENDS 12" GV 12" GV CONTRACTOR TO FIELD VERIFY CROSSING LOCATION ORANGE COUNTY ROWOCOEE ROW 120 125 130 135 140 145 120 125 130 135 140 145 19+00 20+00 21+00 22+00 23+00 24+00 25+00 13 2 . 0 13 2 . 3 13 2 . 5 13 2 . 7 13 3 . 0 13 3 . 2 13 3 . 5 13 3 . 8 13 4 . 0 13 4 . 2 13 4 . 5 13 4 . 7 13 4 . 9 13 5 . 1 13 5 . 5 13 5 . 7 13 6 . 0 13 6 . 3 13 6 . 5 13 6 . 8 13 7 . 0 13 7 . 3 13 7 . 7 13 7 . 9 13 8 . 2 45.00° BEND STA 21+79 45.00° BEND STA 21+84 6" SS LATERAL 6" SS LATERAL 6" SS LATERAL 1/2" UGFBO 8" S STUB OUT 6" W 38" X 60" ERCP CULVERT INV EL AT OUT FALL SHOWN EXISTING GRADE 11.25° BEND STA 21+3311.25° BEND STA 20+38 3' MIN 3' MIN 12" MIN 12" MIN WA T E R S E R V I C E C O N N E C T I O N ST A 2 4 + 9 3 . 0 0 WA T E R S E R V I C E C O N N E C T I O N ST A 2 1 + 0 5 . 0 0 WA T E R S E R V I C E CO N N E C T I O N ST A 2 0 + 4 9 . 4 8 WA T E R S E R V I C E CO N N E C T I O N ST A 2 0 + 3 5 . 0 0 WA T E R S E R V I C E CO N N E C T I O N ST A 1 9 + 8 5 . 0 0 37 39 40 41 42 44 12" MIN 12 " x 6 " T E E F O R H Y D R A N T ST A 2 0 + 6 3 . 0 0 12 " x 6 " T E E F O R H Y D R A N T ST A 2 4 + 8 0 . 0 0 12" GV 6" MIN 38 6" SS LATERAL 6" SS LATERAL 36 12" GV 3' MIN 43 3' MIN 3' MIN 12" DI W 8.14' 12" DI W 35.01' 12" DI W 72.65'12" DI W 20.83' 12" DI W 206.75'3' MIN 12" MIN 12" DI W 33.98' 12" GV 12" DI W 9.23' 12" GV 12" DI W 20.42' 12" x 12" TEE STA 22+77 12" DI W 190.94' 12" x 8" TEE STA 22+43 12" DI W 11.34' 12" DI W 4.14' 12" DI W 72.01' 11.25° BEND STA 24+69 11.25° BEND STA 24+74 12" DI W 10.47' 11.25° BEND STA 22+19 11.25° BEND STA 22+30 J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - W A T E R M A I N P L A N P R O F I L E I V . D W G | 21 7 8 8 - C S - W M P l a n P r o f i l e I V | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 6 / 2 0 2 6 3 : 1 5 : 1 0 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 2/ 2 6 / 2 0 2 6 1 0 : 5 2 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 PLAN SCALE: 1"=20' PROPOSED WATER MAIN PROFILE SCALES VERT:1"=4' HORIZ:1"=20' N 0 20 40 CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2 PR O P O S E D W A T E R M A I N PL A N A N D P R O F I L E S T A 1 9 + 0 0 T O S T A 2 5 + 0 0 C-104 RE V I S I O N S   P E R   C I T Y   C O M M E N T S   A F T E R   B I D   I S S U A N C E     AS         02 / 2 6 J. P I C K E R I N G 21 7 8 8 D. M E T Z C. S T A N L E Y CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   X CROSSING NUMBER: SEE 12" WATER MAIN SEPARATION TABLE ON SHEET C-501 1 1 1 Page 288 of 576 25+00 26+00 27+00 28+00 29+00 B-2 B-3 50 + 0 0 50 + 3 9 60 + 0 0 60 + 3 1 CO CO CO CO CO CO CO 37"35"12" 24" 6" 13"10"6" 7"7"14" 10" 9"9"10" 8" 10" 7"9"6"6"6"7" 9" 8"7" 10" 15" 11" 10" 6" 6"8"6"9" 14" 9" 12" 8"10" 12" 8" O H E UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UG F B O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE G G G G G G G G G G G G G G G G G G G G G G G U G F B O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO STOP WATER STOP WATER IRC 5/8" PSM 5205 (fnd) 4' POST RAIL FENCE 4' POST RAIL FENCE 4' POST RAIL FENCE 6789106 16 T H A V E N U E 15TH AVENUE 50' R/W PLAT BOOK O, PAGE 68 11 11 PID:07-22-28-0000-00-099 DOC#20200253532 PROJECT BENCHMARK SET NAIL & DISK L&S LB 7829 N:1546051.7920 E:482073.7180 ELEV:139.72' (NAVD 1988) PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1546358.9390 E:482064.2430 ELEV:142.01' (NAVD 1988) IRC 5/8" PSM 5205 (fnd) IRC 5/8" PSM 5205 (fnd) IP 212 (fnd) IRC 5/8" PSM 5205 (fnd) IRC 5/8" PSM 5205 (fnd) IRC 5/8" PSM 5205 (fnd) 5' CHAIN-LINK FENCE CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY NORTH LAKEWOOD AVENUE (OCOEE CLARCONA ROAD) B-2 B-3 MA T C H LI N E DW G   C- 1 0 4 DW G   C- 1 0 5 SMH-19 SMH-10 SMH-18 SMH-9 HORIZONTALLY DIRECTIONAL DRILL 1" POLYETHYLENE SINGLE METER RESIDENTIAL SERVICE CONNECTION ENCASED IN A 2" POLYETHYLENE SLEEVE SEE DETAILS UT206, UT207, AND UT208a 1" POLYETHYLENE SERVICE CONNECTION TO EXISTING METER SEE DETAIL UT206 1" POLYETHYLENE SERVICE CONNECTION TO EXISTING METER SEE DETAIL UT206 1" POLYETHYLENE SERVICE CONNECTION TO EXISTING METER 1.5" SEE DETAIL UT206 2" G A L V A N I Z E D S T E E L W M (C O N T R A C T O R T O F I E L D V E R I F Y ) 2" G A L V A N I Z E D W M (C O N T R A C T O R T O FI E L D V E R I F Y ) 12" x 6" HYDRANT TEE, VALVE, & ASSEMBLY PER DETAIL UT201 12" GV (2) CONNECT TO 2" WM WITH TRANSITION COUPLING 12" x 8" TEE, 12" GV (2) AND 8" GV CONNECT TO 2" WM WITH TRANSITION COUPLING 12" x 8" TEE 2" LINESTOP, CUT AND CAP 2" LINESTOP CUT AND CAP CONNECT TO EXISTING 2" BACKFLOW PREVENTER REMOVE AND REPLACE EXISTING FIRE HYDRANT (2) 12" 11.25° BENDS 12" 11.25° BEND 12" 11.25° BEND REMOVE AND REPLACE DRIVEWAY (TYP) 8" x 2" SERVICE SADDLE 8" GV AND BLOWOFF ASSEMBLY 2" GV (2) 11.25° BENDSCONCRETE DRIVEWAY (2) 11.25° BENDS 12" DI W 12" DI W 12" DI W NORTH OCOEE ADDITION NO. 1 PLAT BOOK 0, PAGE 68 MASK FAMILY TRUST PID:07-22-28-0000-00-099 DOC#20200253532 1137 N LAKEWOOD AVE 1143 N LAKEWOOD AVE 1149 N LAKEWOOD AVE 1155 N LAKEWOOD AVE 1161 N LAKEWOOD AVE 1167 N LAKEWOOD AVE NORTH OCOEE ADDITION NO. 1 PLAT BOOK 0, PAGE 68 1105 N LAKEWOOD AVE 1" POLYETHYLENE SERVICE CONNECTION TO EXISTING METER SEE DETAIL UT206 ROOT BARRIER SEE DETAIL ON SHEET C-304 ROOT BARRIER SEE DETAIL ON SHEET C-304 ROOT BARRIER SEE DETAIL ON SHEET C-304 12" X 8" TEE, 8" GV (2) 2" CAPS8" CAP 8" x 2" SERVICE SADDLE 2" LINESTOP CONTRACTOR TO ENSURE SERVICE CONNECTION IS NOT INTERRUPTED BY PROVIDING TEMPORARY BYPASS WATER TO CUSTOMERS DURING CONSTRUCTION 2" LINESTOP CONTRACTOR TO ENSURE SERVICE CONNECTION IS NOT INTERRUPTED BY PROVIDING TEMPORARY BYPASS WATER TO CUSTOMERS DURING CONSTRUCTION 2" GV (4) 12" 45° BENDS CONNECT TO EXISTING 12" WM WITH 12" TAPPING SLEEVE AND VALVE 12" LINESTOP, CUT, GROUT FILL, AND CAP 50' 125 130 135 140 145 150 125 130 135 140 145 150 128+08 128+75 125 130 135 140 145 150 125 130 135 140 145 150 25+00 26+00 27+00 28+00 29+00 29+28 13 8 . 2 13 8 . 4 13 8 . 7 13 8 . 9 13 9 . 1 13 9 . 4 13 9 . 7 14 0 . 0 14 0 . 2 14 0 . 5 14 0 . 8 14 1 . 0 14 1 . 1 14 1 . 2 14 1 . 4 14 1 . 5 14 1 . 7 14 1 . 9 14 1 . 9 45.00° BEND STA 29+26 STA 128+09 6" SS LATERAL 6" SS LATERAL6" SS LATERAL 6" SS LATERAL 1/2" UGFBO 1/2" UGFBO 6" W 1" W 2" W 1" W 1" W 1" W 2" W EXISTING GRADE 8" S STUB OUT 6" MIN 6" MIN 6" MIN 3' MIN 8" S STUB OUT12" MIN 12" MIN 3' MIN WA T E R S E R V I C E CO N N E C T I O N ST A 2 5 + 8 8 . 0 0 WA T E R S E R V I C E CO N N E C T I O N ST A 2 6 + 5 4 . 5 9 WA T E R S E R V I C E C O N N E C T I O N ST A 2 8 + 4 1 . 7 7 47 53 54 59 61 56 12 " x 6 " T E E F O R H Y D R A N T ST A 2 8 + 8 5 . 0 0 WA T E R S E R V I C E CO N N E C T I O N ST A 2 5 + 1 4 . 2 7 12 " x 2 " S E R V I C E SA D D L E ST A 2 5 + 9 2 . 0 0 WA T E R S E R V I C E C O N N E C T I O N ST A 2 7 + 4 8 . 0 8 6" MIN 6" SS LATERAL57 6" SS LATERAL 51 45 46 48 49 50 52 11.25° BEND STA 26+81 11.25° BEND STA 27+02 3' MIN 60 3' MIN 11.25° BEND STA 29+15 11.25° BEND STA 29+08 11.25° BEND STA 28+97 11.25° BEND STA 28+89 5855 12"x6" TEE STA 29+04 12" GV 12" GV 12" GV 12" GV 12" DI W 72.01' 12" DI W 3.43' 12" DI W 86.73' 12" D I W 1 9 . 1 2 ' 12" DI W 7.19' 12" DI W 5.68' 12" DI W 2.44' 12" DI W 6.36' 12" MIN 11.25° BEND STA 25+49 11.25° BEND STA 25+65 3' MIN 12" DI W 24.71' 12" DI W 14.87' 3' MIN 12" DI W 10.10' 12" DI W 180.76' 13 9 . 1 13 8 . 3 13 8 . 4 12" DI W 4.69' 12" DI W 37.98' 12" DI W 10.88' CONNECT TO EXISTING 12" WM W/ 12" TAPPING SLEEVE AND VALVE 12" DI W 37.98' 45.00° BEND STA 29+26 STA 128+09 45.00° BEND STA 128+15 45.00° BEND STA 128+54 45.00° BEND STA 128+55 45.00° BEND STA 128+67 45.00° BEND STA 128+69 2" GAS 1/2" UGFBO 6" W 6" W 6" MIN 6" MIN12" S J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - W A T E R M A I N P L A N P R O F I L E V . D W G | 21 7 8 8 - C S - W M P l a n P r o f i l e V | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 6 / 2 0 2 6 3 : 1 6 : 0 3 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 2/ 2 6 / 2 0 2 6 1 1 : 0 3 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 PLAN SCALE: 1"=20' PROPOSED WATER MAIN PROFILE SCALES VERT:1"=4' HORIZ:1"=20' N 0 20 40 CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2 PR O P O S E D W A T E R M A I N PL A N A N D P R O F I L E S T A 2 5 + 0 0 T O S T A 2 9 + 5 0 C-105 RE V I S I O N S   P E R   C I T Y   C O M M E N T S   A F T E R   B I D   I S S U A N C E     AS         02 / 2 6 J. P I C K E R I N G 21 7 8 8 D. M E T Z C. S T A N L E Y CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   X CROSSING NUMBER: SEE 12" WATER MAIN SEPARATION TABLE ON SHEET C-501 (2) 12" 45° BENDS 1 1 1 1 1 Page 289 of 576 14+00 15+00 16+00 17+00 18+00 19+00 20+00 MA T C H LI N E DW G   C- 2 0 1 DW G   C- 2 0 2 CO CO CO CO COCO CO34" 20/10" TWIN OH E OH E OH E X X UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UG F B O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO O H E OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE O H E O H E O H E OH E OH E OHE OHE OHE OHE O H E OHE OHE UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO G G G G G G G G G G G G G G G G G G G G G G G G G G G G UGE UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO 18" S INV (18"RCP) ELEV=128.78' MEMORIAL MARKERMPH 25 SCB TOP OF GRATE ELEV=128.65' S INV (15"RCP) ELEV= 126.18 IRC 1/2" LB 4596 (fnd) X-CUT (fnd) WATER WATER WATER WATER PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1545497.1210 E:482028.4270 ELEV:132.68' (NAVD 1988) MON 4"X4" (fnd) IP 1" (fnd) WATER WATER X-CUT (fnd) MEMORIAL MARKER FM FM 4' CHAIN LINK FENCE 4' CHAIN LINK FENCE STONE PLATER 5' METAL FENCE 4' BARBED-WIRE FENCE LA U R E L R I D G E A V E N U E TRACT C LIFT STATION 950 N LAKEWOOD AVE PID:07-22-28-0000-00-049 DOC#20180344043 922 N LAKEWOOD AVE PID:07-22-28-0000-00-048 DOC#20180344043 914 N LAKEWOOD AVE PID:07-22-28-0000-00-062 DOC#20190549959 ZACK INVESTMENTS LAKEWOOD AVENUE LLC PID:7-22-28-0000-00-090 DOC#20180523897 1094 N LAKEWOOD AVE PID:08-22-28-0000-00-072 DOC#20240000886 1079 N LAKEWOOD AVE PID:08-22-28-0000-00-082 DOC#20140212727 915 CLARCONA OCOEE RD PID:08-22-28-0000-00-017 DOC#20120018967 911 CLARCONA OCOEE RD PID:08-22-28-0000-00-018 DOC#20020623775 PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1544881.6580 E:482058.2010 ELEV:127.89' (NAVD 1988) 5' METAL FENCE N&D NO ID (fnd)N&D NO ID (fnd) 5' WIDE CONC SIDEWALK 5' WIDE CONC SIDEWALK EDGE OF ASPHALT ROAD CONCRETE DRIVEWAY DIRT DRIVE WAY CONCRETE CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY SCB TO OF GRATE ELEV=127.09' N INV (24"RCP) ELEV=124.29 S INV (24"RCP) ELEV=124.19 SCB TOP OF GRATE ELEV=129.34' N INV (18"RCP) ELEV=126.79 E INV (24"RCP) ELEV=126.70 S INV (24"RCP) ELEV=126.59 NORTH LAKEWOOD AVENUE (OCOEE CLARCONA ROAD) PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1545170.7030 E:482058.1970 ELEV:130.40' (NAVD 1988) 10' LANDSCAPE, UTILITY, WALL & SIGNAGE EASEMENT(P) 5' ADDITIONAL R/W(P) 129 129 130 130 131 131 132 132 133 SMH-7SMH-6 (PHASE 1)12" PVC S12" PVC S PHASE 2 DESIGN SEE PHASE 1 DRAWING SET FOR CONTINUATION B-5B-6 SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-302 SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-302 SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-302 REMOVE AND REPLACE CONCRETE SIDEWALK, SEE DETAIL PW005 ON SHEET C-305 109 LAUREL RIDGE AVE 107 LAUREL RIDGE AVE 6" CLEANOUT 6" CLEANOUT 6" CLEANOUT 6" CLEANOUT SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-302 MILL AND REPLACE 25' FROM TRENCH BOTH DIRECTIONS SMH C 8" P V C S MILL AND REPLACE 25' FROM TRENCH BOTH DIRECTIONS SEE PLAN DETAIL SHEET C-221 CORE AND CONNECT TO EXISTING SMH C AT INVERT 130.32 TO FIT 8" PIPE REMOVE AND REPLACE DRIVEWAY (TYP) 6" CLEANOUT SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-302 MILL AND REPLACE 110 115 120 125 130 135 140 110 115 120 125 130 135 140 14+25 15+00 16+00 17+00 18+00 19+00 20+00 20+25 12 8 . 0 12 8 . 2 12 8 . 4 12 8 . 7 12 8 . 9 12 9 . 2 12 9 . 4 12 9 . 6 12 9 . 9 13 0 . 0 13 0 . 3 13 0 . 4 13 0 . 6 13 0 . 8 13 1 . 0 13 1 . 2 13 1 . 4 13 1 . 5 13 1 . 7 13 2 . 0 13 2 . 3 13 2 . 5 13 2 . 7 13 3 . 0 13 3 . 2 EXISTING GRADE 12" S L=392' S=0.25% SM H - 7 RI M E L . = 1 3 1 . 2 8 ST A 1 8 + 2 1 6 ' R 12 " I N V I N ( N ) = 1 2 3 . 0 0 8" I N V I N ( E ) = 1 2 5 . 7 8 8" D R O P I N V I N ( E ) = 1 2 3 . 3 8 12 " I N V O U T ( S ) = 1 2 2 . 9 0 SM H - 6 RI M E L . = 1 2 7 . 9 4 ST A 1 4 + 2 8 6 ' R 12 " I N V I N ( N ) = 1 2 1 . 9 4 12 " I N V O U T ( S ) = 1 2 1 . 8 4 6" FM 24" SD1/2" UGFBO 8" W 2.5" W 12" S L=409' S=0.88% 2" W SE R V I C E L A T E R A L W Y E ST A 1 5 + 3 1 . 6 8 SE R V I C E L A T E R A L W Y E ST A 1 5 + 2 7 . 2 9 SE R V I C E L A T E R A L W Y E ST A 1 7 + 1 7 . 8 1 SE R V I C E L A T E R A L W Y E ST A 2 0 + 0 3 . 1 7 6" MIN1 2 3 4B4 5 SE R V I C E L A T E R A L W Y E ST A 1 9 + 7 3 . 0 2 J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - P L A N P R O F I L E I . D W G | 21 7 8 8 - C S - P l a n P r o f i l e I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 6 / 2 0 2 6 3 : 1 7 : 1 6 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 1/ 2 1 / 2 0 2 6 3 : 5 7 P M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 PLAN SCALE: 1"=20' PROFILE SCALES VERT:1"=4' HORIZ:1"=20' N 0 20 40 CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2 PR O P O S E D G R A V I T Y S E W E R PL A N A N D P R O F I L E S T A 1 4 + 2 5 T O S T A 2 0 + 2 5 C-201                D. M E T Z 21 7 8 8 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   X CROSSING NUMBER: SEE SEPARATION TABLE ON SHEET C-501 Page 290 of 576 20+00 21+00 22+00 23+00 24+00 25+00 26+00 MA T C H LI N E DW G   C- 2 0 1 DW G   C- 2 0 2 MA T C H LI N E DW G   C- 2 0 2 DW G   C- 2 0 3 CO CO CO CO CO CO CO 120+00 IRC 1/2" LB 7833 (fnd)IRC 1/2" LB 7833 (fnd) ENTRANCE ONLY ENTRANCE ONLY STOP WATER STOP N&D LB 6987 (fnd) SCB TOP OF GRATE ELEV=134.83' S INV (15"RCP) ELEV=131.54 DMH TOP OF LID ELEV=134.98' N INV (34"X53"ERCP) ELEV=130.73 W INV (18"RCP) ELEV=130.93 E INV (48"CMP) ELEV=130.44 FM ARV SCB TOP OF GRATE ELEV=134.62' N INV (15"RCP) ELEV=130.82 E INV (38"X60" RCP) ELEV=130.82 S INV (34"X53"ERCP) ELEV=130.75 IRC 5/8" PSM 5205 (fnd) IP 212 (fnd)IR 1/2" (fnd) MITERED END SECTION W INV (38"X60"ERCP) ELEV=131.10' 6" 13"10"6" 7"7" 12"12" O H E O H E O H E UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UG F B O UG F B O UG F B O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO O H E OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE G G G G G G G G G G G G G G G G G G G G G G G G G G G G G U G F B O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1545497.1210 E:482028.4270 ELEV:132.68' (NAVD 1988) LIL LIGHTS PRESCHOOL OCOEE CHURCH OF GOD 4' WOOD PICKET FENCE 4' WOOD PICKET FENCE 4' CHAIN LINK FENCEGATE GATE 4' POST RAIL FENCE 4' PVC FENCE 4' PVC FENCE DIRT DRIVE WAY 6 7 8910 16 T H A V E N U E 11 NORTH OCOEE ADDITION NO. 1 PLAT BOOK 0, PAGE 68 11 1108 N LAKEWOOD AVE PID:07-22-28-0000-00-050 DOC#20040681218 1104 N LAKEWOOD AVE PID:07-22-28-0000-00-057 DOC#20190801059 1102 N LAKEWOOD AVE PID:07-22-28-0000-00-060 DOC#20190801059 1079 N LAKEWOOD AVE PID:08-22-28-0000-00-082 DOC#20140212727 1081 N LAKEWOOD AVE PID:08-22-28-0000-00-053 ORB 49661, PG 4184 1085 N LAKEWOOD AVE PID:08-22-28-0000-00-051 DOC#20160289785 950 N LAKEWOOD AVE PID:07-22-28-0000-00-049 DOC#20180344043 MASK FAMILY TRUST PID:07-22-28-0000-00-099 DOC#20200253532 PROJECT BENCHMARK SET NAIL & DISK L&S LB 7829 N:1546051.7920 E:482073.7180 ELEV:139.72' (NAVD 1988) 5' CHAIN-LINK FENCE 5' CHAIN-LINK FENCE CONCRETE DRIVEWAY CONCRETE DRIVEWAY BACK OF CURB CONCRETE DRIVEWAYCONCRETE DRIVEWAY 17 T H A V E N U E CONCRETE DRIVEWAY CONCRETE DRIVEWAYCONCRETE DRIVEWAY ASPHALT DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY NORTH LAKEWOOD AVENUE (OCOEE CLARCONA ROAD) 13 5 13 6 13 5 13 4 13 3 13 2 1 3 1 1 3 1 1 3 2 1 3 3 1 3 4 1 3 5 1 3 5 1 3 4 1 3 3 1 3 2 13 3 13 4 13 5 136 135 136 136 137 138 137 137 138 139 140 139 SMH-9SMH-8 12" PVC S12" PVC S12" PVC S 8" PVC S 8" PVC S SMH-16 SMH-18 B-3B-4 ORANGE COUNTY ROWOCOEE ROW SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-302 SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-302 SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-302 SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-302 MILL AND REPLACE 50' FROM TRENCH BOTH DIRECTIONS 3 FT TRENCH THEN START MILL AND REPLACE REMOVE AND REPLACE CONCRETE SIDEWALK, SEE DETAIL PW005 ON SHEET C-305 REMOVE AND REPLACE CONCRETE SIDEWALK, SEE DETAIL PW005 ON SHEET C-305 REMOVE AND REPLACE CONCRETE SIDEWALK, SEE DETAIL PW005 ON SHEET C-305 1105 N LAKEWOOD AVE 1137 N LAKEWOOD AVE 6" CLEANOUT 6" CLEANOUT 6" CLEANOUT 6" CLEANOUT 8" PVC S SMH-17 6" CLEANOUT SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-302 REMOVE AND REPLACE DRIVEWAY (TYP) 6" CLEANOUT SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-302 MILL AND REPLACE MILL AND REPLACE 120 125 130 135 140 145 150 120 125 130 135 140 145 150 20+25 21+00 22+00 23+00 24+00 25+00 26+00 26+25 13 3 . 2 13 3 . 5 13 3 . 8 13 4 . 0 13 4 . 2 13 4 . 5 13 4 . 7 13 4 . 9 13 5 . 1 13 5 . 5 13 5 . 7 13 6 . 0 13 6 . 3 13 6 . 5 13 6 . 8 13 7 . 0 13 7 . 3 13 7 . 7 13 7 . 9 13 8 . 2 13 8 . 4 13 8 . 7 13 8 . 9 13 9 . 1 13 9 . 4 EXISTING GRADE 12" S L=339' S=1.83% 12" S L=409' S=0.88% SM H - 9 RI M E L . = 1 3 9 . 0 1 ST A 2 5 + 6 9 7 ' R 12 " I N V I N ( N ) = 1 3 3 . 0 1 8" I N V I N ( E ) = 1 3 3 . 2 6 12 " I N V O U T ( S ) = 1 3 2 . 9 1 SM H - 8 RI M E L . = 1 3 5 . 2 0 ST A 2 2 + 3 0 6 ' R 12 " I N V I N ( N ) = 1 2 6 . 7 0 8" I N V I N ( E ) = 1 2 6 . 7 0 8" I N V I N ( W ) = 1 2 6 . 7 0 12 " I N V O U T ( S ) = 1 2 6 . 6 0 18" SD 1/2" UGFBO 1/2" UGFBO SE R V I C E L A T E R A L W Y E ST A 2 3 + 9 0 . 9 2 SE R V I C E L A T E R A L WY E ST A 2 0 + 4 4 . 0 2 SE R V I C E L A T E R A L WY E ST A 2 1 + 2 5 . 2 1 SE R V I C E L A T E R A L W Y E ST A 2 4 + 6 1 . 1 0 6 7 8 SE R V I C E L A T E R A L W Y E ST A 2 6 + 1 2 . 2 8 SE R V I C E L A T E R A L WY E ST A 2 0 + 8 8 . 0 2 12" MIN 7B 12" W J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - P L A N P R O F I L E I I . D W G | 21 7 8 8 - C S - P l a n P r o f i l e I I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 6 / 2 0 2 6 3 : 1 8 : 0 4 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 1/ 1 9 / 2 0 2 6 3 : 3 3 P M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 PLAN SCALE: 1"=20' PROFILE SCALES VERT:1"=4' HORIZ:1"=20' N 0 20 40 CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2 PR O P O S E D G R A V I T Y S E W E R PL A N A N D P R O F I L E S T A 2 0 + 2 5 T O S T A 2 6 + 2 5 C-202                D. M E T Z 21 7 8 8 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   X CROSSING NUMBER: SEE SEPARATION TABLE ON SHEET C-501 Page 291 of 576 26+00 27+00 28+00 29+00 30+00 31+00 32+00 MA T C H LI N E DW G   C- 2 0 2 DW G   C- 2 0 3 MA T C H LI N E DW G   C- 2 0 3 DW G   C- 2 0 4 CO CO CO CO CO CO CO CO 12 8 + 7 1 CO STOP WATER STOP FM IRRIGATION CITGO AND GAS PRICES IRC 5/8" PSM 5205 (fnd) IRC 5/8" PSM 5205 (fnd) IRC 5/8" PSM 5205 (fnd) IRC 5/8" PSM 5205 (fnd) IRC 5/8" PSM 5205 (fnd) MWMW MW MWMWMW MW MW MW 37" 35"12" 24" 6" 13"10"6" 7"7"14" 10" 9"9"10" 8" 10" 7"9"6"6"6"7" 9" 8"7" 10" 15" 11" 10" 6" 6"8"6"9" 14" 9" 12" 8"10" 12" 8" 6" 6"12"4"4"17" 18"4"4"7" MWMW O H E UGFBO UGFBO UGFBOUGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UG F B O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGE UGE UGE UGE UGE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OH E OHE OHE OHE G G G G G G G G G G G G G G G G G G G G G G G G G G G G G U G F B O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGF B O UGFBO UGFBO UGFBO UGFBO 4' POST RAIL FENCE 4' POST RAIL FENCE 4' POST CHAIN FENCE 4' POST CHAIN FENCE 4' POST CHAIN FENCE STONE PLANTER BRICK WALL 10' D.U.W.L.E.(P) TRACT "D" 10' ADDITIONAL R/W (P) 1 67891067 8 910 15 T H A V E N U E 11 NORTH OCOEE ADDITION NO. 1 PLAT BOOK 0, PAGE 68 NORTH OCOEE ADDITION NO. 1 PLAT BOOK 0, PAGE 68 11 MASK FAMILY TRUST PID:07-22-28-0000-00-099 DOC#20200253532 101 CLINGER COVE RD LAKEWOOD MANOR PLAT BOOK 72, PAGE 100 PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1546358.9390 E:482064.2430 ELEV:142.01' (NAVD 1988) EDGE OF ASPHALT ROAD CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY NORTH LAKEWOOD AVENUE (OCOEE CLARCONA ROAD) LANDSCAPE AREA 141 141 142 142 142 143 143 143 144 144 144 SMH-1012" PVC S 140 8" PVC S 12" PVC S SMH-19 B-1B-2 OVERALL INFERRED GROUNDWATER NADC PLUME OVERALL INFERRED GROUNDWATER GCTL PLUME SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-302 SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-302 SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-302 SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-302 SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-302 SMH-11 12" PVC FM MILL AND REPLACE 50' FROM TRENCH BOTH DIRECTIONS 6' - 2 " REMOVE AND REPLACE CONCRETE SIDEWALK, SEE DETAIL PW005 ON SHEET C-305 REMOVE AND REPLACE CONCRETE SIDEWALK, SEE DETAIL PW005 ON SHEET C-305 REMOVE AND REPLACE CONCRETE SIDEWALK, SEE DETAIL PW005 ON SHEET C-305 REMOVE AND REPLACE CONCRETE SIDEWALK, SEE DETAIL PW005 ON SHEET C-305 REMOVE AND REPLACE CONCRETE SIDEWALK, SEE DETAIL PW005 ON SHEET C-305 3 FT TRENCH THEN START MILL AND REPLACE 1137 N LAKEWOOD AVE 1143 N LAKEWOOD AVE 1149 N LAKEWOOD AVE 1155 N LAKEWOOD AVE 1161 N LAKEWOOD AVE 1167 N LAKEWOOD AVE 1207 N LAKEWOOD AVE 1399 N LAKEWOOD AVE SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-302 6" CLEANOUT 6" CLEANOUT 6" CLEANOUT 6" CLEANOUT 6" CLEANOUT 6" CLEANOUT TO BE LINED PER DETAIL UT101 ON SHEET C-304 TO BE LINED PER DETAIL UT101 ON SHEET C-304 45° BENDS 45° BENDS 4' POST RAIL FENCE MILL AND REPLACE 50' FROM TRENCH BOTH DIRECTIONS ROOT BARRIER SERVICE LATERAL, SEE DETAIL UT105 ON SHEET C-302 REMOVE AND REPLACE DRIVEWAY (TYP) 4" FM 4" PV AND CAP MILL AND REPLACE HORIZONTALLY DIRECTIONAL DRILL 2" POLYETHYLENE SINGLE METER RESIDENTIAL SERVICE CONNECTION ENCASED IN A 4" POLYETHYLENE SLEEVE SEE DETAILS UT206, UT207, AND UT208a CONCRETE DRIVEWAY REPAIR (TYP) 125 130 135 140 145 150 155 125 130 135 140 145 150 155 26+25 27+00 28+00 29+00 30+00 31+00 32+00 32+25 13 9 . 4 13 9 . 7 14 0 . 0 14 0 . 2 14 0 . 5 14 0 . 8 14 1 . 0 14 1 . 1 14 1 . 2 14 1 . 4 14 1 . 5 14 1 . 7 14 1 . 9 14 2 . 1 14 2 . 3 14 2 . 4 14 2 . 6 14 2 . 8 14 3 . 1 14 3 . 3 14 3 . 5 14 3 . 7 14 3 . 9 14 4 . 1 14 4 . 3 EXISTING GRADE 12" S L=351' S=0.46% SM H - 1 0 RI M E L . = 1 4 1 . 9 6 ST A 2 9 + 2 0 6 ' R 12 " I N V I N ( N ) = 1 3 4 . 7 1 8" I N V I N ( E ) = 1 3 5 . 2 1 12 " I N V O U T ( S ) = 1 3 4 . 6 1 12" S L=144' S=0.35% 18" FM 6" W SM H - 1 1 RI M E L . = 1 4 2 . 9 6 ST A 3 0 + 6 4 5 ' R 12 " I N V I N ( N ) = 1 3 5 . 4 6 ( F M ) 4" I N V I N ( E ) = 1 3 5 . 4 6 ( F M ) 12 " I N V O U T ( S ) = 1 3 5 . 2 1 12" PVC L = 241' 1" UGFBO 45.00° BENDS STA 30+92 SE R V I C E L A T E R A L W Y E ST A 2 7 + 6 5 . 3 8 SE R V I C E L A T E R A L W Y E ST A 2 6 + 6 5 . 2 8 SE R V I C E L A T E R A L W Y E ST A 2 7 + 2 5 . 5 4 SE R V I C E L A T E R A L W Y E ST A 2 8 + 9 7 . 1 0 SE R V I C E L A T E R A L W Y E ST A 2 8 + 4 7 . 8 4 SE R V I C E L A T E R A L W Y E ST A 3 0 + 0 3 . 3 7 12" MIN 9 10 4 SE R V I C E L A T E R A L W Y E ST A 2 8 + 0 3 . 5 3 12" W J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - P L A N P R O F I L E I I I . D W G | 21 7 8 8 - C S - P l a n P r o f i l e I I I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 6 / 2 0 2 6 3 : 1 8 : 5 9 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 2/ 2 6 / 2 0 2 6 1 1 : 1 4 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 PLAN SCALE: 1"=20' PROFILE SCALES VERT:1"=4' HORIZ:1"=20' N 0 20 40 CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2 PR O P O S E D G R A V I T Y S E W E R PL A N A N D P R O F I L E S T A 2 6 + 2 5 T O S T A 3 2 + 2 5 C-203 RE V I S I O N S   P E R   C I T Y   C O M M E N T S   A F T E R   B I D   I S S U A N C E     AS         02 / 2 6 D. M E T Z 21 7 8 8 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   X CROSSING NUMBER: SEE SEPARATION TABLE ON SHEET C-501 X CROSSING NUMBER: SEE 12" FORCE MAIN SEPARATION TABLE ON SHEET C-501 1 1 1 Page 292 of 576 32+00 33+00 33+75 MA T C H LI N E DW G   C- 2 0 3 DW G   C- 2 0 4 MWMW MW MWMW MW 4"7" MW UG F B O UG F B O UGFBO UGFBOUGFBOUGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGE OHE OHE OHE OHE OHE OHE G G G G G G UGFBO UGFBO UGFBO UGFBO UGFBO TEST HOLE 10 SET N/D "L&S TEST HOLE" FORCEMAIN - 12" HDPE T.C. FORCEMAIN=-7.07' N: 1546722.86 E: 482064.13 ELEV: 145.07 CALC TEST HOLE #6 N&D CPH 7143 (fnd) N&D PSM 5792 (fnd) WATERWATER WATER STOP STOP FM FM FM FM STOP STOP IRRIGATION SCB TOP OF GRATE ELEV=146.49' FM WATER FM 5' CHAIN LINK FENCE STONE PLANTER BRICK WALL STONE PLANTER ABOVE GROUND CL I N G E R C O V E R O A D 10' D.U.W.L.E.(P) TRACT "D" 10' ADDITIONAL R/W (P) 38 10116 WU R S T R O A D ( F ) 14 T H A V E N U E ( P ) 1399 N LAKEWOOD AVE NORTH OCOEE ADDITION NO. 1 PLAT BOOK 0, PAGE 68 NORTH OCOEE ADDITION NO. 1 PLAT BOOK 0, PAGE 68 147 PARKER COVE CT LAKEWOOD MANOR PLAT BOOK 72, PAGE 100 101 CLINGER COVE RD LAKEWOOD MANOR PLAT BOOK 72, PAGE 100 PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1546773.1960 E:482015.0010 ELEV:144.71' (NAVD 1988) LANDSCAPE AREA NORTH LAKEWOOD AVENUE (OCOEE CLARCONA ROAD) LANDSCAPE AREA 145 145 145 146 14 4 144 145 14 4 145 B-1 OVERALL INFERRED GROUNDWATER NADC PLUME OVERALL INFERRED GROUNDWATER GCTL PLUME FM FM 45° BEND 12" PVC FM45° BEND 45° BEND 45° BEND 6' - 6 " 1' - 8 " REMOVE AND REPLACE CONCRETE SIDEWALK, SEE DETAIL PW005 ON SHEET C-305 REMOVE AND REPLACE CONCRETE SIDEWALK, SEE DETAIL PW005 ON SHEET C-305 8"x8" TAPPING SADDLE, 8" GV, AND 8" PV PER DETAIL UT107 8" P V C F M 8"x12" REDUCER 100 WURST RD FM MILL AND REPLACE 50' FEET FROM TRENCH BOTH DIRECTIONS MILL AND REPLACE 50' FEET FROM TRENCH BOTH DIRECTIONS 12" RCW 25 ' - 0 " 125 130 135 140 145 150 155 125 130 135 140 145 150 155 32+00 33+00 33+75 14 4 . 1 14 4 . 3 14 4 . 6 14 4 . 9 14 5 . 1 14 5 . 2 EXISTING GRADE 12" FM 12" PVC L = 241' 12" W 12" W 1/2" UGFBO 1/2" UGFBO 45.00° BEND STA 33+53 45.00° BEND STA 33+02 45.00° BEND STA 32+47 45.00° BEND STA 32+26 5 6 9 8 7 5B 12" RCW J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - P L A N P R O F I L E I V . D W G | 21 7 8 8 - C S - P l a n P r o f i l e I V | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 6 / 2 0 2 6 3 : 1 9 : 4 2 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 2/ 2 3 / 2 0 2 6 2 : 5 7 P M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 PLAN SCALE: 1"=20' PROFILE SCALES VERT:1"=4' HORIZ:1"=20' N 0 20 40 CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2 PR O P O S E D G R A V I T Y S E W E R PL A N A N D P R O F I L E S T A 3 2 + 2 5 T O S T A 3 3 + 7 5 C-204 RE V I S I O N S   P E R   C I T Y   C O M M E N T S   A F T E R   B I D   I S S U A N C E     AS         02 / 2 6 D. M E T Z 21 7 8 8 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   X CROSSING NUMBER: SEE 12" FORCE MAIN SEPARATION TABLE ON SHEET C-501 1 Page 293 of 576 22 + 0 0 40+00 40+82 IRC 1/2" LB 7833 (fnd) N&D LB 6987 (fnd) 12" OHE OHE OHE OHE UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O UGFBOUGFBOUGFBOUGFBO U G F B O UG F B O UG F B O UG F B O UG F B O UG F B O OH E OH E OH E OH E OH E OH E G G G G G G G G 132 134 136 134 134 132 1 3 6 UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O SCB TOP OF GRATE ELEV=134.83' S INV (15"RCP) ELEV=131.54 DMH TOP OF LID ELEV=134.98' N INV (34"X53"ERCP) ELEV=130.73 W INV (18"RCP) ELEV=130.93 SCB TOP OF GRATE ELEV=134.62' N INV (15"RCP) ELEV=130.82 E INV (38"X60" RCP) ELEV=130.82 S INV (34"X53"ERCP) ELEV=130.75 17TH AVENUE AS P H A L T D R I V E W A Y B-4 SMH-16SMH-8 12 " P V C S MITERED END SECTION W INV (38"X60"ERCP) ELEV=131.10' 8" PVC S NO R T H L A K E W O O D A V E N U E (O C O E E C L A R C O N A R O A D ) SMH-17 115 120 125 130 135 140 145 115 120 125 130 135 140 145 40+00 40+82 13 5 . 7 13 5 . 0 13 5 . 3 13 6 . 1 13 6 . 2 SM H - 1 6 RI M E L . = 1 3 6 . 2 6 ST A 2 2 + 3 0 4 9 ' R 8" I N V O U T ( W ) = 1 2 6 . 8 3 SM H - 8 RI M E L . = 1 3 5 . 2 0 ST A 2 2 + 3 0 6 ' R 12 " I N V I N ( N ) = 1 2 6 . 7 0 8" I N V I N ( E ) = 1 2 6 . 7 0 8" I N V I N ( W ) = 1 2 6 . 7 0 12 " I N V O U T ( S ) = 1 2 6 . 6 0 EXISTING GRADE 6" W 2" GAS 15" SD 8" S L=42' S=0.31% SM H - 1 7 RI M E L . = 1 3 5 . 9 0 ST A 2 2 + 3 0 3 3 ' L 8" I N V O U T ( E ) = 1 2 6 . 8 3 8" S L=39' S=0.33% 1/2" UGFBO 1/2" UGFBO 1/2" UGFBO 18" FM 8 9 7 5 64 3 26 + 0 0 50+00 50+39 OHEOHE UGFBOUGFBOUGFBO OH E OH E OH E OH E OH E OH E OH E OHE G G G G G G G UGFBO 14 0 IRC 5/8" PSM 5205 (fnd) 16TH AVENUE PROJECT BENCHMARK SET NAIL & DISK L&S LB 7829 N:1546051.7920 E:482073.7180 ELEV:139.72' (NAVD 1988) B-3 SMH-18SMH-9 12 " P V C S 8" PVC S 12 " P V C S NO R T H L A K E W O O D A V E N U E (O C O E E C L A R C O N A R O A D ) 120 125 130 135 140 145 150 120 125 130 135 140 145 150 50+00 50+39 13 9 . 1 13 9 . 9 14 0 . 4 8" S L=39' S=0.54% SM H - 1 8 RI M E L . = 1 4 0 . 5 0 ST A 2 5 + 6 9 4 6 ' R 8" I N V O U T ( W ) = 1 3 3 . 4 7 SM H - 9 RI M E L . = 1 3 9 . 0 1 ST A 2 5 + 6 9 7 ' R 12 " I N V I N ( N ) = 1 3 3 . 0 1 8" I N V I N ( E ) = 1 3 3 . 2 6 12 " I N V O U T ( S ) = 1 3 2 . 9 1 EXISTING GRADE 2" GAS 8" W 10 11 115 120 125 130 135 140 145 115 120 125 130 135 140 145 30+00 30+77 SM H - 7 RI M E L . = 1 3 1 . 2 8 ST A 1 8 + 2 1 6 ' R 12 " I N V I N ( N ) = 1 2 3 . 0 0 8" I N V I N ( E ) = 1 2 5 . 7 8 8" D R O P I N V I N ( E ) = 1 2 3 . 3 8 12 " I N V O U T ( S ) = 1 2 2 . 9 0 SM H C ST A 1 8 + 2 1 8 3 ' R RI M E L . = 1 3 4 . 8 5 IN V I N ( E ) = 1 3 0 . 4 2 IN V I N ( S W ) = 1 3 0 . 3 2 8" I N V O U T ( W ) = 1 3 0 . 3 2 2" GAS 6" W 8" S L=7 7 ' S = 5 . 9 2 % EXISTING GRADE 13 1 . 3 13 2 . 1 1 2 DROP CONNECTION SEE DETAIL UT102 ON SHEET C-304 18 + 0 0 30+00 30+77 X-CUT (fnd) OH E OH E OH E OH E OH E OH E OH E OHE OHE OHE G G G G G G G UG E N&D NO ID (fnd) N&D NO ID (fnd) LA U R E L R I D G E A V E N U E 50 ' R / W PL A T B O O K 5 4 , P A G E ( S ) 4 7 - 5 0 B-5 SMH-7 SMH C CORE AND CONNECT TO EXISTING SMH C AT INVERT 130.32 TO FIT 8" PIPE J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - S T U B P R O F I L E S . D W G | 21 7 8 7 - S t u b P r o f i l e s | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 6 / 2 0 2 6 3 : 2 0 : 2 0 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 12 / 8 / 2 0 2 5 1 0 : 1 0 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 ST U B - O U T A N D F O R C E M A I N P L A N S A N D P R O F I L E S I CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2 C-211                D. M E T Z 21 7 8 8 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   PROFILE SCALES VERT:1"=4' HORIZ:1"=20' PROFILE SCALES VERT:1"=4' HORIZ:1"=20' PLAN SCALE: 1"=10' PLAN SCALE: 1"=10' 0 10 2001020 NN PROFILE SCALES VERT:1"=4' HORIZ:1"=20' PLAN SCALE: 1"=10' 0 10 20 N X CROSSING NUMBER: SEE STUB OUT SEPARATION TABLE ON SHEET C-501 Page 294 of 576 8" UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O OH E OH E OH E OH E OH E OH E O H E OH E OHE G G G G G G G 142 14 2 142 1 4 2 14 2 PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1546358.9390 E:482064.2430 ELEV:142.01' (NAVD 1988) UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O 15TH AVENUE PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1546358.9390 E:482064.2430 ELEV:142.01' (NAVD 1988) CONCRETE DRIVEWAY B-2 29 + 0 0 60+00 60+31 128+71 SMH-19SMH-10 12 " P V C S 8" PVC S 12 " P V C S NO R T H L A K E W O O D A V E N U E (O C O E E C L A R C O N A R O A D ) 125 130 135 140 145 150 155 125 130 135 140 145 150 155 60+00 60+35 14 2 . 0 14 2 . 4 EXISTING GRADE 6" W 2" GAS 8" S L=31' S=0.83% SM H - 1 9 RI M E L . = 1 4 2 . 5 0 ST A 2 9 + 2 0 3 8 ' R 8" I N V O U T ( W ) = 1 3 5 . 4 7 SM H - 1 0 RI M E L . = 1 4 1 . 9 6 ST A 2 9 + 2 0 6 ' R 12 " I N V I N ( N ) = 1 3 4 . 7 1 8" I N V I N ( E ) = 1 3 5 . 2 1 12 " I N V O U T ( S ) = 1 3 4 . 6 1 12 13 12" W 12" 4" 4" 17" UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O U G F B O UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O UG E UG E UG E UG E UG E OH E OH E OH E OH E OH E OH E OH E O H E O H E G G G G G G G UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O 31 + 0 0 70+00 70+30 SMH-11 NO R T H L A K E W O O D A V E N U E (O C O E E C L A R C O N A R O A D ) 1 4 3 12 " P V C S 12 " F M 12" FM 45° BENDS 45° BENDS 125 130 135 140 145 150 155 125 130 135 140 145 150 155 70+00 70+35 14 3 . 2 14 3 . 2 1/2" UGFBO 1/2" UGFBO 12" W 3 1 2 12" FM 24.99' MW MW MW 17" 18" 4" 4" MW MW UG F B O UG F B O UG F B O UG F B O UG F B O U G F B O UG F B O UG F B O UG F B O UG F B O U G F B O UG F B O U G F B O UG F B O UG E UG E UG E UG E UG E UG E UG E OH E OH E OH E OH E OHEOHEOHE OH E OH E G G G G G G G 1 4 4 UG F B O UG F B O UG F B O UG F B O U G F B O UG F B O UG F B O 4' P O S T C H A I N F E N C E PA G E 1 0 0 31 + 0 0 NO R T H L A K E W O O D A V E N U E (O C O E E C L A R C O N A R O A D ) 14 4 12 " F M 12" x 2" SERVICE SADDLE J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - S T U B P R O F I L E S I I . D W G | 21 7 8 7 - S t u b P r o f i l e s I I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 6 / 2 0 2 6 3 : 2 0 : 5 6 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 2/ 2 6 / 2 0 2 6 1 1 : 2 9 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 ST U B - O U T A N D F O R C E M A I N P L A N S A N D P R O F I L E S I I CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2 C-212 RE V I S I O N S   P E R   C I T Y   C O M M E N T S   A F T E R   B I D   I S S U A N C E     AS         02 / 2 6 J. P I C K E R I N G 21 7 8 8 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   N 0 10 20 PLAN SCALE: 1"=10' PROFILE SCALES VERT:1"=4' HORIZ:1"=20' N 0 10 20 PLAN SCALE: 1"=10' PROFILE SCALES VERT:1"=4' HORIZ:1"=20' X CROSSING NUMBER: SEE STUB OUT SEPARATION TABLE ON SHEET C-501 X CROSSING NUMBER: SEE 12" FORCE MAIN SEPARATION TABLE ON SHEET C-501 N 0 10 20 PLAN SCALE: 1"=10' 1 1 Page 295 of 576 BUSHES (2) TRANSFORMERS TO REMAIN MATCH LINE C- 1 0 3 C- 2 2 1 6" FM 8" S CORE EXISTING MANHOLE PER SHEET C-201 2" W 2" W 18" S ELECTRICAL BOX ABOVE GRADE BACKFLOW PREVENTER TO REMAIN 6' BRICK WALL TO REMAIN TO REMAIN 6" F M J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - P L A N D E T A I L . D W G | 21 7 8 8 - C S - P l a n D e t a i l | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 6 / 2 0 2 6 3 : 2 2 : 0 0 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 1/ 1 9 / 2 0 2 6 1 0 : 3 1 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 LIFT STATION 46 DEMOLITION PLAN SCALE: N.T.S. N LI F T S T A T I O N 4 6 D E M O L I T I O N P L A N CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2 C-221                J. P I C K E R I N G 21 7 8 8 D. M E T Z C. S T A N L E Y CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   DEMOLITION NOTES 1.6' BRICK WALL AND ALL VEGETATION (BUSHES) ARE TO BE PROTECTED AND REMAIN. 2.ELEVATIONS ARE FROM THE FOREST RIDGE AS BUILT DRAWINGS CREATED BY NEAL HILER ENGINEERING INC. ARE APPROXIMATE AND SHOULD BE FIELD VERIFIED MODIFY EXISTING MANHOLE PLUGGING THE SOUTHWEST INVERT AND CORING THE WEST INVERT. 1 CUT, CAP AND GROUT FILL EXISTING 6" FORCE MAIN. 2 3 4 GROUT FILL EXISTING 8" GRAVITY SEWER. SAW CUT, REMOVE, AND REPLACE PAVEMENT WITH SOD PER SPECIFICATION SECTION 02480. 5 REMOVE CHAIN LINK FENCE AND GATE. 6 EXISTING VALVE VAULT SHALL BE REMOVED AND DISPOSED OF. ALL VALVES AND APPURTENANCES SHALL BE REMOVED AND PROVIDED TO THE CITY. 7 EXISTING WET WELL SHALL BE ABANDONED IN PLACE. ALL EQUIPMENT INCLUDING PUMPS, LEVEL SWITCHES, AND ELBOWS SHALL BE REMOVED AND PROVIDED TO THE CITY. CONCRETE TOP AND UPPER FOUR (4') FEET OF WALL CASING SHALL BE REMOVED AND DISPOSED OF. REMAINING STRUCTURE SHALL BE FILLED WITH SUITABLE FILL MATERIAL. 8 EXISTING ELECTRICAL CABINET AND PLC PANEL SHALL BE REMOVED AND ALL COMPONENTS SHALL BE PROVIDE TO THE CITY FOR SALVAGE. CONTRACTOR SHALL COORDINATE WITH DUKE ENERGY TO REMOVE MAINLINE POWER FEED TO THE LIFT STATION INCLUDING METER CAN AND TRANSFORMER. 9 REMOVE AND DISPOSE OF WATER METER AND BACK FLOW PREVENTER SYSTEM. 10 11 CUT, CAP AND GROUT FILL EXISTING 2" WATER SERVICE. 4 6 9 8 5 7 8 2 10 3 1 9 WATER METER PAVEMENT & FENCE CONTROL PANEL WET WELL & VALVE VAULT 8 6 7 4 5 REMOVE AND DISPOSE OF 4" ROCK BEDDING AND REPLACE WITH SUITABLE BACKFILL AND SOD (TYP). 11 5 5 7 3 1 PUMP STATION SECTION SCALE: N.T.S. HIGH LEVEL ALARM ELEV. X LAG PUMP ON ELEV. W LEAD PUMP ON ELEV. V BOTH PUMPS OFF ELEV. U MIN 3/4 DIA. x 11" STAINLESS STEEL ANCHOR BOLTS TO EXTEND 7" INTO BASE GROUT GRAVEL #6-12 O.C. E.W. ELEV. T 24 VOLT FLOAT LIQUID LEVEL CONTROLS ELEV. Z SHOWN ROTATED 90° FOR CLARITY A POWER CABLE 2" DIA. SCH. 40 STAINLESS STEEL PIPE MIN 3/8" HEAVY DUTY STAINLESS STEEL LIFTING CHAIN CHECK VALVE GALVANIZED IRON 3" FLOOR DRAIN. SLOPE OUTLET PIPE 1/2" PER FOOT. 2 - #4 BARS DUCTILE IRON PIPE (RESTRAINED JOINT) PLUG VALVE W/ LEVER OPERATOR STAINLESS STEEL PRESSURE GUAGE PET COCK VALVE ALUMINUM ACCESS HATCH W/ LOCKSET AND RECESSED HANDLE FLANGED RISER W/ BLIND FLANGE STANDARD FLANGED TEE ELEV. Y EXIST GRADE #4 - 6" 0.C.E.W 4" D.I. VENT WITH VENT CAP ALUMINUM ACCESS HATCH W/ LOCKSET AND RECESSED HANDLE 6 DU C T I L E IR O N FA C T O R Y T H R E A D E D F L A N G E D ON L Y MIN. 18 L.F. D.I. 3"2" B 2" 3" 3" 1 - 6" 60° 9" MIN. 9" MI N . 12 " 36 " 18 " 7 - 6 " 4" 4" 7" 12 " MI N . 12" MIN. 12 " 11 8 9 BACKFLOW PREVENTOR TO REMAIN 1111 11 Page 296 of 576 Plug, Valve, Dead Ends, Reducer, or Branch of Tee J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - D E T A I L S I . D W G | 21 7 8 8 - C S - D e t a i l s I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 6 / 2 0 2 6 3 : 2 2 : 2 7 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 5/ 2 1 / 2 0 2 5 2 : 2 8 P M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 DE T A I L S I CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2 C-301                D. M E T Z 21 7 8 8 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   Page 297 of 576 2 J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - D E T A I L S I I . D W G | 21 7 8 8 - C S - D e t a i l s I I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 6 / 2 0 2 6 3 : 2 2 : 4 2 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 7/ 2 9 / 2 0 2 5 2 : 1 6 P M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 DE T A I L S I I CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2                D. M E T Z 21 7 8 8 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   C-302 Page 298 of 576 J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - D E T A I L S I I I . D W G | 21 7 8 8 - C S - D e t a i l s I I I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 6 / 2 0 2 6 3 : 2 2 : 5 8 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 2/ 2 3 / 2 0 2 6 2 : 5 6 P M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 DE T A I L S I I I CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2 C-303 RE V I S I O N S   P E R   C I T Y   C O M M E N T S   A F T E R   B I D   I S S U A N C E     AS         02 / 2 6 J. P I C K E R I N G 21 7 8 8 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   1 Page 299 of 576 J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - D E T A I L S I V . D W G | 21 7 8 8 - C S - D e t a i l s I V | 1: 2 . 5 8 4 9 | -- - - | 3/ 2 / 2 0 2 6 1 : 4 2 : 1 6 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 3/ 2 / 2 0 2 6 1 : 4 1 P M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 DE T A I L S I V CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2 RE V I S I O N S P E R C I T Y C O M M E N T S A F T E R B I D I S S U A N C E AS 02 / 2 6 J. P I C K E R I N G 21 7 8 8 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S 40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1 S L A K E D E S T I N Y R O A D , S U I T E 2 9 0 , M A I T L A N D , F L 3 2 7 5 1 C-304 1 Page 300 of 576 TO NEAREST JOINT COMPACTED SUBGRADE UTILITY TRENCH, SEE DETAIL TO NEAREST JOINT ROAD EXISTING PAVEMENT 6" THICK 3,000 PSI CONCRETE EXISTING CONCRETE DRIVEWAY PAVEMENT SAWCUT CL SAWCUT CL CONCRETE DRIVEWAY PAVEMENT REPAIR SCALE: NOT TO SCALE NOTES: 1.CONCRETE TO HAVE A 28-DAY COMPRESSIVE STRENGTH OF 3,000 PSI. 2.USE 1/2" EXPANSION JOINT (PREFORMED JOINT FILLER) BETWEEN CONCRETE AND ALL OTHER FIXED OBJECTS. MATCH EXISTING GRADE PUBLIC ROADWAY PAVEMENT REPAIR DETAILS SCALE: NOT TO SCALE NOTES: 1.PAVEMENT REPAIR, PAVEMENT STRIPING, AND PAVEMENT MARKINGS TO BE CONSTRUCTED IN ACCORDANCE WITH SECTION 02000. 2.MILLED SURFACE SHALL BE PROTECTED FROM TRAFFIC AND RAIN. IN ADDITION, THE PLACEMENT OF THE FIRST LIFT OF STRUCTURAL COURSE SHALL OCCUR NO LATER THAN THE DAY AFTER THE SURFACE IS MILLED. 3.RESTORE PAVEMENT STRIPING AND PAVEMENT MARKINGS BACK TO ORIGINAL LAYOUT AND COLOR. 4.SP-19.0 STRUCTURAL COURSE LIFTS SHALL BE A MINIMUM OF 2 INCHES AND A MAXIMUM OF 4 INCHES 5.25' MINIMUM IS ACCEPTABLE SOUTH OF STA 21+00. 2"2" 3" TYPE SP-19.0 STRUCTURAL COURSE (TRAFFIC C) EXISTING PAVEMENT AGGREGATE SUB-BASE LAYER: 7" TYPE B-12.5 SUPERPAVE ASPHALT BASE OR 14" LIMEROCK, LBR100 OR 5" TYPE SP-19.0 STRUCTURAL COURSE (TRAFFIC C) UTILITY TRENCH SEE CITY OF OCOEE PIPE BEDDING AND TRENCH DETAIL UT001 INITIAL PAVEMENT REPAIR EXISTING PAVEMENT FINAL PAVEMENT REPAIR UTILITY PARALLEL TO ROADWAY ℄ INITIAL PAVEMENT REPAIR RO A D ℄ EDGE OF TRAVELED WAY 1" MILLING AND TACK COAT 1" TYP SP-9.5 STRUCTURAL COURSE (TRAFFIC C) EXISTING PAVEMENT FINAL PAVEMENT REPAIR UTILITY PERPENDICULAR TO ROADWAY ℄ INITIAL PAVEMENT REPAIR 1" MILLING AND TACK COAT 1" TYP SP-9.5 STRUCTURAL COURSE (TRAFFIC C) 50' (MIN) SEE NOTE 5 50" (MIN) SEE NOTE 5 * DIMENSION VARIES PER CRITICAL PROTECTION ZONE DIMENSION VARIES PER CRITICAL PROTECTION ZONE WOOD 1 X 4 STRINGERS. NAIL WOOD STRINGERS SECURELY TO WOOD POSTS. * NOTE: FOR GROUPS OF TREES, PLACE BARRICADES BETWEEN TREES AND CONSTRUCTION ACTIVITY. NOTES: 1.CRITICAL PROTECTION ZONE: THE AREA SURROUNDING A TREE WITHIN A CIRCLE DESCRIBED BY A RADIUS OF ONE FOOT FOR EACH INCH OF THE TREE TRUNK DIAMETER AT 54" ABOVE FINISHED GRADE. FOR GROUPS OF TREES, PLACE BARRICADES BETWEEN TREES AND CONSTRUCTION ACTIVITY. 2.TREE PROTECTION BARRICADES SHALL BE LOCATED TO PROTECT A MINIMUM OF 75% OF THE CRITICAL PROTECTION ZONE. WOOD 2 X 4 POSTS TREE TRUNK SAFETY - ORANGE NYLON OR POLYPROPYLENE TYPE FENCE SECURELY AFFIX FENCE TO STRINGER WITH STAPLES OR NAILS 4' MINIMUM HEIGHT 2' MINIMUM DEPTH EXISTING UNDISTURBED SOIL 1 X 4 MINIMUM STRINGER 2 X 4 MINIMUM POSTS 12' MAXIMUM SPACING TREE PROTECTION BARRICADE SCALE: NTS J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - D E T A I L S V . D W G | 21 7 8 8 - C S - D e t a i l s V | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 6 / 2 0 2 6 3 : 2 3 : 2 6 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 5/ 2 1 / 2 0 2 5 2 : 2 5 P M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 DE T A I L S V CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2 C-305                J. P I C K E R I N G 21 7 8 8 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   Page 301 of 576 J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - S W P P N O T E S I . D W G | 21 7 8 8 - C S - S W P P N o t e s I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 6 / 2 0 2 6 3 : 2 3 : 3 2 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : DA N I E L . M E T Z 5/ 1 3 / 2 0 2 5 5 : 5 0 P M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 ST O R M W A T E R P O L L U T I O N P R E V E N T I O N N O T E S I CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2 C-401                D. M E T Z 21 7 8 8 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   NARRATIVE 1.DESCRIPTION OF CONSTRUCTION ACTIVITY: INSTALLATION OF A NEW 12" GRAVITY SEWER LINE IN THE NORTH BOUND LANE OF LAKEWOOD AVENUE, FROM LAUREL RIDGE AVENUE TO WURST ROAD. 2.SITE AREA INFORMATION: TOTAL AREA OF THE SITE = 2.7 ACRES TOTAL DISTURBANCE AREA = 0.82 ACRES RUNOFF DATA: RUNOFF COEFFICIENTS: BEFORE = 0.75 DURING = VARIES FROM 0.75 TO 0.80 AFTER = 0.75 3.PROPOSED SEQUENCE OF LAND DISTURBING ACTIVITIES, INCLUDING SEQUENCE DURING THE CONSTRUCTION PROCESS IN WHICH THE MEASURES WILL BE INSTALLED. THE CONTRACTOR SHALL FOLLOW THE SEQUENCE OF MAJOR ACTIVITIES DESCRIBED BELOW, UNLESS THE CONTRACTOR PROPOSES A DIFFERENT SEQUENCE THAT IS EQUAL OR APPROVED BY THE ENGINEER. FOR EACH CONSTRUCTION PHASE, INSTALL PERIMETER CONTROLS AFTER CLEARING AND GRUBBING NECESSARY FOR INSTALLATION OF CONTROLS BUT BEFORE BEGINNING OTHER WORK FOR THE CONSTRUCTION PHASE. REMOVE PERIMETER CONTROLS ONLY AFTER ALL UPSTREAM AREAS ARE STABILIZED. A.CONSTRUCTION OF A GRAVITY SEWER SYSTEM B.CONSTRUCTION OF STUB-OUTS FROM MAIN LINE 4.DESCRIPTION OF THE SOILS AND AN IDENTIFICATION OF THOSE THAT ARE HIGHLY ERODIBLE: 46 - TAVARES, FINE SAND 48 - TAVARES, FINE SAND-URBAN LAND COMPLEX 5.AFFECTED DRAINAGE AREAS AND MAJOR DISCHARGE POINTS: N/A 6.LATITUDE AND LONGITUDE OF EACH MAJOR DISCHARGE POINT: N/A 7.NAMES OF RECEIVING WATER(S): STARKE LAKE 8.DESCRIPTION OF PROPOSED POLLUTION CONTROL MEASURES OR BMPS TO BE USED: a.EROSION AND SEDIMENT CONTROL PRACTICES MAINTAINING BUFFERS WITH ADJACENT WETLANDS, MAINTAINING HYDROLOGY OF ADJACENT WETLAND b.STRUCTURAL CONTROL PRACTICES THE FOLLOWING STRUCTURAL CONTROL PRACTICES HAVE BEEN DESIGNED INTO THIS PROJECT: SLIT FENCE, CATCH BASIN FILTERS, LEVEL SPREADER, VEGETATED DRAINAGE SWALE 9.ESTIMATED CONSTRUCTION SCHEDULE: START DATE = TBD COMPLETION DATE = TBD STABILIZATION SCHEDULE CONSTRUCTION ACCESS ROAD = TBD CLEARING AND GRUBBING = TBD INSTALLATION OF TEMPORARY EROSION CONTROL MEASURES = TBD CONSTRUCTION OF SEDIMENT BASIN = TBD SITE CONSTRUCTION & INTERIM EROSION CONTROL MEASURES = TBD FINAL VEGETATION = TBD 10.THE CONTRACTOR RESPONSIBLE FOR THE BMP IMPLEMENTATION, INSPECTION, AND MAINTENANCE: CONTRACTOR TO BE DETERMINED AT A LATER DATE THROUGH A PUBLIC BID PROCESS. 11.CALCULATIONS: SUPPORTING CALCULATIONS FOR THE EROSION AND SEDIMENT CONTROL CAN BE FOUND WITHIN THE PROJECTS' ENVIRONMENTAL RESOURCE PERMITS APPLICATION. 12.CERTIFICATION OF COMPLIANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS. IN AN EFFORT TO ENSURE COMPLIANCE WITH FEDERAL, STATE, AND LOCAL LAWS REGARDING EROSION AND TURBIDITY CONTROLS: THE FOLLOWING PERMITS HAVE BEEN OBTAINED. PERMIT # TBD ACOE PERMIT # TBD ENVIRONMENTAL RESOURCE PERMIT # TBD 13.INVENTORY FOR POLLUTION PREVENTION PLAN: THE MATERIAL OR SUBSTANCES LISTED BELOW ARE EXPECTED TO BE PRESENT ONSITE DURING CONSTRUCTION: CONCRETE, WOOD, FERTILIZERS, ASPHALT, MASONRY BLOCKS, PETROLEUM BASED PRODUCTS, TAR, ROOFING MATERIALS, CLEANING SOLVENTS, DETERGENTS, METAL STUDS, PAINTS RECORD REQUIREMENTS THE CONTRACTOR SHALL, AT A MINIMUM, PERFORM AND DOCUMENT THE FOLLOWING RECORD KEEPING TASKS IN A REGULAR AND EXPEDIENT MANNER WHILE CONSTRUCTION ACTIVITIES ARE OCCURRING. 1.CONTRACTORS MUST RECORD THE FOLLOWING DATES: A)WHEN MAJOR GRADING ACTIVITIES OCCUR B)WHEN CONSTRUCTION ACTIVITIES TEMPORARILY OR PERMANENTLY CEASE ON A PORTION OF THE SITE C)WHEN STABILIZATION (I.E. EROSION CONTROL) MEASURES BEGIN 2.CONTRACTORS ARE TO PROVIDE QUALIFIED INSPECTORS WHO HAVE KNOWLEDGE AND EXPERIENCE IN THE PRINCIPLES AND PRACTICE OF SEDIMENT AND EROSION CONTROL AND CAN COMPLETE PROJECT SITE INSPECTIONS: A)AT LEAST ONCE EVERY SEVEN (7) DAYS B)WITHIN 24 HOURS AFTER THE END OF A STORM EVENT OF 0.50-INCHES OR MORE. TO COMPLY, THE CONTRACTOR SHALL INSTALL AND MAINTAIN RAIN GAUGES AND RECORD THE DAILY RAINFALL. C)WHERE SITES HAVE BEEN PERMANENTLY STABILIZED, INSPECTIONS SHALL BE CONDUCTED AT LEAST ONCE EVERY MONTH. THE CONTRACTOR SHALL ALSO INSPECT THAT CONTROLS INSTALLED IN THE FIELD AGREE WITH THE LATEST STORMWATER POLLUTION PREVENTION PLAN. 3. A MAINTENANCE INSPECTION REPORT WILL BE MADE AFTER EACH INSPECTION. THE REPORTS WILL BE KEPT ON SITE DURING CONSTRUCTION AND AVAILABLE UPON REQUEST TO THE OWNER, ENGINEER OR ANY FEDERAL, STATE, AND LOCAL AGENCY APPROVING SEDIMENT AND EROSION PLANS, OR STORM WATER MANAGEMENT PLANS. COPIES OF THE INSPECTION REPORTS WILL BE SUBMITTED TO THE OWNER AND INCLUDE DOCUMENTATION OF REMEDIAL ACTION TO ADDRESS SYSTEM FAILURES. THE REPORTS SHALL BE MADE AND RETAINED AS PART OF THE STORM WATER POLLUTION PREVENTION PLAN FOR AT LEAST THREE YEARS FROM THE DATE THAT THE SITE IS FINALLY STABILIZED AND THE NOTICE OF TERMINATION IS SUBMITTED. THE REPORTS SHALL IDENTIFY ANY INCIDENTS OF NON-COMPLIANCE. 4.THE CONTRACTOR WILL PROVIDE THE OWNER A COPY OF THE NPDES PERMIT AND THE SWPPP. INSPECTION AND MAINTENANCE REQUIREMENTS EROSION AND SEDIMENT CONTROL INSPECTION AND MAINTENANCE PRACTICES THE FOLLOWING ARE INSPECTION AND MAINTENANCE PRACTICES THAT WILL BE USED TO MAINTAIN EROSION AND SEDIMENT CONTROLS: 1.ALL TURBIDITY CONTROL MEASURES WILL BE MAINTAINED IN GOOD WORKING ORDER; IF A REPAIR IS NECESSARY, IT WILL BE INITIATED WITHIN 24 HOURS OF REPORT. 2.BUILT UP SEDIMENT WILL BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD THE HEIGHT OF THE FENCE. 3.SILT FENCE WILL BE INSPECTED FOR DEPTH OF SEDIMENT, TEARS, TO SEE IF THE FABRIC IS SECURELY ATTACHED TO THE FENCE POSTS, AND TO SEE THAT THE FENCE POSTS ARE FIRMLY IN THE GROUND. 4.CONSTRUCTION ENTRANCES WILL BE INSPECTED FOR DEPTH OF CRUSHED STONE BED AND FILTER FABRIC CONDITION. 5.THE SEDIMENT BASINS WILL BE INSPECTED FOR DEPTH OF SEDIMENT, AND BUILT UP SEDIMENT WILL BE REMOVED WHEN IT REACHES 10 PERCENT OF THE DESIGN CAPACITY OR AT THE END OF THE JOB. 6.DIVERSION DIKES/SWALES WILL BE INSPECTED AND ANY BREACHES PROMPTLY REPAIRED. 7.TEMPORARY AND PERMANENT SEEDING AND PLANTING WILL INSPECTED FOR BARE SPOTS, WASHOUTS, AND HEALTHY GROWTH. UPDATING REQUIREMENTS 1.THE STORMWATER POLLUTION PREVENTION PLANS (SWPPP) AND EROSION AND SEDIMENT CONTROL (E&SC) PLANS CONTAINED HEREIN PROVIDE ONLY THE INITIAL AND MINIMUM REQUIREMENTS, AND PROJECT SPECIFIC STRUCTURAL BMPS NECESSARY FOR THIS PROJECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MODIFY AND UPDATE THESE PLANS ACCORDING TO THEIR OPERATIONS ON SITE. IN ADDITION, THE CONTRACTOR SHALL REVISE THESE DOCUMENTS: a)WITHIN SEVEN CALENDAR DAYS FOLLOWING AN INSPECTION WHEN ADDITIONS AND/OR MODIFICATIONS TO BMPS ARE NECESSARY TO CORRECT OBSERVED PROBLEMS. b)WHENEVER A CHANGE IN THE DESIGN, CONSTRUCTION, OPERATION, OR MAINTENANCE AT THE CONSTRUCTION SITE HAS A SIGNIFICANT EFFECT ON THE DISCHARGE OF POLLUTANTS TO THE WATERS OF THE UNITED STATES NOT PREVIOUSLY ADDRESSED IN THE DOCUMENTS. c)WHENEVER DISCHARGES ARE CAUSING WATER QUALITY “EXCEEDANCES” (AN EPA TERM) OR THE BMPS ARE INEFFECTIVE (TO AN EXTENT PRACTICAL) IN MINIMIZING POLLUTANTS IN STORMWATER DISCHARGING FROM THE CONSTRUCTION SITE. Page 302 of 576 J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - S W P P N O T E S I I . D W G | 21 7 8 8 - C S - S W P P N o t e s I I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 6 / 2 0 2 6 3 : 2 3 : 3 9 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : DA N I E L . M E T Z 5/ 1 3 / 2 0 2 5 5 : 5 0 P M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 ST O R M W A T E R P O L L U T I O N P R E V E N T I O N N O T E S I I CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2 C-402                D. M E T Z 21 7 8 8 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   EROSION AND SEDIMENT CONTROL NOTES AND REQUIREMENTS GENERAL REQUIREMENTS 1.THIS PLAN UTILIZES BEST MANAGEMENT PRACTICES TO CONTROL EROSION AND TURBIDITY CAUSED BY STORM WATER RUN OFF. AN EROSION CONTROL PLAN HAS BEEN PREPARED TO INSTRUCT THE CONTRACTOR ON PLACEMENT OF THESE CONTROLS. IT IS THE CONTRACTORS RESPONSIBILITY TO INSTALL AND MAINTAIN THE CONTROLS AS PER PLAN AS WELL AS ENSURING THE PLAN IS PROVIDING THE PROPER PROTECTION AS REQUIRED BY FEDERAL, STATE, AND LOCAL LAWS. REFER TO THESE EROSION AND SEDIMENT STABILIZATION PRACTICES FOR THE CONTROLS THAT MAY BE IMPLEMENTED. 2.THE CONTRACTOR SHALL AT A MINIMUM IMPLEMENT THE CONTRACTOR'S REQUIREMENTS OUTLINED HEREIN AND THOSE MEASURES SHOWN IN THE PLANS. IN ADDITION, THE CONTRACTOR SHALL UNDERTAKE ADDITIONAL MEASURES REQUIRED FOR COMPLIANCE WITH APPLICABLE PERMIT CONDITIONS AND STATE WATER QUALITY STANDARDS DEPENDING ON THE NATURE OF MATERIALS AND METHODS OF CONSTRUCTION. THE CONTRACTOR SHALL APPLY FOR AND COMPLY WITH A FLORIDA NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY. THE CONTRACTOR SHALL OBTAIN WATER MANAGEMENT DISTRICT APPROVAL FOR DEWATERING PER FAC 40C22. 3.THE CONTRACTOR WILL BE RESPONSIBLE FOR APPLYING FOR AND PAYING FOR THE PERMIT FEE FOR THE NOTICE OF INTENT (NOI) AND THE NOTICE OF TERMINATION (NOT) FORMS. 4.TIMING OF CONTROLS/MEASURES. AS INDICATED IN THE SEQUENCE OF MAJOR ACTIVITIES, THE SILT FENCES AND HAY BALES, STABILIZED CONSTRUCTION ENTRANCE AND SEDIMENT BASINS WILL BE CONSTRUCTED PRIOR TO CLEARING OR GRADING OF ANY OTHER PORTIONS OF THE SITE. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICAL IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED. AFTER THE ENTIRE SITE IS STABILIZED, THE ACCUMULATED SEDIMENT SHALL BE REMOVED FROM THE SEDIMENT BASINS AND THE EARTH BERM/SWALES REGRADED/REMOVED AND STABILIZED IN ACCORDANCE WITH THE EROSION CONTROL PLAN. 5.IT IS THE CONTRACTOR'S RESPONSIBILITY TO IMPLEMENT THE EROSION AND TURBIDITY CONTROLS AS SHOWN ON THE SEDIMENT AND EROSION CONTROL PLAN. IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THESE CONTROLS ARE PROPERLY INSTALLED, MAINTAINED AND FUNCTIONING PROPERLY TO PREVENT TURBID OR POLLUTED WATER FROM LEAVING THE PROJECT SITE. THE CONTRACTOR WILL ADJUST THE EROSION CONTROL PLAN AND ADD ADDITIONAL CONTROL MEASURES, AS REQUIRED, TO ENSURE THE SITE MEETS ALL FEDERAL STATE AND LOCAL EROSION AND SEDIMENT CONTROL PLAN AND AS REQUIRED TO MEET THE SEDIMENT AND TURBIDITY REQUIREMENTS IMPOSED ON THE PROJECT SITE BY THE REGULATORY AGENCIES, AND ORANGE COUNTY CODE CHAPTER 21. EROSION AND SEDIMENT CONTROL - STABILIZATION PRACTICES 1.LOCATION OF STAKED SILT FENCE. STAKED SILT FENCE SHALL BE PLACED ALONG THE BOUNDARY OF FILL SLOPES, ALONG THE LIMITS OF CONSTRUCTION, AND AROUND ALL PROPOSED INLETS AND STRUCTURES. SILT FENCE SHALL BE USED AROUND ALL EXCAVATED MATERIAL IN THEIR TEMPORARY LOCATIONS DURING CONSTRUCTION. 2.LOCATION OF FLOATING TURBIDITY BARRIERS. FLOATING TURBIDITY BARRIERS SHALL BE PLACED DOWNSTREAM OF THE CULVERT REPLACEMENTS. 3.OFF-SITE VEHICLE TRACKING. LOADED HAUL TRUCKS SHALL BE COVERED WITH TARPAULIN. EXCESS DIRT ON THE ROAD SHALL BE REMOVED DAILY. AREAS WITHIN THE LIMITS OF CONSTRUCTION SHALL BE DAMPENED WITH WATER AS REQUIRED FOR DUST CONTROL. 4.THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTENANCE AND REPAIRS OF EROSION AND SEDIMENT CONTROL DEVICES, AND REMOVAL OF EROSION AND SEDIMENT CONTROL DEVICES AFTER THE NOTICE OF TERMINATION. MAINTENANCE AND REPAIR REQUIRED FOR THE CONTROL AND ABATEMENT OF EROSION AND WATER POLLUTION SHALL BE INCLUDED IN THE PROJECT COST. 5.DISTURBED, GRADED OR REGRADED AREAS SHALL BE STABILIZED IMMEDIATELY AFTER GRADING IS COMPLETE, OR WITHIN 7 DAYS IF SUCH AREAS ARE TO REMAIN IDLE FOR MORE THAN 7 DAYS. 6.STRAW BALE BARRIER: STRAW BALE BARRIERS CAN BE USED BELOW DISTURBED AREAS SUBJECT TO SHEET AND RILL EROSION WITH THE FOLLOWING LIMITATIONS: A.WHERE THE MAXIMUM SLOPE BEHIND THE BARRIER IS 33 PERCENT. B.IN MINOR SWALES OR DITCH LINES WHERE THE MAXIMUM CONTRIBUTING DRAINAGE AREA IS NO GREATER THAN 2.0 ACRES. C.WHERE EFFECTIVENESS IS REQUIRED FOR LESS THAN 3 MONTHS. D.EVERY EFFORT SHOULD BE MADE TO LIMIT THE USE OF STRAW BALE BARRIERS CONSTRUCTED IN LIVE STREAMS OR IN SWALES WHERE THERE IS THE POSSIBILITY OF A WASHOUT. IF NECESSARY, MEASURES SHALL BE TAKEN TO PROPERLY ANCHOR BALES TO INSURE AGAINST WASHOUT. 7.FILTER FABRIC BARRIER: FILTER FABRIC BARRIERS CAN BE USED BELOW DISTURBED AREAS SUBJECT TO SHEET AND RILL EROSION WITH THE FOLLOWING LIMITATIONS: a.WHERE THE MAXIMUM SLOPE BEHIND THE BARRIER IS 33 PERCENT. b.IN MINOR SWALES OR DITCH LINES WHERE THE MAXIMUM CONTRIBUTING DRAINAGE AREA IS NO GREATER THAN 2.0 ACRES. 8.BRUSH BARRIER WITH FILTER FABRIC: BRUSH BARRIER MAY BE USED BELOW DISTURBED AREAS SUBJECT TO SHEET AND RILL EROSION WHERE ENOUGH RESIDUE MATERIAL IS AVAILABLE ON SITE. 9.LEVEL SPREADER: A LEVEL SPREADER MAY BE USED WHERE SEDIMENT-FREE STORM RUNOFF IS INTERCEPTED AND DIVERTED AWAY FROM THE GRADED AREAS ONTO UNDISTURBED STABILIZED AREAS. THIS PRACTICE APPLIES ONLY IN THOSE SITUATIONS WHERE THE SPREADER CAN BE CONSTRUCTED ON UNDISTURBED SOIL AND THE AREA BELOW THE LEVEL SPREADER IS STABILIZED. THE WATER SHOULD NOT BE ALLOWED TO RECONCENTRATE AFTER RELEASE. 10.STOCKPILING MATERIAL: NO EXCAVATED MATERIAL SHALL BE STOCKPILED IN SUCH A MANNER AS TO DIRECT RUNOFF DIRECTLY OFF THE PROJECT SITE INTO ANY ADJACENT WATER BODY OR STORM WATER COLLECTION FACILITY. 11.EXPOSED AREA LIMITATION: THE SURFACE AREA OF OPEN, ERODIBLE SOIL EXPOSED BY CLEARING GRUBBING OPERATIONS OR EXCAVATION AND FILLING OPERATIONS SHALL NOT EXCEED 2.0 ACRES. THIS REQUIREMENT MAY BE WAIVED FOR LARGE PROJECTS WITH AN EROSION CONTROL PLAN WHICH DEMONSTRATES THAT OPENING OF ADDITIONAL AREA WILL NOT SIGNIFICANTLY AFFECT OFF-SITE DEPOSIT OF SEDIMENTS. 12.TEMPORARY SEEDING: AREAS OPENED BY CONSTRUCTION OPERATIONS AND THAT ARE NOT ANTICIPATED TO BE RE-EXCAVATED OR DRESSED AND RECEIVE FINAL GRASSING TREATMENT WITHIN 21 DAYS SHALL BE SEEDED WITH A QUICK GROWING GRASS. SPECIES WHICH WILL PROVIDE AN EARLY COVER DURING THE SEASON IN WHICH IT IS PLANTED AND WILL NOT LATER COMPLETE WITH THE PERMANENT GRASSING. 13.TEMPORARY SEEDING AND MULCHING: SLOPES STEEPER THAN 6:1 THAT FALL WITHIN THE CATEGORY ESTABLISHED IN PARAGRAPH 7 ABOVE SHALL ADDITIONALLY RECEIVE MULCHING OF APPROXIMATELY 150 MM LOOSE MEASURE OF MULCH MATERIAL CUT INTO THE SOIL OF THE SEEDED AREA ADEQUATE TO PREVENT MOVEMENT OF SEED AND MULCH OR HYDROMULCHED. 14.TEMPORARY GRASSING: THE SEEDED OR SEEDED AND MULCHED AREA(S) SHALL BE ROLLED AND WATERED OR HYDROMULCHED OR OTHER SUITABLE METHODS IF REQUIRED TO ASSURE OPTIMUM GROWING CONDITIONS FOR THE ESTABLISHMENT OF A GOOD GRASS COVER. 15.TEMPORARY REGRASSING: IF, AFTER 14 DAYS FROM SEEDING, THE TEMPORARY GRASSED AREAS HAVE NOT ATTAINED A MINIMUM OF 75 PERCENT GOOD GRASS COVER, THE AREA WILL BE REWORKED AND ADDITIONAL SEED APPLIED SUFFICIENT TO ESTABLISH THE DESIRED VEGETATIVE COVER. 16.MAINTENANCE: ALL FEATURES OF THE PROJECT DESIGNED AND CONSTRUCTED TO PREVENT EROSION AND SEDIMENT SHALL BE MAINTAINED DURING THE LIFE OF THE CONSTRUCTION SO AS TO FUNCTION AS THEY WERE ORIGINALLY DESIGNED AND CONSTRUCTED. 17.PERMANENT EROSION CONTROL: THE EROSION CONTROL FACILITIES OF THE PROJECT SHOULD BE DESIGNED TO MINIMIZE THE IMPACT ON THE OFFSITE FACILITIES. 18.PERMANENT SEEDING: ALL AREAS WHICH HAVE BEEN DISTURBED BY CONSTRUCTION WILL, AS A MINIMUM, BE SEEDED. THE SEEDING MIX MUST PROVIDE BOTH LONG-TERM VEGETATION AND RAPID GROWTH SEASONAL VEGETATION. SLOPES STEEPER THAN 6:1 SHALL BE SODDED. 19.WHERE SODDING IS CALLED FOR IN THE PLANS, SOD THAT IS PLACED ON SLOPES OF 3:1 OR GREATER SHALL BE PEGGED. 20.OFFSITE VEHICLE TRACKING: STABILIZED CONSTRUCTION ACCESS DRIVES SHALL BE CONSTRUCTED AT ALL POINTS ENTERING AND EXITING THE PROJECT SITE FROM PAVED ROADS. CONSTRUCTION ACCESS DRIVES SHALL HAVE A MINIMUM 6 INCH THICKNESS OF DURABLE ROCK OVER A FILTER FABRIC FREE OF TEARS AND FIRMLY SECURED. ACCESS DRIVES SHALL BE REMOVED AND RESTORED AT THE COMPLETION OF THE PROJECT. EROSION AND SEDIMENT CONTROL - WASTE AND MATERIAL CONTROLS 1.WASTE MATERIALS: ALL WASTE MATERIALS EXCEPT LAND CLEARING DEBRIS SHALL BE COLLECTED AND STORED IN A METAL DUMPSTER. THE DUMPSTER WILL MEET ALL LOCAL AND STATE SOLID WASTE MANAGEMENT REGULATIONS. THE DUMPSTER WILL BE EMPTIED AS NEEDED AND THE TRASH WILL BE HAULED TO A STATE APPROVED LANDFILL ALL PERSONNEL WILL BE INSTRUCTED REGARDING THE CORRECT PROCEDURE FOR WASTE DISPOSAL. NOTICES STATING THESE PRACTICES WILL BE POSTED AT THE CONSTRUCTION SITE BY THE CONSTRUCTION SUPERINTENDENT, THE INDIVIDUAL WHO MANAGES THE DAY-TO-DAY SITE OPERATIONS WILL BE RESPONSIBLE FOR SEEING THAT THESE PROCEDURES ARE FOLLOWED. LAND CLEARING DEBRIS CAN BE BURNED IN ACCORDANCE WITH STATE AND ORANGE COUNTY CODE CHAPTER 15. 2.HAZARDOUS WASTE: ALL HAZARDOUS WASTE MATERIALS WILL BE DISPOSED OF IN THE MANNER SPECIFIED BY LOCAL OR STATE REGULATION OR BY THE MANUFACTURER. SITE PERSONNEL WILL BE INSTRUCTED IN THESE PRACTICES AND THE SITE SUPERINTENDENT, THE INDIVIDUAL WHO MANAGES DAY-TO-DAY SITE OPERATIONS, WILL BE RESPONSIBLE FOR SEEING THAT THESE PRACTICES ARE FOLLOWED. THE CONTRACTOR SHALL PROVIDE A LIST OF TOXIC SUBSTANCES THAT ARE LIKELY TO BE USED ON THE JOB AND PROVIDE A PLAN ADDRESSING THE GENERATION, APPLICATION, MIGRATION, STORAGE, AND DISPOSAL OF THESE SUBSTANCES. 3.SANITARY WASTE: ALL SANITARY WASTE WILL BE COLLECTED FROM THE PORTABLE UNITS AS NEEDED TO PREVENT POSSIBLE SPILLAGE. THE WASTE WILL BE COLLECTED AND DISPOSED OF IN ACCORDANCE WITH STATE AND LOCAL WASTE DISPOSAL REGULATIONS FOR SANITARY SEWER OR SEPTIC SYSTEMS. 4.PAVED AREAS ADJACENT TO ALL CONSTRUCTION ACCESS POINTS SHALL BE SWEPT DAILY TO REMOVE ANY EXCESS MUD, DIRT OR ROCK TRACKED FROM THE SITE. DUMP TRUCKS HAULING MATERIAL FROM THE CONSTRUCTION SITE WILL BE COVERED WITH A TARP. 5.SPILL PREVENTION: THE FOLLOWING ARE THE MATERIAL MANAGEMENT PRACTICES THAT WILL BE USED TO REDUCE THE RISK OF SPILLS OR OTHER ACCIDENTAL EXPOSURE OF MATERIALS AND SUBSTANCES TO STORMWATER RUNOFF. a.GOOD HOUSEKEEPING: THE FOLLOWING GOOD HOUSEKEEPING PRACTICES WILL BE FOLLOWED ONSITE DURING THE CONSTRUCTION PROJECT. i.AN EFFORT WILL BE MADE TO STORE ONLY ENOUGH PRODUCT REQUIRED TO DO THE JOB. ii.ALL MATERIALS STORED ONSITE WILL BE STORED IN A NEAT, ORDERLY MANNER IN THEIR APPROPRIATE CONTAINERS AND, IF POSSIBLE, UNDER A ROOF OR OTHER ENCLOSURE. iii.PRODUCTS WILL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE ORIGINAL MANUFACTURER'S LABEL. iv.SUBSTANCES WILL NOT BE MIXED WITH ONE ANOTHER UNLESS RECOMMENDED BY THE MANUFACTURER. v.WHENEVER POSSIBLE, ALL OF A PRODUCT WILL BE USED UP BEFORE DISPOSING OF THE CONTAINER. vi.MANUFACTURER'S RECOMMENDATIONS FOR PROPER USE AND DISPOSAL WILL BE FOLLOWED. vii.THE SITE SUPERINTENDENT WILL INSPECT DAILY TO ENSURE MATERIALS ONSITE RECEIVE PROPER USE AND DISPOSAL. b.HAZARDOUS MATERIALS: THESE PRACTICES ARE USED TO REDUCE THE RISKS ASSOCIATED WITH HAZARDOUS MATERIALS. i.HAZARDOUS MATERIALS AND/OR TOXIC SUBSTANCES SHALL BE DISPOSED OF BY THE CONTRACTOR ACCORDING TO THE EPA'S STANDARD PRACTICES, THE MANUFACTURER'S RECOMMENDATION OR IN ACCORDANCE WITH STATE AND LOCAL REQURIEMENTS. ii.THE CONTRACTOR SHALL MAINTAIN COPIES OF THE MATERIAL SAFETY DATA SHEET (MSDS) FOR EACH HAZARDOUS MATERIAL PROPOSED FOR USE ON THE PROJECT. BECAUSE STATE LAW DOES NOT TREAT PETROLEUM PRODUCTS THAT ARE PROPERLY CONTAINERIZED AND INTENDED FOR EQUIPMENT USE ON THE PROJECT AS A HAZARDOUS MATERIAL, SUCH PRODUCTS DO NOT NEED A MSDS SUBMITTAL. iii.PRODUCTS WILL BE KEPT IN ORIGINAL CONTAINERS. iv.MATERIALS WILL BE STORED IN ACCORDANCE WITH ORANGE COUNTY CODE CHAPTER 32. v.ORIGINAL LABELS AND MATERIAL SAFETY DATA SHALL BE RETAINED AND AVAILABLE ON SITE. c.PRODUCT SPECIFIC PRACTICES: THE FOLLOWING PRODUCT SPECIFIC PRACTICES WILL BE FOLLOWED ONSITE: i.PETROLEUM AND LUBRICANT PRODUCTS. ALL ONSITE VEHICLES AND EQUIPMENT (I.E. - DEWATERING PUMPS) WILL BE MONITORED FOR LEAKS AND RECEIVE REGULAR PREVENTATIVE MAINTENANCE TO REDUCE THE CHANCE OF LEAKAGE. FLUID PRODUCTS WILL BE STORED IN TIGHTLY SEALED CONTAINERS WHICH ARE CLEARLY LABELED. CONTAINMENT BERMS WILL WE CONSTRUCTED AROUND ALL FUEL STORAGE TANKS USED FOR CONSTRUCTION. ANY ASPHALT SUBSTANCES USED ONSITE WILL BE APPLIED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS. ii.FERTILIZERS. FERTILIZERS USED WILL BE APPLIED ONLY IN THE MINIMUM AMOUNTS RECOMMENDED BY THE MANUFACTURER AND IN ACCORDANCE WITH ORANGE COUNTY CODE CHAPTER 15 ONCE APPLIED, FERTILIZER WILL BE WORKED INTO THE SOIL TO LIMIT EXPOSURE TO STORM WATER. STORAGE WILL BE IN A COVERED AREA. THE CONTENTS OF ANY PARTIALLY USED BAGS OF FERTILIZER WILL BE TRANSFERRED TO A SEALABLE PLASTIC BIN TO AVOID SPILLS. iii.PAINTS. ALL CONTAINERS WILL BE TIGHTLY SEALED AND STORED WHEN NOT REQUIRED FOR USE. EXCESS PAINT WILL BE PROPERLY DISPOSED OF ACCORDING TO MANUFACTURERS' INSTRUCTIONS OR STATE AND LOCAL REGULATIONS. iv.CONCRETE TRUCKS. CONCRETE TRUCKS WILL NOT BE ALLOWED TO WASH OUT OR DISCHARGE SURPLUS CONCRETE OR DRUM WASH WATER TO DITCHES, PONDS OR OTHER WATERWAYS. WASHWATER SHALL BE COLLECTED IN A TEMPORARY SETTLING POND. EROSION AND SEDIMENT CONTROL - SPILL CONTROLS 1.SPILL CONTROL PRACTICES: IN ADDITION TO THE GOOD HOUSEKEEPING AND MATERIAL MANAGEMENT PRACTICES DISCUSSED IN THIS PLAN, THE FOLLOWING PRACTICES WILL BE FOLLOWED FOR SPILL PREVENTION AND CLEANUP: A.MANUFACTURERS' RECOMMENDED METHODS FOR SPILL CLEANUP SHALL BE CLEARLY POSTED ON SITE AND SITE PERSONNEL WILL BE MADE AWARE OF THE METHODS AND POSTED LOCATION. 2.MATERIALS AND EQUIPMENT NECESSARY FOR SPILL CLEANUP WILL BE KEPT IN THE MATERIAL STORAGE AREA ONSITE. EQUIPMENT AND MATERIALS WILL INCLUDE, BUT NOT BE LIMITED TO BROOMS, DUST PANS, MOPS, RAGS, OIL BLANKETS, GLOVES, GOGGLES, LIQUID ABSORBENT (I.E. KITTY LITTER OR EQUAL), SAND SAWDUST, AND PLASTIC AND METAL TRASH CONTAINERS SPECIFICALLY FOR THIS PURPOSE. ALL SPILLS WILL BE CLEANED UP IMMEDIATELY AFTER DISCOVERY, BY THE CONTRACTOR. 3.THE SPILL AREA WILL BE KEPT WILL VENTILATED AND PERSONNEL WILL WEAR APPROPRIATE PROTECTIVE CLOTHING TO PREVENT INJURY FROM CONTACT WITH A HAZARDOUS SUBSTANCE. 4.SPILL OF TOXIC OR HAZARDOUS MATERIAL WILL BE REPORTED IMMEDIATELY TO OWNER AND ENGINEER. 5.THE SPILL PREVENTION PLAN WILL BE ADJUSTED TO INCLUDE MEASURES TO PREVENT THIS TYPE OF SPILL FROM REOCCURRING AND HOW TO CLEAN UP THE SPILL IF THERE IS ANOTHER ONE. A DESCRIPTION OF THE SPILL, WHAT CAUSED IT AND THE CLEANUP MEASURES WILL ALSO BE INCLUDED. 6.THE SITE SUPERINTENDENT RESPONSIBLE FOR THE DAY-TO-DAY SITE OPERATIONS SHALL BE THE SPILL PREVENTION AND CLEANUP COORDINATOR. HE/SHE SHALL DESIGNATE AT LEAST ONE OTHER SITE PERSONNEL, WHO WILL RECEIVE SPILL PREVENTION AND CLEANUP TRAINING. THESE INDIVIDUALS SHALL EACH BECOME RESPONSIBLE FOR A PARTICULAR PHASE OF PREVENTION AND CLEANUP, THE NAMES OF RESPONSIBLE SPILL PERSONNEL WILL BE POSED IN THE MATERIAL STORAGE AREA AND IF APPLICABLE, IN THE OFFICE TRAILER ONSITE. Page 303 of 576 J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - S W P P D E T A I L S . D W G | 21 7 8 8 - C S - S W P P D e t a i l s | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 6 / 2 0 2 6 3 : 2 3 : 4 5 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : DA N I E L . M E T Z 5/ 1 3 / 2 0 2 5 5 : 5 0 P M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 ST O R M W A T E R P O L L U T I O N P R E V E N T I O N D E T A I L S CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2 C-403                D. M E T Z 21 7 8 8 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   SECTION B SECTION A SECTION BSECTION A JOINING SILT FENCE SECTIONS SCALE: "NTS" SILT FENCE INSTALLATION DETAIL SCALE: NTS 6'-0"(MAX)6'-0"(MAX) 2' - 6 " 1' - 0 " (M I N ) 3' - 6 " ( M I N ) 3'-0" WIRE REINFORCED SILTATION FABRIC W/ WIRE MESH BACKING ATTACHED TO WOOD POST EXCAVATE TRENCH FOR MIN 6"-OVERLAP FABRIC AND BACKFILL WITH EXCAVATED MATERIALS WOOD POSTS EXISTING GRADE COUPLER POLES RUNOFF FABRIC WIDT H = W L E N G T H = L DE P T H = D NOTE: INSTALL SILT SACK PER MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS. EMPTY OR REMOVE SEDIMENT FROM SILT SACK WHEN RESTRAINT CORD IS NO LONGER VISIBLE. CLEAN, RINSE, AND REPLACE AS NEEDED. SILT SACK CATCH BASIN INLET SCALE: NTS 1" REBAR FOR LIFTING AND REMOVAL DUMP STRAPPING, TYP SILT SACK AREA TO BE PROTECTED WATER FLOW WORK AREA AREA TO BE PROTECTED NOTES: 1.ALL MATERIAL TO MEET SPECIFICATIONS 2.SILT SOCK COMPOST/SOIL/ROCK/SEED FILL TO MEET APPLICATION REQUIREMENTS 3.SILT SOCK DEPICTED IS FOR MINIMUM SLOPES. GREATER SLOPES MAY REQUIRE LARGER SOCKS PER THE ENGINEER 4.COMPOST MATERIAL TO BE DISPERSED ON SITE, AS DETERMINED BY ENGINEER. WORK AREA COMPOST SILT SOCK SCALE: NTS SECTION PLAN 3' - 4 " 12 " ± COMPOST SILT SOCK STAKE ON 10' LINEAL SPACING 2"x2' WOODEN STAKE SILT SOCK (12" TYP) Page 304 of 576 J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - S E P A R A T I O N T A B L E . D W G | 21 7 8 8 - S e p a r a t i o n T a b l e | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 6 / 2 0 2 6 3 : 2 3 : 5 2 P M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 2/ 2 3 / 2 0 2 6 4 : 2 8 P M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 SE P A R A T I O N T A B L E S CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E NO R T H G R A V I T Y S E W E R PH A S E 2 C-501 RE V I S I O N S   P E R   C I T Y   C O M M E N T S   A F T E R   B I D   I S S U A N C E     AS         02 / 2 6 D. M E T Z 21 7 8 8 D. M E T Z J. H O G A N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   NOTES: 1.ELEVATION IS APPROXIMATE AND NEEDS TO BE FIELD VERIFIED. 2.PROPOSED BOTTOM EL OF GS. 3.NEGATIVE VALUES INDICATE THE PROPOSED PIPELINE IS CROSSING ABOVE THE UTILITY. SEPARATION TABLE Sheet Number Crossing Number Stationing Pipe Being Crossed Pipe Material Pipe Size (in)Top of Pipe EL Bottom of Pipe EL Proposed Separation to GS (ft) Proposed top EL of GS Minimum Seperation (ft) C-201 1 15+30.00 UGFBO (1)Cable 0.5 125.75 125.71 2.44 123.27 1 C-201 2 16+94.00 Storm Drain RCP 24 128.90 126.90 3.28 123.62 1 C-201 3 17+25.82 Water Main DI 8 125.77 125.10 1.40 123.70 0.5 C-201 4 17+50.00 Water Main Metal 2.5 127.43 127.22 3.46 123.76 0.5 C-201 4B 17+51.28 Water Main DI 2 127.35 127.18 3.41 123.77 0.5 C-201 5 18+10.70 Force Main PVC 6 126.38 125.88 1.97 123.91 1 C-202 6 21+88.98 Storm Drain RCP 18 132.27 130.77 3.51 127.26 1 C-202 7 22+47.38 UGFBO (1)Cable 0.5 132.41 132.37 4.33 128.04 1 C-202 7B 22+77.00 Water Main DI 12 132.03 131.03 2.43 128.60 1 C-202 8 25+99.20 UGFBO (1)Cable 0.5 136.14 136.10 1.93 134.17 1 C-203 9 29+39.10 Water Main HDPE 6 139.51 139.01 3.17 135.84 1 C-203 10 30+33.88 Force Main PVC 18 138.98 137.48 1.17 136.31 1 STUB OUT SEPARATION TABLE Sheet Number Crossing Number Stationing Pipe Being Crossed Pipe Material Pipe Size (in)Top of Pipe EL Bottom of Pipe EL Proposed Separation to GS (ft) Proposed top EL of GS Minimum Seperation (ft) C-211 1 30+07.67 Gas (1)PVC 2 129.92 129.75 3.52 126.23 1.0 C-211 2 30+15.23 Water Main PVC 6 129.00 128.50 1.85 126.65 1.5 C-211 3 40+00.60 UGFBO (1)Cable 0.5 134.00 133.96 6.44 127.52 1.5 C-211 4 40+05.48 UGFBO (1)Cable 0.5 134.00 133.96 6.45 127.51 1 C-211 5 40+12.86 UGFBO (1)Cable 0.5 134.00 133.96 6.49 127.47 1.5 C-211 6 40+14.96 Force Main (1)PVC 18 131.80 130.30 2.84 127.46 1 C-211 7 40+43.28 Gas (1)PVC 2 133.27 133.10 5.70 127.40 1.0 C-211 8 40+47.86 Storm Drain (1)RCP 15 131.00 129.75 2.34 127.41 1.0 C-211 9 40+48.07 Water Main PVC 6 131.65 131.15 3.74 127.41 1.5 C-211 10 50+07.73 Gas (1)PVC 2 137.49 137.32 3.33 133.99 1 C-211 11 50+14.16 Water Main PVC 6 136.62 136.12 2.09 134.03 1.5 C-212 12 60+07.91 Gas PVC 2 139.59 139.42 3.51 135.91 1 C-212 13 60+13.80 Water Main DI 6 139.46 138.96 2.49 136.47 1.5 12" FORCE MAIN SEPARATION TABLE Sheet Number Crossing Number Stationing Pipe Being Crossed Pipe Material Pipe Size (in)Top of Pipe EL Bottom of Pipe EL Proposed Separation to GS (ft) Proposed top EL of FM Minimum Seperation (ft) C-212 1 70+02.65 UGFBO (1)Cable 0.5 140.43 140.39 2.59 137.80 1.0 C-212 2 70+05.33 Water Main (1)DI 12 140.41 139.41 2.69 136.72 1.5 C-212 3 70+10.78 UGFBO (1)Cable 0.5 140.44 140.40 2.60 137.80 1 C-203 4 31+08.83 UGFBO (1)Cable 1 140.44 140.36 2.56 137.80 1 C-204 5 32+47.92 ForceMain HDPE 12 137.51 136.51 -1.29 137.80 1 C-205 5B 34+49.38 Recliamed ForceMain (1)PVC 12 141.69 140.69 2.89 137.80 1 C-204 6 32+87.25 Water Main (1)DI 12 141.91 140.91 3.11 137.80 1.5 C-204 7 33+31.22 UGFBO (1)Cable 0.5 142.21 142.17 4.37 137.80 1 C-204 8 33+32.21 UGFBO (1)Cable 0.5 142.21 142.17 4.37 137.80 1 C-204 9 33+39.43 Water Main (1)DI 12 142.50 141.50 3.70 137.80 1.5 Sheet Number Crossing Number Stationing Existing Utility Pipe Material Pipe Size (in)Top of Pipe EL Bottom of Pipe EL WM Over or Under Proposed Top of WM EL Proposed Bottom of WM EL Proposed Separation to WM (ft) Minimum Separation (ft) C-100 1 1+26.78 Water AC 6 124.00 123.50 Under 120.27 119.27 3.2 0.5 C-100 2 1+30.13 Storm CMP 24 123.78 121.64 Under 120.27 119.55 1.4 1 C-101 3 1+82.27 SS FM PVC 24 121.01 119.01 Over 123.03 122.03 1.0 1 C-101 4 1+87.77 SS PVC 12 116.23 115.23 Over 122.98 121.98 5.8 1 C-101 5 2+13.03 UGFBO Cable 0.5 123.05 123.01 Under 120.17 119.17 2.8 1 C-101 6 2+41.99 SS FM DIP 20 122.98 121.31 Under 120.17 119.17 1.1 1 C-101 7 3+35.54 SS Lateral PVC 6 116.84 116.34 Over 122.58 121.58 4.7 1 C-101 8 3+90.00 SS PVC 8 117.64 116.97 Over 122.60 121.60 4.0 1 C-101 9 4+85.22 SS Lateral PVC 6 119.05 118.55 Over 122.67 121.67 2.6 1 C-101 10 5+40.52 UGFBO Cable 0.5 122.73 122.69 Under 121.00 120.00 1.7 1 C-101 11 5+99.08 SS Lateral PVC 6 119.56 119.06 Over 121.15 120.15 0.6 0.5 C-101 12 6+00.87 UGFBO Cable 0.5 122.75 122.71 Under 121.15 120.15 1.6 1 C-101 13 6+37.24 SS PVC 8 119.63 118.96 Over 122.53 121.53 1.9 0.5 C-102 14 7+40.74 GAS Steel 2 123.33 123.16 Under 120.00 117.93 3.2 1 C-102 15 7+46.46 Storm RCP 36 123.62 120.62 Under 118.93 117.93 1.7 1 C-102 16 7+56.06 UGFBO Cable 0.5 122.80 122.76 Under 118.93 117.93 3.8 1 C-102 17 9+21.87 SS PVC 8 120.63 119.96 Over 122.78 121.78 1.2 1 C-102 18 10+55.20 SS Lateral PVC 6 121.14 120.64 Over 122.79 121.79 0.7 0.5 C-102 19 11+62.24 Water PVC 6 120.70 120.20 Over 120.69 119.69 1.0 0.5 C-102 20 11+91.72 UGFBO Cable 0.5 122.84 122.80 Under 120.69 119.69 2.1 1 C-102 21 12+56.06 SS Lateral PVC 6 123.07 122.57 Under 120.69 119.69 1.9 1 C-102 22 12+58.06 SS Lateral PVC 6 123.07 122.57 Under 120.69 119.69 1.9 1 C-103 23 13+48.52 SS Lateral PVC 6 122.59 122.09 Over 124.28 123.28 0.7 0.5 C-103 24 14+06.80 UGFBO Cable 0.5 126.09 126.05 Under 124.89 124.85 1.2 1 C-103 25 14+09.35 UGFBO Cable 0.5 126.09 126.05 Under 124.95 124.91 1.1 1 C-103 26 14+22.45 SS Lateral PVC 6 123.00 122.50 Over 125.00 124.00 1.0 1 C103 27 15+41.43 SS Lateral PVC 6 124.04 123.54 Over 126.13 125.13 1.1 1 C-103 28 15+75.96 Water PVC 6 127.65 127.15 Under 125.69 124.69 1.5 0.5 C-103 29 16+28.83 UGFBO Cable 0.5 128.05 128.01 Under 125.04 124.04 3.0 1 C103 30 16+94.12 Storm PVC 24 128.95 126.95 Under 124.11 123.11 2.8 1 C-103 31 17+30.00 Water DIP 8 125.73 125.06 Under 123.62 122.62 1.4 0.5 C103 32 17+49.97 Water Metal 2.5 127.06 126.85 Under 124.08 123.08 2.8 0.5 C-103 33 17+49.98 Water Metal 2 127.06 126.89 Under 124.11 123.11 2.8 0.5 C-103 34 18+10.60 SS FM PVC 6 126.50 126.00 Under 125.00 124.00 1.0 1 C-103 35 18+20.83 SS PVC 8 127.31 126.64 Under 125.00 124.00 1.6 1 C-104 36 19+73.11 SS Lateral PVC 6 125.49 124.99 Over 128.38 127.38 1.9 1 C-104 37 20+44.00 SS Lateral PVC 6 126.01 125.51 Over 130.42 129.42 3.4 0.5 C-104 38 20+89.36 SS Lateral PVC 6 126.51 126.01 Over 130.71 129.71 3.2 0.5 C-104 39 21+28.28 SS Lateral PVC 6 126.86 126.36 Over 130.96 129.96 3.1 0.5 C-104 40 21+84.92 Water PVC 6 131.69 131.19 Under 129.72 128.72 1.5 0.5 C-104 41 22+02.27 Storm ERCP 38x60 134.64 130.79 Under 129.72 128.72 1.1 1 C-104 42 22+30.20 SS PVC 8 127.92 127.25 Over 129.72 128.72 0.8 0.5 C-104 43 22+47.38 UGFBO Cable 0.5 132.43 132.39 Under 129.72 128.72 2.7 1 C104 44 24+64.28 SS Lateral PVC 6 132.28 131.78 Over 134.59 133.59 1.3 0.5 C-105 45 25+03.03 Water PVC 6 136.07 135.57 Under 134.00 133.00 1.6 0.5 C-105 46 25+15.22 Water Lateral Poly 1 136.20 136.12 Under 134.00 133.00 2.1 0.5 C-105 47 25+68.85 SS PVC 8 134.09 133.42 Under 132.21 131.21 1.2 1 C-105 48 25+94.57 Water Steel 2 136.97 136.80 Under 132.21 131.21 4.6 0.5 C-105 49 25+99.22 UGFBO Cable 0.5 136.16 136.12 Under 132.21 131.21 3.9 1 C-105 50 26+06.97 UGFBO Cable 0.5 138.51 138.47 Under 132.21 131.21 6.3 1 C-105 51 26+10.46 SS Lateral PVC 6 134.45 133.95 Under 132.21 131.21 1.7 1 C-105 52 26+53.37 Water Lateral Poly 1 137.94 137.86 Under 132.21 131.21 5.6 0.5 C-105 53 26+65.10 SS Lateral PVC 6 134.70 134.20 Under 132.21 131.21 2.0 1 C-105 54 27+17.57 SS Lateral PVC 6 134.96 134.46 Over 136.66 135.66 0.70 0.5 C-105 55 27+49.35 Water Lateral Poly 1 138.47 138.39 Under 137.00 136.00 1.39 0.5 C-105 56 27+68.56 SS Lateral PVC 6 135.16 134.66 Over 137.18 136.18 1.02 0.5 C-105 57 28+02.33 SS Lateral PVC 6 135.32 134.82 Over 137.75 136.75 1.43 1 C-105 58 28+43.02 Water Lateral Poly 1 138.79 138.71 Under 138.12 137.12 0.59 0.5 C-105 59 28+52.06 SS Lateral PVC 6 135.54 135.04 Over 138.29 137.29 1.75 1 C-105 60 29+01.00 Water Steel 2 138.43 138.26 Under 137.00 136.00 1.26 1 C-105 61 29+19.57 SS PVC 8 136.05 135.38 Over 139.15 138.15 2.10 1 12" WATER MAIN SEPARATION TABLEX X X X 1 Page 305 of 576 N PENSACOLA TALLAHASSEE JACKSONVILLE ORLANDO MIAMI TAMPA FLORIDA CITY OF OCOEE, FLORIDA CONTRACT DRAWINGS FOR LAKEWOOD AVENUE NORTH GRAVITY SEWER PHASE 1 MARCH 2026 AMENDED CONSTRUCTION PHASING WP PROJECT No. 21787 LOCATION PLAN SCALE: 1"=15,000' ---COVER SHEET CP-1 CONSTRUCTION PHASING NOTES, LEGEND, ABBREVIATIONS AND KEY PLAN CP-2 CONSTRUCTION PHASING PLAN I CP-3 CONSTRUCTION PHASING PLAN II CP-4 CONSTRUCTION PHASING PLAN III CP-5 CONSTRUCTION PHASING PLAN IV CP-6 CONSTRUCTION PHASING PLAN V CP-7 CONSTRUCTION PHASING PLAN VI CP-8 CONSTRUCTION PHASING PLAN VII CP-9 CONSTRUCTION PHASING PLAN VIII CP-10 CONSTRUCTION PHASING PLAN IX 407.906.1776 | www.wright-pierce.com DRAWING INDEX GENERAL CIVIL PROJECT LOCATION OCOEE CITY OF OCOEE 1 N BLUFORD AVE, OCOEE, FL 34761 407-905-3100 MAYOR:RUSTY JOHNSON DISTRICT 1 COMMISSIONER: SCOTT R. KENNEDY DISTRICT 2 COMMISSIONER: ROSEMARY WILSEN DISTRICT 3 COMMISSIONER: RICHARD FIRSTNER DISTRICT 4 COMMISSIONER: GEORGE OLIVER III CITY MANAGER: CRAIG SHADRIX ASSISTANT CITY MANAGER: MICHAEL RUMER CITY OF OCOEE UTILITIES DEPARTMENT 1800 A.D. MIMS ROAD, OCOEE, FL, 34761 407-905-3159 DIRECTOR:JENNIFER BOLLING, P.E. ASSISTANT DIRECTOR:TRENT HOPPER Page 306 of 576 XXXXXX STEP 2A STEP 2 STEP 3A STEP 3 STEP 4A STEP 4STEP 4 STEP 4A STEP 5 STEP 5A STEP 5 STEP 5A STEP 5 STEP 5A STEP 5 CP-3 CP-4 CP-5 CP-6 CP-2 STEP 2 ST E P 1 NORTH LAKEWOOD AVENUE (OCOEE CLARCONA ROAD) AN D E R S O N P L A C E LY M A N S T R E E T ( F ) LA U R E L R I D G E AV E N U E BU R N T T R E E C O U R T MO B I L E L A N E MA C K S T R E E T SE C U R I T Y CI R C L E STEP 6STEP 6 STEP 7A STEP 7 STEP 7 STEP 8STEP 8 STEP 9 STEP 9A STEP 10 CP-7 CP-8 CP-9 CP-10 17 T H A V E N U E 16 T H A V E N U E 15 T H A V E N U E WU R S T R O A D CL I N G E R C O V E RO A D NORTH LAKEWOOD AVENUE (OCOEE CLARCONA ROAD) LA U R E L R I D G E AV E N U E J: \ E N G \ F L \ O C O E E \ 2 1 7 8 7 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 1 \ _ D R A W I N G S \ C I V \ 2 1 7 8 7 - C S - C O N S T P H A S I N G G E N E R A L N O T E S . D W G | 21 7 8 7 - C S - G e n e r a l N o t e s | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 7 / 2 0 2 6 1 1 : 2 0 : 2 3 A M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 2/ 2 7 / 2 0 2 6 1 1 : 0 1 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E CO N S T R U C T I O N P H A S I N G CO N S T R U C T I O N P H A S I N G N O T E S , L E G E N D , AB B R E V I A T I O N S A N D K E Y P L A N CP-1                J. P I C K E R I N G 21 7 8 7 D. M E T Z M. O ' B R I E N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   LEGEND PROPERTY/ROW LINE SETBACK LINE EASEMENT LINE CONTOUR122 LIMIT OF WORK SILT FENCE SPOT ELEVATION UNDERGROUND ELECTRIC OVERHEAD ELECTRIC DRAINAGE FLOW SEWER RIPRAP SIGN TEMPORARY BENCH MARK BUILDING STONEWALL CULVERT12" CMP SURVEY CONTROL POINT IRON PIPE/REBAR DRILLHOLE MONUMENT SEWER MANHOLE DRAINAGE MANHOLE CATCH BASIN SHUTOFF VALVE HYDRANT EXISTING EDGE OF PAVEMENT EDGE OF GRAVEL RETAINING WALL SEWER FORCE MAIN GAS STORM DRAIN WATER G G UGE UGE UTILITY POLE UTILITY POLE W/ GUY LIGHT POLE UTILITY POLE W/ LIGHT BOLLARD CONIFEROUS TREE DECIDUOUS TREE SHRUB TEST PIT TEST BORING TEST PROBE MONITORING WELL WETLANDS EDGE OF WETLANDS TELEPHONE MANHOLE ELECTRIC MANHOLE PAVEMENT MARKINGS CENTERLINE WATER SERVICE SHUTOFF YARD HYDRANT EDGE OF WATER STREAM DRAINAGE SWALE CURBING GUARDRAIL UNDERDRAINUDUD RAILROAD MATCHLINE ROCK OUTCROP MAILBOX TREELINE CHAIN LINK FENCE STOCKADE FENCE BARB WIRE FENCExx EDGE OF CONCRETE 8" 4" 4" 15" 6" FLAGPOLE FLOODPLAIN 124.6 8" OHE OHE CBCB DMH MB SMH EMH TMH B TP P MW T UNDERGROUND TELEPHONEUGTUGT UNDERGROUND CABLE TVCATVCATV CB GAS GAS SERVICE SHUTOFF GAS GATE VALVEG WETLAND FLAG PROPOSED 4"FM 8"S 8"W 15"SD 12" CMP 4"G 6"UD x 123 UGE UGE OHE OHE x 134.5 SMH DMH CB CB EMH TMH x UGT UGT CATV CATV NATIONAL GEODETIC VERTICAL DATUM W/ W POTABLE WATER WITH SMH TBM THK TYP UD SQ STA T, XFMR SD SF S PSI PVC RCP RD REQ'D OD PC PSF NTS NGVD SANITARY SEWER MANHOLE STATION TEMPORARY BENCH MARK THICKNESS UNDERDRAIN TYPICAL SQUARE TRANSFORMER STORM DRAIN SQUARE FEET SLOPE, SEWER POUNDS PER SQUARE INCH POLYVINYL CHLORIDE REINFORCED CONCRETE PIPE REQUIRED ROOF DRAIN OUTSIDE DIAMETER POUNDS PER SQUARE FOOT PERFORATED CLAY NOT TO SCALE FT INV MH MIN MAX HYD INF IN FM DR DWG EL EMH CY DEMO DMH DI FEET MANHOLE MINIMUM MAXIMUM INCH INFLUENT HYDRANT INVERT FORCE MAIN DRAIN ELECTRIC MANHOLE ELEVATION DRAWING DRAIN MANHOLE CUBIC YARD DUCTILE IRON DEMOLITION CIVIL ABBREVIATIONS CEN CO CONC CI CMP CB BLDG & Ø, DIA CENTER CAST IRON CORRUGATED METAL PIPE CLEANOUT CONCRETE CATCH BASIN BUILDING AND DIAMETER PS PRIMARY SLUDGE VC VITRIFIED CLAY UG UNDERGROUND UGE UNDERGROUND ELECTRIC #, NO NUMBER APP'D APPROVED G GAS N N/A NORTH NOT AVAILABLE/APPLICABLE LB POUNDS TOS TOP OF STRUCTURE MW MONITORING WELL CL CENTERLINE CORNERCOR CFS CUBIC FEET PER SECOND PT POINT OF TANGENCY AC ASBESTOS CEMENT BR BRICK CIPP CURED-IN-PLACE-PIPE HDPE HIGH DENSITY POLYETHYLENE LF LINEAR FOOT OUT OUTFALL VF VERTICAL FOOT CPE CORRUGATED POLYETHYLENE PIPE KEY PLAN SCALE: 1" = 100' N 1000 200 STANDARD GENERAL TEMPORARY TRAFFIC CONTROL NOTES: 1.TEMPORARY TRAFFIC CONTROL (TTC) SHALL BE IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (LATEST EDITION AND REVISIONS) AND THE FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD PLANS FOR ROAD CONSTRUCTION (LATEST EDITION AND REVISIONS). 2.CONTRACTOR SHALL UTILIZE THE PROVIDED CONSTRUCTION PHASING PLANS TO DEVELOP A TEMPORARY TRAFFIC CONTROL PLAN FOR SUBMITTAL. THE PLAN HAS BEEN PREPARED IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (2023 EDITION) AND FDOT STANDARD PLANS FOR ROAD CONSTRUCTION (FY 2025-26). 3.THE DESIGN OF THE TTC PLAN SHALL INCLUDE ALL SIGNS, BARRIERS, CHANNELIZING DEVICES, PAVEMENT MARKINGS, ETC. FOR THE SAFE PASSAGE OF VEHICULAR TRAFFIC THROUGH THE PROJECT AND FOR THE PROTECTION OF THE WORKERS. 4.THE TTC PLAN SHALL BE SIGNED AND SEALED BY A REGISTERED PROFESSIONAL ENGINEER AND APPROVED BY ORANGE COUNTY AND THE CITY OF OCOEE PRIOR TO IMPLEMENTATION. 5.ORANGE COUNTY AND THE CITY OF OCOEE RESERVES THE RIGHT TO REQUIRE ADDITIONAL DEVICES AND/OR CHANGES TO THE TTC PLAN BASED UPON CHANGING TRAFFIC CONDITIONS. 6.LOCAL RESIDENTIAL/BUSINESS ACCESS SHALL BE MAINTAINED AT ALL TIMES. CONTRACTOR SHALL PROVIDE WRITTEN NOTIFICATION TO THE RESIDENTS/BUSINESSES AFFECTED BY CONSTRUCTION ACTIVITIES, ONE (1) WEEK IN ADVANCE OF THE START OF ANY STEP OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE COPIES OF THE NOTIFICATION TO THE TRAFFIC CONTROL MANAGER PRIOR TO DISTRIBUTION. 7.ALL SIGNS AND TRAFFIC CONTROL DEVICES SHALL BE NEW OR LIKE NEW CONDITION. ALL SIGNS SHALL BE POST MOUNTED UNLESS OTHERWISE INDICATED. 8.CHANNELIZING DRUMS SHALL BE USED ON NEWLY PAVED ROADWAYS. 9.PORTABLE CHANGEABLE MESSAGE SIGNS (PCMS) IF REQUIRED SHALL BE IN PLACE A MINIMUM OF 2 WEEKS PRIOR TO IMPLEMENTING ANY TRAFFIC CONTROL. 10.BARRIERS MAY BE REQUIRED TO PROTECT DROP OFFS OR ABOVE GROUND HAZARDS. ALL BARRIERS SHALL BE INSTALLED PER FDOT SPECIFICATIONS. 11.DURING NON-WORKING HOURS, NO EQUIPMENT, VEHICLES OR MATERIAL SHALL BE PARKED OR STORED WITHIN THE CLEAR ZONE OF A ROADWAY OPEN TO VEHICULAR TRAFFIC. 12.EXISTING REGULATORY AND WARNING SIGNS ARE TO BE MAINTAINED AT ALL TIMES UNLESS OTHERWISE NOTED. 13.THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSURING EACH EMPLOYEE SUPERVISING THE SELECTION AND PLACEMENT OF TTC DEVICES SHALL BE PROPERLY TRAINED BY ATTENDING AND SUCCESSFULLY COMPLETING A FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) APPROVED TTC COURSE. THE TRAINING SHALL BE AT A LEVEL APPLICABLE TO THE EMPLOYEE’S LEVEL OF INVOLVEMENT. COPIES OF CERTIFICATIONS SHALL BE PROVIDED TO THE ENGINEER PRIOR TO IMPLEMENTING ANY STEP OF TTC. 14.THE CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL SUPERVISOR (TCS) WHO IS RESPONSIBLE FOR INITIATING, INSTALLING AND MAINTAINING ALL TRAFFIC CONTROL DEVICES. 15.THE TCS SHALL BE AVAILABLE ON A 24-HOUR PER DAY BASIS, PARTICIPATE IN ALL CHANGES TO TRAFFIC CONTROL AND REVIEW THE PROJECT ON A DAY-TO-DAY BASIS. 16.THE TCS SHALL BE PRESENT DURING THE INITIAL SETUP OF THE TTC PLAN AND ALL SUBSEQUENT STEPS OR CHANGES TO THE TRAFFIC CONTROL. 17.THE TCS SHALL IMMEDIATELY CORRECT ALL DEFICIENCIES. 18.THE CONTRACTOR SHALL ENSURE THE TCS BE AVAILABLE ON SITE WITHIN 45 MINUTES OF NOTIFICATION OF AN EMERGENCY SITUATION AND IS PREPARED TO RESPOND TO AND CORRECT THE TRAFFIC CONTROL OR PROVIDE ALTERNATE ARRANGEMENTS FOR CORRECTIVE ACTIONS. 19.THE TCS SHALL BE RESPONSIBLE FOR PERFORMING WEEKLY, DAYTIME AND NIGHTTIME INSPECTIONS OF ALL TRAFFIC CONTROL DEVICES AND TRAFFIC FLOW MOVEMENT THROUGH THE WORK AREA AND BUSINESS ACCOMMODATIONS. 20.ORANGE COUNTY AND THE CITY OF OCOEE MAY DISQUALIFY AND REMOVE FROM THE PROJECT A TRAFFIC CONTROL SUPERVISOR THAT FAILS TO COMPLY WITH THESE PROVISIONS. THE FLORIDA DEPARTMENT OF TRANSPORTATION MAY ALSO SUSPEND ALL WORK ACTIVITIES UNTIL CORRECTIVE ACTIONS HAVE BEEN COMPLETED. SPECIFIC TEMPORARY TRAFFIC CONTROL NOTES: 1.THE CONTRACTOR IS REQUIRED TO COMPLY WITH THE FDOT STANDARD PLANS THAT ARE IN EFFECT AT THE TIME OF CONSTRUCTION. IF THE FDOT STANDARD PLANS REFERENCED IN THESE CONSTRUCTION PHASING PLANS BECOME OBSOLETE, THE CONTRACTOR SHALL PROVIDE UPDATED TTC PLANS THAT ARE PREPARED BY A FLORIDA LICENSED PROFESSIONAL ENGINEER WHO HOLDS A CURRENT FDOT ADVANCED TTC CERTIFICATION FOR REVIEW AND APPROVAL BY ORANGE COUNTY AND THE CITY OF OCOEE PRIOR TO ANY TTC OPERATIONS. 2.TTC SHALL COMPLY WITH FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION (2025-26 EDITION) SECTION 102. 3.CONTRACTOR SHALL COORDINATE WITH OTHER PROJECTS IN THE VICINITY AND ADJUST TTC SIGNAGE AND DEVICES TO ENSURE NO CONFLICTING MESSAGES/DIRECTIONS TO THE ROADWAY USERS. TEMPORARY TRAFFIC CONTROL SUBMITTAL REQUIREMENT: 1.THE CONTRACTOR SHALL SUBMIT A SIGNED AND SEALED TEMPORARY TRAFFIC CONTROL PLAN BY A FLORIDA LICENSED PROFESSIONAL ENGINEER WHO HOLDS A FLORIDA DEPARTMENT OF TRANSPORTATION ADVANCED TEMPORARY TRAFFIC CONTROL CERTIFICATE FOR EXECUTION OF CONSTRUCTION DURING THE PRECONSTRUCTION SUBMITTAL PROCESS. THE TEMPORARY TRAFFIC CONTROL PLAN SHALL BE REVIEWED AND APPROVED BY THE ENGINEER, ORANGE COUNTY, AND THE CITY OF OCOEE PRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITIES. ERCP ELLIPTICAL REINFORCED CONCRETE PIPE Page 307 of 576 UGFBOUGFBO UGFBO UGFBOUGFBO UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O UG F B O OHEOHEOHE OH E OH E OH E OH E OHE OHE O H E O H E STOP SCB TOP OF GRATE ELEV=126.11' BOTTOM OF STRUCTURE ELEV=121.76 24" CMP RECESSED SCB TOP OF GRATE ELEV=125.86' N INV (18"CMP) ELEV=122.16 6' C H A I N L I N K F E N C E SECURITY CIRCLE 1 2 1 PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1543687.5510 E:482075.0300 ELEV:126.20' (NAVD 1988) FM FM FMFMSMH TOP OF LID ELEV=126.14' N INV (8"PVC) ELEV= 115.38 E INV (8"PVC) ELEV= 115.42 S INV (8"PVC) ELEV= 115.40 SMH TOP OF LID ELEV=126.14' N INV (20"PVC) ELEV=113.72 SW INV (20"PVC) ELEV=113.86 W INV (8"PVC) ELEV=114.66 SCB TOP OF GRATE ELEV=125.68' BOTTOM OF STRUCTURE ELEV=121.33 24" & 18" CMP RECESSED 1+00 2+ 0 0 CO 12" PVC S 20" PVC FM 10 2 S E C U R I T Y C I R SE C U R I T Y M O B I L E HO M E P A R K PL A T B O O K Z , P A G E 9 3 EXISTING SMH A EXISTING SMH B SCB TOP OF GRATE ELEV=125.86' BOTTOM OF STRUCTURE ELEV=121.66 18" CMP RECESSED STEP 1 CLOSE SECURITY CIRCLE FOR STEP 1 CONSTRUCTION AND DETOUR LOCAL TRAFFIC ONTO MOBILE LANE CLOSE NORTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE SOUTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. GR A V E L DR I V E W A Y CLOSE SIDEWALK AND PROVIDE PEDESTRIAN DETOUR ACROSS NORTH LAKEWOOD AVENUE PER FDOT SPI 102-660 OR PROVIDE PEDESTRIAN SPECIAL DETOUR ADJACENT TO WORK ZONE PER FDOT SPI 102-660. J: \ E N G \ F L \ O C O E E \ 2 1 7 8 7 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 1 \ _ D R A W I N G S \ C I V \ 2 1 7 8 7 - C S - M O T P L A N I . D W G | 21 7 8 7 - C S - M O T P l a n I - 0 | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 7 / 2 0 2 6 1 1 : 2 0 : 5 7 A M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 2/ 2 7 / 2 0 2 6 1 0 : 4 7 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 CO N S T R U C T I O N P H A S I N G P L A N I CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E CO N S T R U C T I O N P H A S I N G CP-2 RE V I S I O N S   P E R   C I T Y   C O M M E N T S   A F T E R   B I D   I S S U A N C E     AS         02 / 2 6 J. P I C K E R I N G 21 7 8 7 D. M E T Z M. O ' B R I E N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   N 0 10 20 PLAN SCALE: 1"=10' NO R T H L A K E W O O D AV E N U E NOTE: STABILIZED ACCESS TO DRIVEWAYS SHALL BE MAINTAINED AT ALL TIMES. ONE LANE OF TRAFFIC SHALL BE MAINTAINED AT ALL TIMES ON NORTH LAKEWOOD AVENUE DURING STEP I CONSTRUCTION. 1 Page 308 of 576 76" 44" X X X UG F B O UG F B O UG F B O UG F B O UG F B O U G F B O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UG F B O X X X XXXXXXX UGFBO UGFBO UGFBO OH E OH E OH E O H E OHE OHE OHE OHE OH E OH E OHE OHE OH E OH E OH E OH E OH E OH E OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE UGFBO UGFBO UGFBO UGFBO STOP SCB TOP OF GRATE ELEV=126.11' BOTTOM OF STRUCTURE ELEV=121.76 24" CMP RECESSED SCB TOP OF GRATE ELEV=125.78' OPEN CHANNEL INV ELEV= 125.16 N INV (18"RCP) ELEV= 121.66 SCB TOP OF GRATE ELEV=125.58' NW INV (18"RCP) ELEV=121.82 SCB TOP OF GRATE ELEV=125.86' N INV (18"CMP) ELEV=122.16 IP 2" (fnd) N&D L&S LB 7829 (fnd) STOP FM ARV 4' BARB-WIRE FENCE 6' CHAIN LINK FENCE 4' BARB-WIRE FENCE 4' CHAIN LINK FENCE SE C U R I T Y CI R C L E MO B I L E L A N E 1 1 PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1543687.5510 E:482075.0300 ELEV:126.20' (NAVD 1988) EDGE OF ASPHALT ROAD 5' WIDE CONC SIDEWALK 5' WIDE CONC SIDEWALK 5' WIDE CONC SIDEWALK 5' WIDE CONC SIDEWALK FMFM FM FM SMH TOP OF LID ELEV=126.14' N INV (8"PVC) ELEV= 115.38 E INV (8"PVC) ELEV= 115.42 S INV (8"PVC) ELEV= 115.40 SCB TOP OF GRATE ELEV=125.68' BOTTOM OF STRUCTURE ELEV=121.33 24" & 18" CMP RECESSED 2+00 3+00 4+00 COCO CO CO CO SMH-1 12" PVC S12" PVC S 12 " P V C S 8" P V C S SMH-12 EXISTING SMH B SCB TOP OF GRATE ELEV=125.86' BOTTOM OF STRUCTURE ELEV=121.66 18" CMP RECESSED NORTH LAKEWOOD AVENUE STEP 2A STEP 2 CLOSE SOUTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE NORTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. CLOSE NORTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE SOUTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. CLOSE SIDEWALK AND PROVIDE PEDESTRIAN DETOUR ACROSS NORTH LAKEWOOD AVENUE PER FDOT SPI 102-660 OR PROVIDE PEDESTRIAN SPECIAL DETOUR ADJACENT TO WORK ZONE PER FDOT SPI 102-660. CLOSE MOBILE LANE FOR STEP 2 CONSTRUCTION AND DETOUR LOCAL TRAFFIC ONTO SECURITY CIRCLE PROVIDE PEDESTRIAN SPECIAL DETOUR AROUND SEWER MAIN, SEWER LATERAL, WATER MAIN, AND WATER SERVICE CONSTRUCTION PER FDOT SPI 102-660 (TYP) GRAVEL DRIVEWAY MA T C H LI N E CP - 3  U P P E R CP - 3  L O W E R MA T C H LI N E CP - 3  U P P E R CP - 3  L O W E R STEP 2 CLOSE SIDEWALK AND PROVIDE PEDESTRIAN DETOUR ACROSS NORTH LAKEWOOD AVENUE PER FDOT SPI 102-660 OR PROVIDE PEDESTRIAN SPECIAL DETOUR ADJACENT TO WORK ZONE PER FDOT SPI 102-660. CLOSE MACK STREET FOR STEP 2 CONSTRUCTION AND DETOUR LOCAL TRAFFIC ONTO MELVA AVE MA C K S T R E E T J: \ E N G \ F L \ O C O E E \ 2 1 7 8 7 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 1 \ _ D R A W I N G S \ C I V \ 2 1 7 8 7 - C S - M O T P L A N I . D W G | 21 7 8 7 - C S - M O T P l a n I - I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 7 / 2 0 2 6 1 1 : 2 1 : 0 5 A M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 2/ 2 7 / 2 0 2 6 1 0 : 4 7 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 CO N S T R U C T I O N P H A S I N G P L A N I I CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E CO N S T R U C T I O N P H A S I N G CP-3 RE V I S I O N S   P E R   C I T Y   C O M M E N T S   A F T E R   B I D   I S S U A N C E     AS         02 / 2 6 J. P I C K E R I N G 21 7 8 7 D. M E T Z M. O ' B R I E N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   N 0 10 20 0 10 20 PLAN SCALE: 1"=10' N 1 1 1 1 Page 309 of 576 12" OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OH E OH E OH E OH E UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UG F B O UG F B O UG F B O G G G G G G G G G G G G G G G G G G G G G G G G G BE BE STOP N INV (24"CMP) ELEV=120.89 S INV (24"CMP) ELEV=120.68 NO OUTLET N&D REF PT (fnd) TRACT "A" RETENTION AREA PID:08-22-28-0000-00-028 DOC#20230197294 DIRT DRIVEWAY IR 1/2" BENT (fnd) CONCRETE DRIVEWAY CONCRETE DRIVEWAY MON 4"X4" (fnd) BU R N T T R E E C O U R T FLUME OVERGROWN GRAVEL DRIVEWAY SE INV (36"RCP) ELEV=122.89' SW INV (15" CMP) ELEV=121.91' NO DUMPING SCB TOP OF GRATE ELEV=125.27' NE INV (18"RCP) ELEV= 120.68 E INV (18"RCP) ELEV= 122.14 S INV (18"RCP) ELEV= 120.76 SCB TOP OF GRATE ELV=125.42' W INV (18"RCP) ELEV= 122.24 NW INV (36"RCP8"PVC) ELEV=120.35 DMH TOP OF LID ELEV=126.45' NE INV (15"CMP) ELEV=119.75 S INV (15"CMP) ELEV=123.10 PROJECT BENCHMARK SET NAIL & DISK L&S LB 7829 N:1544174.3590 E:482061.4690 ELEV:125.22' (NAVD 1988) DMH TOP OF LID ELEV=126.01' SW INV (18"RCP) ELEV= 120.30 E INV (15"RCP) ELEV= 120.40 7+00 8+00 COCOCO SMH-3 12" PVC S SMH-14 B-8 B-9 8" P V C S STEP 4A MA T C H LI N E CP - 3 CP - 5 STEP 4 BURNT TREE COURT IS A DEAD END ROAD, CONTRACTOR TO MAINTAIN ACCESS AT ALL TIMES WITH A STABILIZED SINGLE 10-FOOT TRAVEL LANE AND FLAGGER. CLOSE SIDEWALK AND PROVIDE PEDESTRIAN DETOUR ACROSS NORTH LAKEWOOD AVENUE PER FDOT SPI 102-660 OR PROVIDE PEDESTRIAN SPECIAL DETOUR ADJACENT TO WORK ZONE PER FDOT SPI 102-660. CLOSE NORTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE SOUTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. CLOSE SOUTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE NORTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. NORTH LAKEWOOD AVENUE 68" 20" X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E O H E O H E O H E O H E O H E O H E OHE OHE OHE OHE OHE OHE OHE OHE OHE UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO G G G UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UG F B O UG F B O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO U G F B O U G F B O U G F B O 20/9" NO OUTLET SCB TOP OF GRATE ELEV=125.78' OPEN CHANNEL INV ELEV= 125.16 N INV (18"RCP) ELEV= 121.66 SCB TOP OF GRATE ELEV=125.49' N INV (24"RCP) ELEV= 121.14 SE INV (18"RCP) ELEV= UNK S INV (18"RCP) ELEV= 121.20 MPH 25 IP 2" (fnd)IR 1/2" (fnd) IR 1/2" (fnd) STOP STOP 4' WOOD PANEL FENCE 6'WOOD PANEL FENCE 25 7.5' DRAINAGE, UTILITY, INGRESS & EGRESS EASEMENT(P) MO B I L E L A N E DIRT DRIVEWAY 5' WIDE CONC SIDEWALK BU R N T T R E E C O U R T DMH TOP OF LID ELEV=126.45' SCB TOP OF GRATE ELEV=125.63' N INV (18"RCP) ELEV= 121.22 S INV (24"RCP) ELEV= 120.97 MPH 25 5' WIDE CONC SIDEWALK 4+00 5+00 6+00 CO CO CO CO CO SMH-1 SMH-3SMH-2 12" PVC S12" PVC S 8" PVC S 8" P V C S SMH-12 SMH-14 SMH-13 B-9 B-10 720 N LAKEWOOD AVE PID:18-22-28-0000-00-066 DOC#20180256405 782 N LAKEWOOD AVE PID:18-22-28-0000-00-055 ORB 9110, PG 845 100 MOBILE LN 8" P V C S STEP 3A STEP 3 CLOSE SOUTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE NORTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. CLOSE NORTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE SOUTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. CLOSE LYMAN STREET FOR STEP 3A CONSTRUCTION AND DETOUR LOCAL TRAFFIC ONTO CHARLES STREET BURNT TREE COURT IS A DEAD END ROAD, CONTRACTOR TO MAINTAIN ACCESS AT ALL TIMES WITH A STABILIZED SINGLE 10-FOOT TRAVEL LANE AND FLAGGER. NORTH LAKEWOOD AVENUE PROVIDE PEDESTRIAN SPECIAL DETOUR AROUND SEWER MAIN, SEWER LATERAL, WATER MAIN, AND WATER SERVICE CONSTRUCTION PER FDOT SPI 102-660 (TYP) PROVIDE PEDESTRIAN SPECIAL DETOUR AROUND SEWER MAIN, SEWER LATERAL, WATER MAIN, AND WATER SERVICE CONSTRUCTION PER FDOT SPI 102-660 (TYP) LY M A N S T R E E T J: \ E N G \ F L \ O C O E E \ 2 1 7 8 7 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 1 \ _ D R A W I N G S \ C I V \ 2 1 7 8 7 - C S - M O T P L A N I . D W G | 21 7 8 7 - C S - M O T P l a n I - I I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 7 / 2 0 2 6 1 1 : 2 1 : 1 3 A M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 2/ 2 7 / 2 0 2 6 1 0 : 4 7 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 PLAN SCALE: 1"=10' CO N S T R U C T I O N P H A S I N G P L A N I I I CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E CO N S T R U C T I O N P H A S I N G CP-4 RE V I S I O N S   P E R   C I T Y   C O M M E N T S   A F T E R   B I D   I S S U A N C E     AS         02 / 2 6 J. P I C K E R I N G 21 7 8 7 D. M E T Z M. O ' B R I E N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   N 0 10 20 N 0 10 20 PLAN SCALE: 1"=10' NOTE: STABILIZED ACCESS TO DRIVEWAYS SHALL BE MAINTAINED AT ALL TIMES. 1 1 Page 310 of 576 54" 18"20" 42" 20" OHE OHE UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UG F B O UG F B O U G F B O U G F B O UGF B O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO OH E OH E OH E OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE UGFBO UGFBO UGFBO G G G G G G G G G G G G G G G G G G G G G SCB TOP OF GRATE ELEV=125.51' N INV (24"RCP) ELEV=122.98 S INV (24"RCP) ELEV=122.96 SCB TOP OF GRATE ELEV=125.43' N INV (15"RCP) ELEV= 123.89 S INV (15"RCP) ELEV= 123.80 ARV BT PRESSURE RELEASE VALVE DMH TOP OF LID ELEV=125.48' N (UNKOWN) ELEV=123.52 W(18"RCP) ELEV=123.34 SCB TOP OF GRATE ELEV=125.78' N (18"RCP) ELEV= 122.70 E (24"RCP) ELEV= 122.73 S (24"RCP) ELEV= 122.64IRC 1/2" RLS 2142 (fnd) PID:7-22-28-0000-00-090 DOC#20180523897 PID:08-22-28-0000-00-021 NO DOC FOUND PID:08-22-28-0000-00-046 ORB 6633, PG 788 PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1544881.6580 E:482058.2010 ELEV:127.89' (NAVD 1988) 5' WIDE CONC SIDEWALK IRC 1/2" ILL (fnd) N&D NO ID (fnd) EDGE OF ASPHALT ROAD DIRT DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY DIRT DRIVEWAY AN D E R S O N P L 12+00 13+00 14+00 CO CO CO CO CO B-7 ANDERSON PLACE IS A DEAD END ROAD, CONTRACTOR TO MAINTAIN ACCESS AT ALL TIMES WITH A STABILIZED SINGLE 10-FOOT TRAVEL LANE AND FLAGGER. STEP 5A STEP 5 CLOSE SIDEWALK AND PROVIDE PEDESTRIAN DETOUR ACROSS NORTH LAKEWOOD AVENUE PER FDOT SPI 102-660 OR PROVIDE PEDESTRIAN SPECIAL DETOUR ADJACENT TO WORK ZONE PER FDOT SPI 102-660. CLOSE NORTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE SOUTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. CLOSE SOUTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE NORTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. MA T C H LI N E CP - 4 CP - 6 SMH-5 NORTH LAKEWOOD AVENUE 20" 22" 20" 10" 15"12" 20"24" OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBOUGFBOUGFBOUGFBOUGFBOUGFBOUGFBOUGFBOUGFBOUGFBOUGFBOUGFBOUGFBOUGFBOUGFBOUGFBOUGFBOUGFBOUGFBOUGFBOUGFBOUGFBO O H E O H E O H E O H E G G G G G G G G G G G G G G G G G G G G G G G G G G SCB TOP OF GRATE ELEV=125.19' W INV (15"CMP) ELEV= 123.57 ARV BT PRESSURE RELEASE VALVE IRC 1/2" RLS 2142 (fnd) E INV (15" CMP) ELEV=122.20 S INV (24" RCP) ELEV=122.06 PID:08-22-28-0000-00-028 DOC#20230197294 FLUME 5' WIDE CONC SIDEWALK 5' WIDE CONC SIDEWALK PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1544507.0780 E:482027.9150 ELEV:125.44' (NAVD 1988) FLUME DIRT DRIVEWAY EDGE OF ASPHALT ROAD CONCRETE DRIVEWAY DIRT DRIVEWAY AN D E R S O N P L 9+00 10+00 11+00 CO 50 + 0 0 50 + 2 8 CO SMH-4 12" PVC S STEP 4 MA T C H LI N E CP - 3 CP - 5 STEP 4A SMH-15 CLOSE NORTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE SOUTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. CLOSE SOUTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE NORTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. ANDERSON PLACE IS A DEAD END ROAD, CONTRACTOR TO MAINTAIN ACCESS AT ALL TIMES WITH A STABILIZED SINGLE 10-FOOT TRAVEL LANE AND FLAGGER. SMH-5 CLOSE SIDEWALK AND PROVIDE PEDESTRIAN DETOUR ACROSS NORTH LAKEWOOD AVENUE PER FDOT SPI 102-660 OR PROVIDE PEDESTRIAN SPECIAL DETOUR ADJACENT TO WORK ZONE PER FDOT SPI 102-660. NORTH LAKEWOOD AVENUE J: \ E N G \ F L \ O C O E E \ 2 1 7 8 7 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 1 \ _ D R A W I N G S \ C I V \ 2 1 7 8 7 - C S - M O T P L A N I . D W G | 21 7 8 7 - C S - M O T P l a n I - I I I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 7 / 2 0 2 6 1 1 : 2 1 : 2 2 A M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 2/ 2 7 / 2 0 2 6 1 0 : 4 7 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 PLAN SCALE: 1"=10' CO N S T R U C T I O N P H A S I N G P L A N I V CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E CO N S T R U C T I O N P H A S I N G CP-5 RE V I S I O N S   P E R   C I T Y   C O M M E N T S   A F T E R   B I D   I S S U A N C E     AS         02 / 2 6 J. P I C K E R I N G 21 7 8 7 D. M E T Z M. O ' B R I E N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   N 0 10 20 PLAN SCALE: 1"=10' N 0 10 20 NOTE: STABILIZED ACCESS TO DRIVEWAYS SHALL BE MAINTAINED AT ALL TIMES. 1 Page 311 of 576 16+00 17+00 18+00 CO 34" OH E UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE O H E O H E OH E OH E OH E OH E UGFBO UGFBO UGFBO G G G G G G G G G G G G G G G G G G G G G G UG E UGEUGE UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO 18" S INV (18"RCP) ELEV=128.78' MPH 25 WATER WATER WATER WATER MON 4"X4" (fnd) WATER WATER X-CUT (fnd) MEMORIAL MARKER FM FM LA U R E L R I D G E A V E N U E TRACT C LIFT STATION 5' METAL FENCE N&D NO ID (fnd)N&D NO ID (fnd) EDGE OF ASPHALT ROAD CONCRETE DRIVEWAY SCB TOP OF GRATE ELEV=129.34' N INV (18"RCP) ELEV=126.79 E INV (24"RCP) ELEV=126.70 S INV (24"RCP) ELEV=126.59 PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1545170.7030 E:482058.1970 ELEV:130.40' (NAVD 1988) 10' LANDSCAPE, UTILITY, WALL & SIGNAGE EASEMENT(P) 5' ADDITIONAL R/W(P) 12" PVC S 109 LAUREL RIDGE AVE 107 LAUREL RIDGE AVE 8" P V C S MA T C H LI N E CP - 5  U P P E R CP - 5  L O W E R STEP 5A STEP 5 CLOSE NORTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE SOUTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. CLOSE SOUTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE NORTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. LAUREL RIDGE AVENUE IS A DEAD END ROAD, CONTRACTOR TO MAINTAIN ACCESS AT ALL TIMES WITH A STABILIZED SINGLE 10-FOOT TRAVEL LANE AND FLAGGER. CLOSE SIDEWALK AND PROVIDE PEDESTRIAN DETOUR ACROSS NORTH LAKEWOOD AVENUE PER FDOT SPI 102-660 OR PROVIDE PEDESTRIAN SPECIAL DETOUR ADJACENT TO WORK ZONE PER FDOT SPI 102-660. SMH-7 SMH C NORTH LAKEWOOD AVENUE 14+00 15+00 16+00 B-6 CO CO CO20/10" TWIN O H E OH E OH E OH E OH E OH E OH E OH E UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UG F B O U G F B O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO OHE OHE O H E O H E O H E OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE UGFBO UGFBO U G F B O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO G G G G G G G G G G G G G G G G G G G G G UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO SCB TOP OF GRATE ELEV=128.65' S INV (15"RCP) ELEV= 126.18 IRC 1/2" LB 4596 (fnd) IP 1" (fnd) STONE PLATER 5' METAL FENCE PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1544881.6580 E:482058.2010 ELEV:127.89' (NAVD 1988) 5' METAL FENCE 5' WIDE CONC SIDEWALK N&D NO ID (fnd) CONCRETE DRIVEWAY DIRT DRIVE WAY CONCRETE SCB TO OF GRATE ELEV=127.09' N INV (24"RCP) ELEV=124.29 S INV (24"RCP) ELEV=124.19 DIRT DRIVEWAY SMH-6 (PHASE 1)B-6 CLOSE NORTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE SOUTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. CLOSE SOUTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE NORTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. MA T C H LI N E CP - 5 CP - 5 MA T C H LI N E CP - 5  U P P E R CP - 5  L O W E R STEP 5A STEP 5 CLOSE SIDEWALK AND PROVIDE PEDESTRIAN DETOUR ACROSS NORTH LAKEWOOD AVENUE PER FDOT SPI 102-660 OR PROVIDE PEDESTRIAN SPECIAL DETOUR ADJACENT TO WORK ZONE PER FDOT SPI 102-660. CLOSE SIDEWALK AND PROVIDE PEDESTRIAN DETOUR ACROSS NORTH LAKEWOOD AVENUE PER FDOT SPI 102-660 OR PROVIDE PEDESTRIAN SPECIAL DETOUR ADJACENT TO WORK ZONE PER FDOT SPI 102-660. NORTH LAKEWOOD AVENUE J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - M O T P L A N I I . D W G | 21 7 8 8 - C S - M O T P l a n I I - I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 7 / 2 0 2 6 1 1 : 2 1 : 4 5 A M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 2/ 2 7 / 2 0 2 6 1 1 : 0 0 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 CO N S T R U C T I O N P H A S I N G P L A N V CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E CO N S T R U C T I O N P H A S I N G CP-6                J. P I C K E R I N G 21 7 8 7 D. M E T Z M. O ' B R I E N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   N 0 20 40 PLAN SCALE: 1" = 10' N 0 20 40PLAN SCALE: 1" = 10' NOTE: STABILIZED ACCESS TO DRIVEWAYS SHALL BE MAINTAINED AT ALL TIMES. Page 312 of 576 21+00 22+00 B-4 CO CO CO 120+00 12" OH E O H E O H E O H E UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UG F B O UG F B O UG F B O UG F B O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE G G G G G G G G G G G G G G G G G G G G G G UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO IRC 1/2" LB 7833 (fnd) STOP N&D LB 6987 (fnd) DMH TOP OF LID ELEV=134.98' N INV (34"X53"ERCP) ELEV=130.73 W INV (18"RCP) ELEV=130.93 E INV (48"CMP) ELEV=130.44 PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1545497.1210 E:482028.4270 ELEV:132.68' (NAVD 1988) FM ARV SCB TOP OF GRATE ELEV=134.62' N INV (15"RCP) ELEV=130.82 E INV (38"X60" RCP) ELEV=130.82 S INV (34"X53"ERCP) ELEV=130.75 4' WOOD PICKET FENCE 4' WOOD PICKET FENCE 4' CHAIN LINK FENCE GATE GATE DIRT DRIVE WAY PID:07-22-28-0000-00-060 DOC#20190801059 MITERED END SECTION W INV (38"X60"ERCP) ELEV=131.10' BACK OF CURB 17 T H A V E N U E CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY SMH-8 B-4 STEP 6 MA T C H LI N E CP - 6  U P P E R CP - 6  L O W E R CLOSE SIDEWALK AND PROVIDE PEDESTRIAN DETOUR ACROSS NORTH LAKEWOOD AVENUE PER FDOT SPI 102-660 OR PROVIDE PEDESTRIAN SPECIAL DETOUR ADJACENT TO WORK ZONE PER FDOT SPI 102-660. CLOSE NORTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE SOUTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. CLOSE 17TH AVENUE FOR STEP 6 CONSTRUCTION AND DETOUR LOCAL TRAFFIC ONTO 16TH AVENUE SMH-16 STEP 6A CLOSE SOUTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE NORTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. PROVIDE PEDESTRIAN SPECIAL DETOUR AROUND WATER MAIN CONSTRUCTION PER FDOT SPI 102-660 (TYP) SMH-17 NORTH LAKEWOOD AVENUE 19+00 20+00 B-5 CO CO X X X X UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO OHE OHE OHE OHE OHE O H E O H E O H E O H E O H E O H E OHE OHE OHE OHE OHE OHE OHE OHE OHE O H E O H E OHE OHE OHE G G G G G G G G G G G G G G G G G G G G UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO S INV (18"RCP) ELEV=128.78' MEMORIAL MARKER X-CUT (fnd) WATER PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1545497.1210 E:482028.4270 ELEV:132.68' (NAVD 1988) WATER WATER FM 4' CHAIN LINK FENCE 4' BARBED-WIRE FENCE LA U R E L R I D G E A V E N U E 5' WIDE CONC SIDEWALK CONCRETE DRIVEWAY CONCRETE DRIVEWAY 12" PVC S B-5 8" P V C S LAUREL RIDGE AVENUE IS A DEAD END ROAD, CONTRACTOR TO MAINTAIN ACCESS AT ALL TIMES WITH A STABILIZED SINGLE 10-FOOT TRAVEL LANE AND FLAGGER. STEP 6 MA T C H LI N E CP - 6  U P P E R CP - 6  L O W E R CLOSE NORTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE SOUTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. STEP 6A CLOSE SOUTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE NORTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. CLOSE SIDEWALK AND PROVIDE PEDESTRIAN DETOUR ACROSS NORTH LAKEWOOD AVENUE PER FDOT SPI 102-660 OR PROVIDE PEDESTRIAN SPECIAL DETOUR ADJACENT TO WORK ZONE PER FDOT SPI 102-660. SMH-7 NORTH LAKEWOOD AVENUE J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - M O T P L A N I I . D W G | 21 7 8 8 - C S - M O T P l a n I I - I I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 7 / 2 0 2 6 1 1 : 2 1 : 5 1 A M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 2/ 2 7 / 2 0 2 6 1 1 : 0 0 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 PLAN SCALE: 1" = 10' CO N S T R U C T I O N P H A S I N G P L A N V I CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E CO N S T R U C T I O N P H A S I N G CP-7                J. P I C K E R I N G 21 7 8 7 D. M E T Z M. O ' B R I E N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   N 0 20 40 PLAN SCALE: 1" = 10' N 0 20 40 NOTE: STABILIZED ACCESS TO DRIVEWAYS SHALL BE MAINTAINED AT ALL TIMES. Page 313 of 576 23+00 24+00 CO CO 12"12" O H E O H E O H E O H E OH E O H E O H E O H E UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UG F B O UG F B O UG F B O UG F B O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE G G G G G G G G G G G G G G G G G G G G G G UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO IRC 1/2" LB 7833 (fnd) ENTRANCE ONLY ENTRANCE ONLY STOP N&D LB 6987 (fnd) SCB TOP OF GRATE ELEV=134.83' S INV (15"RCP) ELEV=131.54 LIL LIGHTS PRESCHOOL OCOEE CHURCH OF GOD 4' PVC FENCE 4' PVC FENCE PID:07-22-28-0000-00-050 DOC#20040681218PID:07-22-28-0000-00-057 DOC#20190801059PID:07-22-28-0000-00-060 DOC#20190801059 IR 1/2" (fnd) 5' CHAIN-LINK FENCE CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY 17 T H A V E N U E ASPHALT DRIVEWAY SMH-8 12" PVC S STEP 7A STEP 7 MA T C H LI N E CP - 7  U P P E R CP - 7  L O W E R CLOSE SOUTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE NORTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. CLOSE NORTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE SOUTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. CLOSE SIDEWALK AND PROVIDE PEDESTRIAN DETOUR ACROSS NORTH LAKEWOOD AVENUE PER FDOT SPI 102-660 OR PROVIDE PEDESTRIAN SPECIAL DETOUR ADJACENT TO WORK ZONE PER FDOT SPI 102-660. SMH-16 CLOSE SIDEWALK AND PROVIDE PEDESTRIAN DETOUR ACROSS NORTH LAKEWOOD AVENUE PER FDOT SPI 102-660 OR PROVIDE PEDESTRIAN SPECIAL DETOUR ADJACENT TO WORK ZONE PER FDOT SPI 102-660. SMH-17 CLOSE 17TH AVENUE FOR STEP 7 CONSTRUCTION AND DETOUR LOCAL TRAFFIC ONTO 15TH AVENUE NORTH LAKEWOOD AVENUE 25+00 B-3 COO H E O H E O H E O H E UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE G G G G G G G G G G G G G G G UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO 16 T H A V E N U E PID:07-22-28-0000-00-050 DOC#20040681218 PROJECT BENCHMARK SET NAIL & DISK L&S LB 7829 N:1546051.7920 E:482073.7180 ELEV:139.72' (NAVD 1988) IP 212 (fnd) 5' CHAIN-LINK FENCE CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY NORTH LAKEWOOD AVENUE SMH-9 B-3 MA T C H LI N E CP - 7  U P P E R CP - 7  L O W E R STEP 7 CLOSE NORTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE SOUTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. CLOSE 16TH AVENUE FOR STEP 7 CONSTRUCTION AND DETOUR LOCAL TRAFFIC ONTO 15TH AVENUE CLOSE SIDEWALK AND PROVIDE PEDESTRIAN DETOUR ACROSS NORTH LAKEWOOD AVENUE PER FDOT SPI 102-660 OR PROVIDE PEDESTRIAN SPECIAL DETOUR ADJACENT TO WORK ZONE PER FDOT SPI 102-660. SMH-18 STEP 7A CLOSE SOUTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE NORTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - M O T P L A N I I . D W G | 21 7 8 8 - C S - M O T P l a n I I - I I I | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 7 / 2 0 2 6 1 1 : 2 1 : 5 8 A M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 2/ 2 7 / 2 0 2 6 1 1 : 0 0 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 PLAN SCALE: 1" = 10' CO N S T R U C T I O N P H A S I N G P L A N V I I CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E CO N S T R U C T I O N P H A S I N G CP-8 RE V I S I O N S   P E R   C I T Y   C O M M E N T S   A F T E R   B I D   I S S U A N C E     AS         02 / 2 6 J. P I C K E R I N G 21 7 8 7 D. M E T Z M. O ' B R I E N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   PLAN SCALE: 1" = 10' N 0 20 40 N 0 20 40 NOTE: STABILIZED ACCESS TO DRIVEWAYS SHALL BE MAINTAINED AT ALL TIMES. 1 1 Page 314 of 576 26+00 27+00 CO CO CO 12" 24" 6" 13" 10" 6" 7"7"14" 10" 9"9" 10" 8" 10" 7" O H E O H E O H E UGFBO UGFBO UGFBO UGFB O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UG F B O UG F B O UG F B O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE O H E OH E O H E OH E OH E O H E G G G G G G G G G G G G G G G G G G U G F B O UG F B O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO STOP WATER IRC 5/8" PSM 5205 (fnd) 4' POST RAIL FENCE 16 T H A V E N U E PID:07-22-28-0000-00-099 DOC#20200253532 PROJECT BENCHMARK SET NAIL & DISK L&S LB 7829 N:1546051.7920 E:482073.7180 ELEV:139.72' (NAVD 1988) IRC 5/8" PSM 5205 (fnd) IRC 5/8" PSM 5205 (fnd) IP 212 (fnd) IRC 5/8" PSM 5205 (fnd) CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY SMH-9 12" PVC S SMH-18 MA T C H LI N E CP - 8  U P P E R CP - 8  L O W E R CLOSE NORTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE SOUTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. STEP 8 CLOSE SIDEWALK AND PROVIDE PEDESTRIAN DETOUR ACROSS NORTH LAKEWOOD AVENUE PER FDOT SPI 102-660 OR PROVIDE PEDESTRIAN SPECIAL DETOUR ADJACENT TO WORK ZONE PER FDOT SPI 102-660. STEP 8A CLOSE SOUTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE NORTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. CLOSE 16TH AVENUE FOR STEP 8 CONSTRUCTION AND DETOUR LOCAL TRAFFIC ONTO PETERS AVENUE OR 17TH AVENUE NORTH LAKEWOOD AVENUE 28+00 29+00 CO CO CO CO 37" 35" 12" 9" 6"6" 6"7" 9" 8" 7" 10" 15" 11" 10" 6" 6"8"6"9" 14" 9" UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OH E O H E OH E O H E O H E G G G G G G G G G G G G G G G G G G UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO STOP WATER 4' POST RAIL FENCE 15 T H A V E N U E PID:07-22-28-0000-00-099 DOC#20200253532 PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1546358.9390 E:482064.2430 ELEV:142.01' (NAVD 1988)IRC 5/8" PSM 5205 (fnd)IRC 5/8" PSM 5205 (fnd) IRC 5/8" PSM 5205 (fnd) CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY CONCRETE DRIVEWAY 12" PVC S STEP 8 MA T C H LI N E CP - 8  U P P E R CP - 8  L O W E R CLOSE NORTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE SOUTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. CLOSE 15TH AVENUE FOR STEP 8 CONSTRUCTION AND DETOUR LOCAL TRAFFIC ONTO PETERS AVENUE OR 16TH AVENUE CLOSE SIDEWALK AND PROVIDE PEDESTRIAN DETOUR ACROSS NORTH LAKEWOOD AVENUE PER FDOT SPI 102-660 OR PROVIDE PEDESTRIAN SPECIAL DETOUR ADJACENT TO WORK ZONE PER FDOT SPI 102-660. STEP 8A CLOSE SOUTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE NORTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. SMH-10 SMH-19 NORTH LAKEWOOD AVENUE J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - M O T P L A N I I . D W G | 21 7 8 8 - C S - M O T P l a n I I - I V | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 7 / 2 0 2 6 1 1 : 2 2 : 0 6 A M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 2/ 2 7 / 2 0 2 6 1 1 : 0 0 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 PLAN SCALE: 1" = 10' CO N S T R U C T I O N P H A S I N G P L A N V I I I CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E CO N S T R U C T I O N P H A S I N G CP-9 RE V I S I O N S   P E R   C I T Y   C O M M E N T S   A F T E R   B I D   I S S U A N C E     AS         02 / 2 6 J. P I C K E R I N G 21 7 8 7 D. M E T Z M. O ' B R I E N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   PLAN SCALE: 1" = 10' N 0 20 40 N 0 20 40 NOTE: STABILIZED ACCESS TO DRIVEWAYS SHALL BE MAINTAINED AT ALL TIMES. 1 1 1 Page 315 of 576 31+00 32+00 33+00 33+75 B-1 MW MW MW MW 17" 18"4"4"7" MWMW UG F B O UG F B O UG F B O UGFBO UGFBO UGFBO UGFBO UG F B O UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGF B O UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE OHE OHE OHE OHE OHE OH E OH E OH E OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE G G G G G G G G G G G G G G G G G G G G G UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO N&D CPH 7143 (fnd) N&D PSM 5792 (fnd) WATER WATER WATER STOP STOP FM FM STOP IRRIGATION FM WATER FM LANDSCAPE AREA 4' POST CHAIN FENCE STONE PLANTER BRICK WALL STONE PLANTER ABOVE GROUND CL I N G E R C O V E R O A D 10' D.U.W.L.E.(P) TRACT "D" 10' ADDITIONAL R/W (P) 1 38 LAKEWOOD MANOR PLAT BOOK 72, PAGE 100 LAKEWOOD MANOR PLAT BOOK 72, PAGE 100 PROJECT BENCHMARK SET IRON ROD & CAP L&S LB 7829 N:1546773.1960 E:482015.0010 ELEV:144.71' (NAVD 1988) LANDSCAPE AREA B-1 STEP 10 CLOSE ONE SIDEWALK AT A TIME ALONG CLINGER COVE ROAD AND PROVIDE PEDESTRIAN DETOUR ACROSS CLINGER COVE ROAD FOR ACCESS TO NORTH LAKEWOOD DRIVE PER FDOT SPI 102-660. CLOSE EASTBOUND LANE AND THEN ALTERNATE TO CLOSE WESTBOUND LANE TO CONSTRUCT SEWER FORCE MAIN PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. CLOSE SOUTHBOUND LANE TO CONSTRUCT SEWER FORCE MAIN PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE NORTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. NORTH LAKEWOOD AVENUE 30+00 31+00 B-2 CO CO 12 8 + 7 1 9" 14" 9" 12" 8"10" 12" 8" 6" 6" 12" 4"4"17" 18" MW UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGE UGE UGE UGE UGE UGE UGE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OH E OH E OH E OH E G G G G G G G G G G G G G G G G G G G G G G UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO UGFBO STOP WATER CITGO AND GAS PRICES 4' POST RAIL FENCE 4' POST CHAIN FENCE 4' POST CHAIN FENCE 4' POST CHAIN FENCE 10' D.U.W.L.E.(P) TRACT "D" 10' ADDITIONAL R/W (P) 1 15 T H A V E N U E NORTH LAKEWOOD AVENUE B-2 STEP 9 STEP 9A CLOSE SOUTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE NORTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. PROVIDE PEDESTRIAN SPECIAL DETOUR AROUND SEWER MAIN, SEWER LATERAL, WATER MAIN, AND WATER SERVICE CONSTRUCTION PER FDOT SPI 102-660 (TYP) CLOSE NORTHBOUND LANE TO CONSTRUCT SEWER AND WATER UTILITIES AND FORCE MAIN PER FDOT SPI 102-603. UTILIZE FDOT SPI 102-600 FOR DROP-OFF PROTECTION ON TRENCH. STABILIZE SOUTHBOUND SHOULDER AS NECESSARY TO ALLOW A SINGLE 10-FOOT TRAVEL LANE DURING CLOSURE. PERFORM TEMPORARY RELOCATIONS OF ABOVE GROUND APPURTENANCES AS NECESSARY. SMH-11SMH-10 SMH-19 CLOSE 15TH AVENUE FOR STEP 9 CONSTRUCTION AND DETOUR LOCAL TRAFFIC ONTO 16TH AVENUE J: \ E N G \ F L \ O C O E E \ 2 1 7 8 8 - L A K E W O O D A V E G R A V I T Y S E W E R P H A S E 2 \ _ D R A W I N G S \ C I V \ 2 1 7 8 8 - C S - M O T P L A N I I . D W G | 21 7 8 8 - C S - M O T P l a n I I - V | 1: 2 . 5 8 4 9 | -- - - | 2/ 2 7 / 2 0 2 6 1 1 : 2 2 : 1 2 A M | JA M E S . P I C K E R I N G LA S T S A V E D B Y : JA M E S . P I C K E R I N G 2/ 2 7 / 2 0 2 6 1 1 : 0 0 A M AP P R O V E D : CH E C K E D : CA D : DA T E : 1 2 PR O J E C T N O : DA T E : 3 4 CA D C O O R D : DE S I G N E D : DRAWING RE V I S I O N S NO AP P ' D DA T E SU B M I S S I O N : 5 PLAN SCALE: 1" = 10' CO N S T R U C T I O N P H A S I N G P L A N I X CI T Y O F O C O E E , F L O R I D A LA K E W O O D A V E N U E CO N S T R U C T I O N P H A S I N G CP-10                J. P I C K E R I N G 21 7 8 7 D. M E T Z M. O ' B R I E N CO N T R A C T D O C U M E N T S       40 7 . 9 0 6 . 1 7 7 6 | w w w . w r i g h t - p i e r c e . c o m 60 1   S   L A K E   D E S T I N Y   R O A D ,   S U I T E   2 9 0 ,   M A I T L A N D ,   F L   3 2 7 5 1   N 0 20 40 PLAN SCALE: 1" = 10' N 0 20 40 NOTE: STABILIZED ACCESS TO DRIVEWAYS SHALL BE MAINTAINED AT ALL TIMES. 1 Page 316 of 576 Mayor Commissioners Rusty Johnson Scott R. Kennedy, District 1 Rosemary Wilsen, District 2 City Manager Richard Firstner, District 3 Craig Shadrix George Oliver III, District 4 Addendum No.2 ITB #26-004 Lakewood Avenue North Gravity Sewer Project Phase 1 & Phase 2 Page 1 March 26, 2026 ADDENDUM NO. TWO (2) CITY OF OCOEE ITB #26-004 Lakewood Avenue North Gravity Sewer Project Phase 1 & Phase 2 This addendum shall modify and become a part of the original ITB Documents for ITB #26-004. This addendum consists of ten (10) pages. Bidders should acknowledge receipt of this addendum in the space provided in the Bid Form. Failure to do so may subject the Bidder to disqualification. Answers to questions received and/or Amendments to the ITB Documents are as follows 1.Wright-Pierce Section 01515 – Temporary Bypass Pumping Systems •The revised Section 01515 will be attached to this addendum. 2.Questions / Answers Q1. Is this project subject to state bill SB 674, which went into effect on July 1, 2024? A1. No. Florida SB 674 does not apply to this project because no State of Florida funds are used. The project is funded by federal and/or local funds only, and therefore the state iron and steel requirements under SB 674 are not triggered. Phase 2: No federal or state domestic material requirements apply. Q2. Is this project subject to BABAA, AIS, or any other federal requirement for domestically made products? A2. Yes, by project phase. Phase 1 is subject to federal domestic preference requirements, specifically Build America, Buy America (BABA) under the Infrastructure Investment and Jobs Act, implemented by the EPA, and American Iron and Steel (AIS) requirements for water and wastewater infrastructure. Phase 2 is not subject to federal BABA or AIS requirements. Page 317 of 576 Addendum No.2 ITB #26-004 Lakewood Avenue North Gravity Sewer Project Phase 1 & Phase 2 Page 2 Q3. If domestic materials will be needed, what materials will fall under this requirement? A3. Domestic production requirements apply only to Phase 1 as follows: •Phase 1: Federal AIS/BABA requirements apply to iron and steel products and other covered materials permanently incorporated into the work, including pipe, fittings, valves, hydrants, manhole frames and covers, restraints, and similar appurtenances. •Phase 2: No federal or state domestic material requirements apply. Q4. If State of Florida or Federal funds are being used, where are those funds coming from? A4. Phase 1 is funded by an EPA federal grant, subject to federal grant conditions including BABA/AIS and Davis‑Bacon labor standards, as documented in Appendix C – Federal Grant Compliance Documents of the Project Manual. Phase 2 is funded by the City of Ocoee’s capital funds (local, non‑federal). No federal funds are used in Phase 2. Q5. Please clarify the lane closure requirements. Is the contractor allowed to close the NB lane and leave it closed overnight and for the amount a days it takes to build that section? Or does the NB lane work area need to be stabilized up to the base material at the end of each shift and opened back up to nb and SB traffic? A5. Any lane closure shall be implemented in accordance with FDOT SPI 102‑603 (with drop‑off protection per SPI 102‑600), as noted on the plans. Maintenance of Traffic (MOT) devices shall not remain in place outside of active construction hours. During non‑working hours, the Contractor shall temporarily restore and reopen the lane with a stabilized surface. Traffic control during construction periods and all restoration measures shall be detailed and submitted for review and approval as part of the Temporary Traffic Control (TTC) Plan, in accordance with Plan Sheet CP‑1 and Specification Section 01570 – Traffic Regulation. Q6. Are there any work hour restrictions (daytime or nighttime) for this job? Can the scope of work for the water and sewer construction be done during the daytime or is it only a nighttime work requirement because of traffic? A6. Work hour restrictions are defined in the contract documents. Per the General Notes on Phase 1 Plan Sheet C-1, Note 5, and Phase 2 Plan Sheet C-001, Note 5, in the Lakewood Avenue North Gravity Sewer Project plans the following work hour limitations apply: Standard construction hours: 10:00 AM to 8:00 PM, Monday through Friday Maintenance of Traffic (MOT) setup: May begin no earlier than 9:00 AM Seasonal adjustment (June 1 through August 1): Construction activities may occur 7:00 AM to 7:00 PM Page 318 of 576 Addendum No.2 ITB #26-004 Lakewood Avenue North Gravity Sewer Project Phase 1 & Phase 2 Page 3 Q7. Please clarify what this contractor will have to do to treat / discharge the groundwater that is encountered during utility excavation / installation near the old Circle K store. Will we have to set up a remediation system to treat any ground water encountered? A7. A long-term remediation system is not required however if groundwater is encountered during construction in the area noted on the drawings the contractor must manage, test, and if needed temporarily treat it and discharge only under the proper permits/authorizations, per Section 02080A – Contaminated Soil and Waste Management and related specs in the Project Manual. The contractor is expected to submit a Dewatering & Discharge Plan that includes methods, and any temporary treatment such as filtration/GAC, sampling, discharge location/permit for review before starting work in this zone. Q8. Will the roadway detail shown on sheet C305 be used both phase 1 and phase 2 when the roadway is rebuilt? A8. The roadway pavement repair detail is the same for both Phase 1 and Phase 2, as shown in the respective plan sets (Sheet C-6 for Phase 1 and Sheet C-305 for Phase 2). Contractors shall follow the pavement repair detail included in the applicable phase plans. As noted within the detail, restoration requirements change south of Station 21+00, and the contractor is responsible for applying the correct pavement section based on project stationing and jurisdiction, in accordance with the notes shown on the detail. Q9. Will the initial pavement pay item under the unit measurement of Tons be used to pay for the 3" of asphalt and one of the 3 different types of base materials that could be used to repair the roadway? Of will the base material tonnage be separated into another pay item? A9. The Initial/Final Pavement item pays asphalt tonnage only (initial/final paving and associated paving operations); it does not pay for base. Per Section 01150B (14A/14B, 29A/29B), pavement is measured/paid by ton, while aggregate base/subbase is incidental to the utility items (pipe, manholes, services, water/force mains) which expressly include “backfilling including aggregate base and subbase material.” Q10. Please confirm that there is no existing sanitary sewer mainline or service piping to remove along Lakewood, North of the existing manhole B located at Security Circle. All Existing sanitary flow comes to sanitary manhole B from the South. A10. There is a short section of 8" pipe north of SMH-B. The contractor will be paid for the work to replace the short section of 8" pipe north of SMH-B with 12" pipe. per Line No. 8 of Section 01150B Measurement and Payment. All existing sanitary flow currently enters SMH‑A via the force main. There is no active sanitary flow within SMH‑B. Q11. How much flow comes into Sanitary manhole B? Is it all gravity or is there some forcemain services that are tied into that system? Will the contractor be able to bypass that manhole into the lift station in order to core the North hole and resize the East hole to 12"? A11. There is no active sanitary flow within SMH‑B at this time, and no force main or gravity services discharge into SMH‑B. Accordingly, no sanitary flow bypass pumping at SMH‑B is required to core the north manhole opening or to resize the east opening to 12 inches, as shown on the plans. Page 319 of 576 Addendum No.2 ITB #26-004 Lakewood Avenue North Gravity Sewer Project Phase 1 & Phase 2 Page 4 Q12. How much flow comes into Sanitary manhole C? Is it all gravity or is there some forcemain services that are tied into that system? Will the contractor be able to bypass the upstream manhole East of manhole C and pump it into MH 7 in order to take LS 46 offline"? A12. Sanitary flow enters Sanitary Manhole C (SMH‑C) by gravity from the east at approximately 8 gpm. These values are provided for reference only. The Contractor may bypass from the upstream manhole east of SMH‑C to MH‑7 to facilitate taking Lift Station 46 (LS‑46) offline; however, the design, sizing, installation, operation, monitoring, and removal of the bypass system shall be the Contractor’s responsibility. Specification Section 01515 – Temporary Bypass Pumping Systems will be issued by addendum and will define minimum requirements for bypass pumping, automation, redundancy, and operational controls. The Contractor’s bypass approach shall comply with Section 01515 and the conformed contract documents. Q13. What is the City's engineers cost estimate for this project - phase 1 and phase 2 together? A13. The City posted the engineer’s estimate in addendum #1, with a value of $5,044,000.00. Q14. Can the contaminated groundwater be taken to the City's water treatment plant and disposed off at the plant? A14. No. Contaminated groundwater shall not be discharged to or disposed of at the City’s wastewater treatment plant. Any contaminated groundwater encountered during construction shall be managed, treated (if required), and disposed of in accordance with Section 02080A – Contaminated Soil and Waste Management, applicable permits, and regulatory requirements. Disposal shall be to an approved discharge location or licensed off-site facility, as identified in the Contractor’s approved Dewatering and Discharge Plan. Q15. Does the City require sod to be replaced next to EOP where the pavement is being replaced? If so, is Bahia sod sufficient? A15. Yes. Sod replacement is required adjacent to the edge of pavement where disturbed by the work. Bahia sod is acceptable, subject to final confirmation and approval by the City of Ocoee to match existing conditions. Q16. What are the current flow calcs? *Note Clarification based on an email received from the Contractor “the flow calculations at tie in points so we can be sure to utilize the proper means and methods for bypassing” A16. Based on the City’s hydraulic model, the existing influent to Lift Station 63 (LS‑63) is estimated at approximately 735 gpm average daily flow (ADF) and approximately 1,840 gpm under system average conditions, using a peaking factor of 2.5. These values represent modeled conditions only and are provided for reference. Final flow assumptions, bypass sizing, and operational controls shall be the Contractor’s responsibility and shall be addressed in the Contractor’s proposed means and methods. Specification Section 01515 – Temporary Bypass Pumping Systems will be issued by addendum and will define minimum requirements for bypass pumping and flow management; the Contractor’s approach shall comply with the conformed contract documents. Page 320 of 576 Addendum No.2 ITB #26-004 Lakewood Avenue North Gravity Sewer Project Phase 1 & Phase 2 Page 5 Q17. Does the city have a Bypass plan? A17. No. The City does not provide a bypass plan. The design, sizing, permitting, installation, operation, monitoring, and removal of any temporary bypass pumping system is the Contractor’s responsibility. Specification Section 01515 – Temporary Bypass Pumping Systems will be issued by addendum and will define the minimum requirements for temporary bypass pumping, including system performance, redundancy, controls, alarms, and submittals. The Contractor’s bypass pumping approach shall comply with Section 01515 and be submitted for review and approval in accordance with the contract documents. Q19. Does Phase 1 or 2 have any minority requirements/goals? A19. No specific minority participation goals are established for either Phase 1 or Phase 2. The contract documents do not set percentage goals or mandatory participation requirements for minority‑owned, women‑owned, or disadvantaged business enterprises. Contractors must, however, comply with all applicable federal and state non‑discrimination and equal employment opportunity requirements as outlined in Appendix C of the Project Manual. Q20. Does Phase 1 or 2 have any Davis Bacon requirements? A20. Yes, for Phase 1 only. Phase 1 is funded by an EPA federal grant and is subject to Davis-Bacon prevailing wage requirements, as detailed in Appendix C – Federal Grant Compliance Documents of the Project Manual. Phase 2 is funded solely by City of Ocoee capital funds and is not subject to Davis-Bacon requirements. Q21. Does Phase 1 or 2 have any Build by America requirements? A21. Please see A2 on Page 1 of this addendum. Q22. Does this project require a full time on site superintendent? A22. Yes. The Contractor is required to provide a competent superintendent on‑site at all times when work is being performed, with full authority to direct the work and coordinate with the City and Engineer, in accordance with the Specification Section 01001 - General Requirements, Section 1.02 – Labor. Q23. Does this project require an engineers field office? A23. No. An engineer’s field office is not required for this project. Any temporary field office provided by the Contractor is for the Contractor’s convenience and operational needs only and shall comply with the contract documents. Temporary Field Office costs are incidental to the work as identified in Specification Section 01150B – Measurement and Payment, Incidental Work Item 24. Page 321 of 576 Addendum No.2 ITB #26-004 Lakewood Avenue North Gravity Sewer Project Phase 1 & Phase 2 Page 6 Q24. What are the allowed work hours for this project? A24. Please see A6. on Page 2 of this addendum. 3.Additional Project Clarifications •The following items are provided for clarification purposes only and were not submitted as bidder questions, but are included to ensure a clear and consistent understanding of the project requirements. 1. The project is intended to have a minimum of one crew working at all times during construction work hours throughout the duration of the project. This will be added as part of the specifications in the conformed documents, however, please note this should apply to Specification Section 01010. 2. The project intends that MOT devices should not remain in place outside of active construction hours. This requirement will be incorporated into the conformed contract documents and shall apply to Plan Sheet CP‑1 and Specification Section 01570 – Traffic Regulation. 3.Appendix C Federal Grant Compliance Documents address the primary federal requirements (Davis-Bacon, BABA/AIS, record retention, and reference to 2 CFR Part 200). The bid documents incorporate the federal procurement standards under 2 CFR Part 200 and require compliance with Appendix II to 2 CFR 200, which generally covers the required federal contract provisions. Because of this, the documents are considered compliant as written. Alexis Chentouf Alexis Chentouf Purchasing Technician cc: Jen Bolling, Utilities Director Attachments: Wright-Pierce Section 01515 – Temporary Bypass Pumping Systems Page 322 of 576 01515-1 21787 SECTION 01515 TEMPORARY BYPASS PUMPING SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION A. The Contractor shall design, furnish, install, test, operate, maintain and remove temporary bypass pumping system(s) in order to divert sewage flow around the work area. Temporary bypass pumping system(s) shall be fully automated and able to reliably convey the full range of wastewater flows, as scheduled herein. 1.2 REQUIREMENTS SPECIFIED ELSEWHERE A. Additional Requirements are specified elsewhere including, but not necessarily limited to, General Conditions, Supplementary Conditions, and Division 1. 1.3 QUALITY ASSURANCE A. All system components specified herein shall be furnished by a Supplier who regularly engages in temporary bypass pumping systems. Supplier shall have a minimum of 15 years of experience with temporary bypass pumping systems. Supplier shall provide at least 5 references of project of a similar size and complexity as this project that have been performed within the past 5 years within Florida. B. Supplier shall have sufficient equipment and spare parts inventory to perform normal rentals, including this project, and maintain at least 100% reserve equipment for this project for immediate delivery. Supplier shall have sufficient service personnel to provide service calls within 4 hours, 24 hours per day, 7 days per week. C. Temporary bypass pumping systems shall be: Xylem Dewatering Solutions, (Godwin Pumps); United Rentals (Thompson Pumps); or equal. D. A qualified representative of the Supplier shall inspect the installation and supervise the startup and testing of the temporary bypass pumping system. E. The temporary bypass pumping system shall meet all applicable local, state and federal requirements. F. The temporary bypass pumping system shall be designed by a Professional Engineer licensed to practice in the State of Florida. Compliance with this requirement shall be demonstrated via a signed and sealed submittal package, as specified herein. 1.4 SUBMITTALS A. In accordance with the requirements of the City of Ocoee Specification Section 01340 - Shop Drawings, Working Drawings, And Samples. Qualifications information Proposed schedule, sequence of construction, duration of activities and description of sewer control methods to be utilized for each element of the project. Page 323 of 576 01515-2 TEMPORARY BYPASS PUMPING SYSTEMS 21787 Coordination Drawings showing detailed layout of equipment, pumps, suction piping, discharge piping, fittings, valves, supports, materials, temporary enclosure and temporary odor control provided under this section. List of duty equipment, pumps, piping, fittings, valves, and materials to be utilized by the Contactor for the temporary bypass pumping system. Identify weather-protection and winterization provisions. List of standby equipment and spare parts available on-site and off-site in order to ensure uninterrupted operation of the bypass pumping system in the event of a utility power failure. Fuel consumption rate at full speed duty and standby pumping. Fuel storage tank and secondary containment provision, including Spill Prevention Control and Countermeasure (SPCC) Plan, if applicable. Catalog cut sheets/ technical data for equipment and appurtenances. Performance curves for wastewater bypass pumps and suction lift, static head, headloss, and total dynamic head (TDH) calculations. Description of maintenance procedures to be utilized. Description of controls and alarm equipment to be utilized. Sample alarm log. Names of individuals responsible for on-call response, 24 hours per day, 7 days per week. Call list for alarm response. B. No construction related activities requiring the need for bypass pumping operations shall begin until the related project submittals are reviewed and all provisions of the work have been fully coordinated with the Owner, Agency, Engineer and any other parties having jurisdiction for the proposed work activities. PART 2 - PRODUCTS 2.1 WASTEWATER BYPASS PUMPING SYSTEM A. Pumping Equipment: Temporary bypass pumping system(s) shall designed to convey the full range of flows and head conditions, as scheduled herein, under all weather conditions. Lift Station 63 Lift Station 46 Duty Raw unscreened sewage Raw unscreened sewage Duty Pumps Diesel Diesel Standby Pumps Diesel Diesel Variable Speed Required for Duty Pumps Yes Yes Peak Instantaneous Flow 1,840 gpm 20 gpm Average Flow 735 gpm 8 gpm Minimum Flow 100 gpm 0 gpm The temporary bypass pumping system shall be able to convey the peak instantaneous flow, as scheduled herein: a. with the largest available pump off-line; and Page 324 of 576 01515-3 TEMPORARY BYPASS PUMPING SYSTEMS 21787 b. without utility power. Each pump shall be a skid-mounted unit. The pump system may utilize available on-site manholes, junction/splitter structures, and/or tankage for suction and discharge, as appropriate. The pumps shall be centrifugal trash pumps suitable for handling raw, unscreened sewage with solids up to 3 inches in diameter, and capable of running completely dry for extended periods of time without damage. Pumps shall be capable of static suction lifts to 28 vertical feet, at sea level. The pump priming system shall be fully automatic, needing no form of adjustment or manual addition of water. The priming system shall be capable of priming the pump from a completely dry casing. All pumps shall be critically silenced to less than 69 decibels at 30 feet. Contractor shall provide appropriately sized portable spill guard containment dikes to contain leaks resulting from the pumping system, from the fuel storage tanks(s) and/or from the pumps and process piping within 5 feet of the system. B. Piping Suction piping and discharge piping shall be constructed of: a. Rigid galvanized steel pipe with ball and socket joints, Bauer HK Quick Coupling Piping or equal. b. Fused HDPE piping c. Connection to existing piping shall be made equivalent materials. Aluminum "irrigation" type piping or glued PVC pipe shall not be allowed. C. Controls and Alarms The pump set shall be furnished with a weather-proof automatic control system consisting of floats and/or transducer level controls. The controller shall start/stop the pumps based on signals from high and low level floats or a transducer. The controller shall be capable of automatically varying the pump speed to match varying flow conditions and maintain a constant suction level, if scheduled herein. The controller shall annunciate and log all alarm conditions including but not limited to high upstream water level, duty pump failure, utility power loss and standby pump failure. The alarm log shall include the type of alarm, time of alarm, time alarm acknowledged, and time alarm condition cleared. Annunciation shall be via teledialer, two-way radio, cellular telephone, or equivalent. PART 3 - EXECUTION 3.1 COORDINATION OF WORK A. Provide all labor and equipment necessary to coordinate work of this section and maintain communications. B. Notify all personnel, including but not limited to Owner, Engineer and Utility Companies, seven days in advance of any temporary bypass pumping work. The Owner will identify personnel to be notified in addition to those identified by the Contractor. C. Contractor shall coordinate temporary bypass pumping operations with the Owner and Engineer on a daily basis. Page 325 of 576 01515-4 TEMPORARY BYPASS PUMPING SYSTEMS 21787 3.2 PERFORMANCE: A. General The Contractor shall install and test all sewer flow control methods to the satisfaction of the Owner and Engineer prior to proceeding with the Work. The Contractor shall be solely responsible for clean-up, repair, property damage costs and claims resulting from failure of the diversion system. Any temporary pumps, piping, fuel storage, or other appurtenances associated with the temporary pumping system shall be either located above the 100-year flood elevation or protected against flotation or other damage which would be caused by a flood event. B. The temporary bypass pumping system shall be furnished, installed, tested, operated, maintained and removed as follows: The Contractor shall furnish, install, and test temporary bypass pumping system and discharge pipelines. The Contractor shall test and debug all systems and verify that all necessary equipment, materials, spare parts, and labor are available on-site prior to operation of the system and prior to the demolition of any part of the existing pumping station facilities. The Contractor shall operate and maintain the system until the new Work is completed, demonstration tested and accepted by the Owner and Engineer. Contractor shall coordinate with the Owner on a daily basis. Contractor shall be responsible for making regulatory reporting notifications for any release of wastewater or fuel to the environment. Contractor shall provide copies of notifications to the Owner and Engineer. The Contractor shall anticipate that the Owner will require 7 calendar days of operation on the new, permanent Work following satisfactory completion of demonstration testing prior to beginning disassembly of the temporary bypass pumping system. Upon receipt of approval by the Owner and Engineer, the Contractor shall disassemble and remove the temporary bypass pumping system, including all appurtenant piping. Contractor shall restore the area impacted by the temporary bypass pumping system to a like-new condition. C. Contractor shall be responsible for cleanup, repairs, restoration and fines required to address spills or overflows from a failed bypass pumping system. END OF SECTION Page 326 of 576 Mayor Commissioners Rusty Johnson Scott R. Kennedy, District 1 Rosemary Wilsen, District 2 City Manager Richard Firstner, District 3 Craig Shadrix George Oliver III, District 4 Addendum No.3 ITB #26-004 Lakewood Avenue North Gravity Sewer Project Phase 1 & Phase 2 Page 1 March 30, 2026 ADDENDUM NO. THREE (3) CITY OF OCOEE ITB #26-004 Lakewood Avenue North Gravity Sewer Project Phase 1 & Phase 2 This addendum shall modify and become a part of the original ITB Documents for ITB #26-004. This addendum consists of one (1) page. Bidders should acknowledge receipt of this addendum in the space provided in the Bid Form. Failure to do so may subject the Bidder to disqualification. Answers to questions received and/or Amendments to the ITB Documents are as follows 1. Questions / Answers Q1. Would the City be able to clarify with detailed instructions on the analytical testing and characterization for the contaminated soils on this job? As well as how often are we to conduct testing? A1. The contractor shall perform 5 tests along the length of the trench bottom to verify that there is no contaminated soil. Soil should be tested using FDEP/EPA approved testing methods. Alexis Chentouf Alexis Chentouf Purchasing Technician cc: Jen Bolling, Utilities Director Page 327 of 576