Item 12 Approval of the One-Year Optional Renewal of the Continuing Contracts for RFP #21-005
City of Ocoee ▪ 1 N. Bluford Avenue ▪ Ocoee, Florida 34761 Phone: (407) 905-3100 ▪ www.ocoee.org STAFF REPORT Meeting Date: August 4, 2026 Item #: 12 Contact Name: Joyce Tolbert, Shannon Hopper Department Director: Steven Weber Contact Number: Ext. 1516, Ext. 1524 City Manager: Craig Shadrix Subject: Approval of the One-Year Optional Renewal of the Continuing Contracts for RFP #21- 005 Continuing Geotechnical Testing Services. (Procurement Manager Tolbert) Background Summary: The City of Ocoee (City) entered into a five-year term contract on August 17, 2021, for continuing geotechnical testing services with the following four (4) firms: Geotechnical & Environmental Consultants, Inc.; Professional Services Industries, Inc.; Tierra, Inc.; and NADIC Engineering. These contracts provide geotechnical testing services for projects such as large and small-scale water, sewer, and reclaimed utility projects, road construction and/or rebuild construction, extensions and/or stormwater related projects, and other geotechnical type projects. The term of the existing contracts expires on August 16, 2026. However, the contract allows the City the option of extending the term an additional one (1) year. A new solicitation for these services will be advertised in the coming year and execution of contracts awarded under the new solicitation will supersede and cause early termination of the current contracts. Issue: Should the Honorable Mayor and City Commission extend the term of the continuing contracts for RFQ 21-005 Continuing Contracts for Geotechnical Testing Services for an additional one (1) year until August 16, 2027? Recommendations: Staff recommends the Honorable Mayor and City Commission: 1. Approve the one (1) year optional renewal for RFQ 21-005 Geotechnical Testing Services for the existing term contracts with Geotechnical & Environmental Consultants, Inc.; Professional Services Industries, Inc.; Tierra, Inc.; and NADIC Engineering. 2. Authorize the Mayor, City Clerk, and staff to execute all necessary contract documents with these four (4) firms. 3. Authorize the City Manager to approve change orders to this contract up to the limit of his purchasing authority for each change order and up to the budgeted amount each fiscal year for all change orders. Attachments: 1. Contract - Tierra 2. Contract - PSI 3. Contract - Nadic 4. Contract - GEC City of Ocoee ▪ 1 N. Bluford Avenue ▪ Ocoee, Florida 34761 Phone: (407) 905-3100 ▪ www.ocoee.org Financial Impacts: Funding for each task order/purchase order for geotechnical testing services will be as budgeted each fiscal year, in accordance with the State of Florida Consultants' Competitive Negotiations Act (CCNA). Type of Item: Consent CONTINUING CONSULTING AGREEMENT FOR GEOTECHNICAL TESTING SERVICES THIS AGREEMENT made and entered into this 17ay of AelimitRaj by and between the CITY OF OCOEE, FLORIDA, a Florida municipal corporation, hereinafter referred to as "CITY", and TIERRA, INC., a Florida corporation, hereinafter referred to as "CONSULTANT". WHEREAS, the CITY needs geotechnical testing services to be performed on a continuing and periodic basis as the need for such services may arise, per the CITY's RFQ #21- 005 Continuing Contracts for Geotechnical Testing Services, attached as Exhibit A; and WHEREAS, the CITY desires to employ the CONSULTANT in connection with the geotechnical testing services required, upon the terms and conditions hereinafter set forth, and the CONSULTANT is desirous of performing such services upon said terms and conditions, per CONSULTANT'S qualification package attached as Exhibit B; and WHEREAS, the CITY shall have the option to use the CONSULTANT's professional geotechnical testing services ("Services"), as further described below, for City projects hereinafter referred to as "Project" or"Projects"); and WHEREAS, the City has selected the CONSULTANT in accordance applicable law and the rules and ordinances of the City, and this Contract shall constitute a continuing contract to perform services on an as needed basis over a period of time; NOW, THEREFORE, in consideration of the mutual covenants and agreements hereinafter contained, it is agreed by and between the parties hereto as follows: SECTION I SCOPE OF SERVICES 1.CONSULTANT hereby agrees to perform for the CITY geotechnical testing services which may include services in all phases of a Project. The scope of work to be RFQ#21-005 Continuing Geotechnical Testing Services performed through task orders issued under the continuing contract may consist of, but will not necessarily be limited to: soils investigation for design purposes including season and high ground water levels, soil stability, drainage associated with hydrological groundwater modeling, supporting documentation for permitting, and construction administrative support (materials testing). Various geotechnical testing services for City projects; such projects include large and small scale water, sewer, and reclaimed utility projects, road construction and/or rebuild construction, extensions and/or stormwater related projects, and other geotechnical type projects. There may also be a periodic need to conduct Phase 1 environmental reviews and environmental lien searches related to the possible acquisition of real property by the City. A variety of testing and consultative tasks will be required in various combinations depending on the needs of each project, as requested by the CITY, through the issuance of a Services Authorization (Task Order) issued pursuant to this Agreement. 2.CONSULTANT shall perform such services in accordance with the terms and conditions of this Contract and with applicable regulations and requirements of all interested government agencies. It is expressly understood, however, that the CITY shall have no obligation to authorize CONSULTANT to perform any services under this Contract, and may, in its sole discretion, retain other consultants to perform any or all of the services authorized under this Contract. 3.CONSULTANT shall utilize sufficient qualified personnel acceptable to the CITY to perform all services under this contract and any Services Authorization issued hereunder. CONSULTANT shall promptly remove any person from performing services as the CITY shall request in writing (which request may be made by the CITY with or without cause), and promptly replace such person with a person who shall be approved in writing by the CITY. CONSULTANT agrees to include a similar provision in its agreements with any and all Subconsultants. 2 RFQ#21-005 Continuing Geotechnical Testing Services SECTION II TERM 1.Continuing Contract. This Agreement shall continue in full force for an initial period of three (3) years, beginning on August 17, 2021, with two (2) automatic one-year renewable extensions, for a total of five (5) years. Each one-year renewable term shall automatically be renewable for the next succeeding one-year term with the condition that the CITY'S obligation to pay under this Agreement for each year is contingent upon the CITY in its good faith judgment having sufficient funds to make an annual appropriation for the Services to be provided under this Agreement. The Agreement shall continue in full force and effect from the date first written above or until terminated in accordance with this Agreement. The CITY shall have the option of extending the term an additional one (1) year. The above time periods may be extended to complete Services being rendered under a Project that has already been identified in a Services Authorization issued prior to the expiration of the Agreement. 2.The CITY shall, from time to time at its sole discretion, authorize the CONSULTANT in writing to provide Services under this Agreement by issuing a Services Authorization. A Services Authorization shall, by mutual agreement of the parties, set forth, 1)the Scope of Services, (2) the time for performance, (3) method and amount of compensation, 4)the items to be provided to the CITY, and (5) the services, information and data that can be provided by the CITY to the CONSULTANT. 3.The CITY does not guarantee, warrant, or represent that any number of Projects or any particular type of Project will be assigned to the CONSULTANT under the terms of this Agreement. Furthermore, the purpose of this Agreement is not to authorize a specific Project, but to set forth certain duties, obligations, rights, and responsibilities that may be incorporated by reference into any Services Authorization that may be mutually agreed to by the parties. The 3 RFQ#21-005 Continuing Geotechnical Testing Services CITY shall have the sole discretion to select the Project(s), if any, that may be given to the CONSULTANT. 4.The CONSULTANT shall perform any and all Services in a timely, efficient and cost-effective manner and in a manner that comports with the standards of geotechnical testing services ordinarily exercised by reputable members of Consultant's profession. SECTION III COMPENSATION 1.Method of Payment: For services rendered by CONSULTANT under a Services Authorization, the CITY shall pay CONSULTANT by one of the following methods: (i) a lump sum amount; or (ii) per diem or hourly rates which shall be used as the basis, along with reimbursable expenses, for establishing a guaranteed maximum price ("GMP") which shall not be exceeded. For Services Authorizations issued with a GMP, the CITY shall reimburse CONSULTANT for the cost of permissible out-of-pocket expenses (hereinafter referred to as Reimbursable Expenses") incurred by CONSULTANT in the performance of services. A Reimbursable Expenses budget, if required, shall be included within each Services Authorization priced on a GMP basis. Reimbursable Expenses means the actual, necessary, and reasonable expenses incurred directly or indirectly in connection with the Project and may include expenses for reproduction, presentation materials and supplies, photography and video, travel outside of Orange and Seminole Counties, postage, overnight or express mail, long distance telephone, and facsimile costs. Travel expenses shall be submitted in accordance with Florida Statute § 112.061 2008). Travel and per diem charges shall not exceed the limits allowed under applicable Florida Statutes. 2.CONSULTANT shall submit to CITY the invoices of CONSULTANT, in detail sufficient for a proper preaudit and postaudit thereof. 4 RFQ#21-005 Continuing Geotechnical Testing Services 3.CITY shall pay CONSULTANT not later than thirty (30) calendar days of its receipt of CONSULTANT'S invoices, unless, within the 30-day period, the CITY, 1) notifies CONSULTANT of an objection to the PAYMENT amount, and 2) either provides CONSULTANT with a determination of the proper PAYMENT, or requests further information from CONSULTANT so that a proper PAYMENT can be calculated and agreed upon by the parties. 4.The CITY's objection to the PAYMENT amount shall be accompanied by the CITY's remittance of any undisputed portion of the PAYMENT. 5.Upon the termination of this AGREEMENT, CONSULTANT shall prepare a final and complete payment statement for all SERVICES and reimbursable expenses incurred since the posting of the last payment statement, and through the date of termination. CONSULTANT also agrees to maintain, and to cause each of its subcontractors to maintain complete and accurate books and records (BOOKS) in accordance with sound accounting principles and standards, in a form acceptable to the CITY, and relating to all SERVICES and related costs and expenditures to the CITY that have been contracted for and paid during the life of this AGREEMENT. The BOOKS shall identify the SERVICES rendered during each month of this AGREEMENT, the date that each PROJECT expense was incurred, and whether the expense was SERVICE or reimbursable-related. 6.The BOOKS may (but need not) be kept separate and apart from CONSULTANT's other books; but the CITY shall have the right, at any reasonable time and through any of its designated agents or representatives, to inspect and audit the BOOKS for the purpose of verifying the accuracy of any payment statement. 7.CONSULTANT shall retain the BOOKS, and make them available to the CITY as specified above, until the later of five (5) years after the date of termination of this AGREEMENT, or five (5) years from the date of the final payment statement (of the PROJECT) 5 RFQ#21-005 Continuing Geotechnical Testing Services prepared for the CITY, or such longer time if required by any federal, state, or other governmental law, regulation, policy, or contractual or grant requirement or provision. 8.When the CITY has reasonable grounds for belief(or information to believe) that, 1) CONSULTANT will be unable to perform the SERVICES; or 2) a pending or meritorious claim exists against CONSULTANT or the CITY arising out of CONSULTANT's negligence or CONSULTANT's breach of any provision of this AGREEMENT; then the CITY may withhold a payment otherwise due and payable to CONSULTANT. This provision is intended solely for the benefit of the CITY. 9.The acceptance by CONSULTANT, its successors, or assigns, of any final payment due upon the termination of this AGREEMENT, shall constitute a full and complete release of the CITY from any and all claims, demands, or causes of action whatsoever that CONSULTANT, its successors, or assigns may have against the CITY under the provisions of this AGREEMENT. SECTION IV INDEMNIFICATION AND INSURANCE 1. Indemnification. The CONSULTANT shall indemnify, defend and hold harmless the City, its representatives, employees, and elected and appointed officials, from liabilities, damages, losses and costs, including, but not limited to, reasonable attorney's fees, to the extent caused by the negligence, recklessness, or intentional wrongful misconduct of the Consultant and persons employed or utilized by the CONSULTANT in the performance of any professional services rendered under this Agreement or any Services Authorization issued pursuant to this Agreement. For purposes of compliance with Florida law, CONSULTANT acknowledges that this provision shall be deemed a part of the project specifications or the bid documents. 2.Insurance The CONSULTANT shall purchase, maintain, and keep in full force, effect, and good standing, such insurance that is further described below, and any other insurance 6 RFQ#21-005 Continuing Geotechnical Testing Services necessary to fully protect it from claims of the nature that are detailed below, that may arise out of, or result from, the CONSULTANT's operations, performance, or Services, or all of these things, or any of these things in combination (CONSULTANT's Operations), whether the CONSULTANT's Operations are by the CONSULTANT, any of its agents or Subconsultants, or anyone for whose act or acts it may be liable. The CONSULTANT'S insurance carrier shall be licensed to do business in the State of Florida and shall have an A.M. Best Rating of A or better. The insurance required by this Subsection shall be written for not less than the limits of liability specified below, or required by law, whichever is greater, and shall include contractual liability insurance as applicable to the CONSULTANT's obligation under this Agreement. 3.The CONSULTANT shall provide evidence of insurance in the form of a certificate of insurance issued on behalf of the City of Ocoee by companies acceptable to the City at the following minimum limits and coverage's with deductible amounts acceptable to the City. The CONSULTANT shall not commence any work in connection with this contract or any applicable Services Authorization until all of the following types of insurance have been obtained and such insurance has been approved by the City, nor shall the CONSULTANT allow any Sub-consultant to commence work on a subcontract until all similar insurance required of the sub-consultant has been so obtained and approved. Policies shall be issued only by companies authorized by subsisting certificates of authority issued to the companies by the Department of Insurance of Florida which maintain a rating deemed acceptable to the City. Policies for Workers' Compensation may be issued by companies authorized by applicable Florida law. The following insurance requirements are also applicable: a) Loss Deductible Clause: The City shall be exempt from, and in no way liable for, any sums of money which may represent a deductible in any insurance policy. The payment of such deductible shall be the sole responsibility of the General Consultant and/or subconsultant providing such insurance. 7 RFQ#21-005 Continuing Geotechnical Testing Services b) Workers' Compensation Insurance: The Consultant shall obtain during the life of this Agreement, Worker's Compensation Insurance with Employer's Liability Limits of 500,000/$500,000/$500,000 for all the Consultant's employees connected with the work of this project and, in the event any work is sublet, the Consultant shall require the subconsultant similarly to provide Workers' Compensation Insurance for all of the latter's employees unless such employees are covered by the protection afforded by the Consultant. Such insurance shall comply fully with the Florida Workers' Compensation Law. In case any class of employees engaged in hazardous work under this contract for the City is not protected under the Workers' Compensation statute, the Consultant shall provide, and cause each subconsultant to provide adequate insurance, satisfactory to the City, for the protection of the Consultant's employees not otherwise protected. Include Waiver of Subrogation in favor of the City of Ocoee c) Consultant's Public Liability and Property Damage Insurance: The Consultant shall obtain during the life of this Agreement COMMERCIAL AUTOMOBILE COVERAGE, this policy should name the City of Ocoee as an additional insured, and shall protect the Consultant and the City from claims for damage for personal injury, including accidental death, as well as claims for property damages which may arise from operations under this Agreement whether such operations be by the Consultant or by anyone directly or indirectly employed by the Consultant, and the amounts of such insurance shall be the minimum limits as follows: d) Automobile Bodily Injury Liability & Property Damage Liability 1,000,000 Combined single limit per occurrence (each person, each accident) All covered automobile will be covered via symbol 1 Liability coverage will include hired &non-owned automobile liability Include Waiver of Subrogation in favor of The City of Ocoee e) Comprehensive General Liability (Occurrence Form) - This policy should name the City of Ocoee as an additional insured and should indicate that the insurance of the Consultant is primary and non-contributory. 2,000,000 GENERAL AGGREGATE 2,000,000 PRODUCTS-COMPLETED OPERATIONS AGGREGATE 1,000,000 PER OCCURRENCE 1,000,000 PERSONAL & ADVERTISING INJURY Include Waiver of Subrogation in favor of the City of Ocoee 1,000,000 Professional Liability (Design Errors & Omissions) f) Subconsultant's Comprehensive General Liability, Automobile Liability and Worker's Compensation Insurance: The Consultant shall require each subconsultant to procure and maintain during the life of this subcontract, insurance of the type specified above or insure the activities of these subconsultants in the Consultant's policy, as specified above. g) Owner's Protective Liability Insurance: (Not applicable for Design Services). As applicable for construction projects, providing coverage for the named insured's liability that arises out of operations performed for the named insured by independent 8 RFQ#21-005 Continuing Geotechnical Testing Services consultants and are directly imposed because of the named insured's general supervision of the independent consultant. The Consultant shall procure and furnish an Owner's Protective Liability Insurance Policy with the following limits: 1,000,000, and per occurrence, $2,000,000. Aggregate and naming the City of Ocoee as the Named Insured. h) Contractual Liability: If the project is not bonded, the consultant's insurance shall also include contractual liability coverage to insure the fulfillment of the contract. NOTE: PUBLIC LIABILITY INSURANCE AND AUTOMOBILE LIABILITY INSURANCE, THE CITY SHALL BE NAMED AS ADDITIONAL INSURED. 1,000,000 PER OCCURRENCE 2,000,000 AGGREGATE i) Commercial Umbrella: 1,000,000 PER OCCURRENCE 2,000,000 Aggregate Including Employer's Liability and Contractual Liability j) Certificates of Insurance: Certificate of Insurance Form (see sample, above), naming the City of Ocoee as an additional insured will be furnished by the Consultant upon notice of award. These shall be completed by the authorized Resident Agent and returned to the Office of the Purchasing Technician. This certificate shall be dated and show: The name of the Insured consultant, the specific job by name and job number, the name of the insurer, the number of the policy, its effective date, and its termination date. Statement that the Insurer shall mail notice to the Owner at least thirty (30) days prior to any material changes in provisions or cancellation of the policy, except ten (10) days written notice of cancellation for non-payment of premium. 4.City As Additional Insured. The CITY shall be listed as an additional insured on all insurance coverage required by this Agreement, except Worker's Compensation and Professional Liability errors and omissions insurance. Furthermore, all other insurance policies pertaining to the Services to be performed under this Agreement shall memorialize that the CONSULTANT's, or the CONSULTANT's Subconsultant's, or all of these entities' (Primary Insureds) insurance, shall apply on a primary basis, and that any other insurance maintained by the CITY shall be in excess of and shall not contribute to or be commingled with the Primary Insured's insurance. 9 RFQ#21-005 Continuing Geotechnical Testing Services 5.CITY's Right to Inspect Policies. The CONSULTANT shall, in the event of a material claim, upon thirty (30) days' written request from the CITY, deliver copies to the CITY of any or all insurance policies that are required in this Agreement. SECTION V TERMINATION 1.Termination Without Cause. This Agreement may be terminated by either party by delivering a thirty (30) written notice to the other party. In the event of the termination of this Agreement, any liability of one party to the other arising out of any Services rendered, or any act or event occurring prior to the termination, shall not be deemed to be terminated or released. The CONSULTANT shall be paid for Services completed prior to receipt of the termination notice and for reasonable termination settlement costs relating to commitments which had become firm prior to the termination; however, payment to the CONSULTANT will exclude any and all anticipated supplemental costs, administrative expenses, overhead and profit on uncompleted Services. 2.Termination for Cause. In addition to any other termination provisions that may be provided in this Agreement, the CITY may terminate this Agreement, or any Services Authorization issued under this Agreement, in whole or in part, if the CONSULTANT (1) makes a willfully false payment statement; (2) substantially fails to perform any material obligation under this Agreement or Services Authorization and does not remedy the failure within five (5) calendar days after receipt by the CONSULTANT of written demand by the CITY, or (3) refuses to allow public access to all documents, papers, letters, or other material made or received by the contractor in conjunction with the contract, unless the records are exempt from § 24(a) of Article I of the State Constitution and Florida Statutes § 119.07(1). The CONSULTANT may terminate this Agreement or any Services Authorization issued under this Agreement, if the CITY fails to perform any material obligation under this Agreement, and does not remedy the failure within 10 RFQ#21-005 Continuing Geotechnical Testing Services fifteen (15) calendar days after receipt by the CITY of written demand from the CONSULTANT. 3.Upon termination of this Agreement for Cause by the CITY, the City may pay the CONSULTANT for those Services actually rendered and contracted for under a Services Authorization, and those reasonable and provable expenses required by any Services Authorization and actually incurred by the CONSULTANT for Services prior to the effective date of termination. Such payments, however, shall be, 1) reduced by an amount equal to any additional costs and damages incurred by the CITY as a result of the default(s) of the CONSULTANT, including all incidental and consequential fees and expenses. 4. Delivery of Materials Upon Termination. In the event of termination of this Agreement (or any Services Authorization) by the CITY, prior to the CONSULTANT's satisfactory completion of all the Services described or alluded to herein, the CONSULTANT shall promptly furnish the CITY, at no additional cost or expense, with one (1) copy of the following items (Documents), any or all of which may have been produced prior to and including the date of termination: data, specifications, calculations, estimates, plans, drawings, construction documents, photographs, summaries, reports, memoranda; and any and all other documents, instruments, information, and materials (whether or not completed) generated or prepared by the CONSULTANT, or by any Subconsultant, in rendering the Services described herein, and not previously furnished to the CITY by the CONSULTANT pursuant to this Agreement, or any Services Authorization. The Documents shall be the sole property of the CITY, and the CITY shall be vested with all rights provided therein of whatever kind and however created. The CONSULTANT shall also require that all such Subconsultants agree in writing to be bound by the provisions of this Subsection. 11 RFQ#21-005 Continuing Geotechnical Testing Services SECTION VI SUSPENSION The CITY has the right to suspend the CONSULTANT's Services (in whole or in part) rendered under this Agreement or any Services Authorization. However, if the CITY suspends the CONSULTANT's Services pursuant to any Services Authorization, the CITY will add to the period of service for such Services Authorization a period not less than the duration of such suspension and compensate the CONSULTANT for the reasonable and provable additional costs it has incurred as a direct and proximate result of such suspension. SECTION VII NOTICES 1.All notices denominated as such by this Agreement, or the City Code, or Florida law, required to be given to the CONSULTANT hereunder shall be in writing, and shall be given by hand-delivery or United States mail, postage prepaid, addressed to: TIERRA, INC. 591 Susan B. Britt Court Winter Garden, FL 34787 Attention: a-.G 15te7°l<l 2. All notices required to be given to the CITY shall be in writing, and shall be given by hand-delivery or United States mail, postage prepaid, to the CITY at: CITY OF OCOEE 150 North Lakeshore Drive Ocoee, Florida 34761 Attention: Purchasing Technician A copy of the notice shall be provided to the City of Ocoee, City Engineer. 3. A party shall be permitted to substitute its contact person or change its address, for the purposes of this Subsection, by written notice to the other party given in accordance with the provisions of this Section. 12 RFQ#21-005 Continuing Geotechnical Testing Services SECTION VIII CONFLICTS OF INTEREST The CONSULTANT represents and warrants unto the CITY that no officer, employee, or agent of the CITY has any interest, either directly or indirectly, in the business of the CONSULTANT to be conducted hereunder. SECTION IX WAIVER OF CONSEQUENTIAL DAMAGES IN NO EVENT SHALL THE CITY BE LIABLE TO CONSULTANT OR TO ANY THIRD PARTY FOR ANY PERSONAL INJURY, DEATH OR PROPERTY DAMAGE; NOR SHALL THE CITY BE LIABLE FOR ANY INDIRECT, INCIDENTAL, SPECIAL OR CONSEQUENTIAL DAMAGES, INCLUDING LOSS OF PROFITS, LOSS OF REVENUE, OR LOSS OF USE, OR COST OF COVER INCURRED BY CONSULTANT OR ANY THIRD PARTY ARISING OUT OF THIS AGREEMENT AND/OR CONCERNING THE PERFORMANCE OF SERVICES BY THE CONSULTANT OR BY THE CITY UNDER THIS AGREEMENT OR UNDER A SERVICES AUTHORIZATION ISSUED UNDER THIS AGREEMENT. SECTION X MATERIALS AND DATA 1.All data, field notes, inspector's reports,job files, test reports, contract plans and specifications used to record as-built (or other) conditions, copies of shop drawings, construction photographs, cost control and scheduling data, computer printouts, contractor's submittals, summaries, memoranda work papers and any and all other documents, instruments, information, and materials ("WRITTEN WORK") prepared or accumulated by CONSULTANT for the SERVICES rendered hereunder shall be the sole property of the CITY. The CITY may reuse the WRITTEN WORK at no additional cost, and the CITY shall be vested with all rights of 13 RFQ#21-005 Continuing Geotechnical Testing Services whatever kind and however created that may be in existence thereto; provided, however, that CONSULTANT shall not be liable to the CITY for the CITY's additional use of any WRITTEN WORK for a different project except where CONSULTANT is engaged or retained by the CITY for the different project and the CONSULTANT utilizes the WRITTEN WORK. 2.The CITY acknowledges that the WRITTEN WORK is not intended for use in connection with any project or purpose other than the PROJECT, and the purpose for which the WRITTEN WORK was therefore prepared. Any use by the CITY of the WRITTEN WORK in connection with a project or purpose other than the PROJECT, without the re-engagement or retention of CONSULTANT, shall be at the CITY's sole risk, and CONSULTANT shall have no responsibility or liability related thereto. 3.In the event of termination of this AGREEMENT, CONSULTANT shall promptly furnish the CITY, at no additional cost or expense, one (1) copy of the following items DOCUMENTS"): data, field notes, specifications, calculations, estimates, plans, drawings, construction documents, photographs, summaries, test reports, memoranda; and any and all other documents, instruments, information, and materials (whether or not completed) prepared or accumulated by CONSULTANT, or by any Subconsultant, in rendering the SERVICES described herein, and not previously furnished to the CITY by CONSULTANT pursuant to this AGREEMENT. The DOCUMENTS shall be the sole property of the CITY, and the CITY shall be vested with all rights provided therein of whatever kind and however created. CONSULTANT shall also require that all such Subcontractors and Subconsultants agree in writing to be bound by the provisions of this Paragraph. SECTION XI MISCELLANEOUS PROVISIONS 1. Non-Exclusive Contract. This Agreement is non-exclusive, and may be terminated at the CITY's convenience with the proper notice having been given to the 14 RFQ#21-005 Continuing Geotechnical Testing Services CONSULTANT as provided in this Agreement. The rights granted herein to the CONSULTANT are non-exclusive, and the CITY shall have the right, at any time, to enter into similar agreements with other geotechnical engineers, engineers, architects, landscape architects, planners, consultants, contractors, subconsultants, to perform such geotechnical testing services as the CITY may desire. 2.Discrimination. The CONSULTANT, for itself, its delegates, successors-in-interest, and its assigns, and as a part of the consideration hereof, does hereby covenant and agree that, 1) in the furnishing of Services to the CITY hereunder, no person shall be excluded from participation in, denied the benefits of, or otherwise subjected to discrimination in regard to this Agreement on the grounds of such person's race, color, creed, national origin, disability, marital status, religion or sex; and 2) the CONSULTANT shall comply with all existing requirements concerning discrimination imposed by any and all applicable local, state, and federal rules, regulations, or guidelines, and as such rules, regulations, or guidelines may be from time to time amended. In the event of a breach of any of the nondiscrimination covenants described in this Subsection, the CITY shall have the right to terminate this Agreement, with cause, as described above. 3.Compliance with Law. The CONSULTANT and its employees shall promptly observe, comply with, and execute the provision of any and all present and future federal, state, and local laws, rules, regulations, requirements, ordinances, and orders which may pertain or apply to the Services that may be rendered hereto. The CONSULTANT shall also require, by contract, that all Subconsultants shall comply with the provisions of this Subsection. By entering into this contract, the awarded bidder is obligated to comply with the provisions of Section 448.095, Fla. Statutes, "Employment Eligibility." This includes, but is not limited to utilization of the E-Verify System to verify the work authorization status of all newly hired employees, and requiring all subcontractors to provide an affidavit attesting that the subcontractor does not 15 RFQ#21-005 Continuing Geotechnical Testing Services employ, contract with, or subcontract with, an alien unauthorized to work in the USA. Failure to comply will lead to termination of this contract, or if a subcontractor knowingly violates the statute, the subcontractor must be terminated immediately. 4.Licenses. The CONSULTANT shall, during the life of this Agreement, procure and keep in full force, effect, and good standing all necessary licenses, registrations, certificates, permits, and other authorizations as are required by local, state, or federal law, in order for the CONSULTANT to render its Services required under this Agreement. The CONSULTANT shall also require all Subconsultants to comply by contract with the provisions of this Subsection. 5.Compliance With New Regulations. To the extent applicable, CONSULTANT agrees that if local, state, or federal agencies modify their grant procedures or requirements for the CITY or the CONSULTANT to qualify for local, state, or federal funding the CITY may use to pay for the Services to the rendered by the CONSULTANT, then the CONSULTANT shall consent to and make such modifications or amendments in a timely manner. If the CONSULTANT is unable to comply with such applicable local, state, or federal laws and regulations, then the CITY shall have the right, by written notice to the CONSULTANT, to terminate this Agreement. 6.License Fee and Royalties. The CONSULTANT hereby grants a non-exclusive and fully paid license to the CITY to utilize all WRITTEN WORK or documents produced or prepared by CONSULTANT to perform the services required under this Agreement. 7.Consultant Not Agent of City. The CONSULTANT is not authorized to act as the CITY's agent hereunder and shall have no authority, expressed or implied, to act for or bind the CITY hereunder, either in CONSULTANT's relations with Subconsultants, or in any other manner whatsoever except as otherwise stated in a Services Authorization. 8.Subconsultants. The CONSULTANT shall have the right, conditioned upon the CITY's prior consent (which shall not be unreasonably withheld), to employ other firms, 16 RFQ#21-005 Continuing Geotechnical Testing Services consultants, Contractors, subconsultants, and so forth (Subconsultants); provided, however, that the CONSULTANT shall, 1) advise the CITY as to what particular Services the Subconsultants shall perform; and 2) advise the CITY as to what percentage of the total project services each Subconsultant shall be employed to do. The CONSULTANT shall be solely responsible for the performance of all of its Subconsultants, including but not limited to their maintenance of schedules, correlation of services, or both of these things, and the resolution of all differences between them. The CONSULTANT shall promptly terminate the use and services of any employee or Subconsultant upon written request from the CITY (which may be made by the CITY in its sole discretion). By accepting a Subconsultant, the CITY shall not be deemed to warrant or guarantee the reliability or effectiveness of that entity's Services. 9.Work Outside Scope and Time of Payment. The CITY shall have no obligation to reimburse the CONSULTANT for services rendered which may be in addition to outside of the Scope of any particular Services Authorization, unless and until the CITY has given written approval of such reimbursement. 10. Subconsultant Contracts. The CONSULTANT shall provide a copy of all relevant provisions of this Agreement to all Subconsultants hired by it, or for which it may have management responsibilities as described in a Services Authorization and shall inform all Subconsultants that all Services performed hereunder shall strictly comply with the Agreement terms and provisions. The CONSULTANT shall also furnish the CITY, upon demand, with a copy of all CONSULTANT-Subconsultant contracts. 11. Assignment and Delegation. The CITY and the CONSULTANT bind themselves and their partners, successors, executors, administrators, and assigns, to the other party of this Agreement in respect to all duties, rights, responsibilities, obligations, provisions, conditions, and covenants of this Agreement; except that the CONSULTANT shall not assign, transfer, or delegate its rights or duties, or both of these things, in this Agreement without the prior written 17 RFQ#21-005 Continuing Geotechnical Testing Services consent of the CITY. The CITY has the absolute right to withhold such consent at its convenience, and, furthermore, if the CONSULTANT attempts to assign, transfer, or delegate its rights or duties in violation of these provisions without the CITY's consent, then the CITY may terminate this Agreement. The CITY shall have the right to assign its rights (or any part of them) or to delegate its duties and obligations (or any part of them) to another entity that shall be bound by all applicable terms and conditions as provided in this Agreement. 12. Audits - Periodic Auditing of Consultant's Books. The CITY shall have the right, at any reasonable time and through any of its designated agents or representatives, to inspect and audit the Books of CONSULTANT for the purpose of verifying the accuracy of any payment, charge or invoice. In addition to the above and upon request of the CITY, the CONSULTANT shall prepare an audit (for the most recent fiscal year) for the CITY, which shall include the CONSULTANT's paid salary, fringe benefits, general and administrative overhead costs, profit and the total amount of money paid by the CITY to the CONSULTANT. The Fiscal Report shall be certified as true and correct by, and shall bear the signature of, the CONSULTANT's chief financial officer or its certified public accountant. 13. Overcharge. If it is established by the audit, or by any other means, that the CONSULTANT has over-billed or overstated its costs, fees, or reimbursable expenses Overcharge) to the City, then the amount of any Overcharge shall be refunded by the CONSULTANT, together with interest at the rate of one percent (1%) per month and the CITY's reasonable and provable costs (including the auditing expenses) in discovering the Overcharge and effecting its repayment. 14. Truth in Negotiations. The CONSULTANT shall execute the Truth-in- Negotiation Certificate in the form attached hereto and made a part hereof. It is agreed by the CONSULTANT that any amounts charged under this Agreement or any Services Authorization issues under this Agreement, shall be adjusted to exclude any sums [plus interest at twelve 18 RFQ#21-005 Continuing Geotechnical Testing Services percent (12%) per annum simple interest on the sums, from the date of payment by the CITY] by which the CITY determines that it was overcharged. 15. Prohibition Against Contingent Fees. The CONSULTANT warrants and represents that it has not employed or retained any company or person, other than a bona fide employee working solely for the CONSULTANT to solicit or secure this agreement and that CONSULTANT has not paid or agreed to pay any person, company, corporation, individual, or firm, other than a bona fide employee working solely for the CONSULTANT any fee, commission, percentage, gift, or other consideration contingent upon or resulting from the award or making of this agreement. Any breach of the warranty or representation of this paragraph shall be grounds for termination. 16. Entire Agreement. This Agreement, including the Exhibits hereto, and any Services Authorization issued under this Agreement, shall constitute the entire Agreement between the parties, and shall supersede and replace all prior agreements or understandings, written or oral, relating to the matters set forth therein. 17. Amendment. This Agreement may be amended or modified only by a Services Authorization, or an Amendment, and as duly authorized and executed by the parties. 18. Validity. The validity, interpretation, construction, and effect of this Agreement shall be in accordance with and governed by the laws of the State of Florida. In the event any provision hereof is determined to be unenforceable or invalid, such unenforceability or invalidity shall not affect the remaining provisions of this Agreement, which shall remain in full force and effect. 19. Headings. The headings of the Sections or Subsections of this Agreement are for the purpose of convenience only, and shall not be deemed to expand, limit, or modify the provisions contained in such Sections or Subsections. 19 RFQ#21-005 Continuing Geotechnical Testing Services 20. Timeliness. The CITY and the CONSULTANT acknowledge and understand that time is of the essence in this Agreement, and that the Services shall be performed in expeditious and economical manner. 21. Public Entity Crime. Any Person or affiliate, as defined in 287.133 of the Florida Statutes, shall not be allowed to contract with the CITY, nor be allowed to enter into a subcontract for work on this AGREEMENT, if such a person or affiliate has been convicted of a public entity crime within three (3) years of the date this AGREEMENT was advertised for proposals, or if such person or affiliate was listed on the State's convicted vendor list within three 3) years of the date this AGREEMENT was advertised, whichever time period is greater. A public entity crime means a violation of any state or federal law with respect to and directly related to the transaction of business with any public entity or agency (federal, state or local), involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, forgery, falsification of records, receiving stolen property or material misrepresentation. Any AGREEMENT with the CITY obtained in violation of this Section shall be subject to termination for cause. A Subconsultant who obtains a subcontract in violation of this Section shall be removed from the Project and promptly replaced by a Subconsultant acceptable to the City. 22. Force Majeure. The parties acknowledge that adverse weather conditions, acts of God, terrorism, war or other unforeseen circumstances of a nature that are outside the control of the parties may execute performance under this Agreement; or may necessitate modifications to a Services Authorization. If such conditions and circumstances do in fact occur, then the CITY and CONSULTANT shall mutually agree, in writing, to the modifications to be made to any Services Authorization. 23. Remedies and Costs. All remedies provided in this Agreement shall be deemed cumulative and additional, and not in lieu or exclusive of each other or of any other remedy available to either party, at law or in equity. 20 RFQ#21-005 Continuing Geotechnical Testing Services 24. Dispute Resolution and Exclusive Venue. As a condition precedent to the filing of any suit or other legal proceeding, the parties shall endeavor to resolve claims, disputes or other matters in question by mediation. Mediation shall be initiated by any party by serving a written request for same on the other party. The parties shall, by mutual agreement, select a mediator within fifteen (15) days of the date of the request for mediation. If the parties cannot agree on the selection of a mediator, then the CITY shall select the mediator who, if selected solely by the CITY, shall be a mediator certified by the Supreme Court of Florida. No suit or other legal proceeding shall be filed until the mediator declares an impasse, which declaration, in any event, shall be issued by the mediator not later than sixty (60) days after the initial mediation conference. The sole and exclusive venue for any mediation shall be in Orange County, Florida. Any legal proceeding of any nature brought by either party against the other to enforce any right or obligation under this Agreement or any Services Authorization issued under this Agreement, or arising out of any matter pertaining to this Agreement or the work to be performed hereunder, shall be submitted for trial,without a jury, before the Circuit Court of the Ninth Judicial Circuit, in and for Orange County, Florida. The parties consent and submit to the jurisdiction of such court and agree to accept service of process outside the State of Florida in any matter to be submitted to any such court pursuant hereto. The CITY and CONSULTANT expressly waive all rights to trial by jury regarding any legal proceeding of any nature brought by either party against the other to enforce any right or obligation under this Agreement, or any Services Authorization issued under this Agreement, or arising out of any matter pertaining to this contract or the work to be performed hereunder. As noted herein, the sole and exclusive venue for any litigation or other legal proceeding between the parties shall be the Circuit Court of the Ninth Judicial Circuit in and for Orange County, Florida. 21 RFQ#21-005 Continuing Geotechnical Testing Services 25. Chapter 558, Florida Statutes. The parties agree that the provisions of Chapter 558, Florida Statutes are not applicable to this Agreement of any Services Authorization issued hereunder. 26. PUBLIC RECORDS COMPLIANCE. The City of Ocoee (City) is a public agency subject to Chapter 119, Florida Statutes. The Contractor agrees to comply with Florida's Public Records Law. Specifically, the Contractor shall: 1. Keep and maintain public records required by the City to perform the service. 2.Upon request from the City's custodian of public records, provide the City with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in chapter 119, Florida Statutes, or as otherwise provided by law. 3.Ensure that public records that are exempt or confidential and exempt from the public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the Contractor does not transfer the records to the City. 4. Upon completion of the contract, Contractor agrees to transfer at no cost to the City all public records in possession of the Contractor or keep and maintain public records required by the City to perform the service. If the Contractor transfers all public record to the City upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the City, upon request from the City's custodian of public records, in a format that is compatible with the information technology systems of the City. 22 RFQ#21-005 Continuing Geotechnical Testing Services 5. A Contractor who fails to provide the public records to City within a reasonable time may be subject to penalties under section 119.10, Florida Statutes. IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT 407-905-3100, EXTENSION 1022, CCDL@ci.ocoee.fl.us, WITH AN OFFICE LOCATED AT 150 NORTH LAKESHORE DRIVE, OCOEE, FLORIDA 34761. Signature Page Follows) 23 RFQ#21-005 Continuing Geotechnical Testing Services IN WITNESS WHEREOF, this Agreement has been fully executed on behalf of the parties hereto and by its duly authorized representatives, as of the date first written above. ATTEST: ACCEPTED: TIERRA, INC. SO4 (1111'/ By: iiNamav, C XY Na " <r good/e 4 Title: i P p.P Oq '•rC' r SEAL) SEAL 2ber ATTEST: APPROVED: orida CITY O •COEE, FL I RIDA 74./6. jar By: Name: Melanie Sibbitt Name: Rusty Job% Title: City Clerk Title: Mayor SEAL) FOR USE AND RELIANCE ONLY BY APPROVED BY THE OCOEE CITY THE CITY OF OCOEE, FLORIDA COMMISSION AT A MEETING HELD APPROVED AS TO FORM AND ON July 20, 2021 LEGALITY this f T May of /,. , 2024 UNDER AGENDA ITEM NO. 8. SHUFFIELD, LOWMAN & WILSON, P.A. BY: Scott A. 'o• • , ty Attorn- 24 RFQ#21-005 Continuing Geotechnical Testing Services TRUTH-IN-NEGOTIATION CERTIFICATE The CONSULTANT hereby certifies that all wage rates, and any and all other unit costs supporting the compensation to be paid to the CONSULTANT pursuant to a Services Authorization for the Services as set forth therein, will be accurate, complete, and current at the date of the Services Authorization's execution. WITNESS: CONSULTANT: TIERRA, INC. BY: BYCJNO Prin e: / 3 v!r'. Print Name:Sim (' Title: //, /? Title: [jhtttin Rssts*a. STATE OF FLORIDA COUNTY OF PE&SONALLY APPEARED before me, the undersigned authority, 1/4)/( r.A Hc& ell known to me or [ ] who has produced his/her 6s idfication, and known by me to be the Pncs,al.u+ of the corporation named above, and acknowledged before me that he/she executed the foregoing instrument on behalf of said corporation as its true act and deed, and that he/she was duly authorized to do so. WITNESS my hand and official seal this 2. day of f , 20Z/. PCLYN y ii NO IARY IIBLIC a•MMas R HER'• Print Name: - /c w y c,:cp 72oyipN•• V 1 CCU" My Commission Expires: Iola jL ' y #HH 005564 9 p•,o 6'o ded th i\gy 4.11.41.//*Ci;Si 25 RFQ#21-005 Continuing Geotechnical Testing Services EXHIBIT A RFQ #21-005 CONTINUING CONTRACTS FOR GEOTECHNICAL TESTING SERVICES 26 RFQ#21-005 Continuing Geotechnical Testing Services CITY OF OCOEE REQUEST FOR QUALIFICATIONS RFQ) #21-005 CONTINUING CONTRACTS FOR GEOTECHNICAL TESTING SERVICES V 11L-dr ocoee florida TABLE OF CONTENTS FOR RFQ#21-005 CONTINUING CONTRACTS FOR GEOTECHNICAL TESTING SERVICES RFQ DOCUMENTS Section Page Legal Advertisement RFQ Instructions & General Terms& Conditions 4 - 17 Conflict of Interest Disclosure Form 18 Summary of Litigation 19 Receipt of any addenda issued 19 Company Information and Signature Sheet 20 End Table of Contents RFQ#21005 Continuing Contracts for Geotechnical Testine Ser\ices 2 Request for Qualifications, Legal Advertisement The City of Ocoee. Florida, (the "City") is soliciting sealed statements of qualifications for RFQ 21-005 CONTINUING CONTRACTS FOR GEOTECHNICAL TESTING SERVICES. Qualification packages will only be accepted electronically through Negometrix4, a free e- Procurement platform, until 2:00 pm, local time, on May 4, 2021. Qualification packages received after that time or through any other method will not be accepted under any circumstances. Qualification packages that have been timely received will be publicly opened virtually online and the names of the responding firms read aloud at that time; instructions will be provided at https://www.ocoee.org/959/Public-Bid-Meetings. All questions regarding this RFQ should be in writing to Vanessa Anthony. Purchasing Technician. Finance Department/Purchasing vanthonynci.ocoee.fl.us. No Pre-submittal conference is scheduled at this time. Prospective respondents may secure a copy of the documents required for submitting statements of qualifications at no charge through Negometrix4 by accessing the City's published solicitation page at https://app.negometrix.com/buyer/748. Please visit https://www.ocoee.org/323/Purchasing for more information. Prospective respondents will be provided with all information regarding this RFQ, addenda, and changes to the project requirements through the Negometrix platform. Melanie Sibbitt, City Clerk. Orlando Sentinel April 4, 2021. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 3 CITY OF OCOEE REQUEST FOR QUALIFICATIONS "RFQ" #21-005 CONTINUING CONTRACTS FOR GEOTECHNICAL TESTING SERVICES A. INTRODUCTION AND GENERAL INSTRUCTIONS 1. The City of Ocoee, Florida. in conformance with the Consultants' Competitive Negotiations Act (CCNA), Florida Statutes Section 287.055, et seq., and the policies and procedures of the City of Ocoee (City), is soliciting statements of qualification from geotechnical testing firms that are interested in providing such services for City projects. Such projects include large- and small-scale water, sewer, and reclaimed utility projects, road construction and/or rebuild construction, extensions and/or stormwater related projects, and other geotechnical type projects. There may also be a periodic need to conduct Phase 1 environmental reviews and environmental lien searches related to the possible acquisition of real property by the City. A variety of testing and consultative tasks will be required in various combinations depending on the needs of each project. Responding firms (Respondent, Firms, Bidder, Proposer) must be experienced in providing geotechnical testing services for projects of a scope and nature comparable to those described. Use of qualified subconsultants for specialty work is acceptable. To be considered,the firm shall be qualified by a licensed professional in accordance with Florida State law and be familiar with all applicable State of Florida. St. Johns River Water Management District, Orange County, and City land development codes, regulations, and laws, and with City and Orange County construction standards. In accordance with the CCNA,the work contemplated under these continuing contracts will be limited to routine tasks related to construction projects expected to cost no more than $4 million, or for studies not costing more than $500,000. Geotechnical Testing services related to any project that does not fall within these categories will be separately solicited in conformance with the CCNA. 2. The City intends to award continuing contracts to at least three (3) Respondents. if possible, deemed to be the most highly qualified to perform the required services. In determining whether a firm or individual is qualified, the City shall consider criteria set forth in the RFQ. The firm selected by the City will provide professional services to the City on an as-needed basis. based upon task orders to be issued by the City under the continuing contract. The continuing contract shall have an initial three (3) year period plus two automatic one-year renewable extensions, and one (1) year optional renewal at the City's discretion. 3. Prospective respondents may secure a free copy of the documents required for submitting a response through Negometrix's Negometrix4 platform by accessing the City's published solicitation page at https://app.negometrix.com/buyer/748. Please visit https://www.ocoee.org/323/Purchasing for more information. Prospective respondents will be provided with all information regarding this RFQ, addenda, and changes to the project requirements through the Negometrix4 platform. Partial sets of the documents required for submitting a statement of qualifications will not be issued. By using Negometrix, prospective respondents will be provided with all information RFQ#21005 Continuing Contracts for Geotechnical Testing Services 4 regarding this RFQ. all addendums and changes to the project requirements;there is no charge to use the Negometrix e-procurement platform. 4. Each qualification package should consist minimally of a cover letter, statement of qualifications, conflict of interest disclosure form and company information form attached at the end of these instructions). Please also include a copy of all applicable licenses held by firms or key subconsultants proposing to perform the work. Statements of qualifications should be limited to a total of forty (40) 8.5"x 11" pages (including any resumes and maximum 2-page cover letter but excluding front and back covers, dividers" table of contents, and company information form), single-sided. portrait orientation. 12-point font. Additional submission instructions are supplied below in Section D. Any qualifications package failing to conform to these specifications may be subject to rejection. The person signing the signature sheet on behalf of the respondent must have the legal authority to bind the respondent to the submitted qualification package and shall be understood to do so. All expenses for providing qualification packages to the City shall be borne by the respondent. 5. The City utilizes Negometrix, an e-procurement platform. Negometrix4 version. The City is ONLY accepting electronic solicitation responses online through the City"s Negometrix4 platform at https://app.negometrix.com/buyer/748. This link can also be accessed through the City's website at https://www.ocoee.org/323/Purchasing under the Current Open Solicitations menu. All responses for this bid MUST be submitted through the Negometrix4 platform. Bid/RFP/RFQ submissions received in any other format will not be accepted; no paper, fax, or e-mailed submissions will be accepted. There is no charge to use the Negometrix electronic bid submission platform. Registration with Negometrix is free and is required prior to submitting an RFQ response. You will be required to register once you click the PARTICIPATE BUTTON in the solicitation file. It is suggested your company register no later than 24 hours in advance of the RFQ submission deadline to ensure proper registration. Should your company need assistance with registering, please contact the Negometrix Service Desk by calling (724) 888-5294 or by emailing servicedesk.us a!negometrix.com. Once your company is registered with Negometrix" you will be able to submit your bid/proposal/qualification statement securely, any time before the bid deadline, at https://app.negometrix.com/buyer/748 by clicking the PARTICIPATE BUTTON under the solicitation. Qualification Statements submitted on Negometrix4 will remain locked and inaccessible by City staff until the bid deadline. Respondents are encouraged to allow ample time to upload and submit your Response as the system will automatically lock responses upon the bid deadline. A virtual public RFQ opening will be held on the date and time indicated below. Details on how to access the virtual bid opening will be located on the City"s website at https://www.ocoee.org/959/Public- Bid-Meetings. 6. Respondents shall submit one (1) complete electronic copy. preferably in a single file. of their qualifications package on the Negometrix4 platform. Qualification packages must be received by Negometrix4 no later than 2:00 p.m. (local time)on May 4,2021. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 5 Any qualification package received after the above-noted time will not be accepted under any circumstances. Any uncertainty regarding the time a qualification package is received will be resolved against the Respondent. It shall be the sole responsibility of the Respondent to have the qualifications package uploaded and submitted on the Negometrix4 e-procurement platform prior to the due date and time. File Uploads -All electronic files uploaded must be in a common format accessible by software programs the City uses. Those common formats are generally described as Microsoft Word (.doc or.docx). Microsoft Excel (.xls or .xlsx), Microsoft Power Point ppt or pptx). or Adobe Portable Document Format (.pdf). Respondents will not secure, password protect or lock uploaded files; the City must be able to open and view the contents of the file. Respondents will not disable or restrict the ability of the City to print the contents of an uploaded file. Scanned documents or images must be of sufficient quality, no less than 150 dpi, to allow for reading or interpreting the words, drawings, images or sketches. The City may disqualify any Submittal Response that does not meet the criteria stated in this paragraph. 7. The City will receive questions regarding this RFQ only through the Negometrix4 platform in the Question & Answer tab or written inquires directed to Vanessa Anthony, Purchasing Technician vanthony@ci.ocoee.fl.us. Deadline for receipt of written inquiries will be April 27,2021 at 2:00 p.m., local time. 8. Potential Respondents should not contact City staff, with the exception of the Purchasing Technician, or other City consultants or City Commission for information regarding this RFQ before the project award date. Any contact with any other member of the City Staff. City Commission. or its consultants during the RFQ, award, and protest period may be grounds for Respondent disqualification. 9. Action on qualification packages is expected to be taken by the City Commission within ninety (90) days of the submission opening date; however, no guarantee or representation is made herein as to the time between receipt of the qualification package and subsequent City Commission action. A more detailed schedule is given below. 10. All applicable laws and regulations of the United States, the State of Florida, and the City of Ocoee will apply to any resulting Agreement. The provisions of the Consultant's Competitive Negotiations Act (Section 287.055, Florida State Statutes) shall apply. where applicable. By entering into this contract. the awarded bidder is obligated to comply with the provisions of Section 448.095, Fla. Statutes, "Employment Eligibility." This includes. but is not limited to utilization of the E-Verify System to verify the work authorization status of all newly hired employees, and requiring all subcontractors to provide an affidavit attesting that the subcontractor does not employ, contract with, or subcontract with, an alien unauthorized to work in the USA. Failure to comply will lead to termination of this contract. or if a subcontractor knowingly violates the statute. the subcontractor must be terminated immediately. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 11. The successful Respondent shall be required to execute an Agreement. in form and content acceptable to the City, indemnifying and holding harmless the City, its officials, officers, employees, and agents from all claims. 12. CONVICTED VENDOR LIST(PUBLIC ENTITY CRIME): A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a proposal on an award to provide any goods or services to a public entity, may not submit a proposal on an award with a public entity for the construction or repair of a public building or public work, may not submit proposals on leases of real property to a public entity, may not be awarded or perform work as a Contractor, Supplier, Subcontractor, or Consultant under a award with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in section 287.017 for Category Two for a period of 36 months from the date of being placed on the convicted vendor list. [See Florida State Statute 287.133 2) (a). 13. FLORIDA PUBLIC RECORDS LAW: In accordance with Chapter 119 of the Florida Statutes, and, except as may be provided by Chapter 119 of the Florida Statutes and other applicable State and Federal Laws. all Respondents should be aware that the proposal and the responses thereto are in the public domain and are available for public inspection. Respondents are requested, however, to identify specifically any information contained in their proposal which they consider confidential and/or proprietary and which they believe to be exempt from disclosure, citing specifically the applicable exempting law.All proposals received in response to this request of proposal become the property of the City of Ocoee and will not be returned. In the event of an award, all documentation produced as part of the contract will become the exclusive property of the City. 14. PUBLIC RECORDS COMPLIANCE. The City of Ocoee (City) is a public agency subject to Chapter 119, Florida Statutes. The Contractor agrees to comply with Florida's Public Records Law. Specifically, the Contractor shall: 1. Keep and maintain public records required by the City to perform the service. 2. Upon request from the City's custodian of public records, provide the City with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in chapter 119, Florida Statutes, or as otherwise provided by law. 3.Ensure that public records that are exempt or confidential and exempt from the public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the Contractor does not transfer the records to the City. 4. Upon completion of the contract, Contractor agrees to transfer at no cost to the City all public records in possession of the Contractor or keep and maintain public records required by the City to perform the service. If the Contractor transfers all public record to the City upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the City, RFQ#21005 Continuing Contracts for Geotechnical"Testing Seri-ices 7 upon request from the City's custodian of public records, in a format that is compatible with the information technology systems of the City. 5.A Contractor who fails to provide the public records to City within a reasonable time may be subject to penalties under section 1 19.10, Florida Statutes. IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT 407-905-3100,EXTENSION 1022,CCDL@ci.ocoee.fl.us,WITH AN OFFICE LOCATED AT 150 NORTH LAKESHORE DRIVE, OCOEE,FLORIDA 34761. 15. PATENT INDEMNITY: Except as otherwise provided, the successful respondent agrees to indemnify the City and its officers. agents, and employees against liability, including costs and expenses for infringement upon any letters patent of the United States arising out of the performance of this Contract or out of the use or disposal by or for the account of the City or supplies furnished or construction work performed hereunder,to the extent caused by the negligence,recklessness,or intentional wrongful misconduct of the Respondent and persons employed or utilized by the Respondent in the performance of this contract. Further, the Respondent shall fully indemnify, defend, and hold harmless the City and its officers,agents, and employees from any suits, actions, damages. and costs of every name and description, including attorneys' fees, arising from or relating to violation or infringement of a trademark, copyright, patent, trade secret. unpatented invention, or intellectual property right. If the bidder uses any design, device, or materials covered by letters, patent, or copyright, it is mutually agreed and understood without exception that the bid price shall include all royalties or cost arising from the use of such design. device, or materials. 16. Conflict of Interest/Non-Collusion Certification: a) Respondent declares that the only persons or parties interested in their proposal are those named herein,that this proposal is, in all respects, fair and without fraud and that it is made without collusion with any other vendor or official of the City of Ocoee. Neither the Affiant nor the above-named entity has directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive pricing in connection with the entity's submittal for the above project. This statement restricts the discussion of pricing data until the completion of negotiations and execution of a contract for the described services. b) Respondent certifies that no City Commissioner, other City Official, or City employee directly or indirectly owns assets or capital stock of the Responding entity. nor will directly or indirectly benefit by the profits or emoluments of this proposal. (For purposes of this paragraph, indirect ownership or benefit applies to any members of his or her immediate family) c) Respondent certifies that no member of the entity's ownership or management is presently applying for an employee position or actively seeking an elected position with the City. In the event that a conflict of interest is identified in the provision of services, Respondent agrees to immediately notify the City in writing. Respondent must submit the attached Conflict of Interest Statement. RFQ#21005 Continuing Contracts for Geotechnical Testine Services 8 d) Respondent further declares that a careful examination of the scope of services, instructions. and terms and conditions of this RFQ has occurred, and that the proposal is made according to the provisions of the RFQ documents, and will meet or exceed the scope of services, requirements. and standards contained in the RFQ documents. e) Respondent agrees to abide by all conditions of the negotiation process. In conducting negotiations with the City, Respondent offers and agrees that if this negotiation is accepted,the Respondent will convey,sell, assign, or transfer to the City all rights,title. and interest in and to all causes of action it may now or hereafter acquire under the anti- trust laws of the United States and the State of Florida for price fixing relating to the particular commodities or services purchased or acquired by the City. At the City's discretion, such assignment shall be made and become effective at the time the City tenders final payment to the Respondent. The proposal constitutes a firm and binding offer by the Respondent to perform the services as stated. 17. The City reserves the right to accept or reject any or all proposals, to waive formalities, technicalities or irregularities, to request clarification of information submitted in any proposal, or to re-advertise for new proposals. The City may accept any item or group of items of any proposal, unless the Respondent qualifies its proposal by specific limitations. The City may accept one or more proposals if, in the City's discretion,the City determines that it is in the City's best interest to do so. The City reserves the right to award the contract to the Respondent which, in the City's sole discretion, is the most responsive and responsible Respondent The City reserves the right, as an aid in determining which proposal is responsible, to require a Respondent to submit such additional evidence of Respondent's qualifications as the City may deem necessary. and may consider any evidence available to the City of the financial, technical, and other qualifications and abilities of a Respondent, including past performance (experience) with the City and others. The City Commission shall be the final authority in the selection of any and all proposals B. INSURANCE TERMS AND CONDITIONS The successful respondent shall be required to provide evidence of both General (Public & Property) Liability and Professional (Design Errors and Omissions) Liability Insurance in the amount of$1 million on the form of a certificate of insurance issued on behalf of the City of Ocoee and naming the City as an additional insured, by companies acceptable to the City at the minimum limits and coverages listed below with deductible amounts acceptable to the City. The selected consultant shall not commence any work in connection with an Agreement until all of the following types of insurance have been obtained and such insurance has been approved by the City, nor shall the consultant allow any subconsultant to commence work on a subcontract until all similar insurance required of the subconsultant has been so obtained and approved. Policies other than Workers' Compensation shall be issued only by companies authorized by subsisting certificates of authority issued to the companies by the Department of Insurance of Florida which maintain a Best's Rating of"A" or better and a Financial Size Category of "Vll' or better according to the A.M. Best Company. Policies for Workers' Compensation may be issued by companies authorized as a group self-insurer by F.S. 440.57. Florida Statutes. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 9 I. Loss Deductible Clause: The City shall be exempt from, and in no way liable for, any sums of money which may represent a deductible in any insurance policy. The payment of such deductible shall be the sole responsibility of the General Consultant and/or subconsultant providing such insurance. 2. Workers' Compensation Insurance: The Consultant shall obtain during the life of this Agreement. Worker's Compensation Insurance with Employer's Liability Limits of 500,000/$500,000/$500,000 for all the Consultant's employees connected with the work of this project and. in the event any work is sublet, the Consultant shall require the subconsultant similarly to provide Workers' Compensation Insurance for all of the latter's employees unless such employees are covered by the protection afforded by the Consultant. Such insurance shall comply fully with the Florida Workers' Compensation Law. In case any class of employees engaged in hazardous work under this contract for the City is not protected under the Workers' Compensation statute, the Consultant shall provide, and cause each subconsultant to provide adequate insurance, satisfactory to the City, for the protection of the Consultant's employees not otherwise protected. Include Waiver of Subrogation in favor of the City of Ocoee. 3. Consultant's Public Liability and Property Damage Insurance: The Consultant shall obtain during the life of this Agreement COMMERCIAL AUTOMOBILE COVERAGE, this policy should name the City of Ocoee as an additional insured, and shall protect the Consultant and the City from claims for damage for personal injury, including accidental death. as well as claims for property damages which may arise from operations under this Agreement whether such operations be by the Consultant or by anyone directly or indirectly employed by the Consultant. and the amounts of such insurance shall be the minimum limits as follows: 4. Automobile Bodily Injury Liability& Property Damage Liability 1,000,000 Combined single limit per occurrence (each person, each accident) All covered automobile will be covered via symbol 1 Liability coverage will include hired & non-owned automobile liability Include Waiver of Subrogation in favor of The City of Ocoee 5. Comprehensive General Liability(Occurrence Form)-This policy should name the City of Ocoee as an additional insured and should indicate that the insurance of the Consultant is primary and non-contributory. 2,000,000 GENERAL AGGREGATE 2,000,000 PRODUCTS-COMPLETED OPERATIONS AGGREGATE 1.000,000 PER OCCURRENCE 1,000,000 PERSONAL & ADVERTISING INJURY Include Waiver of Subrogation in favor of the City of Ocoee 1,000,000 Professional Liability (Design Errors & Omissions) 6. Subconsultant's Comprehensive General Liability, Automobile Liability and Worker's Compensation Insurance: The Consultant shall require each subconsultant to procure and maintain during the life of this subcontract. insurance of the type specified above or insure the activities of these subconsultants in the Consultant's policy, as specified above. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 10 7. Owner's Protective Liability Insurance: (Not applicable for Design Services). As applicable for construction projects, providing coverage for the named insured's liability that arises out of operations performed for the named insured by independent consultants and are directly imposed because of the named insured's general supervision of the independent consultant. The Consultant shall procure and furnish an Owner's Protective Liability Insurance Policy with the following limits: $1,000.000, and per occurrence, $2.000.000.Aggregate and naming the City of Ocoee as the Named Insured. 8. Contractual Liability: If the project is not bonded. the consultant's insurance shall also include contractual liability coverage to insure the fulfillment of the contract. NOTE: PUBLIC LIABILITY INSURANCE AND AUTOMOBILE LIABILITY INSURANCE, THE CITY SHALL BE NAMED AS ADDITIONAL INSURED. 1,000,000 PER OCCURRENCE 2,000,000 AGGREGATE Commercial Umbrella: 1,000,000 PER OCCURRENCE 2,000,000 Aggregate Including Employer's Liability and Contractual Liability Builders Risk: (Not Applicable for Design Services). 100,000 Any (1) Location 1,000.000 Any (1) Occurrence Remainder of page left blank intentionally) RFQ#21005 Continuing Contracts for Geotechnical Testing Services 11 ACORD. CERTIFICATE OF LIABILITY INSURANCE >•Ri i_i D i1/04io ntO01T'''S' TH18 CERTIFICATE IB ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS CERTIFICATE 00E8 NOT AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLGCI?3 BELOW. INSURERS AFFORDING COVERAGE NAMC INSURED N EMER A. au.ea..c1.,a.a RH... dais! Cogtrset0r.e Name ceu EMMA! muse COVERAGES THE ROUGES OR luEURANCE UM IRON INYE SEEN ESIm TO THE MAW NAMED AEDVE FOR THE POI.CY PERIOD E101CMEO.TOTYRTWTAOME AYY NIZAH WCNE.TERM OR COMMON Of MY MDITTRAtT OR OTHER DDDIAENT WITH RESPECT10 WHICH WS CERTIFICATE MAY SE eaUSD OR NAY PERTAIN TIE WSiUMCE WOWED ITIM/OIO=001ODE®NOONIS SR1ECTTONIINEOR .OCCLUSIONS ANO COMMIS°FORM POUcm AOGREOATI METE SAWN RMYHAMI MEIN REDUCED EY PRO CRAAM, q Tgf CTryE rgELcroq IIImoN TM O SESRANCE 1 SOURS MOM RETEAME M Wl75isOO4 LINTS OBIBULUANUTY II ECU O D P s 1,000,000 X 1cormaeoSDEsuumuYl PRBNEljT=rvn) 850,000 IcLenmte ZQOCCUR Let wpm*WIR...I 85,000 EMMALSAOYRRWY 81,000,00E OBEFA.AOBEOATE 82,000,000 OWL AOGREDATE 1 LAST ANEES PER PRODUCTS•CORPgPAw•s 2,000,000 n REVOS0ELEweary in No Niro Ie=,;.,TEEALE UNT II 1,000,000 ALL0WN®AUTO1 BOORS SWAY SOCOLLW AUTO*Mr awn) x NOW WOO ROOST HAIRY AO.MOWYEOAUTOS Ve.R+0R+1 PROPERTY.n.:WEGE .$ I OM/OEWE<DY AUTOOMY-EA AGLOW I PAY AUTO l 0114111 TRW A EA ACC 8 N,TOOMr A00 I ERCEENVRIRRLM LRAM ENOSOctwO/CE a 1,000,000 Z craw 0 CLAWS MADE AGEREORTE 12,000,000 OEOYCTBIE RETENTION i 8 ROANSIR'CO"'ENEATID oo XtTORRTETp.! 1FR WSTSYERE UR/MUT El PACO=OM $500,000AMY IMAM YT..IA, kTA100T EL. -u LOYELFEE aSDO,000 fSI'9irL4'RyfROl Saw EL DISEASE-POLICY MIT 8500,000 OMR Builders Risk nay I Leo la), Any 1 Dcc 1,000,000 OtlCRIPRON GP OPS ATANEI unarms moms I'Newsom mom sY mociesB/MRN mast PItos'is s The insurance evidenced by this certificate aha11 name the certificate holders as en additional insured on the General Liability a Cabrella Liability. Workers' Compensation, Employers Liability a General Liability shall contain a Waiver of Subrogation in favor of the certificate holder. The certificate holder is added am a noel 3®>®d i4 pir,)dme R1 CERTIFICATE HOLDER CANCELLATION OCOEBOl PALLS AM'OF THE NOVI OESCPUTED POMO N CNA:ELMD EV ORE THE SSHUTAA DWITNIAWF.MEOima EEUEe,mt EBIN=TO ERE 10 OAYHTITiBI City of Ocoee mom*TO The CEMEGTE N UNS/M tO TNt 6T.MNFALUB To DO SO SYR1 150 X. Lakeshore Drive eBOEEIA0MJ6AnONORLAINUTYOF ANTgmUPONTREWSmBLUEADELTIOR Ocoee IL 34761-2258 METTLEMNERTRIII. AMMO ACORO 25(2001T0e) pt. G_ OACORD CORPORATION TREE sfrokk 9. Certificates of Insurance: Certificate of Insurance Form (see sample, above), naming the City of Ocoee as an additional insured will be furnished by the Consultant upon notice of award. These shall be completed by the authorized Resident Agent and returned to the Office of the Purchasing Technician. This certificate shall be dated and show: The name of the Insured consultant, the specific job by name and job number. the name of the insurer, the number of the policy, its effective date, and its termination date. RFQ#21005 Continuine Contracts for Geotechnical Testine Services 12 Statement that the Insurer shall mail notice to the Owner at least thirty(30)days prior to any material changes in provisions or cancellation of the policy, except ten (10) days written notice of cancellation for non-payment of premium. C. SCOPE OF SERVICES The City of Ocoee, Florida (City), in conformance with its policies and procedures, is soliciting statements of qualification from geotechnical testing firms that are interested in providing such services for City projects. Such projects include large-and small-scale water,sewer,and reclaimed utility projects,road construction and/or rebuild construction,extensions and/or stormwater related projects, and other geotechnical type projects. There may also be a periodic need to conduct Phase 1 environmental reviews and environmental lien searches related to the possible acquisition of real property by the City. A variety of testing and consultative tasks will be required in various combinations depending on the needs of each project. Each firm proposing to provide geotechnical testing services to the City shall provide a complete list of all such services normally available from that firm. Work will be requested through a task work order to which the firm will provide a price proposal. The City may reject or accept the statement of qualifications, request additional information, or negotiate a different mix of services and/or prices. Once an agreement is reached,the work will be authorized through a City purchase order. The task work order will be used to determine the expected quantity and nature of the services required for the covered project(s). The purchase order will authorize a specified maximum cost for services to be provided. Project conditions may alter the number and nature of tests and services provided over the course of the work, so long as the maximum budget authorized is not exceeded. The City intends to award continuing contracts to no fewer than three (3) firms. if possible, deemed to be the most highly qualified to perform the required services. In determining whether a firm is qualified, the City shall consider criteria set forth in the RFQ. The continuing contract shall have an initial three (3) year period plus two automatic one-year renewable extensions,and a one (1) year optional renewal at the City's discretion. The following list is a representative sample of the tasks to be procured, as needed, for City projects: Roadway-related Services: 1. Stabilized subgrade in-place density test 2. Stabilized subgrade depth verification test 3. Stabilized subgrade strength verification test (Limerock Bearing Ratio) 4. Limerock in-place density test 5. Limerock depth verification test 6. Limerock modified proctor test 7. Soil cement testing, crushed concrete for base 8. Asphaltic concrete extraction & gradation test. per day 9. Mobilization of equipment 10. Asphalt core testing for depth & density w/patching of core hole, per core 11. Laboratory test of asphalt cores for density RFQ#21005 Continuing Contracts for Geotechnical Testing Ser\ices 13 Utility-related Services: 1. Pipe in-place density tests (typically 1 test per 300 ft. of pipe for every 1 ft. of backfill) 2. Structure in-place density test (typically 1 test per structure per 1 ft. of backfill) 3. Modified proctor test Building-related Services: I. Footing foundation soil density test 2. Concrete slump test 3. Soil bearing test Miscellaneous Services: I. Phase 1 environmental review 2. Environmental lien search 3. Engineering technician, per hour 2. Engineer review, per hour 3. Engineering review and administrative overhead, as a percent of the total task 4. Other service not explicitly listed above but customarily provided by the firm as part of its geotechnical testing services The list given above is representative but not complete. Interested firms must be experienced in providing services for projects of a scope and nature comparable to those described. Use of qualified sub-consultants for specialty work is acceptable. To be considered, the firm shall be a licensed to do business of this type in accordance with Florida State law and be familiar with all applicable State of Florida, St. Johns River Water Management District, Orange County and City of Ocoee codes,regulations and laws. Please include a copy of all applicable licenses held by firms or subconsultants proposed to perform work. D. SUBMITTALS Qualifications packages should be designed to portray to the City how the respondent's services can best match the knowledge. skills, and abilities suggested by the anticipated Scope of Services given above. In order for the City to evaluate the qualification package, each Respondent shall provide information relative to their ability to provide services that will best meet the needs of the City. The City of Ocoee requires comprehensive responses to every section within this RFQ. To facilitate the review of the responses, firms should follow the described response format.The intent of the RFQ format requirements is to expedite review and evaluation. It is not the intent to constrain firms with regard to content, but to assure that the specific requirements set forth in this RFQ are addressed in a uniform manner amenable to review and evaluation. In order to simplify the review process and obtain the maximum degree of comparison, the Respondent should use the following format in responding to the RFQ and missing material may cause your submission to be evaluated accordingly: I. Firm's Qualifications Firm's and key employee's certifications and licenses with regulatory agencies, professional organizations. etc. RFQ#21005 Continuing Contracts for Geotechnical Testing Seri ices 14 List firm's key sub-consultants, their qualifications, and their role in providing these services, if applicable. List of firms' other current or recently completed similar services within the past two (2) years with other public or private agencies. List of at least three (3) client references to include organization name. contact person, telephone number(s), and e-mail address. Firm's project organization and coordination structure Firm's understanding of the services requested and how the firm would accomplish the work II. Firm's Office Location & Other Forms (not included in page limit) List the location of all offices(firm and key sub-consultants) involved with this project and approximate distance (in miles) and time (in hours)to City Hall. Conflict of Interest Disclosure p. 18 Receipt of any addenda issued. p. 19 Summary of Litigation. if none please so state. Provide a summary of any litigation, claim(s), bid or contract dispute(s) filed by or against the Firm in the past five (5) years which is related to the services that the Firm provides in the regular course of business. The summary shall state the nature of the litigation, claim, or contact dispute. a brief description of the case, the outcome or projected outcome. and the monetary amounts involved. p. 19 Company Information/Signature Sheet p. 20. E. TIME SCHEDULE The anticipated schedule of events related to this solicitation is: Date of RFQ Request for qualifications published 23 days later Last day for questions 30 days later Statements of qualification are due 37 days later Qualification statements distributed to selection committee 45-60 days later Selection committee meeting held Next meeting Short-list of ranked firms recommended to City Commission Dates are estimated and subject to change at the City's discretion. F. SELECTION PROCESS 1. The criteria for selection shall be based on the criteria listed in the RFQ. The City reserves the right,before awarding the contract.to require a Respondent to submit additional evidence of its qualifications,as the City may deem necessary.and shall conduct discussions with. and may require oral presentations by, no fewer than three(3) firms. RFQ#21005 Continuing Contracts for Geotechnical Testing Sen ices 15 2. A City evaluation committee will evaluate each respondent's qualifications and after interviews and/or oral presentations will short-list and recommend to the City Commission the top three (3) firms, if possible, in ranked order of qualifications based upon the evaluation committee's evaluation of the responses and any client references. All Respondents shall be notified via Negometrix or other means of the evaluation committee's recommended ranking of firms to the City Commission. The City Commission's decision to endorse or modify the ranking by the evaluation committee shall be final.The City Commission shall be the final authority in the award or rejection of any and all responses. 3. The City will apply the negotiation requirements of Section 287.0055. Fla. Stat.,(a.k.a.. CCNA). The City will attempt to negotiate an agreement with the top-ranked Respondent. If no agreement is reached with the top-ranked Respondent, negotiations will be terminated and initiated with the second-ranked Respondent, and so on, until an agreement is reached. 4. The successful Respondent shall be required to execute an agreement which provides, among other things, that all plans. drawings, reports. and specifications that result from Respondent's services shall become the property of the City. Upon the successful negotiation of an agreement. a formal contract will be prepared and subsequent executed by both parties. Evaluation Criteria Maximum Points 1. Experience of the firm and key personnel Past Performance and Experience of the Firm Past Performance and Experience of the Team Members Past Performance and Experience with or in the City Overall Experience 50 Affect of Legal Action Against the Firm References, Licenses with Regulatory agencies Firm's project organization and coordination structure 2. Ability to Meet Time and Budget Requirements Current and Projected Workloads of the Firm 25 3. Project Approach Briefly describe your Firm's understanding of the services requested 15 and how the firm would accomplish the work. 4. Office Location Location of the Firm Office and Proximity to the City of Ocoee 5 5. Certified Minority, Women Owned Business Enterprise Include M/WBE Certification forms for the Responding Firm only. 5 100 RFQ#21005 Continuing Contracts for Geotechnical Testing Seri ices 16 G. WORK ASSIGNMENT PROCEDURES Firm(s) selected by the City will provide professional Geotechnical Testing services to the City on an as needed basis, based upon task orders to be issued by the City under the continuing contract. No work shall commence until the verification of the issuance of the purchase order or other authorization document. Invoicing for completed work or progress billing shall be submitted to the requesting Utilities Department for processing and submission for payment by the Finance Department with a copy to: Finance Department Accounts Payable City of Ocoee 150 N. Lakeshore Drive Ocoee, Florida 34761 H. BID PROTESTS All Bid Protests shall be submitted to the Purchasing Technician in the following manner: 1. A Bidder shall file a written bid protest under this Article or be barred any relief; oral protests shall not be acknowledged. 2. A bid protest shall be limited to the following grounds: (a) issues arising from the procurement provisions of the Project Manual, its addenda, and other bidding documents; and/or(b)applicable federal, state, or local law.No bid protest may be based upon questions concerning the design documents (drawings and specifications). The Bidder shall clarify all questions concerning the design documents of the project prior to submitting its bid. 3. The content of the bid protest shall fully state the factual and legal grounds for the protest and the legal basis for the relief requested. 4.The bid protest shall be filed with the Purchasing Technician not later than five(5)calendar days after the posting of the notice of intent to award or recommendation of award by staff, whichever is earlier. 5.The Purchasing Technician,on behalf of the City, shall make a determination of the merits of the protest not later than five (5) business days after receipt of the protest. If the City denies the protest, the City may proceed with award of the contract unless enjoined by order of a court of competent jurisdiction. END OF INSTRUCTIONS RFQ#21005 Continuing Contracts for Geotechnical Testine Services 17 A ocoee florida RFQ CONFLICT OF INTEREST DISCLOSURE FORM The award of this contract is subject to the provisions of Chapter 112, Florida Statutes. All Proposers must disclose within their Proposal: the name of any City of Ocoee employee, Mayor or City Commissioner, other City Official, or City Consultants, who owns assets or capital stock, directly or indirectly, in the Proposer's firm or any of its branches, or would directly or indirectly benefit by the profits or emoluments of this proposal. (Indirect ownership or benefit applies to any members of his or her immediate family.) Proposer certifies that no member of the entity's ownership or management is presently applying for an employee position or actively seeking an elected position with the City. In the event that a conflict of interest is identified in the provision of services, Proposer agrees to immediately notify the City in writing. The purpose of this disclosure form is to give the City the information needed to identify potential conflicts of interest for the City Commission, Evaluation Committee members, and other key City employees and consultants involved in the award of this contract. According to Chapter 112, Florida Statutes, the term "conflict of interest" "means a situation in which regard for a private interest tends to lead to disregard of a public duty or interest", and refers to situations in which financial or other personal considerations may adversely affect, or have the appearance of adversely affecting, an employee's professional judgment in exercising any City duty or responsibility in administration,management, instruction, research, or other professional activities. Please check one of the following statements and attach additional documentation if necessary: To the best of our knowledge,the undersigned firm has no potential conflict of interest for this Proposal. The undersigned firm, by attachment to this form, submits information which may be a potential conflict of interest for this Proposal. Acknowledged by: Firm Name Signature Name and Title(Print or Type) RFQ#21005 Continuing Contracts for Geotechnical Testing Services 18 Date RFQ#21005 Continuing Contracts for Geotechnical Testing Services 19 SUMMARY OF LITIGATION: Provide a summary of any litigation, claim(s), bid or contract dispute(s) filed by or against the Bidder in the past five(5)years which is related to the services that the Bidder provides in the regular course of business. The summary shall state the nature of the litigation. claim, or contact dispute, a brief description of the case,the outcome or projected outcome. and the monetary amounts involved. If none, then please say so. Attach additional sheets if necessary) ACKNOWLEDGEMENT OF ADDENDA: Bidder acknowledges receipt of the following addenda: No.Dated No.Dated No.Dated Remainder of page left blank intentionally.) RFQ#21005 Continuing Contracts for Geotechnical Testing Services 20 COMPANY INFORMATION/SIGNATURE SHEET RFQ#21-005 FAILURE TO COMPLY WITH THESE RFQ INSTRUCTIONS WILL RESULT IN DISQUALIFICATION OF YOUR QUALIFICATION PACKAGE. PLEASE SIGN BELOW ATTESTING THAT YOU HAVE READ AND UNDERSTAND ALL RFQ INSTRUCTIONS AND THAT YOU UNDERSTAND THAT THE SUCCESSFUL RESPONDENT WILL BE REQUIRED TO ENTER INTO A LEGALLY BINDING CONTRACT WITH THE CITY OF OCOEE. COMPANY NAME TELEPHONE(INCLUDE AREA CODE) FAX (INCLUDE AREA CODE) E-MAIL ADDRESS IF REMITTANCE ADDRESS IS DIFFERENT AUTHORIZED SIGNATURE(manual)FROM PURCHASE ORDER ADDRESS. PLEASE INDICATE BELOW: NAME/TITLE(PLEASE PRINT) STREET ADDRESS CITY STATE ZIP FEDERAL ID# Individual Corporation Partnership Other(Specify) Sworn to and subscribed before me by means of physical presence or online notarization this day of 20 . Personally Known or Produced Identification Notary Public- State of Type of Identification) County of Signature of Notary Public Printed,typed or stamped Commissioned name of Notary Public RFQ#21005 Continuing Contracts for Geotechnical Testing Services 21 EXHIBIT B CONSULTANT'S QUALIFICATION PACKAGE RESPONSE TO RFQ #21-005 27 RFQ#21-005 Continuing Geotechnical Testing Services A ;: floftdO 1 RFQtTEST FOR QET tFICATIONS 21 -005 FOTF(' IINIC11. TESTING SERVICES It: e;‘,311114146116114t04 ram;.... y CC)EE CTFY FIAT. k''' wEtCC IHFAt IP!b. igg. . F TIERRA, INC. Jeffrey Begovich, P.E. 591 Susan B. Britt Court Winter Garden, FL 34787 Phone 407-877-1354 Fax 407-654-7347 TIES 44.0.4 E' Cover Letter IIloriao Request for Qualifications Continuing Contracts for Geotechnical Testing Services May 4, 2021 City of Ocoee—Purchasing Department 150 N. Lakeshore Dr. Ocoee, FL 34761 Attn: Ms. Vanessa Anthony Re: Request for Qualifications (RFQ)#21-005 Dear Ms. Anthony: Tierra is pleased to submit this qualification package that demonstrates our capabilities, understanding and experience for the City of Ocoee's Geotechnical Services Contract. Tierra, as a company, has been in business for more than 25 years providing Geotechnical, Environmental and Construction Materials Testing services. For the past 5 years Tierra was under contract with the City of Ocoee to provide on call geotechnical testing services and have successfully completed 4 task assignments on time and within budget for the City. We understand your requirements and expectations. Our office is located within 2 miles of the City and have more than 10 employees that are local residents. Over these 5 years Tierra's Winter Garden office has grown into a Central Florida leader in the Geotechnical, Construction Materials Testing and Inspection, Environmental and Facilities Consulting firm. With over 80 employees in our Winter Garden office, we commit our resources, expertise and knowledge to the City. We have worked on some of Central Florida's most high profile projects including I-4 Ultimate, Wekiva Parkway, Citrus Bowl, Dr. Phillips Performing Arts Center, OIA South Terminal C Expansion and others. However, we have also provided services on small intersection projects, roadway widening, utility projects, sidewalk and safety projects. Our experience spans a vast array and variety of projects. We are a full service consulting geotechnical, environmental and construction materials testing servicing local governmental agencies, school boards and private industry. We have capabilities to provide drilling, field sampling, laboratory testing, field inspection, threshold inspection, materials testing, asbestos and lead based paint surveys, ESA Phase I/II, forensics and engineering analysis and reporting for this contract. We utilize MicroStation and AutoCAD for site maps and plan sheets and are fully integrated with GPS and GIS mapping for self-locating field borings and sample locations. Tierra is also a Minority Business Enterprise (MBE) certified by FDOT and the State of Florida. Tierra has a commitment that is shared by each and every employee to exceed the expectations of our clients on every project, tasks assignment, work order or mission. Our business philosophy of having the right people and the right equipment to provide our clients with the Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 1 of 2 TIERRA 4104 t c c> Cover Letterflorid° most accurate, time responsive, cost effective, quality solutions is the key to our success and why Tierra would be a perfect asset to the City. With Tierra there is no learning curve. Our organization is committed to providing quality, responsive service establishing a reputation for sound approaches and professional competence in a wide range of technically demanding areas to the City. With a fully staffed office and certified laboratory in neighboring Winter Garden , we offer the City of Ocoee our tremendous resources and significant experience without the need for sub-consultants. Tierra is qualified and experienced to meet all of the requested and anticipated services within the RFQ. Tierra recognizes the importance of maintaining the City of Ocoee's vision of being a model of excellence to the community through leadership and responsiveness. We are confident that we can meet and exceed the City's expectations and we are committed to providing the highest professional support available. We look forward to this opportunity to further demonstrate our merits while strengthening our firm's relationship with the City of Ocoee. Respectfully Submitted, TIERRA,INC. 44Begovich, P.E. Vlce esident Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 2 of 2 TIERRA Firms QualificationsIlorido Licenses FDOT Florida Department of Transportation RON DESANTIS 605 Suwannee Street KEVIN J.TBIBAULT,PE. GOVERNOR Tallahassee,Ft. 3 23 99-04 5 0 SECRETARY June 29,2020 Luis Mahiquez,President TIERRA,INC. 7351 Temple Terrace Highway Tampa,Florida 33637 Dear Mr.Mahiquez: The Florida Department of Transportation has reviewed your application for prequalification package and determined that the data submitted is adequate to technically prequalify your firm for the following types of work: Group 9 -Soil Exploration,Material Testing and Foundations 9.1 -Soil Exploration 9.2 -Geotechnical Classification Laboratory Testing 9.3 -Highway Materials Testing 9.4.1 -Standard Foundation Studies 9.4.2 -Non-Redundant Drilled Shaft Bridge Foundation Studies 9.5 -Geotechnical Specialty Laboratory Testing Group 10 -Construction Engineering Inspection 10.1 -Roadway Construction Engineering Inspection 10.3 -Construction Materials Inspection 10.4 -Minor Bridge&Miscellaneous Structures CEI Your firm is now technically prequalified with the Department for Professional Services in the above referenced work types.The overhead audit has been accepted,and your firm may pursue projects in the referenced work types with fees of any dollar amount.This status shall be valid until June 30.2021 for contracting purposes. Approved Rates Home/ HalleFacilities premium Reimburse Hae Field Published Branch Overhead Capital Cost Overtime Actual Direct Direct Fee Overhead of Money Expenses Expense Expense Schedule 163.37% 98.78% 2.597% Reimbursed No 6.87% 11.47%* Yes Rent and utilities excluded from field office rate. These costs will be directly reimbursed on contracts that require the consultant to provide field office. Per Title 23,U.S.Code 112,there are restrictions on sharing indirect cost rates.Refer to Code for additional information. Safety,Mobility,Innovation www.fdot.gov Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 1 of 5 TIERRA Sli0111, Ho.. Qualifications Ron Detontn.Govewnor FBPE STATE OF FLORIDA BOARD OF PROF pp ENGINEERS THE PROFESSIONAL 15.1 iFNSED UNDER THE PROVISIO$ 'pfz A'. ,1, ftA4TUTES ii;, t. la ',1 EXPIRATION DATE.EEBRUARY 28,2023 Always verify licenses online at MyFlorldaLicense.tom 0 : AM f`N Do not alter this document in any form. 155y.,Y , This is your license.It k unlawful for anyone other than the licensee to use this document Ron DeSanNt Govemm FBPE I(11010\nl)5en()I STATE OF FLORIDA Iw U 1 1. BOARD OF PROF ENGINEERS THEPROFESSIONALN Idr HE 444 PROVISI L • • fUTES 4, EDUNDERTAT UM 89w C r U I li: 2il EXPIRATION DATE:'FEBRUARY 28 2023 Always verily licenses online at MyflaidaLicense.com A' " Do not alter this document in form. tee *o` This is your license.It is unlawful for anyone other than thanye licensee to use this document 1 Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 2 of 5 TIERRA PE' Firms Qualificationsrfnrida Ron DeSareis,Governor E •FBPE f f.l`451wv&i'°ILT!, STATE OF FLORIDA BOARD OF PROF NALg ENGINEERS THE PROFESSIONALLY C JO" '• fat NSED UNDER THE PROVISIOPNS'O 4$ rA .!1 so. .+I TATUTES I lei;a• ' .. K it e!", it bilk: 953 EXPIRATION DATE:FEBRUARY 28,2023 Always verify licenses ontne at MyFloridaLicense.co n I],y a Do not alter this document in any form. a 4: :'e• This is your license.It is unlawful for anyone other than the licensee to use this document I El Ron DeSaMis,Governor FBPE Koo1o4Lo0aoar STATE OF FLORIDA BOARD OF PFLOFEfflOINALENGINEERS THE PROFESSIONAL . I '+ 14 49 SED UNDER THE PROVISIOt 9F• ' ap .,1 • R JTATUTES mow 4 y. SY $ 'isl: t ff t r'ff TL ut El 518 EXPIRATION DATE:FEBRUARY 28,2023 Always verify licenses online at MyFloridaticense.com EL El Do not alter this document in any form. El $' o` This is your license.It is unlawful for anyone other than the licensee to use this document. Request for Qualifications Geotechnical Testing Services RFQ 2 1-005 Page 3 of 5 TIERRA 11111101/ o( ()(-'Firms Qualificationsflorid° torte Minority Business Certification Tierra, Inc. Is certified under the provisions of 287 and 2,95.187.Florida Statutes.for a period from: 10/22/2019 10/22/2021 Jonathan R Satter Secretary Fla.da Department ofManarement Semree Office of SUM.Dnvtay MANAGEMENT 405 0 ratoatl orre Suce3a0rD;n99 SERVICES aw mDasu Otf of Sa*,gromny wwre ems myrKKbe cam/me CITY OF ORLANDO CITY OF ORLANDO M/WBE CER 1 ION AWARD LLTI Eft EXPIRATION DATE: 9/30/2022 CERTIFICATION NUMBER:20074870 CERTIFICATION TYPE: MBE COMPANY NAME: Tierra,Inc 7351 Temple Terrace Highway Tampa,FL 33637 OWNER NAME: LUIS MAHIQUEZ CERTIFIED LINE(S)OF BUSINESS/SPECIALTY AREA(S): Engineering Consulting-Geotechnical, Environmental and Material Testing 8 Inspection EXECUTIVE OFFICES•MINORITY BUSINESS ENTERPRISE DIVISION Orlando Crty Hall 400 South Orange Manes EpMh Floor PO Boo 4990 Orlando.FL 32802-4990 P 407 248 2823 dlyolonando net Request for Qualifications Geotechnical Testing Services RFQ 2l-005 Page 4 of 5 TIExR.A th/ F'(-> Firms Qualifications Ifhorioo a_v. . . f Osceola County Board of County Commissioners Minority,Women, Service Disabled Veteran Business Enterprise This certificate validates reciprocal certification for Tierra,Inc. Per certification with State of Florida Office of Supplier Diversity Valid from:12/31/2019 to 10/22/2021 Procurement Services Supplier Development Y 1 Courthouse Square,Suite 2300 Kissimmee,FL 34741f Phone:407-742-0900 7. r,..,,, O`7,...-i> /i-/3,,/ 4 sts ,,,-r Fax:407-742-0901 Supplier Development Date x x x t ..euldid. Tierra, Inc. 3 7 Untted 51886 TE AST1116s94e5s:C1077 C117 C127.C128,C136,C40 COBB C702,D75,E329 AA81RO Methods:F176.R90 711 721.T255,T27,764,786 ASTMWda:11ee C1064 C1077.C1231.C135 C143 C1 t .',4,1 C939.08449.E329 AABRTOMethOCI:14201,R60.7119 7121 T1527 HOT MIX ABPMALt s AUNT 1546,545:02041.02726.D3086 , O%8, 4 AAUMTO Methods:R86,7188 T206 1215, .7 y. ABTM MMInds:01140.01557 02218..,' ABMA8MN MTelMlteWda,edsM:R T9,3 T1 1T08 0T,21 SHTO Hie- A r ?- ta. crier_:/..L remit- 7 f5.9 '08 66e r 0arid A.So*age Cbrbtepber J.Robinson,P.E. Director of Ae6reditatb8 President io-.eeu,ti nr rt .enn h+W.atevhw...r ee ot.o raa.te tr r.+o•.M+.e,prbmp +rm.t+.a.ewaw.ap.:aa.rt»..ar in.a.i.r.aqv t emaertct b reweb,e+ip er cttt=c onw.av W lessens ltlers.w tw+iar.K ay ne eaten Ure B.PBxN 9tipcevi OM A-,t. , E+wtm Won B 8002! 44•44444 I0 tmwr, Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 5 of 5 TIERRA r t c'(' Firms Qualifications Subconsultants Tierra is a full service firm capable of providing all of the services within the RFQ. We do not plan on using any subconsultants. Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 1 of 1 TIERRA 4,01/ ot Firms Qualificationsflorid° References CLIENT AND CONTACT INFORMATION SERVICES PROVIDED Contact Person: Shawn Kennedy— Provide task driven WWAssistant Project Manager geotechnical and materials testing for Orange County. twri Telephone: 321-354-7410GOVERNMENT I " " I " Email: Shawn.Kennedy@ocfl.net Contact Person: Lori Koontz—Provide task driven 114.. Engineering Section Manager geotechnical and materials j,... testing, and CEI inspection Volusia County Telephone: 386-822-6422 services for Volusia County. FLORIDA Email: lkoontz@volusia.org Contact Person: Stephen Miller, P.E.— Provide task driven Construction Project Manager geotechnical and materials testing, and CEI inspection SEMINOLE COUNTY Telephone: 407-665-5654 services for Seminole FLORIDA'S NATURAL CHOICE Email: smiller02@seminolecountyfl.gov County. Contact Person: Terry Scott— Provide geotechnical, Construction Inspection Supervisor materials testing, and CEI LAKE inspection services for Lake COUNTY Telephone: 352-253-9024 County. FLORIDA Email:jscott@lakecounty.gov Contact Person: Richard Gordon, P.E. — Provide task driven Asst. Public Works Director&Asst. geotechnical and materials4irtirCountyEng.testing, and CEI inspection FLAGLER services for Flagler County. COUNTY Telephone: 386-313-4046FLORIDA Email: rgordon@flaglercounty.gov2iflaglercounty.gov Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 1 of 1 TIERRA O(-? > Firm Qualificationsflorid° City of Ocoee requires the services of a qualified consultant to provide geotechnical, environmental and material testing engineering services for individual projects that may be miscellaneous in scope, and varied in size and complexity. Tierra has reviewed the RFQ and through our key team member's involvement on similar engineering services contracts, we have a complete understanding of the technical needs that may be required under this solicitation. Tierra understands that the City desires a consultant that can provide a full range of services. Tierra is that firm. We are a full service Geotechnical Engineering, Environmental Engineering, Construction Materials Testing and Inspection and Facilities Engineering firm. The following is a summary of our capabilities. Soil Exploration; Geotechnical Classification Laboratory Testing; Highway Materials Testing; Foundation Testing and Studies; Geotechnical Specialty Laboratory Testing; Environmental Engineering and Consulting; Facilities Consulting; Forensics Investigations; Miscellaneous Specialty Inspection. As a Florida-licensed professional engineering business, Tierra has the technical competence to provide a complete range of geotechnical engineering, environmental consulting and construction materials testing and inspection services for the City. Per the RFQ, we are currently pre-qualified with the FDOT to assist the City with the following work types: GROUP 9: SOIL EXPLORATION,MATERIAL TESTING AND FOUNDATIONS 9.1 Soil Exploration 9.2 Geotechnical Classification Laboratory Testing 9.3 Highway Materials Testing 9.4.1 Standard Foundation Studies 9.4.2 Non-redundant Drilled Shaft Bridge Foundation Studies 9.5 Geotechnical Specialty Laboratory Testing GROUP 10: CONSTRUCTION ENGINEERING INSPECTION 10.1 Roadway Construction Engineering Inspection 10.3 Construction Materials Inspection 10.4 Minor Bridge and Miscellaneous Structures CEI A copy of our FDOT Prequalification Letter has been included in this submittal, with a summary of our firm's capabilities listed below and on the following pages. GEOTECHNICAL ENGINEERING SERVICES Tierra's professional engineers have extensive experience providing site-specific and cost- effective solutions for clients across the state of Florida. We have provided geotechnical evaluations on a wide array of project types including roadways, buildings, airports, Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 1 of 17 TIERRA ti0.4 0< 0f'(--> Firm QualificationsNorioo transportation systems, landfills, dams, wastewater facilities and water systems. Tierra's geotechnical engineering capabilities include Site Investigation and Characterization; Planning, Feasibility and Due Diligence Studies; Sinkhole Investigations; Pavement Analysis and Design; Groundwater Evaluation; Slope Stability Analysis; Foundation Analysis and Design; Retaining Wall Design; Settlement Analysis and Design; Feasibility Studies and Site Selection Evaluation and Investigation of Sites for Borrow Suitability, Deep Foundation Design,Pile Driving Analysis(FDA) and Ground Penetrating Radar(GPR). As a leader in Geotechnical Engineering Tierra performs a variety of services in-house without the use of subconsultants. Most other firms use subconsultants for specialized geotechnical services. To meet our clients needs and expedite results Tierra does not have subconsultants for the following specialized geotechnical services. Sinkhole Evaluation and Remediation Tierra has significant experience in the identification and remediation of sinkhole conditions and we have performed thousands of subsidence investigations for clients throughout Florida. The focus of a geotechnical exploration in sinkhole-prone areas is to locate potential problematic subsurface conditions and define their extent. Tierra can utilize a variety of methods to evaluate the subsurface conditions present at a site and, based on the results of our exploration, we can prepare recommendations for repair and provide monitoring services during sinkhole remediation. Geophysical Evaluation: Tierra has the capability to offer an array of geophysical testing for identifying and evaluating subsurface anomalous conditions. Tierra owns our own equipment and can provide Ground Penetrating Radar (GPR) to evaluate subsurface conditions. The geophysical surveying is typically performed prior to soil borings so that the anomalous areas, if any, are identified and can be further characterized by drilling. Geotechnical Drilling: With one of the largest drilling fleets in the area, Tierra's complete in- house drilling capabilities make it easier to coordinate schedules and control cost without the need to rely on subcontractors. Our fleet of eleven (11) drill rigs includes track, truck and barge- mounted equipment as well as limited access rigs allowing our crews to access almost any drill site regardless of terrain or location. Our geotechnical drilling capabilities include Standard Penetration Test (SPT) borings, casing installation, borehole grouting, rock coring and sampling, well/piezometer installation and abandonment, hand muck probes, hand augers, pavement and concrete cores,field permeability testing and Double Ring Infiltration Testing. I r " t r r` is 11._kliiii _ _ _ _ _ 3 Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 2 of 17 TIERRA IVOIOr Firm Qualificationsflorida CONSTRUCTION MATERIALS TESTING AND INSPECTION SERVICES In order to best meet the needs of our clients, Tierra operates its own CMEC-certified and FDOT qualified laboratory facilities. Tierra's state of the art laboratories provide specialized testing services associated with geotechnical engineering and construction materials. Inspected annually by the FDOT State Materials Office, our laboratory staff is trained and certified to perform testing to characterize the physical properties of soil, rock, concrete, asphalt and composite building materials. In addition to certification, testing procedures are performed under the guidelines of ASTM E 329, where applicable, and in all cases a state-licensed engineer is in charge of inspection and materials testing procedures. Tierra's construction materials testing and inspection services include the following: Soils and Foundation Testing: Tierra's certified soil technicians I' are trained to evaluate the suitability of subgrade soils and monitor fill placement and compaction procedures. They routinely perform in-place density and moisture content testing of fill materials to monitor for project compliance. Our CTQP- certified Drilled Shaft and Pile Driving Inspectors are experienced in monitoring deep foundation installation. Tierra's laboratory testing abilities for soils include, but are not limited to, moisture content, Atterberg limits, particle size analysis, limerock bearing ratio, organic content and corrosivity testing. Asphalt Inspection and Testing: Tierra's asphalt technicians monitor the placement of asphalt paving systems for project compliance. Our technical field and laboratory staff has extensive experience in asphalt construction methods, field verification testing, temperature, spread rate and compaction monitoring, asphalt plant inspection and density testing. Concrete Testing and Inspection: Tierra routinely I rY provides concrete testing services at construction sites and in our in-house laboratory. All testing is A \performed by ACI-certified inspectors and includes r T the following: fresh concrete field testing and monitoring, compliance testing of fine and coarse aggregates, flexural strength testing of concrete x beams, compressive strength testing of concrete P oat cylinders, reinforcing steel placement documentation, 4 ? pre-cast concrete testing and observation and concrete mix design review. The photo shown left: concrete samples from a single concrete pour prior to placement in curing facility; required 8 technicians and more than 20 hours! Specialty Inspection Services Structural Steel Testing and Inspection: Tierra's certified weld inspectors have the capability to perform visual as well as other non-destructive inspections of welded and bolted torque connections includes but not limited to ultrasonic weld inspection, magnetic particle weld inspection, liquid dye penetrant inspection and coatings inspection. Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 3 of 17 TIERRA t4' Firm Qualifications Iflorido Floor Flatness /Levelness Testing: Tierra utilizes the Allen Face F-Meter to document floor flatness and floor levelness of concrete floor slabs to verify compliance with project requirements. Masonry Testing and Inspection: Tierra is experienced in evaluating a full spectrum of masonry materials, including grout, mortar, brick and Concrete Masonry Units (CMU). Threshold Inspection Services: Tierra performs threshold inspection services during the construction of structures classified by Florida Statutes Chapter 553.71 as "threshold buildings". Tierra's threshold inspectors are state-licensed Engineers certified as a "Special Inspector" to inspect project sites during construction to monitor conformance to project drawings and specifications. Environmental Tierra provides a broad range of environmental, consulting, and construction services ranging from Phase I environmental assessments through corrective action designs and construction management. We identify potential environmental issues early and provide fast and cost effective solutions for each project. We believe that our experience provides a higher quality of service within a reasonable time frame that you can depend on. Tierra provides engineering design and consulting for the general service areas outlined below: Phase I Environmental Site Underground Storage Tank(UST) Assessments Management Phase II/Level II Environmental Water Resources Investigations Regulatory Compliance Environmental Site Assessments Remedial Design and Remedial Action Facilities Consulting and Testing Tierra takes a clinical approach to addressing existing facility concerns and providing quality assurance in new construction and existing structures. Detailed site inspections, specialty testing, and review of construction documents to identify building system deficiencies, determine the issue and provide solutions. Tierra's facility services include: Air& Water Infiltration Testing Roof Testing Ground Penetrating Radar(GPR) Non-destructive Testing Air Barrier Testing Floor Slab Testing Load Testing Coefficient of Friction/Slip Testing Property Condition Assessments Accessibility Compliance Assessments Quality Assurance Monitoring Building Envelope and Roof Surveys Construction Engineering Inspection (CEI) As a consultant pre-qualified in FDOT Work Group 10.1, 10.3 and 10.4, Tierra provides CEI support services as a prime and subconsultant to the FDOT, Consultants and Local Agencies on bridge and roadway transportation projects. Tierra's services include: Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 4 of 17 TIES p E' Firm QualificationsHorlaa Earthwork Testing and Inspection Pre-stressed Concrete Plant Inspection Drilled Shaft Inspections Concrete Testing and Inspections MSE Wall Inspections Project/Construction Administration Driven Pile Inspection Constructability Review Asphalt Plant Inspections Coordination Asphalt Paving Inspections EEO/Compliance Tierra invests substantially in the training and certification of our field personnel. Our technicians are certified through the state's Construction Training and Qualification Program CTQP), American Concrete Institute (ACI), FDEP and FDOT with 2 to 35 years of experience. We currently employ more than 80 inspectors highly experienced in the field of construction materials testing and inspection services and full time laboratory technicians. CERTIFICATION NO. OF QUALIFIED INSPECTORS ACI Concrete Field Level I/II 65 /9 CTQP Concrete Field Level I/II 56/ 10 CTQP Earthwork Level I/II 73 /65 CTQP Asphalt Paving Level I/II 23 / 16 CTQP Asphalt Plant Level I/II 11 /5 CTQP Pile Driving Inspector 21 CTQP Drilled Shaft Inspector 15 CTQP Final Estimates Level I/II 13 /3 Maintenance of Traffic 8 Nuclear Gauge Safety Training 83 CTQP QC Manager 15 DEP Stormwater/Erosion Control 4 FDOT Augercast Pile Inspection 6 As an incumbent to the City's current Geotechnical Testing Services contract, Tierra understands the City's expectations and requirements. Furthermore within the past 2 years our Winter Garden office has maintained similar continuing services contracts for Geotechnical Testing services for Lake County, Orange County, Seminole County, Volusia County, Flagler County, City of Longwood, City of Deltona and City of Orlando. Each of these contracts are task driven and Tierra understands the need for a thorough and prompt response, especially when unexpected conditions arise. To best serve the needs of the City we have developed an organization and coordination structure that provides the City a dedicated project manager. This project manager, Mr. John Sansone, P.E., will be the City's single point of contact and has the authorization to mobilize resources and staff to fulfill each task assignment. Mr. Sansone will coordinate and communicate all activities with the City with support of the following organization structure dedicated to the City of Ocoee. Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 5 of 17 TIERRA t Z Firm Qualificationsflorid° TIERRA ORGANIZATIONAL CHART Ocoee CORPORATE SUPPORT I CONTRACT MANAGER QUALITY ASSURANCE John Sansone, P.E. Jeffrey Begovich, P.E. TIERRA'S SERVICES GEOTECHNICAL SERVICES CONSTRUCTION SERVICES Jeremy Sewell,P.E. John Sansone,P.E. Engineering Drilling Lab Field Robert Bearden Key Symonds,P.E. Kitt Peterson Rakesh Ramadhar Thomas Gonzalez David Barber,P.E. JeffBerg Carlos Lopez Gerald Hope Garrett Pelton,P.E. Joe Erickson Justin Emmert Blake Holton 11 Additional Support 11 Drill Rigs Andrew Chartrand Engineers 51 Additional Support Technicians ENVIRONMENTAL SERVICES FACILITIES CONSULTING Mike Bair,ASP David Sholar,CIT Field Field Chris Garth,LEP Justin Holly Eric Cicero,E.l. Sammy Awad John Andrews,Ed. 13 Additional Support Professionals 9 Additional Support Staff Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 6 of 17 TIERRA i6Pt t t c K,E' Firm Qualificationsflorid° The depth and experience of our firm can be measured by their staff of inspectors, their qualifications and their experience. Tierra is staffed with some of the most experienced, qualified inspectors in the state. The following table represents our inspector staff in Winter Garden, Florida. If needed this list can be supported with as many as 30 more inspectors from our Tampa office. 11111 s°"""' .....Y... .rH .7...R...: n r..«pee s o.r.o.R: ! •e. •e. ...?.P iiii..•-ft?.. liosly g 888j wwrw 8 s W w w.ww 4 a......- 14w...p 1 Y a!:ANIIIIIIIIIIIIIIIJ • ee z c - a 0 ..,,.,. Y.a al I w w...a a tyyi a wow C I. a I J .....w.Pv ' W I..., g 11111111111111111111111111111111111111111111 Ii rt w,.n.... it 111 p; i lit$ i i E El aa i#g gg# i :, I jiI 1'1 ,111 a: 1 i !-_ . Ali rlitta ili LLI s ovaifjj 3 Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 7 of 17 TIERRA Firm Qualificationsflorid° Resumes JEFFREY H.M.BEGOVICH, P.E. 110PRRASeniorEngineer Swilmaly of Capabilities Mr.Begovich has 30 years of experience as a principal engineer in Materials Engineering the Soils and Construction Materials Testing and Inspections field. Civil Engineering He is familiar with field testing and inspection of soils, concrete, Project Management structural steel and asphalt in accordance with ASTM, ACI, Engineering Management AASHTO,AWS,AISC and FDOT standards. For the past 20 years Specially Engineer-Asphalt Mr. Begovich was the Project Manager/Project Engineer Specially Engineer—Concrete/Mass Concrete responsible for all aspects of Quality Control and Quality Assurance Specialty Engineer—Protection of Existing Structures on some of the highest profile projects in Central Florida. These projects included major roadways and bridge structures, rail Years of Experience projects, stadiums, airports, arenas and various specialtyWithTierra:6 Year construction projects. He is a professional engineer and a certifiedWithOtherFirms:24 Years general contractor that understands the design and construction of Education r all types of structures from, concrete, masonry, structural steel, BS,Civil Engineering,Florida State University,1990 light weight and composite materials. In addition to his structures experience, Mr. Begovich has experience in pavement design, Professional Organizations/Registrations testing and inspection for both flexible and rigid pavements. In Florida Professional Engineer,No.51869 addition to his materials testing experience, Mr. Begovich also has Certified General Contractor,No.057089 extensive experience in forensic testing of concrete materials. These tests included,but were not limited to, chloride ion content testing, extracting cores, ground-penetrating radar of concrete slabs,petro graphic analysis and condition surveys. The following is a list of some recent significant protect experience: 1-4 Ultimate,Various Counties,Florida OIA South Terminal C Phase I Expansion,Orlando,Florida CR 448,Lake County,Florida Piccola Bridge,Lake County,Florida CR450 Paved Shoulder from Marion County Line to Lake Yale Road,Lake County,Florida South Lake Trail Phase III,Lake County,Florida Alfred Street One Way Pair,Lake County,Florida Boggy Creek Rd.,Osceola County,Florida Construct an 11'wide NB left turn lane on SR 19,City of Groveland,Florida Old Kings Road Extension,Flagler County,Florida Bunnell Elementary Trails,Flagler County,Florida Gateway Promenade Improvements from 9th Street South to 5th Street North,City of Flagler Beach,Florida In addition to these projects. Mr.Begovich was the contract manager on the following continuing services contracts: Lake County—On Call Geotechnical Engineering Services Volusia County—Construction Materials Testing Volusia County—Construction Engineering Inspection Seminole County—Construction Materials Testing Seminole County—Construction Engineering Inspection City of Deltona—Construction Engineering Inspection Orange County-Construction Materials Testing Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 8 of 17 TIES t J f'' Firm Qualifications INcrida JOHN SANSONE,P.E. RxASeniorEngineer1T Years of Experience Mr.Sansone is licensed Professional Engineer and serves as a With Tierra:7 years senior engineer for the construction materials testing service With other Firms:21 Years line Tierra's Winter Garden office. In this role, he is responsible for maintaining and improving quality of service by Education reviewing proposals and reports,as well as verifying that the BS,Civil Engineering,The Pennsylvania State University,1993 quality of service expectations of our clients are being met Mr. Sansone has gained 28 years of experience in construction Professional Organizations/Registrations materials testing and inspection. Fis experience includes the Florida Professional Engineer,No.53211 areas of soils, concrete, reinforcing steel, structural steel, Special Inspector,#7001897,Florida,2014 asphalt, and soil cement He also has extensive experience Qualified Stormwater Management Inspector(DEP),2008 evaluating shallow and deep foundation systems.As a senior Certified Prestressed Concrete Inspector(FDOT),Florida,1997 engineer,his additional responsibilities include managing daily Certified Structural Masonry Inspector,FC&PA,2005 operations, maintaining client relationships, developing new Advanced Stucco Techniques Seminar,FC&PA,2005 business,overseeing various projects through the construction Certified Concrete Engineer phase, and evaluating site conditions with respect to project Phase I Environmental Site Assessment specifications. Radiation Safety,Nuclear Gauge Operator PROJECT EXPERIENCE Representative Structural Project Experience Villages at Harmony Reedy Creek A3 Parking Garage Lake Nona USTA Tennis Center Lake Nona Town Center Office Building No.2 Infinity Park 6B Office Building Florida Advanced Manufacturing Research Center Hollywood Plaza 10-Story Parking Garage RCID C-1 Parking Garage Coca-Cola at Disney Springs Peabody Hotel and Parking Garage Orlando Regional Hospital C-Deck Parking Garage Marriott Vacation Club at Grande Lakes Grande Palisades at Lake Austin Disney's Fantasyland Expansion at Magic Kingdom Disney's Soarin' Disney's Expedition Everest Disney's Saratoga Springs Resort Clermont Commercial Property Florida Hospital Celebration Surgery Addition Target and Parking Garage at SODO Marriott's Grande Vista Marketplace Reunion Grande Hotel,Reunion,Florida Villas at Reunion Square,Reunion,Florida Sea World Water Park Extension,Orlando,Florida Mona Lisa at Celebration,Celebration,Florida Coronado Springs Exhibit Hall Disney's Dinorama AMC;20-Theater Expansion Project,Brandon,Florida Berth 12 Wharf;Port Manatee,Florida Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 9 of 17 TIERRA I ot o(-' -, Firm QualificationsHondo BJ's Wholesale Club;Manatee County,Florida Hilton Ballroom Addition;Lake Buena Vista,Florida Home Depot;Ocala,Florida Lowes;Ocala,Florida MacDill Air Force Base;GSC-34 Communication Building,Tampa,Florida Ritz-Carlton Hotel;Sarasota,Florida Tampa Bay Arena;Ice Palace,Tampa,Florida Ulttnar III Condominiums;Florida WFTS 28;Tampa Bay Television Station,Tampa,Florida Representative Pavement Evaluation and Consulting Project Experience Hernando County School Board; Brooksville, FL—Performed pavement evaluation at Moton Elementary, determined the cause of distress,and provided repair recommendations. King Engineering;New Port Richey,Florida—Determined the cause for pavement failures and provided recommendations for repair. Manatee County Government;Bradenton, Florida—Performed an assessment of the asphaltic concrete surface layer at River Club Blvd.,and provided repair recommendations. Representative Educational Project Experience Windermere Prep School Cypress Creek Elementary—Volusia County Schools Edgewater Elementary—Volusia County Schools Elementary School'M'—Osceola County School Board Carver Middle School,Lake County,Florida Seminole Community College—Heathrow Center,Florida Seminole Community College—Altamonte Springs,Florida Anchin Elementary/Library Conference Center;University of South Florida,Tampa,Florida Ballard Elementary School;Manatee County,Florida Bayonet Pointe Middle School;Pasco County,Florida Guffgate Elementary School;Sarasota,Florida Hernando High School;Brooksville,Florida Hillsborough High School;Hillsborough County,Florida Parking Facility;University of South Florida,Tampa,Florida.Ridgewood High School School District Transportation Center;Hernando County,Florida Representative DOT Services Project Experience Florida Department of Transportation;Pasco,Hernando Counties,Florida—Performed lab testing for all CEI projects within the above geographic region. Representative RoadwayfTransportation Project Experience US 27/SR 50 Interchange—Lake County SR 436 at Hunt Club Intersection Improvements—Seminole County Markham Woods Road—Seminole County Orange Avenue&Miller Street Roadway Improvements—Orlando Health Celebration East Village Buena Vista Drive Road Widening glh Street East;Bradenton,Florida 751h Street West;Bradenton,Florida Anderson Snow Road;Hernando County,Florida Barkey Road;Hernando County,Florida Calebrina Road Improvements;Hernando County,Florida Denton Avenue/Peace Boulevard;Pasco County,Florida Lakeview Drive Extension;Oldsmar,Florida Landmark Drive;Hernando County,Florida Lockwood Ridge Road Expansion;Manatee County,Florida ram John Sansone,P.E. Page3of3 Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 10 of 17 TIERRA 404' Firm Qualificationstlorioo Powell Road;Hernando County,Florida Royal Highlands Roadway Improvements;Hernando County,Florida Representative Landfill Project Experience Baseline Landfill;Ocala,Florida Citrus County Landfill;Citrus County,Florida Representative Water Management Project Experience Wekiva Park Drive Stormwater Improvements—Seminole County,Florida Bear Gully Drainage Improvements—Seminole County Lake John Stormwater Improvements—Mt.Dora Elder Road Improvements—Seminole County Iron Bridge Bardenpho Improvements,Orlando,Florida Reedy Creek Food Waste Compost Facility Brooksville Wastewater Treatment Facility;Brooksville,Florida Cliffs Septic Tank;Brooksville,Florida Cobb Road Interconnect;Hernando County,Florida 4111T.1...ERR.A. John Sansone,P.E. Page3of3 Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 1 1 of 17 TIERRA 4.0-10r Firm Qualificationsflor,do JEREMY A.SEWELL,P.E. TT D D A Senior Geotechnical Engineer 1 1 iti l Summary of Comdor and Bs Mr.Sewell has over 22 years of experience in geotechnical engineeringRoadway,Corridor and Bridge Studies for projects throughout Florida,Texas and Georgia. The projects that Mr.Geotechnical Engineering Sewell has been involved with have ranged from roadway and bridgeProjectManagement design and construction to embankment design and subsidenceDeepFoundationEvaluation Embankment Design investigation. Land Subsidence Investigations He has a wide variety of experience on FOOT highway and bridge Years of Experience studies,shallow foundation design,settlement evaluations,retaining wall With Tierra:9 Years design, sinkhole remedial repair, and ground subsidence evaluations With other Firms:13 Years throughout Florida. Mr.Sewell's experience also includes the design of deep foundation systems, cross-hole sonic logging (CSL) and Educationcompaction grouting requirements for deep subsoil improvement. BS,Civil Engineering,University of Central Florida, Mr. Sewell has been the Project Manager for numerous roadway soil1999 surveys and bridge foundation designs and construction projects. Professional Organizations/Registrations Florida Professional Engineer,No.62951—July 2005 American Society of Civil Engineers COUNTYICITY PROJECT EXPERIENCE Ronald Reagan Boulevard and North Street Turn Lane Addition—Seminole County SR 426/CR 419 from West of SR 434 to West of Oviedo Boulevard—Seminole County Chapman Road from SR 426 to SR 434—Seminole County Cross Seminole Trail from Layer Elementary School to Old Sanford Oviedo Road—Seminole County Wolf Branch Road and Round Lake Road Intersection Improvements—Lake County Estes Road and Orange Avenue Intersection Improvements—Lake County Orlando Urban Trail overpass over Colonial Drive(SR 50)and Railroad—City of Orlando Sligh Boulevard and Columbia Street Improvements—City of Orlando Reclaimed Water Main,Montgomery Avenue and White Road—City of Ocoee Plant Street Segment 2 Roadway Improvements—City of Winter Garden Avalon Road Improvements from Tilden Road to Marsh Road—Orange County Hooks Street Phase IV-B Retaining Wall Design—Lake County TRANSPORTATION PROJECT EXPERIENCE FDOT District V 1-4 Ultimate Widening of Interstate 4 from Kirkman Road to east of SR 434,Orange and Seminole Counties Central Florida Commuter Rail Transit—Phase 2 South,Osceola County 1-95 New Interchange at St Johns Heritage Parkway,Design/Build,Brevard County SR 40 widening from SR 15/US 17 to West of SR 11,Volusia County SR 35 Baseline Widening,Design/Build,from SR 464 to SR 40,Marion County US 301 PD&E Study from CR 470 E to SR 44,Sumter County SR 40 from East of NE 641h Court to East of CR 314,Marion County 1-75 Widening from North of Hernando County Line to South of CR 470,Design/Build,Sumter County CR 314 Sharpes Ferry Bridge Replacement over the Oklawaha River,Design/Build,Marion County SR 19 Bridge Replacement over Little Lake Harris,Lake County SR 500,from Lake Ella Road to Avenida Central,Lake County Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 12 of 17 TIERRA Firm Qualificationsflorid° SR 50 widening from East of Old Cheney Highway to Chuluota Road,Orange County SR 5 Improvements from South Street to Magnolia Avenue,Volusia County SR 46 Safety Improvements from SR 415 to East of Lake Proctor Court,Seminole County 1-95,from South of Lake Washington Road to South of Fiske Boulevard,Brevard County SR 50,from Good Homes Road to Pine Hills Road,Orange County SR 415,from Seminole County Line to Reed Ellis Road,Volusia County SR 15/00(US 17/92),from Shepard Road to Lake Mary Boulevard,Seminole County SR 11 Bridge Replacement over Little Haw Creek,Flagler County Florida's Turnpike Enterprise&Central Florida Expressway Authority SunTrax Test Facility,Polk County Minneola Interchange(TPK MP 279),Lake County Turnpike Mainline Widening from SR 50 to Minneola Interchange,Orange&Lake Counties SR 417 Widening from Econlockhatchee Trail to Orange/Seminole County Line,Orange and Seminole Counties Turnpike Mainline Widening from West Palm Beach Service Plaza to SR 710,Palm Beach County SR 408 Eastern Extension PD&E Study,Orange County SR 429 Bridge over CR 437,VECP,Orange County SR 429 Bridge over CR 437A Steepened Embankments,VECP,Orange County Turnpike Bridge Widening over SR 50,Orange County Suncoast Parkway 1 Design,Sections 1,2,3,4&6,Hillsborough,Pasco and Hernando Counties SR 570(Polk Parkway)and Pace Road Interchange Improvements,Polk County FDOT District I 1-75 at 1-275 and CR 683 Interchanges Lighting,Design/Build,Manatee County 1-75 Widening from Kings Highway to Toledo Blade Blvd.,Sarasota County 1-75 at SR 64 Interchange Improvements,Manatee County Central Polk Parkway—Segment 3,from Pollard Road to SR 60,Polk County Polk Parkway and Pace Road Interchange Improvements,Design/Build,Polk County 1-4 Design/Build,Section 3,Polk County 1-75 Bridge over Peace River PD&E Study,Charlotte County FDOT District VII CR 486,from SR 44 to Forest Ridge Boulevard,Citrus County 1-275,from US 41 to SR 56 Interchange,Hillsborough County 1-275/1-4 Operational and Safety Interchange Modifications,Hillsborough County US 301,from Sligh Avenue to South of Tampa Bypass Canal,Hillsborough County SR 60(Memorial Highway),from Courtney Campbell Causeway to South of Fish Creek,Hillsborough County FDOT District II CR 241 over Olustee Creek Bridge,Columbia County C Street Cedar Key Channel Bridge,Levy County CR 456(Gulf Blvd)over Daughtry Bayou Bridge,Levy County CR 456(Gulf Blvd)over Lewis Pass Bridge,Levy County SR 200(US 301)Improvements North of Crawford Road,Nassau County FDOT District Ill SR 8A(1-110),from SR 296 to SR 750,Escambia County FDOT District IV SR 5/US 1 Widening from 53rd Street to CR 510,Indian River County FDOT District VI Miami Arterial DMS Replacement Project,Miami-Dade County RA Jeremy Sewell,P.E. Page 2 of 2 Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 13 of 17 TIERRA t/ O t O E'E' Firm Qualifications Iflorid° KENNETH L.SYMONDS,JR., P.E.1 TEA Senior Geotechnical Engineer Summary of Capabilities Mr. Symonds has over 23 years of experience in geotechnicalRoadway,Corridor and Bridge Studies engineering for projects throughout all of Florida. He has a wideGeotechnicalEngineeringvarietyofexperienceinmunicipalandcommercialfacilities, FDOTProjectManagement highway and bridge studies, shallow foundation design, settlementDeepFoundations evaluations, retaining wall design, ground subsidence evaluations,Embanlmlent Design and sinkhole remediation. Mr. Symonds'experience also includesConstructionMonitoringthedesignofdeepfoundationsystems, cross-hole sonic loggingGroundSubsidenceInvestigations CSL),drilled shaft installation and compaction grouting requirements Years of Experience for deep subsoil improvement. With Tierra:9 Years With Other Firms:14 Years Mr. Symonds has been the Senior Project Engineer for numerous commercial and school facilities,airports,roadway soil surveys and Education bridge foundation designs and construction projects. BS,Env.Engineering,University of Central Florida,1998 Professional Organizations/Registrations Florida Professional Engineer,No.59518—January 2003 American Society of Civil Engineers Florida Engineering Society PROJECT EXPERIENCE Ground Subsidence Evaluations&Remediation Mr. Symonds has been involved with many residential and commercial sinkhole investigations throughout various regions of Florida. His responsloilities have varied from task oriented type work to senior project management. The types of services typically performed during theses types of studies generally include coordinating with the homeowner,site reconnaissance/assessment,development and implementation of a subsurface exploration plan,evaluation of the results of the field exploration and formulation of recommendations based on the results of the field study. Mr. Symonds has performed these services for clients including insurance companies, homeowners, municipalities and the Florida Department of Transportation. Mr. Symonds has experience with geotechnical explorations throughout the State of Florida and is experienced with the requirements for evaluating sinkhole claims both pre and post S8408. Water&Wastewater Utility Experience OUC Lake Nona Boulevard Water Main Extension,Orange County,Florida OUC Water Main Replacement,Hughey Ave,Division Ave,&Garland Ave,Orange County,Florida OUC Water Main Replacement,North Summerlin Ave to Cherokee Dr,Orange County,Florida OUC Water Main Replacement,Delaney Avenue,Orange County,Florida New Wet Well/Lift Station No.6,City of Oakland,Orange County,Florida New Wet Well/Lift Station,E.Hull Ave&S.Arrington Ave,City of Oakland,Orange County,Florida Water Main Extension,Burns Sci-Tech Charter School,Oak Hill,Volusia County,Florida South Bermuda Water Clarifier Replacement,Osceola County New Wet Well 1 Lift Station,Orange County Pump Station No.371,Pinellas County Coopers Point Water Improvements,Pinellas County School Facilities Gymnasium&Classroom Building Addition,Burns Sci-Tech Charter School,Oak Hill,Volusia County,Florida Orange County Public Schools,Future High School Facility,Site 50-H-SE-2,Innovation Way,Orange County,Florida New Welcome Center,Masters Academy,1500 Lukas Lane,Oviedo,Seminole County,Florida Classroom Additions,Cafeteria&Media Center,Walker Middle School,Orange County,Florida Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 14 of 17 TIERRA 4.04. Firm Qualificationsflorid° Classroom Additions,Auditorium,Gymnasium&Media Center,Osceola High School,Osceola County,Florida Recreation Fields&Track,Osceola School of the Arts,Osceola County,Florida Evans High School Renovation,Orange County,Florida Classroom Additions,Bus Loop&Additional Parking,Highlands Elementary School,Osceola County,Florida Jackson Heights Middle School Renovation,Seminole County,Florida Bus Facility Improvements,Horizons Middle School,Osceola County,Florida Gymnasium Building,Passport Charter School,Orange County,Florida Classroom Building Addition,Sweetwater Elementary School,Volusia County,Florida Gymnasium Building,Red Bug Elementary School,Seminole County,Florida Classroom Buildings,Hunters Creek Elementary School,Orange County,Florida Transportation Project Experience SR 417 Widening From Boggy Creek Road to Narcoossee Road,Orange County,Florida SR 417 Widening from Landstar Boulevard to Boggy Creek Road,Orange County,Florida SR 408 Eastern Extension PD&E Study,Orange County,Florida SR 417 Widening from Econlockhatchee Trail to Orange/Seminole County Line,Orange and Seminole Counties SR 408/SR 417 Interchange Improvements—Phase 2,Orange County,Florida Metro Parkway from Winkler Avenue to North of S.R.82 40th Street from Hillsborough Avenue to Fowler Avenue,Tampa,FL PD&E Study—S.R.559 from S.R.655 to U.S.Highway 92,Polk County,FL PD&E Study 1-75 Collier County from S.R.951 to South of Bonita Springs Road S.R.789(Ringling Bridge Replacement),Sarasota,FL Collier Parkway from Hale Road to Pines Parkway,Pasco County,FL I-4/John Young Parkway Interchange,Orlando,FL 1-95 Rest Areas,Stuart,Martin County,Florida I.T.S.Structures,SunGuide Intelligent Transportation System(ITS),Phase V,Duval County,FL I.T.S.Structures,Dynamic Message Sign Implementation for Amber Alert and Freeway Management,Tallahassee,Leon County,FL West Palm Beach Service Plaza Expansion Project,Palm Beach County,FL S.R.82 from Lee County Line to Collier County Line,Hendry County,FL S.R.82 from Homestead Road to Hendry County Line,Lee County,FL Central Polk Parkway(Segment 4),Polk County,FL S.R.574(MLK Jr.Blvd.)from Kingsway Rd.to McIntosh Rd.,Hillsborough County,FL S.R.739(Metro Parkway)from Daniels Parkway to Wrinkle Avenue,Lee County,FL I-75/S.R.39A from Westbound S.R.60 Entrance Ramp to South of CSX RR/C.R.574,Hillsborough County,FL S.R.530(U.S.Hwy 192)from Lake C/L to Secret Lake Drive,Orange County,Florida S.R.4001-4 Ultimate Project,Orange&Seminole Counties,Florida SunRail Phase 2 South,Orange&Osceola Counties,Florida New Interchange,Florida's Turnpike(S.R.91)at Sand Lake Road,Orange County,Florida PD&E Study Babcock Street from South of Micco Road to Malabar Road,Brevard County,Florida Kissimmee Park Road All Electronic Tolling(AET),Osceola County,Florida All Electronic Tolling(AET)Northern Coin Conversion,Osceola County,Florida Major Structure Project Experience: Eight-Story Timeshare Buildings,Orange Lake Country Club,Kissimmee,FL Florida Technical College,Orlando,FL Lake Nona South Greeneway CDD,Orlando,FL Turnpike Headquarters Facility,Turkey Lake Plaza,Orlando,FL Star Island Resort Timeshare Apartments,Orlando,FL Expansion to Naughton Power Plant,Kemmerer,Wyoming Sunnyside Ash Landfill,Carbon,Utah TERRA Kenneth L.Symonds,Jr.,P.E. Page 2 of 2 Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 15 of 17 TIERRA Firm Qualificationsflorid° MICHAEL J.BAIR,ASP Chief Scientist TIERRA Summary of Capabilities Mr. Bair has 24 years of experience in the laboratory, Environmental Consulting environmental consulting,due diligence,remediation, safety, Scope Development&Review and transportation fields. His progressive experience has FDOT Level I&II CSER,PD&E r, included all phases of a typical project from the laboratory to ASTM Phase I&II ESA the field work to all of the required office tasks. His Contamination Assessment&Reporting responsbilities have included serving as a Principal Consultant Source Removal&Remediation working with a staff of 20 professionals. His duties included Program/Project Management mentoring junior level staff in company policy, scientific UST/AST Compliance,Assessment,and Closure protocol, proposal/report preparation, client/regulatory Soil/Groundwater Sampling interactions, scoping projects, field work, business Dewatering&NPDES Permitting development, safety, ethics, and quality. Mr. Bair also Waste Characterization&Disposal Options reviewed work products for compliance with quality Contractor/Subcontractor Oversight&Performance Evaluation assurance/quality control objectives. His Program Regulatory Liaison—FDEP,FDOT,Water Mgmt.Districts Management experience includes the Florida Department of Quality Assurance/QualityControl Environmental Protection (Preapproval, PRP, LSSI), Florida Department of Transportation,several large private clients,and Years of Experience multiple municipal contracts. Currently,Mr.Bair is responsible With Tierra:5 Year for the day-to-day operations of the environmental department With Other Firms:19 Years at Tierra. This involves work assignments for Level I and II Education CSERs, PD&E studies, kick-off meetings, review of work BA Biology,University of Miami,1994 products, budgeting, resource allocation, scheduling of field work, report preparation,and QA/QC reviews. Mr. Bair has Professional Certifications/Licenses been providing environmental assessments and reporting for Associate Safety Professional#A15807(2011) FDOT project throughout the State of Florida for more than 10 Environmental Professional per 40 CFR 312.10 years. His knowledge of the Chapter 20 PD&E Manual and the 40-Hour HAZWOPER Certified(OSHA 1910.120) various District Contamination Impact Coordinators (DCIC) 8 Hour HAZWOPER Refresher Certified(OSHA 1910.120.3)requirements contribute to seamless reporting capabilities for ACOE Wetland Delineation&Management Training the Prime Engineering firms in the PD&E and design phases. AHERA Asbestos Inspector Initial Course Representative Phase I/Il Environmental Site Assessment Project Experience Pinellas County Schools,St.Petersburg, Florida—Project Manager for Phase II ESA at proposed high school expansion site which included former gas station and dry cleaner. Responsible for field work and report preparation. St.Petersburg/Clearwater International Airport Clearwater,Florida—Phase I ESA on undeveloped airport parcel.Responsible for ground reconnaissance,records review,and report preparation. Cash America Pawn, Tampa,Florida—Project Manager for Phase II ESA field activities and report preparation at commercial property. Tower Technology, Punta Gorda, Florida—Project Manager for assessment of subsurface conditions at suspected landfill site for development as a telecommunication tower. Ponderosa Restaurant,Brandon,Florida—Project Manager for Phase II ESA on former gas station to determine current environmental quality. Responsible for all aspects of project management including proposal preparation,client interaction and report preparation. Private Client(Developer), Pensacola,Florida—Principal Consultant for Phase II ESA at historical cemetery site. Responsible for technical review of proposal and report and development of recommendations based on client's objectives. Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 16 of 17 TIERRA t/4j 0< < P E' Firm Qualificationsflorid° Representative Petroleum Project Experience Residential Property, Davis Island, Florida—Project Manager for removal and closure of heating oil UST located partially beneath foundation of garage. Responsible for field activities,coordination with regulatory agencies and report preparation. Lambright Street Property, Tampa,Florida—Assessment of former gas station property for pending real estate transaction. Geoprobe was used to evaluate extent of soil and groundwater impacts in two days. Responsible for data evaluation and the development of conclusions/recommendations. Caxambas Park Marina,Marco Island,Florida—Project Manager for assessment of site with on-going fueling operations in accordance with Chapter 62-770,F.AC.,negotiated with local regulatory agency for reduction in sampling requirements,which resulted in a reduced budget for the client(Collier County). 78"Street Fleet Maintenance Facility, Tampa, Florida—Project Manager and Field Technician for the assessment of discharge discovered as a result of tank upgrades. Meetings with Hillsborough County Project Manager and regulatory agency streamlined investigation and expectations. Pat's Landing Marina,Ozona,Florida—Project Manager and Field Technician for the assessment of discharge discovered during the replacement of UST with AST. Used Geoprobe to delineate soil and groundwater impacts in one day,thereby reducing costs for client. University of South Florida, Tampa,Florida—Project Manager and Field Technician for assessment of discharge discovered during closure of UST. Reduced sampling recommendations to client resulted in earlier closure of project with regulatory agency. Representative FDEP Pre-ApprovalPRP Program Project Experience Division of Forestry,Brooksville,Hernando County Secret Garden,Crystal River,Citrus County FDOT/Former Amoco,Dunedin,Pinellas County Pinellas County Courthouse Annex,Clearwater,Pinellas County Pinellas County Sheriff's Office,Largo,Pinellas County CITGO Gasoline Station,Brooksville,Hernando County Palms of Sebring,Sebring,Highlands County Willard Mays Used Car Lot,Okeechobee,Okeechobee County Public Works Garage,Crystal River,Citrus County Smyth Lumber,Orlando,Orange County Fort Drum Taxidermy,Fort Drum,Okeechobee County Bob's Service Station,Kissimmee,Osceola County Harry's Auto Repair,Arcadia,DeSoto County Clearwater Auto Electric,Clearwater,Pinellas County Snapper Golf and Cart,Okeechobee,Okeechobee County McCall's Grocery,Zolfo Springs,Hardee County FDOT Right-of-Way,Dunedin,Pinellas County Representative FDOT Project Experience 1-75 Design/Build/Finance,Level I and II CSER US 98(CR 540A to SR 540),Level I and II CSER and Asbestos Survey 1-75(Bonita Beach Road to Corkscrew),Level II CSER 1-75(Corkscrew to Daniels Parkway),Levels I and II CSER SR 78(Burnt Store Road to Chiquita Boulevard),Level I and II CSER 1-75(River Road to SR 681),Levels I and II CSER and Asbestos Survey SR 559 Extension(CR 655 to Derby Avenue),Levels I and II CSER SR 80(Clark to Birchwood),Levels I and II CSER and Asbestos Survey SR 82(Ortiz to Lee),Levels I and II and Corridor Re-evaluation TIIERRA MichaelJ.Bair,ASP Chief Scientist Page 2 of 2 Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 17 of 17 TIERRA 40../or Firm's Office and Other Forms Ihortdo Tierra's Central Florida office will be the responsible office to serve the City of Ocoee. Our office is located just off the Turnpike in neighboring Orange County, within 1.9 miles (0.10 hours) from the Ocoee City Hall. This location provides Tierra with easy access to all major Central Florida Highways and Interstates. The office has the equipment and staff resources to fulfill the contract requirements. This office has been established under the procedures, systems and solutions developed over Tierra's past 29 years of experience. With the knowledge we've gained, coupled with our local experience, we feel we are poised to be an industry leader in Central Florida. Our office is located at 591 Susan B. Britt Court, Winter Garden, Florida 34787. IF-- 402 Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 1 of 1 TIERRA ocoee florid° RFQ CONFLICT OF INTEREST DISCLOSURE FORM The award of this contract is subject to the provisions of Chapter 112,Florida Statutes. All Proposers must disclose within their Proposal: the name of any City of Ocoee employee, Mayor or City Commissioner, other City Official, or City Consultants, who owns assets or capital stock, directly or indirectly, in the Proposer's firm or any of its branches,or would directly or indirectly benefit by the profits or emoluments of this proposal. (Indirect ownership or benefit applies to any members of his or her immediate family.) Proposer certifies that no member of the entity's ownership or management is presently applying for an employee position or actively seeking an elected position with the City. In the event that a conflict of interest is identified in the provision of services,Proposer agrees to immediately notify the City in writing. The purpose of this disclosure form is to give the City the information needed to identify potential conflicts of interest for the City Commission, Evaluation Committee members, and other key City employees and consultants involved in the award of this contract. According to Chapter 112, Florida Statutes, the term "conflict of interest" "means a situation in which regard for a private interest tends to lead to disregard of a public duty or interest",and refers to situations in which financial or other personal considerations may adversely affect, or have the appearance of adversely affecting, an employee's professional judgment in exercising any City duty or responsibility in administration,management,instruction,research,or other professional activities. Please check one of the following statements and attach additional documentation if necessary: X To the best of our knowledge,the undersigned firm has no potential conflict of interest for this Proposal. The undersigned firm,by attachment to this form,submits information which may be a potential conflict of interest for this Proposal. Acknowledged by: Tierra,Inc. Firm Name igiraT e Jeffrey Begovich,P.E. -Vice President Name and Title(Print or Type) 5/4/21 RFQ#21005 Continuing Contracts for Geotechnical Testing Services 18 SUMMARY OF LITIGATION: Provide a summary of any litigation,claim(s),bid or contract dispute(s)filed by or against the Bidder in the past five(5)years which is related to the services that the Bidder provides in the regular course of business. The summary shall state the nature of the litigation, claim,or contact dispute,a brief description of the case,the outcome or projected outcome, and the monetary amounts involved. If none,then please say so. None Attach additional sheets if necessary) ACKNOWLEDGEMENT OF ADDENDA: Bidder acknowledges receipt of the followin addenda: No. 1 Dated 4/27/2 No. Dated No. Dated Remainder of page left blank intentionally.) RFQ#21005 Continuing Contracts for Geotechnical Testing Services 20 Summary of Litigationaerida Tierra, Inc. is a financially stable firm and have the necessary resources, human and financial, to provide the services at the level required by the City of Ocoee. Tierra, Inc. is not currently involved in any lawsuits relative to the services or failing to perform services, nor have we been involved with any related lawsuits in the past 5 years. There are no projects or any work for which Tierra, Inc. or its team have failed to complete in the last 5 years. Tierra, Inc. Dunn & Bradstreet number is 794753707 Request for Qualifications Geotechnical Testing Services RFQ 21-005 Page 1 of 1 TIERRA COMPANY INFORMATION/SIGNATURE SHEET RFO#21-005 FAILURE TO COMPLY WITH THESE RFQ INSTRUCTIONS WILL RESULT IN DISQUALIFICATION OF YOUR QUALIFICATION PACKAGE. PLEASE SIGN BELOW ATTESTING THAT YOU HAVE READ AND UNDERSTAND ALL RFQ INSTRUCTIONS AND THAT YOU UNDERSTAND THAT THE SUCCESSFUL RESPONDENT WILL BE REQUIRED TO ENTER INTO A LEGALLY BINDING CONTRACT WITH THE CITY OF OCOEE. Tierra,Inc. 407-877-1354 COMPANY NAME TELEPHONE(INCLUDE AREA CODE) 407-654-7347 FAX (INCLUDE AREA CODE) lbegovich@tierreang.com E-MAIL ADDRESS IF REMITTANCE ADDRESS IS DIFFERENT ORI GNATURE(manual) FROM PURCHASE ORDER ADDRESS, PLEASE INDICATE BELOW: ey Begovich,P.E. -V.P. NAME/TITLE(PLEASE PRINT) 591 Susan B.Britt Court STREET ADDRESS Winter Garden,FL 34787 CITY STATE ZIP FEDERAL ID# 59-3154723 Individual X Corporation Partnership Other(Specify) Sworn to and subscribed before me by means of Ci physical presence or 0 online notarization this 4th day of April 20 21 Personally Known X or CyR Produced Identification o5pce9ER cam'•, iq Notary Public-State of Florida HH 005564 Type of Identification) County of Orange So.•:#sondes thud i°y ae i Py p0alic untie..• % Si ture otary Public 14Iljj jjN O\ Jaclyn Cyr Printed,typed or stamped Commissioned name of Notary Public RFQ#21005 Continuing Contracts for Geotechnical Testing Services 21 10 TIERINC-01 DSMITH2 i4`,.--RE CERTIFICATE OF LIABILITY INSURANCE DATE 8/9/2 D/YYYY) 8/9/2021 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Hub One Urban International Florida HONE Ext):( ) I FAX 669-0673AC,No, 727 797-0441 A/C,No):(727 4830 W.Kennedy Boulevard E-MAIL Certificates.FLA@Hubinternational.com Tampa,FL 33609 ADDRESS: INSURER(S)AFFORDING COVERAGE NAIC# INSURER A:Charter Oak Fire Insurance Company 25615 INSURED INSURER B:The Travelers Indemnity Company of America 25666 Tierra,Inc. INSURER C:Travelers Property Casualty Company of America 25674 7351 Temple Terrace Highway INSURER D:The Phoenix Insurance Company 25623 Tampa,FL 33637 INSURER E:Illinois Union Insurance Company 27960 INSURER F:Endurance American Specialty Insurance Company 41718 COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUER POLICY NUMBER POLICY EFF POLICY EXP LIMITSLTRINSDWVDMMIDD/YYYY) (MM/DD/YYYY) A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 CLAIMS-MADE X OCCUR 6601H805464 5/1/2021 5/1/2022 DAMAGETORENTED 300,000 PREMISES(Ea occurrence) $ X Standard Contractual MED EXP(Any one person) $ 5,000 PERSONAL 8 ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY X 78T LOC PRODUCTS-COMP/OP AGG $ 2,000,000 X OTHER:$5,000,000 Maximum Limit B COMBINED SINGLE LIMITAUTOMOBILELIABILITY Ea accident) 1,000,000 X ANY AUTO 8109M551030 5/1/2021 5/1/2022 BODILY INJURY(Per person) $ OWNED SCHEDULED AUTOSEE ONLY _ AUTOS BODILYBODILY INJURYp (Per accident) $ AUTOS ONLY AUOTO ONLY Per accdent)AMAGE $ PIP 10,000 C X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 5,000,000 EXCESS LIAB CLAIMS-MADE CUP1J383756 5/1/2021 5/1/2022 AGGREGATE 5,000,000 DED X RETENTION$ 10,000 Over GL,AL,EL $ D WORKERSNDEMPLOYERSCOMPENSATIONN Y/N X STATUTE OTH-ER ANY PROPRIETgOERR/PARTNER/EXECUTIVE UB4K202452 5/1/2021 5/1/2022 1,000,000 QFFICER/ME NH) EXCLUDED? N NIA E.L.EACH ACCIDENT $ 1,000+000E.L DISEASE-EA EMPLOYEE $ If yes,describe under 1,000,000DESCRIPTIONOFOPERATIONSbelowE.L.DISEASE-POLICY LIMIT, $ E Pollution/SIR 25,000 CPYG46634937005 5/1/2021 5/1/2022 $1 M per Occ/Agg--> 2,000,000 F Professional E&O DPL30001055702 5/1/2021 5/1/2022 SIR$25,000/ea&agg 5,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Project#5111-21-105 Continuing Consulting Agreement for Geotechnical Testing RFQ 21-005 CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Cityof Ocoee THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. 150 N.Lakeshore Drive Ocoee,FL 34761 AUTHORIZED REPRESENTATIVE ACORD 25(2016/03) 1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD CONTINUING CONSULTING AGREEMENT FOR GEOTECHNICAL TESTING SERVICES THIS AGREEMENT made and entered into this ' day of 5itnbm aa2,1 by and between the CITY OF OCOEE, FLORIDA, a Florida municipal corporation, hereinafter referred to as "CITY", and PROFESSIONAL SERVICE INDUSTRIES, INC., a Delaware corporation, hereinafter referred to as "CONSULTANT". WHEREAS, the CITY needs geotechnical testing services to be performed on a continuing and periodic basis as the need for such services may arise, per the CITY's RFQ #21- 005 Continuing Contracts for Geotechnical Testing Services, attached as Exhibit A; and WHEREAS, the CITY desires to employ the CONSULTANT in connection with the geotechnical testing services required, upon the terms and conditions hereinafter set forth, and the CONSULTANT is desirous of performing such services upon said terms and conditions, per CONSULTANT'S qualification package attached as Exhibit B; and WHEREAS, the CITY shall have the option to use the CONSULTANT's professional geotechnical testing services ("Services"), as further described below, for City projects hereinafter referred to as "Project" or"Projects"); and WHEREAS, the City has selected the CONSULTANT in accordance applicable law and the rules and ordinances of the City, and this Contract shall constitute a continuing contract to perform services on an as needed basis over a period of time; NOW, THEREFORE, in consideration of the mutual covenants and agreements hereinafter contained, it is agreed by and between the parties hereto as follows: SECTION I SCOPE OF SERVICES 1.CONSULTANT hereby agrees to perform for the CITY geotechnical testing services which may include services in all phases of a Project. The scope of work to be RFQ#21-005 Continuing Geotechnical Testing Services performed through task orders issued under the continuing contract may consist of, but will not necessarily be limited to: soils investigation for design purposes including season and high ground water levels, soil stability, drainage associated with hydrological groundwater modeling, supporting documentation for permitting, and construction administrative support (materials testing). Various geotechnical testing services for City projects; such projects include large and small scale water, sewer, and reclaimed utility projects, road construction and/or rebuild construction, extensions and/or stormwater related projects, and other geotechnical type projects. There may also be a periodic need to conduct Phase 1 environmental reviews and environmental lien searches related to the possible acquisition of real property by the City. A variety of testing and consultative tasks will be required in various combinations depending on the needs of each project, as requested by the CITY, through the issuance of a Services Authorization(Task Order) issued pursuant to this Agreement. 2.CONSULTANT shall perform such services in accordance with the terms and conditions of this Contract and with applicable regulations and requirements of all interested government agencies. It is expressly understood, however, that the CITY shall have no obligation to authorize CONSULTANT to perform any services under this Contract, and may, in its sole discretion, retain other consultants to perfoiiii any or all of the services authorized under this Contract. 3.CONSULTANT shall utilize sufficient qualified personnel acceptable to the CITY to perform all services under this contract and any Services Authorization issued hereunder. CONSULTANT shall promptly remove any person from perfoiiiiing services as the CITY shall request in writing (which request may be made by the CITY with or without cause), and promptly replace such person with a person who shall be approved in writing by the CITY. CONSULTANT agrees to include a similar provision in its agreements with any and all Subconsultants. 2 RFQ#21-005 Continuing Geotechnical Testing Services SECTION II TERM 1.Continuing Contract. This Agreement shall continue in full force for an initial period of three (3) years, beginning on August 17, 2021, with two (2) automatic one-year renewable extensions, for a total of five (5) years. Each one-year renewable term shall automatically be renewable for the next succeeding one-year term with the condition that the CITY'S obligation to pay under this Agreement for each year is contingent upon the CITY in its good faith judgment having sufficient funds to make an annual appropriation for the Services to be provided under this Agreement. The Agreement shall continue in full force and effect from the date first written above or until terminated in accordance with this Agreement. The CITY shall have the option of extending the term an additional one (1) year. The above time periods may be extended to complete Services being rendered under a Project that has already been identified in a Services Authorization issued prior to the expiration of the Agreement. 2.The CITY shall, from time to time at its sole discretion, authorize the CONSULTANT in writing to provide Services under this Agreement by issuing a Services Authorization. A Services Authorization shall, by mutual agreement of the parties, set forth, 1) the Scope of Services, (2)the time for performance, (3) method and amount of compensation, 4) the items to be provided to the CITY, and (5) the services, information and data that can be provided by the CITY to the CONSULTANT. 3.The CITY does not guarantee, warrant, or represent that any number of Projects or any particular type of Project will be assigned to the CONSULTANT under the terms of this Agreement. Furthermore, the purpose of this Agreement is not to authorize a specific Project, but to set forth certain duties, obligations, rights, and responsibilities that may be incorporated by reference into any Services Authorization that may be mutually agreed to by the parties. The 3 RFQ#21-005 Continuing Geotechnical Testing Services CITY shall have the sole discretion to select the Project(s), if any, that may be given to the CONSULTANT. 4.The CONSULTANT shall perform any and all Services in a timely, efficient and cost-effective manner and in a manner that comports with the standards of geotechnical testing services ordinarily exercised by reputable members of Consultant's profession. SECTION III COMPENSATION 1.Method of Payment: For services rendered by CONSULTANT under a Services Authorization, the CITY shall pay CONSULTANT by one of the following methods: (i) a lump sum amount; or (ii) per diem or hourly rates which shall be used as the basis, along with reimbursable expenses, for establishing a guaranteed maximum price ("GMP") which shall not be exceeded. For Services Authorizations issued with a GMP, the CITY shall reimburse CONSULTANT for the cost of permissible out-of-pocket expenses (hereinafter referred to as Reimbursable Expenses") incurred by CONSULTANT in the performance of services. A Reimbursable Expenses budget, if required, shall be included within each Services Authorization priced on a GMP basis. Reimbursable Expenses means the actual, necessary, and reasonable expenses incurred directly or indirectly in connection with the Project and may include expenses for reproduction, presentation materials and supplies, photography and video, travel outside of Orange and Seminole Counties, postage, overnight or express mail, long distance telephone, and facsimile costs. Travel expenses shall be submitted in accordance with Florida Statute § 112.061 2008). Travel and per diem charges shall not exceed the limits allowed under applicable Florida Statutes. 2.CONSULTANT shall submit to CITY the invoices of CONSULTANT, in detail sufficient for a proper preaudit and postaudit thereof. 4 RFQ#21-005 Continuing Geotechnical Testing Services 3.CITY shall pay CONSULTANT not later than thirty (30) calendar days of its receipt of CONSULTANT'S invoices, unless, within the 30-day period, the CITY, 1) notifies CONSULTANT of an objection to the PAYMENT amount, and 2) either provides CONSULTANT with a determination of the proper PAYMENT, or requests further information from CONSULTANT so that a proper PAYMENT can be calculated and agreed upon by the parties. 4.The CITY's objection to the PAYMENT amount shall be accompanied by the CITY's remittance of any undisputed portion of the PAYMENT. 5. Upon the termination of this AGREEMENT, CONSULTANT shall prepare a final and complete payment statement for all SERVICES and reimbursable expenses incurred since the posting of the last payment statement, and through the date of termination. CONSULTANT also agrees to maintain, and to cause each of its subcontractors to maintain complete and accurate books and records (BOOKS) in accordance with sound accounting principles and standards, in a form acceptable to the CITY, and relating to all SERVICES and related costs and expenditures to the CITY that have been contracted for and paid during the life of this AGREEMENT. The BOOKS shall identify the SERVICES rendered during each month of this AGREEMENT, the date that each PROJECT expense was incurred, and whether the expense was SERVICE or reimbursable-related. 6.The BOOKS may (but need not) be kept separate and apart from CONSULTANT's other books; but the CITY shall have the right, at any reasonable time and through any of its designated agents or representatives, to inspect and audit the BOOKS for the purpose of verifying the accuracy of any payment statement. 7.CONSULTANT shall retain the BOOKS, and make them available to the CITY as specified above, until the later of five (5) years after the date of termination of this AGREEMENT, or five (5) years from the date of the final payment statement (of the PROJECT) 5 RFQ#21-005 Continuing Geotechnical Testing Services prepared for the CITY, or such longer time if required by any federal, state, or other governmental law, regulation,policy, or contractual or grant requirement or provision. 8.When the CITY has reasonable grounds for belief(or information to believe) that, 1) CONSULTANT will be unable to perform the SERVICES; or 2) a pending or meritorious claim exists against CONSULTANT or the CITY arising out of CONSULTANT's negligence or CONSULTANT's breach of any provision of this AGREEMENT; then the CITY may withhold a payment otherwise due and payable to CONSULTANT. This provision is intended solely for the benefit of the CITY. 9.The acceptance by CONSULTANT, its successors, or assigns, of any final payment due upon the termination of this AGREEMENT, shall constitute a full and complete release of the CITY from any and all claims, demands, or causes of action whatsoever that CONSULTANT, its successors, or assigns may have against the CITY under the provisions of this AGREEMENT. SECTION IV INDEMNIFICATION AND INSURANCE 1.Indemnification. The CONSULTANT shall indemnify, defend and hold harmless the City, its representatives, employees, and elected and appointed officials, from liabilities, damages, losses and costs, including, but not limited to, reasonable attorney's fees, to the extent caused by the negligence, recklessness, or intentional wrongful misconduct of the Consultant and persons employed or utilized by the CONSULTANT in the perfoimance of any professional services rendered under this Agreement or any Services Authorization issued pursuant to this Agreement. For purposes of compliance with Florida law, CONSULTANT acknowledges that this provision shall be deemed a part of the project specifications or the bid documents. 2. Insurance. The CONSULTANT shall purchase, maintain, and keep in full force, effect, and good standing, such insurance that is further described below, and any other insurance 6 RFQ#21-005 Continuing Geotechnical Testing Services necessary to fully protect it from claims of the nature that are detailed below, that may arise out of, or result from, the CONSULTANT's operations, performance, or Services, or all of these things, or any of these things in combination (CONSULTANT's Operations), whether the CONSULTANT's Operations are by the CONSULTANT, any of its agents or Subconsultants, or anyone for whose act or acts it may be liable. The CONSULTANT'S insurance carrier shall be licensed to do business in the State of Florida and shall have an A.M. Best Rating of A or better. The insurance required by this Subsection shall be written for not less than the limits of liability specified below, or required by law, whichever is greater, and shall include contractual liability insurance as applicable to the CONSULTANT's obligation under this Agreement. 3.The CONSULTANT shall provide evidence of insurance in the form of a certificate of insurance issued on behalf of the City of Ocoee by companies acceptable to the City at the following minimum limits and coverage's with deductible amounts acceptable to the City. The CONSULTANT shall not commence any work in connection with this contract or any applicable Services Authorization until all of the following types of insurance have been obtained and such insurance has been approved by the City, nor shall the CONSULTANT allow any Sub-consultant to commence work on a subcontract until all similar insurance required of the sub-consultant has been so obtained and approved. Policies shall be issued only by companies authorized by subsisting certificates of authority issued to the companies by the Department of Insurance of Florida which maintain a rating deemed acceptable to the City. Policies for Workers' Compensation may be issued by companies authorized by applicable Florida law. The following insurance requirements are also applicable: a) Loss Deductible Clause: The City shall be exempt from, and in no way liable for, any sums of money which may represent a deductible in any insurance policy. The payment of such deductible shall be the sole responsibility of the General Consultant and/or subconsultant providing such insurance. b) Workers' Compensation Insurance: The Consultant shall obtain during the life of this Agreement, Worker's Compensation Insurance with Employer's Liability Limits of 7 RFQ#21-005 Continuing Geotechnical Testing Services 500,000/$500,000/$500,000 for all the Consultant's employees connected with the work of this project and, in the event any work is sublet, the Consultant shall require the subconsultant similarly to provide Workers' Compensation Insurance for all of the latter's employees unless such employees are covered by the protection afforded by the Consultant. Such insurance shall comply fully with the Florida Workers' Compensation Law. In case any class of employees engaged in hazardous work under this contract for the City is not protected under the Workers' Compensation statute, the Consultant shall provide, and cause each subconsultant to provide adequate insurance, satisfactory to the City, for the protection of the Consultant's employees not otherwise protected. Include Waiver of Subrogation in favor of the City of Ocoee c) Consultant's Public Liability and Property Damage Insurance: The Consultant shall obtain during the life of this Agreement COMMERCIAL AUTOMOBILE COVERAGE, this policy should name the City of Ocoee as an additional insured, and shall protect the Consultant and the City from claims for damage for personal injury, including accidental death, as well as claims for property damages which may arise from operations under this Agreement whether such operations be by the Consultant or by anyone directly or indirectly employed by the Consultant, and the amounts of such insurance shall be the minimum limits as follows: d) Automobile Bodily Injury Liability&Property Damage Liability 1,000,000 Combined single limit per occurrence (each person, each accident) All covered automobile will be covered via symbol 1 Liability coverage will include hired &non-owned automobile liability Include Waiver of Subrogation in favor of The City of Ocoee e) Comprehensive General Liability (Occurrence Form) - This policy should name the City of Ocoee as an additional insured and should indicate that the insurance of the Consultant is primary and non-contributory. 2,000,000 GENERAL AGGREGA 1'E 2,000,000 PRODUCTS-COMPLETED OPERATIONS AGGREGATE 1,000,000 PER OCCURRENCE 1,000,000 PERSONAL &ADVERTISING INJURY Include Waiver of Subrogation in favor of the City of Ocoee 1,000,000 Professional Liability (Design Errors & Omissions) f) Subconsultant's Comprehensive General Liability, Automobile Liability and Worker's Compensation Insurance: The Consultant shall require each subconsultant to procure and maintain during the life of this subcontract, insurance of the type specified above or insure the activities of these subconsultants in the Consultant's policy, as specified above. g) Owner's Protective Liability Insurance: (Not applicable for Design Services). As applicable for construction projects, providing coverage for the named insured's liability that arises out of operations performed for the named insured by independent consultants and are directly imposed because of the named insured's general supervision of the independent consultant. The Consultant shall procure and furnish 8 RFQ#21-005 Continuing Geotechnical Testing Services an Owner's Protective Liability Insurance Policy with the following limits: 1,000,000, and per occurrence, $2,000,000. Aggregate and naming the City of Ocoee as the Named Insured. h) Contractual Liability: If the project is not bonded, the consultant's insurance shall also include contractual liability coverage to insure the fulfillment of the contract. NOTE: PUBLIC LIABILITY INSURANCE AND AUTOMOBILE LIABILITY INSURANCE, THE CITY SHALL BE NAMED AS ADDITIONAL INSURED. 1,000,000 PER OCCURRENCE 2,000,000 AGGREGATE i) Commercial Umbrella: 1,000,000 PER OCCURRENCE 2,000,000 Aggregate Including Employer's Liability and Contractual Liability j) Certificates of Insurance: Certificate of Insurance.Form (see sample, above), naming the City of Ocoee as an additional insured will be furnished by the Consultant upon notice of award. These shall be completed by the authorized Resident Agent and returned to the Office of the Purchasing Technician. This certificate shall be dated and show: The name of the Insured consultant, the specific job by name and job number, the name of the insurer, the number of the policy, its effective date, and its termination date. Statement that the Insurer shall mail notice to the Owner at least thirty (30) days prior to any material changes in provisions or cancellation of the policy, except ten (10) days written notice of cancellation for non-payment of premium. 4.City As Additional Insured. The CITY shall be listed as an additional insured on all insurance coverage required by this Agreement, except Worker's Compensation and Professional Liability errors and omissions insurance. Furthermore, all other insurance policies pertaining to the Services to be performed under this Agreement shall memorialize that the CONSULTANT's, or the CONSULTANT's Subconsultant's, or all of these entities' (Primary Insureds) insurance, shall apply on a primary basis, and that any other insurance maintained by the CITY shall be in excess of and shall not contribute to or be commingled with the Primary Insured's insurance. 9 RFQ#21-005 Continuing Geotechnical Testing Services 5.CITY's Right to Inspect Policies. The CONSULTANT shall, in the event of a material claim, upon thirty (30) days' written request from the CITY, deliver copies to the CITY of any or all insurance policies that are required in this Agreement. SECTION V TERMINATION 1.Termination Without Cause. This Agreement may be terminated by either party by delivering a thirty (30) written notice to the other party. In the event of the termination of this Agreement, any liability of one party to the other arising out of any Services rendered, or any act or event occurring prior to the termination, shall not be deemed to be terminated or released. The CONSULTANT shall be paid for Services completed prior to receipt of the termination notice and for reasonable termination settlement costs relating to commitments which had become firm prior to the termination; however, payment to the CONSULTANT will exclude any and all anticipated supplemental costs, administrative expenses, overhead and profit on uncompleted Services. 2.Termination for Cause. In addition to any other termination provisions that may be provided in this Agreement, the CITY may terminate this Agreement, or any Services Authorization issued under this Agreement, in whole or in part, if the CONSULTANT (1) makes a willfully false payment statement; (2) substantially fails to perform any material obligation under this Agreement or Services Authorization and does not remedy the failure within five (5) calendar days after receipt by the CONSULTANT of written demand by the CITY, or (3) refuses to allow public access to all documents, papers, letters, or other material made or received by the contractor in conjunction with the contract, unless the records are exempt from § 24(a) of Article I of the State Constitution and Florida Statutes § 119.07(1). The CONSULTANT may terminate this Agreement or any Services Authorization issued tinder this Agreement, if the CITY fails to perform any material obligation under this Agreement, and does not remedy the failure within 10 RFQ#21-005 Continuing Geotechnical Testing Services fifteen (15) calendar days after receipt by the CITY of written demand from the CONSULTANT. 3. Upon teimination of this Agreement for Cause by the CITY, the City may pay the CONSULTANT for those Services actually rendered and contracted for under a Services Authorization, and those reasonable and provable expenses required by any Services Authorization and actually incurred by the CONSULTANT for Services prior to the effective date of termination. Such payments, however, shall be, 1) reduced by an amount equal to any additional costs and damages incurred by the CITY as a result of the default(s) of the CONSULTANT, including all incidental and consequential fees and expenses. 4.Delivery of Materials Upon Termination. In the event of termination of this Agreement (or any Services Authorization) by the CITY, prior to the CONSULTANT's satisfactory completion of all the Services described or alluded to herein, the CONSULTANT shall promptly furnish the CITY, at no additional cost or expense, with one (1) copy of the following items (Documents), any or all of which may have been produced prior to and including the date of termination: data, specifications, calculations, estimates, plans, drawings, construction documents, photographs, summaries, reports, memoranda; and any and all other documents, instruments, information, and materials (whether or not completed) generated or prepared by the CONSULTANT, or by any Subconsultant, in rendering the Services described herein, and not previously furnished to the CITY by the CONSULTANT pursuant to this Agreement, or any Services Authorization. The Documents shall be the sole property of the CITY, and the CITY shall be vested with all rights provided therein of whatever kind and however created. The CONSULTANT shall also require that all such Subconsultants agree in writing to be bound by the provisions of this Subsection. 11 RFQ#21-005 Continuing Geotechnical Testing Services SECTION VI SUSPENSION The CITY has the right to suspend the CONSULTANT's Services (in whole or in part) rendered under this Agreement or any Services Authorization. However, if the CITY suspends the CONSULTANT's Services pursuant to any Services Authorization, the CITY will add to the period of service for such Services Authorization a period not less than the duration of such suspension and compensate the CONSULTANT for the reasonable and provable additional costs it has incurred as a direct and proximate result of such suspension. SECTION VII NOTICES 1.All notices denominated as such by this Agreement, or the City Code, or Florida law, required to be given to the CONSULTANT hereunder shall be in writing, and shall be given by hand-delivery or United States mail, postage prepaid, addressed to: Professional Service Industries, Inc. 1748 33rd Street Orlando, FL 32839 I / JJ Attention: A r yo), WF)u 2. All notices required to be given to the CITY shall be in writing, and shall be given by hand-delivery or United States mail, postage prepaid, to the CITY at: CITY OF OCOEE 150 North Lakeshore Drive Ocoee, Florida 34761 Attention: Purchasing Technician A copy of the notice shall be provided to the City of Ocoee, City Engineer. 3. A party shall be permitted to substitute its contact person or change its address, for the purposes of this Subsection, by written notice to the other party given in accordance with the provisions of this Section. 12 RFQ#21-005 Continuing Geotechnical Testing Services SECTION VIII CONFLICTS OF INTEREST The CONSULTANT represents and warrants unto the CITY that no officer, employee, or agent of the CITY has any interest, either directly or indirectly, in the business of the CONSULTANT to be conducted hereunder. SECTION IX WAIVER OF CONSEQUENTIAL DAMAGES IN NO EVENT SHALL THE CITY BE LIABLE TO CONSULTANT OR TO ANY THIRD PARTY FOR ANY PERSONAL INJURY, DEATH OR PROPERTY DAMAGE; NOR SHALL THE CITY BE LIABLE FOR ANY INDIRECT, INCIDENTAL, SPECIAL OR CONSEQUENTIAL DAMAGES, INCLUDING LOSS OF PROFITS, LOSS OF REVENUE, OR LOSS OF USE, OR COST OF COVER INCURRED BY CONSULTANT OR ANY THIRD PARTY ARISING OUT OF THIS AGREEMENT AND/OR CONCERNING THE PERFORMANCE OF SERVICES BY THE CONSULTANT OR BY THE CITY UNDER THIS AGREEMENT OR UNDER A SERVICES AUTHORIZATION ISSUED UNDER THIS AGREEMENT. SECTION X MATERIALS AND DATA 1. All data, field notes, inspector's reports,job files, test reports, contract plans and specifications used to record as-built (or other) conditions, copies of shop drawings, construction photographs, cost control and scheduling data, computer printouts, contractor's submittals, summaries, memoranda work papers and any and all other documents, instruments, information, and materials ("WRITTEN WORK") prepared or accumulated by CONSULTANT for the SERVICES rendered hereunder shall be the sole property of the CITY. The CITY may reuse the WRITTEN WORK at no additional cost, and the CITY shall be vested with all rights of 13 RFQ#21-005 Continuing Geotechnical Testing Services whatever kind and however created that may be in existence thereto; provided, however, that CONSULTANT shall not be liable to the CITY for the CITY's additional use of any WRITTEN WORK for a different project except where CONSULTANT is engaged or retained by the CITY for the different project and the CONSULTANT utilizes the WRITTEN WORK. 2.The CITY acknowledges that the WRITTEN WORK is not intended for use in connection with any project or purpose other than the PROJECT, and the purpose for which the WRITTEN WORK was therefore prepared. Any use by the CITY of the WRITTEN WORK in connection with a project or purpose other than the PROJECT, without the re-engagement or retention of CONSULTANT, shall be at the CITY's sole risk, and CONSULTANT shall have no responsibility or liability related thereto. 3. In the event of termination of this AGREEMENT, CONSULTANT shall promptly furnish the CITY, at no additional cost or expense, one (1) copy of the following items DOCUMENTS"): data, field notes, specifications, calculations, estimates, plans, drawings, construction documents, photographs, summaries, test reports, memoranda; and any and all other documents, instruments, information, and materials (whether or not completed) prepared or accumulated by CONSULTANT, or by any Subconsultant, in rendering the SERVICES described herein, and not previously furnished to the CITY by CONSULTANT pursuant to this AGREEMENT. The DOCUMENTS shall be the sole property of the CITY, and the CITY shall be vested with all rights provided therein of whatever kind and however created. CONSULTANT shall also require that all such Subcontractors and Subconsultants agree in writing to be bound by the provisions of this Paragraph. SECTION XI MISCELLANEOUS PROVISIONS 1. Non-Exclusive Contract. This Agreement is non-exclusive, and may be terminated at the CITY's convenience with the proper notice having been given to the 14 RFQ#21-005 Continuing Geotechnical Testing Services CONSULTANT as provided in this Agreement. The rights granted herein to the CONSULTANT are non-exclusive, and the CITY shall have the right, at any time, to enter into similar agreements with other geotechnical engineers, engineers, architects, landscape architects, planners, consultants, contractors, subconsultants, to perform such geotechnical testing services as the CITY may desire. 2. Discrimination. The CONSULTANT, for itself, its delegates, successors-in-interest, and its assigns, and as a part of the consideration hereof, does hereby covenant and agree that, 1) in the furnishing of Services to the CITY hereunder, no person shall be excluded from participation in, denied the benefits of, or otherwise subjected to discrimination in regard to this Agreement on the grounds of such person's race, color, creed, national origin, disability, marital status, religion or sex; and 2) the CONSULTANT shall comply with all existing requirements concerning discrimination imposed by any and all applicable local, state, and federal rules, regulations, or guidelines, and as such rules, regulations, or guidelines may be from time to time amended. In the event of a breach of any of the nondiscrimination covenants described in this Subsection, the CITY shall have the right to terminate this Agreement, with cause, as described above. 3.Compliance with Law. The CONSULTANT and its employees shall promptly observe, comply with, and execute the provision of any and all present and future federal, state, and local laws, rules, regulations, requirements, ordinances, and orders which may pertain or apply to the Services that may be rendered hereto. The CONSULTANT shall also require, by contract, that all Subconsultants shall comply with the provisions of this Subsection. By entering into this contract, the awarded bidder is obligated to comply with the provisions of Section 448.095, Fla. Statutes, "Employment Eligibility." This includes, but is not limited to utilization of the E-Verify System to verify the work authorization status of all newly hired employees, and requiring all subcontractors to provide an affidavit attesting that the subcontractor does not 15 RFQ#21-005 Continuing Geotechnical Testing Services employ, contract with, or subcontract with, an alien unauthorized to work in the USA. Failure to comply will lead to termination of this contract, or if a subcontractor knowingly violates the statute, the subcontractor must be terminated immediately. 4. Licenses. The CONSULTANT shall, during the life of this Agreement, procure and keep in full force, effect, and good standing all necessary licenses, registrations, certificates, permits, and other authorizations as are required by local, state, or federal law, in order for the CONSULTANT to render its Services required under this Agreement. The CONSULTANT shall also require all Subconsultants to comply by contract with the provisions of this Subsection. 5.Compliance With New Regulations. To the extent applicable, CONSULTANT agrees that if local, state, or federal agencies modify their grant procedures or requirements for the CITY or the CONSULTANT to qualify for local, state, or federal funding the CITY may use to pay for the Services to the rendered by the CONSULTANT, then the CONSULTANT shall consent to and make such modifications or amendments in a timely manner. If the CONSULTANT is unable to comply with such applicable local, state, or federal laws and regulations, then the CITY shall have the right, by written notice to the CONSULTANT, to terminate this Agreement. 6. License Fee and Royalties. The CONSULTANT hereby grants a non-exclusive and fully paid license to the CITY to utilize all WRITTEN WORK or documents produced or prepared by CONSULTANT to perform the services required under this Agreement. 7.Consultant Not Agent of City. The CONSULTANT is not authorized to act as the CITY's agent hereunder and shall have no authority, expressed or implied, to act for or bind the CITY hereunder, either in CONSULTANT's relations with Subconsultants, or in any other manner whatsoever except as otherwise stated in a Services Authorization. 8.Subconsultants. The CONSULTANT shall have the right, conditioned upon the CITY's prior consent (which shall not be unreasonably withheld), to employ other firms, 16 RFQ#21-005 Continuing Geotechnical Testing Services consultants, Contractors, subconsultants, and so forth (Subconsultants); provided, however, that the CONSULTANT shall, 1) advise the CITY as to what particular Services the Subconsultants shall perform; and 2) advise the CITY as to what percentage of the total project services each Subconsultant shall be employed to do. The CONSULTANT shall be solely responsible for the performance of all of its Subconsultants, including but not limited to their maintenance of schedules, correlation of services, or both of these things, and the resolution of all differences between them. The CONSULTANT shall promptly terminate the use and services of any employee or Subconsultant upon written request from the CITY (which may be made by the CITY in its sole discretion). By accepting a Subconsultant, the CITY shall not be deemed to warrant or guarantee the reliability or effectiveness of that entity's Services. 9.Work Outside Scope and Time of Payment. The CITY shall have no obligation to reimburse the CONSULTANT for services rendered which may be in addition to outside of the Scope of any particular Services Authorization, unless and until the CITY has given written approval of such reimbursement. 10. Subconsultant Contracts. The CONSULTANT shall provide a copy of all relevant provisions of this Agreement to all Subconsultants hired by it, or for which it may have management responsibilities as described in a Services Authorization and shall inform all Subconsultants that all Services performed hereunder shall strictly comply with the Agreement terms and provisions. The CONSULTANT shall also furnish the CITY, upon demand, with a copy of all CONSULTANT-Subconsultant contracts. 11. Assignment and Delegation. The CITY and the CONSULTANT bind themselves and their partners, successors, executors, administrators, and assigns, to the other party of this Agreement in respect to all duties, rights, responsibilities, obligations, provisions, conditions, and covenants of this Agreement; except that the CONSULTANT shall not assign, transfer, or delegate its rights or duties, or both of these things, in this Agreement without the prior written 17 RFQ#21-005 Continuing Geotechnical Testing Services consent of the CITY. The CITY has the absolute right to withhold such consent at its convenience, and, furthermore, if the CONSULTANT attempts to assign, transfer, or delegate its rights or duties in violation of these provisions without the CITY's consent, then the CITY may terminate this Agreement. The CITY shall have the right to assign its rights (or any part of them) or to delegate its duties and obligations (or any part of them) to another entity that shall be bound by all applicable terms and conditions as provided in this Agreement. 12. Audits - Periodic Auditing of Consultant's Books. The CITY shall have the right, at any reasonable time and through any of its designated agents or representatives, to inspect and audit the Books of CONSULTANT for the purpose of verifying the accuracy of any payment, charge or invoice. In addition to the above and upon request of the CITY, the CONSULTANT shall prepare an audit (for the most recent fiscal year) for the CITY, which shall include the CONSULTANT's paid salary, fringe benefits, general and administrative overhead costs, profit and the total amount of money paid by the CITY to the CONSULTANT. The Fiscal Report shall be certified as true and correct by, and shall bear the signature of, the CONSULTANT's chief financial officer or its certified public accountant. 13. Overcharge. If it is established by the audit, or by any other means, that the CONSULTANT has over-billed or overstated its costs, fees, or reimbursable expenses Overcharge) to the City, then the amount of any Overcharge shall be refunded by the CONSULTANT, together with interest at the rate of one percent (1%) per month and the CITY's reasonable and provable costs (including the auditing expenses) in discovering the Overcharge and effecting its repayment. 14. Truth in Negotiations. The CONSULTANT shall execute the Truth-in- Negotiation Certificate in the faun attached hereto and made a part hereof. It is agreed by the CONSULTANT that any amounts charged under this Agreement or any Services Authorization issues under this Agreement, shall be adjusted to exclude any sums [plus interest at twelve 18 RFQ#21-005 Continuing Geotechnical Testing Services percent (12%)per annum simple interest on the sums, from the date of payment by the CITY] by which the CITY determines that it was overcharged. 15. Prohibition Against Contingent Fees. The CONSULTANT warrants and represents that it has not employed or retained any company or person, other than a bona fide employee working solely for the CONSULTANT to solicit or secure this agreement and that CONSULTANT has not paid or agreed to pay any person, company, corporation, individual, or firm, other than a bona fide employee working solely for the CONSULTANT any fee, commission, percentage, gift, or other consideration contingent upon or resulting from the award or making of this agreement. Any breach of the warranty or representation of this paragraph shall be grounds for termination. 16. Entire Agreement. This Agreement, including the Exhibits hereto, and any Services Authorization issued under this Agreement, shall constitute the entire Agreement between the parties, and shall supersede and replace all prior agreements or understandings, written or oral, relating to the matters set forth therein. 17. Amendment. This Agreement may be amended or modified only by a Services Authorization, or an Amendment, and as duly authorized and executed by the parties. 18. Validity. The validity, interpretation, construction, and effect of this Agreement shall be in accordance with and governed by the laws of the State of Florida. In the event any provision hereof is determined to be unenforceable or invalid, such unenforceability or invalidity shall not affect the remaining provisions of this Agreement, which shall remain in full force and effect. 19. Headings. The headings of the Sections or Subsections of this Agreement are for the purpose of convenience only, and shall not be deemed to expand, limit, or modify the provisions contained in such Sections or Subsections. 19 RFQ#21-005 Continuing Geotechnical Testing Services 20. Timeliness. The CITY and the CONSULTANT acknowledge and understand that time is of the essence in this Agreement, and that the Services shall be performed in expeditious and economical manner. 21. Public Entity Crime. Any Person or affiliate, as defined in 287.133 of the Florida Statutes, shall not be allowed to contract with the CITY, nor be allowed to enter into a subcontract for work on this AGREEMENT, if such a person or affiliate has been convicted of a public entity crime within three (3) years of the date this AGREEMENT was advertised for proposals, or if such person or affiliate was listed on the State's convicted vendor list within three 3) years of the date this AGREEMENT was advertised, whichever time period is greater. A public entity crime means a violation of any state or federal law with respect to and directly related to the transaction of business with any public entity or agency (federal, state or local), involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, forgery, falsification of records, receiving stolen property or material misrepresentation. Any AGREEMENT with the CITY obtained in violation of this Section shall be subject to termination for cause. A Subconsultant who obtains a subcontract in violation of this Section shall be removed from the Project and promptly replaced by a Subconsultant acceptable to the City. 22. Force Majeure. The parties acknowledge that adverse weather conditions, acts of God, terrorism, war or other unforeseen circumstances of a nature that are outside the control of the parties may execute performance under this Agreement; or may necessitate modifications to a Services Authorization. If such conditions and circumstances do in fact occur, then the CITY and CONSULTANT shall mutually agree, in writing, to the modifications to be made to any Services Authorization. 23. Remedies and Costs. All remedies provided in this Agreement shall be deemed cumulative and additional, and not in lieu or exclusive of each other or of any other remedy available to either party, at law or in equity. 20 RFQ#21-005 Continuing Geotechnical Testing Services 24. Dispute Resolution and Exclusive Venue. As a condition precedent to the filing of any suit or other legal proceeding, the parties shall endeavor to resolve claims, disputes or other matters in question by mediation. Mediation shall be initiated by any party by serving a written request for same on the other party. The parties shall, by mutual agreement, select a mediator within fifteen (15) days of the date of the request for mediation. If the parties cannot agree on the selection of a mediator, then the CITY shall select the mediator who, if selected solely by the CITY, shall be a mediator certified by the Supreme Court of Florida. No suit or other legal proceeding shall be filed until the mediator declares an impasse, which declaration, in any event, shall be issued by the mediator not later than sixty (60) days after the initial mediation conference. The sole and exclusive venue for any mediation shall be in Orange County, Florida. Any legal proceeding of any nature brought by either party against the other to enforce any right or obligation under this Agreement or any Services Authorization issued under this Agreement, or arising out of any matter pertaining to this Agreement or the work to be performed hereunder, shall be submitted for trial, without a jury,before the Circuit Court of the Ninth Judicial Circuit, in and for Orange County, Florida. The parties consent and submit to the jurisdiction of such court and agree to accept service of process outside the State of Florida in any matter to be submitted to any such court pursuant hereto. The CITY and CONSULTANT expressly waive all rights to trial by jury regarding any legal proceeding of any nature brought by either party against the other to enforce any right or obligation under this Agreement, or any Services Authorization issued under this Agreement, or arising out of any matter pertaining to this contract or the work to be performed hereunder. As noted herein, the sole and exclusive venue for any litigation or other legal proceeding between the parties shall be the Circuit Court of the Ninth Judicial Circuit in and for Orange County, Florida. 21 RFQ#21-005 Continuing Geotechnical Testing Services 25. Chapter 558, Florida Statutes. The parties agree that the provisions of Chapter 558, Florida Statutes are not applicable to this Agreement of any Services Authorization issued hereunder. 26. PUBLIC RECORDS COMPLIANCE. The City of Ocoee (City) is a public agency subject to Chapter 119, Florida Statutes. The Contractor agrees to comply with Florida's Public Records Law. Specifically,the Contractor shall: 1.Keep and maintain public records required by the City to perform the service. 2. Upon request from the City's custodian of public records, provide the City with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in chapter 119, Florida Statutes, or as otherwise provided by law. 3.Ensure that public records that are exempt or confidential and exempt from the public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the Contractor does not transfer the records to the City. 4. Upon completion of the contract, Contractor agrees to transfer at no cost to the City all public records in possession of the Contractor or keep and maintain public records required by the City to perform the service. If the Contractor transfers all public record to the City upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the City, upon request from the City's custodian of public records, in a format that is compatible with the information technology systems of the City. 22 RFQ#21-005 Continuing Geotechnical Testing Services 5. A Contractor who fails to provide the public records to City within a reasonable time may be subject to penalties under section 119.10, Florida Statutes. IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT 407-905-3100, EXTENSION 1022, CCDL@ci.ocoee.fl.us, WITH AN OFFICE LOCATED AT 150 NORTH LAKESHORE DRIVE, OCOEE, FLORIDA 34761. Signature Page Follows) 23 RFQ#21-005 Continuing Geotechnical Testing Services IN WITNESS WHEREOF,this Agreement has been fully executed on behalf of the parties hereto and by its duly authorized representatives, as of the date first written above. ATTEST: ACCEPTED: PROFESSIONAL SERVICE f INDUSTRIES, INC. N Leknriis By: i,, „ I Name: Ao:roin kAki Title:a 11 ,e Ao..ver SEAL) ATTEST: APPROVED: LLCF C By: F C EE,F ORIDA 714S Name: Melanie Sibbitt Name: Rusty: on Title: City Clerk Title: Mayor SEAL) FOR USE AND RELIANCE ONLY BY APPROVED BY- THE OCOEE CITY THE CITY OF OCOEE, FLORIDA COMMISSION AT_A MEETING HELD APPROVED AS TO FORM AND ON July 20, 2021 LEGALITY this-71)4" day of 5,-71: 20 UNDER AGENDA ITEM NO. 8. SHUFFIELD, LOWMAN & WILSON, P.A. BY: Scott A oo o ity Attorney 24 RFQ#21-005 Continuing Geotechnical Testing Services TRUTH-IN-NEGOTIATION CERTIFICATE The CONSULTANT hereby certifies that all wage rates, and any and all other unit costs supporting the compensation to be paid to the CONSULTANT pursuant to a Services Authorization for the Services as set forth therein, will be accurate, complete, and current at the date of the Services Authorization's execution. WITNESS: CONSULTANT: PROFESSIONAL SERVICE INDUSTRIES, INC. BY: 1(/ f/ BY: Oa—, Print N e: pep j fV .(fit r i i S Print Name: A;v aw 14CJi; Title: 131A5ine brm MP'r Title: Per aj ,Fpi} Gnc Er STATE OF FLORIDA COUNTY OF 0 rq r J Q } PERSONALLY APPEARED before me, the undersigned authority, ACC ro n WQ.—)1S , well known to me or [ ] who has produced his/her as identification, and known by me to be the h P p q r}t,TQ riA Ball C13 er of the corporation named above, and acknowledged before me that he/she executed the foregoing instrument on behalf of said corporation as its true act and deed, and that he/she was duly authorized to do so. WITNESS my hand and official seal th•is I Thday of Ao3vS a-, 20 a NOTARY PUBLIC Print Name: J-15 cL R . Lamp My Commission Expires: i. SAR Usa A.LeMontagne oQ n Notary Public State of Florida 441,. , Comm*HH048402 Expires 9/29/2024 25 RFQ#21-005 Continuing Geotechnical Testing Services CITY OF OCOEE REQUEST FOR QiJALIFICA'I'IONS RFQ) #21-005 CONTINUING CONTRACTS FOR GEOTFCHNICAI. TESTING SERVICES ocoee florida F TABLE OF CONTENTS FOR RFQ#21-005 CONTINUING CONTRACTS FOR GEOTECHNICAL TESTING SERVICES RFQ DOCUMENTS Section Page Legal Advertisement 3 RFQ Instructions & General Terms &Conditions 4 - 17 Conflict of Interest Disclosure Form 18 Summary of Litigation 19 Receipt of any addenda issued 19 Company Information and Signature Sheet 20 End Table of Contents RFQ#21005 Continuing Contracts for Geotechnical Testing Services 2 Request for Qualifications,Legal Advertisement The City of Ocoee, Florida, (the "City") is soliciting sealed statements of qualifications for RFQ 21-005 CONTINUING CONTRACTS FOR GEOTECHNICAL TESTING SERVICES. Qualification packages will only be accepted electronically through Negometrix4, a free e- Procurement platform, until 2:00 pm, local time, on May 4, 2021. Qualification packages received after that time or through any other method will not be accepted under any circumstances. Qualification packages that have been timely received will be publicly opened virtually online and the names of the responding firms read aloud at that time; instructions will be provided at https://www.ocoee.org/959/Public-Bid-Meetings. All questions regarding this RFQ should be in writing to Vanessa Anthony, Purchasing Technician, Finance Department/Purchasing vanthony@ci.ocoee.fl.us. No Pre-submittal conference is scheduled at this time. Prospective respondents may secure a copy of the documents required for submitting statements of qualifications at no charge through Negometrix4 by accessing the City's published solicitation page at https://app.negometrix.com/buyer/748. Please visit https://vvww.ocoee.org/323/Purchasing for more information. Prospective respondents will be provided with all information regarding this RFQ, addenda, and changes to the project requirements through the Negometrix platform. Melanie Sibbitt, City Clerk, Orlando Sentinel April 4, 2021. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 3 CITY OF OCOEE REQUEST FOR QUALIFICATIONS "RFQ"#21-005 CONTINUING CONTRACTS FOR GEOTECHNICAL TESTING SERVICES A. INTRODUCTION AND GENERAL INSTRUCTIONS 1. The City of Ocoee, Florida, in conformance with the Consultants' Competitive Negotiations Act (CCNA), Florida Statutes Section 287.055, et seq., and the policies and procedures of the City of Ocoee (City), is soliciting statements of qualification from geotechnical testing firms that are interested in providing such services for City projects. Such projects include large- and small-scale water, sewer, and reclaimed utility projects, road construction and/or rebuild construction, extensions and/or stormwater related projects, and other geotechnical type projects. There may also be a periodic need to conduct Phase 1 environmental reviews and environmental lien searches related to the possible acquisition of real property by the City. A variety of testing and consultative tasks will be required in various combinations depending on the needs of each project. Responding firms (Respondent, Firms, Bidder, Proposer) must be experienced in providing geotechnical testing services for projects of a scope and nature comparable to those described.Use of qualified subconsultants for specialty work is acceptable.To be considered, the firm shall be qualified by a licensed professional in accordance with Florida State law and be familiar with all applicable State of Florida, St. Johns River Water Management District, Orange County, and City land development codes, regulations, and laws, and with City and Orange County construction standards. In accordance with the CCNA,the work contemplated under these continuing contracts will be limited to routine tasks related to construction projects expected to cost no more than $4 million, or for studies not costing more than $500,000. Geotechnical Testing services related to any project that does not fall within these categories will be separately solicited in conformance with the CCNA. 2. The City intends to award continuing contracts to at least three (3) Respondents, if possible, deemed to be the most highly qualified to perform the required services. In determining whether a firm or individual is qualified, the City shall consider criteria set forth in the RFQ. The firm selected by the City will provide professional services to the City on an as-needed basis, based upon task orders to be issued by the City under the continuing contract. The continuing contract shall have an initial three (3) year period plus two automatic one-year renewable extensions, and one (1) year optional renewal at the City's discretion. 3. Prospective respondents may secure a free copy of the documents required for submitting a response through Negometrix's Negometrix4 platform by accessing the City's published solicitation page at https://app.negometrix.com/buyer/748. Please visit https://www.ocoee.org/323/Purchasing for more information. Prospective respondents will be provided with all information regarding this RFQ, addenda, and changes to the project requirements through the Negometrix4 platform. Partial sets of the documents required for submitting a statement of qualifications will not be issued. By using Negometrix, prospective respondents will be provided with all information RFQ#21005 Continuing Contracts for Geotechnical Testing Services 4 regarding this RFQ,all addendums and changes to the project requirements;there is no charge to use the Negometrix e-procurement platform. 4. Each qualification package should consist minimally of a cover letter, statement of qualifications, conflict of interest disclosure form and company information form attached at the end of these instructions). Please also include a copy of all applicable licenses held by firms or key subconsultants proposing to perform the work. Statements of qualifications should be limited to a total of forty (40) 8.5"x 11" pages (including any resumes and maximum 2-page cover letter but excluding front and back covers, dividers, table of contents, and company information form), single-sided, portrait orientation, 12-point font. Additional submission instructions are supplied below in Section D. Any qualifications package failing to conform to these specifications may be subject to rejection. The person signing the signature sheet on behalf of the respondent must have the legal authority to bind the respondent to the submitted qualification package and shall be understood to do so. All expenses for providing qualification packages to the City shall be borne by the respondent. 5. The City utilizes Negometrix, an e-procurement platform, Negometrix4 version. The City is ONLY accepting electronic solicitation responses online through the City's Negometrix4 platform at https://app.negometrix.com/buyer/748. This link can also be accessed through the City's website at https://www.ocoee.org/323/Purchasing under the Current Open Solicitations menu. All responses for this bid MUST be submitted through the Negometrix4 platform. Bid/RFP/RFQ submissions received in any other format will not be •accepted; no paper, fax, or e-mailed submissions will be accepted. There is no charge to use the Negometrix electronic bid submission platform. Registration with Negometrix is free and is required prior to submitting an RFQ response. You will be required to register once you click the PARTICIPATE BUTTON in the solicitation file. It is suggested your company register no later than 24 hours in advance of the RFQ submission deadline to ensure proper registration. Should your company need assistance with registering, please contact the Negometrix Service Desk by calling (724) 888-5294 or by emailing servicedesk.us0,negometrix.com. Once your company is registered with Negometrix, you will be able to submit your bid/proposal/qualification statement securely, any time before the bid deadline, at https://app.negometrix.com/buyer/748 by clicking the PARTICIPATE BU Fl ON under the solicitation. Qualification Statements submitted on Negometrix4 will remain locked and inaccessible by City staff until the bid deadline. Respondents are encouraged to allow ample time to upload and submit your Response as the system will automatically lock responses upon the bid deadline. A virtual public RFQ opening will be held on the date and time indicated below. Details on how to access the virtual bid opening will be located on the City's website at https://www.ocoee.org/959/Public- Bid-Meetings. 6. Respondents shall submit one (1) complete electronic copy, preferably in a single file, of their qualifications package on the Negometrix4 platform. Qualification packages must be received by Negometrix4 no later than 2:00 p.m. (local time)on May 4,2021. RPQ#21005 Continuing Contracts for Geotechnical Testing Services 5 Any qualification package received after the above-noted time will not be accepted under any circumstances. Any uncertainty regarding the time a qualification package is received will be resolved against the Respondent. It shall be the sole responsibility of the Respondent to have the qualifications package uploaded and submitted on the Negometrix4 e-procurement platform prior to the due date and time. File Uploads -All electronic files uploaded must be in a common format accessible by software programs the City uses. Those common formats are generally described as Microsoft Word (.doc or .docx), Microsoft Excel (.xls or.xlsx), Microsoft Power Point ppt or pptx), or Adobe Portable Document Format (.pdf). Respondents will not secure, password protect or lock uploaded files;the City must be able to open and view the contents of the file. Respondents will not disable or restrict the ability of the City to print the contents of an uploaded file. Scanned documents or images must be of sufficient quality, no less than 150 dpi, to allow for reading or interpreting the words, drawings, images or sketches. The City may disqualify any Submittal Response that does not meet the criteria stated in this paragraph. 7. The City will receive questions regarding this RFQ only through the Negometrix4 platform in the Question &Answer tab or written inquires directed to Vanessa Anthony, Purchasing Technician vanthony@ci.ocoee.fl.us. Deadline for receipt of written inquiries will be April 27,2021 at 2:00 p.m., local time. 8. Potential Respondents should not contact City staff, with the exception of the Purchasing Technician, or other City consultants or City Commission for information regarding this RFQ before the project award date. Any contact with any other member of the City Staff, City Commission, or its consultants during the RFQ, award, and protest period may be grounds for Respondent disqualification. 9. Action on qualification packages is expected to be taken by the City Commission within ninety (90) days of the submission opening date; however, no guarantee or representation is made herein as to the time between receipt of the qualification package and subsequent City Commission action. A more detailed schedule is given below. 10. All applicable laws and regulations of the United States, the State of Florida, and the City of Ocoee will apply to any resulting Agreement. The provisions of the Consultant's Competitive Negotiations Act (Section 287.055, Florida State Statutes) shall apply, where applicable. By entering into this contract, the awarded bidder is obligated to comply with the provisions of Section 448.095, Fla. Statutes, "Employment Eligibility." This includes, but is not limited to utilization of the E-Verify System to verify the work authorization status of all newly hired employees, and requiring all subcontractors to provide an affidavit attesting that the subcontractor does not employ,contract with, or subcontract with, an alien unauthorized to work in the USA. Failure to comply will lead to termination of this contract, or if a subcontractor knowingly violates the statute, the subcontractor must be terminated immediately. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 6 11. The successful Respondent shall be required to execute an Agreement, in form and content acceptable to the City, indemnifying and holding harmless the City, its officials, officers, employees, and agents from all claims. 12. CONVICTED VENDOR LIST(PUBLIC ENTITY CRIME): A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a proposal on an award to provide any goods or services to a public entity, may not submit a proposal on an award with a public entity for the construction or repair of a public building or public work, may not submit proposals on leases of real property to a public entity, may not be awarded or perform work as a Contractor, Supplier, Subcontractor, or Consultant under a award with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in section 287.017 for Category Two for a period of 36 months from the date of being placed on the convicted vendor list. [See Florida State Statute 287.133 2) (a). 13. FLORIDA PUBLIC RECORDS LAW: In accordance with Chapter 119 of the Florida Statutes, and, except as may be provided by Chapter 119 of the Florida Statutes and other applicable State and Federal Laws, all Respondents should be aware that the proposal and the responses thereto are in the public domain and are available for public inspection. Respondents are requested, however, to identify specifically any information contained in their proposal which they consider confidential and/or proprietary and which they believe to be exempt from disclosure, citing specifically the applicable exempting law.All proposals received in response to this request of proposal become the property of the City of Ocoee and will not be returned. In the event of an award, all documentation produced as part of the contract will become the exclusive property of the City. 14. PUBLIC RECORDS COMPLIANCE. The City of Ocoee (City) is a public agency subject to Chapter 119, Florida Statutes. The Contractor agrees to comply with Florida's Public Records Law. Specifically, the Contractor shall: 1. Keep and maintain public records required by the City to perform the service. 2. Upon request from the City's custodian of public records, provide the City with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in chapter 119, Florida Statutes, or as otherwise provided by law. 3.Ensure that public records that are exempt or confidential and exempt from the public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the Contractor does not transfer the records to the City. 4. Upon completion of the contract, Contractor agrees to transfer at no cost to the City all public records in possession of the Contractor or keep and maintain public records required by the City to perform the service. If the Contractor transfers all public record to the City upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the City, RFQ#21005 Continuing Contracts for Geotechnical Testing Services 7 upon request from the City's custodian of public records, in a format that is compatible with the information technology systems of the City. 5.A Contractor who fails to provide the public records to City within a reasonable time may be subject to penalties under section 119.1 0, Florida Statutes. IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT 407-905-3100,EXTENSION 1022,CCDL@ci.ocoee.fl.us,WITH AN OFFICE LOCATED AT 150 NORTH LAKESHORE DRIVE, OCOEE,FLORIDA 34761. 15. PATENT INDEMNITY: Except as otherwise provided, the successful respondent agrees to indemnify the City and its officers, agents, and employees against liability, including costs and expenses for infringement upon any letters patent of the United States arising out of the performance of this Contract or out of the use or disposal by or for the account of the City or supplies furnished or construction work performed hereunder,to the extent caused by the negligence, recklessness, or intentional wrongful misconduct of the Respondent and persons employed or utilized by the Respondent in the performance of this contract. Further, the Respondent shall fully indemnify, defend, and hold harmless the City and its officers, agents, and employees from any suits, actions, damages, and costs of every name and description, including attorneys' fees, arising from or relating to violation or infringement of a trademark, copyright, patent, trade secret, unpatented invention, or intellectual property right. If the bidder uses any design, device, or materials covered by letters, patent, or copyright, it is mutually agreed and understood without exception that the bid price shall include all royalties or cost arising from the use of such design, device, or materials. 16. Conflict of Interest/Non-Collusion Certification: a) Respondent declares that the only persons or parties interested in their proposal are those named herein, that this proposal is, in all respects, fair and without fraud and that it is made without collusion with any other vendor or official of the City of Ocoee. Neither the Affiant nor the above-named entity has directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive pricing in connection with the entity's submittal for the above project. This statement restricts the discussion of pricing data until the completion of negotiations and execution of a contract for the described services. b) Respondent certifies that no City Commissioner, other City Official, or City employee directly or indirectly owns assets or capital stock of the Responding entity, nor will directly or indirectly benefit by the profits or emoluments of this proposal. (For purposes of this paragraph, indirect ownership or benefit applies to any members of his or her immediate family) c) Respondent certifies that no member of the entity's ownership or management is presently applying for an employee position or actively seeking an elected position with the City. In the event that a conflict of interest is identified in the provision of services, Respondent agrees to immediately notify the City in writing. Respondent must submit the attached Conflict of Interest Statement. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 8 d) Respondent further declares that a careful examination of the scope of services, instructions, and terms and conditions of this RFQ has occurred, and that the proposal is made according to the provisions of the RFQ documents, and will meet or exceed the scope of services, requirements, and standards contained in the RFQ documents. e) Respondent agrees to abide by all conditions of the negotiation process. In conducting negotiations with the City, Respondent offers and agrees that if this negotiation is accepted,the Respondent will convey,sell,assign,or transfer to the City all rights,title, and interest in and to all causes of action it may now or hereafter acquire under the anti- trust laws of the United States and the State of Florida for price fixing relating to the particular commodities or services purchased or acquired by the City. At the City's discretion, such assignment shall be made and become effective at the time the City tenders final payment to the Respondent. The proposal constitutes a firm and binding offer by the Respondent to perform the services as stated. 17. The City reserves the right to accept or reject any or all proposals,to waive formalities, technicalities or irregularities, to request clarification of information submitted in any proposal, or to re-advertise for new proposals. The City may accept any item or group of items of any proposal, unless the Respondent qualifies its proposal by specific limitations. The City may accept one or more proposals if, in the City's discretion,the City determines that it is in the City's best interest to do so. The City reserves the right to award the contract to the Respondent which, in the City's sole discretion, is the most responsive and responsible Respondent The City reserves the right, as an aid in determining which proposal is responsible, to require a Respondent to submit such additional evidence of Respondent's qualifications as the City may deem necessary, and may consider any evidence available to the City of the financial, technical, and other qualifications and abilities of a Respondent, including past performance (experience) with the City and others. The City Commission shall be the final authority in the selection of any and all proposals B. INSURANCE TERMS AND CONDITIONS The successful respondent shall be required to provide evidence of both General (Public & Property) Liability and Professional (Design Errors and Omissions) Liability Insurance in the amount of$1 million on the form of a certificate of insurance issued on behalf of the City of Ocoee and naming the City as an additional insured, by companies acceptable to the City at the minimum limits and coverages listed below with deductible amounts acceptable to the City. The selected consultant shall not commence any work in connection with an Agreement until all of the following types of insurance have been obtained and such insurance has been approved by the City, nor shall the consultant allow any subconsultant to commence work on a subcontract until all similar insurance required of the subconsultant has been so obtained and approved. Policies other than Workers' Compensation shall be issued only by companies authorized by subsisting certificates of authority issued to the companies by the Department of Insurance of Florida which maintain a Best's Rating of"A" or better and a Financial Size Category of "VII" or better according to the A.M. Best Company. Policies for Workers' Compensation may be issued by companies authorized as a group self-insurer by F.S. 440.57, Florida Statutes. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 9 1. Loss Deductible Clause: The City shall be exempt from, and in no way liable for, any sums of money which may represent a deductible in any insurance policy. The payment of such deductible shall be the sole responsibility of the General Consultant and/or subconsultant providing such insurance. 2. Workers' Compensation Insurance: The Consultant shall obtain during the life of this Agreement, Worker's Compensation Insurance with Employer's Liability Limits of 500,000/$500,000/$500,000 for all the Consultant's employees connected with the work of this project and, in the event any work is sublet, the Consultant shall require the subconsultant similarly to provide Workers' Compensation Insurance for all of the latter's employees unless such employees are covered by the protection afforded by the Consultant. Such insurance shall comply fully with the Florida Workers' Compensation Law. In case any class of employees engaged in hazardous work under this contract for the City is not protected under the Workers' Compensation statute, the Consultant shall provide, and cause each subconsultant to provide adequate insurance, satisfactory to the City, for the protection of the Consultant's employees not otherwise protected. Include Waiver of Subrogation in favor of the City of Ocoee. 3. Consultant's Public Liability and Property Damage Insurance: The Consultant shall obtain during the life of this Agreement COMMERCIAL AUTOMOBILE COVERAGE, this policy should name the City of Ocoee as an additional insured, and shall protect the Consultant and the City from claims for damage for personal injury, including accidental death, as well as claims for property damages which may arise from operations under this Agreement whether such operations be by the Consultant or by anyone directly or indirectly employed by the Consultant, and the amounts of such insurance shall be the minimum limits as follows: 4. Automobile Bodily Injury Liability&Property Damage Liability 1,000,000 Combined single limit per occurrence (each person, each accident) All covered automobile will be covered via symbol 1 Liability coverage will include hired &non-owned automobile liability Include Waiver of Subrogation in favor of The City of Ocoee 5. Comprehensive General Liability(Occurrence Form)-This policy should name the City of Ocoee as an additional insured and should indicate that the insurance of the Consultant is primary and non-contributory. 2,000,000 GENERAL AGGREGATE 2,000,000 PRODUCTS-COMPLETED OPERATIONS AGGREGATE 1,000,000 PER OCCURRENCE 1,000,000 PERSONAL &ADVERTISING INJURY Include Waiver of Subrogation in favor of the City of Ocoee 1,000,000 Professional Liability (Design Errors & Omissions) 6. Subconsultant's Comprehensive General Liability. Automobile Liability and Worker's Compensation Insurance: The Consultant shall require each subconsultant to procure and maintain during the life of this subcontract, insurance of the type specified above or insure the activities of these subconsultants in the Consultant's policy, as specified above. RFQ 421005 Continuing Contracts for Geotechnical Testing Services 10 7. Owner's Protective Liability Insurance: (Not applicable for Design Services). As applicable for construction projects, providing coverage for the named insured's liability that arises out of operations performed for the named insured by independent consultants and are directly imposed because of the named insured's general supervision of the independent consultant. The Consultant shall procure and furnish an Owner's Protective Liability Insurance Policy with the following limits: $1,000,000, and per occurrence,$2,000,000.Aggregate and naming the City of Ocoee as the Named Insured. 8. Contractual Liability: If the project is not bonded,the consultant's insurance shall also include contractual liability coverage to insure the fulfillment of the contract. NOTE: PUBLIC LIABILITY INSURANCE AND AUTOMOBILE LIABILITY INSURANCE,THE CITY SHALL BE NAMED AS ADDITIONAL INSURED. 1,000,000 PER OCCURRENCE 2,000,000 AGGREGATE Commercial Umbrella: 1,000,000 PER OCCURRENCE 2,000,000 Aggregate Including Employer's Liability and Contractual Liability Builders Risk: (Not Applicable for Design Services). 100,000 Any (1) Location 1,000,000 Any(1) Occurrence Remainder of page left blank intentionally) RFQ#21005 Continuing Contracts for Geotechnical Testing Services 11 ACORD_ CERTIFICATE OF LIABILITY INSURANCE DPID JC ° ATEIRI° 7'PAA28-1 11/04/04 PRODUCER ME CERTIFICATE LS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGIIT5UPON THE CERTIFICATE 1- HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY TIE POLICIES BELOW. INSORERS AFFORDING COVERAGE NAIC6 041/1103 MOROI& IA Mn ftl.P B.ex R.et,e Q INSURER a AadrOOGtar'e Name SL9dlfAG SBn1RERe I COVERAGES DIE POUmES OF Mbl1RBEE 0500 BELAY(LAVE BEEN ISSUED TO RENAMED NMIED ABOVE FOR THE POLL,PEWDD WDCATE0,NDTYROTBTAONG AVI'R TAAAE.uEM,TETLY WA CO,®TON of ANYC0010AC•E OR OTHER°OCW WI'W T1 RF...,T TO WRCR 1H6 CERTIFICATE MAY BE ISSUED OR MY PERIAIN,THE 111SUFANCE AFFORDED BY THE POLICES DESDRIRED KEP1.11601JBJECT TO ALL THE TERTA%EACUISONS OLD OT 04ON5 OF SUCK ig//I1uTa,M S.AGGREGATE LWeSETTOWN WY RAVE BEEN REDUCED RV PAIDCI5AIL pL1Cy C(q{LTA IAtTN.I MEDIWISILWCB POLICYROA®ER pA7CINWDE I TRUPO yy/001'lla LORTB GENERAL WEAN, EAGI000U TENCE "11,000,000 X X COLo1ERL1ALG9,EALLIAB6aV RREW1297EADmTEROI 550,000 i MAIDS DADE Q0mB1 LTOE%P(kry we Gomm) 15,000 PERSDrw 6 AINBUURT S 1,000,0D0 comaL ADGREOAIE 52,000;000 BENL AGGREGATE OUT APPLIES PER PRODUCTS•a0u0IOPAGO:12,000,000 AOTa"Ds`e(At66"r r°"a°'c°6eN000040T 51,000,000 X FAT AUTO IERAma.u1 ALL ONNEOAUTOS Bo01v WBRY SCREOULEO AUTOS VW 1.:,,,..) 5 C315183 AUTOS BODRY INJURY J NON0D5NEDAUrpy per.meN1 ,5 rtmPERTy WANACE 1p.:T' 1 0,0A0CUAEIUTY AVID0/NI•EAACLOEHT 5 TNT AUTO OTRW 11011 FAACC i 1 A/ROONLY: FOG I 33I0355NM1REUA I5A00AT MITDccuRREADE 11,000,000 X X OCCUR 0 CWu5 woe AGGREGATE 12,000,000 5 DEDUCTIBLEETi 5 NFTgN B 1 ROBBERS COIRSNBAT OR ARD X 1Tg/iTiT'tBI Y6i__°n OaDNDYenf TUBn rtY EL EACH AGCWEYT 5500,000 lonPADPRIETORPARTNEUESECUTNE DTFnPA.Es AIEMTBN L'OLOt,BE 05.5E•EA ELTLOYEG 1 500,000 SGW PPOV6O,Y5OebA EL DOEA5E•POLICY LEIBT .1500/OOP Builders Risk Any 1 Loa 103,000 Any 1 Dcc 1,000,000 DESDWlIrW OF OPERATORS/LOCAT001IYB6CLEE 1 RCLUS0NB ROBED BY FJ9ORSELENT/6PECWL FRONBOIO Tbo insurance evidenced by Chia certificate shall name the cacti fice to holders as an additional insured on the General Liability 0 Umbrella Liability. Markers' Compeaaation, fesplayoreI Liability 4 General Liability shall contain •Waiver of Subrogation in favor of the certificate holder. The certificate holder iR added as a I/Aad: j2Sg5 fcr$7[]timRiSk CERTIFICATE HOLDER CANCELLATION OCOSE01 611121012^RT OFT.ABOYE 13B30R1000 POLICIE3 BE CA4CELLED a EMI!TNe EaPB+ATw+ DATE TTT10000,THE IMMO MLRERW$L END[MDR 10 NAL 10 DAYS WNRT 1 Mona TO THE CERTIRCJLTr MOWER NAKED TO THE LEFT.BUT FARURE TO 00 BO MALL city o£ Ocoee 1101102 000BuATIOH00.Ls,mmwAM KIND Unv THE MEM,REAGMSOR150N. LTtkeehore Drive Ocoee FL 34761.225B I RORETORT0ES DEOAMOREPREBENTATIYE ACORD 25(2001100I ow 0 ACORD CORPORATION WEE 9. Certificates of Insurance: Certificate of Insurance Form (see sample, above), naming the City of Ocoee as an additional insured will be furnished by the Consultant upon notice of award. These shall be completed by the authorized Resident Agent and returned to the Office of the Purchasing Technician. This certificate shall be dated and show: The name of the Insured consultant, the specific job by name and job number, the name of the insurer, the number of the policy, its effective date, and its termination date. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 12 Statement that the Insurer shall mail notice to the Owner at least thirty(30)days prior to any material changes in provisions or cancellation of the policy, except ten (10) days written notice of cancellation for non-payment of premium. C. SCOPE OF SERVICES The City of Ocoee, Florida (City), in conformance with its policies and procedures, is soliciting statements of qualification from geotechnical testing firms that are interested in providing such services for City projects. Such projects include large-and small-scale water, sewer,and reclaimed utility projects,road construction and/or rebuild construction,extensions and/or stonnwater related projects,and other geotechnical type projects. There may also be a periodic need to conduct Phase 1 environmental reviews and environmental lien searches related to the possible acquisition of real property by the City. A variety of testing and consultative tasks will be required in various combinations depending on the needs of each project. Each firm proposing to provide geotechnical testing services to the City shall provide a complete list of all such services normally available from that firm. Work will be requested through a task work order to which the firm will provide a price proposal. The City may reject or accept the statement of qualifications,request additional information, or negotiate a different mix of services and/or prices. Once an agreement is reached,the work will be authorized through a City purchase order. The task work order will be used to determine the expected quantity and nature of the services required for the covered project(s). The purchase order will authorize a specified maximum cost for services to be provided. Project conditions may alter the number and nature of tests and services provided over the course of the work, so long as the maximum budget authorized is not exceeded. The City intends to award continuing contracts to no fewer than three(3) firms, if possible, deemed to be the most highly qualified to perform the required services. In determining whether a firm is qualified, the City shall consider criteria set forth in the RFQ. The continuing contract shall have an initial three (3) year period plus two automatic one-year renewable extensions,and a one (1) year optional renewal at the City's discretion. The following list is a representative sample of the tasks to be procured, as needed, for City projects: Roadway-related Services: 1. Stabilized subgrade in-place density test 2. Stabilized subgrade depth verification test 3. Stabilized subgrade strength verification test (Limerock Bearing Ratio) 4. Limerock in-place density test 5. Limerock depth verification test 6. Limerock modified proctor test 7. Soil cement testing, crushed concrete for base 8. Asphaltic concrete extraction & gradation test, per day 9. Mobilization of equipment 10. Asphalt core testing for depth & density w/patching of core hole, per core 11. Laboratory test of asphalt cores for density RFQ#21005 Continuing Contracts for Geotechnical Testing Services 13 Utility-related Services: 1. Pipe in-place density tests (typically 1 test per 300 ft. of pipe for every 1 ft. of backfill) 2. Structure in-place density test(typically 1 test per structure per 1 ft. of backfill) 3. Modified proctor test Building-related Services: 1. Footing foundation soil density test 2. Concrete slump test 3. Soil bearing test Miscellaneous Services: 1. Phase 1 environmental review 2. Environmental lien search 3. Engineering technician, per hour 2. Engineer review, per hour 3. Engineering review and administrative overhead, as a percent of the total task 4. Other service not explicitly listed above but customarily provided by the firm as part of its geotechnical testing services The list given above is representative but not complete. Interested firms must be experienced in providing services for projects of a scope and nature comparable to those described. Use of qualified sub-consultants for specialty work is acceptable. To be considered, the firm shall be a '— licensed to do business of this type in accordance with Florida State law and be familiar with all applicable State of Florida, St. Johns River Water Management District, Orange County and City of Ocoee codes, regulations and laws.Please include a copy of all applicable licenses held by firms or subconsultants proposed to perform work. D. SUBMITTALS Qualifications packages should be designed to portray to the City how the respondent's services can best match the knowledge, skills, and abilities suggested by the anticipated Scope of Services given above. In order for the City to evaluate the qualification package, each Respondent shall provide information relative to their ability to provide services that will best meet the needs of the City. The City of Ocoee requires comprehensive responses to every section within this RFQ. To facilitate the review of the responses, firms should follow the described response format.The intent of the RFQ format requirements is to expedite review and evaluation. It is not the intent to constrain firms with regard to content, but to assure that the specific requirements set forth in this RFQ are addressed in a uniform manner amenable to review and evaluation. In order to simplify the review process and obtain the maximum degree of comparison, the Respondent should use the following format in responding to the RFQ and missing material may cause your submission to be evaluated accordingly: I. Firm's Qualifications Firm's and key employee's certifications and licenses with regulatory agencies, professional organizations, etc. RFQ#2 1005 Continuing Contracts for Geotechnical Testing Services 14 List firm's key sub-consultants, their qualifications, and their role in providing these services, if applicable. List of firms' other current or recently completed similar services within the past two (2) years with other public or private agencies. List of at least three (3) client references to include organization name, contact person, telephone number(s), and e-mail address. Firm's project organization and coordination structure Firm's understanding of the services requested and how the firm would accomplish the work H. Firm's Office Location & Other Forms (not included in page limit) List the location of all offices(firm and key sub-consultants) involved with this project and approximate distance (in miles) and time(in hours)to City Hall. Conflict of Interest Disclosure p. 18 Receipt of any addenda issued. p. 19 Summary of Litigation, if none please so state. Provide a summary of any litigation, claim(s), bid or contract dispute(s) filed by or against the Firm in the past five (5) years which is related to the services that the Firm provides in the regular course of business. The summary shall state the nature of the litigation, claim, or contact dispute, a brief description of the case, the outcome or projected outcome, and the monetary amounts involved. p. 19 Company Information/Signature Sheet p. 20. E. TIME SCHEDULE The anticipated schedule of events related to this solicitation is: Date of RFQ Request for qualifications published 23 days later Last day for questions 30 days later Statements of qualification are due 37 days later Qualification statements distributed to selection committee 45-60 days later Selection committee meeting held Next meeting Short-list of ranked firms recommended to City Commission Dates are estimated and subject to change at the City's discretion. F. SELECTION PROCESS 1. The criteria for selection shall be based on the criteria listed in the RFQ. The City reserves the right,before awarding the contract,to require a Respondent to submit additional evidence of its qualifications,as the City may deem necessary,and shall conduct discussions with, and may require oral presentations by, no fewer than three(3)firms. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 15 2. A ( ity evaluation committee will evaluate each respondent's qualifications and after interviews and/or oral presentations will xbod-|ini and recommend to 1hc City Commission the top three (3) fiono, if possible, in ranked order ofqualifications based upon the evaluation committee's evaluation of the responses and any client references. All }{cmpoudootx shall be notified viuNeg0000bix or other oucoux of the uvn|undoo cuonnuittcc'u ,scncu/ucuded ranking of firnuu to the City Commission. The City C000noioninn`s decision to endorse or modify the ranking by the cvu1outinu oomnnidsc shall bcfinu\. The City Commission shall bethe fiuulauthority iu the award orrejection of any and all responses. 3. The City will apply the negotiation requirements nf Section 287.O055,Fla. Stat.,(u.k.u., CCNA). The City will attempt to negotiate an ogrcccocut with the top-ranked lloSp0ndenL lfnoagreement is reached with tile top-ranked Respondent, negotiations will be terminated and initiated with the second-ranked Respondent, and so on, until an agreement isreached. 4. The successful Respondent shall bo required to execute 8uagrccnueo{ which provides, among other things, that all plans, drawings, reports, and specifications that result from Respondent's services ohu|| beomnno the property of the City. Upon the uuooc»sfbl negotiation of an agreement, a formal contract will be prepared and Subsequent executed by both parties. Evaluation Criteria Maximum Points 1' Experience of the firm and key personnel Past Performance and Experience uf the Firm Past Performance and Experience of the Team Members Past Performance and Experience with orin the City Overall Experience so Affect of Legal Action Against the Firm References, Licenses with Regulatory agencies Firnn's project organization and coordination structure 2. Ability to Meet Time and Budget Requirements Current and Projected Workloads of the Firm 25 3. Project Approaoh Briefly describe your Firnn'a understanding of the aen/ioee requested 15 and how the firm would accomplish the work. 4. Office Location Location of the Firm Office and Proximity to the City of Ocoee 6 5. Certified Minority, Women Owned Business Enterprise Include M/VVBE Certification forms for the Responding Firm only. 5 100 Ky0#2|U0j Continuing Contracts for Gootcchuicu|Testing Services 16 G. WORK ASSIGNMENT PROCEDURES Firm(s) selected by the City will provide professional Geotechnical Testing services to the City on an as needed basis, based upon task orders to be issued by the City under the continuing contract. No work shall commence until the verification of the issuance of the purchase order or other authorization document. Invoicing for completed work or progress billing shall be submitted to the requesting Utilities Department for processing and submission for payment by the Finance Department with a copy to: Finance Department Accounts Payable City of Ocoee 150 N.Lakeshore Drive Ocoee, Florida 34761 H. BID PROTESTS All Bid Protests shall be submitted to the Purchasing Technician in the following manner: 1.,A Bidder shall file a written bid protest under this Article or be barred any relief; oral protests shall not be acknowledged. 2. A bid protest shall be limited to the following grounds: (a) issues arising from the procurement provisions of the Project Manual, its addenda, and other bidding documents; and/or(b)applicable federal, state, or local law.No bid protest may be based upon questions concerning the design documents (drawings and specifications). The Bidder shall clarify all questions concerning the design documents of the project prior to submitting its bid. 3. The content of the bid protest shall fully state the factual and legal grounds for the protest and the legal basis for the relief requested. 4.The bid protest shall be filed with the Purchasing Technician not later than five(5)calendar days after the posting of the notice of intent to award or recommendation of award by staff, whichever is earlier. 5.The Purchasing Technician,on behalf of the City, shall make a determination of the merits of the protest not later than five (5) business days after receipt of the protest. If the City denies the protest,the City may proceed with award of the contract unless enjoined by order of a court of competent jurisdiction. END OF INSTRUCTIONS RFQ#21005 Continuing Contracts for Geotechnical Testing Services 17 ocoee florldo RFQ CONFLICT OF INTEREST DISCLOSURE FORM The award of this contract is subject to the provisions of Chapter 112, Florida Statutes. All Proposers must disclose within their Proposal: the name of any City of Ocoee employee, Mayor or City Commissioner, other City Official, or City Consultants, who owns assets or capital stock, directly or indirectly, in the Proposer's firm or any of its branches, or would directly or indirectly benefit by the profits or emoluments of this proposal. (Indirect ownership or benefit applies to any members of his or her immediate family.) Proposer certifies that no member of the entity's ownership or management is presently applying for an employee position or actively seeking an elected position with the City. In the event that a conflict of interest is identified in the provision of services,Proposer agrees to immediately notify the City in writing. The purpose of this disclosure form is to give the City the information needed to identify potential conflicts of interest for the City Commission, Evaluation Committee members, and other key City employees and consultants involved in the award of this contract. According to Chapter 112, Florida Statutes, the term "conflict of interest" "means a situation in which regard for a private interest tends to lead to disregard of a public duty or interest", and refers to situations in which financial or other personal considerations may adversely affect, or have the appearance of adversely affecting, an employee's professional judgment in exercising any City duty or responsibility in administration,management, instruction, research,or other professional activities. Please check one of the following statements and attach additional documentation if necessary: To the best of our knowledge,the undersigned firm has no potential conflict of interest for this Proposal. The undersigned firm, by attachment to this form, submits information which may be a potential conflict of interest for this Proposal. Acknowledged by: Firm Name S ignature Name and Title(Print or Type) RFQ#21005 Continuing Contracts for Geotechnical Testing Services 18 Date RFQ#21005 Continuing Contracts for Geotechnical Testing Services 19 SUMMARY OF LITIGATION: Provide a summary of any litigation, claim(s), bid or contract dispute(s) filed by or against the Bidder in the past five(5)years which is related to the services that the Bidder provides in the regular course of business. The summary shall state the nature of the litigation, claim,or contact dispute, a brief description of the case,the outcome or projected outcome, and the monetary amounts involved. If none, then please say so. Attach additional sheets if necessary) ACKNOWLEDGEMENT OF ADDENDA: Bidder acknowledges receipt of the following addenda: No.Dated No.Dated No.Dated Remainder of page left blank intentionally.) RFQ#21005 Continuing Contracts for Geotechnical Testing Services 20 COMPANY INFORMATION/SIGNATURE SHEET RFQ#21-005 FAILURE TO COMPLY WITH THESE RFQ INSTRUCTIONS WILL RESULT IN DISQUALIFICATION OF YOUR QUALIFICATION PACKAGE. PLEASE SIGN BELOW ATTESTING THAT YOU HAVE READ AND UNDERSTAND ALL RFQ INSTRUCTIONS AND THAT YOU UNDERSTAND THAT THE SUCCESSFUL RESPONDENT WILL BE REQUIRED TO ENTER INTO A LEGALLY BINDING CONTRACT WITH THE CITY OF OCOEE. COMPANY NAME TELEPHONE(INCLUDE AREA CODE) FAX (INCLUDE AREA CODE) E-MAIL ADDRESS IF REMITTANCE ADDRESS IS DIFFERENT AUTHORIZED SIGNATURE(manual)FROM PURCHASE ORDER ADDRESS, PLEASE INDICATE BELOW: NAME/TITLE(PLEASE PRINT) STREET ADDRESS CITY STATE ZIP FEDERAL ID# Individual Corporation Partnership Other(Specify) Sworn to and subscribed before me by means of 0 physical presence or 0 online notarization this day of 20 . Personally Known or Produced Identification Notary Public-State of Type of Identification) County of Signature of Notary Public Printed,typed or stamped Commissioned name of Notary Public RFQ#21005 Continuing Contracts for Geotechnical Testing Services 21 EXHIBIT A RFQ #21-005 CONTINUING CONTRACTS FOR GEOTECHNICAL TESTING SERVICES 26 RFQ#21-005 Continuing Geotechnical Testing Services EXHIBIT B CONSULTANT'S QUALIFICATION PACKAGE RESPONSE TO RFQ #21-005 27 RFQ#21-005 Continuing Geotechnical Testing Services F - d f'. -s'.s .- r }''} Y y'?-} 'Y IT'r ssPaY= ` y• ...1 ',I - 4 ice. `-1 . \ y: 3 114 t_..„.....„tai ,A ,¢u,. 4 1 II I .II,-F• ` 1'.i n S c'e' ` rI' t ., r /p t is emu s: ,Alm rvN i. k t k vty. d tea n r tM3%.4i4 y.; r g . w 7-.. 4'-„":-i,:..:,.... -,,,,_,:,'.; r-. 2".,."..:.;.7.-.;:,.„.`-S,"..47•7,..... t4. i...S..:::.,,;4..:-.,^:-;•. e. - _. t- i,'n..!..ak. 7 1.-y .« F T r' I:*, 6 4•+'iI.f Yi, .,, et.., ry 4 d. 474*Y— '~ _ Y- Th. ....„._..,.., . .: y.H...„. ...L—„,...„.....,:-.„._. s...,--.... 7,.-7. --'--T - __ ', -. --.-t.'"'-- .,.- 17: fi 3' ' A `'' xi t .-p' • ? ,} n d'' r,• T x" k"`=a Y ,F i r 3 y „^ f+ 7,,; r !. „,, + t°, try -+"" ..:+ 3 * w T« jpray .}` YS '• §",c v 9r'. ., ' ,y s: - dam'' "' ` s; s ` t.' Z-,M. - y,_: x. .° "n.{„$:r +". r: xtr .. . ir s. ^ ? 'b,ai3r>.".,>_ s„ f psi o\t~° ~°~"~eu Service industries,Inc. 174833, Street Orlando,Florida 328=9fp. —3O475s6z May 4, 202l 04s. Melanhe ibbitt City Clerk City ofOcoee 1SON` Lakeshore Drive Ocoee, Florida 34761 Re: RFQ#21-U05 Continuing Contracts for Geo¢ecbm;caUTesting Services Dear K4s''Sibbd±and the Selection Committee: Thank you for the opportunity to submit our qu.alification.s package to provide,the City of Ocoee (City) wit Professional GedtechOical Testing SerY|ceS,* We have reviewed the AFqGOd are certPSI:\Dthat P can continue to provide the services requested in the timely and cost-effective «lannerth.at the City hag become accustom to. PSI was founded in 1961 `n Champaign, Illinois as A&H Materials Testing and was incorporated in Delaware in June ofl972. PSI is now a Wholly owned subsidiary of|ntertekaglobal leading provider nf quality and safety solutions to the building and construction industry. PSI has been providing geotechnicai engineering, construction materials testing, threshold inspection, environmental consulting,-and roofing and building envelope consulting services with various.City, County and State agencies for more than 4S years in Florida. Our Orlando offce,vxhere all work for this contract will be managed from, is one UfPS|'s largest in the country and employs more than 150 Staff members. PSI nffersthed1yaful|spe[trWrVofin'hbU e'capabiUtios,along with a wealth Ufknovvledg apdexperience needed to meet any challenge associated with the requirements of.thi,s contract. We offerthe City more thanjustthe typical'geotechnical,environmental,and materials testing services. We have in-house abilities to perform specialty services such as Pile Dynamic Analysis (PDA), conduct radiographic inspections, locate reinforcing and voids in concrete, perform ground penetrating radar GPR\, provide coatings and corrosion inspections, and offer environmental renlediatimn, as well as many other specialized services. We have barge and track-mounted drill rigs,sonic logging abilities and in-house wood products,metallurgical and analytical laboratories. PSI provides a complete package. The following p age includes a brief summary of additional reasons why vve believe PSI is the best choice for this contract: Qualified Personnel PSI will provide the.City with experienced personnelto continue meetingallthe needs of this continuing contract. Our staff indudes.nnanyde reedand |icensedpnofessiono|sindud|n8Pno6eus|0na} Engineers, Professional "Geologists, -Registia.ed Architects, Licensed Environmental Professioha|s, [rti ed Industrial Hygienists, Certified |ndoor nvinonrnental ts, Certified Indoor Envinonm0enta!Consultants, Certified Safety Professionals, Florida Licensed Mold Assessors, Engineers-In-Training, and, Registered' Roof Consultants. Page I 0in Proven Past Loca| Vnowledge PSI continues to successfully manage similar contracts with various City, County and State agencies and has done so-for nearly 45 years in Central Florida. We have been continually under contract with the City providing these same services since 1999. As such, we are very familiar with your personnel, procedures, requirements, and expectations. We also have a clear understanding of Federal, State, County,City and Water Management District procedures, personnel, conditions,regulations, applicable codes and requirements. As o result of these experiences, we will not face a learning curve and are immediately prepared to provide the City with an unparalleled commitment. Performance Ability Due tothe size ofPS|'s staff and facilities in Orlando, we are able to provide quick response times for both personnel and test results—especially for your on-call emergency services, Maintaining one of the largest private engineering inspection and testing laboratory in the state, PS| performs thousands of tests and inspections each week. This volume and capacity assure our clients of some of the quickest turn-around times in the industry. PSI's laboratoryis one of only afew local labs with R-18 certification and full accreditation by CMECood the Army Corps mfEngineers. Our 70+ field and laboratory technicians are also certified by the pertinent industry accreditation aQencies. We maintain o fu||'tinna dispatcher and equip all our field personnel with smart phones, laptops, and/or tablets Quality Control PS|'o implementation of PSlCiEST (Quality, Efficiency, Standardization, Technology) assuresthe City real-time access to reporting, invoicing, and budgetary information on all your projects with us. PSIQESTis our customized solution that integrates the world's most powerful information management system for engineering and testing services with a client portal and project andfinanda| nnmna0ennent toolset.Among the many innovative and efficient features of the system are the built-in data validation checks' equipment calibration controls, budgetary monitoring and specification checks to help assure laboratory performance, accuracy and accreditation, Two arms of the PSIQEST system, QESTField and Construction Hive, deliver field data and final reports electronically, and a||ovv for secure access of project information via a web-based portal available 24/710 authorized City staff. Commitment We commit to the City that PSI will continue performing our work with the quality you've come to expect. We are confident that with our demonstrated experience, size and qualified professional staff, we are the best choice to provide the City with the services outlined in this RF[l response. If there is any additional information you may need, please do not hesitate to contact us directly. Sincerely, AanonVV VP.E. Ste" anieNJeidnerLandio Single Point of Contact/Department Manager Business Development Manager pamc | Z r• o Cta Eg ewa) 5 c illill ocoee CONTINUING CONTRACTS GEOTECHNICAL TESTING SERVICES RFQ NO:21-005 c., -,,-.c, ,:-- --,;,:.• ':„...1,----,..„- , ;., - ; ,'.,,.. -;; . ..._.,„..,SN,,-‘' 4.4'11*'44:' 1,;• ;,`,"*_-,-k-. ,' P''... A.r.-,Al,;,,,;:,„Tr?‘, rt', : '.,- .-'; ,-.74),'/ --.1. ''' ' ;, 2,;i t:L....;,-----n%44t - ',-- • ,' ''' - - ''; ;"' ") c ti.:. -,,,z,- -- ....- - • ---- . -: rd,,-:,,--,- ----.,-4-1-.--4,..:4;.,-,...,,,- -', lia -- - • . '. oil:lip. rithlju,ti. II.' ' -.. • Nr;„,'.•,,r g-,.... .,„. 4-. VA.',,), -11-gr,riT,--EL 1-...)4.1 . .. ,,,,,,,,,,,. 0.10` • ;:e.,„,'§o'-'- le":":„,ofrve-47.----- ' .-• ,. s-..".l'''''"' • ,, stos'44 i..,._•1"•,‘:,?Wk",-..'. •-:"., ,,, eftraii• " 7 ,.--• - i •4,4----..v. 1:''' ";• ----1,1,,;,.• ;,',..• '-..`...,,,,,,' •••-• •.' 4,,,,,c-*"-"..„...41.7.1,-•,:voi'.-_ -......,.../...,...i..4.- .'" 1,.. 7,,,,i?•..,., 1 2, -,-, t • .*tAffi - "-, ....=.-.:47,t7--- ----" v ..,--------;-9 t1•41 '' ..-..,,.„,,'=' ---- 4•4'-t.''';'-•._1,-..rt,r; 4,•, ,! ,_•.-ITP,:i.•,- --4 1-...„-.1_,..----:----r------,---,•• -.7 7,A-,f,„,,.•-, •.,-,-„;--",4 ,, -' ',.*-- ' 1,„-.7' 22,*,,,'4'A .,,'.."- '-'•*.',-,'; vi,.,,,%,4-1....i.o,, odaommmmmiimmguu it::: 4'... tio 0,r'„1,1t0,e.b.,A, 4 -4,,,,,,L.,..-4 2;,,',. -,:.• .....,,;,, t, .!,*--.."4:'"."."' .--- #.4--•:!—•, ,liaR?&'(.4...%" ..•,•A-- ,...7,-;:-''''-' ''• "•4•N•A,.-• -, i.A.1 y.•?'',..., .z.'4.:C.:4.2-•.174,-,-,1*.of4.,-Lig ',..f..,9 N.0-014.,:,. ...,. ...,..'., 1.„...,_,..!.., .4. „4 ---",-..-1,-- :-•- r'•. ,--,:..-gr.". •-‘-.",:, ...:8,--•-• .-.•.•-,,,,-,-,z,-.-_,--.*„,- ..--- 0,•-1,,,•0, „;,:,• ,,..-. ',,,,-- 7'loom, -....,''',&, 4-4.4. , - „...".. 7'.. C:iPOIfc''''''''',.;. --''::*... 7-*TZ.:: i....S,Y7-'''' '''''' ''.. 2.i,17. ''''';'"'. ft.e. P.':•;.,..;,..*t •-k-,,- -,,'•;-- ---1-.;ir.,-•,'J--'';f-!,.'''..,".',• 4 •••••;", ‘4.-C-.• .10. .,•,,=';;; ‘.. r .1'4 " : le-11.7.'‹Ir P-..... 0,-. li, 4, ,.,4%. 4":- ..t,r-- 7.:•-•; . 46.24... 7--- .::,':,.-1. 4. .1.-::-,:„. ' t:,.,-,.. .4,,,- . zio--,,,y•-,,,•0<- .<„,',.•‘_„, F-, - --,f-••• - ? •,••,..• =-A. -. '•,'-'., 4" -,-.••• „..,- 0,-.4„1•4„.,.-t.4,..,--ir:'...4P,', "f9,'` "f ,'1 154:,4!-...,:, 1-, :.,:-.4 :Al .''..,:! e,-' t ‘ 7,,,,,;:,,,,f4, 4. ''.:; "i"'., QUALIFICATIONS0[0eQ Company Background 8& Licensing: Professional Service Industries, Inc. (PSI) PSI is nationally recognized geo1echnica| engineering, construction nnateria|stestinsAnspection, environmental ti industrial h i & facilities/roof consulting corporation that currently employs over 2,500 professionals in nearly 100 offices across the country. We are a leader among the nation's independent testing organizations and rank among the country's largest consulting engineering firms. PSI has been providing business and industry Hudson with objective, accurate and useful information for more than 135 years. PSI was founded in 1961 in Champaign, Illinois as A&H Materials Testing, and incorporated as Professional Service Industries, Inc. in 1972. Our business history dates back to 1881, by way of the acquisition of Pittsburgh Testing Laboratories Inc. PSI is now a wholly owned subsidiary of Intertek(effective date, 11/24/15), a leading quality and safety solutions provider to industries worldwide. Established as a legal entity in Florida in 1975,we have a team of more than 300 professionals located within our offices throughout the state. Our Central Florida operations are the largest in the firm employing over 200 geotechnical, construction materials, environmental engineers,facilities services, technicians, and support staff who have been providing services throughout Florida for 45+years. PS|'suniqve combination of local, independent offices and nationwide resources means our project managers have the full responsibility for managing your local projects, and also have the national resources to handle the most challenging and complex projects, re8ard|essofsize. Locations P8'sexperiencexvithcontractsofthisnatuneisextensive. VVehave Pensacola g provided geotechnica| engineering site investigations, drilling services, Orlando 152 foundation design and analysis,construction materials testing and Kissinnnnee 6 inspection, environmental site assessments,asbestos analysis, lead- cocoa 10 based soil &groundwater assessment, e tc' Plant City 1 to multiple government agencies during our 45+years nf central Florida Hudson Q work history. Tampa 51 AstheOtyisresponsib/forthem/e||beinQ,grovxth and service to itsRiveraBeach/VVPB Z Fort Lauderdale. 20 citizens, PSI takes on that same commitment when working under continuing contract with any municipality. We knovvthat the CityMiamiS7 Tota| 316 maintains a tight budget for the construction and maintenance of utilities, buildings, roads, and parks. As a result, providing cost effective solutions and considerations are an important part in design services, remediation services, and new construction services. Our firm has created a project approachthataUoxvsforronstan1connnmunicatinn between the City and PSI in order to maintain a strong working partnership—starting with pre- construction meetings through to project completion. We pride ourselves in listening to our clients and providing sound, quality,cost-effective solutions.This work ethic has allowed PSI to maintain continuing contracts with many local governments and municipalities through many multi-year terms. mu"rtex, M RFQ#21'OO5 Continuing Contracts for Geotechnica|Testing Services I May 4,7021 Page I 1 igt_WIr I. FIRM'S QUALIFICATIONSocoee Norldo Below and on the next pages, please find our firms licensing. Additionally,we have listed on each key staff member's resume any licenses/certifications that they may have. State of Florida Department of State I certify from the records of this office that PROFESSIONAL SERVICE INDUSTRIES,INC.is a Delaware corporation authorized to transact business in the State of Florida,qualified on July 1,1983. The document number of this corporation is 856982. I further certify that said corporation has paid all fees due this office through December 31,2021,that its most recent annual report/uniform business report was flied on January 5,2021,and that its status is active. I further certify that said corporation has not filed a Certificate of Withdrawal. Given trader my hand and the GreatSeal ofthe State ofFlorida at TaUahaesee,the Capital,ads e3....s the Filth ofJanuary,2021 Secretary of State TrackingNumber:1844760775Clf To authenticate this certificate,visit the following site,emer this number,and then follow the E1StruaJons displayed. https://servicessuribleurgfellings/CertlilcateOfStatusiCertificateAuthenticatica Intertek. psi RFQ U21-005 Continuing Contracts for Geotechnical Testing Services I May 4,2021 Page I 2 40.4" i. FIRM'S QUALIFICATIONSoc:oee NoMdo Flatida 1, . . e, ' 1H ,,, , 5-,,, - -- .fd... 0 ,....._rls.. 1.. ,-,,.'-', !' it:-..-.,:P ''i' Vr - .1 a .k„ r 1„,.w., 1 „,_..,,;,.... 1.e. _. mfili,,,ta.,,,, , ef ,..•A ,...'''''-"47p ,,V)'` DBPR. ONLINE SERVICES 117'4;:: ) ' -7#t-fatmioaaafgvilinusuitak;*or mile k--"'"iaisr-41,04L'AW.51farkos- . 9:40:06AM 2'24'2021 g6'61.0.1i,f0-ai,.111.00ZW, I 4-Pty'foi'aliO)rige.: ti vigkASIAT001:i.-,40,44-..-;: j :Fibtpe (fy,gr'-f,fdrffi*t* Licensee Details 1I .'Fire-a'16601-gilit.-. '` ---------7---------%47' - " `'. ", . '. "" "- `- iticen,kee-Ilif Orrnatione friii"01,(64,41;640,4 Name- PROFESSIONAL SERVICE INDUSTRIES, 11147.6,h';' INC.(Primary Name) Main-Address:5,45 E.,AL NpONQUIROAD ATTN: LIND A.ELLIS ARLINGTON HEIGHTS Illinois 60005 County: OUT OFSTATE. 1 I Lioense 6(lailihg: 1 Li enseLoceti on: I VI 4eillSP.,CI".6 till'.trial)Of I licensetype: Registry rank: Registry License-Number: 3684 1 Status:Current Licensure Date: 07/15/1983 Extaires: Effecttyp ti4lieprtaiw'Narrips, I 1 View Related License Information I View License Complaint 2.501 Blair Rana itaaar Tallahassee FL 339.9::Email:Custairmr OnntAct Canter::Customer Contact Center:850,487.1:395 1-i ,S6te of Fiotida is an NY lifl empioier,Copyiight20 07-2010 State of Florida-PrivamrStatement Intertek. ps]RFQ#21-005 Continuing Contracts for Geotechnical Testing Services I May 4,2021 Page I 3 U. IRN^S QUAL IFICATIONSU[0ee do Sub-consultants Qualifications: Nadicisa client-driven engineering firm providing geotechnioa|,geo- environnnento|, and construction materials testing and inspection services. NADIC was founded in M01 andis a certified Small Business Enterprise (SBE) and Disadvantaged Business Enterprise (DBE)with the Florida Department of Transportation' NAD|C is also certified K4VV8Exvith the State ofFlorida, Orange County, Florida, City of Orlando, Orlando International Airport, Miami-Dade County Public Schools, Central Florida Expressway Authority(C'FX) and South Florida VVater anogernentDistrict(SFVVW1D)' NAD|Cis further certified asa NADIC CBE and Micro/SBE with Miami- Dade County, Florida.. NADIC is currently serving clients from two locations: Orlando and Miami. NAD|[was chosen asa sub-consultant for this contract based on their relationship with PSI and their track record of successful performance onC/ 4 ruan0, 2 ioo ry u8 S8Certification nnunidPa|contracts and p 'ects. |nfac hoth Godwin 0Dadi and Rich Haffner of0AD|C are Nadiu Engineering Services,Inc.former employees of PSI,further cementing our relationship. NAD|[has recently participated in from: several p 'ectsin [)rangaCoun bothvyithPS| and with others.These projects indudeGoneStreet Uti|ity|rnprovemneOt! Berry 0ease Road, L.B. K0mbemdImprovements,SR429 Milling and Resurfacing from CRS35tnUS441,Apopka Vineland at Conroy Windermere Road Intersection, Orange County Convention Center Tradeshow Road Improvements,SR 429.and Schofield Road Interchange Improvements,CR 535 and Blue Bird Pond Road improvements,Avalon Road Roadway Conceptual Analysis from Florida's Turnpike to West Colonial Drive, Rosalind Avenue Pavement Reconstruction, West Livingston Road Extension, Econlockhatchee Trail Widening from South of Lee Vista Boulevard to South of Curry Ford Road, Grand National Drive and Greenbriar Parkway, Lake Davis to Lake Greenwood Drainage Improvements, and Dr. Phillips Performing Art Center. N&D|C provides the following services: w Geotechnico/Engineering:NAD/[helpsdefinethecnnshnctionond performance risk associated with subsurface conditionsfor all types of wastewater plants, transportation systems, buildings, airportfbc0it&es dams, /ondfDls. ondntherciv0 projects. yAD/C has in-house three(3) drill rigs and one(1)pavement coring drill. w Geo-environmental Engineering:For o site suspected tobe contaminated, NAD/Captly characterizes the physicalfeatures of the site and of existing chemical components;assesses the existing risk;and performs on engineering evaluotion of appropriate corrective measures required to reduce risk and meet regulatory compliance. RR\#21-005 Continuing Contracts for Geotechnica|Testing Services I May 4,202I Page 14 40o4 I. FIRM'S QUALIFICATIONSocee florid° Water resources: The need for development, conservation, and management of water as a natural resource has continued to be a challenge. NADIC engineers seek to apply problem control and mitigation as regional water resources are placed on under constant pressure. Construction Materials Testing and Inspection:NADIC offers material engineering testing and inspection services applicable to the governmental, construction and manufacturing industries. Field testing includes verification of material standards and quality, construction quality control and reconstruction quality assurance. Name Godwin N. Nnadi, PhD,PE Title Principal Engineer Certifications Professional Engineer#50637, Florida Professional Engineer#90355751, Canada Education PhD Civil Engineering(1990);Queens University, Kingston,Canada M.S. Civil Engineering (1980); Purdue University, Lafayette, Indiana B.S Mining/Geological Eng., (1979); University of Nevada, Reno Similar Dr. Nnadi, Principal-In-Charge, has 41 years of experience in Projects/Experience geotechnical and geo-environmental engineering. His experience include work on roadways, bridges, high-rise structures, pipelines, earth dam design, dam remediation, landfills, geotechnical instrumentation, pavement evaluation and forensic engineering. He has completed over 600 projects in Central Florida. He is also an adjunct professor with the University of Central Florida, Civil & Environmental Department and has authored and co-authored over 14 publications. Dr. Nnadi was also a former PSI employee. PSI's Recently Completed Similar Services: While PSlis growth has been notable,even more impressive has been our ability to grow without sacrificing our personalized attention to our clients. Recognition of the importance of our clients and repeat business has been a key factor in PSI's success. PSI will not sacrifice quality,value, or service to our clients.Since our founding,we have dedicated ourselves to excellence both in our technical expertise and in customer service. It is this principal upon which we have based our organization and established a national reputation as a leader in the field of professional engineering,testing and consulting. Through PSI's One Company, One Call service, the County can access a wide range of engineering and environmental services, all through a single consultant. PSI has a strong reputation as an industry leader providing "Information to Build On", enabling you to make knowledgeable, cost-effective business decisions—decisions that help reduce expenses, improve quality,and decrease liabilities. intertek ps1 RFQ#21-005 Continuing Contracts for Geotechnical Testing Services I May 4,2021 Page I 5 U. I mx»o QUALIFICATIONSO[08( With experienced personnel dedicated to providing the highest level of customer service, PSI has built an impressive municipal client list throughout the State 0f Florida. PSI currently maintains a continuing contract with each of the following municipalities, under which we have been providing 8eotechnica|, environmental,and materials testing/inspection during the past 2 years and prior: City nfOcoee x Osceola County School District »South Fl Water Mgt. District x City ofTampa Canaveral Port Authority x Hillsborough County Osceola County Km/usia County Schools x City ofOrlando xFDOT x Lake County x City of Palm Coast BrevardCounty Orange County Utilities x City of Daytona Beach Orlando Utilities Commission x Hernando County x Citrus County City ofKissimmee Sem/no/e County City ofEustis Turnpike Authority x Pinellas County x City ufLongwood Orange County Public Schools x City of Altamonte Springs x City ofGrove/ond xRoQ&erCounty City gfOviedo City of Ormond Beach City of New Smyrna Beach City of Mount Dora x Sarasota County x City of Winter Garden x Manatee County City ofLakeland x City nfSanford Reedy Creek Improvement Dist. xBrgvordPublic Schools x City nfMaitland x City of Winter Park x City nf Port Orange Following iya sampling ofPS|'s related experience on projects sinni|arinnaturetothoseanticipated under this continuing contract.VVe have reviewed the RFCl and believe the projects |istedbduvvnmirror services that will be requested in your upcoming projects. PG| haSb8enresponsib|efOrp[Ovidihg these same services mn hundreds of projects emchyear. Anycontarts||stedbe|ovvmnaybeca|ieduponto provide a reference for PSI and more detailed information about our performance. Ocoee Lakeshore Center City of Ocoee Date of Completion-2029 Summary. PSI provided materials testing and threshold inspection services Lo the City ofOcoee for an expansion to their Lakeshore Municipal Facility.The project indud2dth8 construction ofe single-story expansion tm the existing structure with approximately Q,OOO square-feet ofnew building, associated infrastructure and parking areas on approximately 3.5 acres ofland. There will also be a new storage unit with an epproxinnate2,GOO square-foot building area. The building consisted of a typical shallow foundation system, light-gauge steel walls and post-tensioned floor slabs.The existing site required up to three feet of fill in various locations to achieve the finished floor elevation for the expansion.An assembly occupancy exceeding 500 persons made this athreshold-required structure, and as such, PSI provided the threshold inspection services to the City. muedpx, RF[l#21'DO5 Continuing Contracts for Geotechnica|Testing Services May 4,2O21 Page 1G QUALIFICATIONSO[0(( U am~ ~ ~_~ Gore Street Sanitary Sewer and Water Main Rehabilitation City of Orlando Date mƒCompletion—JO19 PSI provided testing services for this project for the City PfOr|aDd[,as a task authorization under our continuing g8O1echnical and materials testing contract. NAD|C also provided services under PSI in order to help meet the minority participation goals of the City of Orlando. The projectcmnsistedoftheconstructionofnexvinfrastructureinc|udedtheconstructionofmnevv sanitary sewer and water main on West Gore Street extending from Woods Avenue to Avondale Avenue,and ODP8[r8[nOre Avenue from Gore Street 1oColumbia Street. The scope of work consisted of the testing elements within the right of way improvements.This included the testing and inspection of pipe structural backfill on downtown city streets for approximately 2/3 of a mile over a period of approximately one year. Site construction included installation of storm and sanitary sewer pipelines. Roadway construction included testing and inspection of concrete curb, subbase, base and asphalt.ThePSI Team provided materials testing and inspection services. Briarmmomd Drive atBciarm/ood Path& O/d Brick RoadFloCounty Date of 203O This project, which PSI worked under Halifax Paving onbehalf ofRag|er County for, included paving and pavement markings MV- on BriarmxoOd Drive, 8riarmxood Path and Old Brick Road,starting atS.R. 100. It entailed the rehabilitation of approximately 0.523 miles of roadway and other associated improvements for F|mg|erCounty. F|ag|erCounty inspectors performed visual inspections on some port|ons of this project. PS|'spr 'ectscopeinduded: w MobilizationlDemobilization for the paving and pavement marking operation. m Testing and ' sctionofembonkn/ent,stabilized subgrade and base materials. w Testing and inspection of added drainage structures. 0 Testing and inspection ofasphalt paving and materials. TypeSP Structural Course(Traffic C)1 Y2^with primeltadifor roadway and driveways and required asphalt w Pavement markings. Testing services provided included: Modified Proctor Maximum Density Testing; Limerock Bearing Ratio Testing;and Comprehensive Strength nf Concrete Testing. PS|'a testing contract was valued at 17,887. intertek WS1 RRl#Z1-DO5 Continuing Contracts for Geotechnica\Testing Services N.ay4`2021Page 7 JO, I. FIRM'S QUALIFICATIONSocoee nondo Aviation Drive Flagler County Date of Completion—2020 Summary:Work entailed the reconstruction of approximately 700 linear feet of Aviation Drive at the intersection with State Road 100 and associat9d improvements in Flagler County. Flagler County inspectors performed visual inspections on the asphalt paving portions of this project. PSI's scope of work included, but was not limited to the following: Concrete Curb& Gutter Type RA Shoulder Gutter, Concrete Traffic Sep., Concrete Type I, 4'Wide Pipe Culverts, Storm Inlets and Manholes Testing services provided included: Modified proctor Maximum Density Testing; Limerock Bearing Ratio Testing; and Comprehensive Strength ofiConcrete Testing. PSI's testing contract was valued at 16,450 SR 408 Widening from SR 417 to Alafaya Trail Central Florida Expressway Authority(CFX)do Lane Construction Date of Completion—2019 i ,„; A. N., Summary: PSI provided materials testing services for a 7.1'.. ,„„..... 52-"-4',1- roadway widening project on State Road 408 (SR 408)from State Road 417 to Alafaya Trail. PSI was contracted with CFX e-"*** i ii 4-, ,, . .1 i v,' , , v„,- r. through Lane Construction. This 3.24-mile project added a i• ' i;. 1 rci- I, . - , , travel lane to SR 408 in each direction (from two lanes to three ii. 1:4C34'11, '.tt'-lanes);widened the entrance ramp from northbound Alafaya tkr I: .f,i, . .Iii , i.„--,-.1 Trail to westbound SR 408 from one lane to two lanes, in "I, 101.17-::-, reconfigured the exit and entry ramps at Rouse Road and i 4. , , '. 1„! ill',.;,%,-,4 f'- 1,1 II , ' ii*,‘:'St ,,,- ./A added an additional Open Road Tolling(ORT) lane in both 1 ' l'i:' )` ; ' i 1'14' ''.-L-1-- directions at the Dean Road Main Plaza. Construction took approximately 24 months and was completed in 2019. 1 1 1 Intertek. Si RFC/#21-005 Continuing Contracts for Geotechnical Testing Services I May 4,2021 Page I 8 414MO/Swir 8, FIRmm^o QUALIFICATIONS City Soccer Stadium Citnmf n Date af Completion—2OZO The City of Orlando (Citv) hired PSI in SepterObeF2O13 to perform a Phase | ESA for two ci tv blocks in downtown Orlando. The Phase | ESA report identified various on-site recognized environmental conditions(RE s\, including stations, engine and auto motive repair facilities,o junkyard, o insecticide company, battery and repair facilities, used car sales, scrap nl8ta|and metal shop, iron works,and a transformer repair facility. PSI performed Phase || ESA and Supplemental Site Assessment(SSA) activities in 2014. The assessment activities included the performance of hundreds of soil borings up to 50 feet below land surface (BLS) and collection of soil samples for laboratory analysis, Bs well asthe installation and sampling of46 shallow and deep monitoring and observation wells. PSI identified various areas of soil impacted by petroleum, metals, and pesticide related chemicals, as well as three areas of groundwater impacted by petroleum and solvent related chemicals. PSI was also contracted 6«the development team tn perform QeOtechnica|engineering services, including the performance Of28 standard penetration tests/SPTs\ and soil laboratory analysis. The geotechnica! report evaluated the high groundwater table in the area of the project,asxve|| assoi| characteristics related toplanned redevelopment. Fire Station#2 City of Orlando Date of Completion—JD2O K4cCreo General Contractors and Architects, Inc. K4cCree\ hired PSI in January 2O16 to continue with site assessment activities initiated 6v another City ofOrlando City) contractor. During various due diligence activities pe orrnedonthep|annedre|ocationaitefortheCityFire Station#2,vvasdeternninedthatthepropa yvvas previously developed asa 'unkv rd Duringjunkyard.' preparation activities,the site general contractor/K4[r p) identified buried debris mt the site. Subsequent site assessment activities performed by the Cit«'scontractor determined that there was extensive debris buried across large portion of the property, and various contaminants ofconcern (CO/ s)were identified, including metals, petroleum-related parameters, solvents,and polychlorinated bipheoy|s/PCBs\, RRQ#Z1{05 Continuing Contracts for Geotachnioa|Testing Services I pNay4,2021PageJ9 t I. FIRM'S QUALIFICATIONSOcoee Based on the initial soil and groundwater assessment results, in December 2015,the City, McCree, and PSI met with the Florida Department of Environmental Protection (FDEP)to discuss further assessment activities and potential remediation of the site. It was decided that PSI would perform test pits across the property on a grid pattern, collect soil samples for laboratory analysis from just below the buried debris in each test pit, and perform horizontal and vertical delineation of the Toxicity Characteristic Leaching Procedure (TCLP) lead-impacted soil above 5 milligrams per liter (mg/L) and the PCB-impacted soil above 50 milligrams per kilogram (mg/kg). Based on the site assessment activities performed by PSI, PSI coordinated the excavation and disposal of approximately 14,000 tons of non-hazardous soil and approximately 1,600 tons of hazardous soil. A Remedial Action Status Report(RASR) and No Further Action (NFA) Proposal was submitted to the U.S. Environmental Protection Agency (EPA)and the FDEP documenting the activities performed. An NFA and Site Rehabilitation Completion Order(SRCO)was issued for the site by the FDEP, and it is expected that the EPA will also approve the final report and recommendation for no further action. PSI also performs annual Brownfields reporting to the FDEP,which allows the City of Orlando to receive Voluntary Cleanup Tax Credits (VCTC) for the costs associated with the assessment and remediation activities, providing a total project tax credit of approximately$720,000. The following are examples of several of our current continuing municipal contracts and the work we have been awarded. City of Ocoee Continuing Geotechnical, Environmental and Materials Testing Contract Ocoee, Florida Oly. ocoee Summary:Services provided under this contract include Geotechnical Consulting and llartda Engineering, Environmental Assessments and Construction Materials Testing and NDE Services.The services have specifically included: subsurface investigations for soil and water conditions using standard penetration test borings,visual classifications in the field and laboratory classifications including minus 200, plasticity index and permeability tests,foundation consultation and recommendation, soils and materials testing including suitability, compaction testing, concrete quality control,and pavement/asphalt evaluation,testing and inspection. Our environmental services have included ESA, indoor air quality analysis,asbestos and demolition surveys,groundwater monitoring, etc. The majority of projects most recently performed under this contract are roadway construction and/or expansion projects. PSI has provided extensive geotechnical and materials testing on these jobs including subsurface investigations; soil classifications; pipe backfill, base and subbase soils testing and inspection;concrete compressive strength testing; and asphalt testing, inspection and observation. PSI has also had the opportunity to perform asbestos surveys and other environmental services.We have helped the City to address several emergency call-out projects. intertek. RFQ#21-005 Continuing Contracts for Geotechnical Testing Services I May 4,2021 Page 110 v4~'w- U |0HN QUALIFICATIONSDCOe@ 1-1- Selecte Lakewood/D Oakland Avenue Reconstruction (current project) Ocoee City Hall(current project) w The Hammocks Reclaimed Water Retrofit w Ocoee Hills Road w Ocoee Lakefront Park Windermere Grove Reclaim m Vi/netti Park Pavilion Montgomery Park Pavilion 8/uford and Main Street Coring w North Clarke Road Inlet w Downtown Ocoee Stnnnw/oterPond w Maine Street Extension w City»f Ocoee Downtown Expansions w Inlet Settlement Project w Asbestos Survey and RennedYotion for Two Residential Structures Ocoee Parking Lot Coring City mf Orlando Continuing Environmental Contract Orlando, CITY OF U U Summary: PSI has pe ormedvarious Phase | ESAs for the City of n n~"= Orlando. The sites have included former gasoline stations, former dry-cleaning facilities, automotive repair and body shops, and multi-tenant residential dwellings. Subsequent to the Phase I ESAs, PSI has performed Phase 11 ESAs on sites identified to have recognized environmental conditions (RECs).The Phase || ESAsxverg performed to address various contaminants of concern, including but not limited to petroleum, metals, and solvents. Soil and groundwater impacts at concentrations warranting further assessment have been identified at select sites whereby PSI subsequently conducted site assessment activities to further delineate the area of impact. PSI has also been involved with remedial activities to include soil and groundwater systems and source removal activities at various sites for the City. The City ofOrlando contracted PSI to perform petroleum storage tank closure assessment activities during the removal of underground storage tanks (LISTs) at various City-owned properties, including lift stations, treatment facilities, and tanks encountered under roadways during utility improvement projects. The assessment activities included observing the storage tank removals, performing field screening of soil samples in the excavation areas, collecting soil and groundwater samples for laboratory analysis, report preparation, and submittal of tank closure documents to the local regulatory agencies. PSI also performs asbestos, lead-based paint, and indoor air quality consulting services for the City on an ongoing basis. We provide air monitoring services during the asbestos abatement activities and have developed a Master Asbestos Abatement Specification Manual to assist the City in standardizing asbestos abatement scope of services performed under their asbestos abatement term contract. mtexex, nS8 wm\,mw K. U_mm _ QUALIFICATIONSd 0[O(( During PSysextensive assessment activities,Vve were able h}assess several media types, including soil, soil gas,groundwater, surface water, sediments, and'sanitary drainage systems.Asa result qfthese activities, PSI developed a Remedial Investigation/Feasibility Study(RI/FS)to evaluate remedial strategies for cleanup purposes. PSI also developed a Community Relations Plan, along with the OUC and the City. Selected projects w Packing District Park M w PrincetonlJYP—LSA w McCoy Annex M Southport Asbestos Survey w Fire Station#1S Nap Ford School Carver Park Phase VY City Horse Stables Loma Donne Park Demo Survey Iron Bridge Phase//& 0/ w L Station#55 w2127VenetianAve Asbestos Survey w y&xncoossea Road ROW Groundwater w Continuing Annual Soil Sampling Lift Stotion#I33 0 [onserv/MN/S Harry R1eu Building—NfSH4P Pulse Nightclub Orange County Utilities Continuing Contract Orange County, Florida 0DateofCompletion—Ongo/ng Summary. Forthia nntra PSI has provided geotechnica| engineering, construction materials testing and inspection,and environmental consulting C KJl JL L services.Specific tasks under this contract include eva|uaU p L 0 a I U Aonofsoi|sond geologic conditions of project sites; determination of soil stability for soils tObe under and around foundations and other infrastructure; evaluation of areas prone to settlement and sinhho|es;eff|uentdispopa| reconnnnendatiohs;dexe|opnnentofQroundvxatermnonitorin8p|ans, installation of groundwater monitoring wells,and evaluation of data from such wells; evaluation of sites for new well fields;aquifer performance testing; evaluation of abandonment of underground storage tanks, including remedial restoration work; preparation of hazardous-waste contamination assessment reports; specialized ge0techDica|and water resource evaluation;. e|d and laboratory testing of materials (soi|s,concrete, asphalt, masonry, etc.);and field testing for construction inspection and compliance with construction standards. Selected projects Oak Meadows Well Houses(current) laromo Ocoee Force Main & Utility Improvements(current) w Semi-Annual Water Sampling Continuing Assignments(current} w N/RN/SF Phase 3A/&3B ERN/3F Sodium 8ypoch/or/te Rio Pinar Lakes Blvd Force Main Water[onserv0Transmission Main H muytex~ 8~= ww RFO#21'OO5'Continuing Contracts for 5eotechnica\Testing Services May 4,ZO21Page 12 4_04'I. FIRM'S QUALIFICATIONSocoee floddo Palm Parkway&Apopka Vineland Connector LB. McLeod Road Transfer Station Replacement Berry Dease Water Main Replacement Southwest Regional Wastewater Facility Southern Service Area Transmission Main Northwest WRF Reclaimed Water Storage Investors'Row&JYP Force Main Holden Heights Community Improvements Sand Lake Hills& Hiawassee Road Force Main CR 535 Reclaimed Water Main Landfill Biennial Sampling and Leach ate Quality Monitoring Bonneville Drive Sanitary Sewer Pine Hills Landfill Monitoring Well Abandonment South Reclamation Digester Improvements I-Drive Force Main & Pump Station Improvements Osceola County Continuing Geotechnical and Materials Testing Contract Osceola County, Florida I\ tit).- 1,,• :6,11Selectedprojects Osceola County Sheriff's Training Facility—Materials testing services for new construction on a 101-acre site. The project is being built in two phases. Phase 1 has a$13.7 million budget and includes road improvements, a 300-yard shooting range, two pistol shooting ranges, a terrain shooting range, a shoot house, and areas for driver training. Testing services provided include mass soil density, pavement sub grade and base course testing, moisture/density testing and limerock bearing ratio testing. Osceola Fire Station #73—Construction of a fire station and fueling pad with an approximate 12,400 square foot building footprint on an approximate 3.7-acre parcel of land. The construction consists of typical shallow foundations and tilt-up concrete walls. Site work will consist of new utility lines and approximately 85,000 square feet of concrete paving and approximately 15,000 square feet of asphalt paving. Materials testing services provided as part of this contract include concrete sampling, asphalt testing, structural steel inspection, moisture/density testing and limerock bearing ratio testing. Additional projects Osceola County Specified Projects—10 fire stations(current) Austin-Tindall Park Osceola Parkway Phase Pleasant Hill, Canoe Creek and Boggy Creek Coring Cypress/Doverplum Intersection Dyer/Osceola Parkway Intersection intertek. pso RFQ#21-005 Continuing Contracts for Geotechnical Testing Services I May 4,2021 Page I 13 tii0loeeOr 1. FIRM'S QUALIFICATIONSoc Flagler County Continuing Contract Flagler County, Florida Selected projects FLASLER CR 305 Bridge#734083 Replacement-CR 305 Bridge project included the COUNTYFLORMA replacement of a two-lane bridge, roadway approach reconstruction and drainage improvements. The new bridge is approximately 1,300 feet in length. The bridge is supported by 18-inch square pre-cast pre-stressed concrete piles. PSI's scope of work included performing geotechnical engineering and verification testing/inspection services for Flagler County. Specifically, our services included performing Pile Driving Analyzer(PDA)testing of the test piles and determining the driving criteria for the production piles. PSI's services also included inspecting the reinforcing steel and casting cylinders on fresh concrete for compressive strength testing. We also performed field and laboratory testing of the pavement section components of stabilized subbase, base course, and asphalt. Princess Place CEI—Design,permitting and construction including but not limited to survey, prevention, control and abatement of erosion and water pollution, demolition of the existing bridge, construction of a replacement bridge and associated approach and other related items. The overall project length including bridge approach was 200 feet and included the removal of the existing Bridge, along with the design,permit and construction of a replacement bridge for a brackish water environment with related roadway and safety improvements. Additional projects Aviation Drive Briarwood Road Princess Place Island House City of Sanford Continuing Environmental Contract I P Sanford,Florida Apnto, N•—1877=4 PSI has a Continuing Services contract with the City of Sanford under which we have provided environmental consulting services to the City of Sanford since 2010.The industrial hygiene services projects have included demolition National Emission Standards for Hazardous Air Pollutants(NESHAP) and lead-based paint surveys for City owned facilities and properties the City is looking to acquire, and indoor air quality and mold assessments. The asbestos and lead-based paint surveys have been conducted on properties surveyed have included facilities occupied by City employees, apartment complexes comprised of multiple buildings that included apartments ranging in size from approximately 1,500 to 3,750 square feet,and individual commercial and residential structures. Samples of suspect asbestos-containing materials identified were collected and submitted to the laboratory for analysis by polarized light microscopy (PLM). Additionally,as necessary, point count methodology was utilized to determine the absence or presence of asbestos fibers within select materials. The lead-based paint surveys were performed utilizing an X-ray fluorescense (XRF) device. Intertek RFQ#21-005 Continuing Contracts for Geotechnical Testing Services I May 4,2021 Page I 14 vm 0X U O S 000e( U um ~ PSI has also conducted industrial hygiene sampling for the City to include mold assessments to address employee concerns in areas where moisture and/or fungal amplification may be affecting the areas surveyed. PSI has collected total fungal air samples utilizing A||ergenco-O/M spore traps that deposit the spores onto a slide where they are identified and enumerated microscopically were used as the sampling media. TheA||ergenoo-D TM spore trap was connected toa sampling pump calibrated toa flow rate of 15 liters per minute (Ipm) for a total sample volume of 150 liters. Additionally, P3| has collected tape/lift samples and comfort parameter measurements toinclude temperature and relative humidity during the indoor air quality surveys. Based on the findings, PSI provided recommendations to the City based on the data collected. Recent projects have included Sanford Storm Sewer and Utilities Advanced Environmental, 121S. Palmetto Avenue ESA, Lake Munroe Terrace ESA, and the 24 1»&South Oak Avenue StVrmxvaterPond, Client References: Client/Lotation Continuing Cont Osceola County Mr. Curt Diehl Geotechnica/Engineering, Construction Materials Testing& 407-742-0517 Threshold Inspection, and[]EI Services curt.diph|@0sCeo|a.urF, Orange County Utilities Ms.Terra ReFfitt Geobechn/ca/Engineering and Construction Materials Testing 407-947-9803ce|| Services terra.reffitt@ncf|.net City of Orlando M[. Uavid]. 8a55, PE Environmental Engineering Services407-246-3221 david.bass@or|ando.gnv 0 v RFD#2I'005[ondnuing Contracts for Gentechnica|Testing Services I May 4,2O2lPage 15 04 I. FIRM'S QUALIFICATIONSocoee florid° Organizational Chart: ocoee Honda PROJECT MANAGER/ CORPORATE SUPPORT SINGLE POINT OF CONTACT Lance Reaves Aaron Wells, PE District Manager Department Manager/Project Construction Services Engineer GEOTECHNICAL SERVICES MATERIALS TESTING ENVIRONMENTAL SERVICES SERVICES Robert Trompke, PE James Hill, PE,SI I Vicki Lewis, LEP,REPA Principal Consultant Principal Consultant Department Manager Ian Kinnear, PE Robert Bryant Angela Garzia,PE Chief Engineer Transportation Manager Chief Engineer Mustapha Abboud, PE Stan McLellan Jeffrey Townsend, LEP,REPA Regional Transportation Senior Project Manager Senior Project Specialist Engineer GEOTECHNICAL SUPPORT TESTING SUPPORT ENVIROMENTAL SUPPORT 3 Staff Engineers 4 Staff Engineers 6 Staff Scientists 70 Field & Lab Techs 6 Drill Rigs &Crews 3 Field Scientists 1 Laboratory Manager CAD/Drafting Department 2 Staff Engineers 24-Hour Dispatch Service Intertek psi RFQ#21-005 Continuing Contracts for Geotechnical Testing Services I May 4,2021 Page I 16 w', K U » U 0 SOcoeeQUALIFICATIONS PSI has assembled a team of highly qualified professionals to work with the City on this contract. Each member of our team possesses the requisite technical skills along with excellent interpersonal skills and a complete understanding of the total process.These assets are all essential to attaining the high quality and performance goals the City will expect. Mr.Aaron Wells, PE,will act as your s/ng/e ' tmFmmmtoot. Havvi|| takeanact|vero|eina|| aspectsof each project,coordinate all assignments of personnel, and review all summary reports and invoices. As Department Manager, he has the full authority to appropriate the necessary PSI resources to accomplish all engineering,testing, and inspection assignments. All communication and coordination will take place through Mr. Wells. He will always stay abreast of the project details and will be your conduit to the additional members of our team. Following this page, please find summary resumes for each of our proposed staff members.All staff listed work for PSI and will be committed to this contract's work as needed. Mr. AaronWells, PE nstruc/on en/*D rtn? t8 onoger,S/oo6sPo/ of D n ict Mr.Wells isa Department Manager for the construction materials testing service line inPS|'s Orlando office. |n this capacity, Mr. Wells supports the firnn's goal of being an industry-leader in engineering, consulting and testing by ensuring the delivery of quality services. He has experience providing a broad range of materials testing and construction inspection serv|cgs Thi n rnp d pf und ti n soils testing for s|tevxork. concrete and asphalt pavement testing and evaluation, quality assurance inspection, and construction inspection. Mr. Wells manages projects involving soils, concrete, and asphalt, as well as reinforcing steel and threshold inspections across various industries. His daily operations include scheduling, billing, and overseeing various projects from start-up through to the construction phase and evaluating site conditions to ensure compliance with project speciMcationy. K8r. VVeUsxxiU coordinate all assigned construction projects gndnl3naQethe |argestaffufen8ineerin8fie|d technicians across our Orlando and Kissimmee offices. Education: e BSin Engineering, North Carolina State University, 2012 Certifications: Professional Engineer,#83O34` Florida Completed Project&4anagennent[ertiOcationPro8rann (2D13) Nuclear Gauge Operator Certified Year Total Experience: 7 Year Started With PSI: 2013 ps[ RFQ#21-005 Continuing Contracts for Geotechnical Testing Services I May 4,2021 Page 17 t I. FIRM'S QUALIFICATIONSOcoee Horida Mr. Robert Trompke, PE-Geotechnical Principal Consultant/Department Manager Mr.Trompke has over 27 years of experience and, as the Geotechnical Department Manager, regularly oversees commercial, private and public development. Mr. Trompke supervises FDOT highway and bridge projects, municipal water, wastewater and transportation projects,deep foundation applications,and soil explorations and evaluations.Additionally, he has performed geotechnical engineering services under more than fifteen different continuing service contracts with various city and county governments. His vast experience also includes geotechnical laboratory analysis, groundwater modeling, and structural design and analysis. Education: BS in Civil Engineering, University of Central Florida, 1995 BS in Design Engineering Technology, University of Central Florida, 1992 Certifications: Professional Engineer,#55456, Florida, 2000 Year Total Experience: 27 Year Started With PSI: 1995 Mr. Ian Kinnear, PE-Geotechnical Chief Engineer Mr. Kinnear has 45 years of industry experience and has been with PSI for more than 18 years as the Chief Engineer for the Geotechnical Department in the Orlando office. His background is in geotechnical engineering,foundation engineering,groundwater evaluations, and design and is considered an expert in construction over highly compressible soils. His experience includes providing consultation in soils and foundation engineering to public and private sector clients for a variety of buildings, pipelines, roadways, and waste disposal related projects.A small sample of similar projects include:SR 15 from Lee Vista to Conway,SR 415 over St.Johns River Bridge, US 17-92 Pedestrian Bridge,and multiple projects at Walt Disney World, Universal Studios. For this contract Mr. Kinnear will provide QA/QC and senior technical geotechnical support as needed. Education: BS in Civil Engineering, Heriot-Watt University, 1976 Certifications: Professional Engineer,#32614, Florida, 1982 Professional Engineer,#818E, U.S. Virgin Islands, 2003 Year Total Experience:45 Year Started With PSI: 1989 intertek, RFQ#21-005 Continuing Contracts for Geotechnical Testing Services I May 4,2021 Page 118 S4. Oc06!@ K^ ^ " » QUALIFICATIONSU°' ~*== M @h@Abboud PE—Geo chn eoz no/Transportation ^Engineer Mr. Abboud's experience in the field of geotechnical engineeringindudes management of various sized projects inthepub|ic, prhxateandgoxernnoent sectors. He has analyzed and designed a variety of shallow and deep foundation r ~ 'systems, including driven piles, drilled shafts and augercas1p||es. He has designed and executed dozens mf pile load tests, both instrumented and non-inatrurnented. In addition, he has been involved in collecting field data on driven piles using the Pile Driving Analyzer(PDA). Mr.Abboud has managed the geotechnical aspects of H multiple FDOT projects in every District in the State of Florida including the Florida Turnpike District8. One good example of a project he worked on is the 1-4 Ultimate Widening in Orange County and the Western Beltway(SR 429), Part{, in Osceola County.The geotechnica| exploration conducted in the area of the proposed SR 429 Interchange with 1-4, showed alternating layers of muck and highly organic clays were encountered to depths greater than 50 feet. In order to address the challenges associated with the roadway construction inthis area of the project andto allow the construction of the proposed interchange as planned (i.e.over the location of a relic sinkhole), Mr.Abboud designed and executed a low-cost and time-effective surcharge program that would later allow the construction of the Ramps without the need to excavate and replace the deep deposits of organic soils or bridge over them. Education: QSin Civil Engineering, Beirut University, l984 w K8SinGeotechnica| Engineering, University of Michigan, 19Q8 Certifications: Professional Engineer,#56112, FL, 2OUU Year Total Experience: 26 Year Started With PSI: 199Q-2O14, 2019 mumek~ o RFQ#l1-0O5 Continuing Contracts for 5eotechnko|Testing Services May 4'2O21 Page i 1 Sae U~ U mm^o o K FUK TK K S D[Oe Stan Senior,Project ManagerNUnkj.-. Mr. McLellan isaSenior Project Manager responsible for overseeing the construction materials testing and threshold inspections on many large commercial projects throuQhoutCentra| F|ohdaondhehaaover37yearsof gxpehence. |Dthis capac y, heSUpen ses technicians, mnanages con ruction schedules, prepares proposals, issues reports, and aiDtainsbudgets oDDU0Oerous ongoing projects. HebxveUveoedinabroadronge .ofnmateha|stestingandinspecbohsorvicmsdue to!morNngasaOe|d technician and dispatcher duh xvduringhis Th secategories include deep foundations, soil testing and'anakais, rO8dvvav materials testing, pavement investigation and evaluation,concrete testing and evaluation including performing Floor Flatness and Levelness testing, construction inspection,structural 'steel inspection/testing,fireproofing testing and inspection and vibration monitoring. Certifications: AC|_Agsregate Field-Testing Certification w [IQPQCManager CT[lPUrnerock Bearing Ratio Technician w Certified F-Meter Operator(Concrete floor f|atness/|eve|ness) w Vibration Monitoring Year Total Experience: 40 Year Started With PSI: 1981 erM Lance Reaves-Cons uc Construction District As District Manager for PSys Central Florida Construction Services operations and with over 44 years Of industry experience, Mr. Reaves is expert iD8 broad ran8eof nnateria|stestingandconstruotioninspecdonservices.Thesecategoriesconsistof deep foundations, sinkhole assessment and remediation,soils testing for site work, roadway materials testing,concrete testing and evaluation, construction inspection, structural steel inspection and testing and coatings measurement and inspection. Mr. Reaves also manages a group of more than 7O personnel and serves as Client Manager,Technical Liaison and Project K4anaQerforavvidearray of clients, such as Orange County, City of Orlando, Orange County School Board, Florida DOT,Wait Disney World Company, Universal Studios,and Osceola County School Board. Certifications: Certified Building Inspector-|CC Certified Concrete Inspector /AC|\, Levels |/||, 19OO w Certified Welding Inspector(AVV5), 1993 Year Total Experience:44 Year Started With PSI: 1977 KC-rtek Ok Sm RFQ#21-OO5Continuing Contracts for Geotechnica|Testing Services I May 4,2U21Page 20 4_04 1. FIRM'S QUALIFICATIONSocoee No000 Mr. James Hill, PE, SI-construction Testing Principal consultant&Special(Threshold) Inspector Mr. Hill,a Professional Engineer and a graduate of the University of Virginia with a degree in Civil and Environmental Engineering,joined PSI in the Spring of 2016 and 1 _ has over 9 years of diverse industry experience. He is currently responsible forr1providingprojectmanagement, technical expertise and support to clients for a variety of construction materials including soils, concrete, masonry, concrete reinforcing, structural steel, wood framing,and paving His past experiences as a Project Engineer include working on various aspects of a project's scope,such as conducting materials testing,threshold inspection,geotechnical engineering evaluations, Phase 1 Environmental Site Assessments, and soil and water analyses. He has performed these services on projects for both public and private sector clients. Mr. Hill will serve as Licensed Special Inspector for any assignments requiring threshold inspection services. Education: BS in Civil and Environmental Engineering, University of Virginia, 2010 Certifications: Professional Engineer, Professional Engineer/Special Inspector,#81087, Florida Professional Engineer,#042619, North Carolina Year Total Experience: 11 Year Started With PSI: 2016 Mr. Robert Bryant- Transportation Department Manager Mr. Bryant is extremely familiar with both the field and laboratory procedures and has been involved in a diversity of testing services. Mr. Bryant also has a wide array of knowledge concerning prestress plants and manufacturing processes. He has worked on all testing and inspection aspects of roadwayi liflifJV4:' construction. His responsibilities included ensuring all sampling, testing and materials were in compliance with project specifications;attending meetings; providing MAC entry; invoicing; managing/supervising all testing procedures and methods in the field; and being present at large concrete pours,the beginning of paving operations, etc. Certifications: CTQP QC Manager CTQP, LBR Technician CTQP,Asphalt Paving Tech—Level I & II AC!,Concrete Field Testing—Level I CTQP,Asphalt Plant Tech—Level I & II ACI, Concrete Inspector—Level II (CTCI) FDOT Concrete Field Tech—Level I & II CTQP, Concrete Lab Technician—Level I CTQP, Drilled Shaft Inspector CTQP, Aggregate Base Testing Technician Year Total Experience: 37 Year Started With PSI: 1989 intertek. Si RFQ#21-005 Continuing Contracts for Geotechnical Testing Services I May 4,2021 Page I 21 mms.omww~ K. FUR--»S QUALIFICATIONSO[Oe6 V ki Ms. Lewis has over 38yeors of experience in the environmental field. Her current responsibilities include the management and direction of the Orlando, Florida environmental department which provides Phase 1/11 Environmental Site Assessments (ESAs), contamination assessments and remedial activities, industrial hygiene services(asbestos, lead, indoor air quality, noise assessments, negative exposure ayse3Sm2DtS>, and ecological services. K4S. Lewis has extensive experience with Phase 1/11 ESAs for due diligence and communicating findings of fir co nditionsonditionsidenti ed1oc|ients. J.l Education: w BA International Business, Florida Atlantic University, 1989 Certifications: Licensed Environmental PrnfesSiODal#138 Certified Florida Environmental Assessor#294 Lead Inspector w EPA/\HERA Asbestos Inspector and Management Planner Year Total Experience:29 Year Started With PSI: 1991 Ms, Angela Garzia, PE_Environniental_ Chief Engineer. With over 33 years of experience with PSI providing Phase kA| ES'Ay soil and groundwater [Oents n r OM d P nd b hhzhk/sW||edFVWDrsyecovo/e individual and a Regional Engineer, Officer, as well as Principal Consultant f for PSI.She is responsible for overall management of various types ofprojects, including Phase | and Phase || ESAs,tank closure assessments,tank system specifications and replacements, soil and groundwater sampling and analysis plans, pilot study activities, source removal activities,i cUAtarninad n>n eS nts, and remedial action plans/RAPsi Ms. Garziaalso serves asamain point of contact for the Petroleum Cleanup Program contract PSI nnainta|ns with the FDEP. Education: BS Environmental Engineering, Un of Florida, 199G w Professional En8ineer#6QO8S, Flohda2OO2 OSHA 4O Hour Safety Trainingh\O Hour Refresher for Hazardous Waste Sites Year Total Experience: 24 Year Started With PSI: 1997 muntex, w RF[l#Z1'DO5 Continuing Contracts for Geotechnica|festing Services I May 4,2O21Page 22 Ocoee 1. FIRM'S QUALIFICATIONS Mr. Jeffrey Townsend, LEP, REPA —Envirommental Senior Project' Specialist Mr.Townsend has over 3Z years of experiencein the environmental engineering field. Heis responsible for senior technical review of Phase | ESAs employee development and quality control for those performing Phase I ESAs, and has been assig ned as one of PSIs Principal Consultants for the Phase I ESA Program in Orlando, Florida and other Florida operations, conducting ESAs and surveys to include components relevant to the All Appropriate Inquiry(AAI), U.S. Housing and Urban Development(HUD), and Federal Communication Commission (FCC) National Environmental Policy Act (NEPA). He serves as the point of contact on projects to provide a.fluid project for the client from beginning to end. Education: w AS Valencia Community College, Orlando, Florida, 1994 w Aerospace Engineering Studies, Kansas University l985-Q7 Certifications: Licensed Environmental Professional, Florida#144 w Registered Environmental Property Assessor, NREP#S999 w EPA/\HERA Asbestos Inspector w Lead Inspector OSHA 4O-Hnu[ HAZVVOPER Year Total Experience: 32 Year Started With PSI: 2019 PSI's Understanding& Project Approach: Mr.Aaron Wells, PEwill act as your single point Of contact for this contract. Mr. Wells isalicensed professional engineer and has extensive experience in the management of continuing contracts for . local and state government. He will take an active role ina||your projects,coordinate all assignments of personnel,and review all summary reports and invoices. He has the full authority to apply the necessaryresouroestoaruJnnp||5ha||tes¢ing, inspection, orengiUeering assignments. We envision our personnel nearly as an extension of your staff and a dependable resource upon which you can rely. Our approach to providing each of the services requested by the City will embrace this vision,and will rely upon developing an approved project scopmandbudgetarycostestirnate, stafOng the project xvithqua|ifiedpersonne|, proceedingxvithservicessubsequentto|smuanceofataskorder, maintaining communication with the City project mon3ger/eOgineer, and providing the requested services within schedule.We will address all alternatives to provide the most professionaland cost- effective environmental,geotechnica|, laboratory testing, construction materials testing and inspection services. mWxsx. o RRZ#21'005 Continuing Contracts for Gentechnica|Testing8emices K8ay4,2U21Page 23 to m e mw' U, 'URm» nA FICATUK S O[O2( Geotexhnicsl Services PS|'s services will be performed in accordance with the most current version (unless the project isbeingdesiBnedunder an older version) of the Soils and Foundation Handbook SFH) au well as related manuals,Structures Design Guidelines and procedures. Our services will include gathering o["enb1ng data" (i.e. USDA SCS Soil Survey maps, USGS maps, historic aerial photographs and review of Qeotechnico|data from projects in dose proximity).AxveU planned "existing data" review increases project avvanyhess and puts forth knowledge of any unusual conditions duringtte tj the planning stages. We understand that itis an FDOT District V requirement tO obtain drilling permits for work performed within the FDOT ROW. The field work will be performed with appropriate Maintenance of Traffic and gSSA certified peraonneL Our local knowledge of existing soils conditions, availability oflocal construction materials, local contractor capabilities and potential claim areas,will be used tOprepare the most cost effective/feasible recommendations and identify areas that may require special considerations beyond the typical scope ufservices. We would execute a program of subsurface sampling and field testing,. Field testing would consist of . Standard Penetration Test(SPT) and auger borings in the proposed development areas.The SPT borings would be performed in building and structure areas.The auger borings would be performed in the proposed pavement and ytnrnnxvaternatention areas.The boring depths would be planned to provide necessary.subsurface information based on building loads, pavement requirements,and stormwater retention criteria.The borings would be field-located measuring from existing features at the site and hand-held GPSequipnOent. PSI w/i||visua||y classify and stratify representative soil samples in the laboratory using the Unified Soil Classification System. We will conduct a laboratory testing program appropriate for each project, identify soil conditions eteach boring location and form an opinion of the site soil stratignaphy' Performing permea bility testing for proposed stormwater facilities, collecting groundwater level measurements iDthe borehV|es and estimating normal wet seasonal high groundwater levels would a|sobepartofourscope.Theresu|tsofthefie|dexp|orationand |aboratoryteutsxxi|| beusedihPS|'s engineering analysis and in the formulation of our geotechnica| recommendations.The results ofthe field and laboratory work, including the recommendations and the data on which they are based, will ba presented ina written report to the City. muertex, w RFQ#21-005 Continuing Contracts for 8entechnica|Testing Services yNay4`202IPage 24 t0,4 I. FIRM'S QUALIFICATIONSOcoee Hondo All geotechnical services will follow a series of steps in order to assure each project requirement is adequately addressed. This approach may be summarized as follows: Proposal Attend meetings between City representatives and PSI project personnel to review and define project objectives, to establish scope of study, and to establish the time required to complete the scope of work. Research any available data. Submit a preliminary written proposal to the City Project Manager/Engineer. Agree on proposal and receipt of work order. Assign geotechnical engineering team for specific project. Schedule drilling and field activities. j k A Field Exploration and Testing if ua,A Perform field reconnaissance to determine existing conditions f:{ t¢ pertaining to site accessibility, location, etc. rtl: t Locate all utilities within the project area prior to field activities.sr Execute field subsurface exploration and testing as outlined in the u proposal and per FDOT guidelines and requirements unless modified by the City. Borings in rock with density exceeding 50 blows per foot will continue at a minimum of five feet into the stratum. If the stratum is less than five feet thick, the boring will continue to the design depth. t Perform standard penetration tests in cohesionless soils at two- foot intervals to a depth of ten feet and at five-foot intervals thereafter, and at any stratum change. Perform field determination tests of unconfined compressive strength(Qu)on cohesive soils encountered during explorations. Communicate significant findings immediately to the Project Manager/Engineer. Laboratory Testing Begin laboratory testing as samples become available, prior to all fieldwork being completed to expedite the project. Review laboratory data as tests are completed. Communicate significant findings immediately to the Project Manager/Engineer. Engineering Evaluation Begin and continue the preliminary evaluation based on field and laboratory data. Outline potential alternative solutions. Discuss with City possible alternatives, associated risks, and costs. Develop engineering parameters from the final field and laboratory data. Analyze and evaluate alternatives. Select and recommend alternatives to the City. Intertek,, RFQ#21-005 Continuing Contracts for Geotechnical Testing Services I May 4,2021 Page 125 to K. 'IR« - v QUALIFICATIONS0[O(@ dd. Environmental Services Approach: Phase ( Environmental Site Assessments(ESAs) Phase I ESAs are conducted to search for evidence of recognized environmental conditions(RECs), historical RECs, Controlled RECs, and Vapor Encroachment Conditions in connection xviththe subject property. PSI performs Phase I ESAs in,general accordance with ASTM.Standard E 1527-013,Standard Practice for Environmental Site Assessments: Phase | Environmental Site Assessment Process. Phase | ESAs may also be performed to satisfy the requirements to qualifv for the innocent landowner, contiguous property owner,or bona fide prospective purchaser limitations on CERCLA liability, or landowner liability protections (LLPs). Each Phase I ESA report is performed under the direction of an Environmental Professioha|and reviewed by Principal Consultant. Phase|DESAs; f the conditions observed in Phase | ESA indicate that additional - ---' — --- - information is needed tm determine the presence or absence of pollutants, PSI has trained personnel to perform Phase UESAs. Phase UE5As are site- and the scope ofuemicesisQeneraUy based o0 the DdingsOfthe Phase | ESA report.The sampling process encompasses the initial assessment, development ofa specific sample plan,sample collection (including field measurement where necessary to obtain reliable results),field handling (e.g.,filtration where determination of the dissolved fraction of metals is desired),and preservation and delivery of samples to the analytical facility(with consideration of special transportation and holding time requirements). Underground Storage Tanks PSI has performed hundreds of LIST closures in a wide variety of settings. Frequently,these activities are performed concurrently with active construction following the discovery of unregistered tanks during site development,where sensitivity to contractor schedule and budget is of paramount importance. Storm Water Pollution Prevention Plans(SWPPP) A SWPPP is used to identify potential sources of pollution that may reasonably be expected to affect the quality of stormwater di scharge form a facility and to ensure the implementation of best management practices,which are used to reduce the pollutants associated with industrial activities,An SWPPP also enables the City to maintain compliance with the terms and conditions of a National Pollutant Discharge Elimination System_(NPDES) Multi-sector General Permit. PSI prepares these plans on a regular basis in general accordance with the requirements of the EPA and the Clean Water Act Section 4U2,for appropriate state and local regulations. Regulatory Permitting Good communication between the Project Manager and the Client to assure that the ultimate objective of the permit is understood by all affected parties, between the Project Manager and the permitting agency to assure.that all appropriate information is presented to the agency to allow for a quick and hassle-free review and approval of the permit,and between the Project ManageraDd construction team to assure that all parties understand the boundaries of the permit to assure that violations of the permit are not encountered,which could lead to fines and/or projectde|eys' tnuertex, RFO#21-DO5 Continuing Contracts for Gentechnica}testing Services I May 4,ZO21 Page \ 2G ID U^ ^ ^"'ma ^ FUK TU SO[O(Q Industrial Hygiene Services PSI also offers a wide variety of Industrial Hygiene AH\ services tninclude asbestos, lead-based paint, indoor air quality and other industrial hygiene services.These serviceoaneoveoeenhvourin'housePrincipa| Consu|tants, RohdaUcensed Asbestos Consultants, Florida Licensed Mold Assessors, and Certified Industrial x Hy8ien|sts(C|Hs). The majority of PSI's |Hconsu|ting is based on our clients' needs,whether it be buying, selling, developing,or maintaining properties. For each project, a sampling plan is determined and devsedbasedonthep 'ectanddientobiectk/es The industrial hygiene services typically consist of three basis phases of work to indude:Surveyorassessrnemtforpurposes of identification, quantification, and evaluation; Design for purposes of developing, removal, mitigation, or management plan, and;Abatement or removal monitoring, sampling and testing to ensure the work has been completed in accordance with design, specification,and regulatory requirements. Natural Resource Management Services Our team provides comprehensive ecological evaluations ofaquatic and terrestrial ecosystems. In- depth surveys and analysis will ensure that a balance between land use, conservation, permitting, and project planning needs will be provided for each project assigned tnus. All environmental services willfollow a series of steps in order to assure each project requirement is adequately addressed. This approach may be summarized asfo8ows: Proposal w Attend meeting between the City representatives and PS/project personnel to review and define project obecdves, to establish scope nf study, and tD establish the time required to complete the scope ofwork. w Research any available data. w Submit opreliminary written proposal to the City Project MonogerlEngineer. Agree on proposal and receipt ofwonkorder. Field Service Activities w Assign appropriate environmental team tofacilitate thespecificproject. w Refine the project scope tomeet the Data Quality Objectives(DQOs)of the City Project MonmgenEng/neer. Perform afield reconnaissance, if necessary, to evaluate potential access issues nrsite limitations&7 assure precautions are taken kr avoid project delay. w Contact the Citys Project MonagerlEngineer and local utilities to determine potential utility issues prior tn performing in-situ or sub-grade sampling activities. w Execute field activities in accordance with predetermined scope ofwork. Pneporemnyso/no/esco0ectedforso/e shipment to the analytical laboratory. Review project scopemodfie6ddncunnentotimntwossunethmtthe completescope ofservices has been performed prior to demobilizing from the projectsite. mtexex, H RFD#21-OO5Continuing Contracts for Geotechnica|Testing Services I May 4,2O21Page 27 ocoee I. FIRM'S QUALIFICATIONS Markle, Laboratory Testing Conduct appropriate laboratory analysis on the sample(s)provided in accordance with Florida DOH and U.S. Environmental Protection Agency(EPA)methods, standards, and guidelines. Perform predetermined quality assurance/quality control(QA/QC) testing procedures to assure the validity,of the data generated for use by the City. Generate a final report summarizing the sample identification information, analytical results, method detection limits, and QA/QC backup documentation, and a completed chain of custody. Field and Analytical Data Review and Evaluation Begin and continue the preliminary evaluation of the field and analytical data. Perform QA/QC inspection of all available data to assure validity prior to comparing results to applicable standards and guidelines. Organize data to allow for quick preliminary review and discussion. Reporting Prepare clear and concise tables and figures summarizing the data collected during the task. Prepare an Executive Summary of the report to allow a quick perusal of the project task scope of work,findings, conclusions, and recommendations. Provide detailed scope of work,sampling techniques and methodologies,findings, conclusions, and recommendations to allow further evaluation of the information/data collection. Issue a draft report to the City for preliminary review and subsequent discussion. Incorporate comments from the City Project Manager/Engineer. Prepare and submit a final report to City and other appropriate parties as directed by the City. Construction Materials Testing Services Approach: Construction materials testing services will involve a timely response for quality control/quality assurance field and laboratory testing,followed by prompt issuance of test results. Our"total team" philosophy in providing these services is that testing, and inspection services are meant to enhance the construction effort, not to serve as stumbling blocks to the successful completion of a project. We will work in harmony with the City, its consultants and contractors,to help ensure the success of each individual project. We are accustomed to providing these services on a short notification basis, even on projects that require weekend or night work, as we maintain adequate personnel to staff multiple concurrent projects. Our approach to this program is presented as follows: Proposal Review plans,specifications and other construction documents such as pertinent soils reports. Prepare a scope of services including test quantity estimates and a budget estimate. Submit preliminary written proposal for the City Project Manager's review. Agree on scope and budgetary cost, issue final proposal, and receive work order. Assign appropriate technical staff to the project. PSI will maintain the same staffing for the project for the sake of continuity. Attend pre-construction conference to coordinate communications between PSI personnel, the contractor and City representatives. intertek psi RFQ#21-005 Continuing Contracts for Geotechnical Testing Services I May 4,2021 Page 128 oc I I. FIRM'S QUALIFICATIONSocoee flortdo Field Testing Coordinate with City representatives to schedule testing on 7 an as needed basis. g Use smartphone and tablet-equipped personnel to respond k.,i „ --1,l quickly to unanticipated or emergency testing needs and Z ,^ ''\ give rapid results for tests conducted in the field. V Communicate field results to the on-site City representative ' utilizing verbal and written daily field reports prepared by `' 40 technicians. Laboratory Testing Commence testing immediately upon receipt of sample. Maintain full-time dedicated laboratory staff to expedite test turn-around and quality. Maintain state-of-the-art testing equipment to enhance timeliness and accuracy. Provide more capabilities for a full range of testing services that any competing firm. Reporting Furnish all field and laboratory results in a typed format identifying all"retests". Provide test results verbally to the City representative immediately following tests. Provide final routine test reports within 48 hours following completion of testing in a report format that the City's Project Manager/Engineer desires. Furnish a summary of recommended use of materials, design of the project, and description of additional exploration and testing, if needed. Identify materials/conditions that may be used to enhance the project or provide a cost savings. Project Control Communicate with the City via meetings and timely reports. f'k.,= y Track our work order amount against actual fees on a monthly basis. Advise construction manager of the test results and construction t, recommendations, with City concurrence. 1 tk Recommend that the PSI project manager attend construction lie 1 rIr . TT r. F meetings with the City, enabling us to maintain communication, I avoid potential problems, and provide quick response times if issues _...- ` .' ' arise. Additionally, discuss any questions concerning test methods, results, or scheduling needs. Special Needs Abilities PSI provides forensic testing of in-place concrete, asphalt,piping and structures. We can perform petrographic analysis of existing concrete. We maintain specialized equipment that allows us to provide half-life potentiometric investigations to determine the condition of embedded reinforcing steel and ultrasonic crack investigations to show the remaining useful life of concrete. PSi routinely performs analytical testing, down hole permeability testing, laboratory and insitu permeability testing and soils classification testing. Our Orlando office has in-house capabilities to provide certified traffic safety control including arrow boards, warning signs, and an attenuator truck with certified MOT personnel. intertek. pm RFQ#21-005 Continuing Contracts for Geotechnical Testing Services I May 4,2021 Page 129 U. U mw —» QUALIFICATIONS0[O(Q r1do PSI is uniquely able to support special needs and conditions that might arise through our broad diversity of specialized services. Not only does PSI provide all the services below from our local offices, but we also routinely perform some of these services for our competitors: Forensic testing uf in-place concrete— Nuclear roof moisture testing m Petrographic testing ofconcrete Coefficient«fhictiontesting Reinforcing steel mapping Infrared thermVyraphy w R-/neterscons AS7ME2O28 Property Condition Ground Penetrating Radar w ANSI standards welding inspection Thermocouple temperature monitoring m Cross-Hole Sonic Logging Concrete cracking investigation Complete metallurgical testing services Flatness and levelness ofconcrete w Welder qualification testing Vibration monitoring and reporting w N.A.C.6 Level//fX ///coatings inspection Sound monitoring Coatings thickness measurements Asphalt mix design verification Adhesion testing Aspholtforensic testing a Lomdframetes!ing Asphalt striping reflectivity testing All terrain drilling equipment m Complete MOT equipment/certifications Barge mounted drilling equipment Adhesion testing w indoor drilling equipment Water penetrotion/\woterleakage Micro-sized drilling platform Wind uplift testino/w/ndve/oc/ty P8e'D/iving/\no/vrers Laboratory PS|'sC)r|andn laboratory maintains nnonaaccreditations and certificationsthan nearly every other mxprivatelabinFlorida. |n fact, PSI hs one mf only af p vmta labs/m Florida that mrefully AASHJO R18 accredited and certified by CMEC the A rmy Corps mF Engineers.VVe take pride in our laboratories and ourOA/[lC Program; this will ultimately provide the City with quality service and m quality product that you can Count on. Our lab routinely performs more than 1,000 tests per week. Our ability to maintain such a high capacity ensures the City of rapid turnaround for test results. Report Generation & Turn-Around Time Report generation is typically initiated immediately following completion of the fieldwork. Associated laboratory testing is completed concurrently with the report preparation to maximize efficiency. On fast-track missions,verbal results and recommendations can be provided quickly and reinforced with a subsequent report so as not to delay design decisions. Materials testing services are reported daily through field reports and are summarized at appropriate intervals, per the City's desire. Laboratory testing reports are produced daily, as the information becomes available. In the case of failing tests or critical needs,the test results are communicated verbally immediately and with a subsequent written report issued from our system via email or other method as directed by the City. PSI's system automatically ennai|stest reports to any and all parties identified by the City and PSI is pleased to alter or modify any nf our reporting procedures to best suit your needs. muytex, R RF[l#21'0O5 Continuing Contracts for Geotechnica|Testing Services May 4,2O21 Page 1 30 vw,~,- U B FUK TU 8yS 0[OeQ Scheduling&Quality Control The entire contract will be processed through pS|'s state of the art laboratory information management system called pSlQEST. PS|QEST leverages Quality, Bficiency,Stanclarclization and Technology. It is a web-based solution that integrates project set up and tracking;work assignments and employee scheduling; laboratory management and technical reporting; and financial reporting. For every task, PSIQEST creates a specific work order, schedules the task, assigns the certified/qualified employee, and tracks the employee's time on site. For every sample, PS|QEST ensures that the person obtaining the sample is qualified,the equipment used is appropriate to the task and is currently calibrated, and the appropriate test method is applied. PS|QESTis incorporated into our Quality Control Plan and is approved byAA5HTO, CCRLAK8RLCMEC and the Army Corps Vf Engineers. Subsequent toa qualified technician entering in test data, PSIQEST electronically presents results instantaneously tothe Project Manager and/or project engineer for approval. Once the data is approved, test reports will be emnai|ed to you through P3|'s Construction Hive.The system can distribute report data to up to 99 unique locations.The project client representatives as well as other construction project team members can be granted access to the data files and test results ona real time basis through the web portal,which iS also searchable and autonnatic3||ya[chive'ab|8. P3| will also be integrating PS|QESTF7e/donthis project for on-site data acquisition; testing and inspection reports will be delivered into the project team from smart devices.All of PSI's field perSonn8|vv||! haveVVi'F| enab|ed |apLnpconlputem,tab|etsorsrnartphonesonsitevvithPS1QESTf7e/d to achieve the real-time reporting that will be critical to this contract. Data will be review by our Project Manager and/or Special Inspector upon immediate receipt of the field report, for editing/correcting and augmenting with laboratory test data. it is then entered into a project database accessible by the PSI Team as well as the City. As work commences, all reports will be uploaded to our Construction Hive web-based portal,where the City can easily review, print, and/or archive the data. With this system,all parties will have instant appraisal of the status of individual projects. We are also happy to compile hard copy backup with our invoices, asvve currently provide to various City personnel. Budget Adhemmnce/Conmrmitrnentto Cost Control Our single point mf conbwctvvith the City,Aaron Wells, PE will shepherd the pr 'ect'sgeotechnica|, environmental, and materials testing/inspection services from the initial conversations through to the project close-out.As such, Mr. Wells will always "be in the loop" regarding the project's allotted budget and work authorizations, submitted invoicing, changes in scope, current status and potential short-falls or overruns. PSI's philosophy states that effective communication is a cornerstone of client satisfaction and can only be achieved through early identification, planning and establishment of project requirements and budget constraints. The relationships that PSI established with the City personnel will facilitate the coordination required for a timely resolution of any technical issues.The members of PSI's team have also worked closely with each other and with the City for many years, which also enhances the coordination continuity. mumex, PS] t j 1. FIRM'S QUALIFICATIONSOcoee nondo To minimize the City's personnel involvement with the contract and help ensure adherence to budgets, PSI's Project Manager's duties will include: Maintain constant awareness of project activities Coordinate with PSl field personnel and City's Project Manager Maintain a library of most current references to promote effective development of plans and reports Review and supervise field and laboratory results Track budgets and maintain a close watch on budget status with the aid of PSIQEST Supervise invoice preparation Be readily available to City staff to discuss, consult, and deal with any project issues that may arise Consult to develop reasonable&cost-effective solutions for difficult conditions discovered in the field An economy of the project budget can often be realized through PSI's ability to utilize members of our cross-trained technical staff capable of providing services in several arenas.When possible,we will attempt to use our broad-based capabilities to the City's best interest,thereby reducing on-site times, multiple technicians on-site,etc.Additionally,the large quantity of specialty services that we can provide in-house will reduce or eliminate the need for emergency sub-consultant usage and uncontrolled fees.The fact that we can marshal and control these services often results in an initial budget savings, as well as mitigation of unforeseen expenses as critical on-site conditions arise or planned situations change. As a part of our invoicing process, PSI will maintain complete back-up records of all fees and charges within the PSIQEST system.These records will include payroll data, daily reports of site visits, laboratory testing results and reports, field testing results and reports, receipts of any reimbursable expenses,etc.This back-up will include any re-testing or re-inspection services,which can often be backcharged to the appropriate party. PSI as a matter of policy will only invoice for the services as requested by the City and at the contracted rates. As a final statement regarding control of costs, it is our intention to provide the City with'outstanding services as a valued part of the design and construction process. PSI is committed to providing quality professional services. PSI has a long history of providing innovative solutions and superior value to our clients. In fact,the costs that we have saved our clients have even outweighed our fees on several occasions. In order to ensure that our clients receive a superior value for our services, PSI performs value engineering on all significant projects.The goal of our value engineering is to identify sounder,safer, and less costly alternatives to standard approaches. Generally,the value engineering team will consist of Chief Engineer and other support personnel with experience in the required area.As always, we will be available to the City 24 hours a day and 7 days a week. Intertek re Si RFQ#21-005 Continuing Contracts for Geotechnical Testing Services I May 4,2021 Page 132 ocoee CONTINUING CONTRACTS GEOTECHNICAL TES PING SERVICES 0 RFQ NO:21-005 o 0TI 3 r t x*, y "t„- writ i, Kaya{ Z 4 .+, r....-- C„e wN It ti „ySr<e.`k -.t £ y'`}l• L` "y. ^ h• i'. rm r+.F a. .. n' x x'=.•" w= s`.. . • rr .^ ti .6 t"''-' _ S ' At, ar.,..14`'mr,'.Gi.mS:xc ?....i '." ....t ^... .'.v> ..z.., N UU, FIRMS OFFICE PN r R ' S O[O(( Office Locations: Established as a legal entity in Floricla.in 1975, we have a team of more than 300 professionals located within 1O offices throughout the state. Services for this contract will be performed out of our Orlando office.We can also pull from our other Florida offices when needed. PS|'s Orlando office is the largest within the State, employing more than 1508eotechnica|,construction services, environmental, facilities engineers, technicians, and support staff who have been providing services throughout the State nf Florida for more than 4Syears. Orlando Office Information 174833=Street Orlando, florido32839 Phone:4O7-3O4-5S6D The distance from P5|'s office at174833rd Street Orlando, Florida 32839 and Ocoee City Hall at15ON. Lakeshore Drive, Ocoee, FL]4761, as per K8ap[iuest, is: Miles-12.6 Hours-22minutes Lq x Thedistancefronnoursub'consu|tantNAQ|CEn8ineehngServices, |nc, officeotS7OUHoffnerAvenue, Orlando, Florida 32822 and Ocoee City Hall at 150 N Lakeshore Drive, Ocoee, FIL 34761, as,per Map[luest, is: Miles-20.9 Hours-32minutes mtem" , N%B o RFQ#21-DOS Continuing Contracts for Gentechnioa|Testing Services May 4,20Z1 Page \ 33 14W UU Um U RMS0(< FORMS Conflict of Interest Disclosure Form: After this section, please find our completed and signed Conflict of Interest Disclosure Form. Receipt mfany Addenda Issued Form: After this section, please find our completed Acknowledgment of.Addenda Form. Summary of PSI has never been the subject of an investigation conducted by a regulatory agency or professional licensing board. PS|'s Central Florida operations have not been involved in any litigation with any federal,. state or local agency asaresult of actions or inactions inthe past five(5)years or previously in the regular course Ofbusiness. Furthermore, PS|'s Central Florida operations have not had any claims or actions taken against us in the last five (S) years by any regulatory a8ehcy and/or court That being said. PSI is a large consulting firm with nearly 2,200 employees in 100 offices nationwide. In today's legal environment, it is impossible to perform a magnitude of work nationwide without becoming involved in lawsuits. Obviously, PSI cannot discuss matters in litigation. Any litigation PSI may be involved in does not threaten the company's viability,and P5| remains fully insured for both professional and general liability. Additionally,after this section, please find our completed Summary of Litigation Form. CommpamyUmformmatimn/Signature Sheet: After this section, please find our completed and signed Company information/Signature Sheet. mWtp*, BFO#Z1-OU5 Continuing Contracts for Geotezhnica|Testing Services May 4,ZO21 Pagel 34 ocoee florlda RFQ CONFLICT OF INTEREST DISCLOSURE FORM The award of this contract is subject to the provisions of Chapter]12,Florida Statutes. All Proposers must. disclose within their Proposal: the name of any City of Ocoee employee, Mayor or City Commissioner, other City Official, or City Consultants, who owns assets or capital stock, directly or indirectly, in the Proposer's firm or any of its branches,or would directly or indirectly benefit by the profits or emoluments of this proposal:(Indirect ownership or benefit applies to any members of-his or her immediate family.) Proposer certifies that no member of the entity's ownership or management is presently:applying for an employee position or actively seeking an elected position with the City. In the event that a conflict of interest is identified in the provision of services,Proposer agrees to immediately notify'the City in writing. The purpose of this disclosure form is to give the City the information needed to identify potential conflicts of interest for the City Commission, Evaluation Committee members, and other key City employees and consultants involved in the-award of this contract. According to Chapter 112, Florida Statutes, the term "conflict of interest" "means a situation in whichregardforaprivateinteresttendstoleadtodisregardofapublicdutyorinterest", and refers to situations in which financial or other personal considerations may adversely affect, or have the appearance of adversely affecting, an employee's professional judgment in exercising any City duty or responsibility in administration,management,instruction,research;or other professional activities. Please check one of the following statements and attach additional documentation if necessary: X To the best of our knowledge,the undersigned firm has no potential conflict of interest for this Proposal. The undersigned firm,by attachment to this form,submits information which may be a potential conflict of interest for this Proposal. Acknowledged by: Professional Service Industries, Inc. Firm Name Signature Aaron Wells, PE-Department Manager Name and Title(Print or Type) RFQ#21005 Continuing Contracts for Geotechnical Testing Services 18 SUMMARY OF LITIGATION: Provide a summary of any litigation, claim(s),bid or contract dispute(s) filed by or against the Bidder in the past five(5) years which is related to the services that the Bidder provides in the regular course of business. The summary shall state the nature of the litigation, claim,or contact dispute,a brief description of the case,the outcome or projected outcome, and the monetary amounts involved. If none,then please say so. PSI has never been the subject of an investigation conducted by a regulatory agency or professional licensing board. PSI's Central Florida operations have not been involved in any litigation with any federal, state or local agency as a result of actions or inactions in the past five(5) years or previously in the regular course of business. PSI is a large consulting firm with nearly 2,200 employees in 100 offices nationwide. In today's legal environment, it is impossible to perform a magnitude of work nationwide without becoming involved in lawsuits. Obviously, PSI cannot discuss matters in litigation.Any litigation PSI may be involved in does not threaten the company's viability,and PSI remains fully insured for both professional and general liability. ACKNOWLEDGEMENT OF ADDENDA: Bidder acknowledges receipt of the following addenda: No.I Dated 4/27/2021 No. Dated No. Dated Remainder of page left blank intentionally.) RFQ#21005 Continuing Contracts for Geotechnical Testing Services 20 COMPANY INFORMATION/SIGNATURE SHEET RFQ#21-005. FAILURE TO COMPLY WITH THESE RFQ INSTRUCTIONS WILL RESULT IN DISQUALIFICATION OF YOUR QUALIFICATION PACKAGE. PLEASE SIGN BELOW ATTESTING THAT YOU HAVE READ AND UNDERSTAND ALL RFQ INSTRUCTIONS AND THAT YOU UNDERSTAND THAT THE SUCCESSFUL RESPONDENT WILL BE REQUIRED TO ENTER INTO A LEGALLY BINDING CONTRACT WITH THE CITY OF OCOEE. Professional Service Industries,Inc. 407-304-6560 COMPANY NAME TELEPHONE(INCLUDE AREA CODE) 407-304-5561 FAX (INCLUDE AREA CODE) aaron.wells@intertek.com E-MAIL ADDRESS IF REMITTANCE ADDRESS IS DIFFERENT AUTHORIZED SIGNATURE(manual) FROM PURCHASE ORDER ADDRESS, PLEASE INDICATE BELOW: Aaron Wells,PE-Department Manager NAME/TITLE(PLEASE PRINT) 1748 33rd Street STREET ADDRESS Orlando,Florida 32839 CITY STATE ZIP FEDERAL ID#37-0962090 Individual X Corporation Partnership Other(Specify) Sworn to and subscribed before me by means of physical presence or 0 online notarization this 31). (Pday of (*ZA 207j . Personally Known t7 or Produced Identification Notary Public-State of Type of Identification) ounty of Si nature of otary Public Printed,typed or stamped Commissioned name of Notary Public Alct7 440 PamNOTeAlaRYD.PHUaBrpLeICr 4-14' c-A STATE OF FLORIDA 15" CorrirrOGG318186 0410 Expires 4/1/2023 RFQ#21005 Continuing Contracts for Geotechnical Testing Services 21 DATE(MM/DD/YYYY) AR o® CERTIFICATE OF LIABILITY INSURANCE 08/23/2021 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED,the policy(les)must have.ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Marsh USA Inc. NAME: 701 Market Street,Suite 1100 A/CCNro.Ext): FAX No): St.Louis,MO 63101 E-MAIL Attn:stlouis.certrequest@marsh.com ADDRESS: INSURER(S)AFFORDING COVERAGE NAIC# CN102792561-PSI-PrPo-20-21 INSURER A:Zurich American Insurance Company 16535 INSURED INSURER B:NIA N/A PROFESSIONAL SERVICE INDUSTRIES,INC. 1748 33RD STREET INSURER C:Steadfast Insurance Company 26387 ORLANDO,FL 32839 INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: CHI-009617255-41 REVISION NUMBER: 7 THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY EFF POLICY EXPIYY) LIMITSLTRINS/ WVD POLICY NUMBER IMM!DDtYYYY) (MMIDDYY A X COMMERCIAL GENERAL LIABILITY GL0541569307 10/01/2020 10/01/2021 EACH OCCURRENCE $ 5,000,000 DAMAGE TO RENTED CLAIMS-MADE X OCCUR PREMISES Ea occurrence) $ 100,000 MED EXP(Any one person) $ 20,000 PERSONAL&ADV INJURY $ 5,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 10,000,000 X POLICY PROT LOC PRODUCTS-COMP/OP AGG $ 5,000,000JEC OTHER: A AUTOMOBILE LIABILITY BAP 7296414-00 10/01/2020 10/01/2021 COMBINED SINGLE LIMIT $ 1,000,000Eaaccident) X ANY AUTO BODILY INJURY(Per person) $ X OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS X HIRED x NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY Per accident) UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE S DEO RETENTION$ A WORKERS COMPENSATION WC 7296412-00(AOS) 10101/2020 10/01/2021 X PER OTH- AND EMPLOYERS'LIABILITY STATUTE ER A ANYPROPRIETORtPARTNER/EXECUTIVE Y/N WC 7296413-00(WI)1010112020 10/01/2021 E L.EACH ACCIDENT $ 1,000,000 OFFICER/MEMBER EXCLUDED? N N/A Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under 1,000,000DESCRIPTIONOFOPERATIONSbelowE.L.DISEASE-POLICY LIMIT $ C Professional Liability E00O206920-05 09/30/2020 09/30/2021 Each Claim/Aggregate: 5,000,000 SIR: 1,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space is required) RE: RFQ#21-005 CONTINUING CONTRACT FOR GEOTECHNICAL TESTING SERVICES CERTIFICATE HOLDER IS INCLUDED AS ADDITIONAL INSURED(EXCEPT AS RESPECTS ALL COVERAGE AFFORDED BY THE WORKERS'COMPENSATION AND PROFESSIONAL LIABILITY POLICIES)AS REQUIRED BY WRITTEN CONTRACT. CERTIFICATE HOLDER CANCELLATION CITY OF OCOEE SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 150 N.LAKESHORE DRIVE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN OCOEE,FL 34761 ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE of Marsh USA Inc 1988-2016 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD AGENCY CUSTOMER ID: CN102792561 LOC#: St.Louis Accmco ADDITIONAL REMARKS SCHEDULE Page 2 of 2 AGENCY NAMED INSURED Marsh USA Inc. PROFESSIONAL SERVICE INDUSTRIES,INC. 1748 33RD STREET POLICY NUMBER ORLANDO,FL 32839 CARRIER NAIC CODE EFFECTIVE DATE: ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: 25 FORM TITLE: Certificate of Liability insurance Contractor's Pollution Liability Policy tt:CP016503597 Carrier:AIG Specialty Insurance Company-NAIC#26883 Effective Dates:10/01/2020-10/01/2021 Limit of Liability:$5,000,000 Coverage A Each Loss 5250,000 Coverage B Each Loss 10,000,000 Aggregate Deductible: $100,000 Each Loss Professional Liability and Contractor's Pollution Liability:Other deductibles may apply as per policy terms and conditions. - ACORD 101 (2008101) 2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD CONTINUING CONSULTING AGREEMENT FOR GEOTECHNICAL TESTING SERVICES THIS AGREEMENT made and entered into this /7 --day of Affett , by and between the CITY OF OCOEE, FLORIDA, a Florida municipal corporation, hereinafter referred to as "CITY", and NADIC ENGINEERING SERVICES, INC., a Florida corporation, hereinafter referred to as "CONSULTANT". WHEREAS, the CITY needs geotechnical testing services to be performed on a continuing and periodic basis as the need for such services may arise, per the CITY's RFQ #21- 005 Continuing Contracts for Geotechnical Testing Services, attached as Exhibit A; and WHEREAS, the CITY desires to employ the CONSULTANT in connection with the geotechnical testing services required, upon the terms and conditions hereinafter set forth, and the CONSULTANT is desirous of performing such services upon said terms and conditions, per CONSULTANT'S qualification package attached as Exhibit B; and WHEREAS, the CITY shall have the option to use the CONSULTANT's professional geotechnical testing services ("Services"), as further described below, for City projects hereinafter referred to as "Project" or"Projects"); and WHEREAS, the City has selected the CONSULTANT in accordance applicable law and the rules and ordinances of the City, and this Contract shall constitute a continuing contract to perform services on an as needed basis over a period of time; NOW, THEREFORE, in consideration of the mutual covenants and agreements hereinafter contained, it is agreed by and between the parties hereto as follows: SECTION I SCOPE OF SERVICES 1.CONSULTANT hereby agrees to perform for the CITY geotechnical testing services which may include services in all phases of a Project. The scope of work to be RFQ#21-005 Continuing Geotechnical Testing Services performed through task orders issued under the continuing contract may consist of, but will not necessarily be limited to: soils investigation for design purposes including season and high ground water levels, soil stability, drainage associated with hydrological groundwater modeling, supporting documentation for permitting, and construction administrative support (materials testing). Various geotechnical testing services for City projects; such projects include large and small scale water, sewer, and reclaimed utility projects, road construction and/or rebuild construction, extensions and/or stormwater related projects, and other geotechnical type projects. There may also be a periodic need to conduct Phase 1 environmental reviews and environmental lien searches related to the possible acquisition of real property by the City. A variety of testing and consultative tasks will be required in various combinations depending on the needs of each project, as requested by the CITY, through the issuance of a Services Authorization (Task Order) issued pursuant to this Agreement. 2.CONSULTANT shall perform such services in accordance with the terms and conditions of this Contract and with applicable regulations and requirements of all interested government agencies. It is expressly understood, however, that the CITY shall have no obligation to authorize CONSULTANT to perform any services under this Contract, and may, in its sole discretion, retain other consultants to perform any or all of the services authorized under this Contract. 3.CONSULTANT shall utilize sufficient qualified personnel acceptable to the CITY to perform all services under this contract and any Services Authorization issued hereunder. CONSULTANT shall promptly remove any person from performing services as the CITY shall request in writing (which request may be made by the CITY with or without cause), and promptly replace such person with a person who shall be approved in writing by the CITY. CONSULTANT agrees to include a similar provision in its agreements with any and all Subconsultants. 2 RFQ#21-005 Continuing Geotechnical Testing Services SECTION II TERM 1.Continuing Contract. This Agreement shall continue in full force for an initial period of three (3) years, beginning on August 17, 2021, with two (2) automatic one-year renewable extensions, for a total of five (5) years. Each one-year renewable term shall automatically be renewable for the next succeeding one-year term with the condition that the CITY'S obligation to pay under this Agreement for each year is contingent upon the CITY in its good faith judgment having sufficient funds to make an annual appropriation for the Services to be provided under this Agreement. The Agreement shall continue in full force and effect from the date first written above or until terminated in accordance with this Agreement. The CITY shall have the option of extending the term an additional one (1) year. The above time periods may be extended to complete Services being rendered under a Project that has already been identified in a Services Authorization issued prior to the expiration of the Agreement. 2.The CITY shall, from time to time at its sole discretion, authorize the CONSULTANT in writing to provide Services under this Agreement by issuing a Services Authorization. A Services Authorization shall, by mutual agreement of the parties, set forth, 1)the Scope of Services, (2) the time for performance, (3) method and amount of compensation, 4)the items to be provided to the CITY, and (5) the services, information and data that can be provided by the CITY to the CONSULTANT. 3.The CITY does not guarantee, warrant, or represent that any number of Projects or any particular type of Project will be assigned to the CONSULTANT under the terms of this Agreement. Furthermore, the purpose of this Agreement is not to authorize a specific Project, but to set forth certain duties, obligations, rights, and responsibilities that may be incorporated by reference into any Services Authorization that may be mutually agreed to by the parties. The 3 RFQ#21-005 Continuing Geotechnical Testing Services CITY shall have the sole discretion to select the Project(s), if any, that may be given to the CONSULTANT. 4.The CONSULTANT shall perform any and all Services in a timely, efficient and cost-effective manner and in a manner that comports with the standards of geotechnical testing services ordinarily exercised by reputable members of Consultant's profession. SECTION III COMPENSATION 1.Method of Payment: For services rendered by CONSULTANT under a Services Authorization, the CITY shall pay CONSULTANT by one of the following methods: (i) a lump sum amount; or (ii) per diem or hourly rates which shall be used as the basis, along with reimbursable expenses, for establishing a guaranteed maximum price ("GMP") which shall not be exceeded. For Services Authorizations issued with a GMP, the CITY shall reimburse CONSULTANT for the cost of permissible out-of-pocket expenses (hereinafter referred to as Reimbursable Expenses") incurred by CONSULTANT in the performance of services. A Reimbursable Expenses budget, if required, shall be included within each Services Authorization priced on a GMP basis. Reimbursable Expenses means the actual, necessary, and reasonable expenses incurred directly or indirectly in connection with the Project and may include expenses for reproduction, presentation materials and supplies, photography and video, travel outside of Orange and Seminole Counties, postage, overnight or express mail, long distance telephone, and facsimile costs. Travel expenses shall be submitted in accordance with Florida Statute § 112.061 2008). Travel and per diem charges shall not exceed the limits allowed under applicable Florida Statutes. 2.CONSULTANT shall submit to CITY the invoices of CONSULTANT, in detail sufficient for a proper preaudit and postaudit thereof. 4 RFQ#21-005 Continuing Geotechnical Testing Services 3.CITY shall pay CONSULTANT not later than thirty (30) calendar days of its receipt of CONSULTANT'S invoices, unless, within the 30-day period, the CITY, 1) notifies CONSULTANT of an objection to the PAYMENT amount, and 2) either provides CONSULTANT with a determination of the proper PAYMENT, or requests further information from CONSULTANT so that a proper PAYMENT can be calculated and agreed upon by the parties. 4.The CITY's objection to the PAYMENT amount shall be accompanied by the CITY's remittance of any undisputed portion of the PAYMENT. 5. Upon the termination of this AGREEMENT, CONSULTANT shall prepare a final and complete payment statement for all SERVICES and reimbursable expenses incurred since the posting of the last payment statement, and through the date of termination. CONSULTANT also agrees to maintain, and to cause each of its subcontractors to maintain complete and accurate books and records (BOOKS) in accordance with sound accounting principles and standards, in a form acceptable to the CITY, and relating to all SERVICES and related costs and expenditures to the CITY that have been contracted for and paid during the life of this AGREEMENT. The BOOKS shall identify the SERVICES rendered during each month of this AGREEMENT, the date that each PROJECT expense was incurred, and whether the expense was SERVICE or reimbursable-related. 6. The BOOKS may (but need not) be kept separate and apart from CONSULTANT's other books; but the CITY shall have the right, at any reasonable time and through any of its designated agents or representatives, to inspect and audit the BOOKS for the purpose of verifying the accuracy of any payment statement. a'. 7.CONSULTANT shall retain the BOOKS, and make them available to the CITY as specified above, until the later of five (5) years after the date of termination of this AGREEMENT, or five (5) years from the date of the final payment statement (of the PROJECT) 5 RFQ#21-005 Continuing Geotechnical Testing Services 1 prepared for the CITY, or such longer time if required by any federal, state, or other governmental law, regulation, policy, or contractual or grant requirement or provision. i rt 8.When the CITY has reasonable grounds for belief(or information to believe) that, 1) CONSULTANT will be unable to perform the SERVICES; or 2) a pending or meritorious claim exists against CONSULTANT or the CITY arising out of CONSULTANT's negligence or 1 CONSULTANT's breach of any provision of this AGREEMENT; then the CITY may withhold a payment otherwise due and payable to CONSULTANT. This provision is intended solely for the benefit of the CITY. 9.The acceptance by CONSULTANT, its successors, or assigns, of any final payment due upon the termination of this AGREEMENT, shall constitute a full and complete release of the CITY from any and all claims, demands, or causes of action whatsoever that CONSULTANT, its successors, or assigns may have against the CITY under the provisions of this AGREEMENT. SECTION IV INDEMNIFICATION AND INSURANCE 1.Indemnification. The CONSULTANT shall indemnify, defend and hold harmless F the City, its representatives, employees, and elected and appointed officials, from liabilities, damages, losses and costs, including, but not limited to, reasonable attorney's fees, to the extent caused by the negligence, recklessness, or intentional wrongful misconduct of the Consultant and persons employed or utilized by the CONSULTANT in the performance of any professional services rendered under this Agreement or any Services Authorization issued pursuant to this Agreement. For purposes of compliance with Florida law, CONSULTANT acknowledges that this provision shall be deemed a part of the project specifications or the bid documents. 2. Insurance The CONSULTANT shall purchase, maintain, and keep in full force, effect, and good standing, such insurance that is further described below, and any other insurance 6 RFQ#21-005 Continuing Geotechnical Testing Services necessary to fully protect it from claims of the nature that are detailed below, that may arise out of, or result from, the CONSULTANT's operations, performance, or Services, or all of these things, or any of these things in combination (CONSULTANT's Operations), whether the CONSULTANT's Operations are by the CONSULTANT, any of its agents or Subconsultants, or anyone for whose act or acts it may be liable. The CONSULTANT'S insurance carrier shall be 1r licensed to do business in the State of Florida and shall have an A.M. Best Rating of A or better. The insurance required by this Subsection shall be written for not less than the limits of liability specified below, or required by law, whichever is greater, and shall include contractual liability insurance as applicable to the CONSULTANT's obligation under this Agreement. 3.The CONSULTANT shall provide evidence of insurance in the form of a certificate of insurance issued on behalf of the City of Ocoee by companies acceptable to the City at the following minimum limits and coverage's with deductible amounts acceptable to the City. The CONSULTANT shall not commence any work in connection with this contract or any applicable Services Authorization until all of the following types of insurance have been obtained and such insurance has been approved by the City, nor shall the CONSULTANT allow any Sub-consultant to commence work on a subcontract until all similar insurance required of the sub-consultant has been so obtained and approved. Policies shall be issued only by companies authorized by subsisting certificates of authority issued to the companies by the Department of Insurance of Florida which maintain a rating deemed acceptable to the City. Policies for t Workers' Compensation may be issued by companies authorized by applicable Florida law. The following insurance requirements are also applicable: a) Loss Deductible Clause: The City shall be exempt from, and in no way liable for, any sums of money which may represent a deductible in any insurance policy. The payment of such deductible shall be the sole responsibility of the General Consultant t and/or subconsultant providing such insurance. b) Workers' Compensation Insurance: The Consultant shall obtain during the life of this Agreement, Worker's Compensation Insurance with Employer's Liability Limits of 7 RFQ#21-005 Continuing Geotechnical Testing Services 500,000/$500,000/$500,000 for all the Consultant's employees connected with the work of this project and, in the event any work is sublet, the Consultant shall require the subconsultant similarly to provide Workers' Compensation Insurance for all of the latter's employees unless such employees are covered by the protection afforded by the Consultant. Such insurance shall comply fully with the Florida Workers' Compensation Law. In case any class of employees engaged in hazardous work under this contract for the City is not protected under the Workers' Compensation statute, the Consultant shall provide, and cause each subconsultant to provide adequate insurance, satisfactory to the City, for the protection of the Consultant's employees not otherwise protected. Include Waiver of Subrogation in favor of the City of Ocoee c) Consultant's Public Liability and Property Damage Insurance: The Consultant shall obtain during the life of this Agreement COMMERCIAL AUTOMOBILE COVERAGE, this policy should name the City of Ocoee as an additional insured, and shall protect the Consultant and the City from claims for damage for personal injury, including accidental death, as well as claims for property damages which may arise from operations under this Agreement whether such operations be by the Consultant or by anyone directly or indirectly employed by the Consultant, and the amounts of such insurance shall be the minimum limits as follows: d) Automobile Bodily Injury Liability & Property Damage Liability 1,000,000 Combined single limit per occurrence (each person, each accident) All covered automobile will be covered via symbol 1 Liability coverage will include hired & non-owned automobile liability Include Waiver of Subrogation in favor of The City of Ocoee e) Comprehensive General Liability (Occurrence Form) - This policy should name the City of Ocoee as an additional insured and should indicate that the insurance of the Consultant is primary and non-contributory. 2,000,000 GENERAL AGGREGATE 2,000,000 PRODUCTS-COMPLETED OPERATIONS AGGREGATE 1,000,000 PER OCCURRENCE 1,000,000 PERSONAL &ADVERTISING INJURY Include Waiver of Subrogation in favor of the City of Ocoee 1,000,000 Professional Liability (Design Errors & Omissions) 0 Subconsultant's Comprehensive General Liability, Automobile Liability and Worker's Compensation Insurance: The Consultant shall require each subconsultant to procure and maintain during the life of this subcontract, insurance of the type specified above or insure the activities of these subconsultants in the Consultant's policy, as specified above. g) Owner's Protective Liability Insurance: (Not applicable for Design Services). As applicable for construction projects, providing coverage for the named insured's liability that arises out of operations performed for the named insured by independent consultants and are directly imposed because of the named insured's general supervision of the independent consultant. The Consultant shall procure and furnish 8 RFQ#21-005 Continuing Geotechnical Testing Services an Owner's Protective Liability Insurance Policy with the following limits: 1,000,000, and per occurrence, $2,000,000. Aggregate and naming the City of Ocoee as the Named Insured. h) Contractual Liability: If the project is not bonded, the consultant's insurance shall also include contractual liability coverage to insure the fulfillment of the contract. NOTE: PUBLIC LIABILITY INSURANCE AND AUTOMOBILE LIABILITY INSURANCE, THE CITY SHALL BE NAMED AS ADDITIONAL INSURED. 1,000,000 PER OCCURRENCE 2,000,000 AGGREGATE i) Commercial Umbrella: 1,000,000 PER OCCURRENCE 2,000,000 Aggregate Including Employer's Liability and Contractual Liability j) Certificates of Insurance: Certificate of Insurance Form (see sample, above), naming the City of Ocoee as an additional insured will be furnished by the Consultant upon notice of award. These shall be completed by the authorized Resident Agent and returned to the Office of the Purchasing Technician. This certificate shall be dated and show: The name of the Insured consultant, the specific job by name and job number, the name of the insurer, the number of the policy, its effective date, and its termination date. Statement that the Insurer shall mail notice to the Owner at least thirty (30) days prior to any material changes in provisions or cancellation of the policy, except ten (10) days written notice of cancellation for non-payment of premium. 4.City As Additional Insured. The CITY shall be listed as an additional insured on all insurance coverage required by this Agreement, except Worker's Compensation and Professional Liability errors and omissions insurance. Furthermore, all other insurance policies pertaining to the Services to be performed under this Agreement shall memorialize that the CONSULTANT's, or the CONSULTANT's Subconsultant's, or all of these entities' (Primary Insureds) insurance, shall apply on a primary basis, and that any other insurance maintained by the CITY shall be in excess of and shall not contribute to or be commingled with the Primary Insured's insurance. 9 RFQ#21-005 Continuing Geotechnical Testing Services 5.CITY's Right to Inspect Policies. The CONSULTANT shall, in the event of a material claim, upon thirty (30) days' written request from the CITY, deliver copies to the CITY of any or all insurance policies that are required in this Agreement. SECTION V TERMINATION 1.Termination Without Cause. This Agreement may be terminated by either party by delivering a thirty (30) written notice to the other party. In the event of the termination of this Agreement, any liability of one party to the other arising out of any Services rendered, or any act or event occurring prior to the termination, shall not be deemed to be terminated or released. The CONSULTANT shall be paid for Services completed prior to receipt of the termination notice and for reasonable termination settlement costs relating to commitments which had become firm prior to the termination; however, payment to the CONSULTANT will exclude any and all anticipated supplemental costs, administrative expenses, overhead and profit on uncompleted Services. 2.Termination for Cause. In addition to any other termination provisions that may be provided in this Agreement, the CITY may terminate this Agreement, or any Services Authorization issued under this Agreement, in whole or in part, if the CONSULTANT (1) makes a willfully false payment statement; (2) substantially fails to perform any material obligation under this Agreement or Services Authorization and does not remedy the failure within five (5) calendar days after receipt by the CONSULTANT of written demand by the CITY, or (3) refuses to allow public access to all documents, papers, letters, or other material made or received by the contractor in conjunction with the contract, unless the records are exempt from § 24(a) of Article I of the State Constitution and Florida Statutes § 119.07(1). The CONSULTANT may terminate this Agreement or any Services Authorization issued under this Agreement, if the CITY fails to perform any material obligation under this Agreement, and does not remedy the failure within 10 RFQ#21-005 Continuing Geotechnical Testing Services fifteen (15) calendar days after receipt by the CITY of written demand from the CONSULTANT. 3. Upon termination of this Agreement for Cause by the CITY, the City may pay the CONSULTANT for those Services actually rendered and contracted for under a Services Authorization, and those reasonable and provable expenses required by any Services Authorization and actually incurred by the CONSULTANT for Services prior to the effective date of termination. Such payments, however, shall be, 1) reduced by an amount equal to any additional costs and damages incurred by the CITY as a result of the default(s) of the CONSULTANT, including all incidental and consequential fees and expenses. 4.Delivery of Materials Upon Termination. In the event of termination of this Agreement (or any Services Authorization) by the CITY, prior to the CONSULTANT'S satisfactory completion of all the Services described or alluded to herein, the CONSULTANT shall promptly furnish the CITY, at no additional cost or expense, with one (1) copy of the following items (Documents), any or all of which may have been produced prior to and including the date of termination: data, specifications, calculations, estimates, plans, drawings, construction documents, photographs, summaries, reports, memoranda; and any and all other documents, instruments, information, and materials (whether or not completed) generated or prepared by the CONSULTANT, or by any Subconsultant, in rendering the Services described herein, and not previously furnished to the CITY by the CONSULTANT pursuant to this Agreement, or any Services Authorization. The Documents shall be the sole property of the CITY, and the CITY shall be vested with all rights provided therein of whatever kind and however created. The CONSULTANT shall also require that all such Subconsultants agree in writing to be bound by the provisions of this Subsection. 11 RFQ#21-005 Continuing Geotechnical Testing Services p SECTION VI SUSPENSION The CITY has the right to suspend the CONSULTANT's Services (in whole or in part) rendered under this Agreement or any Services Authorization. However, if the CITY suspends the CONSULTANT's Services pursuant to any Services Authorization, the CITY will add to the period of service for such Services Authorization a period not less than the duration of such suspension and compensate the CONSULTANT for the reasonable and provable additional costs it has incurred as a direct and proximate result of such suspension. SECTION VII NOTICES 1.All notices denominated as such by this Agreement, or the City Code, or Florida law, required to be given to the CONSULTANT hereunder shall be in writing, and shall be given by hand-delivery or United States mail, postage prepaid, addressed to: NADIC ENGINEERING SERVICES, INC. 601 North Hart Boulevard Orlando, F 328 8 Attention: l ab\n Wadi, 2.All notices required to be given to the CITY shall be in writing, and shall be given by hand-delivery or United States mail, postage prepaid, to the CITY at: CITY OF OCOEE 150 North Lakeshore Drive Ocoee, Florida 34761 Attention: Purchasing Technician A copy of the notice shall be provided to the City of Ocoee, City Engineer. 3. A party shall be permitted to substitute its contact person or change its address, for the purposes of this Subsection, by written notice to the other party given in accordance with the provisions of this Section. 12 RFQ#21-005 Continuing Geotechnical Testing Services SECTION VIII CONFLICTS OF INTEREST The CONSULTANT represents and warrants unto the CITY that no officer, employee, or agent of the CITY has any interest, either directly or indirectly, in the business of the CONSULTANT to be conducted hereunder. SECTION IX WAIVER OF CONSEQUENTIAL DAMAGES IN NO EVENT SHALL THE CITY BE LIABLE TO CONSULTANT OR TO ANY THIRD PARTY FOR ANY PERSONAL INJURY, DEATH OR PROPERTY DAMAGE; NOR SHALL THE CITY BE LIABLE FOR ANY INDIRECT, INCIDENTAL, SPECIAL OR CONSEQUENTIAL DAMAGES, INCLUDING LOSS OF PROFITS, LOSS OF REVENUE, OR LOSS OF USE, OR COST OF COVER INCURRED BY CONSULTANT OR ANY THIRD PARTY ARISING OUT OF THIS AGREEMENT AND/OR CONCERNING THE PERFORMANCE OF SERVICES BY THE CONSULTANT OR BY THE CITY UNDER THIS AGREEMENT OR UNDER A SERVICES AUTHORIZATION ISSUED UNDER THIS AGREEMENT. SECTION X MATERIALS AND DATA 1. All data, field notes, inspector's reports,job files, test reports, contract plans and specifications used to record as-built (or other) conditions, copies of shop drawings, construction photographs, cost control and scheduling data, computer printouts, contractor's submittals, summaries, memoranda work papers and any and all other documents, instruments, information, and materials ("WRITTEN WORK") prepared or accumulated by CONSULTANT for the SERVICES rendered hereunder shall be the sole property of the CITY. The CITY may reuse the WRITTEN WORK at no additional cost, and the CITY shall be vested with all rights of 13 RFQ#21-005 Continuing Geotechnical Testing Services whatever kind and however created that may be in existence thereto; provided, however, that CONSULTANT shall not be liable to the CITY for the CITY's additional use of any WRITTEN WORK for a different project except where CONSULTANT is engaged or retained by the CITY for the different project and the CONSULTANT utilizes the WRITTEN WORK. 2.The CITY acknowledges that the WRITTEN WORK is not intended for use in connection with any project or purpose other than the PROJECT, and the purpose for which the WRITTEN WORK was therefore prepared. Any use by the CITY of the WRITTEN WORK in connection with a project or purpose other than the PROJECT, without the re-engagement or retention of CONSULTANT, shall be at the CITY's sole risk, and CONSULTANT shall have no responsibility or liability related thereto. 3.In the event of termination of this AGREEMENT, CONSULTANT shall promptly furnish the CITY, at no additional cost or expense, one (1) copy of the following items DOCUMENTS"): data, field notes, specifications, calculations, estimates, plans, drawings, construction documents, photographs, summaries, test reports, memoranda; and any and all other documents, instruments, information, and materials (whether or not completed) prepared or accumulated by CONSULTANT, or by any Subconsultant, in rendering the SERVICES described herein, and not previously furnished to the CITY by CONSULTANT pursuant to this AGREEMENT. The DOCUMENTS shall be the sole property of the CITY, and the CITY shall be vested with all rights provided therein of whatever kind and however created. CONSULTANT shall also require that all such Subcontractors and Subconsultants agree in writing to be bound by the provisions of this Paragraph. SECTION XI MISCELLANEOUS PROVISIONS 1. Non-Exclusive Contract. This Agreement is non-exclusive, and may be terminated at the CITY's convenience with the proper notice having been given to the 14 RFQ#21-005 Continuing Geotechnical Testing Services 4 I I CONSULTANT as provided in this Agreement. The rights granted herein to the CONSULTANT are non-exclusive, and the CITY shall have the right, at any time, to enter into similar agreements with other geotechnical engineers, engineers, architects, landscape architects, planners, consultants, contractors, subconsultants, to perform such geotechnical testing services as the CITY may desire. 2.Discrimination. The CONSULTANT, for itself, its delegates, successors-in-interest, and its assigns, and as a part of the consideration hereof, does hereby covenant and agree that, 1) in the furnishing of Services to the CITY hereunder, no person shall be excluded from participation in, denied the benefits of, or otherwise subjected to discrimination in regard to this Agreement on the grounds of such person's race, color, creed, national origin, disability, marital status, religion or sex; and 2) the CONSULTANT shall comply with all existing requirements concerning discrimination imposed by any and all applicable local, state, and federal rules, regulations, or guidelines, and as such rules, regulations, or guidelines may be from time to time amended. In the event of a breach of any of the nondiscrimination covenants described in this Subsection, the CITY shall have the right to terminate this Agreement, with cause, as described above. 3.Compliance with Law. The CONSULTANT and its employees shall promptly observe, comply with, and execute the provision of any and all present and future federal, state, and local laws, rules, regulations, requirements, ordinances, and orders which may pertain or apply to the Services that may be rendered hereto. The CONSULTANT shall also require, by contract, that all Subconsultants shall comply with the provisions of this Subsection. By entering into this contract, the awarded bidder is obligated to comply with the provisions of Section 448.095, Fla. Statutes, "Employment Eligibility." This includes, but is not limited to utilization of the E-Verify System to verify the work authorization status of all newly hired employees, and requiring all subcontractors to provide an affidavit attesting that the subcontractor does not 15 RFQ#21-005 Continuing Geotechnical Testing Services employ, contract with, or subcontract with, an alien unauthorized to work in the USA. Failure to comply will lead to termination of this contract, or if a subcontractor knowingly violates the statute,the subcontractor must be terminated immediately. 4.Licenses. The CONSULTANT shall, during the life of this Agreement, procure and keep in full force, effect, and good standing all necessary licenses, registrations, certificates, permits, and other authorizations as are required by local, state, or federal law, in order for the CONSULTANT to render its Services required under this Agreement. The CONSULTANT shall also require all Subconsultants to comply by contract with the provisions of this Subsection. 5.Compliance With New Regulations. To the extent applicable, CONSULTANT agrees that if local, state, or federal agencies modify their grant procedures or requirements for the CITY or the CONSULTANT to qualify for local, state, or federal funding the CITY may use to pay for the Services to the rendered by the CONSULTANT, then the CONSULTANT shall consent to and make such modifications or amendments in a timely manner. If the CONSULTANT is unable to comply with such applicable local, state, or federal laws and regulations, then the CITY shall have the right, by written notice to the CONSULTANT, to terminate this Agreement. 6.License Fee and Royalties. The CONSULTANT hereby grants a non-exclusive and fully paid license to the CITY to utilize all WRITTEN WORK or documents produced or prepared by CONSULTANT to perform the services required under this Agreement. 7.Consultant Not Agent of City. The CONSULTANT is not authorized to act as the CITY's agent hereunder and shall have no authority, expressed or implied, to act for or bind the CITY hereunder, either in CONSULTANT's relations with Subconsultants, or in any other manner whatsoever except as otherwise stated in a Services Authorization. 8.Subconsultants. The CONSULTANT shall have the right, conditioned upon the CITY's prior consent (which shall not be unreasonably withheld), to employ other firms, 16 RFQ#21-005 Continuing Geotechnical Testing Services consultants, Contractors, subconsultants, and so forth (Subconsultants); provided, however, that the CONSULTANT shall, 1) advise the CITY as to what particular Services the Subconsultants shall perform; and 2) advise the CITY as to what percentage of the total project services each Subconsultant shall be employed to do. The CONSULTANT shall be solely responsible for the performance of all of its Subconsultants, including but not limited to their maintenance of schedules, correlation of services, or both of these things, and the resolution of all differences between them. The CONSULTANT shall promptly terminate the use and services of any employee or Subconsultant upon written request from the CITY (which may be made by the CITY in its sole discretion). By accepting a Subconsultant, the CITY shall not be deemed to warrant or guarantee the reliability or effectiveness of that entity's Services. 9.Work Outside Scope and Time of Payment. The CITY shall have no obligation to reimburse the CONSULTANT for services rendered which may be in addition to outside of the Scope of any particular Services Authorization, unless and until the CITY has given written approval of such reimbursement. 10. Subconsultant Contracts. The CONSULTANT shall provide a copy of all relevant provisions of this Agreement to all Subconsultants hired by it, or for which it may have management responsibilities as described in a Services Authorization and shall inform all Subconsultants that all Services performed hereunder shall strictly comply with the Agreement terms and provisions. The CONSULTANT shall also furnish the CITY, upon demand, with a copy of all CONSULTANT-Subconsultant contracts. 11. Assignment and Delegation. The CITY and the CONSULTANT bind themselves and their partners, successors, executors, administrators, and assigns, to the other party of this Agreement in respect to all duties, rights, responsibilities, obligations, provisions, conditions, and covenants of this Agreement; except that the CONSULTANT shall not assign, transfer, or delegate its rights or duties, or both of these things, in this Agreement without the prior written 17 RFQ#21-005 Continuing Geotechnical Testing Services consent of the CITY. The CITY has the absolute right to withhold such consent at its convenience, and, furthermore, if the CONSULTANT attempts to assign, transfer, or delegate its rights or duties in violation of these provisions without the CITY's consent, then the CITY may terminate this Agreement. The CITY shall have the right to assign its rights (or any part of them) or to delegate its duties and obligations (or any part of them) to another entity that shall be bound by all applicable terms and conditions as provided in this Agreement. 12. Audits - Periodic Auditing of Consultant's Books. The CITY shall have the right, at any reasonable time and through any of its designated agents or representatives, to inspect and audit the Books of CONSULTANT for the purpose of verifying the accuracy of any payment, charge or invoice. In addition to the above and upon request of the CITY, the CONSULTANT shall prepare an audit (for the most recent fiscal year) for the CITY, which shall include the CONSULTANT's paid salary, fringe benefits, general and administrative overhead costs, profit and the total amount of money paid by the CITY to the CONSULTANT. The Fiscal Report shall be certified as true and correct by, and shall bear the signature of, the CONSULTANT's chief financial officer or its certified public accountant. 13. Overcharge. If it is established by the audit, or by any other means, that the CONSULTANT has over-billed or overstated its costs, fees, or reimbursable expenses Overcharge) to the City, then the amount of any Overcharge shall be refunded by the CONSULTANT, together with interest at the rate of one percent (1%) per month and the CITY's reasonable and provable costs (including the auditing expenses) in discovering the Overcharge and effecting its repayment. 14. Truth in Negotiations. The CONSULTANT shall execute the Truth-in- Negotiation Certificate in the form attached hereto and made a part hereof. It is agreed by the CONSULTANT that any amounts charged under this Agreement or any Services Authorization issues under this Agreement, shall be adjusted to exclude any sums [plus interest at twelve 18 RFQ#21-005 Continuing Geotechnical Testing Services percent (12%) per annum simple interest on the sums, from the date of payment by the CITY] by which the CITY determines that it was overcharged. 15. Prohibition Against Contingent Fees. The CONSULTANT warrants and represents that it has not employed or retained any company or person, other than a bona fide employee working solely for the CONSULTANT to solicit or secure this agreement and that CONSULTANT has not paid or agreed to pay any person, company, corporation, individual, or firm, other than a bona fide employee working solely for the CONSULTANT any fee, commission, percentage, gift, or other consideration contingent upon or resulting from the award or making of this agreement. Any breach of the warranty or representation of this paragraph shall be grounds for termination. 16. Entire Agreement. This Agreement, including the Exhibits hereto, and any Services Authorization issued under this Agreement, shall constitute the entire Agreement between the parties, and shall supersede and replace all prior agreements or understandings, written or oral, relating to the matters set forth therein. 17. Amendment. This Agreement may be amended or modified only by a Services Authorization, or an Amendment, and as duly authorized and executed by the parties. 18. Validity. The validity, interpretation, construction, and effect of this Agreement shall be in accordance with and governed by the laws of the State of Florida. In the event any provision hereof is determined to be unenforceable or invalid, such unenforceability or invalidity shall not affect the remaining provisions of this Agreement, which shall remain in full force and effect. 19. Headings. The headings of the Sections or Subsections of this Agreement are for the purpose of convenience only, and shall not be deemed to expand, limit, or modify the provisions contained in such Sections or Subsections. 19 RFQ#21-005 Continuing Geotechnical Testing Services 20. Timeliness. The CITY and the CONSULTANT acknowledge and understand that time is of the essence in this Agreement, and that the Services shall be performed in expeditious and economical manner. 21. Public Entity Crime. Any Person or affiliate, as defined in 287.133 of the Florida Statutes, shall not be allowed to contract with the CITY, nor be allowed to enter into a subcontract for work on this AGREEMENT, if such a person or affiliate has been convicted of a public entity crime within three (3) years of the date this AGREEMENT was advertised for proposals, or if such person or affiliate was listed on the State's convicted vendor list within three 3) years of the date this AGREEMENT was advertised, whichever time period is greater. A public entity crime means a violation of any state or federal law with respect to and directly related to the transaction of business with any public entity or agency (federal, state or local), involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, forgery, falsification of records, receiving stolen property or material misrepresentation. Any AGREEMENT with the CITY obtained in violation of this Section shall be subject to termination for cause. A Subconsultant who obtains a subcontract in violation of this Section shall be removed from the Project and promptly replaced by a Subconsultant acceptable to the City. 22. Force Majeure. The parties acknowledge that adverse weather conditions, acts of God, terrorism, war or other unforeseen circumstances of a nature that are outside the control of the parties may execute performance under this Agreement; or may necessitate modifications to a Services Authorization. If such conditions and circumstances do in fact occur, then the CITY and CONSULTANT shall mutually agree, in writing, to the modifications to be made to any Services Authorization. 23. Remedies and Costs. All remedies provided in this Agreement shall be deemed cumulative and additional, and not in lieu or exclusive of each other or of any other remedy available to either party, at law or in equity. 20 RFQ#21-005 Continuing Geotechnical Testing Services 24. Dispute Resolution and Exclusive Venue. As a condition precedent to the filing of any suit or other legal proceeding, the parties shall endeavor to resolve claims, disputes or other matters in question by mediation. Mediation shall be initiated by any party by serving a written request for same on the other party. The parties shall, by mutual agreement, select a mediator within fifteen (15) days of the date of the request for mediation. If the parties cannot agree on the selection of a mediator, then the CITY shall select the mediator who, if selected solely by the CITY, shall be a mediator certified by the Supreme Court of Florida. No suit or other legal proceeding shall be filed until the mediator declares an impasse, which declaration, in any event, shall be issued by the mediator not later than sixty(60) days after the initial mediation conference. The sole and exclusive venue for any mediation shall be in Orange County, Florida. Any legal proceeding of any nature brought by either party against the other to enforce any right or obligation under this Agreement or any Services Authorization issued under this Agreement, or arising out of any matter pertaining to this Agreement or the work to be performed hereunder, shall be submitted for trial, without a jury, before the Circuit Court of the Ninth Judicial Circuit, in and for Orange County, Florida. The parties consent and submit to the jurisdiction of such court and agree to accept service of process outside the State of Florida in any matter to be submitted to any such court pursuant hereto. The CITY and CONSULTANT expressly waive all rights to trial by jury regarding any legal proceeding of any nature brought by either party against the other to enforce any right or obligation under this Agreement, or any Services Authorization issued under this Agreement, or arising out of any matter pertaining to this contract or the work to be performed hereunder. As noted herein, the sole and exclusive venue for any litigation or other legal proceeding between the parties shall be the Circuit Court of the Ninth Judicial Circuit in and for Orange County, Florida. 21 RFQ#21-005 Continuing Geotechnical Testing Services 25. Chapter 558, Florida Statutes. The parties agree that the provisions of Chapter 558, Florida Statutes are not applicable to this Agreement of any Services Authorization issued hereunder. 26. PUBLIC RECORDS COMPLIANCE. The City of Ocoee (City) is a public agency subject to Chapter 119, Florida Statutes. The Contractor agrees to comply with Florida's Public Records Law. Specifically, the Contractor shall: 1.Keep and maintain public records required by the City to perform the service. 2. Upon request from the City's custodian of public records, provide the City with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in chapter 119, Florida Statutes, or as otherwise provided by law. 3.Ensure that public records that are exempt or confidential and exempt from the public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the Contractor does not transfer the records to the City. 4. Upon completion of the contract, Contractor agrees to transfer at no cost to the City all public records in possession of the Contractor or keep and maintain public records required by the City to perform the service. If the Contractor transfers all public record to the City upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the City, upon request from the City's custodian of public records, in a format that is compatible with the information technology systems of the City. 22 RFQ#21-005 Continuing Geotechnical Testing Services 5.A Contractor who fails to provide the public records to City within a reasonable time may be subject to penalties under section 119.10, Florida Statutes. IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT 407-905-3100, EXTENSION 1022, CCDL@ci.ocoee.fl.us, WITH AN OFFICE LOCATED AT 150 NORTH LAKESHORE DRIVE, OCOEE, FLORIDA 34761. Signature Page Follows) 23 RFQ#21-005 Continuing Geotechnical Testing Services IN WITNESS WHEREOF, this Agreement has been fully executed on behalf of the parties hereto and by its duly authorized representatives, as of the date first written above. ATTEST: ACCEPTED: NADIC ENGINEERING SERVICES, INC. le Name:lq(Lra, acird By: 46-y Nam Title: IMPAI %r WIlis ` SEAL) ATTEST: APPROVED: C DA By: ite - Name: Melanie Sibbitt Name: Rusty Jo son Title: City Clerk Title: Mayor SEAL) FOR USE AND RELIANCE ONLY BY APPROVED BY THE OCOEE CITY THE CITY OF OCOEE, FLORIDA COMMISSION AT A MEETING HELD APPROVED AS TO FORM AND ON July 20, 2021 LEGALITY this 1)N day of /v..16. , 202,1 UNDER AGENDA ITEM NO. 8. SHUFFIELD, LOWMAN & WILSON, P.A. BY: Scott A. 'ooks ty Atto 24 RFQ#21-005 Continuing Geotechnical Testing Services TRUTH-IN-NEGOTIATION CERTIFICATE The CONSULTANT hereby certifies that all wage rates, and any and all other unit costs supporting the compensation to be paid to the CONSULTANT pursuant to a Services Authorization for the Services as set forth therein, will be accurate, complete, and current at the date of the Services Authorization's execution. WITNESS: CONSULTANT: NADIC ENGINEERING SERVICES, INC. BY: i" BY: 4,CHName: (LH 4r--PN Print , e: M i[jilnr lti Title: up Title: I1__I IV iLI STATE OF FLORIDA COUNTY OF ortivi c_ } P RSONALLY APPEARED before me, the undersigned authority, Gixk W 1 NtflQdj N] well known to me or -who_has rod ced his/her as identification, and known by me to be the i Intel the corporation named above, and acknowledged before e that he/she executed the foregoing instrument on behalf of said corporation as its true act and deed, and that he/she was duly authorized to do so. WITNESS my hand and official seal thi2f day oft 1VKj 202) J N ARY PUBLIC AVI —., S-ANA WARD I ii ^\ Notary P;.;iic•State o/Florida l Carrrrision#GG 946356 Print Name: a....:• My Corm.Expires Jan 12,2024 Bonded thrct:gh National Notary Assn. iMy Commission Expires: 25 RFQ#21-005 Continuing Geotechnical Testing Services EXHIBIT A RFQ #21-005 CONTINUING CONTRACTS FOR GEOTECHNICAL TESTING SERVICES 26 RFQ#21-005 Continuing Geotechnical Testing Services CITY OF OCOEE REQUEST FOR QUALIFICATIONS RFQ) #21-005 CONTINUING CONTRACTS FOR GEOTECHNICAL TESTING SERVICES ocoee florida TABLE OF CONTENTS FOR RFQ#21-005 CONTINUING CONTRACTS FOR GEOTECHNICAL TESTING SERVICES RFQ DOCUMENTS Section Page Legal Advertisement 3 RFQ Instructions & General Terms& Conditions 4 - 17 Conflict of Interest Disclosure Form 18 Summary of Litigation 19 Receipt of any addenda issued 19 Company Information and Signature Sheet 20 End Table of Contents RFQ#21005 Continuing Contracts for Geotechnical Testing Services 2 Request for Qualifications,Legal Advertisement The City of Ocoee, Florida, (the "City") is soliciting sealed statements of qualifications for RFQ 21-005 CONTINUING CONTRACTS FOR GEOTECHNICAL TESTING SERVICES. Qualification packages will only be accepted electronically through Negometrix4, a free e- Procurement platform, until 2:00 pm, local time, on May 4, 2021. Qualification packages received after that time or through any other method will not be accepted under any circumstances. Qualification packages that have been timely received will be publicly opened virtually online and the names of the responding firms read aloud at that time; instructions will be provided at https://www.ocoee.org/959/Public-Bid-Meetings. All questions regarding this RFQ should be in writing to Vanessa Anthony, Purchasing Technician, Finance Department/Purchasing vanthony@ci.ocoee.fl.us. No Pre-submittal conference is scheduled at this time. Prospective respondents may secure a copy of the documents required for submitting statements of qualifications at no charge through Negometrix4 by accessing the City's published solicitation page at https://app.negometrix.com/buyer/748. Please visit https://www.ocoee.org/323/Purchasing for more information. Prospective respondents will be provided with all information regarding this RFQ. addenda, and changes to the project requirements through the Negometrix platform. Melanie Sibbitt, City Clerk, Orlando Sentinel April 4, 2021. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 3 CITY OF OCOEE REQUEST FOR QUALIFICATIONS "RFQ" #21-005 CONTINUING CONTRACTS FOR GEOTECHNICAL TESTING SERVICES A. INTRODUCTION AND GENERAL INSTRUCTIONS 1. The City of Ocoee, Florida, in conformance with the Consultants' Competitive Negotiations Act (CCNA), Florida Statutes Section 287.055, et seq., and the policies and procedures of the City of Ocoee (City), is soliciting statements of qualification from geotechnical testing firms that are interested in providing such services for City projects. Such projects include large- and small-scale water, sewer. and reclaimed utility projects, road construction and/or rebuild construction, extensions and/or stormwater related projects, and other geotechnical type projects. There may also be a periodic need to conduct Phase I environmental reviews and environmental lien searches related to the possible acquisition of real property by the City. A variety of testing and consultative tasks will be required in various combinations depending on the needs of each project. Responding firms (Respondent, Firms, Bidder, Proposer) must be experienced in providing geotechnical testing services for projects of a scope and nature comparable to those described. Use of qualified subconsultants for specialty work is acceptable. To be considered,the firm shall be qualified by a licensed professional in accordance with Florida State law and be familiar with all applicable State of Florida, St. Johns River Water Management District, Orange County. and City land development codes, regulations. and laws, and with City and Orange County construction standards. In accordance with the CCNA,the work contemplated under these continuing contracts will be limited to routine tasks related to construction projects expected to cost no more than $4 million, or for studies not costing more than $500,000. Geotechnical Testing services related to any project that does not fall within these categories will be separately solicited in conformance with the CCNA. 2. The City intends to award continuing contracts to at least three (3) Respondents, if possible, deemed to be the most highly qualified to perform the required services. In determining whether a firm or individual is qualified, the City shall consider criteria set forth in the RFQ. The firm selected by the City will provide professional services to the City on an as-needed basis, based upon task orders to be issued by the City under the continuing contract. The continuing contract shall have an initial three (3) year period plus two automatic one-year renewable extensions, and one (1) year optional renewal at the City's discretion. 3. Prospective respondents may secure a free copy of the documents required for submitting a response through Negometrix's Negometrix4 platform by accessing the City's published solicitation page at https://app.neQometrix.com/buyer/748. Please visit https://www.ocoee.org/323/Purchasing for more information. Prospective respondents will be provided with all information regarding this RFQ. addenda. and changes to the project requirements through the Negometrix4 platform. Partial sets of the documents required for submitting a statement of qualifications will not be issued. By using Negometrix, prospective respondents will be provided with all information RFQ#21005 Continuing Contracts for Geotechnical Testing Seri ices 4 regarding this RFQ, all addendums and changes to the project requirements;there is no charge to use the Negometrix e-procurement platform. 4. Each qualification package should consist minimally of a cover letter, statement of qualifications, conflict of interest disclosure form and company information form attached at the end of these instructions). Please also include a copy of all applicable licenses held by firms or key subconsultants proposing to perform the work. Statements of qualifications should be limited to a total of forty (40) 8.5"x 11" pages (including any resumes and maximum 2-page cover letter but excluding front and back covers, dividers, table of contents, and company information form), single-sided. portrait orientation. 12-point font. Additional submission instructions are supplied below in Section D. Any qualifications package failing to conform to these specifications may be subject to rejection. The person signing the signature sheet on behalf of the respondent must have the legal authority to bind the respondent to the submitted qualification package and shall be understood to do so. All expenses for providing qualification packages to the City shall be borne by the respondent. 5. The City utilizes Negometrix, an e-procurement platform, Negometrix4 version. The City is ONLY accepting electronic solicitation responses online through the City's Negometrix4 platform at https://app.negometrix.com/buyer/748. This link can also be accessed through the City's website at https://www.ocoee.org/323/Purchasing under the Current Open Solicitations menu. All responses for this bid MUST be submitted through the Negometrix4 platform. Bid/RFP/RFQ submissions received in any other format will not be accepted; no paper, fax, or e-mailed submissions will be accepted. There is no charge to use the Negometrix electronic bid submission platform. Registration with Negometrix is free and is required prior to submitting an RFQ response. You will be required to register once you click the PARTICIPATE BUTTON in the solicitation file. It is suggested your company register no later than 24 hours in advance of the RFQ submission deadline to ensure proper registration. Should your company need assistance with registering, please contact the Negometrix Service Desk by calling (724) 888-5294 or by emailing servicedesk.us a negometrix.com. Once your company is registered with Negometrix, you will be able to submit your bid/proposal/qualification statement securely, any time before the bid deadline, at https://app.negometrix.com/buyer/748 by clicking the PARTICIPATE BUTTON under the solicitation. Qualification Statements submitted on Negometrix4 will remain locked and inaccessible by City staff until the bid deadline. Respondents are encouraged to allow ample time to upload and submit your Response as the system will automatically lock responses upon the bid deadline. A virtual public RFQ opening will be held on the date and time indicated below. Details on how to access the virtual bid opening will be located on the City's website at https://www.ocoee.org/959/Public- Bid-Meetings. 6. Respondents shall submit one (1) complete electronic copy, preferably in a single file, of their qualifications package on the Negometrix4 platform. Qualification packages must be received by Negometrix4 no later than 2:00 p.m. (local time)on May 4,2021. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 5 Any qualification package received after the above-noted time will not be accepted under any circumstances. Any uncertainty regarding the time a qualification package is received will be resolved against the Respondent. It shall be the sole responsibility of the Respondent to have the qualifications package uploaded and submitted on the Negometrix4 e-procurement platform prior to the due date and time. File Uploads -All electronic files uploaded must be in a common format accessible by software programs the City uses. Those common formats are generally described as Microsoft Word (.doc or.docx), Microsoft Excel (.xls or.xlsx), Microsoft Power Point ppt or pptx), or Adobe Portable Document Format (.pdf). Respondents will not secure, password protect or lock uploaded files;the City must be able to open and view the contents of the file. Respondents will not disable or restrict the ability of the City to print the contents of an uploaded file. Scanned documents or images must be of sufficient quality, no less than 150 dpi, to allow for reading or interpreting the words, drawings, images or sketches. The City may disqualify any Submittal Response that does not meet the criteria stated in this paragraph. 7. The City will receive questions regarding this RFQ only through the Negometrix4 platform in the Question & Answer tab or written inquires directed to Vanessa Anthony, Purchasing Technician vanthonynci.ocoee.fl.us. Deadline for receipt of written inquiries will be April 27,2021 at 2:00 p.m., local time. 8. Potential Respondents should not contact City staff, with the exception of the Purchasing Technician, or other City consultants or City Commission for information regarding this RFQ before the project award date. Any contact with any other member of the City Staff, City Commission. or its consultants during the RFQ, award, and protest period may be grounds for Respondent disqualification. 9. Action on qualification packages is expected to be taken by the City Commission within ninety (90) days of the submission opening date; however, no guarantee or representation is made herein as to the time between receipt of the qualification package and subsequent City Commission action. A more detailed schedule is given below. 10. All applicable laws and regulations of the United States, the State of Florida, and the City of Ocoee will apply to any resulting Agreement. The provisions of the Consultant's Competitive Negotiations Act (Section 287.055, Florida State Statutes) shall apply. where applicable. By entering into this contract, the awarded bidder is obligated to comply with the provisions of Section 448.095, Fla. Statutes, "Employment Eligibility." This includes, but is not limited to utilization of the E-Verify System to verify the work authorization status of all newly hired employees, and requiring all subcontractors to provide an affidavit attesting that the subcontractor does not employ, contract with,or subcontract with, an alien unauthorized to work in the USA. Failure to comply will lead to termination of this contract, or if a subcontractor knowingly violates the statute, the subcontractor must be terminated immediately. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 11. The successful Respondent shall be required to execute an Agreement, in form and content acceptable to the City, indemnifying and holding harmless the City, its officials, officers, employees, and agents from all claims. 12. CONVICTED VENDOR LIST(PUBLIC ENTITY CRIME): A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a proposal on an award to provide any goods or services to a public entity, may not submit a proposal on an award with a public entity for the construction or repair of a public building or public work, may not submit proposals on leases of real property to a public entity, may not be awarded or perform work as a Contractor, Supplier, Subcontractor, or Consultant under a award with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in section 287.017 for Category Two for a period of 36 months from the date of being placed on the convicted vendor list. [See Florida State Statute 287.133 2) (a). 13. FLORIDA PUBLIC RECORDS LAW: In accordance with Chapter 119 of the Florida Statutes, and, except as may be provided by Chapter 119 of the Florida Statutes and other applicable State and Federal Laws, all Respondents should be aware that the proposal and the responses thereto are in the public domain and are available for public inspection. Respondents are requested, however, to identify specifically any information contained in their proposal which they consider confidential and/or proprietary and which they believe to be exempt from disclosure, citing specifically the applicable exempting law.All proposals received in response to this request of proposal become the property of the City of Ocoee and will not be returned. In the event of an award, all documentation produced as part of the contract will become the exclusive property of the City. 14. PUBLIC RECORDS COMPLIANCE. The City of Ocoee (City) is a public agency subject to Chapter 119. Florida Statutes. The Contractor agrees to comply with Florida's Public Records Law. Specifically, the Contractor shall: 1. Keep and maintain public records required by the City to perform the service. 2. Upon request from the City's custodian of public records, provide the City with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in chapter 119, Florida Statutes, or as otherwise provided by law. 3.Ensure that public records that are exempt or confidential and exempt from the public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the Contractor does not transfer the records to the City. 4. Upon completion of the contract, Contractor agrees to transfer at no cost to the City all public records in possession of the Contractor or keep and maintain public records required by the City to perform the service. If the Contractor transfers all public record to the City upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the City, RFQ#21005 Continuing Contracts for Geotechnical Testing Services 7 upon request from the City's custodian of public records, in a format that is compatible with the information technology systems of the City. 5.A Contractor who fails to provide the public records to City within a reasonable time may be subject to penalties under section 119.10, Florida Statutes. IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT 407-905-3100,EXTENSION 1022,CCDL(&ci.ocoee.fl.us,WITH AN OFFICE LOCATED AT 150 NORTH LAKESHORE DRIVE, OCOEE,FLORIDA 34761. 15. PATENT INDEMNITY: Except as otherwise provided, the successful respondent agrees to indemnify the City and its officers. agents. and employees against liability. including costs and expenses for infringement upon any letters patent of the United States arising out of the performance of this Contract or out of the use or disposal by or for the account of the City or supplies furnished or construction work performed hereunder.to the extent caused by the negligence,recklessness,or intentional wrongful misconduct of the Respondent and persons employed or utilized by the Respondent in the performance of this contract. Further, the Respondent shall fully indemnify, defend, and hold harmless the City and its officers, agents. and employees from any suits, actions, damages, and costs of every name and description. including attorneys' fees. arising from or relating to violation or infringement of a trademark, copyright, patent, trade secret, unpatented invention, or intellectual property right. If the bidder uses any design, device, or materials covered by letters, patent. or copyright, it is mutually agreed and understood without exception that the bid price shall include all royalties or cost arising from the use of such design. device, or materials. 16. Conflict of Interest/Non-Collusion Certification: a) Respondent declares that the only persons or parties interested in their proposal are those named herein, that this proposal is, in all respects, fair and without fraud and that it is made without collusion with any other vendor or official of the City of Ocoee. Neither the Affiant nor the above-named entity has directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive pricing in connection with the entity's submittal for the above project. This statement restricts the discussion of pricing data until the completion of negotiations and execution of a contract for the described services. b) Respondent certifies that no City Commissioner, other City Official, or City employee directly or indirectly owns assets or capital stock of the Responding entity, nor will directly or indirectly benefit by the profits or emoluments of this proposal. (For purposes of this paragraph, indirect ownership or benefit applies to any members of his or her immediate family) c) Respondent certifies that no member of the entity's ownership or management is presently applying for an employee position or actively seeking an elected position with the City. In the event that a conflict of interest is identified in the provision of services. Respondent agrees to immediately notify the City in writing. Respondent must submit the attached Conflict of Interest Statement. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 8 d) Respondent further declares that a careful examination of the scope of services, instructions, and terms and conditions of this RFQ has occurred, and that the proposal is made according to the provisions of the RFQ documents, and will meet or exceed the scope of services, requirements. and standards contained in the RFQ documents. e) Respondent agrees to abide by all conditions of the negotiation process. In conducting negotiations with the City, Respondent offers and agrees that if this negotiation is accepted,the Respondent will convey, sell,assign,or transfer to the City all rights,title. and interest in and to all causes of action it may now or hereafter acquire under the anti- trust laws of the United States and the State of Florida for price fixing relating to the particular commodities or services purchased or acquired by the City. At the City's discretion, such assignment shall be made and become effective at the time the City tenders final payment to the Respondent. The proposal constitutes a firm and binding offer by the Respondent to perform the services as stated. 17. The City reserves the right to accept or reject any or all proposals,to waive formalities, technicalities or irregularities, to request clarification of information submitted in any proposal, or to re-advertise for new proposals. The City may accept any item or group of items of any proposal, unless the Respondent qualifies its proposal by specific limitations. The City may accept one or more proposals if, in the City's discretion, the City determines that it is in the City's best interest to do so. The City reserves the right to award the contract to the Respondent which, in the City's sole discretion, is the most responsive and responsible Respondent The City reserves the right, as an aid in determining which proposal is responsible, to require a Respondent to submit such additional evidence of Respondent's qualifications as the City may deem necessary, and may consider any evidence available to the City of the financial, technical, and other qualifications and abilities of a Respondent, including past performance (experience) with the City and others. The City Commission shall be the final authority in the selection of any and all proposals B. INSURANCE TERMS AND CONDITIONS The successful respondent shall be required to provide evidence of both General (Public & Property) Liability and Professional (Design Errors and Omissions) Liability Insurance in the amount of$1 million on the form of a certificate of insurance issued on behalf of the City of Ocoee and naming the City as an additional insured, by companies acceptable to the City at the minimum limits and coverages listed below with deductible amounts acceptable to the City. The selected consultant shall not commence any work in connection with an Agreement until all of the following types of insurance have been obtained and such insurance has been approved by the City, nor shall the consultant allow any subconsultant to commence work on a subcontract until all similar insurance required of the subconsultant has been so obtained and approved. Policies other than Workers' Compensation shall be issued only by companies authorized by subsisting certificates of authority issued to the companies by the Department of Insurance of Florida which maintain a Best's Rating of"A" or better and a Financial Size Category of "VII" or better according to the A.M. Best Company. Policies for Workers" Compensation may be issued by companies authorized as a group self-insurer by F.S. 440.57, Florida Statutes. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 9 1. Loss Deductible Clause: The City shall be exempt from, and in no way liable for, any sums of money which may represent a deductible in any insurance policy. The payment of such deductible shall be the sole responsibility of the General Consultant and/or subconsultant providing such insurance. 2. Workers' Compensation Insurance: The Consultant shall obtain during the life of this Agreement, Worker's Compensation Insurance with Employer's Liability Limits of 500.000/$500.000/$500,000 for all the Consultant's employees connected with the work of this project and, in the event any work is sublet, the Consultant shall require the subconsultant similarly to provide Workers' Compensation Insurance for all of the latter's employees unless such employees are covered by the protection afforded by the Consultant. Such insurance shall comply fully with the Florida Workers' Compensation Law. In case any class of employees engaged in hazardous work under this contract for the City is not protected under the Workers' Compensation statute, the Consultant shall provide, and cause each subconsultant to provide adequate insurance, satisfactory to the City, for the protection of the Consultant's employees not otherwise protected. Include Waiver of Subrogation in favor of the City of Ocoee. 3. Consultant's Public Liability and Property Damage Insurance: The Consultant shall obtain during the life of this Agreement COMMERCIAL AUTOMOBILE COVERAGE, this policy should name the City of Ocoee as an additional insured, and shall protect the Consultant and the City from claims for damage for personal injury, including accidental death, as well as claims for property damages which may arise from operations under this Agreement whether such operations be by the Consultant or by anyone directly or indirectly employed by the Consultant, and the amounts of such insurance shall be the minimum limits as follows: 4. Automobile Bodily Injury Liability & Property Damage Liability 1,000,000 Combined single limit per occurrence (each person, each accident) All covered automobile will be covered via symbol 1 Liability coverage will include hired & non-owned automobile liability Include Waiver of Subrogation in favor of The City of Ocoee 5. Comprehensive General Liability(Occurrence Form)-This policy should name the City of Ocoee as an additional insured and should indicate that the insurance of the Consultant is primary and non-contributory. 2.000.000 GENERAL AGGREGATE 2,000,000 PRODUCTS-COMPLETED OPERATIONS AGGREGATE 1,000,000 PER OCCURRENCE 1,000.000 PERSONAL & ADVERTISING INJURY Include Waiver of Subrogation in favor of the City of Ocoee 1,000,000 Professional Liability (Design Errors & Omissions) 6. Subconsultant's Comprehensive General Liability, Automobile Liability and Worker's Compensation Insurance: The Consultant shall require each subconsultant to procure and maintain during the life of this subcontract, insurance of the type specified above or insure the activities of these subconsultants in the Consultant's policy, as specified above. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 10 7. Owner's Protective Liability Insurance: (Not applicable for Design Services). As applicable for construction projects, providing coverage for the named insured's liability that arises out of operations performed for the named insured by independent consultants and are directly imposed because of the named insured's general supervision of the independent consultant. The Consultant shall procure and furnish an Owner's Protective Liability Insurance Policy with the following limits: $1,000,000. and per occurrence. $2,000,000.Aggregate and naming the City of Ocoee as the Named Insured. 8. Contractual Liability: If the project is not bonded, the consultant's insurance shall also include contractual liability coverage to insure the fulfillment of the contract. NOTE: PUBLIC LIABILITY INSURANCE AND AUTOMOBILE LIABILITY INSURANCE, THE CITY SHALL BE NAMED AS ADDITIONAL INSURED. 1,000,000 PER OCCURRENCE 2,000.000 AGGREGATE Commercial Umbrella: 1,000,000 PER OCCURRENCE 2,000,000 Aggregate Including Employer's Liability and Contractual Liability Builders Risk: (Not Applicable for Design Services). 100.000 Any (1) Location 1,000.000 Any (1) Occurrence Remainder of page left blank intentionally) RFQ#21005 Continuing Contracts for Geotechnical Testing Services 1 1 I ACORD_ CERTIFICATE OF LIABILITY INSURANCE OP ID i G 4ionr lsD PRO OOCa' THIS CERTIFICATE IS ISSUED AS A MATTER Of INFORMATION ONLYANO CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS CERTIFICATE DOES NOT AMEND.EXTEND OR ALTER THE COVERAGE AFFORDED SYTHE POLICIES BELOW. SURER!AFFORDING COVERAGE HNC s mfYN[O MIMEO A. so sea s. ttyOURER CQgtractar'a Name Na PaSIEIC MOIR OISUSERLe COVERAGES TIEPOUCRS Of Pawpaw mom wow ROVE ILO.HUED TO TEAGs MIMEO AIM FOR TE POLL,PEW00 NOCAITOS ND1WRMSTAN000 AMYASDLMM.EM.Met OR COMMON Of ANY CONIpAOT OR OMEN DOCUMENT wm,iEEPCT TO WWCM Wn COTTP1c*TE MAY SE aea00M WYFEW"THE IMP/AM APPOICSED SY THE PE CEEDER I EDNEAENSSAVECTTONI TIE TERME.OCWSONE ENO COMMONS°FIRMt POIXEE AOONEOATE UNTO SWIM MY HAVE SEER WOWED ET PAW CWMS. LTA TYPSOPSOWAHOS MUM'NAME 41,W, - lasts DUAL WEN' EACHOCLNasocf 11,000,000 X i COamCVA OSaANWRIfT PINNEDNs nnia; E50,000 I OASIS WACO OCCUR N®ESP 0o0an•Onen) E5,00D PMlcamsawm*MY E 1,000,000 DMEEALAOGROAIE E2,000,000 0011.AGOE OATESWT AP(I'CES PER PEOOVCTE.00Y50PAO0 sa,000,000 P«.rs 1+ 1P• I I LDc 1OMDa0/a/L61um 1 I u." 11,000.000 ALL OWNED NJITE BOOST INJURY s0ME0 AVTON PO torsos two Nona IOOLYwLmY X AO.CALVEDA POS Pe.mENrl POOPERTY SWAGE I WAGE LORRY AVTOGAIY•EA AMNION E N""Rn MINN TON EA ACC S AU100MLM ADO E 0.2e6MMMEELLAWMUN' EACHOCCOEE/CE 11,000,000 I K OCOAL C1 cLAae AOOE AOCAEOAT:12,000,000 DEOUC71mG i EETEIRON S WOMEES OOIPEMSATIOMAND X IoI rLr`AMi`i l 15P ePavrlN lmlanY EL fA0M A000EM E500,000rm"e'e= CCLI f NMN El.SIFIE-SA DalOYEE I SOO,OGo PEIEIra'A°rPRDtlg16w E.L=Asa•POLICY WIT '500,000 one Builders Risk Any 3 Leo 1C0,0W Any 1 Occ 1,000,000 I[fCEPI10M COP OPIEATION/I LOCATING/VESCt IISCLOIWNSADOED ST FIWOEIBNIT I OMSKPROWIpq The insurance evidenced by this certificate shall name the certificate holders es an additional insured on the General Liability A Umbrella Liability. Workers' Compensation, Employers* Liability a General Liability shall contain a Waiver of Subrogation in favor of the certificate holder. The certificate bolder is added ae a TisDd ir9Zid fq H>L] 9 Rldc. CERTIFICATE HOLDER CANCELLATION OCOEEol SWUM ANY Of TISAeOVS0elC10SSO POMP Mt CNi e.S51IIPOOS TO 12000010A MTETNM1W1.Dm Hama MUMS waL OOWFRIO PAa 10 OATaaRRTM NOMETOM tPA1PCATE MOLDER NAAPD TO THE LOTL OUT PALUP!T000 SO SMALL City of Ocoee MOUND OR LIMA O NIS MDU/OMTME NUM IT0$GOITa0RISON. Lakeshore Drivo Ocoee FL 34761-225S 111011EImRATI1[a I, AYIMPass ENINBRATNE mows)ACORD 25 0) SA` '- P . GACORD CORPORATION TSEE 9. Certificates of Insurance: Certificate of Insurance Form (see sample, above), naming the City of Ocoee as an additional insured will be furnished by the Consultant upon notice of award. These shall be completed by the authorized Resident Agent and returned to the Office of the Purchasing Technician. This certificate shall be dated and show: The name of the Insured consultant, the specific job by name and job number, the name of the insurer, the number of the policy, its effective date, and its termination date. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 12 Statement that the Insurer shall mail notice to the Owner at least thirty(30)days prior to any material changes in provisions or cancellation of the policy, except ten (10) days written notice of cancellation for non-payment of premium. C. SCOPE OF SERVICES The City of Ocoee, Florida (City), in conformance with its policies and procedures, is soliciting statements of qualification from geotechnical testing firms that are interested in providing such services for City projects. Such projects include large-and small-scale water,sewer.and reclaimed utility projects,road construction and/or rebuild construction,extensions and/or stormwater related projects,and other geotechnical type projects. There may also be a periodic need to conduct Phase 1 environmental reviews and environmental lien searches related to the possible acquisition of real property by the City. A variety of testing and consultative tasks will be required in various combinations depending on the needs of each project. Each firm proposing to provide geotechnical testing services to the City shall provide a complete list of all such services normally available from that firm. Work will be requested through a task work order to which the firm will provide a price proposal. The City may reject or accept the statement of qualifications, request additional information, or negotiate a different mix of services and/or prices. Once an agreement is reached, the work will be authorized through a City purchase order. The task work order will be used to determine the expected quantity and nature of the services required for the covered project(s). The purchase order will authorize a specified maximum cost for services to be provided. Project conditions may alter the number and nature of tests and services provided over the course of the work. so long as the maximum budget authorized is not exceeded. The City intends to award continuing contracts to no fewer than three (3) firms, if possible, deemed to be the most highly qualified to perform the required services. In determining whether a firm is qualified, the City shall consider criteria set forth in the RFQ. The continuing contract shall have an initial three (3) year period plus two automatic one-year renewable extensions, and a one (1) year optional renewal at the City's discretion. The following list is a representative sample of the tasks to be procured, as needed, for City projects: Roadway-related Services: 1. Stabilized subgrade in-place density test 2. Stabilized subgrade depth verification test 3. Stabilized subgrade strength verification test(Limerock Bearing Ratio) 4. Limerock in-place density test 5. Limerock depth verification test 6. Limerock modified proctor test 7. Soil cement testing, crushed concrete for base 8. Asphaltic concrete extraction & gradation test, per day 9. Mobilization of equipment 10. Asphalt core testing for depth & density w/patching of core hole, per core 11. Laboratory test of asphalt cores for density RFQ#21005 Continuing Contracts for Geotechnical 'Testing Services 13 Utility-related Services: 1. Pipe in-place density tests (typically 1 test per 300 ft. of pipe for every 1 ft. of backfill) 2. Structure in-place density test (typically 1 test per structure per 1 ft. of backfill) 3. Modified proctor test Building-related Services: 1. Footing foundation soil density test 2. Concrete slump test 3. Soil bearing test Miscellaneous Services: 1. Phase 1 environmental review 2. Environmental lien search 3. Engineering technician, per hour 2. Engineer review, per hour 3. Engineering review and administrative overhead. as a percent of the total task 4. Other service not explicitly listed above but customarily provided by the firm as part of its geotechnical testing services The list given above is representative but not complete. Interested firms must be experienced in providing services for projects of a scope and nature comparable to those described. Use of qualified sub-consultants for specialty work is acceptable. To be considered, the firm shall be a licensed to do business of this type in accordance with Florida State law and be familiar with all applicable State of Florida. St. Johns River Water Management District, Orange County and City of Ocoee codes,regulations and laws. Please include a copy of all applicable licenses held by firms or subconsultants proposed to perform work. D. SUBMITTALS Qualifications packages should be designed to portray to the City how the respondent's services can best match the knowledge. skills, and abilities suggested by the anticipated Scope of Services given above. In order for the City to evaluate the qualification package. each Respondent shall provide information relative to their ability to provide services that will best meet the needs of the City. The City of Ocoee requires comprehensive responses to every section within this RFQ. To facilitate the review ofthe responses. firms should follow the described response format.The intent of the RFQ format requirements is to expedite review and evaluation. It is not the intent to constrain firms with regard to content, but to assure that the specific requirements set forth in this RFQ are addressed in a uniform manner amenable to review and evaluation. In order to simplify the review process and obtain the maximum degree of comparison, the Respondent should use the following format in responding to the RFQ and missing material may cause your submission to be evaluated accordingly: I. Firm's Qualifications Firm's and key employee's certifications and licenses with regulatory agencies, professional organizations. etc. RFQ#21005 Continuing Contracts for Geotechnical Testing Seri-ices 14 List firm's key sub-consultants, their qualifications, and their role in providing these services, if applicable. List of firms' other current or recently completed similar services within the past two (2) years with other public or private agencies. List of at least three (3) client references to include organization name, contact person, telephone number(s), and e-mail address. Firm's project organization and coordination structure Firm's understanding of the services requested and how the firm would accomplish the work II. Firm's Office Location & Other Forms (not included in page limit) List the location of all offices(firm and key sub-consultants) involved with this project and approximate distance (in miles) and time (in hours)to City Hall. Conflict of Interest Disclosure p. 18 Receipt of any addenda issued. p. 19 Summary of Litigation, if none please so state. Provide a summary of any litigation. claim(s), bid or contract dispute(s) filed by or against the Firm in the past five (5) years which is related to the services that the Firm provides in the regular course of business. The summary shall state the nature of the litigation, claim, or contact dispute, a brief description of the case, the outcome or projected outcome, and the monetary amounts involved. p. 19 Company Information/Signature Sheet p. 20. E. TIME SCHEDULE The anticipated schedule of events related to this solicitation is: Date of RFQ Request for qualifications published 23 days later Last day for questions 30 days later Statements of qualification are due 37 days later Qualification statements distributed to selection committee 45-60 days later Selection committee meeting held Next meeting Short-list of ranked firms recommended to City Commission Dates are estimated and subject to change at the City's discretion. F. SELECTION PROCESS 1. The criteria for selection shall be based on the criteria listed in the RFQ. The City reserves the right,before awarding the contract,to require a Respondent to submit additional evidence of its qualifications,as the City may deem necessary.and shall conduct discussions with, and may require oral presentations by, no fewer than three (3)firms. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 15 2. A City evaluation committee will evaluate each respondent's qualifications and after interviews and/or oral presentations will short-list and recommend to the City Commission the top three(3) firms, if possible, in ranked order of qualifications based upon the evaluation committee's evaluation of the responses and any client references. All Respondents shall be notified via Negometrix or other means of the evaluation committee's recommended ranking of firms to the City Commission. The City Commission's decision to endorse or modify the ranking by the evaluation committee shall be final.The City Commission shall be the final authority in the award or rejection of any and all responses. 3. The City will apply the negotiation requirements of Section 287.0055, Fla. Stat.,(a.k.a., CCNA). The City will attempt to negotiate an agreement with the top-ranked Respondent. If no agreement is reached with the top-ranked Respondent, negotiations will be terminated and initiated with the second-ranked Respondent, and so on, until an agreement is reached. 4. The successful Respondent shall be required to execute an agreement which provides, among other things, that all plans, drawings, reports, and specifications that result from Respondent's services shall become the property of the City. Upon the successful negotiation of an agreement, a formal contract will be prepared and subsequent executed by both parties. Evaluation Criteria Maximum Points 1. Experience of the firm and key personnel Past Performance and Experience of the Firm Past Performance and Experience of the Team Members Past Performance and Experience with or in the City Overall Experience 50 Affect of Legal Action Against the Firm References, Licenses with Regulatory agencies Firm's project organization and coordination structure 2. Ability to Meet Time and Budget Requirements Current and Projected Workloads of the Firm 25 3. Project Approach Briefly describe your Firm's understanding of the services requested 15 and how the firm would accomplish the work. 4. Office Location Location of the Firm Office and Proximity to the City of Ocoee 5 5. Certified Minority, Women Owned Business Enterprise Include M/WBE Certification forms for the Responding Firm only. 5 100 RFQ#21005 Continuing Contracts for Geotechnical Testing Services 16 G. WORK ASSIGNMENT PROCEDURES Firm(s) selected by the City will provide professional Geotechnical Testing services to the City on an as needed basis, based upon task orders to be issued by the City under the continuing contract. No work shall commence until the verification of the issuance of the purchase order or other authorization document. Invoicing for completed work or progress billing shall be submitted to the requesting Utilities Department for processing and submission for payment by the Finance Department with a copy to: Finance Department Accounts Payable City of Ocoee 150 N. Lakeshore Drive Ocoee, Florida 34761 H. BID PROTESTS All Bid Protests shall be submitted to the Purchasing Technician in the following manner: 1. A Bidder shall file a written bid protest under this Article or be barred any relief: oral protests shall not be acknowledged. 2. A bid protest shall be limited to the following grounds: (a) issues arising from the procurement provisions of the Project Manual, its addenda, and other bidding documents: and/or(b)applicable federal, state. or local law.No bid protest may be based upon questions concerning the design documents (drawings and specifications). The Bidder shall clarify all questions concerning the design documents of the project prior to submitting its bid. 3. The content of the bid protest shall fully state the factual and legal grounds for the protest and the legal basis for the relief requested. 4.The bid protest shall be filed with the Purchasing Technician not later than five(5)calendar days after the posting of the notice of intent to award or recommendation of award by staff, whichever is earlier. 5.The Purchasing Technician,on behalf of the City, shall make a determination of the merits of the protest not later than five (5) business days after receipt of the protest. If the City denies the protest, the City may proceed with award of the contract unless enjoined by order of a court of competent jurisdiction. END OF INSTRUCTIONS RFQ#21005 Continuing Contracts for Geotechnical Testing Senn ices 17 l Ocoee florlda RFQ CONFLICT OF INTEREST DISCLOSURE FORM The award of this contract is subject to the provisions of Chapter 112, Florida Statutes. All Proposers must disclose within their Proposal: the name of any City of Ocoee employee, Mayor or City Commissioner, other City Official, or City Consultants, who owns assets or capital stock, directly or indirectly, in the Proposer's firm or any of its branches, or would directly or indirectly benefit by the profits or emoluments of this proposal. (Indirect ownership or benefit applies to any members of his or her immediate family.) Proposer certifies that no member of the entity's ownership or management is presently applying for an employee position or actively seeking an elected position with the City. In the event that a conflict of interest is identified in the provision of services, Proposer agrees to immediately notify the City in writing. The purpose of this disclosure form is to give the City the information needed to identify potential conflicts of interest for the City Commission, Evaluation Committee members, and other key City employees and consultants involved in the award of this contract. According to Chapter 112, Florida Statutes, the term "conflict of interest" "means a situation in which regard for a private interest tends to lead to disregard of a public duty or interest", and refers to situations in which financial or other personal considerations may adversely affect, or have the appearance of adversely affecting, an employee's professional judgment in exercising any City duty or responsibility in administration,management, instruction, research, or other professional activities. Please check one of the following statements and attach additional documentation if necessary: To the best of our knowledge.the undersigned firm has no potential conflict of interest for this Proposal. The undersigned firm,by attachment to this form, submits information which may be a potential conflict of interest for this Proposal. Acknowledged by: Firm Name Signature Name and Title(Print or Type) RFQ#2I005 Continuing Contracts for Geotechnical Testing Services 18 Date RFQ#21005 Continuing Contracts for Geotechnical Testing Services 19 SUMMARY OF LITIGATION: Provide a summary of any litigation, claim(s), bid or contract dispute(s) filed by or against the Bidder in the past five(5)years which is related to the services that the Bidder provides in the regular course of business. The summary shall state the nature of the litigation, claim,or contact dispute. a brief description of the case,the outcome or projected outcome. and the monetary amounts involved. If none, then please say so. Attach additional sheets if necessary) ACKNOWLEDGEMENT OF ADDENDA: Bidder acknowledges receipt of the following addenda: No.Dated No.Dated No.Dated Remainder of page left blank intentionally.) RFQ#21005 Continuine Contracts for Geotechnical Testing Services 20 COMPANY INFORMATION/SIGNATURE SHEET RFQ#21-005 FAILURE TO COMPLY WITH THESE RFQ INSTRUCTIONS WILL RESULT IN DISQUALIFICATION OF YOUR QUALIFICATION PACKAGE. PLEASE SIGN BELOW ATTESTING THAT YOU HAVE READ AND UNDERSTAND ALL RFQ INSTRUCTIONS AND THAT YOU UNDERSTAND THAT THE SUCCESSFUL RESPONDENT WILL BE REQUIRED TO ENTER INTO A LEGALLY BINDING CONTRACT WITH THE CITY OF OCOEE. COMPANY NAME TELEPHONE(INCLUDE AREA CODE) FAX (INCLUDE AREA CODE) E-MAIL ADDRESS IF REMITTANCE ADDRESS IS DIFFERENT AUTHORIZED SIGNATURE(manual)FROM PURCHASE ORDER ADDRESS. PLEASE INDICATE BELOW: NAME/TITLE(PLEASE PRINT) STREET ADDRESS CITY STATE ZIP FEDERAL ID# Individual Corporation Partnership Other(Specify) Sworn to and subscribed before me by means of physical presence or online notarization this day of 20 . Personally Known or Produced Identification Notary Public-State of Type of Identification) County of Signature of Notary Public Printed,typed or stamped Commissioned name of Notary Public RFQ#21005 Continuing Contracts for Geotechnical Testing Services 21 EXHIBIT B CONSULTANT'S QUALIFICATION PACKAGE RESPONSE TO RFQ #21-005 27 RFQ#21-005 Continuing Geotechnical Testing Services NADIC ENGINEERING CITY OF OCOEE CONTINUING CONTRACTS FOR GEOTECHNICAL TESTING SERVICES RFQ #21-005 ocoee florida NADIC ENGINEERING May 2nd, 2021 City of Ocoee Purchasing Division Attention:Vanessa Anthony, 150 N. Lakeshore Drive Ocoee, Florida 34761 Subject: RFQ#21005 CONTINUING CONTRACTS FOR GEOTECHNICAL TESTING SERVICES Dear Ms.Anthony and Selection Committee Members: Nadic Engineering Services, Inc. (NADIC) is pleased to respond to the City of Ocoee's Request for Qualifications RFQ) for Continuing Contracts for Geotechnical Testing Services. Thank you for the opportunity to submit our qualifications package. We have reviewed the Request for Qualifications and submittal requirements, and we are confident that our team can provide the services requested in a timely and cost-effective manner. Please accept this letter of interest to provide exceptional qualifications and experience to your service. NADIC is one of the most respected, dependable and trusted engineering firms and is dedicated to providing services on time, within budget, and in a professional manner. We propose to use Dr. Godwin Nnadi, PE, as our single-point- of-contact. Dr. Nnadi is highly qualified and is a nationally known expert in Geotechnical, and Environmental engineering consulting. Dr. Nnadi will be available to the City to address engineering issues and coordinate staffing for all task authorizations. He is supported by a dedicated group of engineers, qualified CTQP technicians, and administrative personnel. Our unsurpassed client devotion ensures the City that our team will deliver quality, cost- effective, and on-time services safely. Incident and injury free are at the foundation of NADIC's business model and would help the City's team be successful and accountable to the stakeholders. We understand the City of Ocoee is seeking for qualified consultants who are interested in providing professional services to support the needs of the City. The Consultant shall function as an extension of the City's resources by providing qualified technical and professional personnel to perform duties and responsibilities assigned under the terms of the professional consulting services according to City Standards and Procedures. The NADIC Team is well qualified and committed to provide the City the required services to achieve your project goals in the areas of Geotechnical, and Materials Testing. NADIC is currently maintaining seven (7) continuing services contracts for government agencies with scopes similar to those involved on this contract. We understand the challenges facing the City and their need to "do more with less"we will proactively participate on your projects in ways that will ultimately allow the City to save cost. Our team will provide you the following benefits: Dedicated:Nadic office is 5 miles from the City Hall;we will be an extension of your office. We will mobilize our drill rigs and staff in a moment's notice to meet your 1141.Pine Hills needs. Our employees are always available to you and committed to accommodate you for both routine and a emergency requests. All work for the City will be a`, ,- performed by NADIC from our corporate headquarters: q -xe 601 N Hart Blvd,Orlando, FL 32818 Devoted: With a"client first"motto,we take pride in being proactive and creative in solving project challenges. We are devoted to providing the highest quality and most responsive professional services. Dependable:With over 20 years of local working experience in Central Florida, we will be a reliable and dependable partner to the City. We have provided similar geotechnical/material testing services on multiple projects within the area. Our approach is to place the City's needs and objectives first. Safety:We strive to build safety and wellbeing in all aspects of our business. This is a responsibility we take very seriously and are committed to everyone going home safely every day. We are confident that NADIC is the best choice to provide professional for Geotechnical Testing Services to the City. We appreciate the consideration, and we look forward to providing the City of Ocoee "Dedicated, Devoted and Dependable" Services as your consultant partner. As the team Project Manager, I am personally committed to you and the City's team for a seamless delivery of the resources and expertise required to accomplish the City's goal in this contact. Sincerely, CCXIL Godwin N. Nnadi, Ph.D., P.E. Principal Engineer/Contract Manager On behalf of: The Nadic Engineering Services Inc.(NADIC)Team TABLE OF CONTENT TABA Firm's Qualification TAB B Firm's Office Location &Other Forms A M T# tY6 F 'f h. YfnF' 5 ," TAB A FIRM'S QUALIFICATIONS FIRM'S QUALIFICATIONS Nadic Engineering Services(NADIC) brings over 20 years of proven dedicated and responsive services to the City of Ocoee. We have successfully completed several hundreds of projects for the different governmental entities. NADIC is currently maintaining seven (7)continuing services contracts for government agencies with scopes similar to those involved on this contract. NADIC has assembled a team of professionals who will work as an extension of the City to fulfill its vision. Our State of Florida Team stands ready to not only meet, but to exceed the Department of State expectations of the City. Given our long-term history working within Central Florida, we are fully cognizant of I certify from the records of this office that NADIC ENGATEERING the local conditions, local construction materials and SERVICES INCORPORATED is a corporation organized under the laws of the State of Florida.filed on August 28.'_001. construction practices, building codes, and City The document number of this corporation is P01000085332. regulations. Our Team would be honored to work with the I father certify that said corporation has paid all fees due this office through City and continue to be a part of the history of the City of December 31.2021.that its most recent annual report/uniform business report was filed on February,2.2021.and that its status is attire. Ocoee represented by this contract. These individuals I further certify that said corporation has not filed Articles of Dissolution have local knowledge and are also complimented with the years of expertise. We are proud to provide the City with knowledgeable staff,Gat Se;;spite S;,te Florida at Tallahassee,the Capital,thisvastequipmentresources, and proven experience on a thePighteeath day of Parch,2021 local level. Every one of our staff takes this contract is personal, and 100% committed to this contract and available to the City of Ocoee 24/7/365. Secretary of State All of the required services for this contract will be Tracking Number.35110343a01ca: coordinated through our Orlando office and our single taauthenticate dift cerliticate,v1sit„efoRo ,,,,a„h amber.and thee robm the'infractions&splayed point of contact, Dr. Godwin Nnadi, PE. Ce„at „t e„auAe,be„„„ TEAM QUALIFICATIONS NADIC is a full-service, Florida-licensed professional consulting engineering firm offering a portfolio of services ranging from environmental and geotechnical engineering to construction materials testing and inspection. NADIC has been serving public and private sector in Central Florida for the past 20 years. Our public sector projects include Florida's signature transportation and Water/Sewer line projects in Central Florida. Our broad company experience, and specific relevant experience of our engineers and technicians, makes NADIC the premier firm for this contract. We chose to remain as a boutique-DBE firm, so that our Principals can spend their time and energy helping our clients make their project successful. This is what we bring to the table for this contract— the commitment and experience of our Principals and staff. Our Team is fully-equipped and staffed to offer a comprehensive array of geotechnical, environmental engineering, and construction materials testing services to meet needs of the City. We will serve the City of Ocoee from our Orlando office located at 601 N Hart Blvd Orlando,FL 32818. NADIC is ideally situated to offer fast response and laboratory turn-around times to the City's team including: RN)7tlttEa f ( A\gr,,a,et: f'`. 14\ ! ig4 W-it AE. Truly local expertise(over 20 years serving Central Florida),readily familiar with your area to meet your nOf1 . G',e0,/fiproject's needs. Minimal travel time to project sites—we will Woman & Minority Business Certification respond quickly and perform services in a timely manner. Nadic Engineering Services,Inc. Quick response to meet your deadlines in the event I,erti&d under the pnivLdnn,of of any unforeseen engineering or inspection 287And 2115 187.Florida Statute'fur a period from 01 04:021 01 04 2023 emergency. Our Principals are hands-on, meaning you have Df"i our full attention on each task order. NADIC offers the project management skills,technical expertise, relevant project experience, registered and certified engineers and technicians, and in-house equipment resources to perform all the anticipate categories under this contract. NADIC offers a complete line of services in the following areas: Preliminary/Pre-development Foundation/Specialty Analysis Roadway/Transportation Studies Muck survey and delineation Risk Assessment Corridor study/roadway design Site feasibility analysis Foundation analyses and recommendations Bridge foundations Preliminary soil and foundation evaluation shallow and deep foundations Pavement design Sinkhole evaluation Subsoil modification Scour analyses Cn Landfill site selection Pond recovery analysis Foundation studies W Site preparation specifications Settlement analysis Slope stability and design Design of pond and pond liners Retaining wall design Site preparation specifications ce Vibration studies Interpret cone penetration test data Design of pond and pond liners w Borrow/fill evaluations Earth dam analysis Embankment settlement Geophysical testin includingground Pile drivinganalyzer(FDA)Retainingwall design C.7 9 Y 9 penetrating radar(GPR),electromagnetic Sinkhole evaluation/remediation Pile load test i- surveys(EM),seismic refraction surveys Permitting and landfill studies Ground improvement J Dynamic analysis/evaluation Box culvert design Earth Instrumentation Pavement design and subgrade evaluation Groundwater control 0 U J Groundwater/Effluent Disposal Laboratory Services Field and Drilling Services Groundwater&soil suitability studies Soil classification Standard Penetration Test borings Groundwater monitoring plans Soil property index tests Cone Penetration Test soundingsU N Installation of monitoring wells Consolidation test Dilatometer soundings Flow modeling Proctor and Modified compaction tests Auger borings and drilling W Septic tank design and permitting Permeability Rock&pavement coring 0 Drawdown effects on wetlands Soil cement Vane testing Exfiftration/Percolation pond design Triaxial shear test Undisturbed thin-walled tubes/permeability Rapid Infiltration Basins(RIBs) Relative density GPS locating Double ring infiltration(DRI) 41/fi ii -on.21 Et:5( €r\ a 1"al S"ai, t (Y`,. ! 1(_k( l a..¢..'^,ro f.r I 1. It: Soils&Foundation Concrete Pavements On-site observation and monitoring O. Cement physical and chemical testing Preconstruction services In-place moisture and density test Mix design Soil density testing Field testing and laboratory bearing tests Flexural testing of beams Soil stabilization testing N Grout stabilization inspection Concrete testing(slump,ar content,Soil-cement base mix design U Deep foundations testing and inspection temperature and compression)Asphaltic concrete ma design 5 Reinforced earth construction Concrete curing Batch plant inspection ce W Pre-stressed/precast testing and inspection 0. Pavement distress evaluation N Concrete plant inspection and calibration Asphalt laboratory testing N Aggregate unit weight,etc.Field testing and inspection Q Subgrade testing and evaluation Pavement evaluation and failure investigation ce Underdrains W I-- M O Masonry Structural Specialty H Concrete masonry unit testing 0.- Threshold inspections Structural steel fabrication inspection U Mortar/stucco mix design testing&inspection Post tensioning calibration and inspection O. Structural steel field erection inspection 0. Brick testing 0- Fireproofing thickness,weight, Weld certification&procedure qualification Eit Construction testing and inspection adhesion/cohesion Construction inspection&testing i) Failure investigation Reinforcing steel Nondestructive examination Z Prisms construction control Roofing Vibration monitoring 0 0- Concrete masonry testing and certificationII- Load tests Curtainwall mock-up&fabrication inspection Due Diligence Services Storm-waterINPDES Industrial Hygiene Natural resources management Storm-water and surface water sampling and Asbestos services Phase I,II,and III ESAs analysis Indoor air quality assessments LV Transaction screens Drinking water sampling and analysis Mold inspection and remediation U UST/AST consulting Wastewater sampling and analysis Lead based paint Contamination assessments Biological testing 0- Industrial hygiene CC 0.w Petroleum,Arsenic,PCBs I,- Storm-water Pollution Prevention Plans 0.. Regulatory compliance assistance P. Pesticides,Solvents SWPPP) Lead-based paint and asbestos management J 0- Soil and groundwater sampling 0- NPDES permitting and inspections services Q Monitoring well installation Hazardous material survey I— Z W z Remediation Services Natural Resources 0 Remediation feasibility studies Wetland assessment and impact mitigation ce Remediation system design and installation Threatened/endangered species assessment Remediation system operation Relocation and permit preparation W Deed restriction preparation i` 1` : ! {,! 1\i, { 0 ',< t ', 1 ?iE .t,t, 0 ( tl a Accredited Laboratory: The NADIC has a Florida Department of "'" : ' _ °-- Transportation (FDOT) and Concrete Materials Engineering Council CMCE) certified laboratory. Our laboratory capabilities include triaxial shear, resilient modulus, consolidation, permeability, hydrometer, mechanical Limerock Bearing Ratio (LBR) presses with plotters and automatic compaction machines to reduce operator error during the LBR and Proctor tests. Our laboratory is staffed with full time laboratory `° technicians to respond to heavy workloads and the need for quick results. Each individual test is performed in strict accordance with our in-house Laboratory Quality Management System (QMS) Manual and the latest FDOT, AASHTO, and ASTM standards with careful consideration to any special provisions and specifications. t Our certified laboratory is strategically located for dropping off samples after hours,and in case of emergencies.We understand that the contractors work off-hours,weekends and holidays; therefore, our Laboratory staff are available after hours. The experience levels of our personnel make it possible for us to meet the City's needs.This assures that we will have the required personnel available to staff the assigned work orders. We calibrate our equipment continually and the laboratories are inspected annually by independent testing agencies such as CMEC and FDOT. Team Equipment - Geotechnical Services: Depending on the project type, NADIC uses the appropriate cost-effective tool to evaluate the site. These tools include in-house geophysical survey equipment such as Ground Penetration Radar GPR, drilling equipment, pavement coring equipment, cone penetrometer, etc. By having the equipment in-house, r`'' •.,,' we can ensure quality control and quick turnaround in collection site and It.. subsurface samples on projects. We continually study and evaluate the latest in geotechnical technology and adopt methods and procedures that provide clear benefits to our clients. fa. d NADIC has a fleet of three (3) drill rigs that can be mobilized for the City project at a moment's notice. Our drilling supervisor and drill crew members are trained in drill rig operating procedures and OSHA 29 CFR 1910.120 40-hour safety training course and annual refresher course. Drill rigs mounted on trucks and all-terrain vehicles are available to perform subsurface exploration borings and sampling. In addition, our drilling service has the capacity of many methods of subsurface sampling and data acquisition to meet client needs. We also provide a full range of environmental drilling, such as sampling of contaminated soils and installation of monitoring wells.Our drilling team will drill for the City on as needed basis,even with short notice PROJECT MANAGER We are proud of our skilled professionals for this contract, we possess capabilities and expertise in the fields of Environmental, Geotechnical engineering, and Materials Engineering. We have been providing geotechnical, and environmental and construction material testing services to similar municipal since our inception in 2001. We are familiar with continuing contracts and are available for planned projects and unplanned emergences. The benefit to the City is that NADIC is ready on day one to utilize our knowledge,experience,and expertise to assist the City during the implementation of the capital and maintenance projects. Dr. Godwin Nnadi P.E., (Cell: 407.702.4603 I email: gnnadi@nadicinc.com)will serve as the Contract/Project Manager for this Contract. tiPt1I r`4€ r ; f `=. '.. ',? ;l tit .;'s £iIIt ii\i i.1. s !s ii`- i ._., TEAM KEY PERSONNEL RESUME SUMMARIES Dr. Nnadi has over 41 years of experience and is highly knowledgeable in the field of geotechnical and environmental disciplines. Dr. Nnadi will serve as the primary point of contact for this project and will review the work of the project team. He will be responsible for interacting with the City's project manager(s), staff, consultants, designers and construction teams for the different projects under this contract. As a Contract Manager, Dr. Nnadi has directed thousands of projects. He personally supervises a team of individuals who provide geotechnical and environmental services throughout Central Florida,and he is ultimately responsible for technicians and drilling personnel,for projects related to foundations, land development, transportation, stormwater ponds, landfills, sinkholes, pipelines, dams, environmental assessments and remediation of contaminated sites, As the Contract Manager, he will ensure the necessary resources needed for successful execution of this contract are provided to the City. He is very familiar with the local regulations based on his extensive experience working for several years with the different agencies within the Central Florida. Dr. Nnadi will be supported by an extraordinary. Mr. Richard Haffner, PE will be the Quality Control Testing, Construction Materials Testing and Inspections (CMT) Task Manager. Mr. Haffner has 28 years of experience in Quality Control and construction materials testing and inspection. He is a Florida Licensed Professional Engineer,Certified Welding Inspector and holds a Master's in quality management. Mr. Haffner CMT experience includes post tension inspections, vibration monitoring, and pile load testing and analysis. His CMT and geotechnical projects have included,public and private infrastructure projects such as commercial, institutional, industrial and manufacturing facilities, universities, bridges, roadways, and airports. Mr. Haffner is also proficient in field project management and report preparation. He is currently responsible for overseeing budgeting, field coordination, technical reporting, reviews, invoicing, and coordination of inspectors and laboratory technicians. Geotechnical issues will be directed by Mr.Vijay Boodhoo, PE the Geotechnical Task Manager. Mr. Boodhoo has over 39 years of experience in geotechnical engineering. His geotechnical engineering includes field exploration and recommendations for foundations,pavements,subgrade treatments and earth-work recommendations for private and public sector roadways, bridges, pipelines and buildings. Mr. Boodhoo will be assisted by team of engineers all of whom are familiar with soils and materials testing services in general, and local municipal. Dr. Ola Nnadi, PE, F.ASCE will be the Environmental Task Manager. Dr. Ola Nnadi is an International recognized leader in Environmental and Water Resources Engineering. Dr. Ola Nnadi is a special consultant to the Kingdom of Jordan and University De Zulia, Zulia, Venezuela. Dr. Ola is a Peer Reviewer for SWFWMD and SFWMD. She has worked on numerous stormwaters, groundwater water supply and environmental projects in Florida. She is familiar with regulations and policies of Toho, SWFWMD, SFWMD, St. Johns River Water Management District and the Florida Department of Environmental Protection. In addition to the key personnel presented in our organizational chart, our Team will be supported by dedicated engineers and dependable technicians with various Florida Department of Transportation, CTQP field and laboratory certifications, as well as certifications from other agencies such as the American Concrete Institute (ACI) and the Construction Materials Engineering Council (CMEC) ready to serve the City. AVAILABILTY OF STAFF NADIC has developed a reputation of excellence both technically and with regards to client service.We maintain the capacity and flexibility to not only meet, but exceed all the City's scheduled requirements for this project.We are fully committed to performing all assignments in a timely manner and within the anticipated budget. We distribute task accordingly to meet the project's needs without affecting the Departments or the Contractor's schedule. 44 €{F,4d...t((f4t°"v _ lF, f`.l 1 .t: _ :?'+. SdrS<", r ' €?` _,t €Es' .,_ ttt k 'aY. S_ i 8. '^'tIk% d 'w AVAILABILITY OF KEY PERSONNEL Name Role FrrMlin Godwin Nnadi,Ph.D,PE Contract Manager 24/7/365 Ola Nnadi,Ph.D,PE,F.ASCE,F.WRE Environmental Task Manager 50% Richard Haffner,MS,PE Materials Testing&Inspection Task Manager 65% Vijay Boodhoo,MS,PE Geotechnical Task Manager 70% r Shang Ward Contract Coordinator 85% FIELD STAFF FDOT CTQP CERTIFICATIONS/QUALIFICATIONS i. ry H, ice, H a Richard Haffner H1567596600 x x x Godwin Nnadi N30029453140 x MustafaSyed S300540823270 x x x x x x X x x x x x Lajuan Medas M6803951801 x x x x x Gonzalo Cordona C635280802030 (pending) x x Calvin Tillman T455104904710 x x x x Christian Morales M642110892200 (pending) x x Brandon Johnson J525073904260 x x x x x x x Carlos Reyes R200113894640 x x x x x x RobertThomas T520772734140 x x x x x x LABORATORY STAFF QUALIFICATIONS 44404 :.. Y.. ^ v- _. r•r*^ :-" . 1.$RTediMoiMi nlst Tea",iiWnLe'va"t(Ta68niaLT.e'iell'TteFh nLivetH OenElfv Ea?Nnadi N3002141000 x x x x x x Rick Cothran C160783753630 x x x x x x We have not had the opportunity to work for the City of Ocoee. We are excited about the chance to begin and build a strong relationship with the city. Uv4w `1 _',3' °t4' tta\. p",t 0\*xk0',, i 2-',. (0:, a . s ' <E` t,9 , ; ',€ d; J Q C 0 3 Z Q 2 o_ _Z a N z 0 O L. CO Z a Q U C p;H = N 0 W fa W N 0 u a Ck. t!1 I u. W a Q IX zM if a U E— cc a o% Naa o z oc u) W H J Q U GC Z la W 0 a 1 u U a zQ N W u z CWes a 0 V a G 0 e // © a p Z Z a 0 Q U 0 a z3zQpOGhzE v) Li z Z Fe 0 ix W z U 0 o O U Z D Z H J a W O a W U U a,N z v; tin Z a Z cZ = 0 N N r, f6 0 0 W cv V 2 0 W 0 z 0 O' 0 R 0 3 m c u0.iI-- 0° Wa 0 0 a oc d a a GODWIN NNADI, Ph.D., PE PROFESSIONAL PROFILE Dr. Nnadi directs and manages NADIC's operations throughout Florida. He has more than 41 years of experience from geotech- nical and geo-environmental engineering applications to various areas such as civil, transportation, industrial and environmental systems. He has authored and co-authored over 14 publications and was an adjunct professor at University of Central Florida, Civil & Environmental Department. REGISTRATIONS/ PROJECT EXPERIENCE AFFILIATIONS Professional Engineer Northwest Water Reclamation Facility Rapid Infiltration Basin, LICENSES/CERTIFICATON Orange County, FL PE #50637, Florida 1996; Project Manager responsible for geotechnical evaluation for pro- 90355751, Canada, 1993 ject involving investigation and evaluated the soil and groundwa- Nigeria, 1985 ter conditions as well as stability of the existing berms. EDUCATION Lake Davis to Lake Greenwood Drainage Improvements, Ph.D. Civil Engineering Orlando, FL 1990) Miami-Dade Water and Sewer Department identified plans to re- Queens University, Kingston, habilitate the existing 54-inch diameter South District Force Main Canada from southern Miami-Dade County, City of Homestead, and Flori- da City to SDWWTP, and install a redundant 54-inch bypass FM M.S. Civil Engineering to allow for the sustainable conveyance of wastewater flows from 1980); the South District service areas to SDWWTP. Purdue University, Lafayette, Indiana West Central Boulevard Streetscape and Utility Upgrade, B.S Mining/Geological Eng., Orlando, FL 1979); Geotechnical Project Manager responsible for recom-mendations University of Nevada, Reno for site preparation, mast arm signal structures, and roadway soil survey. NADIC explored soil and groundwater conditions along EXPERIENCE sections of Central Boulevard and side streets associated with this project. Soil survey along Terry Avenue from CR 526 to West 40 years Jackson Street, and along West Pine Street from Terry Avenue to South Division Avenue PUBLICATIONS Nnadi, G.N., I. Kinnear, J.D. ADDITIONAL EXPERIENCE Hussin & S. Flood, 2001. A • Church Street Streetscape, Orlando, FL Case Study of Ground Im- provemenf for a Major • I-Drive Congestion Management, Orlando, FL r , Power Plant in Jacksonville, • Lift Station 45 Replacement, Orlando, FL GODWIN NNADI, Ph.D., PE PUBLICATIONS G.N. Nnadi & Nnadi, F.N. Orlando Police Department Fueling Station, Gore Street, Orlan- 1996. Pipe Rehabilitation do , FL Technology without Exca- • Pineapple Avenue, FDOT LAP Project, Melbourne, Brevard vation, 3rd African-USA County Conference on manufactur- • SR 417 and Boggy Creek Road Interchange Modification ing technology, August 12- CFX 417-301) 15, Accra, Ghana. SR 417 Milling and Resurfacing (International Drive to Moss Park Road, Orange County) Nnadi, G.N., 1995. Micro- • SR 417 and Turnpike (SR 91) Interchange, Orange County structure investigation of CFX 417-304) Tropical Residual Soils, • Florida's Turnpike (SR 91) MP 216 Heavy Truck Turnaround, Proceedings of the 11th Afri- Osceola County can Regional conference on • SR 417 Milling and Resurfacing (SR 50 to Seminole County Soil Mechanics and Founda- Line) tion Engineering, Cairo, • SR 528/SR 436 Bridge Deck Replacements, Orange County Egypt, December 11-15. SR 408 Milling and Resurfacing (SR 417 to Rouse Road) Wekiva Parkway Section 1 A, Orange County Nnadi, G.N., W.A. Ericson & • Wekiva Parkway Line and Grade (FDOT), Orange and Lake C.E. Fielland, 1995. Utiliza- Counties tion of Dredged Spoils for • SR 408 and SR 417 Interchange System Modification (CFX Dike Rehabilitation, ASCE 253E), Orange County Proceedings of the Confer- • I- Drive Pedestrian Bridge, Orlando ence on Ports and Harbors • I-Drive Congestion Management, Orlando of the Waterways, Tampa, • Osceola County Phase III DMS and Hub StructuresFlorida. 1, pp. 585-596. 1-95 Widening from SR 40 to 1-4, Volusia County I-Drive (South Westwood Blvd. to North Westwood Blvd., Or- Mitchell, R.J. & G.N. Nnadi, ange County 1994. Simulated backfill • SR 417/Dallas Blvd. Mainline Toll Plaza, Orange County blast damage in centrifuge • SR 429/SR 414 Interchange Improvement, Orange County models, ASTM Specialty • SR 530/US192 at Hoagland Blvd. Kissimmee, Osceola Coun- Symposium on Dynamic Ge- otechnical Testing II. tY Nnadi, G.N. & R.J. Mitchell, 1991. Behavior of cement- ed sandfills under repeated loadings, Canadian Ge- otech. Journal, Vol. 28, RICHARD HAFFNER, PE, CWI PROFESSIONAL PROFILE Rich Haffner is the principal engineer for construction materials testing and inspections. Mr. Haffner has 13 years of experience in construction materials testing and inspection. In addition, he has 14 years of experience in quality control testing and inspec- tion of industrial equipment and consumer products. He has4 managed many threshold inspection projects, as well as served as an on-site authorized representative of the threshold inspec- tor. REGISTRATIONS/ AFFILIATIONS PROJECT EXPERIENCE Professional Engineer Shingle Creek Regional Trail, Orange County, FL Project Manager and Principal Engineer for construction materi- CERTIFICATONS als testing the multi-use trail from Sand Lake Road going south American Welding Society for approximately 10-miles until it reaches the Orange—Osceola Certified Welding Inspector county line. It included a boardwalk over the wetlands south of Masonry Association of Flori- SR 528, a boardwalk north of the intersection of Taft-Vineland da Road and Central Florida Parkway and a bridge over Shingle Structural Masonry Inspector Creek at John Young Parkway. Radiation Safety Officer FDOT Earthworks Technical Rosemont Gymnasium, Orlando, FL Level 1 Project Manager and Principal Engineer for construction materi- Post-Tensioning Institute als testing of the addition of a 15,840 SF gymnasium building Unbonded Tendon Inspector west of the existing community building, a new parking lot north Level 1 and west of the addition, and the relocation of an outdoor bas- Earthworks 2 ketball court from west of the existing community building to Quality Control Manager south of the addition. EDUCATION ADDITIONAL EXPERIENCE Master of Science,Kissimmee Police Training Facility, Kissimmee, FL 2011 Quality Manage-Fire Station #87, Orange County, FL ment, Eastern Michigan L. Claudia Allen Senior Center Parking lot Expansion, Orlan- University, Ypsilanti, MI do, FL Rockledge High School Science Building, Rockledge, FL Bachelor of Sci- • LB McLeod Transfer Station, Orlando, FL ence, 2000, Aerospace En- • Lake Lorna Doones Park, Orlando, FL gineering, University of • Lockwood Blvd Turn Lane, Oviedo, FL Michigan, Ann Arbor, MI • Ability Housing Mercy Drive, Orlando, FL Spring Hill Phase 3 Gravity Sewer Retrofit, Deland, FL EXPERIENCE • East Longwood Phase 1 Septic Tank Abatement, Long- 27 years wood, FL VIJAY BOODHOO, P.E., MSCE PROFESSIONAL PROFILE Mr. Vijay Boodhoo the Geotechnical Task Manager. Mr. Mont- gomery has over 39 years of experience in geotechnical engi- neering. His geotechnical engineering includes field exploration and recommendations for foundations, pavements, subgrade treatments and earthwork recommendations for private and public sector roadways, bridges, pipelines and buildings. Mr. Boodhoo coaches junior engineers in field investigations, engi- neering analysis and recommendations, design and develop- ment of plans and specifications. REGISTRATIONS/ AFFILIATIONS Professional Engineer PROJECT EXPERIENCE Wayne Densch Center Connections Headquarters Building, LICENSES/CERTIFICATON Foundation Report, Orange County, FL PE# 87462, Florida Project consist of the foundation investigation, assessment and PE#04-007, Trinidad & To- reporting, including backfilling, settlement analyses, development bago, 1984 of surcharge program, and monitoring of settlement. Radiation Safety Officer, Emory Court East Branch Drainage Ditch (EBDD), Tallahassee, OSHA 510 FL Project involved geotechnical investigation and assessment, de- EDUCATION velopment of soil strength parameters and sheet pile wall designs MSCE, 2017 at several locations with different wall heights and different soil University of Central Florida parameters. B.S Civil Engineering, 1981 University of the West Indies ADDITIONAL EXPERIENCE Lake County Pavement Maintenance & Repair Plan for Lake EXPERIENCE County Primary and Secondary Roads with Emphasis on 39 Years Overlays to Address Reflective Cracking, Lake County, FL Hiawassee Road Pavement Investigation and Rehabilitation, Central Florida Parkway Pavement Investigation and Rehabil- itation, Orange County, FL Crown Point Airport Development, Crown Point Tobago, WI Scarborough Harbour Development, Scarborough, Tobago, WI Essequibo Coast Road Rehabilitation Project—Georgetown, Guyana, Dredging of Sea Lots Channel and Basis, Trinidad Churchill Roosevelt Highway, Trinidad FIDELIA NNADI, Ph.D., PE, F.WRE, F.ASCE PROFESSIONAL PROFILE Dr. Ola Nnadi directs all Environmental scope of services and manpower requirements for Florida projects. She has more than 37 years of experience in environmental engineering applica- tions to various areas such as civil, transportation, industrial and environmental systems. She is a special consultant to the King- dom of Jordan and University De Zulia, Zulia, Venezuela. She has authored and co-authored over 30 publications and is now retired professor at UCF. REGISTRATIONS/ PROJECT EXPERIENCE AFFILIATIONS Professional Engineer Phase I ESA, International Drive (from South Westwood Blvd to North Westwood Blvd), Orange County, FL LICENSES/CERTIFICATON The project is a design-built consisting of 10 bridges, sev-eral PE #52045, Florida, 1996; sign and signal structures and roadway construction. Project in- PE #9038744, Canada, 1993 volved analyzing and interpreting drilled shaft inspection device results, nondestructive tests and load tests; pile inspection re- EDUCATION sults, pile driving analyses, pile integrity test result. Ph.D. Civil/Environmental Engineering (1992) Phase 1 Environmental Site Assessment for Grand National Queen's University Drive 1-4 Overpass, Orlando, FL Grand National Drive widening to four-lane divided road-way and B.Eng. Civil/Environmental extend it from 1000 feet, over Interstate 4 (1-4) along Caravan Engineering, (1981), Court to its intersection with Major Boulevard. The improvements University of Nigeria include bridge over 1-4, roadway extension, stormwater manage- ment ponds and swales, mast-arm signalization and pavement EXPERIENCE condition evaluation and survey. Fidelia pre-pared the Contami- 37 Years nation Screening Evaluation Report (CSER). PUBLICATIONS ADDITIONAL EXPERIENCE Rizou, M. and Nnadi, F. N. • South Water Treatment Plant Improvement, Casselberry, FL A Land use Adapted Model , • 1-95 and Ellis Road Interchange PD&E Study, Brevard Coun- for ET Estimation." Inter. J. ty, FL of Climatology. Vol. 27, No. • Sunrise Food Mart#43 Ellis Road Widening & Reconstruction 2. Feb. 2007 from S. Wick-ham Rd. to N. John Rhodes Blvd. Melbourne, Brevard County, FL Al-Hamdan and F.N. Nnadi: • Contamination Screening Evaluation Report, 1-95 and Ellis Performance Reconnais- Road Interchange PD&E Study, Brevard County sance of Stormwater Proprie- • Level II Preliminary Contamination Assessment, SR 45 (US tary Best Management Prac- 41 from SW 111th Place Ln to SR 40) Marion County tices" J. of Env. Manage- V ment, Env. Sc. and Health, JAMES COTHRAN PROFESSIONAL PROFILE Mr. James Cothran is the Lab Supervisor, and has over 18 years of experience geotechnical and construction materials testing. He is experienced in field testing and inspection of both private and public projects. He has extensive experience in soil compaction and density testing, observation and testing of utility lines and pavement subgrades/base materials, observation and testing of foundation systems including auger cast piles, con- crete sampling and strength testing, non-destructive, visual welding inspection, slurry wall monitoring, asphalt sampling and CERTIFICATON testing. Soils-Radiation Safety and use of Nuclear Gauges PROJECT EXPERIENCE CTQP— Earthwork Construc- Narcoossee Road Widening and Imgrovments, Orlando, FL tion Inspection —Level I & II Four lane to six lane widening of Narcoossee Road from SR 417 CTQP— LBR Technician to SR 528, including asphalt paving, asphalt and concrete trail, ACI —Aggregate Base Test- curb and gutter, concrete sidewalks and driveways; installation of ing Technician 14,500 linear feet of 30-inch diameter reclaimed water main; relo- CTQP— Qualified Sampler cation wastewater forcemain; installation of 4,500 linear feet of 36 CTQP—Aggregated Filed -inch diameter potable water main and 4,500 linear feet of 24- Testing Technician inch diameter reclaimed water main. ACI — Field Technician Level Helena Road, Polk County, Florida Concrete—ACI Certified 0.8-mile roadway expansion project consisted of addition of a CTQP—Concrete Lab Tech- new traveling lane for both east and west bound roadway. Mr. nician-Level I Cothran supervised construction material testing of both laborato- CTQP—Concrete Field Ty and field on soils and concrete for the overall subgrade, con- Technician-Level I Asphalt crete and asphalt sampling and testing. CTQP—Asphalt Plant Level II ADDITIONAL EXPERIENCE CTQP—Asphalt Paving Lev- • SR-60/US17, Bartow Florida (FDOT) el I & II • SR-60 Widening, Bartow, Florida (FDOT) US 98 SR35/700, Bartow, Florida (FDOT) SR25/US27, Lake Wales, Florida (FDOT) EXPERIENCE • US 17 Railroad Crossing, Sebring, Florida (FDOT) 18 Years • US 17 Babson Park, Florida (FDOT) The Lakeland Ledger Administration Building, Polk County, Florida Geico Building, Lakeland, Florida SunTrust Bank, Lakeland, Florida 1-4 Turbidity Monitoring (FDOT) 1 MUSTAFA SYED, BS PROFESSIONAL PROFILE I 4 Mr. Mustafa Syed is a Project Manager with more than 14 years 0 - of experience. He is responsible for supervision of the project Si testing and inspection. Mr. Syed oversees and coordinates fieldV 'exploration, development of data, recommendations, and criteria to guide the design and construction of foundations for struc- tures, earthworks, and excavations. He provides support to cli- ents and acts as the point of contact for the projects field work. Mr. Mustafa also assists in field obligations to meet client's CERTIFICATONS needs when necessary. ACI Concrete Field Testing- PROJECT EXPERIENCE Grade 1 FDOT Concrete Field Techni- West Central Blvd Sanitarv/Streetscape Design/Build Phase I, II, cian Level 1 & Ill, Orlando, FL FDOT Earthwork Construc- The project consists of the installation of a sanitary sewer line, tion Inspector—Level 1 roadway resurfacing and streetscape along West Central Blvd be- FDOT Asphalt Paving Level tween Glenn Lane and Garland Avenue. Pavement coring was 1 & 2 performed to determine the extent of buried brick pavers within FDOT Asphalt Plant Level 1 the project limits. Quality control of fill/backfill. Project also includ- Drilled Shaft Inspector ed installation of mast arm structures, repaving, and other Nuclear Gauge Safety & streetscape improvements. U.S.D.O.T Hazmat MOT SR 408 Widening from Goldenrod Road to Chickasaw Trail, Or- Intermediatelando, FL The project consisted of quality control testing and inspection of EDUCATION SR 408 widening from Goldenrod Road to Chickasaw Trail. Su- B.S Civil Engineering, 2006 pervised in-place density tests and asphalt and concrete sampling Osmania University, India and testing. EXPERIENCE ADDITIONAL EXPERIENCE 14 years • Amazing Explorers Academy, Orlando, FL Dowden Road Phase II Drainage & Roadway Improvements, Orlando, FL 1-4 High Mast Lighting Structures at CR 535, Osceola County, FL Econlockhatchee Trail Widening, Orlando, FL South Triplet Lake Drive Improvements , Orlando, FL BP-451 Hanger Boulevard Sanitary Sewer and Lift Stations, Orlando, FL a DEWAN HOSSAIN, PH.D., El PROFESSIONAL PROFILE 4,4 Mr. Dewan Hossain is a project engineer more than five (5) years of experience. He has experience in geotechnical engi- neering applications including civil, industrial, structural and transportation projects. Mr. Hossain performs geotechnical la- boratory analysis, slope stability analysis and repair, and retain- ing wall design. He is also involved in investigation of sinkholes, seepage analysis, soil testing and classification for the public roadway projects. LICENSES/CERTIFICATONS PROJECT EXPERIENCE El #31781, Louisiana East Central Regional Rail Trail Phase 4A, Osteen Volusia Coun- El #65040, Texas t This project consists of the construction of a 12-foot Multi-Use EDUCATION Trail as part of the East Central Regional Rail Trail running just Ph. D. , Civil & Environmental south of Maytown Road, and the construction of two (2) pedestri- Engineering, (2019) an bridges at Deep Creek Diversion Canal and at Lake Ashby FIU, Miami, Florida Canal. The started at the terminus of the existing trail at Guise Road eastward to Gobblers Lodge Road. M.S. Civil Engineering, (2016) University of Delaware SR 417 John Young Parkway to Landstar Blvd, Orange County Newark, Delaware FL The project consists of bridge widening, pavement coring, truss B.S Civil Engineering, (2009) and cantilever sign structures, ITS poles, permanent retaining Bangladesh University walls, temporary critical walls and sound walls, box culvert exten- of Engineering and Technolo- sions, roadway and ramp widening, Stormwater management gy, pond modifications, milling and resurfacing . Dhaka, Bangladesh, ADDITIONAL EXPERIENCE EXPERIENCE • SR429 Widening, from West Road to SR 414, Orange County, 5 years FL SR 414 (Maitland Blvd.) from 1-4 to CR 427, Orange County, PUBLICATIONS FL Approach to Determine Time • Bridge replacement @ SR 528 and SR 436 Interchange, Or- dependent Prestress Loss- lando, FL es from Corrosion in Post • Mast Arm Traffic Signal @ CR 535 and Bluebird Pond Road, Tensioned Tendons with De- Orange County, FL ficient Grout, DZ Hossain, K. • Mast Arm Signal @ Pine Hills Road and Indialantic Drive, Or- Lau, D. Garber, ASCE, SEI lando, FL 2019. • Exhibit Drive Entrance Improvements, Orange County RICARDINA DIAZ, MSCE PROFESSIONAL PROFILE Mrs Ricardina Diaz is a project Hydrologist/geologist involved infthetechnicaloversightandmanagementofwiderangeofgeo- logical and environmental projects. Mrs. Diaz has a significant amount of field-related experience including soil, groundwater 1 r ` and sediment sampling, and gas monitoring. Mrs. Diaz has completed several Phase I and Phase II Environmental Site As- ts ; sessments (ESAs), building condition surveys, natural resource evaluations, and asbestos/lead based paint/mold surveys and utility evaluations. In addition, he has performed demographic information evaluation. EDUCATION M.S. Hydrology, 2009 PROJECT EXPERIENCE Universidad de la Republica Avalon Road Roadway Conceptual Analysis (RCA) Oranqe Montevideo, Uruguay County, FL Mr. Diaz was the project geologist for Avalon Road RCA Contam- B.S Geology, 2006 ination Screening Evaluation (CSE). NADIC Engineering Services University of the Andes Inc. completed CSE of facilities along Avalon Road from Florida's Merida, Venezuela Turnpike to West Colonial Drive (SR 50) in Orlando, Florida. The CSE was conducted in conformance with ASTM. The purpose of EXPERIENCE this study is to evaluate the presence/absence of Recognized En- 8 Years vironmental Conditions (RECs) as part of the Orange County Study for proposed Avalon Road Roadway Conceptual Analysis PUBLICATIONS (RCA) from Florida's Turnpike to State Road (SR) 50. Hydrogeological model of saline intrusion of the aquifer Ellis Road Widening from John Rodes Blvd. to West of Wickham located in the sector Pedro Road, Melbourne, FL Gonzalez - El Salado, Munic- Mr. Diaz was the project geologist and performed a Contamina- ipality Gomez, Isla de Mar- tion Screening Evaluation. The CSE was conducted for the pro- garita, Venezuela ". GEOMI- posed 1-95 Interchange at Ellis Road and roadway improvements NAS Magazine edition Vol. along Ellis Road from South John Rodes Boulevard to South 37, No. 48 (pages 61-66) Wickham Road in Melbourne and West Melbourne, Brevard April 2009 County. Hydrogeomorphological and ADDITIONAL EXPERIENCE Geotechnical analysis for the . Grand National Drive 1-4 overpass Contamination Screening site of the alternative pon- Evaluation teadero of El Vigia, Alberto . West Living ton Street extension, Phase I Environmental As- Adriani Municipality, Merida sessment state. Proposal for environ- • East Palm Drive Canal Culverting and Roadway Widening mental impact. Contamination Screening Evaluation March 2014 LICENSES lit enreer Iketalls 1, 1 *allk 11;;;M• 669. 16601C 199114t9.1196 9649105.11K-1.99v 9969 e Maw Address 691 N.14/1111 1990. 091.9900 Fiseklo 6/11111 e-1; MANG. 11991stry 1999rary 9)14 Caorreen1 66/16/1696 110410004W4E. 1996 11196941.991691919,699199 Veerf 1,41:(04 C.11011011 FBPE 11.0•Sona,Orme AFBPE0STATEOFFLORIDASTATEOFFLORIDA BOARD OF PROF0010friAL ENGINEERS BOARD OF PILOFIBISIONAL ENGINEERSI / tRiTHEPROFESPON61 • • . 696j104SED UNDER THE rui PROFESS1ONAL 1961$.1619.9.0 UNDER me PROviSicoitt* ,.r,, f • Arif/FTUFES PROV$101070f F , ITATUTES 4 to!4:LER uctiviusupst 40147 I I Licalik%utisst°elm" j EXPIRATION DATE ftillIPJARY 214 2023 ISIDIRAT11261 DATE Fel/MARY 28,2023 Morays reinify&MM.wane 1401•61•11.k.s.cona 666,1909 6969s 966.9 6101699.13999666 Dona 969 this document in anvil:an Do not alter 1th 9°99999999hr= This 699119966 Otis es6999.4169 aveont other Mon Itot licensee to aft thie documert fhb leyourikkerse A Is unteerhike anoone other than 991996er 16 use this doota9nt. 0.6.1Mc Crow. AFBPE FBPE STATE OF FLORIDA STATE OF FLORIDA BOARD OF PROFEWONAL ENGINEERS BOARD OF PI ENGINEERS ENGINEERS w 1619 PROFE e•• 1 Itplaeolo uttOER THE THE Paoressanot - • . 19611:04(1)111C99 THE PP°""51°14.Vf TATUTES PROVISIQFF,t0F ATUIES eff**7: v‘t4rx. ay.% Lice4iiiimeet 47462 1 uceiSiliulalla kitass I 0991111710110ATe.FIORUARY 26,2023 01PIRATION DATE FEBRUARY*2023 996.m.m...*(fr(ersm.ledm messroweooss olo Moors reelhe rei6w ne406411.16.9e9arn Oft nOt/Om Os*doconeet form Ore no1 riter this 6999991 in any kart MAI IS yOUt MUM. Unlh.14 YVON OtNe Ihe Ir.01.11411[11.1.111.CIOCUrneeM1 This 96691999e It kunberld for arronr other than the*raver louse this downer*. 404gP SIMILAR SERVICES Continuing Geotechnical Engineering, Environmental, Material Consulting Services City of Kississmee: Robert Masiku; 407.518.2177 Professional Consulting Service (Geotechnical) City of Winter Haven: M.J. Carnevale; 863.291.5600 Professional Consulting Service: Geotechnical and Environmental Consulting Services City of Sanford: Bilal lftikhar; 407.688.5080 Continuing Professional Services for Geotechnical and Construction Material Testing Osceola County Public Works Department: Curt Diehl; 407.423.0504 Professional Engineering Service (Geotechnical) City of Tavares:James Dillon; 352.742.6221 3 Miscellaneous Professional Services for Soils, Foundations and Geotechnical Testing Services Miami Dade County: Luis Lacau; 305-375-5774 ray Professional Engineering for Geotechnical Site Investigations, Design and Testing Services City of Debary: Alan Williamson; 386-601-0208 Continuing Professional Engineering Design Services Orange County Public Works /Pegasus Engineering LLC: Fursan Munjed; 407.992.9160 Continuing Professional Engineering Design Services Orange County Public Works /Baxter Woodman: Claude Cassagnol; 407.380.0402 Continuing Professional Engineering Design Services Orange County Public Works/Avcon: Rick V. Baldocchi; 407.599.1122 Continuing Professional Stormwater Services City of Orlando/RS&H:Jeff Glenn; 407.893.5820 Environmental Consulting Services FDOT District Five/ E Sciences: Peter K. Partlow; 407.481.9006 Environmental Permit Compliance Services FDOT District Five/ E Sciences: Peter K. Partlow; 407.481.9006 Continuing Structural Engineering Services Seminole County School Board / Neel Schaffer: Steve Cockerham: 407.6476623 Continuing Professional Structural Engineering Services City of Orlando/ McClaren: Andrew Habel: Phone: 407.354.5411 Continuing Engineering Services City of Davenport/ CPH: NikJindal; 407.322.6841 Architectural Continuing Professional Services City of Wildwood/CPH: NikJindal; 407.322.6841 Professional Engineering Services City of Lake Mary/ Reiss Engineering: Mark A. Burgess; 407.679.5358 Continuing Hydrogeological Engineering Services City of Oviedo/ Esciences: David Mahnken; 407.481.9006 Continuing Professional Civil Engineering Services City of Orlando/ CDM Smith: Eric Grotke; 407.660.2552 Continuing Professional Civil Engineering Services City of Orlando/ RS&H: Rento Gonzalez; 407.893.5800 Transportation Planning&Traffic Engineering Continuing Services City of Apopka/ RS&H: Rento Gonzalez; 407.893.5800 Professional Traffic Signal Design Services Orange County/ DRMP: Nick DeVito; 407.896.0594 Continuing Professional General Engineering Services City of Casselberry/Wright Pierce: Dennis David; 407.720.5306 Continuing Design Services for Utilities Orange County/ Black&Veatch: Kenny Blanton; 407.419.3570 Continuing Design Services for Utilities Orange County/CPH: NikJindal; 407.322.6841 Professional Engineering Services City of Clermont/Woodard & Curran: Scott C. Shannon; 407.580.1707 406 O 11.Project Name: Geotechnical, Environmental, Material u and Consulting Testing Services Kissimmee, FL PROJECT DESCRIPTION NADIC is currently involved with providing services to the City of Kissimmee. Below is five very similar task orders as examples of our capabilities and abilities to effectively serve the City of Ocoee. Some of the projects we have recently completed are presented below. The primary elements required under this type of contract include the following; Perform/manage multiple task assignments, possibly simultaneously Provide a broad range of services in geotechnical engineering (GE), construction materials testing (CMT) and environmental services Effectively manage schedules and budgets Projects: Kissimmee Police Department Training Facility Emory Canal Trail Hudson Street Improvements Shingle Creek Regional Trail Fire Station 14 REFERENCE INFORMATION Agency: City of Kissimmee Telephone: 407.518.2174 Contact: Robert T. Masiku Email: rmasiku@kissimmee.org w Project Name: Bear Lake Road Interconnect and Water Main, Seminole County y PROJECT DESCRIPTION This project consisted of a new below grade emergency interconnect between an existing 12- inch potable water main owned by Orange County and a new 10-inch water main owned by Seminole County. The interconnect assembly is located on the northern side of Maitland Blvd approximately 900 feet west of the Bear Lake Rd/Maitland Blvd intersection. The new Seminole County water main extended east from the new interconnect to Bear Lake Road where it continued north along the west side of Bear Lake Road. The new main then crossed over to the east side of Bear Lake Road just south of the Paxton Court/Bear Lake Road intersection to enable a tie into an existing Seminole County owned 8- inch water main. NADIC performed Pipe in-place density tests, Modified proctor test, Gradation Test, Limerock Bearing Ratio Test, Asphaltic concrete extraction & gradation test, Asphalt core testing for depth & density w/patching of core hole, and Concrete Compressive Strength Cylinder Set Similarity to RFQ: As the population of Ocoee increases and with aged water and sewer pipelines, it is anticipated that the City will replace and enhance some of the aged utility pipelines. This project exemplifies the type of services NADIC can perform for the City, if the need arises. REFERENCE INFORMATION Agency: Seminole County, c/o Killebrew • Telephone: 863-701-0273 Inc Email: Bruce@killebrewinc.net Contact: Bruce Herold i t 151 i 44 1 0.{ 7y a l Project Name: s'a1r" ,k „fie k - v . s V at IN. West Central Blvd. Gravity Sewer, Roadway, Utility and Streetscape, i i.• . Orlando, FL Mt PROJECT DESCRIPTION City of Orlando awarded the design, installation and construction of Gravity Sewer Pipeline, Roadway Resurfacing, and Streetscape along West Central Boulevard between Glenn Lane and North Garland Avenue to Garney/CPH Team. NADIC was the geotechnical and construction materials testing engineer. The project was divided into three phases as follows: Upgrading and placing of sanitary sewer lines Placement of new powerline below grade by Orlando Utility Commission (OUC) Construction of roadway and streetscape A key challenge on this project was the project schedule, being a design build project. In addition, the location was challenging for field exploration due to maintenance of traffic MOT). Drilling was performed at night between 10.00 pm and 5.00am. NADIC completed the geotechnical phase on time and within budget. Construction was performed both during the day and at night. NADIC performed Stabilized subgrade in-place density test, Stabilized Limerock Bearing RatioTest, Limerock in-place density test, Modified proctor test, Asphaltic concrete extraction & gradation test, Asphalt density testing, Concrete slump test, and Vibration Monitoring. REFERENCE INFORMATION Agency: City of Orlando c/o Garney Telephone: 321-221-2826 Companies, Inc Email: dsmolik@garney.com Contact: Dan Smolik a ii zi LAKE g r IVAN)4 E Project Name: Y. Ivanhoe Boulevard Drainage Improvements, Orlando, FL PROJECT DESCRIPTION NADIC conducted a geotechnical engineering investigation for installation of an 18-inch to 48-inch Reinforced Concrete Pipe (RCP), and 36-inch by 60-inch Elliptical Reinforced Concrete Pipe (ERCP) and restoration of the existing brick roadway along Ivanhoe Boulevard from Gerda Trail to North Shore Terrace, along University Drive, Harrison Avenue, Ivanhoe Road, Yale Street, and Elizabeth Avenue in Orlando. The project also included installation of four (4) baffle boxes. The purpose of the exploration was to explore subsurface conditions and groundwater conditions and use the information obtained to provide recommendations for pipe installation, baffle box construction and roadway restoration. Because of the sensitivity of this project area, subsurface exploration was conducted between 10.00 am and 3.00 pm. The exploration was completed without any negative adverse effect or complain from the residents. The key is communication. Our project manager lies the groundwork by communicating with the designer project manager, the client project manager and NADIC field crew. Though sunshine utility clearance was utilized prior to drilling, NADIC's in-house GPR was utilized always to confirm absence of underground utilities REFERENCE INFORMATION Agency: City of Orlando, c/o Baxter & • Telephone: 407.380.0402 Woodman, Inc Email: ccassagnol@baxterwoodman.com Contact: Claude L. Cassagnol, P.E Project Name: Rosemont Gymnasium it r Orlando, FL PROJECT DESCRIPTION Rosemont Gymnasium Project included the addition of a 15,840 SF gymnasium building west of the existing community building, a new parking lot north and west of the addition, and the relocation of an outdoor basketball court from west of the existing community building to south of the addition. The building addition structure was predominantly concrete tilt panel walls with structural steel and metal deck roof system on a conventional, shallow foundation. There was also limited structural masonry walls. The project will also include new hardscape surrounding the addition, modifications and additions to the onsite stormwater management system, other utility additions, and a retaining wall north of the addition. NADIC performed proofroll observations of prepared subgrades; In-place density testing of utility trench backfill, foundation excavations, floor slab and sidewalk subbase, and pavement subgrade and base; Concrete testing of foundations, floor slab, tilt panel walls, tie columns, housekeeping pads, sidewalks, and exterior stem (retaining) walls; Grout testing of masonry wall cell fill; Observations of hot mix asphalt paving and bulk sampling during paving, and asphalt pavement thickness and density testing by coring after paving; Threshold inspections in general accordance with the approved threshold inspection plan; and associated laboratory testing and office engineering REFERENCE INFORMATION Agency: City of Orlando c/o McCree Telephone: 407-234-5842 General Contractors & Architects, Inc. • Email: joe.robertson@mccree.com Contact: Joe Robertson PE P..u UNDERSTANDING YOUR NEEDS We understand the needs, concerns, challenges and expectation of the City. Our team understands the immediate and future needs of the City of Ocoee and is ready to assist the City to focus on achieving the following goals: Trail System: North-Central segment; Pedestrian Path Paving -Spring Lake Elementary School; Lakefront Park Improvements Phase 1; Trail Connector Segment 3 Roadway: Maguire Rd. Phase V; Clarke Road Widening; Crown Point Parkway Extension; Old Winter Garden Rd. Extension Stormwater: Starke Lake Drainage Improvement Utilities: Lakewood/Rewis Water Main Replacement; A.D. Mims Road/North Johio Shores Road Transmission Extension; Wellington Place Reclaim Connection Project With our experience with similar projects, we can assist the City to continue to develop in a positive way, reflecting the City's character as a one the fasted growing Cities in Central Florida.We help our clients succeed in their projects by effectively executing projects,controlling costs,and managing risk. Our clients appreciate this approach,and they know that we intend to be an extension of their office. METHOD OF APPROACH NADIC understands the challenges facing the City of Ocoee and their need to "do more with less"we will proactively participate on your projects in ways that will ultimately allow the City to save cost. During construction we will provide owner-centered testing and inspection services that verify that the City is receiving the specified materials and construction quality. For environmental issues we will take a very practical approach that seeks the most efficient path that protects the health and welfare of the public and satisfies the regulatory requirements while minimizing the City's resources of time and money. For design projects, our analytical methods are geared to developing the most cost-effective foundation and site preparation alternatives. Further,we understand the special consideration inherent in public work that require us to serve as an advocate for the City and to complete all assignment knowing that our work is subject to public scrutiny. Geotechnical Services: Understanding the subsurface v soils,rock and groundwater conditions is fundamental to the design and construction of a functional and cost-effective , structure.A wide variety of field explorations are anticipated to be required within the scope of this contract. All geotechnical activities including field, laboratory testing 141cirandengineeringevaluationwillbeconductedinaccordance with the project requirements and current Ocoee and FDOT policies, procedures, and specifications. The geotechnical design services will be performed in accordance with the FDOT Soils and Foundation Handbook, Design Standards, Standard Specifications for Road and Bridge Construction and the Structures Design Guidelines. The NADIC Team will communicate effectively with the appropriate City project manager to ensure a clear understanding of the project's goals and issues. Based on our previous experience with the other Cities, we anticipate an initial work authorization to perform our services for each individual project under this agreement. The following flow chart depicts the anticipated Work Authorization Process: We will review all available project information, WORK AUTHORIZATION FLOW CHART including published resources such as the Orange GEOTECHNICAL&ENVIRONMENTAL County Soil Survey published by the United States CITY IDENTIFIES VI"EWS I"•HOUSE Department of Agriculture (USDA) Natural A TASK UNDER AND AVAILABLE DATA VERSUS THE CONTRACT '• THE SCOPE.PROVIDES THE Resources Conservation Service (NRCS), Florida CITY WITH E `EESTI iS TO Geological Surveys and Bulletins, Orange County Agricultural maps, etc. Field reconnaissance will BASED ON RESPONSE be performed to assess site conditions with respect NADIC DE E— NAOK PRICING FOR WAPRICINGFORWA to the anticipated geotechnical exploration, SCOPEOoRWAING including maintenance of traffic (MOT), utility 4, clearance and property access concerns. PM ASSIGNS STAFF WA ACCEPTED Depending on project requirements, field exploration would consist of Standard Penetration SCRV,CFS ARE PERFORMED Test (SPT) or Cone Penetration Test (CPT) and auger borings within the proposed project area.4, SPT and/or CPT borings would be performed in REPORT CONTAINING building and structure areas while auger borings REC°µMEtT TO r}iEOTliECSrSPR°V'DED crrr would be performed within proposed stormwater y retention area and under proposed paved areas. The borings would be located in the field by 1,•c,_. rissui,m, TTALmeasuringfromexistingfeaturesandwiththeaid of a hand-held Global Positioning System (GPS) equipment. The boring depths would be planned to provide the necessary subsurface conditions for 1, t the project. The recovered samples would be examined, logged and visually classified in the field, and securely packed for shipment to the laboratory for further classification by an engineer and laboratory testing. Upon completion and after groundwater measurement,all borings would be backfilled. During and immediately following completion of field exploration, the recovered soil samples would be visually classified and stratified based on the Unified Soil Classification System (USCS). A laboratory tests program appropriate for the project would be performed. Typical laboratory tests would evaluate soil type, organic content, strength, compressibility and permeability. The engineer assigned to the project would use the results of the field exploration and laboratory test results to perform engineering analysis and formulate engineering recommendations with respect to the project design and construction. Field logs, boring location plans and site maps would be prepared to document and illustrate the encountered conditions in a clear and legible manner. Typically, immediately following completion of field exploration, a geotechnical report is generated concurrently with laboratory test and engineering analysis.This method allows for prompt turnaround time,and project efficiency. The final report would be based on the field and laboratory tests results, assessments of the existing conditions and their influence on the project whether beneficial or detrimental), and detailed recommendations for design as well as construction considerations, as appropriate. Environmental Services: Due to the crucial nature of Environmental Risk Projects,test turnaround time is probably one of the most important capabilities required of environmental professional services consultants. Rapid results lead to project efficiencies in go/no-go decisions and in tum, lead to cost savings. We understand that fast results lead to project efficiencies as a result, budget savings. Should any unusual condition or technical challenge arise on your project, our key team members can provide immediate advice and practical solutions. a A Our team have conducted a variety of assessments rangingIN* ilk from ASTM Phase I environmental site assessments 4004/00, a ESAs) to extensive subsurface investigations. We have performed hundreds of Phase I Environmental Sitelet ' Assessments(ESA)and Phase II ESA.We understand the" goal of the Phase I ESA is to identify recognized environmental conditions (REC) such as hazardous substances or petroleum products on a property, under conditions that indicate an existing or past release, or a material threat of a release that may impact environmental media on the property. Our Phase I ESAs are performed in strict accordance with requirements of ASTM E1527-05 standards and routinely include a limited review of non- scope considerations including radon, wetlands and suspect asbestos-containing building materials. Our Phase II ESA is conducted to find whether or not the REC reported in the Phase I ESA presents an environmental concern,hazard or liability to our client.All Phase I&II reports are reviewed internally and signed and sealed by licensed professional engineer. Our team has extensive experience assessing and remediating sites for public clients. Our Team is knowledgeable of geologic conditions, regulatory jurisdictions, and location information as defined in ASTM E-1527. This will help WASD to avoid problematic situations, and to efficiently complete site assessments with a trusted local partner. We are capable of providing a full spectrum of soil,sediment, surface water and groundwater contamination assessment, investigative and remediation services. Our Team has extensive experience and a thorough understanding of the process for the planning,implementation of soil and groundwater contamination assessment,both chlorinated solvent and heavy metals(such as lead)contaminants. Awareness of Permitting Requirements: NADIC's familiarity with regulations and the County's permitting process is an important component of our consulting services. The permitting effort requires a thorough knowledge of regulations and policies enforced by several Seminole County and State of Florida agencies, including DERM(RER), FDEP, Department of Solid Waste, and SFWMD. Our Team's permitting approach between the Contract Manager and the permitting agency assures that all appropriate information is presented to the agency to allow for a quick and hassle-free review and approval of the permit. Materials Testing and Inspection Services: Our Team understands that construction projects do not always go as planned which is why NADIC runs a 24/7 business with an 1. emergency dispatcher available at any time. In order to keep track of the project schedule, we have a Contract Coordinator whose sole purpose is to make sure our Team r— members are available, punctual, and trained for the -=- client's needs.Every project starts with a thoroughly review of the project plans and specifications, and a meeting with the City staff to set up the testing approach. It is vital to establish fluid communication with the contractor and the City's staff by holding a "kick-off' meeting. This allows us to establish a work schedule for testing and inspection,and help to identify and reduce risks at the beginning of the A WORK AUTHORIZATION FLOW CHART project. We assign and maintain the same MATERIALS TESTING &INSPECTIONS personnel through the duration of the projects to f1 allow for continuity and efficiency. CITY IDENTIFIESNADIC A TASK UNDER SCOPE& DEVELOPS , WAS Our technicians are cross-trained and equipped to THE CONTRACT ACCEPTED FOR WA perform all of the necessary testing required for tr° City projects. Our field technicians and inspectors attend regular training sessions and keep current with technology through continuing education in ST"E` their areas of expertise. We routinely conduct weekly meetings to verify that the project is progressing in accordance to the project schedule ER°"E'R and requirements. If additional support is required,ERFCFMED dedicated senior level Project Engineering Technicians are available. We are poised and CONTRACTOR ready to offer our services in the event there is PERFORMS RE"''" ' REMEDIAL WORK unscheduled emergency requests, and haveCE4'7:iFILL' the ability to staff projects twenty-four(24)hours a day. C G'T.Ar Tr,G Yr P Our field technicians are trained to properly document project issues such as gaps, inconsistencies, or conflicts in their daily field logs x ""''"Ti when they happen.The information in the daily log including any retesting, standby time or re- CLOSEOUT inspection time will be verbally communicated andDOCUMENTATIONE.SUBMITTAL made available to the Construction Supervisor daily and also presented in the project weekly summary. This makes sure that issues are indeed raised, and investigated and resolved quickly and effectively.Proper field documentation and reporting,as well as timely submittal of test results will help eliminate unnecessary project quality control concerns. We are using state-of-the-art and calibrated equipment with written procedure for testing and inspections. Both our field and laboratory testing services are operated in accordance to NADIC's Quality Management System (QMS). This internal quality management manual was developed to meet the requirements of AASHTO and CMEC for testing laboratories providing soils, aggregate, asphalt and concrete testing. NADIC documents training of staff, equipment and calibrations. We verify and establish internal quality control procedures as stated in our QMS. Our team also participates in annual reference sample and proficiency tests which are compared statistically by the accrediting agencies to assess accuracy in testing methods.NADIC team's laboratories are inspected annually by the accrediting agencies, including FDOT, CMEC and AASHTO. Project Issues and Challenges All tasks are managed and supervised by a qualified and experienced engineer,assigned to the task by our contract manager, Godwin Nnadi Ph.D., P.E. These individuals, selected specifically for their expertise in the task requirements,are responsible for both supervising the task team and managing the successful completion of the task, including adherence to schedule and budget. The responsibility of establishing a schedule for a task falls on the Task Manager.These experienced individuals are well versed with estimating cost and schedule requirements, and, more importantly,with the need to involve the City on the scheduling and budget process and to maintain a line of communication throughout the task. Nevertheless, delays which negatively impact the schedule are not uncommon, and when they become evident it is imperative that our Task Managers immediately inform the City,describing the situation and reasons for the delay.Together with the City, NADIC's Task Manager will assess the impact of the delay and consider the available options for reducing the negative effects on completion of the task. If the delay was resulting from NADIC's failure to perform,we will conduct an internal evaluation to assure that future failures do not occur. Potential Project Risks Avoidance! Minimization Approach Avoidance:NADIC schedules a preconstruction meeting with the Contractor to Misunderstanding of Scope and introduce our core team personnel assigned to the project NADIC also Scheduling/Response addresses the scope of work,scheduling,cost saving strategies,and our standard 24-hour response times. Avoidance: Being proactive by discussing scheduling and standard 24-hour Contractor forgets to provide 24 hours' response time during preconstruction meeting. notice for testing Minimization: NADIC makes every effort to send a technician out to the site in time. Avoidance: Being proactive by discussing scheduling and standard 24-hour; response time during preconstruction meeting. Contractor proceeds with construction Minimization: without testing Concrete — NADIC Performs concrete cores or nondestructive testing, such as f Windsor probe testing. Density—NADIC test by potholing or excavating and retesting.Asphalt—NADIC performs asphalt cores. Avoidance and Minimization: 1)Perform all testing in accordance with project requirements and in accordance I with ASTM. 2) Employ and train ACI, FDOT CTQP, SBCCI and Nuclear Density Gauge f, Troxler)certified personnel I( Fieldllaboratory tests performed (3) Perform routine equipment calibrations and maintenance. (4) QC Manager; incorrectly periodically visits project sites to ensure field personnel are performing work/testing per standards. 4) In-house testing laboratory is American Society for Testing and Materials ASTM) and American Association of Highway and Transportation (AASHTO), certified by Construction Material Engineering Council, Inc. (CMEC), as well as! validated by the Florida Department of Transportation(FDOT) Avoidance: 1)Set up MOT for high traffic areas and nighttime work. 2 Equip technicians with appropriate safety equipment to accident 3) If Troxler gauges are damaged during an accident technicians immediately; contact the Radiation Safety Officer(RSO), isolate hazard area, deny entry, and wait for RSO arrival for further instruction. Minimization:Maintain proper insurance coverage and Workers Compensation. Violate site specific personnel Avoidance: Ensure familiarization with personnel requirements at Project Scope requirements(background check,drug meeting. Obtain background checks, drug testing, etc. as required and provide i testing,etc.) documentation. Errors in calculations/reporting Avoidance:Perform QA/QC Process on each project A Adhering to Budget and Schedule: When provided any task by the City, our Contract Manager, Dr. Nnadi with other key staff will develop a project scope that addresses the specific need. An appropriate experienced project manager will be assigned to the task. The key to cost control and a successful project execution is the quality of communication between the City and the project team, and good planning. The project manager will provide direct line of communication between the City and NADIC. Staffing will be based on the needs of the City and the project manager ensures that the assigned staff is the right staff for the task.The staff assigned to the task will be committed to the project until the task is completed. Our Project Manager will track project cost closely and will be in constant communication with the City to ensure the scope of services align with the initial proposal.The task project manager will meet regularly with the appropriate City Task Manager for updates and performance review. We internally audit the project costs data to verify all invoices and time sheets are accurate.This allows us to eliminate project inefficiency and in turn, increase budget savings. Upon approval of the proposal by the City, Dr. Nnadi, our Contract Manager will activate our Project team within 12 hours. During the next two (2) days after approval, our task project manager will contact the City's Task Manager representative to define the project scope, timeline, and obtain all necessary documents. Geotechnical Engineering services for most projects are typically completed within two(2)to three(3)weeks,while construction materials testing and inspection services are performed on a project-by-project basis,as the requirements are contingent on the scope. Our testing and inspection personnel are available at a moment's notice and can service the City on projects seven 7)days a week. Our technicians and engineers are cross trained and this allows us to exceed the normal response time for typical tasks expected in this contract. NADIC will meet any response and test turnaround time set forth by the City. Quick response to the City's needs results in cost saving to the City. Our estimated turn-around time for services that may be required under this contract is shown below: GEOTECHNICAL ENGINEERING MATERIALS TESTING & INSPECTION Field crew on site Technician on site Normal Response: within 72 hours of notification Normal Response: 24 hours Emergency Response: within 24 hours of Emergency Response: within 1 hour of notification I notification Final Report Field Reports Normal Response: 2-3 weeks (authorization to Normal Response: immediate (when required) completion) Emergency Response: 1 week or less (expedited) Laboratory Reports(typed, signed and sealed) Normal Response: 2-4 days (depending on test) The ability to provide reports and results in a timely manner is an important aspect of successfully performing under a continuing contract. NADIC's ability to obtain similar public-sector continuing contracts is testimony to our ability to meet scheduling expectations of our public clients. Our dedicated staff and resources give us the ability to meet virtually any schedule. The schedule for producing geotechnical and environmental study reports is dependent on the scope and magnitude of the project. We will work closely with the City to establish the appropriate work scope and develop a schedule that meets the needs of the scope. Obviously, there will be times when a very quick turnaround is required. We have the resources to address these "emergency" situations. Materials Testing and Inspection Services are very critical regarding test turnaround.Construction schedules are frequently dependent on the results of acceptance testing. NADIC's laboratory is designed to accommodate large volumes of work, and process test results quickly. Quality Control and Quality Assurance Successful project management requires attention to Quality Assurance and Quality Control (QA/QC). NADIC main objective is to provide quality services to our clients. QA/QC has been the cornerstone of our reputation, which is overseen by Richard Haffner, PE. Mr. Haffner holds a Master Quality Management and is a FDOT certified Quality Control Manager. Mr. Haffner is responsible for establishing and managing the Quality Control and Quality Assurance policies for NADIC and often acts as a liaison between NADIC and our clients. Our Quality Management System (QMS), is the umbrella process by which we impose the stringent quality controls for our projects, and can implemented to various degrees, depending on the nature and magnitude of the project. This policy encompasses the certification of NADIC technical staff and laboratory facilities. Our committed to total-quality management is grounded in three main elements: Client participation, standardization, and independent technical reviews. We believe that the following items are essential to developing a quality system covering all aspects of our services. Work Quality - The primary way to achieve quality results is perform the work in a quality manner with quality equipment. Our approach is to always assign personnel who are properly trained and certified. The field and laboratory technicians are required to obtain and maintain the proper certifications applicable to their work type. Further, the field and laboratory equipment are maintained in good working order and regularly calibrated to obtain the most accurate and consistent results. The QMS includes a quality control checking, back checking, verification procedures,and QA/QC reviews/audits of all work and documents. Employee Education - Our professional and technical staff attends continuing education workshops and presentations.Technician training has included an extensive FDOT formalized training process through which dozens of our technicians have obtained CTQP certifications. Documents/Reporting - All project-related correspondence, notes, calculations, graphics, invoices, preliminary reports,final reports and contracts are maintained in project files for a minimum of three years after completion of the contract,or as required by our client.After three years we scan and store documents in lieu of retaining original paper documents.We maintain a library of updated software,guidelines, manuals and specifications is critical to our work. We have subscribed to e-mail lists for the major testing specification organizations(AASHTO and ASTM)as well as FDOT,so that we are notified of changes to their standard specifications. Laboratory Inspection - Our laboratory is inspected annually by the Concrete Materials Engineering Council, and FDOT. Quality Review-The results of all field and laboratory tests are subject to an initial independent review. All reports issued by NADIC will be reviewed by a registered and experienced Professional Engineer. Any inconsistencies or discrepancies are noted and resolved between the reviewer and the author of the report. This peer review process helps to assure that each report issued has had a thorough and accurate engineering review. Senior Engineer Review-All work performed by Project Engineers is reviewed and checked by a Task Managers. We frequently implement a peer/quality assurance review by an in- house engineer from one of the other Task Managers.All proposals and reports are reviewed by a minimum of two individuals which include a senior engineer who reviews the document for accuracy and thoroughness. Safety- Safety is our top priority. It is our commitment to provide a strong safety program covering not only field personnel, but members of the general public which may also be impacted by project activities. Our personnel follow Pre-Task Planning safety guidelines while implementing their day-to-day activities. Our safety program is enhanced by weekly tool box talks, as well as project/task specific training when needed. Our safety plan encompasses all that OSHA requires and more. Innovative Concepts: NADIC continually searches for innovative and effective cost saving solutions for our clients.An innovative technique employed by NADIC is to use our in-house Ground Penetrating Radar (GPR) system to assess asphalt, base and subgrade thicknesses, as well as the possible presence of voids below the pavement. NADIC's GPR system collects continuous pavement section data at highway speeds and the output data integrates easily with GIS asset management systems. We are one of the few local firms to deploy unmanned aerial vehicle (UAV/Drone) technology on our projects. Our team is qualified with FAA Part 107 Certification, which allows us to a commercial operator a 107 Small Unmanned Aircraft.We have tested the use of UAV's on a few clients and have increased efficiency, project visibility, and budget savings. The use of UAV technology allows our team to; minimize the obvious dangers and health risks, collect in- depth and higher detail data, inspect difficult to reach and hazardous areas, save time and money for the City. i A g iiir kt tt'.... s• y elpliq R'.5 iil- ffilfrk Y i A 6 A M TAB B FIRM'S OFFICE LOCATION OTHER FORMS ESTATES LONDONDERRY s REFLECTIONS SIEVEK,STAR THE Wltt. WILLOWS,LEiN ,r Star Rd TERRACE ciii O. R GERM RISE THE LAKE 4 4.7 CEAJCPAS TURF 1 .111. =T.':".1,„ _ L.L.L.L... LL IL 1`1.'"ft-•,,,,, -"is,E' Pine HillsOcoe:1- •,. • •-..•-, 4:if'1,'COUNTRY CHASE A' WHITEHILL , ROBINSWOOD HAIR 0 U R "s— ., LAUREL HILLS L f• city Of„OCOE.eHLANDS a: z 4: a. ,a a. West LAKE SHERWOOD HILES = Oks SUN RAY a NOB HILL C TERRACE d, h.la:i, WCLion.al o, Min. W Colonial Dr itral , ... 4 a Expy.WEL--- --•SLE4IY EI4OTIk,,,_„,„'1351 '''''''' plTal C IT ft\US404._ARISwest ixo."?..,, L,EWe'''' ..,,ARNadic Engineering Service,i):7" ''''''-"'ii A. . Florida's ' „....... s 7:444,5 4 mt 4# VILLAGES'OF SIENA GARDENS RENTONS WESMERE`S" 1,...-. r44-GARDEN COVE Orlovista HAMPTON wooSs 1VICTORIA PLACE . i j Gotha BELMERE VILLAGE M TiMBERLEAF 1.-ilT.).-.L.....Ea LAKE A- NEE 1 LANEu •:—,,,,, I, ' rtak.at al 4# ',-- , Poppy Park Headquarters 9 601 N Hart Blvd Orlando, FL 9 1101 Miranda Lane Suite #131 Kissimmee, FL 9 15261 NW 60th Avenue #106 Miami Lakes, FL 33014 46, A ocoee floridn RFQ CONFLICT OF INTEREST DISCLOSURE FORM The award of this contract is subject to the provisions of Chapter 112,Florida Statutes. All Proposers must disclose within their Proposal: the name of any City of Ocoee employee, Mayor or City Commissioner, other City Official, or City Consultants, who owns assets or capital stock, directly or indirectly, in the Proposer's firm or any of its branches,or would directly or indirectly benefit by the profits or emoluments of this proposal. (Indirect ownership or benefit applies to any members of his or her immediate family.) Proposer certifies that no member of the entity's ownership or management is presently applying for an employee position or actively seeking an elected position with the City. In the event that a conflict of interest is identified in the provision of services,Proposer agrees to immediately notify the City in writing. The purpose of this disclosure form is to give the City the information needed to identify potential conflicts of interest for the City Commission, Evaluation Committee members, and other key City employees and consultants involved in the award of this contract. According to Chapter 1 12, Florida Statutes, the term "conflict of interest" "means a situation in which regard for a private interest tends to lead to disregard of a public duty or interest",and refers to situations in which financial or other personal considerations may adversely affect, or have the appearance of adversely affecting, an employee's professional judgment in exercising any City duty or responsibility in administration,management, instruction,research,or other professional activities. Please check one of the following statements and attach additional documentation if necessary: V To the best of our knowledge,the undersigned firm has no potential conflict of interest for this Proposal. The undersigned firm,by attachment to this form,submits information which may be a potential conflict of interest for this Proposal. Acknowledged by: Nadic Engineering Services Inc. Firm Name Ct. j....,“ Signature Godwin Nnadi,Ph.D.,P.E., CEO Name and Title(Print or Type) RFQ#21005 Continuing Contracts for Geotechnical Testing Services 18 SUMMARY OF LITIGATION: Provide a summary of any litigation, claim(s), bid or contract dispute(s) filed by or against the Bidder in the past five(5)years which is related to the services that the Bidder provides in the regular course of business. The summary shall state the nature of the litigation, claim,or contact dispute,a brief description of the case,the outcome or projected outcome, and the monetary amounts involved. If none,then please say so. N/A has not faced any litigations, claims or contract disputes within the last 5 years Attach additional sheets if necessary) ACKNOWLEDGEMENT OF ADDENDA: Bidder acknowledges receipt of the following addenda: No.1 Dated 4/27/2021 No.Dated No.Dated Remainder of page left blank intentionally.) RFQ#21005 Continuing Contracts for Geotechnical Testing Services 20 COMPANY INFORMATION/SIGNATURE SHEET RFO#21-005 FAILURE TO COMPLY WITH THESE RFQ INSTRUCTIONS WILL RESULT IN DISQUALIFICATION OF YOUR QUALIFICATION PACKAGE. PLEASE SIGN BELOW ATTESTING THAT YOU HAVE READ AND UNDERSTAND ALL RFQ INSTRUCTIONS AND THAT YOU UNDERSTAND THAT THE SUCCESSFUL RESPONDENT WILL BE REQUIRED TO ENTER INTO A LEGALLY BINDING CONTRACT WITH THE CITY OF OCOEE. Nadic Engineering Services Inc. 407-521-4771 COMPANY NAME TELEPHONE(INCLUDE AREA CODE) 407-521-4772 FAX (INCLUDE AREA CODE) gnnadi@nadicinc.com E-MAIL ADDRESS IF REMITTANCE ADDRESS IS DIFFERENT AUTHORI D SIGNATURE(manual) FROM PURCHASE ORDER ADDRESS, PLEASE INDICATE BELOW: Godwin Nnadi,Ph.D., P.E.,CEO NAME/TITLE(PLEASE PRINT) accounting@nadicinc.com 601 North Hart Boulevard STREET ADDRESS Orlando, FL 32818 CITY STATE ZIP FEDERAL ID#30-0052251 Individual Corporation Partnership Other(Specify) Syugrn to and subs f',e vbef re me by mean of ,physical presence or 0 online notarization this U Q day of Y"1)1 i 207.4 . Personally Known or Produced Identification Notar Publ'•',` t, S ate of otaq Type of Identification) Countyof V D IhriallWaiiiAhabreigibilleadIV ignature of Notary Public r4+,1 SHANAWARD of Floridae S\Pana MOt _I Commission/GG 9463l6 Ir.My Comm.Expires Jan 12,2024 ( Printed,typed or stamped 1 Bonded through National Notary Assn. I Commissioned name of Notary Public RFQ#21005 Continuing Contracts for Geotechnical Testing Services 21 CONTACT US OPL:IIDO OFFCE E01 N Hart Eculevard Orlando,Florida 32o15 C 407-521-4771 nadic@nadicinc.com www.nadicinc.com NADIENG-01 KGODWIN 4coRv' CERTIFICATE OF LIABILITY INSURANCE DATE/ 8/2/202YYYY)2021 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(les)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER ACT NnME: Ames&Gough PHONE 8300 Greensboro Drive A/C,No,Est):(703)827-2277 A/C,No):(703)827-2279 Suite 980 keD'!ss:admin@amesgough.com McLean,VA 22102 INSURER(S)AFFORDING COVERAGE NAIC# INSURER A:Phoenix Insurance Company A++,XV 25623 INSURED INSURER B:Travelers Indemnity Co.of America A++,XV 25666 Nadic Engineering Services,Inc.INSURER C:Travelers Casualty&Surety Co.of America A++,XV 31194 601 North Hart Boulevard INSURER D:National Casualty Company Orlando,FL 32818 INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF POLICY EXP LIMITSLTRINSDWVDIMM/DD/YYYYI IMM/DDIYYYYI A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 2,000,000 CLAIMS-MADE X OCCUR 680-2H652822 9/19/2020 9/19/2021 DAMAGE TO RENTED 1,000,000 PREMISES(Ea occurrence) $ MED EXP(Any one person) $ 10,000 PERSONAL&ADV INJURY $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 4,000,000 POLICY X JELQT LOC PRODUCTS-COMP/OP AGG $ 4,000,000 OTHER. B AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT 1,000,000 Ea accident) X ANY AUTO BA-8P748354 9/19/2020 9/19/2021 BODILY INJURY(Per person) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY(Per accident) $ AUTOS ONLY AUUTO WNES ONLYY PPer acodentDAMAGE UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE DED RETENTION$ C AND EMPLOYERS'LIABILIITY ATION X STATUTE EERRH UB-5J596163 9/19/2020 9/19/2021 1,000,000ANYPROPRIETOR/PARTNER/EXECUTIVE E L EACH ACCIDENT $ FICER/MEMBER EXCLUDED', N N I A andatory in NH) E L DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under 1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ D Professional Liab. JE00000065 9/19/2020 9/19/2021 Per Claim/Aggregate 2,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS I VEHICLES (ACORD 101 Additional Remarks Schedule,may be attached if more space is required) RE:RFQ#21-005,CONTINUING CONTRACTS FR GEOTECHNICAL TESTING SERVICES The City of Ocoee,FL is included as additional insured with respect to General Liability and Automobile Liability when required by written contract.General Liability includes Additional Insured coverage for On-Going&Completed Operations as required by written contract.General Liability is primary and non-contributory over any existing insurance and limited to liability arising out of the operations of the named insured and when required by written contract. General Liability,Automobile Liability and Workers Compensation policies include a waiver of subrogation in favor of the additional insureds where permissible by state law and when required by written contract.30-day Notice of Cancellation will be issued for the General Liability,Automobile Liability, Workers Compensation and Professional Liability policies in accordance with policy terms and conditions. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Cityof Ocoee,FL THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. 150 N Lakeshore Drive Ocoee,FL 34761 AUTHORIZED REPRESENTATIVE ACORD 25(2016/03) 1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD CONTINUING CONSULTING AGREEMENT FOR GEOTECHNICAL TESTING SERVICES THIS AGREEMENT made and entered into this /7Orlay of AG `LQit ,a/, by and between the CITY OF OCOEE, FLORIDA, a Florida municipal corporation, hereinafter referred to as "CITY", and GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS, INC., a Florida corporation, hereinafter referred to as "CONSULTANT". WHEREAS, the CITY needs geotechnical testing services to be performed on a continuing and periodic basis as the need for such services may arise, per the CITY's RFQ #21- 005 Continuing Contracts for Geotechnical Testing Services, attached as Exhibit A; and WHEREAS, the CITY desires to employ the CONSULTANT in connection with the geotechnical testing services required, upon the terms and conditions hereinafter set forth, and the CONSULTANT is desirous of performing such services upon said terms and conditions, per CONSULTANT'S qualification package attached as Exhibit B; and WHEREAS, the CITY shall have the option to use the CONSULTANT's professional geotechnical testing services ("Services"), as further described below, for City projects hereinafter referred to as "Project" or"Projects"); and WHEREAS, the City has selected the CONSULTANT in accordance applicable law and the rules and ordinances of the City, and this Contract shall constitute a continuing contract to perform services on an as needed basis over a period of time; NOW, THEREFORE, in consideration of the mutual covenants and agreements hereinafter contained, it is agreed by and between the parties hereto as follows: SECTION I SCOPE OF SERVICES 1.CONSULTANT hereby agrees to perform for the CITY geotechnical testing services which may include services in all phases of a Project. The scope of work to be RFQ#21-005 Continuing Geotechnical Testing Services performed through task orders issued under the continuing contract may consist of, but will not necessarily be limited to: soils investigation for design purposes including season and high ground water levels, soil stability, drainage associated with hydrological groundwater modeling, supporting documentation for permitting, and construction administrative support (materials testing). Various geotechnical testing services for City projects; such projects include large and small scale water, sewer, and reclaimed utility projects, road construction and/or rebuild construction, extensions and/or stormwater related projects, and other geotechnical type projects. There may also be a periodic need to conduct Phase 1 environmental reviews and environmental lien searches related to the possible acquisition of real property by the City. A variety of testing and consultative tasks will be required in various combinations depending on the needs of each project, as requested by the CITY, through the issuance of a Services Authorization (Task Order) issued pursuant to this Agreement. 2.CONSULTANT shall perform such services in accordance with the terms and conditions of this Contract and with applicable regulations and requirements of all interested government agencies. It is expressly understood, however, that the CITY shall have no obligation to authorize CONSULTANT to perform any services under this Contract, and may, in its sole discretion, retain other consultants to perform any or all of the services authorized under this Contract. 3.CONSULTANT shall utilize sufficient qualified personnel acceptable to the CITY to perform all services under this contract and any Services Authorization issued hereunder. CONSULTANT shall promptly remove any person from performing services as the CITY shall request in writing (which request may be made by the CITY with or without cause), and promptly replace such person with a person who shall be approved in writing by the CITY. CONSULTANT agrees to include a similar provision in its agreements with any and all Subconsultants. 2 RFQ#21-005 Continuing Geotechnical Testing Services SECTION II TERM 1.Continuing Contract. This Agreement shall continue in full force for an initial period of three (3) years, beginning on August 17, 2021, with two (2) automatic one-year renewable extensions, for a total of five (5) years. Each one-year renewable term shall automatically be renewable for the next succeeding one-year term with the condition that the CITY'S obligation to pay under this Agreement for each year is contingent upon the CITY in its good faith judgment having sufficient funds to make an annual appropriation for the Services to be provided under this Agreement. The Agreement shall continue in full force and effect from the date first written above or until terminated in accordance with this Agreement. The CITY shall have the option of extending the term an additional one (1) year. The above time periods may be extended to complete Services being rendered under a Project that has already been identified in a Services Authorization issued prior to the expiration of the Agreement. 2.The CITY shall, from time to time at its sole discretion, authorize the CONSULTANT in writing to provide Services under this Agreement by issuing a Services Authorization. A Services Authorization shall, by mutual agreement of the parties, set forth, 1) the Scope of Services, (2) the time for performance, (3) method and amount of compensation, 4)the items to be provided to the CITY, and (5) the services, information and data that can be provided by the CITY to the CONSULTANT. 3.The CITY does not guarantee, warrant, or represent that any number of Projects or any particular type of Project will be assigned to the CONSULTANT under the terms of this Agreement. Furthermore, the purpose of this Agreement is not to authorize a specific Project, but to set forth certain duties, obligations, rights, and responsibilities that may be incorporated by reference into any Services Authorization that may be mutually agreed to by the parties. The 3 RFQ#21-005 Continuing Geotechnical Testing Services CITY shall have the sole discretion to select the Project(s), if any, that may be given to the CONSULTANT. 4.The CONSULTANT shall perform any and all Services in a timely, efficient and cost-effective manner and in a manner that comports with the standards of geotechnical testing services ordinarily exercised by reputable members of Consultant's profession. SECTION III COMPENSATION 1.Method of Payment: For services rendered by CONSULTANT under a Services Authorization, the CITY shall pay CONSULTANT by one of the following methods: (i) a lump sum amount; or (ii) per diem or hourly rates which shall be used as the basis, along with reimbursable expenses, for establishing a guaranteed maximum price ("GMP") which shall not be exceeded. For Services Authorizations issued with a GMP, the CITY shall reimburse CONSULTANT for the cost of permissible out-of-pocket expenses (hereinafter referred to as Reimbursable Expenses") incurred by CONSULTANT in the performance of services. A Reimbursable Expenses budget, if required, shall be included within each Services Authorization priced on a GMP basis. Reimbursable Expenses means the actual, necessary, and reasonable expenses incurred directly or indirectly in connection with the Project and may include expenses for reproduction, presentation materials and supplies, photography and video, travel outside of Orange and Seminole Counties, postage, overnight or express mail, long distance telephone, and facsimile costs. Travel expenses shall be submitted in accordance with Florida Statute § 112.061 2008). Travel and per diem charges shall not exceed the limits allowed under applicable Florida Statutes. 2.CONSULTANT shall submit to CITY the invoices of CONSULTANT, in detail sufficient for a proper preaudit and postaudit thereof. 4 RFQ#21-005 Continuing Geotechnical Testing Services 3.CITY shall pay CONSULTANT not later than thirty (30) calendar days of its receipt of CONSULTANT'S invoices, unless, within the 30-day period, the CITY, 1) notifies CONSULTANT of an objection to the PAYMENT amount, and 2) either provides CONSULTANT with a determination of the proper PAYMENT, or requests further information from CONSULTANT so that a proper PAYMENT can be calculated and agreed upon by the parties. 4.The CITY's objection to the PAYMENT amount shall be accompanied by the CITY's remittance of any undisputed portion of the PAYMENT. 5.Upon the termination of this AGREEMENT, CONSULTANT shall prepare a final and complete payment statement for all SERVICES and reimbursable expenses incurred since the posting of the last payment statement, and through the date of termination. CONSULTANT also agrees to maintain, and to cause each of its subcontractors to maintain complete and accurate books and records (BOOKS) in accordance with sound accounting principles and standards, in a form acceptable to the CITY, and relating to all SERVICES and related costs and expenditures to the CITY that have been contracted for and paid during the life of this AGREEMENT. The BOOKS shall identify the SERVICES rendered during each month of this AGREEMENT, the date that each PROJECT expense was incurred, and whether the expense was SERVICE or reimbursable-related. 6.The BOOKS may (but need not) be kept separate and apart from CONSULTANT's other books; but the CITY shall have the right, at any reasonable time and through any of its designated agents or representatives, to inspect and audit the BOOKS for the purpose of verifying the accuracy of any payment statement. 7.CONSULTANT shall retain the BOOKS, and make them available to the CITY as specified above, until the later of five (5) years after the date of termination of this AGREEMENT, or five (5) years from the date of the final payment statement (of the PROJECT) 5 RFQ#21-005 Continuing Geotechnical Testing Services prepared for the CITY, or such longer time if required by any federal, state, or other governmental law, regulation, policy, or contractual or grant requirement or provision. 8.When the CITY has reasonable grounds for belief(or information to believe)that, 1) CONSULTANT will be unable to perform the SERVICES; or 2) a pending or meritorious claim exists against CONSULTANT or the CITY arising out of CONSULTANT's negligence or CONSULTANT's breach of any provision of this AGREEMENT; then the CITY may withhold a payment otherwise due and payable to CONSULTANT. This provision is intended solely for the benefit of the CITY. 9.The acceptance by CONSULTANT, its successors, or assigns, of any final payment due upon the termination of this AGREEMENT, shall constitute a full and complete release of the CITY from any and all claims, demands, or causes of action whatsoever that CONSULTANT, its successors, or assigns may have against the CITY under the provisions of this AGREEMENT. SECTION IV INDEMNIFICATION AND INSURANCE 1. Indemnification. The CONSULTANT shall indemnify, defend and hold harmless the City, its representatives, employees, and elected and appointed officials, from liabilities, damages, losses and costs, including, but not limited to, reasonable attorney's fees, to the extent caused by the negligence, recklessness, or intentional wrongful misconduct of the Consultant and persons employed or utilized by the CONSULTANT in the performance of any professional services rendered under this Agreement or any Services Authorization issued pursuant to this Agreement. For purposes of compliance with Florida law, CONSULTANT acknowledges that this provision shall be deemed a part of the project specifications or the bid documents. 2.Insurance The CONSULTANT shall purchase, maintain, and keep in full force, effect, and good standing, such insurance that is further described below, and any other insurance 6 RFQ#21-005 Continuing Geotechnical Testing Services necessary to fully protect it from claims of the nature that are detailed below, that may arise out of, or result from, the CONSULTANT's operations, performance, or Services, or all of these things, or any of these things in combination (CONSULTANT's Operations), whether the CONSULTANT's Operations are by the CONSULTANT, any of its agents or Subconsultants, or anyone for whose act or acts it may be liable. The CONSULTANT'S insurance carrier shall be licensed to do business in the State of Florida and shall have an A.M. Best Rating of A or better. The insurance required by this Subsection shall be written for not less than the limits of liability specified below, or required by law, whichever is greater, and shall include contractual liability insurance as applicable to the CONSULTANT's obligation under this Agreement. 3.The CONSULTANT shall provide evidence of insurance in the form of a certificate of insurance issued on behalf of the City of Ocoee by companies acceptable to the City at the following minimum limits and coverage's with deductible amounts acceptable to the City. The CONSULTANT shall not commence any work in connection with this contract or any applicable Services Authorization until all of the following types of insurance have been obtained and such insurance has been approved by the City, nor shall the CONSULTANT allow any Sub-consultant to commence work on a subcontract until all similar insurance required of the sub-consultant has been so obtained and approved. Policies shall be issued only by companies authorized by subsisting certificates of authority issued to the companies by the Department of Insurance of Florida which maintain a rating deemed acceptable to the City. Policies for Workers' Compensation may be issued by companies authorized by applicable Florida law. The following insurance requirements are also applicable: a) Loss Deductible Clause: The City shall be exempt from, and in no way liable for, any sums of money which may represent a deductible in any insurance policy. The payment of such deductible shall be the sole responsibility of the General Consultant and/or subconsultant providing such insurance. b) Workers' Compensation Insurance: The Consultant shall obtain during the life of this Agreement, Worker's Compensation Insurance with Employer's Liability Limits of 7 RFQ#21-005 Continuing Geotechnical Testing Services 500,000/$500,000/$500,000 for all the Consultant's employees connected with the work of this project and, in the event any work is sublet, the Consultant shall require the subconsultant similarly to provide Workers' Compensation Insurance for all of the latter's employees unless such employees are covered by the protection afforded by the Consultant. Such insurance shall comply fully with the Florida Workers' Compensation Law. In case any class of employees engaged in hazardous work under this contract for the City is not protected under the Workers' Compensation statute, the Consultant shall provide, and cause each subconsultant to provide adequate insurance, satisfactory to the City, for the protection of the Consultant's employees not otherwise protected. Include Waiver of Subrogation in favor of the City of Ocoee c) Consultant's Public Liability and Property Damage Insurance: The Consultant shall obtain during the life of this Agreement COMMERCIAL AUTOMOBILE COVERAGE, this policy should name the City of Ocoee as an additional insured, and shall protect the Consultant and the City from claims for damage for personal injury, including accidental death, as well as claims for property damages which may arise from operations under this Agreement whether such operations be by the Consultant or by anyone directly or indirectly employed by the Consultant, and the amounts of such insurance shall be the minimum limits as follows: d) Automobile Bodily Injury Liability& Property Damage Liability 1,000,000 Combined single limit per occurrence (each person, each accident) All covered automobile will be covered via symbol 1 Liability coverage will include hired & non-owned automobile liability Include Waiver of Subrogation in favor of The City of Ocoee e) Comprehensive General Liability (Occurrence Form) - This policy should name the City of Ocoee as an additional insured and should indicate that the insurance of the Consultant is primary and non-contributory. 2,000,000 GENERAL AGGREGATE 2,000,000 PRODUCTS-COMPLETED OPERATIONS AGGREGATE 1,000,000 PER OCCURRENCE 1,000,000 PERSONAL &ADVERTISING INJURY Include Waiver of Subrogation in favor of the City of Ocoee 1,000,000 Professional Liability (Design Errors & Omissions) f) Subconsultant's Comprehensive General Liability, Automobile Liability and Worker's Compensation Insurance: The Consultant shall require each subconsultant to procure and maintain during the life of this subcontract, insurance of the type specified above or insure the activities of these subconsultants in the Consultant's policy, as specified above. g) Owner's Protective Liability Insurance: (Not applicable for Design Services). As applicable for construction projects, providing coverage for the named insured's liability that arises out of operations performed for the named insured by independent consultants and are directly imposed because of the named insured's general supervision of the independent consultant. The Consultant shall procure and furnish 8 RFQ#21-005 Continuing Geotechnical Testing Services an Owner's Protective Liability Insurance Policy with the following limits: 1,000,000, and per occurrence, $2,000,000. Aggregate and naming the City of Ocoee as the Named Insured. h) Contractual Liability: If the project is not bonded, the consultant's insurance shall also include contractual liability coverage to insure the fulfillment of the contract. NOTE: PUBLIC LIABILITY INSURANCE AND AUTOMOBILE LIABILITY INSURANCE, THE CITY SHALL BE NAMED AS ADDITIONAL INSURED. 1,000,000 PER OCCURRENCE 2,000,000 AGGREGATE i) Commercial Umbrella: 1,000,000 PER OCCURRENCE 2,000,000 Aggregate Including Employer's Liability and Contractual Liability j) Certificates of Insurance: Certificate of Insurance Form (see sample, above), naming the City of Ocoee as an additional insured will be furnished by the Consultant upon notice of award. These shall be completed by the authorized Resident Agent and returned to the Office of the Purchasing Technician. This certificate shall be dated and show: The name of the Insured consultant, the specific job by name and job number, the name of the insurer, the number of the policy, its effective date, and its termination date. Statement that the Insurer shall mail notice to the Owner at least thirty (30) days prior to any material changes in provisions or cancellation of the policy, except ten (10) days written notice of cancellation for non-payment of premium. 4.City As Additional Insured. The CITY shall be listed as an additional insured on all insurance coverage required by this Agreement, except Worker's Compensation and Professional Liability errors and omissions insurance. Furthermore, all other insurance policies pertaining to the Services to be performed under this Agreement shall memorialize that the CONSULTANT's, or the CONSULTANT's Subconsultant's, or all of these entities' (Primary Insureds) insurance, shall apply on a primary basis, and that any other insurance maintained by the CITY shall be in excess of and shall not contribute to or be commingled with the Primary Insured's insurance. 9 RFQ#21-005 Continuing Geotechnical Testing Services 5.CITY's Right to Inspect Policies. The CONSULTANT shall, in the event of a material claim, upon thirty (30) days' written request from the CITY, deliver copies to the CITY of any or all insurance policies that are required in this Agreement. SECTION V TERMINATION 1.Termination Without Cause. This Agreement may be terminated by either party by delivering a thirty (30) written notice to the other party. In the event of the termination of this Agreement, any liability of one party to the other arising out of any Services rendered, or any act or event occurring prior to the termination, shall not be deemed to be terminated or released. The CONSULTANT shall be paid for Services completed prior to receipt of the termination notice and for reasonable termination settlement costs relating to commitments which had become firm prior to the termination; however, payment to the CONSULTANT will exclude any and all anticipated supplemental costs, administrative expenses, overhead and profit on uncompleted Services. 2.Termination for Cause. In addition to any other termination provisions that may be provided in this Agreement, the CITY may terminate this Agreement, or any Services Authorization issued under this Agreement, in whole or in part, if the CONSULTANT (1) makes a willfully false payment statement; (2) substantially fails to perform any material obligation under this Agreement or Services Authorization and does not remedy the failure within five (5) calendar days after receipt by the CONSULTANT of written demand by the CITY, or (3) refuses to allow public access to all documents, papers, letters, or other material made or received by the contractor in conjunction with the contract, unless the records are exempt from § 24(a) of Article I of the State Constitution and Florida Statutes § 119.07(1). The CONSULTANT may terminate this Agreement or any Services Authorization issued under this Agreement, if the CITY fails to perform any material obligation under this Agreement, and does not remedy the failure within 10 RFQ#21-005 Continuing Geotechnical Testing Services fifteen (15) calendar days after receipt by the CITY of written demand from the CONSULTANT. 3.Upon termination of this Agreement for Cause by the CITY, the City may pay the CONSULTANT for those Services actually rendered and contracted for under a Services Authorization, and those reasonable and provable expenses required by any Services Authorization and actually incurred by the CONSULTANT for Services prior to the effective date of termination. Such payments, however, shall be, 1) reduced by an amount equal to any additional costs and damages incurred by the CITY as a result of the default(s) of the CONSULTANT, including all incidental and consequential fees and expenses. 4.Delivery of Materials Upon Termination. In the event of termination of this Agreement (or any Services Authorization) by the CITY, prior to the CONSULTANT's satisfactory completion of all the Services described or alluded to herein, the CONSULTANT shall promptly furnish the CITY, at no additional cost or expense, with one (1) copy of the following items (Documents), any or all of which may have been produced prior to and including the date of termination: data, specifications, calculations, estimates, plans, drawings, construction documents, photographs, summaries, reports, memoranda; and any and all other documents, instruments, information, and materials (whether or not completed) generated or prepared by the CONSULTANT, or by any Subconsultant, in rendering the Services described herein, and not previously furnished to the CITY by the CONSULTANT pursuant to this Agreement, or any Services Authorization. The Documents shall be the sole property of the CITY, and the CITY shall be vested with all rights provided therein of whatever kind and however created. The CONSULTANT shall also require that all such Subconsultants agree in writing to be bound by the provisions of this Subsection. 11 RFQ#21-005 Continuing Geotechnical Testing Services SECTION VI SUSPENSION The CITY has the right to suspend the CONSULTANT's Services (in whole or in part) rendered under this Agreement or any Services Authorization. However, if the CITY suspends the CONSULTANT's Services pursuant to any Services Authorization, the CITY will add to the period of service for such Services Authorization a period not less than the duration of such suspension and compensate the CONSULTANT for the reasonable and provable additional costs it has incurred as a direct and proximate result of such suspension. SECTION VII NOTICES 1. All notices denominated as such by this Agreement, or the City Code, or Florida law, required to be given to the CONSULTANT hereunder shall be in writing, and shall be given by hand-delivery or United States mail, postage prepaid, addressed to: GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS, INC. 919 Lake Baldwin Lane Orlando, FL 32814 Attention: J-Gl+(, 2. All notices required to be given to the CITY shall be in writing, and shall be given by hand-delivery or United States mail, postage prepaid, to the CITY at: CITY OF OCOEE 150 North Lakeshore Drive Ocoee, Florida 34761 Attention: Purchasing Technician A copy of the notice shall be provided to the City of Ocoee, City Engineer. 3. A party shall be permitted to substitute its contact person or change its address, for the purposes of this Subsection, by written notice to the other party given in accordance with the provisions of this Section. 12 RFQ#21-005 Continuing Geotechnical Testing Services SECTION VIII CONFLICTS OF INTEREST The CONSULTANT represents and warrants unto the CITY that no officer, employee, or agent of the CITY has any interest, either directly or indirectly, in the business of the CONSULTANT to be conducted hereunder. SECTION IX WAIVER OF CONSEQUENTIAL DAMAGES IN NO EVENT SHALL THE CITY BE LIABLE TO CONSULTANT OR TO ANY THIRD PARTY FOR ANY PERSONAL INJURY, DEATH OR PROPERTY DAMAGE; NOR SHALL THE CITY BE LIABLE FOR ANY INDIRECT, INCIDENTAL, SPECIAL OR CONSEQUENTIAL DAMAGES, INCLUDING LOSS OF PROFITS, LOSS OF REVENUE, OR LOSS OF USE, OR COST OF COVER INCURRED BY CONSULTANT OR ANY THIRD PARTY ARISING OUT OF THIS AGREEMENT AND/OR CONCERNING THE PERFORMANCE OF SERVICES BY THE CONSULTANT OR BY THE CITY UNDER THIS AGREEMENT OR UNDER A SERVICES AUTHORIZATION ISSUED UNDER THIS AGREEMENT. SECTION X MATERIALS AND DATA 1. All data, field notes, inspector's reports,job files, test reports, contract plans and specifications used to record as-built (or other) conditions, copies of shop drawings, construction photographs, cost control and scheduling data, computer printouts, contractor's submittals, summaries, memoranda work papers and any and all other documents, instruments, information, and materials ("WRITTEN WORK") prepared or accumulated by CONSULTANT for the SERVICES rendered hereunder shall be the sole property of the CITY. The CITY may reuse the 13 RFQ#21-005 Continuing Geotechnical Testing Services WRITTEN WORK at no additional cost, and the CITY shall be vested with all rights of whatever kind and however created that may be in existence thereto; provided, however, that CONSULTANT shall not be liable to the CITY for the CITY's additional use of any WRITTEN WORK for a different project except where CONSULTANT is engaged or retained by the CITY for the different project and the CONSULTANT utilizes the WRITTEN WORK. 2.The CITY acknowledges that the WRITTEN WORK is not intended for use in connection with any project or purpose other than the PROJECT, and the purpose for which the WRITTEN WORK was therefore prepared. Any use by the CITY of the WRITTEN WORK in connection with a project or purpose other than the PROJECT, without the re-engagement or retention of CONSULTANT, shall be at the CITY's sole risk, and CONSULTANT shall have no responsibility or liability related thereto. 3.In the event of termination of this AGREEMENT, CONSULTANT shall promptly furnish the CITY, at no additional cost or expense, one (1) copy of the following items DOCUMENTS"): data, field notes, specifications, calculations, estimates, plans, drawings, construction documents, photographs, summaries, test reports, memoranda; and any and all other documents, instruments, information, and materials (whether or not completed) prepared or accumulated by CONSULTANT, or by any Subconsultant, in rendering the SERVICES described herein, and not previously furnished to the CITY by CONSULTANT pursuant to this AGREEMENT. The DOCUMENTS shall be the sole property of the CITY, and the CITY shall be vested with all rights provided therein of whatever kind and however created. CONSULTANT shall also require that all such Subcontractors and Subconsultants agree in writing to be bound by the provisions of this Paragraph. 14 RFQ#21-005 Continuing Geotechnical Testing Services SECTION XI MISCELLANEOUS PROVISIONS 1. Non-Exclusive Contract. This Agreement is non-exclusive, and may be terminated at the CITY's convenience with the proper notice having been given to the CONSULTANT as provided in this Agreement. The rights granted herein to the CONSULTANT are non-exclusive, and the CITY shall have the right, at any time, to enter into similar agreements with other geotechnical engineers, engineers, architects, landscape architects, planners, consultants, contractors, subconsultants, to perform such geotechnical testing services as the CITY may desire. 2.Discrimination. The CONSULTANT, for itself, its delegates, successors-in-interest, and its assigns, and as a part of the consideration hereof, does hereby covenant and agree that, 1) in the furnishing of Services to the CITY hereunder, no person shall be excluded from participation in, denied the benefits of, or otherwise subjected to discrimination in regard to this Agreement on the grounds of such person's race, color, creed, national origin, disability, marital status, religion or sex; and 2) the CONSULTANT shall comply with all existing requirements concerning discrimination imposed by any and all applicable local, state, and federal rules, regulations, or guidelines, and as such rules, regulations, or guidelines may be from time to time amended. In the event of a breach of any of the nondiscrimination covenants described in this Subsection, the CITY shall have the right to terminate this Agreement, with cause, as described above. 3.Compliance with Law. The CONSULTANT and its employees shall promptly observe, comply with, and execute the provision of any and all present and future federal, state, and local laws, rules, regulations, requirements, ordinances, and orders which may pertain or apply to the Services that may be rendered hereto. The CONSULTANT shall also require, by contract, that all Subconsultants shall comply with the provisions of this Subsection. By entering 15 RFQ#21-005 Continuing Geotechnical Testing Services into this contract, the awarded bidder is obligated to comply with the provisions of Section 448.095, Fla. Statutes, "Employment Eligibility." This includes, but is not limited to utilization of the E-Verify System to verify the work authorization status of all newly hired employees, and requiring all subcontractors to provide an affidavit attesting that the subcontractor does not employ, contract with, or subcontract with, an alien unauthorized to work in the USA. Failure to comply will lead to termination of this contract, or if a subcontractor knowingly violates the statute, the subcontractor must be terminated immediately. 4.Licenses. The CONSULTANT shall, during the life of this Agreement, procure and keep in full force, effect, and good standing all necessary licenses, registrations, certificates, permits, and other authorizations as are required by local, state, or federal law, in order for the CONSULTANT to render its Services required under this Agreement. The CONSULTANT shall also require all Subconsultants to comply by contract with the provisions of this Subsection. 5.Compliance With New Regulations. To the extent applicable, CONSULTANT agrees that if local, state, or federal agencies modify their grant procedures or requirements for the CITY or the CONSULTANT to qualify for local, state, or federal funding the CITY may use to pay for the Services to the rendered by the CONSULTANT, then the CONSULTANT shall consent to and make such modifications or amendments in a timely manner. If the CONSULTANT is unable to comply with such applicable local, state, or federal laws and regulations, then the CITY shall have the right, by written notice to the CONSULTANT, to terminate this Agreement. 6. License Fee and Royalties. The CONSULTANT hereby grants a non-exclusive and fully paid license to the CITY to utilize all WRITTEN WORK or documents produced or prepared by CONSULTANT to perform the services required under this Agreement. 7.Consultant Not Agent of City. The CONSULTANT is not authorized to act as the CITY's agent hereunder and shall have no authority, expressed or implied, to act for or bind the 16 RFQ#21-005 Continuing Geotechnical Testing Services CITY hereunder, either in CONSULTANT's relations with Subconsultants, or in any other manner whatsoever except as otherwise stated in a Services Authorization. 8.Subconsultants. The CONSULTANT shall have the right, conditioned upon the CITY's prior consent (which shall not be unreasonably withheld), to employ other firms, consultants, Contractors, subconsultants, and so forth (Subconsultants); provided, however, that the CONSULTANT shall, 1) advise the CITY as to what particular Services the Subconsultants shall perform; and 2) advise the CITY as to what percentage of the total project services each Subconsultant shall be employed to do. The CONSULTANT shall be solely responsible for the performance of all of its Subconsultants, including but not limited to their maintenance of schedules, correlation of services, or both of these things, and the resolution of all differences between them. The CONSULTANT shall promptly terminate the use and services of any employee or Subconsultant upon written request from the CITY (which may be made by the CITY in its sole discretion). By accepting a Subconsultant, the CITY shall not be deemed to warrant or guarantee the reliability or effectiveness of that entity's Services. 9.Work Outside Scope and Time of Payment. The CITY shall have no obligation to reimburse the CONSULTANT for services rendered which may be in addition to outside of the Scope of any particular Services Authorization, unless and until the CITY has given written approval of such reimbursement. 10. Subconsultant Contracts. The CONSULTANT shall provide a copy of all relevant provisions of this Agreement to all Subconsultants hired by it, or for which it may have management responsibilities as described in a Services Authorization and shall inform all Subconsultants that all Services performed hereunder shall strictly comply with the Agreement terms and provisions. The CONSULTANT shall also furnish the CITY, upon demand, with a copy of all CONSULTANT-Subconsultant contracts. 17 RFQ#21-005 Continuing Geotechnical Testing Services 11. Assignment and Delegation. The CITY and the CONSULTANT bind themselves and their partners, successors, executors, administrators, and assigns, to the other party of this Agreement in respect to all duties, rights, responsibilities, obligations, provisions, conditions, and covenants of this Agreement; except that the CONSULTANT shall not assign, transfer, or delegate its rights or duties, or both of these things, in this Agreement without the prior written consent of the CITY. The CITY has the absolute right to withhold such consent at its convenience, and, furthermore, if the CONSULTANT attempts to assign, transfer, or delegate its rights or duties in violation of these provisions without the CITY's consent, then the CITY may terminate this Agreement. The CITY shall have the right to assign its rights (or any part of them) or to delegate its duties and obligations (or any part of them) to another entity that shall be bound by all applicable terms and conditions as provided in this Agreement. 12. Audits - Periodic Auditing of Consultant's Books. The CITY shall have the right, at any reasonable time and through any of its designated agents or representatives, to inspect and audit the Books of CONSULTANT for the purpose of verifying the accuracy of any payment, charge or invoice. In addition to the above and upon request of the CITY, the CONSULTANT shall prepare an audit (for the most recent fiscal year) for the CITY, which shall include the CONSULTANT's paid salary, fringe benefits, general and administrative overhead costs, profit and the total amount of money paid by the CITY to the CONSULTANT. The Fiscal Report shall be certified as true and correct by, and shall bear the signature of, the CONSULTANT's chief financial officer or its certified public accountant. 13. Overcharge. If it is established by the audit, or by any other means, that the CONSULTANT has over-billed or overstated its costs, fees, or reimbursable expenses Overcharge) to the City, then the amount of any Overcharge shall be refunded by the CONSULTANT, together with interest at the rate of one percent (1%) per month and the CITY's 18 RFQ#21-005 Continuing Geotechnical Testing Services reasonable and provable costs (including the auditing expenses) in discovering the Overcharge and effecting its repayment. 14. Truth in Negotiations. The CONSULTANT shall execute the Truth-in- Negotiation Certificate in the form attached hereto and made a part hereof It is agreed by the CONSULTANT that any amounts charged under this Agreement or any Services Authorization issues under this Agreement, shall be adjusted to exclude any sums [plus interest at twelve percent (12%)per annum simple interest on the sums, from the date of payment by the CITY] by which the CITY determines that it was overcharged. 15. Prohibition Against Contingent Fees. The CONSULTANT warrants and represents that it has not employed or retained any company or person, other than a bona fide employee working solely for the CONSULTANT to solicit or secure this agreement and that CONSULTANT has not paid or agreed to pay any person, company, corporation, individual, or firm, other than a bona fide employee working solely for the CONSULTANT any fee, commission, percentage, gift, or other consideration contingent upon or resulting from the award or making of this agreement. Any breach of the warranty or representation of this paragraph shall be grounds for termination. 16. Entire Agreement. This Agreement, including the Exhibits hereto, and any Services Authorization issued under this Agreement, shall constitute the entire Agreement between the parties, and shall supersede and replace all prior agreements or understandings, written or oral, relating to the matters set forth therein. 17. Amendment. This Agreement may be amended or modified only by a Services Authorization, or an Amendment, and as duly authorized and executed by the parties. 18. Validity. The validity, interpretation, construction, and effect of this Agreement shall be in accordance with and governed by the laws of the State of Florida. In the event any provision hereof is determined to be unenforceable or invalid, such unenforceability or invalidity 19 RFQ#21-005 Continuing Geotechnical Testing Services shall not affect the remaining provisions of this Agreement, which shall remain in full force and effect. 19. Headings. The headings of the Sections or Subsections of this Agreement are for the purpose of convenience only, and shall not be deemed to expand, limit, or modify the provisions contained in such Sections or Subsections. 20. Timeliness. The CITY and the CONSULTANT acknowledge and understand that time is of the essence in this Agreement, and that the Services shall be performed in expeditious and economical manner. 21. Public Entity Crime. Any Person or affiliate, as defined in 287.133 of the Florida Statutes, shall not be allowed to contract with the CITY, nor be allowed to enter into a subcontract for work on this AGREEMENT, if such a person or affiliate has been convicted of a public entity crime within three (3) years of the date this AGREEMENT was advertised for proposals, or if such person or affiliate was listed on the State's convicted vendor list within three 3) years of the date this AGREEMENT was advertised, whichever time period is greater. A public entity crime means a violation of any state or federal law with respect to and directly related to the transaction of business with any public entity or agency (federal, state or local), involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, forgery, falsification of records, receiving stolen property or material misrepresentation. Any AGREEMENT with the CITY obtained in violation of this Section shall be subject to termination for cause. A Subconsultant who obtains a subcontract in violation of this Section shall be removed from the Project and promptly replaced by a Subconsultant acceptable to the City. 22. Force Majeure. The parties acknowledge that adverse weather conditions, acts of God, terrorism, war or other unforeseen circumstances of a nature that are outside the control of the parties may execute performance under this Agreement; or may necessitate modifications to a Services Authorization. If such conditions and circumstances do in fact occur, then the CITY 20 RFQ#21-005 Continuing Geotechnical Testing Services and CONSULTANT shall mutually agree, in writing, to the modifications to be made to any Services Authorization. 23. Remedies and Costs. All remedies provided in this Agreement shall be deemed cumulative and additional, and not in lieu or exclusive of each other or of any other remedy available to either party, at law or in equity. 24. Dispute Resolution and Exclusive Venue. As a condition precedent to the filing of any suit or other legal proceeding, the parties shall endeavor to resolve claims, disputes or other matters in question by mediation. Mediation shall be initiated by any party by serving a written request for same on the other party. The parties shall, by mutual agreement, select a mediator within fifteen (15) days of the date of the request for mediation. If the parties cannot agree on the selection of a mediator, then the CITY shall select the mediator who, if selected solely by the CITY, shall be a mediator certified by the Supreme Court of Florida. No suit or other legal proceeding shall be filed until the mediator declares an impasse, which declaration, in any event, shall be issued by the mediator not later than sixty (60) days after the initial mediation conference. The sole and exclusive venue for any mediation shall be in Orange County, Florida. Any legal proceeding of any nature brought by either party against the other to enforce any right or obligation under this Agreement or any Services Authorization issued under this Agreement, or arising out of any matter pertaining to this Agreement or the work to be performed hereunder, shall be submitted for trial,without a jury, before the Circuit Court of the Ninth Judicial Circuit, in and for Orange County, Florida. The parties consent and submit to the jurisdiction of such court and agree to accept service of process outside the State of Florida in any matter to be submitted to any such court pursuant hereto. The CITY and CONSULTANT expressly waive all rights to trial by jury regarding any legal proceeding of any nature brought by either party against the other to enforce any right or obligation under this Agreement, or any Services Authorization issued under this Agreement, or arising out of any matter pertaining to this contract or the work 21 RFQ#21-005 Continuing Geotechnical Testing Services to be performed hereunder. As noted herein, the sole and exclusive venue for any litigation or other legal proceeding between the parties shall be the Circuit Court of the Ninth Judicial Circuit in and for Orange County, Florida. 25. Chapter 558, Florida Statutes. The parties agree that the provisions of Chapter 558, Florida Statutes are not applicable to this Agreement of any Services Authorization issued hereunder. 26. PUBLIC RECORDS COMPLIANCE. The City of Ocoee (City) is a public agency subject to Chapter 119, Florida Statutes. The Contractor agrees to comply with Florida's Public Records Law. Specifically, the Contractor shall: 1.Keep and maintain public records required by the City to perform the service. 2.Upon request from the City's custodian of public records, provide the City with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in chapter 119, Florida Statutes, or as otherwise provided by law. 3.Ensure that public records that are exempt or confidential and exempt from the public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the Contractor does not transfer the records to the City. 4.Upon completion of the contract, Contractor agrees to transfer at no cost to the City all public records in possession of the Contractor or keep and maintain public records required by the City to perform the service. If the Contractor transfers all public record to the City upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored 22 RFQ#21-005 Continuing Geotechnical Testing Services electronically must be provided to the City, upon request from the City's custodian of public records, in a format that is compatible with the information technology systems of the City. 5. A Contractor who fails to provide the public records to City within a reasonable time may be subject to penalties under section 119.10, Florida Statutes. IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT 407-905-3100, EXTENSION 1022, CCDL@ci.ocoee.fl.us, WITH AN OFFICE LOCATED AT 150 NORTH LAKESHORE DRIVE, OCOEE, FLORIDA 34761. Signature Page Follows) 23 RFQ#21-005 Continuing Geotechnical Testing Services IN WITNESS WHEREOF, this Agreement has been fully executed on behalf of the parties hereto and by its duly authorized representatives, as of the date first written above. ATTEST: ACCEPTED: GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS, INC. Name: By: Name: (2k G we'- c. 1knlp-a Title: p2ESIQ a--N-T SEAL) ATTEST: APPROVED: hue, CI OCOEE, FLORIDA By: Name: Melanie Sibbitt Name: Rusty John Title: City Clerk Title: Mayor SEAL) FOR USE AND RELIANCE ONLY BY APPROVED BY THE OCOEE CITY THE CITY OF OCOEE, FLORIDA COMMISSION AT A MEETING HELD APPROVED AS TO FORM AND ON July 20, 2021 LEGALITY this 11 day of 202-1 UNDER AGENDA ITEM NO. 8. SHUFFIELD, LOWMAN & WILSON, P.A. r-ThBY: Scott A. 'ooksonti i y Atto ey 24 RFQ#21-005 Continuing Geotechnical Testing Services TRUTH-IN-NEGOTIATION CERTIFICATE The CONSULTANT hereby certifies that all wage rates, and any and all other unit costs supporting the compensation to be paid to the CONSULTANT pursuant to a Services Authorization for the Services as set forth therein, will be accurate, complete, and current at the date of the Services Authorization's execution. WITNESS: CONSULTANT: GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS, INC. BY: Print Name: BY: Title:Print Name: 12ftt-Gl1-G-! F• /c1U Title: p2ESto&.ti..-- STATE OF FLORIDA COUNTY OF(W4yt t• PERSONALLY APPEARED before me, the undersigned authority, IR ac Le t gn arr` , S4 well known to me or [ ] who has produced his/her as identification, and known by me to be the frts: k i F of the corporation named above, and acknowledged before me that he/she executed the foregoing instrument on behalf of said corporation as its true act and deed, and that he/she was duly authorized to do so. WITNESS my hand and official seal this S day of 1A,,v,,,,s-} , I N TARY PUBLIC Print Name: ,U uc vn.i ) 0 ke S My Commission Expires: O/pmS' V I. r r 7 NORMA I.MORALES MY COMMISSION#HH 077756 EXPIRES:January 24,2025 EOF n P: Bonded Thru Notary Public Underwriters 4 25 RFQ#21-005 Continuing Geotechnical Testing Services EXHIBIT A RFQ #21-005 CONTINUING CONTRACTS FOR GEOTECHNICAL TESTING SERVICES 26 RFQ#21-005 Continuing Geotechnical Testing Services CITY OF OCOEE REQUEST FOR QUALIFICATIONS RFQ) #21-005 CONTINUING CONTRACTS FOR GEOTECHNICAL TESTING SERVICES V 4-414* ocoee florida TABLE OF CONTENTS FOR RFQ#21-005 CONTINUING CONTRACTS FOR GEOTECHNICAL TESTING SERVICES RFQ DOCUMENTS Section Page Legal Advertisement 3 RFQ Instructions & General Terms& Conditions 4 - 17 Conflict of Interest Disclosure Form 18 Summary of Litigation 19 Receipt of any addenda issued 19 Company Information and Signature Sheet 20 End Table of Contents RFQ#21005 Continuing Contracts for Geotechnical Testing Services 2 Request for Qualifications, Legal Advertisement The City of Ocoee, Florida. (the "City") is soliciting sealed statements of qualifications for RFQ 21-005 CONTINUING CONTRACTS FOR GEOTECHNICAL TESTING SERVICES. Qualification packages will only be accepted electronically through Negometrix4, a free e- Procurement platform, until 2:00 pm, local time, on May 4, 2021. Qualification packages received after that time or through any other method will not be accepted under any circumstances. Qualification packages that have been timely received will be publicly opened virtually online and the names of the responding firms read aloud at that time; instructions will be provided at https://www.ocoee.org/959/Public-Bid-Meetings. All questions regarding this RFQ should be in writing to Vanessa Anthony, Purchasing Technician, Finance Department/Purchasing vanthony*i.ocoee.fi.us. No Pre-submittal conference is scheduled at this time. Prospective respondents may secure a copy of the documents required for submitting statements of qualifications at no charge through Negometrix4 by accessing the City's published solicitation page at https://app.negometrix.com/buyer/748. Please visit https://www.ocoee.org/323/Purchasing for more information. Prospective respondents will be provided with all information regarding this RFQ, addenda, and changes to the project requirements through the Negometrix platform. Melanie Sibbitt, City Clerk, Orlando Sentinel April 4, 2021. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 3 CITY OF OCOEE REQUEST FOR QUALIFICATIONS "RFQ"#21-005 CONTINUING CONTRACTS FOR GEOTECHNICAL TESTING SERVICES A. INTRODUCTION AND GENERAL INSTRUCTIONS 1. The City of Ocoee, Florida, in conformance with the Consultants' Competitive Negotiations Act (CCNA), Florida Statutes Section 287.055. et seq., and the policies and procedures of the City of Ocoee (City), is soliciting statements of qualification from geotechnical testing firms that are interested in providing such services for City projects. Such projects include large- and small-scale water, sewer. and reclaimed utility projects. road construction and/or rebuild construction, extensions and/or stormwater related projects, and other geotechnical type projects. There may also be a periodic need to conduct Phase I environmental reviews and environmental lien searches related to the possible acquisition of real property by the City. A variety of testing and consultative tasks will be required in various combinations depending on the needs of each project. Responding firms (Respondent, Firms, Bidder, Proposer) must be experienced in providing geotechnical testing services for projects of a scope and nature comparable to those described. Use of qualified subconsultants for specialty work is acceptable.To be considered,the firm shall be qualified by a licensed professional in accordance with Florida State law and be familiar with all applicable State of Florida, St. Johns River Water Management District, Orange County. and City land development codes, regulations, and laws, and with City and Orange County construction standards. In accordance with the CCNA,the work contemplated under these continuing contracts will be limited to routine tasks related to construction projects expected to cost no more than $4 million, or for studies not costing more than $500,000. Geotechnical Testing services related to any project that does not fall within these categories will be separately solicited in conformance with the CCNA. 2. The City intends to award continuing contracts to at least three (3) Respondents, if possible, deemed to be the most highly qualified to perform the required services. In determining whether a firm or individual is qualified, the City shall consider criteria set forth in the RFQ. The firm selected by the City will provide professional services to the City on an as-needed basis, based upon task orders to be issued by the City under the continuing contract. The continuing contract shall have an initial three (3) year period plus two automatic one-year renewable extensions, and one (1) year optional renewal at the City's discretion. 3. Prospective respondents may secure a free copy of the documents required for submitting a response through Negometrix's Negometrix4 platform by accessing the City's published solicitation page at https://app.negometrix.com/buyer/748. Please visit https://www.ocoee.org/323/Purchasing for more information. Prospective respondents will be provided with all information regarding this RFQ, addenda, and changes to the project requirements through the Negometrix4 platform. Partial sets of the documents required for submitting a statement of qualifications will not be issued. By using Negometrix. prospective respondents will be provided with all information RFQ#21005 Continuing Contracts for Geotechnical Testing Services 4 regarding this RFQ. all addendums and changes to the project requirements; there is no charge to use the Negometrix e-procurement platform. 4. Each qualification package should consist minimally of a cover letter, statement of qualifications, conflict of interest disclosure form and company information form attached at the end of these instructions). Please also include a copy of all applicable licenses held by firms or key subconsultants proposing to perform the work. Statements of qualifications should be limited to a total of forty (40) 8.5"x 11" pages (including any resumes and maximum 2-page cover letter but excluding front and back covers. dividers, table of contents, and company information form), single-sided. portrait orientation. 12-point font. Additional submission instructions are supplied below in Section D. Any qualifications package failing to conform to these specifications may be subject to rejection. The person signing the signature sheet on behalf of the respondent must have the legal authority to bind the respondent to the submitted qualification package and shall be understood to do so. All expenses for providing qualification packages to the City shall be borne by the respondent. 5. The City utilizes Negometrix, an e-procurement platform, Negometrix4 version. The City is ONLY accepting electronic solicitation responses online through the City's Negometrix4 platform at https://app.negometrix.com/buyer/748. This link can also be accessed through the City's website at https://www.ocoee.org/323/Purchasing under the Current Open Solicitations menu. All responses for this bid MUST be submitted through the Negometrix4 platform. Bid/RFP/RFQ submissions received in any other format will not be accepted; no paper, fax, or e-mailed submissions will be accepted. There is no charge to use the Negometrix electronic bid submission platform. Registration with Negometrix is free and is required prior to submitting an RFQ response. You will be required to register once you click the PARTICIPATE BUTTON in the solicitation file. It is suggested your company register no later than 24 hours in advance of the RFQ submission deadline to ensure proper registration. Should your company need assistance with registering, please contact the Negometrix Service Desk by calling (724) 888-5294 or by emailing servicedesk.us a negometrix.com. Once your company is registered with Negometrix, you will be able to submit your bid/proposal/qualification statement securely, any time before the bid deadline, at https://app.negometrix.com/buyer/748 by clicking the PARTICIPATE BUTTON under the solicitation. Qualification Statements submitted on Negometrix4 will remain locked and inaccessible by City staff until the bid deadline. Respondents are encouraged to allow ample time to upload and submit your Response as the system will automatically lock responses upon the bid deadline. A virtual public RFQ opening will be held on the date and time indicated below. Details on how to access the virtual bid opening will be located on the City"s website at https://www.ocoee.org/959/Public- Bid-Meetings. 6. Respondents shall submit one (1) complete electronic copy, preferably in a single file, of their qualifications package on the Negometrix4 platform. Qualification packages must be received by Negometrix4 no later than 2:00 p.m. (local time)on May 4,2021. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 5 Any qualification package received after the above-noted time will not be accepted under any circumstances. Any uncertainty regarding the time a qualification package is received will be resolved against the Respondent. It shall be the sole responsibility of the Respondent to have the qualifications package uploaded and submitted on the Negometrix4 e-procurement platform prior to the due date and time. File Uploads -All electronic files uploaded must be in a common format accessible by software programs the City uses. Those common formats are generally described as Microsoft Word (.doc or.docx), Microsoft Excel (.xls or.xlsx), Microsoft Power Point ppt or pptx), or Adobe Portable Document Format (.pdf). Respondents will not secure. password protect or lock uploaded files;the City must be able to open and view the contents of the file. Respondents will not disable or restrict the ability of the City to print the contents of an uploaded file. Scanned documents or images must be of sufficient quality, no less than 150 dpi, to allow for reading or interpreting the words, drawings, images or sketches. The City may disqualify any Submittal Response that does not meet the criteria stated in this paragraph. 7. The City will receive questions regarding this RFQ only through the Negometrix4 platform in the Question & Answer tab or written inquires directed to Vanessa Anthony, Purchasing Technician vanthonynci.ocoee.fl.us. Deadline for receipt of written inquiries will be April 27,2021 at 2:00 p.m., local time. 8. Potential Respondents should not contact City staff. with the exception of the Purchasing Technician, or other City consultants or City Commission for information regarding this RFQ before the project award date. Any contact with any other member of the City Staff, City Commission, or its consultants during the RFQ, award. and protest period may be grounds for Respondent disqualification. 9. Action on qualification packages is expected to be taken by the City Commission within ninety (90) days of the submission opening date; however, no guarantee or representation is made herein as to the time between receipt of the qualification package and subsequent City Commission action. A more detailed schedule is given below. 10. All applicable laws and regulations of the United States, the State of Florida, and the City of Ocoee will apply to any resulting Agreement. The provisions of the Consultant's Competitive Negotiations Act (Section 287.055, Florida State Statutes) shall apply, where applicable. By entering into this contract, the awarded bidder is obligated to comply with the provisions of Section 448.095, Fla. Statutes, "Employment Eligibility." This includes, but is not limited to utilization of the E-Verify System to verify the work authorization status of all newly hired employees, and requiring all subcontractors to provide an affidavit attesting that the subcontractor does not employ, contract with,or subcontract with, an alien unauthorized to work in the USA. Failure to comply will lead to termination of this contract, or if a subcontractor knowingly violates the statute, the subcontractor must be terminated immediately. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 11. The successful Respondent shall be required to execute an Agreement. in form and content acceptable to the City. indemnifying and holding harmless the City, its officials, officers, employees. and agents from all claims. 12. CONVICTED VENDOR LIST(PUBLIC ENTITY CRIME):A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a proposal on an award to provide any goods or services to a public entity, may not submit a proposal on an award with a public entity for the construction or repair of a public building or public work, may not submit proposals on leases of real property to a public entity, may not be awarded or perform work as a Contractor, Supplier, Subcontractor, or Consultant under a award with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in section 287.017 for Category Two for a period of 36 months from the date of being placed on the convicted vendor list. [See Florida State Statute 287.133 2) (a). 13. FLORIDA PUBLIC RECORDS LAW: In accordance with Chapter 119 of the Florida Statutes. and. except as may be provided by Chapter 119 of the Florida Statutes and other applicable State and Federal Laws. all Respondents should be aware that the proposal and the responses thereto are in the public domain and are available for public inspection. Respondents are requested. however, to identify specifically any information contained in their proposal which they consider confidential and/or proprietary and which they believe to be exempt from disclosure,citing specifically the applicable exempting law.All proposals received in response to this request of proposal become the property of the City of Ocoee and will not be returned. In the event of an award, all documentation produced as part of the contract will become the exclusive property of the City. 14. PUBLIC RECORDS COMPLIANCE. The City of Ocoee (City) is a public agency subject to Chapter 119. Florida Statutes. The Contractor agrees to comply with Florida's Public Records Law. Specifically, the Contractor shall: 1. Keep and maintain public records required by the City to perform the service. 2. Upon request from the City's custodian of public records, provide the City with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in chapter 119, Florida Statutes, or as otherwise provided by law. 3. Ensure that public records that are exempt or confidential and exempt from the public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the Contractor does not transfer the records to the City. 4. Upon completion of the contract, Contractor agrees to transfer at no cost to the City all public records in possession of the Contractor or keep and maintain public records required by the City to perform the service. If the Contractor transfers all public record to the City upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the City, RFQ#21005 Continuing Contracts for Geotechnical Testing Services 7 upon request from the City's custodian of public records, in a format that is compatible with the information technology systems of the City. 5.A Contractor who fails to provide the public records to City within a reasonable time may be subject to penalties under section 119.10, Florida Statutes. IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT 407-905-3100,EXTENSION 1022,CCDL(&ci.ocoee.fl.us,WITH AN OFFICE LOCATED AT 150 NORTH LAKESHORE DRIVE, OCOEE,FLORIDA 34761. 15. PATENT INDEMNITY: Except as otherwise provided, the successful respondent agrees to indemnify the City and its officers, agents, and employees against liability, including costs and expenses for infringement upon any letters patent of the United States arising out of the performance of this Contract or out of the use or disposal by or for the account of the City or supplies furnished or construction work performed hereunder,to the extent caused by the negligence,recklessness,or intentional wrongful misconduct of the Respondent and persons employed or utilized by the Respondent in the performance of this contract. Further, the Respondent shall fully indemnify, defend, and hold harmless the City and its officers,agents, and employees from any suits, actions, damages, and costs of every name and description, including attorneys' fees, arising from or relating to violation or infringement of a trademark, copyright, patent, trade secret. unpatented invention, or intellectual property right. If the bidder uses any design. device, or materials covered by letters, patent, or copyright, it is mutually agreed and understood without exception that the bid price shall include all royalties or cost arising from the use of such design, device, or materials. 16. Conflict of Interest/Non-Collusion Certification: a) Respondent declares that the only persons or parties interested in their proposal are those named herein,that this proposal is, in all respects, fair and without fraud and that it is made without collusion with any other vendor or official of the City of Ocoee. Neither the Affiant nor the above-named entity has directly or indirectly entered into any agreement. participated in any collusion, or otherwise taken any action in restraint of free competitive pricing in connection with the entity's submittal for the above project. This statement restricts the discussion of pricing data until the completion of negotiations and execution of a contract for the described services. b) Respondent certifies that no City Commissioner, other City Official, or City employee directly or indirectly owns assets or capital stock of the Responding entity, nor will directly or indirectly benefit by the profits or emoluments of this proposal. (For purposes of this paragraph, indirect ownership or benefit applies to any members of his or her immediate family) c) Respondent certifies that no member of the entity's ownership or management is presently applying for an employee position or actively seeking an elected position with the City. In the event that a conflict of interest is identified in the provision of services, Respondent agrees to immediately notify the City in writing. Respondent must submit the attached Conflict of Interest Statement. RFQ#21005 Continuing Contracts for Geotechnical Testing Ser\ices 8 d) Respondent further declares that a careful examination of the scope of services, instructions. and terms and conditions of this RFQ has occurred, and that the proposal is made according to the provisions of the RFQ documents, and will meet or exceed the scope of services, requirements. and standards contained in the RFQ documents. e) Respondent agrees to abide by all conditions of the negotiation process. In conducting negotiations with the City, Respondent offers and agrees that if this negotiation is accepted,the Respondent will convey, sell,assign,or transfer to the City all rights,title, and interest in and to all causes of action it may now or hereafter acquire under the anti- trust laws of the United States and the State of Florida for price fixing relating to the particular commodities or services purchased or acquired by the City. At the City's discretion, such assignment shall be made and become effective at the time the City tenders final payment to the Respondent. The proposal constitutes a firm and binding offer by the Respondent to perform the services as stated. 17. The City reserves the right to accept or reject any or all proposals,to waive formalities. technicalities or irregularities, to request clarification of information submitted in any proposal, or to re-advertise for new proposals. The City may accept any item or group of items of any proposal, unless the Respondent qualifies its proposal by specific limitations. The City may accept one or more proposals if, in the City's discretion, the City determines that it is in the City's best interest to do so. The City reserves the right to award the contract to the Respondent which, in the City's sole discretion, is the most responsive and responsible Respondent The City reserves the right, as an aid in determining which proposal is responsible. to require a Respondent to submit such additional evidence of Respondent's qualifications as the City may deem necessary, and may consider any evidence available to the City of the financial, technical, and other qualifications and abilities of a Respondent. including past performance (experience) with the City and others. The City Commission shall be the final authority in the selection of any and all proposals B. INSURANCE TERMS AND CONDITIONS The successful respondent shall be required to provide evidence of both General (Public & Property) Liability and Professional (Design Errors and Omissions) Liability Insurance in the amount of$1 million on the form of a certificate of insurance issued on behalf of the City of Ocoee and naming the City as an additional insured, by companies acceptable to the City at the minimum limits and coverages listed below with deductible amounts acceptable to the City. The selected consultant shall not commence any work in connection with an Agreement until all of the following types of insurance have been obtained and such insurance has been approved by the City, nor shall the consultant allow any subconsultant to commence work on a subcontract until all similar insurance required of the subconsultant has been so obtained and approved. Policies other than Workers' Compensation shall be issued only by companies authorized by subsisting certificates of authority issued to the companies by the Department of Insurance of Florida which maintain a Best's Rating of"A" or better and a Financial Size Category of "VII" or better according to the A.M. Best Company. Policies for Workers' Compensation may be issued by companies authorized as a group self-insurer by F.S. 440.57, Florida Statutes. RFQ#21005 Continuing Contracts for Geotechnical Testing Seri ices 9 1. Loss Deductible Clause: The City shall be exempt from, and in no way liable for, any sums of money which may represent a deductible in any insurance policy. The payment of such deductible shall be the sole responsibility of the General Consultant and/or subconsultant providing such insurance. 2. Workers' Compensation Insurance: The Consultant shall obtain during the life of this Agreement. Worker's Compensation Insurance with Employer's Liability Limits of 500.000/$500.000/$500,000 for all the Consultant's employees connected with the work of this project and, in the event any work is sublet, the Consultant shall require the subconsultant similarly to provide Workers' Compensation Insurance for all of the latter's employees unless such employees are covered by the protection afforded by the Consultant. Such insurance shall comply fully with the Florida Workers' Compensation Law. In case any class of employees engaged in hazardous work under this contract for the City is not protected under the Workers' Compensation statute, the Consultant shall provide, and cause each subconsultant to provide adequate insurance, satisfactory to the City, for the protection of the Consultant's employees not otherwise protected. Include Waiver of Subrogation in favor of the City of Ocoee. 3. Consultant's Public Liability and Property Damage Insurance: The Consultant shall obtain during the life of this Agreement COMMERCIAL AUTOMOBILE COVERAGE, this policy should name the City of Ocoee as an additional insured, and shall protect the Consultant and the City from claims for damage for personal injury, including accidental death, as well as claims for property damages which may arise from operations under this Agreement whether such operations be by the Consultant or by anyone directly or indirectly employed by the Consultant, and the amounts of such insurance shall be the minimum limits as follows: 4. Automobile Bodily Injury Liability& Property Damage Liability 1.000,000 Combined single limit per occurrence (each person, each accident) All covered automobile will be covered via symbol 1 Liability coverage will include hired &non-owned automobile liability Include Waiver of Subrogation in favor of The City of Ocoee 5. Comprehensive General Liability(Occurrence Form)-This policy should name the City of Ocoee as an additional insured and should indicate that the insurance of the Consultant is primary and non-contributory. 2,000,000 GENERAL AGGREGATE 2,000,000 PRODUCTS-COMPLETED OPERATIONS AGGREGATE 1,000,000 PER OCCURRENCE 1,000,000 PERSONAL& ADVERTISING INJURY Include Waiver of Subrogation in favor of the City of Ocoee 1,000,000 Professional Liability (Design Errors& Omissions) 6. Subconsultant's Comprehensive General Liability. Automobile Liability and Worker's Compensation Insurance: The Consultant shall require each subconsultant to procure and maintain during the life of this subcontract, insurance of the type specified above or insure the activities of these subconsultants in the Consultant's policy, as specified above. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 10 7. Owner's Protective Liability Insurance: (Not applicable for Design Services). As applicable for construction projects, providing coverage for the named insured's liability that arises out of operations performed for the named insured by independent consultants and are directly imposed because of the named insured's general supervision of the independent consultant. The Consultant shall procure and furnish an Owner's Protective Liability Insurance Policy with the following limits: $1,000,000, and per occurrence.$2.000,000.Aggregate and naming the City of Ocoee as the Named Insured. 8. Contractual Liability: If the project is not bonded, the consultant's insurance shall also include contractual liability coverage to insure the fulfillment of the contract. NOTE: PUBLIC LIABILITY INSURANCE AND AUTOMOBILE LIABILITY INSURANCE, THE CITY SHALL BE NAMED AS ADDITIONAL INSURED. 1,000,000 PER OCCURRENCE 2,000.000 AGGREGATE Commercial Umbrella: 1,000,000 PER OCCURRENCE 2,000,000 Aggregate Including Employer's Liability and Contractual Liability Builders Risk: (Not Applicable for Design Services). 100,000 Any (1) Location 1,000,000 Any (1) Occurrence Remainder of page left blank intentionally) RFQ#21005 Continuing Contracts for Geotechnical Testing Services 11 I ACORD CERTIFICATE OF LIABILITY INSURANCE .RAZ3 1 c 11/02/02 MIDDUCei THIS CERTIFICATE IB ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS CERTIFICATE DOES NOT AMINO,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. INSURERS AFFORDING COVERAGE NAIL f MUMS SIMPER u sot t.t1y a•w Cbntraetor a Name e pa INSURER C SOWER D COVERAGES THE MUMS as Aa PMCE LATE IKON NAVE SEES MMED TO THE MAW WSW ANNE THt POLO'PNEDDSOGDTEO,NDTWITOSI WOMn ANYR$I) .60..OM ON COMOTOW Of NN COMPACT OR OWES DOCABtT WIDE NESPEDTTO WNCN TNa CISTEICATELAY E AILEO Os WYPIITAEt THE EOAANCEM/DIOED EY TIE FOLEBS OEECIMED WREN RMECITO SUM TESIL67CUBOW MO ONDETEINE OF MICH MUMS AOOREOATSLIRESHOWN SKY WOE E@1 AEOOCFD R PAO CANE. Tr= MUFF MIMIC( I"NUWER Q{,'T Oyn, largaWI CMTS MIMS INm,TY EACH DRtmoce 11,000,000 I 1 COWSSACUL 010e91ALLAs1TTY FREE;67=4 I 15040D I CAWS twat QOon LET VW IMNetF PGA.) s 5,00a SERSWWEAENA T 11,000,000 ileamvxmom0 S2,000,000 GENT.DOMEGATEIL RE.T Or013PERWWOUCTE-O .OVAGO S 2,000,000 E SOUCY I l j mimosas IMAM WOW=WW2 MST 11,000,000 AU.OWNED ANTIS DOOM SLOW SCHEDULED DITTOS PTr PNso') s X WWI AUTOS WORT µPRY X Nw.OWNED ANT09 thr ms A'p PROPERTY OPWOE IOARAOCuD—JrV WIG ONLY-FA ACCOOR s ANY AOTO men nos FAACC s Auto OK, AGE I 80 INREIaAE{LALIsSUR EAtPOCCLRPDCE 11,000,000 X X OCCUR El OAMIMADE AOOREDATE s2,000,000 I`OISMATME 1 1 RE713111011 S 1 N MU I COMMA,IN Na X ITOn4 E riiSr oVLDruruAINUIY ELFACIACWENT 1500,000ANYEROPNETWOWSDIENNaCURYE OFACTO ENefl1 IICLIIOFD,E.Laswl-FAoBLovEE 1500,000 Ell tt~'rwDY waerPA El.MEW,.FOXYMr 1500,000 0080 Builders Risk Any I Inc 7013, 1 Any 1 0cc 1,000,000 limmarnmawormmummiumAmmetamcEsetemssecosmmesmoccomemmimmmummelamm The insurance evidenced by this certificate shall name the certificate holders as an additional insured on the General Liability i Umbrella Liability. Markers' Cae>penoAtien, Employers' Liability i General Liability shall contain a Waiver of Subrogation in favor of the certificate holder. The certificate holder ie added ae a romzuremd fur nodal,fur, CERTIFICATE HOLDER CANCELLATION OCDEBol eoAD AR 0,Tie NMI DECMM ME POUNIS E CANCELLEO WOOS TO O0s1An0.. OATETIBIWF,ne IMMO EINRRTIU.DOFAMS TOIIPA 10 oLYST11RTa1* OM sese TM cosnscArs KIWIS NAND TO WE DIET.SW SALMI TO 00 SO PALL City of Ocoee IMPOSING/MOTION Olt LIMITS OF AM 0II LEE MUM ISSN/UMOR ISO N. Lakeshore Drive Ocoee FL 34761-2255 ErnsumlRet Ammo Renesert,mg ACORO Is(2001As)sI E ACORD CORPORATION Hsu sfrAtik pc 9. Certificates of Insurance: Certificate of Insurance Form (see sample, above), naming the City of Ocoee as an additional insured will be furnished by the Consultant upon notice of award. These shall be completed by the authorized Resident Agent and returned to the Office of the Purchasing Technician. This certificate shall be dated and show: The name of the Insured consultant, the specific job by name and job number, the name of the insurer, the number of the policy. its effective date, and its termination date. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 12 Statement that the Insurer shall mail notice to the Owner at least thirty(30)days prior to any material changes in provisions or cancellation of the policy, except ten (10) days written notice of cancellation for non-payment of premium. C. SCOPE OF SERVICES The City of Ocoee, Florida (City), in conformance with its policies and procedures, is soliciting statements of qualification from geotechnical testing firms that are interested in providing such services for City projects. Such projects include large-and small-scale water,sewer,and reclaimed utility projects.road construction and/or rebuild construction,extensions and/or stormwater related projects, and other geotechnical type projects. There may also be a periodic need to conduct Phase 1 environmental reviews and environmental lien searches related to the possible acquisition of real property by the City. A variety of testing and consultative tasks will be required in various combinations depending on the needs of each project. Each firm proposing to provide geotechnical testing services to the City shall provide a complete list of all such services normally available from that firm. Work will be requested through a task work order to which the firm will provide a price proposal. The City may reject or accept the statement of qualifications, request additional information, or negotiate a different mix of services and/or prices. Once an agreement is reached,the work will be authorized through a City purchase order. The task work order will be used to determine the expected quantity and nature of the services required for the covered project(s). The purchase order will authorize a specified maximum cost for services to be provided. Project conditions may alter the number and nature of tests and services provided over the course of the work, so long as the maximum budget authorized is not exceeded. The City intends to award continuing contracts to no fewer than three (3) firms, if possible, deemed to be the most highly qualified to perform the required services. In determining whether a firm is qualified, the City shall consider criteria set forth in the RFQ. The continuing contract shall have an initial three (3) year period plus two automatic one-year renewable extensions, and a one (1) year optional renewal at the City's discretion. The following list is a representative sample of the tasks to be procured, as needed, for City projects: Roadway-related Services: 1. Stabilized subgrade in-place density test 2. Stabilized subgrade depth verification test 3. Stabilized subgrade strength verification test(Limerock Bearing Ratio) 4. Limerock in-place density test 5. Limerock depth verification test 6. Limerock modified proctor test 7. Soil cement testing, crushed concrete for base 8. Asphaltic concrete extraction & gradation test, per day 9. Mobilization of equipment 10. Asphalt core testing for depth & density w/patching of core hole, per core 11. Laboratory test of asphalt cores for density RFQ#21005 Continuing Contracts for Geotechnical Testing Services 13 Utility-related Services: 1. Pipe in-place density tests (typically 1 test per 300 ft. of pipe for every 1 ft. of backfill) 2. Structure in-place density test(typically 1 test per structure per 1 ft. of backfill) 3. Modified proctor test Building-related Services: 1. Footing foundation soil density test 2. Concrete slump test 3. Soil bearing test Miscellaneous Services: 1. Phase 1 environmental review 2. Environmental lien search 3. Engineering technician. per hour 2. Engineer review, per hour 3. Engineering review and administrative overhead, as a percent of the total task 4. Other service not explicitly listed above but customarily provided by the firm as part of its geotechnical testing services The list given above is representative but not complete. Interested firms must be experienced in providing services for projects of a scope and nature comparable to those described. Use of qualified sub-consultants for specialty work is acceptable. To be considered. the firm shall be a licensed to do business of this type in accordance with Florida State law and be familiar with all applicable State of Florida, St. Johns River Water Management District, Orange County and City of Ocoee codes, regulations and laws.Please include a copy of all applicable licenses held by firms or subconsultants proposed to perform work. D. SUBMITTALS Qualifications packages should be designed to portray to the City how the respondent's services can best match the knowledge, skills, and abilities suggested by the anticipated Scope of Services given above. In order for the City to evaluate the qualification package, each Respondent shall provide information relative to their ability to provide services that will best meet the needs of the City. The City of Ocoee requires comprehensive responses to every section within this RFQ. To facilitate the review of the responses, firms should follow the described response format.The intent of the RFQ format requirements is to expedite review and evaluation. It is not the intent to constrain firms with regard to content, but to assure that the specific requirements set forth in this RFQ are addressed in a uniform manner amenable to review and evaluation. In order to simplify the review process and obtain the maximum degree of comparison, the Respondent should use the following format in responding to the RFQ and missing material may cause your submission to be evaluated accordingly: I. Firm's Qualifications Firm's and key employee's certifications and licenses with regulatory agencies, professional organizations, etc. RFQ#21005 Continuing Contracts for Geotechnical Testing Services 14 List firm's key sub-consultants, their qualifications, and their role in providing these services. if applicable. List of firms' other current or recently completed similar services within the past two (2) years with other public or private agencies. List of at least three (3) client references to include organization name. contact person, telephone number (s), and e-mail address. Firm's project organization and coordination structure Firm's understanding of the services requested and how the firm would accomplish the work II. Firm's Office Location & Other Forms (not included in page limit) List the location of all offices(firm and key sub-consultants) involved with this project and approximate distance (in miles) and time (in hours) to City Hall. Conflict of Interest Disclosure p. 18 Receipt of any addenda issued. p. 19 Summary of Litigation, if none please so state. Provide a summary of any litigation, claim(s), bid or contract dispute(s) filed by or against the Firm in the past five (5) years which is related to the services that the Firm provides in the regular course of business. The summary shall state the nature of the litigation, claim, or contact dispute, a brief description of the case, the outcome or projected outcome, and the monetary amounts involved. p. 19 Company Information/Signature Sheet p. 20. E. TIME SCHEDULE The anticipated schedule of events related to this solicitation is: Date of RFQ Request for qualifications published 23 days later Last day for questions 30 days later Statements of qualification are due 37 days later Qualification statements distributed to selection committee 45-60 days later Selection committee meeting held Next meeting Short-list of ranked firms recommended to City Commission Dates are estimated and subject to change at the City's discretion. F. SELECTION PROCESS 1. The criteria for selection shall be based on the criteria listed in the RFQ. The City reserves the right,before awarding the contract,to require a Respondent to submit additional evidence of its qualifications,as the City may deem necessary,and shall conduct discussions with, and may require oral presentations by, no fewer than three(3)firms. RFQ#21005 Continuing Contracts for Geotechnical Testing Seri ices 15 2. A City evaluation committee will evaluate each respondent's qualifications and after interviews and/or oral presentations will short-list and recommend to the City Commission the top three (3) firms, if possible. in ranked order of qualifications based upon the evaluation committee's evaluation of the responses and any client references. All Respondents shall be notified via Negometrix or other means of the evaluation committee's recommended ranking of firms to the City Commission. The City Commission's decision to endorse or modify the ranking by the evaluation committee shall be final.The City Commission shall be the final authority in the award or rejection of any and all responses. 3. The City will apply the negotiation requirements of Section 287.0055. Fla. Stat..(a.k.a.. CCNA). The City will attempt to negotiate an agreement with the top-ranked Respondent. If no agreement is reached with the top-ranked Respondent, negotiations will be terminated and initiated with the second-ranked Respondent, and so on. until an agreement is reached. 4. The successful Respondent shall be required to execute an agreement which provides, among other things, that all plans, drawings, reports. and specifications that result from Respondent's services shall become the property of the City. Upon the successful negotiation of an agreement, a formal contract will be prepared and subsequent executed by both parties. Evaluation Criteria Maximum Points 1. Experience of the firm and key personnel Past Performance and Experience of the Firm Past Performance and Experience of the Team Members Past Performance and Experience with or in the City Overall Experience 50 Affect of Legal Action Against the Firm References, Licenses with Regulatory agencies Firm's project organization and coordination structure 2. Ability to Meet Time and Budget Requirements Current and Projected Workloads of the Firm 25 3. Project Approach Briefly describe your Firm's understanding of the services requested 15 and how the firm would accomplish the work. 4. Office Location Location of the Firm Office and Proximity to the City of Ocoee 5 5. Certified Minority, Women Owned Business Enterprise Include M/WBE Certification forms for the Responding Firm only. 5 100 RFQ#21005 Continuing Contracts for Geotechnical Testing Ser\ices 16 G. WORK ASSIGNMENT PROCEDURES Firm(s) selected by the City will provide professional Geotechnical Testing services to the City on an as needed basis, based upon task orders to be issued by the City under the continuing contract. No work shall commence until the verification of the issuance of the purchase order or other authorization document. Invoicing for completed work or progress billing shall be submitted to the requesting Utilities Department for processing and submission for payment by the Finance Department with a copy to: Finance Department Accounts Payable City of Ocoee 150 N. Lakeshore Drive Ocoee, Florida 34761 H. BID PROTESTS All Bid Protests shall be submitted to the Purchasing Technician in the following manner: 1. A Bidder shall file a written bid protest under this Article or be barred any relief; oral protests shall not be acknowledged. 2. A bid protest shall be limited to the following grounds: (a) issues arising from the procurement provisions of the Project Manual, its addenda. and other bidding documents; and/or(b)applicable federal, state. or local law.No bid protest may be based upon questions concerning the design documents (drawings and specifications). The Bidder shall clarify all questions concerning the design documents of the project prior to submitting its bid. 3. The content of the bid protest shall fully state the factual and legal grounds for the protest and the legal basis for the relief requested. 4.The bid protest shall be filed with the Purchasing Technician not later than five(5)calendar days after the posting of the notice of intent to award or recommendation of award by staff, whichever is earlier. 5.The Purchasing Technician, on behalf of the City, shall make a determination of the merits of the protest not later than five (5) business days after receipt of the protest. If the City denies the protest,the City may proceed with award of the contract unless enjoined by order of a court of competent jurisdiction. END OF INSTRUCTIONS RFQ#21005 Continuing Contracts for Geotechnical Testing Seri ices 17 1 ocoee Itorida RFQ CONFLICT OF INTEREST DISCLOSURE FORM The award of this contract is subject to the provisions of Chapter 112, Florida Statutes. All Proposers must disclose within their Proposal: the name of any City of Ocoee employee, Mayor or City Commissioner, other City Official, or City Consultants, who owns assets or capital stock, directly or indirectly, in the Proposer's firm or any of its branches, or would directly or indirectly benefit by the profits or emoluments of this proposal. (Indirect ownership or benefit applies to any members of his or her immediate family.) Proposer certifies that no member of the entity's ownership or management is presently applying for an employee position or actively seeking an elected position with the City. In the event that a conflict of interest is identified in the provision of services, Proposer agrees to immediately notify the City in writing. The purpose of this disclosure form is to give the City the information needed to identify potential conflicts of interest for the City Commission, Evaluation Committee members, and other key City employees and consultants involved in the award of this contract. According to Chapter 112, Florida Statutes, the term "conflict of interest" "means a situation in which regard for a private interest tends to lead to disregard of a public duty or interest", and refers to situations in which financial or other personal considerations may adversely affect, or have the appearance of adversely affecting, an employee's professional judgment in exercising any City duty or responsibility in administration,management, instruction, research,or other professional activities. Please check one of the following statements and attach additional documentation if necessary: To the best of our knowledge,the undersigned firm has no potential conflict of interest for this Proposal. The undersigned firm,by attachment to this form, submits information which may be a potential conflict of interest for this Proposal. Acknowledged by: Firm Name Signature Name and Title(Print or Type) RFQ 421005 Continuing Contracts for Geotechnical Testing Services 18 Date RFQ#21005 Continuing Contracts for Geotechnical Testing Services 19 SUMMARY OF LITIGATION: Provide a summary of any litigation, claim(s), bid or contract dispute(s) filed by or against the Bidder in the past five(5)years which is related to the services that the Bidder provides in the regular course of business. The summary shall state the nature of the litigation. claim.or contact dispute, a brief description of the case.the outcome or projected outcome, and the monetary amounts involved. If none, then please say so. Attach additional sheets if necessary) ACKNOWLEDGEMENT OF ADDENDA: Bidder acknowledges receipt of the following addenda: No.Dated No.Dated No.Dated Remainder of page left blank intentionally.) RFQ#21005 Continuing Contracts for Geotechnical Testing Services 20 COMPANY INFORMATION/SIGNATURE SHEET RFQ#21-005 FAILURE TO COMPLY WITH THESE RFQ INSTRUCTIONS WILL RESULT IN DISQUALIFICATION OF YOUR QUALIFICATION PACKAGE. PLEASE SIGN BELOW ATTESTING THAT YOU HAVE READ AND UNDERSTAND ALL RFQ INSTRUCTIONS AND THAT YOU UNDERSTAND THAT THE SUCCESSFUL RESPONDENT WILL BE REQUIRED TO ENTER INTO A LEGALLY BINDING CONTRACT WITH THE CITY OF OCOEE. COMPANY NAME TELEPHONE(INCLUDE AREA CODE) FAX (INCLUDE AREA CODE) E-MAIL ADDRESS IF REMITTANCE ADDRESS IS DIFFERENT AUTHORIZED SIGNATURE(manual)FROM PURCHASE ORDER ADDRESS, PLEASE INDICATE BELOW: NAME/TITLE(PLEASE PRINT) STREET ADDRESS CITY STATE ZIP FEDERAL ID# Individual Corporation Partnership Other(Specify) Sworn to and subscribed before me by means of physical presence or online notarization this day of 20 Personally Known or Produced Identification Notary Public-State of Type of Identification) County of Signature of Notary Public Printed.typed or stamped Commissioned name of Notary Public RFQ#2I005 Continuing Contracts for Geotechnical Testing Ser ices 2 1 EXHIBIT B CONSULTANT'S QUALIFICATION PACKAGE RESPONSE TO RFQ #21-005 27 RFQ#21-005 Continuing Geotechnical Testing Services w'0 P4 x 4" Ait.". 41:::14;'-''''': . '.. w:cIiiiipli. -......-,,N,,, , ' 440* t S ri. P PROPOSAL FOR: City of Ocoee (RFQ) #21-005 Continuing Contracts for Geotechnical Testing Services k 1 ittt 1 , iipigAripak eim..- II 1110010" Prepared for: Prepared by: c.d.-4044,...N 4 GeC 3 OC OPP Geotechnical and Environmental Consultants, Inc. Geotechnical and Environmental Consultants,Inc.1919 Lake Baldwin Lane,Orlando,Florida 32814 1407-898-1818 I www.gecfla.com Ge .• Geotechnical and Environmental Consultants. Inc. May 4, 2021 Ms.Vanessa Anthony Purchasing Technician City of Ocoee 150 N. Lakeshore Drive Ocoee, Florida 34761 Subject: Cover Letter Request for Qualifications(RFQ)#21-005 Continuing Contracts for Geotechnical Testing Services Dear Ms. Anthony: Geotechnical and Environmental Consultants, Inc. (GEC) is pleased to submit this Qualifications Package for RFQ#21-005 to provide Geotechnical Testing Services to the City of Ocoee (City). We understand the City will assign work orders under this contract to obtain geotechnical support for large- to small-scale public infrastructure projects.The City may also need Phase I and Phase II Environmental Site Assessments ESA) to facilitate real estate acquisitions. GEC carries the required insurance coverages outlined in RFQ Section B. The RFQ states the Qualifications Package should portray how the respondent's services can best match the knowledge, skills and abilities suggested by the anticipated Scope of Services. Our summary of how GEC meets these requirements and will exceed your expectations for performance is presented in the following sections. Knowledge GEC has provided engineering consulting services to public and private sector clients throughout Central Florida for the past 30 years. We have been proud to serve the City of Ocoee under a continuing contract since 2015. Our service areas include geotechnical engineering, construction materials testing and inspection,and environmental consulting(Phase I/Phase II ESA). Our public sector clients also include the cities of St. Cloud, Kissimmee, Winter Garden, Altamonte Springs, and Orlando; Osceola, Orange and Seminole Counties; the School Districts of Orange, Osceola and Seminole Counties; the Florida Department of Transportation, the Central Florida Expressway Authority, the Greater Orlando Aviation Authority,and Lynx. Our broad company experience,and the local experience of our engineers,geologists and technicians, provides GEC with the knowledge required for the type of engineering services you will assign under this contract. Geotechnical and Environmental ,Onsultant Inc 919 Lake Bdldwfn Lane, Orl ndo,Florida 32 U.', 407-898-1913 r 4'r 4'/ gectla.tom Skills GEC was founded in 1991 with the intent to serve our friends and our community in Central Florida. GEC has 39 employees, with a professional staff of 15 engineers, project managers and geologists, and 17 engineering technicians. GEC has worked on hundreds of small to large infrastructure projects in Central Florida. We are also one of the leading firms in Florida providing Ground Penetrating Radar(GPR)services. We encourage you to check with our references for an independent evaluation of our skills. GEC believes our RoadScan GPR system could be of tremendous value to the city. This relatively new technology can aid the City in the life cycle cost analysis of one of your most important assets, the City's asphalt pavement network. This technology rapidly and safely evaluates asphalt thicknesses and sources of pavement distress. GEC would love to provide this unique service to the City! Ability GEC has taken a measured approach with continuing service contracts. We limit our contracts to key municipalities and counties within the immediate Central Florida region who can best be served from our office/laboratory locations in Orlando and Kissimmee. Both of our laboratories are accredited by the Construction Materials Engineering Council (CMEC) and are qualified by the Florida Department of Transportation (FOOT). In addition, our Engineering Technicians hold 41 certifications and qualifications for construction materials testing. Commitment GEC's mission is to be the premier geotechnical and materials testing firm in Central Florida — not the largest. The Principals of GEC spend their time and energy helping local clients like the City make your projects successful. Our emphasis on serving the City means you will have our full attention, all of the time. We back up that claim through our actions; four of the five GEC Owners will serve in key roles for this contract. Our commitment to the City includes designating Daniel C. Stanfill, P.E., GEC Senior Vice President, as Contract Manager. We would welcome the opportunity to continue working with the City in achieving its goals. Our team has the experience, flexibility, and availability to serve the City's construction materials testing, geotechnical engineering and environmental consulting needs in a responsive and cost-effective manner. Sincerely, GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS, INC. Daniel C. Stanfill, P.E. Rachel F. Andre, P.E. Sr.Vice President President Contract Manager Principal In Charge Geotechnical and City of Ocoee Request for Qualifications IRFQ)g21-005 GeeE n vi ro n m e nta 1ContinuingContractsforGeotechnicalTestingServices2 Consultants, Inc. Table of Contents4,140k C) t10f,_0 TAB/SECTION DESCRIPTION Cover Letter 1 Table of Contents I. Firm's Qualifications a. Firm's and Key Employees' Certifications and Registrations 3 b. Sub-consultant's Qualifications and Role 17 c. Firm's Current or Recently Completed Similar Services 20 d. Client References 26 e. Project Organization 27 f. Firm's Understanding of Services 28 II. Firm's Office Locations & Other Forms g. Locations of All Offices (Prime Firm and Sub-consultants)34 h. Conflict of Interest Disclosure Form 35 Receipt of Addenda Issued 36 j. Summary of Litigation 37 k. Company Information/Signature Sheet City of Ocoee Request for Qualifications(RFQ)#21-005 GeeContinuingContractsforGeotechnicalTestingServices Gestectlnica(and Environmental Consultants,Inc. Tab I . Firm's Qualifications a . Firm's and Key Employees' Certifications and Registrations a. Firm & Key Staff Qualifications VO4 fforfdo This section presents GEC's key personnel and summarizes their qualifications and experience to serve on this contract. Our resumes for the GEC key staff are included after this summary. GEC has developed a straightforward organizational structure and management process to ensure easy communication of project information, project coordination and accountability for meeting project goals with regard to technical issues,schedule and cost.Our contract organizational structure provides our most experienced personnel to lead task assignments from the City of Ocoee under this contract, with direct involvement of the GEC owners in the day to day performance of our services. The following GEC professionals will be the key personnel assigned to this contract: Daniel Stanfill, P.E., Contract Manager. Dan has 37 years of experience as a practicing geotechnical engineer in the State of d DmconstructionFloria. an materialshasmanagedtestingnu contractserous during continuinghisgeotechnicalcareerand alsoand t serves as GEC's Senior Vice President. Contracts that Dan has managed include City of Orlando, Florida Department of Transportation, Toho Water Authority, Polk County and Orange County Public Schools (OCPS), to name a few. His wide-ranging knowledge of geotechnical, construction and environmental issues makes him ideally suited to serve as Contract Manager for this contract. Gene Williford, P.E., Deputy Contract Manager. Gene has 15 years of experience in geotechnical engineering in Central Florida. Gene has worked on several projects for the City of Ocoee including the geotechnical design and construction of the Ocoee Downtown Lift Station #66 Project. Gene also serves as Deputy Contract Manager for Dan on GEC's City of Oviedo Continuing Geotechnical Services Contract. When Dan is unavailable, Gene will serve as secondary contact for the City to allow for continuous communication in his absence. Gary Kuhns, P.E., Quality Control Manager. Gary has 39 years of experience, is a founding Principal of GEC and serves as our Chief Engineer and past President.Gary has managed numerous continuing services contracts for the City of Orlando, the Florida Department of Transportation, Osceola County and other public agencies. Gary has served as geotechnical engineer of record on many infrastructure projects, from the very small to the very large over the past 39 years. Gary will be available to the City of Ocoee for technical consultation and to address any unique or unusual situations that may arise during the course of the contract. Chris Meyer, P.E., Geotechnical Services Task Manager. Chris has 30 years of experience and is a Vice President of GEC. For 30 years Chris has worked on public and private sector projects throughout Central Florida. He has extensive experience on transportation,facilities and utilities projects and currently serves as GEC's Geotechnical Task Manager for our City of Orlando Continuing Geotechnical Services Contract. City of Ocoee Request for Qualifications(RFQ)#t21-005 GegContinuingContractsforGeotechnicalTestingServices Geotechnical and Environmental 3 Consultants.Inc. a. Firm & Key Staff Qualifications 4,8410r Hondo Chris will oversee all geotechnical tasks assigned under this contract from the proposal to the reporting stage. Chris has been the Geotechnical Engineer of Record on numerous municipality projects. Richard McCormick,P.G., Environmental Services Task Manager. Richard has been working for 29 years as an Environmental Geologist. He is GEC's Environmental Department Manager and a GEC Owner as well. Richard has extensive experience providing Phase I and Phase II Environmental Site Assessments for public sector clients in Central Florida. Richard will oversee all environmental tasks assigned under this contract including proposal preparation, public records review, field reconnaissance, field sampling and laboratory testing(if needed) and reporting. Stephen Cook, Construction Services Task Manager. Steve is GEC's Construction Services Operations Manager with 30 years of experience and has been a GEC employee for 28 years. Steve works closely with Dan and Gene on Construction Materials Testing projects and has been Project Manager on many roadway, utility and building construction projects. Steve is very detail-oriented and will oversee preparation of materials testing proposals,test reports and invoices. Steve will also manage the services of our subconsultant. Scott Robinson, Construction Services Lab Manager and Dispatcher. Scott Robinson has 23 years of construction materials testing and inspection experience throughout Florida. Scott has extensive experience in the field and laboratory testing of soil, asphalt, soil-cement, limerock and concrete and maintains the necessary Construction Training & Qualification Program (CTQP) and American Concrete Institute (ACI) certifications to perform these tests. Scott's construction inspection experience includes pressure grouting, demucking, soil backfilling, compaction operations, geotextile installation and surcharge construction. Tim Robinson, Geotechnical and Environmental Services Lab Manager and Dispatcher. Tim Robinson has 21 years of experience as a geotechnical and construction materials testing technician. He has received extensive CTQP and ACI training for field and laboratory testing. His qualifications include pile driving inspection, ground penetrating radar (GPR) operator, field classification of soil, supervision of geotechnical drilling crews, and geotechnical/construction materials tests in the field and laboratory. Subconsultant. The GEC team includes Blue Marlin Engineering (BME) to provide additional construction materials testing resources to the City. BME is a Minority Business Enterprise (MBE) located in Orlando, Florida. We understand that MWBE points will not be awarded for utilization of MWBE subconsultants on this contract BLUE MAEtLtN ENGINEERING and GEC can perform all of the services included in the RFQ in-house. However, BME is a partner on many of GEC's continuing municipal contracts, including our current contract with the City of Ocoee, and we value the knowledge, skills and ability they bring to our team. Ozzie Plaza, P.E., President of Blue Marlin will coordinate with Steve Cook on construction services assignments. Field and Laboratory Technicians. In addition to our key personnel, the GEC team of 17 engineering technicians is the core of our field and laboratory services. GEC's field and laboratory technicians City of Ocoee Request for Qualifications(RFQ)fi21-005 GeeContinuingContractsforGeotechnicalTestingServices Geotechnicat and Environmental 4 Consultants.Inc. a. Firm & Key Staff Qualifications 4.0.4r flooda participate in monthly health and safety training and maintain numerous certifications to better serve our clients. The following certifications in geotechnical, materials testing and contamination assessment services are maintained by the GEC staff: Orlando Laboratory—CMEC& FDOT Certified 40-Hour OSHA HAZWOPER and Annual 8-Hour Refresher ACI Concrete Field Technician ACI Concrete Strength Testing Technician ACI Aggregate Testing Technician—Level 1 ACl/CTQP Aggregate Base Testing Technician ACl/CTQP Concrete Laboratory Testing Technician— Level 1 Annual Training for Portable Nuclear Gauges & Nuclear Gauge Safety& Hazmat Certification CTQP Asphalt Paving CTQP Asphalt Plant Technician—Level 1 CTQP Earthwork Construction Inspection—Level 1 & 2 CTQP LBR Technician CTQP Pile Driving Inspector FDOT Pile Driving and Drilled Shaft Inspection Ground Penetrating Radar StructureScan/RoadScan Operator Maintenance of Traffic (MOT) Intermediate Course QC Manager Qualified Sampler Technician RADAN 7 GPR Processing Certification Radiation Safety Officer LPS Training 8-Hour Florida Stormwater, Erosion &Sedimentation Control Certification City of Ocoee Request for Qualifications(RFQ)##21-005 GeeContinuingContractsforGeotechnicalTestingServices Geotechnical and Environmental 5 Consultants,Inc. GeeDanielC. Stanfill, P.E. Contract Manager Geotechnical and Environmental Consultants, Inc. I. tom Mr. Stanfill has 37 years of experience in geotechnical engineering throughout Florida. Mr. Stanfill has performed extensive service on major transportation design projects for the Florida Department of Transportation (FDOT), the Central Florida Expressway Authority (CFX), City of Orlando, Lake, Seminole, and Orange Counties. He has managed numerous Districtwide and continuing services contracts in the Central Florida area. EXPERTISE: Geotechnical Engineering Laureate Park Neighborhood Center Phase 3, Orlando, Florida. Sr. Project YEARS OF EXPERIENCE: Manager for the construction materials testing services for the new phase of the 37 years of experience Laureate Park subdivision. 17 years with GEC City of Longwood Reiter Park, Longwood, Florida. Senior Geotechnical Engineer EDUCATION: for the investigation of subsurface conditions of a paved parking lot, restroom Bachelor of Sciencel19801Business building, several pavilions, splash pad, pedestrian foot bridges, expanded AdministrationI stormwater pond, boardwalk, amphitheater, and numerous connected walking University of Florida paths. Organic soils (muck) were encountered and required special site preparation procedures and moving the amphitheater building. A preload of deep Bachelor of organic soils that could not be removed was also required. Science 119841 Civil Engineering University of Florida City of Kissimmee Continuing Services Contract for Geotechnical Engineering, Environmental and Materials Testing Consulting Services. Contract Manager for LICENSES:the Construction Materials Testing Services portion of this continuing contract Florida Licensed which includes roadways, structures and utilities. Professional Engineer FL No.42763 Toho Water Authority Continuing Services for Geotechnical Engineering and PROFESSIONAL Construction Materials Testing Services Contract Manager, Osceola County. ORGANIZATIONS: Florida. GEC was awarded the Number One Ranking among candidate firms to Past President,East Central serve TOHO Water Authority for on call assignments. Dan is the Contract ManagerFloridaBranch,American Society of Civil Engineers for services including utilities design for force mains, lift stations, distribution systems and water/wastewater treatment plant design in Osceola County. Past Chairman,Florida Geotechnical and Material Osceola County Continuing Services Contract for Geotechnical Engineering, Engineers Council Environmental and Construction Materials Testing Services. Contract Manager Florida Engineering Society for this continuing services contract providing specialized engineering support for Osceola County and City of Kissimmee projects including buildings, roadways, American Society of Civil utilities,trails, parks, drainage systems and bridges. Engineers Geo-Institute ASHE Member School District of Osceola Continuing Services Contract for Geotechnical Engineering and Construction Materials Testing Services,Osceola County, Florida. Contract Manager for the SDOC's continuing services contract that includes projects such as St. Cloud High School Major Renovations, Gateway High School Cafeteria, Poinciana High School Black Box Theater and Celebration High School Drainage Improvements. Geotechnical and Environmental Consultants, Inc. 1919 Lake Baldwin Lane,Orlando,Florida 32814 1407-898-1818 6 GeeGaryL. Kuhns, P.E. Quality Control Manager Geotechnical and Environmental Consultants. Inc. Gary Kuhns has 39 years of experience as a Geotechnical Engineer in Central Florida. Gary has provided geotechnical engineering services on major transportation design and design-build projects for the Florida Department of 4" Transportation (FDOT), Florida Turnpike Enterprise (FTE) the Central Florida Expressway Authority (CFX), and Orange, Seminole and Osceola Counties. Gary's other areas of specialized practice include deep foundation design, ground EXPERTISE: penetrating radar studies, sinkhole stabilization and hydrogeologic modeling.Geotechnical Engineering Deep Foundations Ground Penetrating Radar City of Oviedo Regional Stormwater Pond, Oviedo, Florida. Quality Control Hydrogeologic Modeling Reviewer for the geotechnical engineering and contamination assessment services Sinkhole Stabilization to support design of the 4-acre wet detention stormwater pond and a 600-foot long double 10-ft wide by 4-ft high concrete box culvert to be constructed in placeYEARSOFEXPERIENCE: of the existing canal along the east side of the site. Geotechnical analyses included39yearsofexperience 30 years with GEC deep muck removal recommendations, global stability analyses of the pond side slopes and berms, and berm seepage calculations. EDUCATION: Master of Science City of Orlando Continuing Geotechnical and Materials Testing Services 1983ICivil Engineering University of Central Continuing Contracts. QA/QC Manager for the current City of Orlando continuing Florida services contract that has included Randal Park Phase 2, Storey Park Phase 1, Lake Nona South Laureate Park Residential Phase 5B, Publix Distribution at Hazeltine Bachelor of Science Drive and Baldwin Cove. 19821Civil Engineering University of Central Florida City of St. Cloud Geotechnical Engineering Continuing Services Contract, Osceola County, Florida. Contract Manager for the continuing services contract that has LICENSES:included the Parks Beautification Storage Facility Building, St. Cloud City Hall, and Florida Licensed the St. Cloud Police Training Facility. Professional Engineer FL No.38704 City of Kissimmee Continuing Services Contract for Geotechnical Engineering, PROFESSIONAL Environmental and Materials Testing Consulting Services. QA/QC Manager for ORGANIZATIONS: the current contract,which includes roadway, structures and utility projects. Past President,ASCE East central Florida Branch City of St. Cloud City Hall,St. Cloud, Florida. Geotechnical Engineer for design and Past Chairman,ACEC-FL construction of two 3-story public administration buildings occupying a combined Geotechnical and Materials area of 18,000 sq. ft. and associated paved parking areas. Engineers Council(GMEC) Treasurer,ASHE Central Lake Bellalago Stormwater Irrigation Withdrawal System, Osceola County, Florida Section Florida. Geotechnical Engineer for hydrogeologic modeling using Groundwater Vistas/MODFLOW to evaluate the impact of irrigation withdrawals from the lake Florida Engineering Society on the surrounding groundwater table and wetlands. The project was successfully ASCE Geo-Institute permitted with the South Florida Water Management District. Former Adjunct Instructor Delaney Avenue and Church Street Pavement Renovations, Orlando, Florida.of Geotechnical Engineering,UCF Geotechnical Engineer for the GPR study to evaluate the extent of asphalt-covered brick pavement and provide quantity estimates for the brick-paved roadway Founding GEC Principal renovations. Geotechnical and Environmental Consultants, Inc. 1919 Lake Baldwin Lane,Orlando, Florida 32814 1407-898-1818 7 GeeChristopherP. Meyer, P.E. Geotechnical Services Task Manager Geotechnical and Environmental Consultants. Inc. Chris Meyer has 30 years of experience in geotechnical engineering in the Central Florida area. Chris has performed extensive geotechnical engineering services for infrastructure-related public works projects for LYNX Central Florida Regional Transportation Authority, Central Florida Expressway Authority (CFX), Florida Department of Transportation (FDOT) and many Cities and Counties. Chris has managed numerous geotechnical investigations for private commercial EXPERTISE: developments, stormwater drainage projects and distressed structures due to Geotechnical Engineering potential sinkhole activity. YEARS OF EXPERIENCE: 30 years of experience Schofield Road Extension, Orange and Lake County, Florida. Senior Geotechnical 18 years with GEC Engineer for the 5 mile extension to connect US 27 to the existing paved section of Schofield Rd. Plans included construction of approx. 0.6 miles of paved 4-lane EDUCATION: roadway, 5.4 miles of 2-lane roadway and roadside swales along the majority ofMasterofSciencel1994 Civil Engineering the alignment. University of Florida City of Windermere Park Avenue Turn Lane Improvements and Project#2 Multi- Bachelor of Science l 1991 Use Trail, Windermere, Florida. Senior Geotechnical Engineer for the Park Avenue Civil Engineering roadway improvements that included the addition of multiple turn lanes,University of Florida pavement assessment for milling and resurfacing and 2 separate 1,200-foot LICENSES:sections of proposed paved multi-use trail. Florida Licensed Professional Engineer Greater Hills Water Mains & Water Treatment Plant Improvements, Clermont, FL No.49328 Florida. Project Manager for geotechnical investigation in support of a water PROFESSIONAL treatment plant build-out. GEC explored subsurface conditions at four subject ORGANIZATIONS: sites. American Society of Civil Engineering(ASCE) Shingle Creek Shoal Disposal, Osceola County, Florida. Senior Geotechnical ASCE Education Engineer for the shoal disposal area as part of the due diligence process prior to Committee excavation and disposal of the shoal at the mouth of Shingle Creek. ASCE Geo-Institute City of Clermont Sunburst Lane WTP Expansion, Clermont, Florida. Senior Geotechnical Engineer for the investigation in support of a water treatment plant Florida Engineering Society FES) expansion. Florida Institute of Maitland Town Center Redevelopment Phase 1, Maitland, Florida. Senior Consulting Engineers(FICE) geotechnical engineer for the geotechnical investigation of the Phase 1 project Transportation Committee elements of the redevelopment of a 4-square-block developed area of Downtown DBE Subcommittee Maitland. The Phase 1 site development plans included a 3-story Public Safety American Society of Building, 5-story North Garage, infrastructure for the north half of the site (lift Highway Engineers(ASHE) station, pipelines, roadways), mast arm signal poles and a 3-story City Hall Building. Lake Eustis Lakeshore Drive Improvements, Lake County, Florida. Senior Geotechnical Engineer for the geotechnical services for new stormwater pipes, lakeshore erosion control and pavement cores. Geotechnical and Environmental Consultants, Inc. 1919 Lake Baldwin Lane,Orlando,Florida 32814 1407-898-1818 8 GeeStephenL. Cook Construction Services Task Manager Geotechnical and Environmental Consultants. Inc. Mr. Cook has 30 years of experience as a field and laboratory technician in Central Florida. For the past 16 years Steve has been the Operations Manager on GEC's construction services projects. Steve manages GEC's team of field and laboratory technicians for such clients as FDOT, Osceola County, the Cities of Orlando, St. Cloud and Kissimmee. Steve also prepares test reports for review and approval by GEC Senior Engineers. EXPERTISE: construction Materials City of Orlando Continuing Geotechnical and Materials Testing ServicesTesting Continuing Contract. Construction Services Task Manager for the current City of Project Management Orlando continuing services contract that includes projects such as Crystal Lake Drive Sanitary Sewer Improvements,Corporate Center Multi-Family,South Orange Subsurface Investigation Retail, Lake Nona South Laureate Park Residential, Nemours Parkway West and Lift Pavement Construction Station#10. Surveys City of Kissimmee Continuing Services Contract for Geotechnical Engineering, YEARS OF EXPERIENCE: Environmental and Materials Testing Consulting Services. Construction Services 30 years of experience Task Manager for the construction materials testing portion of this continuing28yearswithGEC contract, which includes roadways, structures and utilities. Projects include Oak EDUCATION: Street Widening, FAMRC Holding Ponds, Osceola County Health Department and Bishop Moore High School the New Fueling Facility for the Osceola County Sherriff's Office. 19861 Diploma Southlake Park, Lake Nona, Florida. Project Manager for the new construction of United States Marine Corps multiple roads within the Orlando Lake Nona development. Specific projects1987-19911 Honorably Discharged included Veterans Way, Laureate Boulevard, Tavistock Boulevard and Lake Nona Boulevard. Seminole Community College 11991-1992 SR 530 Utilities, Osceola County, Florida. Project Manager for the installation of PROFESSIONAL CERTIFICATIONS: 2,500 ft of new watermain which included several open cuts within existing Troxler Radiation Safety roadways. CTQP QC Manager Radiation Safety Officer Toho Water Authority Pipe Repairs, Osceola County, Florida. Project Manager for over 400 pipe repairs in Kissimmee, St. Cloud and Poinciana under GEC's currentlyCOMMUNITYSERVICE: held TWA continuing contract. Projects include emergency scheduling ofFloridaDepartmentof Transportation(FOOT) technicians for field testing and preparation and delivery of reports to the Toho Construction Career Days Water Authority within 48 hours. Volunteer Orange County Public Schools (OCPS) Professional Services for Geotechnical, Environmental and Construction Materials Testing Continuing Services Contract. CMT Project Manager for GEC's current OCPS continuing services contract that includes projects such as the Dr. Phillips High School Renovation and Expansion, Wheatley Elementary School Expansion, Cypress Creek High School and the OCPS Pine Hills Bus Transportation Facility. Geotechnical and Environmental Consultants,Inc. 1919 Lake Baldwin Lane,Orlando, Florida 32814 1 407-898-1818 9 GeeRichardP. McCormick, P.G. Environmental Services Task Manager Geotechnical and Environmental illi, Consultants. Inc. Rich McCormick has 29 years of experience performing environmental and or 4:geological services on public infrastructure and private development projects. Rich has provided numerous Level 1 Contamination Screening Evaluation Reports CSERs) and Level 2 Contamination Impact Assessments (CIAs) for major highway 4 and rail projects in Central Florida. He has extensive experience in field sampling of soil and groundwater in accordance with Florida Department of Environmental EXPERTISE: Protection (FDEP) Standard Operating Procedures (SOPs). Level 1 Contamination Screening Evaluation Reports(CSERs)Lynx Lymmo Downtown Orlando Transit Project, Orlando, Florida. Project Geologist for the Contamination Site Assessment for the 3-mile Bus Rapid Transit Level 2 Contamination BRT) loop in Downtown Orlando. The project included reconstruction of Magnolia Impact Assessments Avenue between South Street and Livingston Street, as well as improvements to Soil and Groundwater Livingston Street, Garland Avenue, Amelia Avenue, Alexander Place, Orange Sampling Avenue and Church Street to create the BRT loop. YEARS OF EXPERIENCE: OCPS Pershing Elementary School Expansion, Orange County, Florida. Senior 29 years of experience Geologist for the Phase I Environmental Site Assessment for the 10-acre Pershing 15 years with GEC Elementary School that was originally constructed in 1962. Two historical EDUCATION: underground fuel tanks were identified, and additional site features included a Bachelor of Environmental wastewater treatment plant and two rapid infiltration basins for effluent disposal. Sciences and Geology 19921 Eastern Connecticut City of Longwood Properties, Seminole County, Florida. Senior Geologist for the State University Phase 1 Environmental Site Assessments (ESA) for the Police Station, Community LICENSES:Development, City Hall/Financial Services and Fire Station facilities. Licensed Professional Geologist FL No.2096, Pleasant Hill Road Farm, Kissimmee, Florida. Project Geologist for the Phase I and Georgia No.2014, Phase II ESA's for an abandoned 600 acre farm. The site included a historic Tennessee No.5765 maintenance barn, a construction and demolition debris landfill, and a buried PROFESSIONAL CERTIFICATIONS: historic trash dump/landfill. Soil and groundwater analyses and test pits were OSHA 40-Hour Hazardous performed to evaluate the property for the presence of potential contaminants. Materials Health and Safety Certification Shingle Creek Shoal Disposal, Osceola County, Florida. Chief Geologist for the OSHA 8-Hour Refresher shoal disposal area as part of the due diligence process prior to excavation and Course—Annually disposal of the shoal at the mouth of Shingle Creek. LPS Training 8-Hour OCPS Site 114-E-W-4 School, Winter Garden, Florida. Senior Geologist for the Phase I Environmental Site Assessment of the 13.5-acre parcel in Orange County. Florida Stormwater, Historical citrus cultivation was identified on-site. Assessing the property forErosion&Sedimentation Control Certification pesticides, herbicides and arsenic impacts was not within the project scope. Chase Plaza, Orlando, Florida. Project Geologist for the Phase I and II ESA's for the Chase Plaza site in downtown Orlando. Scope included a historic gasoline service station and dry-cleaner parcels. Phase II ESA revealed levels of chlorinated contaminants in excess of state clean-up guidelines. Negotiated with FDEP to waive site remediation requirements for the multi-story construction. Geotechnical and Environmental Consultants,Inc. 1919 Lake Baldwin Lane,Orlando,Florida 32814 1 407-898-1818 10 Verna "Gene" Williford, P.E. Deputy Contract Manager 6cotecl nical and Environmental Consultants. Inc. Mr. Williford has 15 years of experience in geotechnical engineering in the Central Florida area. Mr. Williford has performed geotechnical engineering services for infrastructure-related transportation projects for FDOT, as well as various Central Florida County and City municipalities, and has managed numerous geotechnical investigations for private commercial developments. EXPERTISE: City of Ocoee Continuing Contracts for Geotechnical Testing Services, Ocoee,Geotechnical Engineering Florida. GEC received the Number One Ranking on this Continuing Contract. Gene YEARS OF EXPERIENCE: currently serves as the Deputy Contract Manager for this contract which includes 15 years of experience testing services for roadway, utility, building and environmental projects. 13 years with GEC City of Ocoee Downtown Lift Station #66, Ocoee Florida. Geotechnical Engineer EDUCATION: for the improvements that included design and construction of a new lift station Bachelor of ScienceI2012ICivil with associated 20-foot deep wet well with new pumps and piping as well as new Engineering I pavements to access the lift station. University of Central Florida City of Ocoee Security Circle Lift Station, Ocoee, Florida. Geotechnical Engineer for the site preparation and design of the new master lift station with associatedLICENSES: Florida Licensed wet well with new pumps, piping, etc. as well as new access concrete pavements Professional Engineer and paved drive areas. FL No.82275 City of Oviedo Wood Street Extension, Oviedo, Florida. Project Engineer for the PROFESSIONAL design and construction of the 300-foot long Wood Street roadway extension thatORGANIZATIONS: American Society of Civil was part of the Oviedo on the Park project. Plans included roadside swales for Engineers(ASCE) stormwater treatment for the new pavements and gravity wall along most of the roadside swale segments. Florida Engineering Society FES) City of Orlando Lift Station No.3 Rehabilitation,Orlando,Florida. Project Engineer Florida Institute of for the design and construction of the new lift station with 20-foot deep wet well Consulting Engineers(FICE) and new electrical and generator buildings at US 17-92 and Lakeshore Drive in east Orlando. American Society of Highway Engineers(ASHE) Toho Lift Station LS-2 Rehabilitation, Kissimmee, Florida. Geotechnical Engineer for the site preparation and design of the new lift station with associated 25-foot deep wet well, piping and pump pads. Plans also included design of a new forcemain as well as a new unpaved stabilized access drive. City of Oviedo Regional Storm water Pond, Oviedo, Florida. Geotechnical Engineer for the site preparation and design of a regional wet detention stormwater pond. Plans also included a pedestrian trail encircling the pond and a perimeter cut-off berm. Geotechnical and Environmental Consultants,Inc. 1919 Lake Baldwin Lane,Orlando,Florida 32814 1407-898-1818 11 GeeRichardScottRobinson Construction Materials Testing GeotechniGal and Environmental 44- Consultants. Inc. Lab Manager and Dispatcher Scott Robinson has 23 years of construction materials testing and inspection experience; he is proficient in both field and laboratory testing. Scott manages ft GEC's Orlando CMT Laboratory services. He has extensive experience in the field and laboratory testing of soil, asphalt, soil-cement, limerock and concrete. Scott EXPERTISE: also has expertise in the engineering classification of soils and the supervision of Pavement Coring geotechnical field testing operations. Sinkhole Compaction/ Grouting/Inspection Concrete Sampling and I-4/Maitland Blvd. Interchange Sinkhole Stabilization, Orange County, Florida. Field Testing Senior Engineering Technician for largest individual sinkhole grouting project in QA/QC Procedures U.S. history which included the stabilization of a 325-ft diameter sinkhole by Asphalt Paving installation of over 200 grout injection pipes to depths of up to 350 feet and Inspection injection of approximately 40,000 cubic yards of cement grout. Maintenance of Traffic Earthwork Sampling and Testing Narcoossee Road Reconstruction, Osceola County, Florida. Senior Inspector for Soil Cement Sampling the roadway project that included 3 design sections starting at US 192 and ending and Testing at Boggy Creek Road.Construction included replacing a rural two-lane roadway and Laboratory Testing of an open drainage system with a four-lane urban roadway and a closed drainage Soil,Concrete,Aggregate system and stormwater ponds. A 2-lane bridge over a SFWMD canal was also and Asphalt replaced with a 4-lane bridge founded on 18-inch square precast prestressed YEARS OF EXPERIENCE: concrete piles. 23 years of experience 23 years with GEC Lancaster Road, Orange County, Florida. Roadway Inspector whose primary responsibilities included quality control testing for roadway embankment utility EDUCATION: High School GED 11986 pipe, storm water pipe, and roadway pavement over a 1.5 year construction schedule. CERTIFICATIONS: CTQP Asphalt Plant City of Oviedo Wood Street Extension, Oviedo, Florida. Senior Engineering Technician-Level Technician who performed laboratory testing on soil, concrete, asphalt and CTQP Concrete Laboratory Technician limerock base material for the roadway improvements. Level 1 CTQP LBR Technician Lake Mary Boulevard Widening, Seminole County, Florida. Roadway Inspector CTQP Qualified Sampler whose primary responsibilities included quality control testing for roadway Technician embankment utility pipe, storm water pipe, and roadway pavement over a 2 year ACI Aggregate Base construction schedule. Testing Technician ACI Concrete Strength Testing Technician County Road 535, Orange County, Florida. Roadway Inspector performing Portable Nuclear Gauge materials testing for utility line and roadway construction during this 24 month project. Poinciana Parkway, Osceola and Polk Counties, Florida. Senior Engineering Technician who performed laboratory testing for the new 9-miles tolled expressway. Testing included soil subgrade, limerock base, asphalt and concrete compressive strength testing. Geotechnical and Environmental Consultants,Inc. 1919 Lake Baldwin Lane,Orlando,Florida 32814 1407-898-1818 12 GeeTimothyJ. Robinson Geotechnical & Environmental Geotechnical and Environmental Consultants, Inc. Lab Manager and Dispatcher Tim Robinson has 21 years of experience as a geotechnical and construction materials testing technician. He has received extensive CTQP and ACI training for pile driving inspection,field classification of soil,supervision of geotechnical drilling crews, and various construction materials tests in the field and laboratory. Tim EXPERTISE: currently serves as GEC's Orlando Laboratory and Geotechnical Field Services Pile Driving Manager. Compaction Grouting/ Inspection John Young Parkway Extension from Shader Road to SR 424/Edgewater Drive, Pavement Coring Orange County, Florida. Geotechnical Field Services Manager and Senior Pile Sinkhole Grouting Driving Inspector for the 1,200-foot long flyover bridge. Subsurface conditions at Laboratory Management the bridge site were evaluated by performing eight Standard Penetration Test(SPT)and Testing Geotechnical Field borings to depths ranging from 120 to 200 feet below ground surface and two Cone Investigation Penetrometer Test (CPT) soundings to depths of 61 and 115 feet. Tim performed Concrete&Soil Cement Pile Driving Inspection during installation of the 24-inch square concrete piles. This Sampling and Field project included 18 test piles and one full-scale static pile load test. Testing Asphalt Paving Poinciana Parkway, Osceola and Polk Counties, Florida. Geotechnical Field Earthwork Sampling and Services Manager for the new 9-mile long tolled expressway crossing the ReedyTesting Creek Swamp. The project included 3 bridges and 8 stormwater ponds. The project YEARS OF EXPERIENCE: also included two surcharges where the road was built over very deep muck 21 years of experience deposits. GEC designed and oversaw the surcharge installation and managed the 21 years with GEC surcharge program. The Reedy Creek Swamp Bridge is 6,200 feet long and Tim was the Senior Pile Driving Inspector for installation of over 500 concrete piles toEDUCATION: Seminole High School support the bridges. 1997I High School Diploma Richmond Street Drainage Improvements, Orlando, Florida. Senior Field CERTIFICATIONS: Technician for the geotechnical field and laboratory investigation for the CTQP Aggregate Base installation and design of the storm sewer and manhole structures along Florida Testing Technician Street, Delaney Park Drive, Richmond Street and Summerlin Avenue between CTQP LBR Technician Richmond Street and Delaney Park Drive. CTQP Qualified Sampler Technician ACI Aggregate Base Conway Road Widening and Surcharge, Orlando, Florida. Senior Engineering Testing Technician Technician for monitoring of the surcharge to pre-settle soft, deep organic soil ACI Aggregate Testing deposits beneath the proposed widened roadway. Technician-Level 1 CTQP Concrete Lab La Costa Roadway Corridor, Orlando, Florida. Senior Engineering Technician forTechnicianLevel1 the geotechnical field and laboratory investigation along the proposed 2,000-footACIConcreteLaboratory Testing Tech-Level 1 new roadway connecting Curry Ford Road and La Costa Drive. ACI Concrete Strength Testing Technician 22 Rosedown Boulevard Sinkhole Subsidence, DeBary, Florida. Senior Engineering CTQP Pile Driving Technician for the investigation of the westbound travel lane collapse of Rosedown Inspector Boulevard that included a GPR evaluation and CPT soundings. GPR was utilized to MOT Intermediate Course assess the subsurface dimensions of the sinkhole and presence of voids below the pavement. CPT soundings were conducted to evaluate the extent of soil raveling. Geotechnical and Environmental Consultants,Inc. 1919 Lake Baldwin Lane,Orlando, Florida 32814 1407-898-1818 13 a. Key Firm Registrations and Licenses t0.4 ttorido 1' ' rzivni:sts..,:r.,,„,,•,—,.,;',:,,,,,-,;.;„ Licensee GEOTECHNICAL& Name: ENVIRONMENTAL Ucense Number: 5882 CONSULTANTS,INC. Rank: Registry License Expiration Date: Primary Status: Current Original License Date: 02/01/1991 Related License Information License Relationship Relation Expiration Number Status Related Party T./Pe Effective Date Rank Date 62418 Current, ANDRE, RACHEL F Registry 02/10/2021 Professional 02/28/2023 Active Engineer State of Florida Department of State w_ 11 Mon Motsoa..nw iiIcertifyfromtherecordsofthisofficethatOEOTECNNICALANDI0AFBPE ENVIRONMENTAL CONSULTANTS INC.is a corporation organized under STATE OF FLORIDA the laws of the State of Florida.filed on January II,1991,effective January S. 1991. BOARD OF PROFESSIONAL.ENGINEERS The document number of this corporation is S_4531. t`i IaTHEPROFESS101triutrimEw)StiptNSED UNDER THE PROVt510NSOF < iI 4JyR. A ATUTES I further certify that said corporation has paid all fees due this office through December 31.2021.that its most recent annual report/uniform business report was filed on January 20.2021,and that its status is active. I CHELF-1 further certify that said corporation has not filed Articles of Dissolution. , I 1rcB1giamai de P424S to I Chen sodergird sad ars EXPIRATION DA1T,ftMRUARY 25.3D23 Granekill4l'si,Stair etb7..idia war.rrwr I•um asa.aoe w nMbmna nw.wn el ThSWk are,the C is Mr r Aiers.etlelrAq sf'.A.anrJ% kr!.-.3. MI i De not after this document any, .,,. e loom rug-- This is your kenfe.it is unlawful Mantoranyoneother the karate to use tins document F t y f Secretary of State Trarkk0Manton.rad`is '2CC To asneotkate this oftmte ykft the tolkwkyt;An awn this number,end then follow the fanned ass displayed. haps:therrlas.wt*kareTlnaasCerrik.tod5ntuoCenha eAu henk.nm City of Ocoee Request for Qualifications(RFQ)#21-005 GeeContinuingContractsforGeotechnicalTestingServices Geotechnical and Environmental 14 Consultants.Inc. a. Key Firm Registrations and Licenses it J/ Rondo Ron Month,Gaon. FBPE STATE OF FLORIDA BOARD OF NAL ENGI NEERS THE PROFESSIONAL ,, ' „} ';.k s.ED UNDER THE PROVISIO $ r '1 ATUTES i s`r 4 tzw fix PHz76 EXPIRATfONDAYE 4 UARY 28,2023 I. verily licenses online at MyFlwidatkeme.Ceflt I ken taws:Gerona. Do not biter this document In any form. l'' FBPE i STATE OF FLORIDAThisisyourlicenseItisunlawfulforanyoneotherthanthelicenseeWI BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL_... Ts k EREail„.1. NSED UNDER THE PROVISIOP(S+OE: ,47t, I,>sA ATUTES J 5• o e;47j Ha;4hk. I LICeitOitnatikkiUnie4 I EXPIRATION DATE FEBRUARY 2e,2023 Atwan rarity Icwes serene at MyFbridatkenm.tom tf Do not alter this document In anYform. Ron tManKGevmar is unlawful tot anyone other than the licensee to use this document FBPE STATE OF FLORIDA BOARD OF PROFMMONAL ENGINEERS THE PROFESSIONALVti * IjEREINIS.EIF'ENSED UNDER THE PROVISI W OF 1:FOrtRIIITATUTES M ems., a .0PkikPAUI I uctectaiuriastd4vste EXPIRATION DATE:FEBRUARY 28,2023 Ahem verify aceraes online at M'Floridaixens man w•O fi:,-;":', Do not alter this document In any form zr-P"` '4-o• This Is your license.It is unlawful for anyone other than the licensee to use this document.a:. - City of Ocoee Request for Qualifications(RFQ)#t21-00SGeeContinuingContractsforGeotechnicalTestingServices Geotechnical and Environmental 15 Consultants,Inc. a. Key Firm Registrations and Licenses J Rondo Ron Dastna Govern° pas,a.d,e 0 koasr db r STATE Of FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROfFrS$IOItIAL GEOLOGISTS THE PROFESSIONAL 1GW ERE t(#4ENSED UNDER THE PROVISIOL4S'OF C/44 #2, i._.ig 'tATUTES 1,5:AY EXPIRATION DATE:JULY 31.2022 Mvays vents licenses online at MyFbridallumewm Ron oesv+n C FBPE Do not alter this osdocumentinaany STATE OF FLORIDA o Thh is your kense.It is unlawful for anyone other than the licensee to use BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HERON IS LICENSED UNDER THE PROVISIONS OF CHAPTER A71,FLORIDA STATUTES WILUIFARD;VERNA EUGENE IV 1435 CAIGTOIACT 7 LICErbE PE{2275 EXPIRATION DATE:PEBRVARY 2@,2023 Aways verify scant online at MyFbridat cesne.com Z,. Do not after this document in any forth. ensl.It h unlawful for anyone other than the licensee to use this document Geotechnical&Environmental Consultants Inc. °'Late aaa tamn t a.toAgGIIIRANm 4'4f e//,Cttl.VV.Ctaa.CI Caa,C702, Iia Qla ARIDYeOgec Rra Mt Ts,Tye in IDt MS MOMS UL100AlVIIIII•4,.a tM.C Ian Clest.,4,tC1q,C. _AMMOIfeFe4:1I7at Rde Tiro fiat tint ttRIJIKANNALT 9 ` Arm 7'rA Me se.Ow.Dew MIRITDY1e0W TIlt sae Ta96 ....+:.. sum A°ttl iMpdi VMS MAIM YeeptF nee WIC rAelseleede tnlM.DtRey Dt ty/y1( y bnaA nay AA9MDta Rea Ttw,Tfai 1W YAYe rY 1 Ton Pm its AA:ini0 -rit) A,;(:. ?c'iit tG:i ni A.Swap ChWWWD eJ.RAIIIaeeA.r.r_ Wester el Acendieetimei he.* egn= r rneeerr====i w it oaar {e m iYi,e • s a *".eO ml.w NtfJaatn.ee• we tatttan lira !MEt E,Oea.4*11/l°10af a.iY.D Marl City of Ocoee Request for Qualifications(RFQ)R21-005GeeContinuingContractsforGeotechnicalTestingServices Geotechnical and Environmental 16 Consultants.Inc. b. Subconsultant's Qualifications and Role b. Subconsultant's qualifications and role !,---, it,40.....k to; ocv non„.. Blue Marlin Engineering (BME), headquartered in Orlando, was established in 2011 as a Florida corporation with partners Osciel Plaza, P.E. and Derek Hajaar, P.E. BME is a Minority Business Enterprise (MBE)likr certified by the City of Orlando, Orange County and the Florida Department of Transportation. BME currently serves as a GEC BLUE MARLIN subconsultant on our continuing services contracts with the City of Ocoee, ENGINEERING Orange County Public Schools and the City of Orlando. BME's role will be to provide construction materials testing services on roadway, utility and building projects. BME and GEC have a long-standing working relationship and GEC is confident in their ability to perform these services. BME will provide additional capacity and flexibility for surges in workload and responding to emergency tasks. BME and GEC have similar business philosophies. BME is small firm with hands-on,working owners. Like GEC, this business model allows BME to be very responsive and maintain a high level of Quality Assurance/Quality Control. The following certifications are maintained by the BME staff: ACI—Aggregate Base Testing Technician ACI -Concrete Strength Testing Technician ACI - Field Testing Technician Level I CTQP-Aggregate Base Testing-Technician Aggregate Testing Technician CTQP—Aggregate Testing CTQP-Concrete Lab Testing Technician CTQP- Earthworks Level 1 CTQP- LBR Technician CTQP- Qualified Sampler Technician Nuclear Density Gauge City of Ocoee Request for Qualifications(RFQ)#21-005 GeeContinuingContractsforGeotechnicalTestingServices cestecknica(and Environmental 17 Consultants,Inc. Osciel "Ozzie" F. Plaza, PE 74111117---President BLUE MARLIN ENGINEERING Summary of Capabilities: Geotechnical Engineering Construction Materials Testing Foundation Analysis Pile Load Testing Sinkhole Investigation and Remediation Education: B.S. in Civil Engineering, University of Florida, 2001 Professional Registration: 1 Florida Registered Professional Engineer, Florida #73262 (2011) Certified General Contractor, Florida CGG 1510402 (2005) Mr. Plaza has 17 years of experience in the geotechnical and construction materials testing industry in Florida. Prior to co-founding Blue Marlin Engineering in early 2011, he served as a Project Engineer, Project Manager and Foundations Manager for notable engineering firms primarily in Central Florida, but also in Miami and Maryland. Mr. Plaza's knowledge spans both geotechnical and construction materials testing services in the field and laboratory with an emphasis on foundation analysis, earth retention analysis, design and construction; management of test boring exploratory programs, and sinkhole investigation and remediation. Lake Nona Blvd Road L to Boggy Creek- Project Engineer/Manager for new roadway, Road L. Materials testing services included soil testing of the storm and sanitary backfill, roadway subgrade, and roadway base along with asphalt pavement testing. Randall Park Phase IV - Project Engineer/Manager for new roadway for subdivision. Materials testing services included soil testing of the storm and sanitary backfill, roadway subgrade,and roadway base along with asphalt pavement testing. Little Egypt Ring Rd Sewer Extension -Geotechnical Engineer of Record—Orange County Utilities-Sewer extension consisting of 1,100 linear feet of 12"PVC Gravity Main Pipe. The gravity main pipe originated from an existing manhole located south of the intersection of Old Winter Garden Rd and Ring Rd and extended south terminating at a new manhole located at the intersection of W. South St and Ring Rd. Presidents Drive Wastewater System Improvements- Geotechnical Engineer of Record - Orange County Utilities, Force main replacement project on Presidents Drive, near the intersection of Presidents Drive and Sand Lake Road.The replacement consisted of approximately 800 linear feet of 24"force main pipe. Eatonville Lake Lovely&Eastern Sanitary Sewer Evaluation-Geotechnical Engineer of Record,The Town of Eatonville, Florida. Gravity sewer replacement project. The project was underneath the following roadways:W Kennedy Boulevard, Deacon Jones Boulevard,Washington Avenue, Lincoln Avenue, Bethune Drive,Toni Street, Park Place, and Carver Avenue. Lake Silver Elementary School, Orange County, Florida — Construction Materials Testing- Construction Materials Testing Project Manager for the construction of the new OCPS campus located in Orlando. The project consisted of a main 45,000 (+) square foot, two story building, new retention pond, paved areas, playgrounds, ball fields, and temporary classrooms. Blue Marlin Engineering performed all field and laboratory testing for the project including proof rolling observations, soil sampling, soil compaction testing, concrete sampling & compressive testing, asphalt sampling & testing, light weight concrete sampling, unit weight and compressive strength testing, modified Proctors, and Limerock Bearing Tests. Blue Marlin Engineering,LLC,102 Drennen Road,Suite B-10,Orlando, FL 32806 I Ph:(407)217-4464 Fax:(321)710-2483 18 b. Subconsultant's Licenses40.)„,%, not 20 dbpr 1 k Mtssr Name BLUE MARLIN ENGINEERING tkense Number 20210 Rank.MOistry license Expiration Date. Primary Status. Currant Original license Date 08/27/2010 R.Ltued I kenar Infarin.o610 Number ally Relation expiration status Rotated Party r effective DateRank Date 73262 Current. PLAZA,OSCIEL F Registry 08/04/2011 Professional 02/28/2023 Mine Engineer U("C STATC Oi FLORIDA State of Florida ENGINEERi a, rn irml ttaooVq pk+tMrefimtiAlkunen urxua tm Pa0v4.01(10rCIi fr.TV"/ Department of State l+Oso4t*' I teratt.(forathe to ad..rruM<.dr I.VI4xaIltalillI \l AIU 14 r 4EERi4.7 Ll.i is hanger band.y ca:grot tasanurtd soda the LIMN al the'Amer of e 'i fl.nda tfkd T::nemt t:an./ene.titr taturin I :nin Tha dns uunt'Imhof.dtlw Iamla+t Irdebt}c.mg'6lt}Is I rrarxrtn-Mar W*attONDAM n!..lilt I trmhr,.ntn t r atdtlntitedttetaht}.nylon?fuss leelt all kec dal the aa.ew..w.»«,» Alfa tJm'ehh ate emtet 1 t Yr_I•Ibet ate moll receru ennui I,ssm ran filed m!anion-to 7u2 I.and that as stir 1,atu/r w...n.,w...,...r.,..a.. ir. tr*YM.•k....DY sh.R.IN..K/e..•.+rM ere h.w 9..r.aie.aer L L_ Llrs reran Loa aefit Blue Marlin Engineering rt; craet.saat*fie err 4 e1lelYeere.W Caplet awe www:•ss...:. alr lwrpr..aY Aar M•Irnt n......•• '_ 1111 4 as Seen7ery of Shire i....W}.rin q"18,01,t• 1n.trr.at.M.r1.•..r.ea,vow a.MI.aa{Nurrrlabn.rM.»N 4ee e. INwihr we*no do.rMl c aaN wm..w.r..s+a.a'.mwJelrm2'..erYr..rY.+cawn sy'',^",1 ' P.#i; .i rrs t..:rn.a tia,teir,xsaw r» City of Ocoee Request for Qualifications(RFQ)#21-005Gee,Continuing Contracts for Geotechnical Testing Services ceeteclinical and Environmental 19 Cansultants.Inc. c. Firm's Current or Recently Completed Similar Services c. Similar Services — Roadway Related 4.01-1/ nand(' Project Name: Laureate Park Neighborhood Center Phase 3, Orlando, FL Client: City of Orlando, Olivia Boykin (407) 246-3223 Start/Completion: 2020/On-going Services: Density testing of pipe backfill, structure backfill, stabilized subgrade and limerock base and laboratory testing for a new phase of the Laureate Park subdivision. Blue Marlin was a subconsultant to GEC on this project. Project Name: Pinewood Reserve Phase 2,Orlando, FL Client: City of Orlando, Olivia Boykin (407) 246-3223 Start/Completion: 2020/On-going Services: Density testing on pipe backfill,structure backfill, crushed concrete base, stabilized subgrade, asphalt cores and laboratory testing for a new phase of the Pinewood subdivision. Blue Marlin was a subconsultant to GEC on this project. Project Name: 1439 Howell Branch Road Pipe Repair,Orlando, FL Client: Reiss Engineering, Inc., Stephano Ceriana, PE (407) 679-5358 Start/Completion: 2019/2019 Services: Density testing on pipe backfill and crushed concrete base and laboratory testing. This project was an emergency situation and GEC provided a technician after hours to perform testing to re-open the roadway before morning rush hour. Project Name: Wood Street Extension, Oviedo, FL Client: City of Oviedo,Tom Radzai (407) 971-5651 Start/Completion: 2019/2020 Services: Density testing on compacted subgrade, footing subgrade, pipe backfill, structure backfill, limerock base material, compressive strength tests, asphalt cores and laboratory testing. GEC also tested fresh concrete for the new gravity wall. Project Name: Advent Health LEGO Building,Orlando, FL Client: City of Orlando, Olivia Boykin (407) 246-3223 Start/Completion: 2021/On-going Services: In-place density testing on pipe, structure, stabilized subgrade, base material, asphalt cores and laboratory testing on 1,400 feet of roadway. Project Name: Countywide Emergency Pipe Repairs for TOHO Water Authority(TWA), Osceola County, FL Client: WW Daniels Construction Company, Mike McMillan (407) 320-0702 Start/Completion: 2009/2019 Services: Construction materials testing for emergency pipe repairs. Services included testing and inspection of soil backfill,stabilized subgrade,limerock base and asphalt pavement, with work performed at night and on weekends. City of Ocoee Request for Qualifications(RFQ)#21-005 GeeContinuingContractsforGeotechnicalTestingServices Geotechnical and Environmental 20 Consultants.Inc. c. Similar Services — Utility Related 401‘ florrCio Project Name: SR 600 Utility Adjustments,Osceola County, FL Client: Toho Water Authority, Edwin Matos, PE (407) 944-5065 Start/Completion: 2019/On-going Services: Density testing on pipe backfill, structure backfill, limerock base material and laboratory testing. Project included 7,230 feet of watermain and sanitary sewer. Project Name: Lift Station#48 Force Main Replacement,Osceola County, FL Client: Toho Water Authority, Eric Ratliff(407) 944-5065 Start/Completion: 2019/2019 Services: Density testing on pipe backfill and laboratory testing for 125 feet of 6-inch PVC force main that included several open roadway cuts. Project Name: Narcoossee Road Booster Pump System,Osceola County, FL Client: Toho Water Authority, Edwin Matos, PE (407) 944-5065 Start/Completion: 2020/2020 Services: Density testing on slab subgrade, concrete sampling and laboratory concrete compressive strength testing for improvements to an existing pump station. Project Name: Misty Oaks(744 West Road),Orange County, FL Client: Allen's Environmental Construction, Ron Allen (407) 592-2567 Start/Completion: 2021/On-going Services: In-place density tests on pipe and structure backfill material and laboratory testing. The project included installation of 36 new drainage structures and one new lift station. Project Name: Rain Shower Lane Watermain Extension,Osceola County, FL Client: WW Daniels Construction Company, Maureen Grossman (407) 320-0702 Start/Completion: 2021/On-going Services: Density testing on pipe backfill and laboratory testing for the installation of 1,500 feet of 6-inch PVC watermain. Project Name: Collector Roads Gravity Sewer Repair and Restoration, Osceola County, FL Client: Garney Construction, Sam Flowers (407) 877-5903 Start/Completion: 2020/On-going Services: In-place density tests on pipe backfill, structure backfill and limerock base material for 6-and 8-inch PVC pipe upgrades to the sanitary system that includes several open roadway cuts. City of Ocoee Request for Qualifications(RFQ)#i21-005 GeeContinuingContractsforGeotechnicalTestingServices Geotechnical and Environmental 21 Consultants, Inc. c. Similar Services — Building Related Project Name: Oviedo Technology Center, Oviedo, FL Client: IPG Photonics Corporation, Richard Senecal (407) 542-7704 Start/Completion: 2019/On-going Services: Density tests on pipe backfill, structure backfill, footing subgrade, building slab subgrade and roadway stabilized subgrade. GEC observed proofrolling, sampled and tested concrete and performed laboratory concrete compressive strength tests for the construction of the two-story building. Project Name: Canoe Creek K-8 School,Osceola County, FL Client: School District of Osceola County(SDOC),John Viscomi (407) 870-4600 Start/Completion: 2020/on-going Services: Laboratory testing and proofrolling inspections, density tests on slab subgrade, footing subgrade, and pipe backfill material for the two-story facility. The project also included groundwater evaluation and in-situ permeability testing for the athletic field. Project Name: AutoZone Store#6135,Orlando, FL Client: Bunnell Lammons Engineering, Matthew Christie (864) 288-1265 Start/Completion: 2021/On-going Services: Density tests on footing and slab subgrade material, and sampled and tested fresh concrete for the 7,500-sf store. Project Name: Osceola Science Campus,Osceola County, FL Client: Building Hope, Henrique Rojas (786) 877-8694 Start/Completion: 2019/2020 Services: Density testing on mass grading fill, pipe backfill, structure backfill, slab subgrade, pavement stabilized subgrade, footing subgrade, crushed concrete base and limerock base. GEC performed proofrolling inspection, sampled and tested fresh concrete and performed laboratory concrete compressive strength tests for the two-story charter school. Project Name: Winegard Elementary School, Orlando, FL Client: Orange County Public Schools (OCPS), Edie Morgan (407) 317-3700 Start/Completion: 2019/2020 Services: Density testing on slab subgrade,footing subgrade, pipe backfill, structure backfill, pavement stabilized subgrade, limerock base and crushed concrete base. GEC performed proofrolling inspection, sampled and tested fresh concrete and conducted laboratory concrete compressive strength tests for the new 2 story school. Subconsultant Blue Marlin performed floor flatness measuring and fireproofing inspections. City of Ocoee Request for Qualifications(RFQ)#21-005 GeeContinuingContractsforGeotechnicalTestingServices Geotechnical and Environmental 22 Consultants.Inc. c. Similar Services — Miscellaneous Related ' , t l c >( fioodo Project Name: NeoCity, Kissimmee, FL Client: Dewberry Engineers, Inc. (Design Osceola County), Kevin Knudsen (321) 354-9646 Jr. Davis Construction (Osceola County), Steve Davis (407) 870-0066 Start/Completion: 2018/2019 Services: Geotechnical engineering and construction materials testing on infrastructure elements for the high-technology center. Site development included mass grading, pond construction,fill placement and compaction, and roadway construction. Project Name: Boggy Creek Road Widening and Reconstruction, Osceola County, FL Client: Dewberry Engineers, Inc., Kevin Knudsen (321) 354-9646 Start/Completion: 2020/On-going Services: Geotechnical engineering and contamination screening evaluation report(CSER)for the four-lane divided roadway conversion that included sewer and stormwater pond modifications, box culvert replacement/extension, reconstruction of three signalized intersections as well as ITS upgrades and lighting additions. Project Name: Rinehart Road Sinkhole Evaluation, Lake Mary, FL Client: Brown and Caldwell, Reinhard Ruhmke, PG (919)424-1435 Start/Completion: 2020/2020 Services: Geotechnical engineering evaluation of a surface depression utilizing Ground Penetrating Radar (GPR) to assess possible causes and provide geotechnical engineering recommendations for remediation of the depression. Project Name: Shingle Creek Shoal Disposal, Osceola County, FL Client: Osceola County Public Works Division, Rick Baird (407) 742-0513 Start/Completion: 2020/2020 Services: Soil sampling and testing at the Shingle Creek Shoal and proposed shoal disposal area as part of the due diligence process prior to the excavation and disposal of the shoal at the mouth of Shingle Creek. Project Name: Watermark Subdivision Pavement Evaluation,Windermere, FL Client: CDM Smith (for OC Public Works), Lena Rivera, PE, D.WRE (407) 660-2552 Start/Completion: 2020/2021 Services: Pavement evaluation utilizing GEC's GPR RoadScan to assess pavement conditions and develop recommendations to address the pavement distress that occurred throughout the subdivision. Project Name: Clay Street Drainage Well DW-037,Orange County, FL Client: CDM Smith, Benjamin Pernezny, PE (407) 660-2552 Start/Completion: 2020/2020 Services: Geotechnical investigation to evaluate potential causes of a subsidence around a drainage well and provide remediation recommendations. City of Ocoee Request for Qualifications(RFQ)R21-005 GeeContinuingContractsforGeotechnicalTestingServices Geotechnical and Environmental 23 Consultants,Inc. c. Similar Services — Continuing Services Relat nor da Contract Name:Continuing Geotechnical and Materials Testing Services Client: City of Orlando, Richard Howard, PE, Public Works Director(407) 246-3222 Start/Completion: 2018/On-going Services: Construction materials testing and geotechnical engineering services for buildings, renovations, roadways, utilities,trails, wastewater systems,stormwater ponds and emergency response for repairs. GEC also provides inspection services for proofrolling, underdrain installation and organic soil removal. Contract Name:Continuing Geotechnical Engineering, Environmental& Materials Testing Consulting Services Client: City of Kissimmee, Ashley Willis, PE, City Engineer(407) 847-2821 Start/Completion: 2017/On-going Services: Construction materials testing, geotechnical engineering and contamination assessment support for design and construction projects including buildings, roadways, structures,trails and utilities. Contract Name:Continuing Service Contract for Geotechnical Engineering, Materials Testing and Threshold Inspection Services Client: School District of Osceola County(SDOC) Marc Clinch, Chief Facilities Officer(407) 518-2964 Start/Completion: 2018/On-going Services: Construction materials testing,geotechnical engineering and contamination assessment support for buildings, renovations, pavements, utilities and stormwater ponds. Contract Name:Continuing Geotechnical, Environmental & Materials Testing Consulting Services Client: Tohopekaliga Water Authority(TWA), George Eversole, PE, Project Manager 407) 944-5000 Start/Completion: 2020/On-going Services: Construction materials testing, geotechnical engineering and contamination assessment support for pipelines, structures, structure repairs, roadways and sheet pile walls for braced utility excavations. Contract Name:Continuing Contract for Geotechnical Services Client: City of Oviedo,Sofia Liatsos, PE, Project Manager(407) 971-5555 Start/Completion: 2021/On-going Services: Construction materials testing and inspection, geotechnical engineering and contamination assessments for buildings, roadways,traffic signalization, stormwater management, pond berm stability and utilities. City of Ocoee Request for Qualifications(RFQ)n21-005 GegContinuingContractsforGeotechnicalTestingServices Geotechnical and Environmental 24 Consultants,Inc. c. List of Available Services t t J c,( horida CONSTRUCTION MATERIALS TESTING SERVICES GEOTECHNICAL DESIGN Roadway Subsurface Exploration In-Place Density(IPD)tests on SPT Drilling stabilized subgrade Auger Borings Stabilized subgrade depth verification CPT Soundings Limerock Bearing Ratio (LBR)testing Permeability Testing In-Place Density(IPD)testing on Laboratory Soil Testing limerock base Classification Testing Limerock depth verification Consolidation Limerock modified proctor testing Triaxial Shear Soil cement testing and inspection Corrosion Series Crushed concrete base testing Foundation Design Recommendations Asphalt extraction/gradation testing Shallow Footings Asphalt core depth and density testing Mat Foundations LA Abrasion Testing Driven Concrete and Steel Piles Utility Auger Cast Piles In-Place Density testing on pipe and structures Drilled Shafts Modified proctor Tests Sinkhole Assessment and Remediation Buildings/Structures Field Exploration/Emergency Response Foundation subgrade in-place density testing Remediation Design Concrete slump tests Remediation Monitoring Soil bearing testing (Geotechnical Soil Exploration) HYDROGEOLOGIC MODELING Dewatering Impacts ENVIRONMENTAL CONSULTING SERVICES Stormwater Volume Recovery Contamination Screening Evaluations Stormwater Irrigation Withdrawals Phase I Environmental Site Assessments Phase II Environmental Site Assessments GROUND PENETRATING RADAR(GPR) Environmental Lien Searches Sinkhole Investigation Dewatering Discharge Permitting Underground Storage Tank Assessment Consumptive Use Permitting StructureScan Concrete Reinforcement Environmental Field Services Mapping o Direct Push Technology Rig RoadScan Pavement and Base Thickness o Soil and Groundwater Sampling Mapping City of Ocoee Request for Qualifications(RFQ)#21-005 GeeContinuingContractsforGeotechnicalTestingServices Geotechnical and Environmental 25 Consultants.Inc. d . Client References 1 d. Client Referencesi.4i04, c> flor,do Pegasus David W. Hamstra, PE Pegasus Engineering Principal/Project Manager 301 West State Road 434, Suite 309 Winter Springs, Florida 32708 407) 992-9160 david@pegasusengineering.net Ashley Willis, PE City of Kissimmee y Assistant Director, City Engineer 101 Church Street, Suite 200 r Kissimmee, Florida 34741 407) 847-2821 awillis@kissimmee.org I"A Raymond Stangle, PE Osceola County P County Engineer 1 Courthouse Square, Suite 3100 ri W 6' Kissimmee, Florida 34741 407) 742-0541 raymond.stangle@OSCEOLA.org Brett Blackadar, PE, PMP, PTOE City of Altamonte Springs t]Sf6 Division Director of Engineering 950 Calabria Drive 1 A.....9y /City Engineer Altamonte Springs, Florida 32714 407) 571-8338 BBlackadar@altamonte.org Toho 4 George Eversole, PE Toho Water AuthorityWater Authorityjx.i Project Manager 951 Martin Luther King Boulevard 0"' Kissimmee, Florida 347414'` 407) 944-5000 geversole@tohowater.com City of Ocoee Request for Qualifications(RFQ)f121-005 GimContinuingContractsforGeotechnicalTestingServices Geotechnicat and Environmental 26 Consultants,Inc. e. Project Organization ia L c al O O cces a) c C C E s- O cn L R aJtia Q a) C Yu ra cnwaa LD r C v aci L L y N O j O N E Ce wU >. a U _• f) O O i ^bet ._ O N o cs x.g{tomr Ff 1-Lu sr bn m Z cc N Tom' gD S ' L ca ai c N L w u w e . A ao o_ s • _ a — p . o 4.,s (^V^J ii n tB aa s- Cll k ,-, . k'`z" tom'-' iI ;CI1E;C am° d (*r..) 112 (j) c C U t i it d l II m • l N O f6 N u + °. Cts*Ala C W ~ a V i r WC. , C Q a "g H U 2 41Sly Y v• N O N r Y N V N e i ,' fC -0 1E O Na ' CO in cu CO V oo N i a) Yo, 'U {}/1 — 'N o C N to O Y, S N O 3 N w O CO11 1 Y'r.L + CO• CeLSQJx` , a`Cs'... ..., 4 OJO U N c t C V) c c 7. Q H in E O. U m Lu L CU 6. CCDUVI4- N Q c U c• U o O ULf6w N V f0 cn a L• .L o_ c Q. O W w 0 C ra '2 co o Q o = o 3 u N OC 1- N U V L3+ m ' N L f0 N NJ4 c O i Lf1 V CIS U 0 0 O O N eo.L U _a N.. 3 J N f. Firm's Understanding of Services f. Firm's Understanding of Services 4, 1 fto ritla Introduction. GEC is a small business by design. Other geotechnical firms pursuing this contract have many more continuing services contracts with numerous agencies throughout Central Florida. GEC is selective in pursuing contracts; we hold only 10 continuing contracts with local municipalities and public entities we believe are a good fit for our company location, philosophy and goals. Our experience working on City of Ocoee projects under our current continuing services contract has convinced us that we can provide excellent service to the City and we enjoy working with your staff. Since you would not be one of a multitude of GEC continuing contracts,but one of a select few,you can continue to count on the availability of our staff and you will remain a high priority client for GEC. Understanding of Scope. Many of the technical challenges the City staff handles arise from meeting the demands of a fast-growing population.The majority of the assignments under this contract are anticipated to be for water, sewer, reclaimed water, stormwater, utilities and roadway maintenance and improvement projects. GEC has been serving Central Florida for 30 years and our professional staff is extremely knowledgeable of the local geological challenges, such as the karst(sinkhole-prone)geology and closed basin drainage systems, as well as the technical requirements that are typical of City projects. We understand that geotechnical engineering projects assigned under this contract may require a rapid response and a quick turnaround. GEC's headquarters within the City of Orlando limits enables GEC staff to be on site in less than an hour for a geotechnical assignment that requires an immediate response, such as an emergency pipeline repair or roadway subsidence.The involvement of at least one of the five GEC owners in every project we do for the City means that all of our resources can be directed to your projects whenever they are needed. We enjoy the challenge of handling numerous smaller projects at one time, and the satisfaction of completing a project in a few weeks, rather than a few years. These types of projects include roadways, utilities, fire stations, pavement evaluations and drainage studies. We believe a wide variety of engineering projects is good for our staff; the unusual technical challenges that arise keep us engaged and challenged to find good, cost-effective engineering solutions as quickly as possible. We know the key to providing the service you need on your projects is consistency in field testing, laboratory testing and reporting. GEC uses long-term employees on your projects for all three phases of our services. Having experienced technicians and engineers working on your projects allows us to solve technical issues quickly and avoid impacting the project budget or schedule. GEC's Orlando laboratory is accredited by the Construction Materials Engineering Council (CMEC) and is qualified by the Florida Department of Transportation (FDOT). In addition, our Engineering Technicians hold numerous certifications and qualifications for construction materials testing and inspection. Project Approach. GEC has developed a straightforward organizational structure and management process to ensure easy communication of project information, project coordination and accountability for meeting project goals with regard to technical issues, schedule and cost. Our Organizational Chart for this contract is shown in Tab e. City of Ocoee Request for Qualifications(RFQ)#21-005GeeContinuingContractsforGeotechnicalTestingServices Geotechnical and Environmental 28 Consultants.Inc. f. Firm's Understanding of Services riorido GEC's approach begins with our Contract Manager, Dan Stanfill, P.E., who has 37 years of experience as a Geotechnical Engineer in Central Florida. Dan will be the first point of contact and, as GEC Senior Vice President, can commit the necessary resources to the City for GEC to serve as an extension of your staff. Our Organizational Chart presents the key employees that GEC will assign to the contract. As you can see,four out of five GEC Owners (Rachel Andre, Dan Stanfill, Chris Meyer, and Richard McCormick) have key roles in our Management Plan;therefore,you can be assured this City contract will be a high priority for our firm.We have established efficient systems for proposal preparation, communications, managing project information, cost control, schedule, quality assurance and reporting. The following discussion describes our management approach in more detail. Project Initiation. The first step in a new project is your assignment of the project to GEC. Dan Stanfill is your Primary Contact and Dan's residence in Winter Park will make him immediately available to meet with you in person to review project details if needed. Gene Williford will be Dan's back-up should Dan be out of the office for some reason. Proposal Preparation. When notified of an assignment by City Staff, Dan will work with the City Project Manager to develop the scope of services and cost proposal. A focused and thorough proposal is necessary for any project to be successful. Dan will assign the proposal to the appropriate Task Manager(Geotechnical, Construction or Environmental) and will ensure that project requirements including the scope of services, budget and schedule are accurately reflected. The proposal will then be forwarded to the City Project Manager for review and preparation of the Work Order. Project Execution. Once the Work Order is received, Dan and the Task Manager will review the project requirements with the assigned GEC staff to ensure understanding of the scope, budget and schedule. Geotechnical and materials testing projects are unique and require active management since they involve field, laboratory and engineering activities. We have to work with the uncertainty of weather and other site conditions that can impact the field operations. GEC addresses these issues by maintaining an experienced professional and technician staff that is focused solely on Central Florida projects. We continually monitor the progress of our field operations and adjust our resources daily and as needed to achieve schedule milestones and meet client expectations. Schedule. We can submit our proposal within 24 to 48 hours after receiving the request from the City. Geotechnical and environmental projects are usually completed within 4 to 6 weeks. Construction materials testing schedules are dependent on the construction schedule. Dan and the GEC Task Leader will establish the schedule for each task assignment in conjunction with the City representative. For short duration projects, Dan will review the schedule on a daily basis to ensure that project deliverables are completed on time. For longer duration projects, monthly progress reports will be submitted and will indicate any deviation from the original schedule,along with corrective measures,if needed to achieve the overall project milestones. We can typically provide construction materials field and/or laboratory test results on the same day as the request to facilitate the contractor's schedule. For emergency response situations, such as pipeline breaks or roadway subsidences, GEC is committed to providing personnel on site within two hours of your notification. GEC's City of Ocoee Request for Qualifications(RFQ)4121-005 GeeContinuingContractsforGeotechnicalTestingServices Geotechnical and Environmental 29 Consultants,Inc. f. Firm's Understanding of Services vgtOlor flortdo Orlando Office is located less than 30 minutes from the Ocoee City Hall,and we understand a prompt response in an emergency situation is critical to limit facility closure periods. Our in-house Ground Penetrating Radar GPR) and Cone Penetration Test (CPT) rig have been very useful in evaluating subsoil conditions when a subsidence or sinkhole occurs. As an example, GEC responded to a subsidence that occurred in 2019 at SR 50 and South Bluford Avenue. A sanitary sewer manhole structure shifted and GEC responded within 24-hours with GPR equipment and Crew to evaluate pavement thickness and potential raveled soils. GEC also developed preliminary recommendations for remediation of potential raveled soils. Schedules often need to be accelerated to accommodate grant funding requirements. GEC recently completed the geotechnical design of the Little Wekiva River Erosion Mitigation Improvements Project with the City of Altamonte Springs, which was funded by a FEMA Grant to repair flood damage and mitigate future flooding. In order for the City of Altamonte Springs to secure the grant funding, a very tight project schedule was established, and GEC mobilized multiple drill rigs to keep the project on schedule. Project Communications. Based on our experience,the projects assigned under this type of contract can vary widely in scope and duration, from less than a week to more than a year. Dan will work with the City representative to establish a schedule for updating the City on project milestones that is tailored to the project type and length. Part of GEC's construction materials testing quality control program requires immediate notification and tracking of failed tests so that remediation and retesting can take place promptly. If a material test failure cannot be remediated promptly, GEC will notify our City Project Manager to give them updates on the status of the failure and the remedial actions that are taking place. Cost Control. GEC's cost accounting system, Deltek Vision,tracks all project costs and develops budget status reports on a weekly or monthly basis. This allows our Project Managers to quickly identify any areas where the project budget may be exceeded and quickly take corrective action to complete the task assignment within the original budget. A review of the project budget status will be provided on a monthly basis as a minimum. In addition, GEC applies innovative solutions to projects when possible to limit project costs and enhance the schedule. An innovative technique employed by GEC is our in-house RoadScan Ground Penetrating Radar GPR)system to assess asphalt,base and subgrade thicknesses,as well as the possible presence of voids below the pavement. GEC's RoadScan GPR system collects continuous pavement section data at highway speeds, which avoids the need for traffic control, and the output data integrates easily with GIS asset management systems. GEC is the only private company in Florida with the RoadScan GPR system. Quality Assurance. GEC has a quality assurance/control program (QA/QC) that addresses field, laboratory and engineering services. Gary Kuhns, P.E., GEC's n • ,, Chief Engineer, will be the Quality Control Manager and Gary has 39 years of \ s engineering experience in Central Florida. He will make sure our contract specific QA/QC procedures are followed on all City projects. GEC's QA/QC program includes the requirement for two authors on every engineering report, with one author being a seasoned engineer who has been qualified as a Senior f RoadScan Pavement Thickness GIS Output City of Ocoee Request for Qualifications(RFQ)#21-005 GeeContinuingContractsforGeotechnicalTestingServices Geotechnicat and Environmental 30 Consultants.Inc. f. Firm's Understanding of Services 4, tat ( ca(> ftorrdo Engineer in accordance with the GEC QA/QC Program. In addition, our Orlando and Kissimmee laboratories have their own QA/QC plans and are qualified by FDOT. Safety. Safety is always a GEC priority, especially since drilling, testing and other field operations can entail the use of heavy equipment and other potentially dangerous machinery in proximity to active roadways, utilities and other facilities. GEC has a corporate health and safety plan that covers all of our operations and we will develop a contract-specific health and safety plan for this City of Ocoee contract. Our personnel are trained in the safe use of all required machinery and equipment, and all precautions will be taken to avoid any concerns. Reporting. Project reports will be clear, concise and will be reviewed in accordance with the contract-specific QA/QC Plan. Construction materials testing projects will be reported on a monthly basis,along with a monthly invoice and updates on the project costs and schedule. As test results on construction projects are generally required as soon as possible to keep projects on schedule, field inspection and test results will be provided through email on a weekly basis.The following graphic illustration describes GEC's management approach for geotechnical/environmental and construction materials testing projects. Key items in the project approach such as review of existing data to reduce field investigation costs, early notification of design impacts when identified in the field and the use of project tracking sheets on construction testing projects have been highlighted in green on the flow charts. I Geotechnical / Proposal Field ReportingEnvironmental Phase Investigation i Phase Project Team i City Project Manager Scope Coordinate Access CITY) Draft Report CITY/CD/CM/TM) CITY/TM) PE) City Civil Designer Utility Clearance CD) Schedule CITY/TM) CITY/CM/TM) Report Quality GEC Contract P Notification of Start I Control Manager(CM) Budget TM) TM) GEC Task Manager CITY/CM/TM) Notification of Report Quality TM) ExistingData Review AssuranceCompletionand GEC Project Engineer TM/PE) Schedule Update QC) PE) TM/CM) Proposal Development Design Impacts Submit Electronic/ QC Manager Hard Copy of Report QC) TM/PE/QC) CITY/CD/TM) City of Ocoee Request for Qualifications(RFQ)#21-005GeeContinuingContractsforGeotechnicalTestingServices Geotechnical and Environmental 31 Consultants,Inc. f. Firm's Understanding of Servicesa 1 J Hondo Construction Proposal Field Testing & ReportingMaterialsTestingPhaseInspectionPhaseProjectTeam City Project Manager Scope Project Tracking Test/Inspection C CITY) CITY/CM/TM) Sheet Results Submitted Weekly City Contractor CT) TM/PM) Schedule CITY/CM/TM) PM/TM) Schedule Testing Test/Inspection GEC Contract Reports Manager(CM) Budget CT/PM) Submitted Monthly CITY/CM/TM) PM/TM) GEC Task Manager Test Failures— TM) Review Plans and Retest Report Quality Specs. CT/PM) Assurance GEC Project TM/PM) QC) Manager(PM) Test FailuresProposal Schedule and Budget QC Mana er Development Resolution Updates MonthlygCITY/TM/PM) QC) TM/PM/QC) CITY/TM/PM) Project Approach Example - NeoCity Academy. To further illustrate our approach, we provide the following example of one of our geotechnical engineering, construction materials testing and contamination assessment projects - the state-of-the-art rv•v,.-.:, „ ;: - NeoCity Academy in Osceola County. GEC also provided I. t "L "'" ° . geotechnical engineering, contamination assessment and construction materials testing services for mass grading,drainage, utilities,and transportation infrastructure to support construction r of the overall NeoCity development. A` iwk Artist Rendering of Future NeoCity The NeoCity site occupies about 483 acres of former lake bottom and uplands that previously comprised the Judge Farm. NeoCity required up to 10 feet of fill to raise site grades and a large stormwater lake in the western portion of the site was the source of the fill material. GEC's geotechnical investigation of the proposed borrow material identified organic soil (muck) and silty and clayey sands typical of lake bottom conditions. Although the underlying very silty/clayey sands would be difficult to compact, it was necessary to use this "less than optimal" material on-site to limit construction costs. GEC provided detailed classification of the silty/clayey soils, along with recommendations for special handling, placement and preparation of the material to allow its use in building and roadway areas, greatly reducing City of Ocoee Request for Qualifications(RFQ)#21-005 GeeContinuingContractsforGeotechnicalTestingServices Geotechnical and Environmental 32 Consultants.Inc. f. Firm's Understanding of Services t J f toridn development costs. To aid the site civil engineer and contractor in assessing soil workability constraints, GEC color-coded the boring profiles for easy identification, and quantifying of on-site materials. Stratum Uror llNlkd Sof FIII k, I,Nos. code aazsfflcatlan Sulrablflry llmlbttoM era 40 f2 f ffi' kW!for mass grades,roadway I.2 33.SP 9vt embankment None structural fill&wet pondbackM grriftralons for man MIregdre more handl kV to 3 SM gracire,roadway ty,dace and compact. embankment and II-Inner fits may he vicar[red. structural fill 0•:a _ still reyo-e more ha dlIra to Suitable with tky,dace and compact fmftationsforman tlsraw lifts may be reeked. I ^• 4 SM graze roadway Rdetively tnpermeable end embankment and should not be used in drainage structurelfill ernleve area.ortnoopC 3 feet of MI. la Improve workabllltythfs a stream would be mixed wtdt Wad 1.2 or 3.WI require Mappable w4th severe mare handling to dry.place r 5 a.CH limitations form.et and compact Thinretliftevrfll gre6rE be required Relatively impermeable and should tut et be used in drainage sereadve s s — 1 err ammo oarrntr - areasa.inupper5 feet offir. Color Coding of Soil Boring Logs for Fill Suitability at NeoCity Academy GEC also conducted the Phase I Environmental Site Assessment (ESA) for NeoCity Academy and identified an historical animal holding pen on the site, which can be a source of pesticide chemical impacts. GEC followed up quickly with a Phase II ESA, to sample and test soil and groundwater, and was able to determine that contamination was not present and was eliminated as a project concern. GEC's construction materials testing services included full-time monitoring of demucking activities as well as laboratory classification testing of excavated soils. Much of the in-situ soils at the NeoCity site are dark-stained from past exposure to the waters of Lake Tohopekaliga as well as the past agricultural use of the site, which makes identification of organic soils(muck)difficult. An experienced field technician, proficient in organic soil identification, was assigned to this project to avoid both under- and over-excavation of the muck. GEC field personnel developed daily field inspection reports as well as monthly status reports to facilitate communication of the field and laboratory test results to the site contractor and Osceola County. City of Ocoee Request for Qualifications(RFQ)#121-005 GeeContinuingContractsforGeotechnicalTestingServices Geotechnical and Environmental 33 Consultants.Inc. Tab II . Firm's Office Locations & Other Forms g. Locations of All Offices g. Location of Offices 4.,40:4r 4 '() flOrtOo Office Location Miles/Time to Ocoee City Hall Prime Consultant: Geotechnical and Environmental Consultants, Inc. (GEC) 16.5 miles/ 23 minutes 919 Lake Baldwin Lane Orlando, Florida 32814 Subconsultant: Blue Marlin Engineering LLC 14.4 miles /21 minutes 102 Drennen Road, Suite B-10 Orlando, Florida 32806 it - - iiGoaHiawassee nz3-- r= 4 EIN, 1 Aloma lr i ter P.,rk X 1 1 1 9 irv,e ..°, n u I hor 4&01 W a3e` I Orland useum of Art V i c, ocoee i, Pine Hills i ,, 1 i r Y4:) 14. lllal 1 ldrWi" 1*"*4''."4 , ". _-r Ortotfa tr_,`j trip. 5 bC' see LandoksreybiQflIldo---ortp Ot!Ig i lo;E E A, 7. x, i fr'NiH _ Tti Ur MARI tN - e rl sk., ,.-.aat , Nli1NLLItING I&NE rnl ltfei;t. I 1 ,, r3s y en If A Berme r," Ighis 4F, a: IIl Conway,1 F 1°4 x I t a.rdgewo•$.... City of Ocoee Request for Qualifications(RFQ)ri21-005 GeeContinuingContractsforGeotechnicalTestingServices Geotechnical and Environmental 34 Consultants,Inc. h . Conflict of Interest Disclosure Form A-L*4P ocoee mien RFQ CONFLICT OF INTEREST DISCLOSURE FORM The award of this contract is subject to the provisions of Chapter 112,Florida Statutes. All Proposers must disclose within their Proposal: the name of any City of Ocoee employee, Mayor or City Commissioner, other City Official, or City Consultants, who owns assets or capital stock, directly or indirectly, in the Proposer's firm or any of its branches,or would directly or indirectly benefit by the profits or emoluments of this proposal. (Indirect ownership or benefit applies to any members of his or her immediate family.) Proposer certifies that no member of the entity's ownership or management is presently applying for an employee position or actively seeking an elected position with the City. In the event that a conflict of interest is identified in the provision of services,Proposer agrees to immediately notify the City in writing. The purpose of this disclosure form is to give the City the information needed to identify potential conflicts of interest for the City Commission, Evaluation Committee members, and other key City employees and consultants involved in the award of this contract. According to Chapter 112, Florida Statutes, the term "conflict of interest" "means a situation in which regard for a private interest tends to lead to disregard of a public duty or interest",and refers to situations in which financial or other personal considerations may adversely affect, or have the appearance of adversely affecting, an employee's professional judgment in exercising any City duty or responsibility in administration,management,instruction,research,or other professional activities. Please check one of the following statements and attach additional documentation if necessary: X To the best of our knowledge,the undersigned firm has no potential conflict of interest for this Proposal. The undersigned firm,by attachment to this form,submits information which may be a potential conflict of interest for this Proposal. Acknowledged by: Geotechnical and Environmental Consultants, Inc. (GEC) Firm Name Signature V Daniel C.Stanfill, PE/Sr Vice President Name and Title(Print or Type) S.-I If VI Date RFQ#21005 Continuing Contracts for Geotechnical Testing Services 1 35 i. Receipt of Addenda Issued ACKNOWLEDGEMENT OF ADDENDA: Bidder acknowledges receipt of the following addenda: No. 1 Dated April 27, 2021 No.Dated No.Dated Remainder of page left blank intentionally.) RFQ#21005 Continuing Contracts for Geotechnical Testing Services 20a 36 j . Summary of Litigation SUMMARY OF LITIGATION: Provide a summary of any litigation, claim(s),bid or contract dispute(s)filed by or against the Bidder in the past five(5)years which is related to the services that the Bidder provides in the regular course of business. The summary shall state the nature of the litigation, claim,or contact dispute,a brief description of the case,the outcome or projected outcome, and the monetary amounts involved. If none,then please say so. No lawsuits, claims, or contract disputes have been filed by or against GEC in the past five (5) years that are related to the services that GEC provides in the regular course of business. Attach additional sheets if necessary) RFQ#21005 Continuing Contracts for Geotechnical Testing Services 20b 37 k. Company Information/ Signature Sheet d COMPANY INFORMATION/SNGNATTJRF SIJFFT RFO#21-O01 FAILURE TO COMPLY WITH THESE RFQ INSTRUCTIONS WILL RESULT IN DISQUALIFICATION OF YOUR QUALIFICATION PACKAGE. PLEASE SIGN BELOW ATTESTING THAT YOU HAVE READ AND UNDERSTAND ALL RFQ INSTRUCTIONS AND THAT YOU UNDERSTAND THAT THE SUCCESSFUL RESPONDENT WILL BE REQUIRED TO ENTER INTO A LEGALLY BINDING CONTRACT WITH THE CITY OF OCOEE. Geotechnical and Environmental Consultants, Inc. (GEC) 407-898-1818 COMPANY NAME TELEPHONE(INCLUDE AREA CODE) 407-898-1837 FAX (INCLUDE AREA CODE) dcstanfill@gecfla.com E-MAIL ADDRESS C- CdP_____ IF REMITTANCE ADDRESS IS DIFFERENTAUQ(‘'°i ORIZED SIGNATURE(manual)FROM PURCHASE ORDER ADDRESS, PLEASE INDICATE BELOW: Daniel C. Stanfill, PE/Sr Vice President NAME/TITLE(PLEASE PRINT) Same Address 919 Lake Baldwin Lane STREET ADDRESS Orlando, Florida 32814 CITY STATE ZIP FEDERAL ID# 59-3044233 Individual X Corporation Partnership Other(Specify) Sworn to and subscribed before me by means of Irphysical presence or 0 online notarization this 3 r I day of Mttiy 20 2( . Personally Known or Produced Identification Notary Public-State of Florida Type of Identification) County of Orange L4/44/1-ra 414.44 Signature of Notary Public El!!"'•+ , NORMAL MORALES wi MY commissiON r HH o77756 Printed,typed or stamped EXPIRES:January 24,2025 Commissioned name of Notary Public Bonded Thu Notary Pubic Undenedeers RFQ#21005 Continuing Contracts for Geotechnical Testing Services 21 4%1,11 , as 3 -, 4 I .....L.. itit a I1, r+l ill b a ..,, L Y r 4 Prepared by: IV, WC 3.op Geotechnical and Environmental Consultants. Inc. Geotechnical and Environmental Consultants,Inc.1919 Lake Baldwin Lane,Orlando,Rorida 32814 407-898-1818 I www.gecfla.com GEOTAND-01 RRROVi1N 44cORO" CERTIFICATE OF LIABILITY INSURANCE DATE (MMMDNYYY) 8/6/2021 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERSAO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,. EXTEND OR ALTER THE. COVERAGE AFFORDED' BY THE POLICIES BELOW. 'THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING 1NSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is'an ADDITIONAL INSURED, the policy(les) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsements . PRODUCER T CT JCJ.Insurance Agency, LLC Hlllcrest Street Orlando, FL 32803 FAXAIC, Ne ;(321) 445-1076PIHcONNEo. Fdt; (321) 445-1i172208 AI certs c-instirance:com INSURERS AFFORDING COVERAGE NAIC 0 IN'SURER A: Tmvelers Pedip & Cas of Amer 25674 INSURED INSURERB:Travelers Casual & Su[qly Co 19038 Geotechnical and Environmental Consultants, Inc. Consultants, Inc. INSURER C -Berkley Insurance Com6any 32603 919 Lake Baldwin Lane INSURER D : INSURERE.,. Orlando, FL 32814 INSURER F : COVERAGES CFRTIFICATF Nl1MP1l=R- ornAcirw wl imi2co. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR -CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITHAESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPEOFINSURANCE 'ADDLSUBR pOLICYNUMBER POLICYEFF POLICY EXPLTRLlM[i5 A X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE X OCCUR X. X 680SH710218 1/2612021 1/2612022 EACH OCCURRENCE 1,000.000 DAMAGE TO RENTEDPR1,0Op.000 X MED EXP ft one erson S -6.000ContractualLlab PERSONAL&ADVINJURY 1,000,000 RGEN' LAGGREGATEUM IT.APPLIESPER: POLICY' "rJECT El LOC GENERAL AGGREGATE 5 2,000,000 PRODUCTS -COMPIOPAGG S 2,000,000 OTHER: A AUTOMOBILE LIABILITY NED SING[ E LIMITCOMB' S 1,000,000 X DDIBLYINJURY Per Iron SANYAUTO OWNED SCHEDULED AUTOS ONLY AUUTTIOSyy X X BA311867638 1126/2021 112612022 BODILY INJURY Pereeddenl OaR AMAGE SASONLYAUTOUONLYgp S A X > UMBRELLA LIAR X OCCUR EACH OCCURRENCE S 2,000,000 AGGREGATE g 2,000,OODEXCESSLIABCLAIMS -MADE X X CUP9D619194 1/26/2021 112612022 DED X RETENTIONS ,1 O,000 B WORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANY PROPRIETORIPARTNEVFXECUTIVE YIN IfyFICERfMEEMBEREXCLUDED? _Y Byes, describe underes,drorylnund DESCRIPTION OF OPERATIONS 6ekniv NIA X UB9J775015 1/2612021 1126/2022 X RTUT, OTH- E.LEACH ACCIDENT 1.000,000 E. L. DISEASE -EA EMPLOYE 1,000,000 E. L DISEASE -POLICY LIMIT S 1000.000 C ProflPoll. Llab EC-9042065-OS 112612021 1/26/2022 Per Claim 2,000,000 C EC-9042065-05 112612021 1/26/2022 Aggregate 2,000,000 D€ SCRIPTipN OF OPERATIONS 1 LOCATIONS I VEHICLES (ACORD 101 Addillonal Remarks Schedule, mey be attached if more space Ia required) RE: City of Ocoee; Continuing Contracts for Geotechnica(Testing Services, RFQ #21-005. Certificate Holder is an Additional Insureds with regards to General, Auto and Umbrella Liability when required by written contract. Coverage Is Primary & Nori-Contrlbutory with respect to all policies. A Waiver of Subrogation for all policies applies when required by written contract City of Ocoee 160 N. Lakeshore Drive Ocoee, FL U761 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. REPRESENTATIVE ACORD 25 (2016103) 1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD AC(:>RVO AGENCY CUSTOMER ID: GEOTAND-01 BBROWN Lac #: 1 ADDITIONAL REMARKS SCHEDULE Page 1 a 1 AGENCY NAMED INSURED CJ Insurance Agency, LLC Geotechnical and Environmental Consultants, Inc. Consultants Inc. POUCYNUMBER 919 Lake Baldwin Lane Orlando, FL 32814SEEPAGE1 CARRIER NAIL CODE EE PAGE 1 ISEE P 1 E CWE DAM. SEE PAGE I THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER. ACORD 25 FORM TITLE: Certificate of Uability insurance Pollution Coverage Pollution Liability is included under the Professional Liability. Policy Dates:1/26121-1126-22 Carrier: Berkley Insurance Company Policy # AEC-9034467-04 AcUriu 1u1 IZUUt11U1) © 2008 ACORD CORPORATION. All rights reserved. The ACORD name and Iogo are registered marks of ACORD