Loading...
HomeMy WebLinkAboutItem 03 Approval of Inliner Solutions, LLC as Vendor for the Adair St Drainage Project City of Ocoee ▪ 1 N. Bluford Avenue ▪ Ocoee, Florida 34761 Phone: (407) 905-3100 ▪ www.ocoee.org STAFF REPORT Meeting Date: November 3, 2026 Item #: 3 Contact Name: Milen Womack Department Director: Stephen Krug Contact Number: Ext. 6013 City Manager: Craig Shadrix Subject: Approval of Inliner Solutions, LLC as Vendor for the Adair St Drainage Pipe Rehabilitation Project. (City Engineer Womack) Background Summary: The Public Works Department has budgeted repairs for approximately 1100 feet of corrugated metal drainage pipes on Adair St between Wurst Rd and Northern Durango Ave. City Staff reached out to three companies that the Department frequently uses for pipe rehabilitation projects, to provide quotes to rehabilitate pipe in place. Three companies responded (quotes attached). The three quotes ranged from $114,084.00 to $220,845.78. Inliner Solution, LLC provided the low quote of $114,084.00 to clean and install cured-in-place pipe lining to restore the failing corrugated metal drainage pipes. Public Works is seeking approval from the City Commission to utilize Inliner Solution, LLC to perform the restoration work. The cost proposal from Inliner Solution, LLC aligns with industry standards for pipe liners of this size and complexity. Funding is available within the General Stormwater Improvements Project Budget. Public Works recommends the approval of Inliner Solution, LLC as a vendor to complete the Adair St Drainage Rehabilitation Project. Issue: Should the Honorable Mayor and City Commission approve Inliner Solutions, LLC as a vendor for the Stormwater Division, to complete the drainage pipe repairs on Adair St? Recommendations: Staff recommends that the Honorable Mayor and City Commission approve Inliner Solutions, LLC as a vendor for the Stormwater Division, to complete the drainage pipe repairs on Adair St and authorize the City Manager and Staff to execute change orders in accordance with the City Purchasing Manual. Attachments: 1. American In-line Inspection - Adair Street Quote 2. Flotech Environmental — Adair Street CIPP 3. Inliner Solutions Quote - Adair Street Financial Impacts: Funding is available within the General Stormwater Improvements Budget. Job Project Number P000420. GL # 312-538-20-6302 in the amount of $224,116. City of Ocoee ▪ 1 N. Bluford Avenue ▪ Ocoee, Florida 34761 Phone: (407) 905-3100 ▪ www.ocoee.org Type of Item: Consent City of Ocoee — Adair Street 15-24" CIPP (v7.28.2026) City of Ocoee 1 N. Bluford Ave. Ocoee, FL 34761 United States Russell Oliver roliver@ocoee.org Reference: 20260728-203013163 Quote created: July 28, 2026 Quote expires: October 6, 2026 Quote created by: Luis Ferre Business Development Associate luis.ferre@flotechllc.com +17862028723 Project Information Project Owner Information Project Owner: City of Ocoee Owner Contract/Project Number: TBD Owner Project Name: Adair Street CIPP Project General Contractor (Prime): Flotech Onsite Point of Contact: Russell Oliver Region: Central County: Orange Flotech Project Manager: Geimar Pino Job-site Address: 1701 Adair St, Ocoee, FL 34761 Post-Construction: No Maps/Plans Provided: No Technical Specifications: NASSCP PACP; ASTM-F1216 Certified Payroll Compliance Required: No Wage Program Type: N/A Deliverables Instruction: NASSCO certified PACP report will be provided along with video logs as final deliverables Billing Instructions: email invoice with PO number AP / Billing contact email: SThomas@ocoee.org Business Development Rep: Luis Ferre Scope of Work: Mobilization of vehicles and equipment from Belle Isle Light pipe cleaning and CCTV pipeline inspection of existing 15"-24" CMP storm pipes: [1,112 LF] 15" CMP x 55 LF 18" CMP x 785 LF 18" CMP x 36 LF 24" CMP x 50 LF 24" CMP x 186 LF Cured in place pipe (CIPP) lining installations: [1,112 LF] 15" CMP x 55 LF 18" CMP x 785 LF 18" CMP x 36 LF 24" CMP x 50 LF 24" CMP x 186 LF Post-repair cleaning and CCTV inspection of the rehabilitated pipes Offsite disposal of debris NASSCO PACP reports, inspection videos and recommendations provided upon completion Inclusions: Sewer Combination Vactor 2100 with 15 CY Debris Tank / 80 GPM / 2500 PSI with operator and laborer. Cues Mainline CCTV Inspection Truck with operator. Rush Overland Gen 2 Boiler Truck MOT flagger Exclusions: Sod restoration, Grout repairs, joint sealing, lateral or cross pipe reinstatements, grate or casting removal / replacement, weir wall removal / replacement, baffle removal / reinstatement, confined space manhole entry, MOT Permitting, Major MOT Set-up's, Hydrant meter access, anything not mentioned in this proposal. Assumptions: Pricing is based on provided project information and assumed site conditions. Work areas must be suitable for requested services without undue risk to equipment or personnel, unless stated otherwise by the Owner in writing. Pipe Heavy cleaning provision: This proposal is based on unit pricing for pre-CIPP light cleaning. If heavy cleaning is required per NASSCO Standards, the final invoice will reflect the actual time worked and the following hourly rates and conditions will apply: Jet-Vac Cleaning: $285 per hour CCTV with Vactor: $485 per hour 4-hour minimum (portal-to-portal) *Heavy cleaning is defined as exceeding the following debris thresholds: 0-12” pipes: > 25% debris 13-24” pipes: > 20% debris 25-30” pipes: > 20% debris 31-36" pipes: > 20% debris 37-42" pipes: > 15% debris 43-48" pipes: > 15% debris 49-54" pipes: > 10% debris 55-60" pipes: > 10% debris Change-Order Clause – CIPP Feasibility In the event that the existing pipe conditions prevent a successful installation of cured-in-place pipe (CIPP) lining—such as in cases of significant collapse, deformation, or obstruction—Flotech Environmental will promptly notify the client and provide alternative repair recommendations under a change order request. These may include dig-and-replace or sectional point repairs, with a separate scope of work and pricing to be submitted for approval prior to proceeding. Should site conditions, such as pipe diameters, differ from the as-built plans, Flotech reserves the right to a change order for this CIPP work. 5% price increase per year of contract. Products & Services Item & Description Quantity Unit Price Total 15" CIPP 55 $165.00 $9,075.00 18" CIPP 821 $87.00 $71,427.00 24" CIPP 238 $161.00 $38,318.00 MOT 2 $750.00 $1,500.00 Water Meter Rental & Usage 1 $500.00 $500.00 One-time subtotal $120,820.00 Total $120,820.00 LF LF LF Traffic maintenance. LS Proposal Terms Above pricing is based on project information and plans as provided by Client, and assumed site conditions. All quantities provided are estimates. Invoices will be calculated based on the actual quantities, in accordance with the quoted unit rates. Disclaimer: Cleaning and CCTV inspection work must meet NASSCO-PACP standards. The Contractor is not liable for damage caused by preexisting conditions. If the camera cannot pass through a manhole section, the Contractor will attempt inspection from the opposite manhole. If unsuccessful, the inspection is marked as Survey Abandoned and considered complete. An hourly standby rate of $1,500 will apply for any issues that delay production outside of Flotech Environmental's control. Nighttime/weekend hourly rates: $300 for 2-man Jet-Vac Cleaning crew; $500 for 3-man Jet-Vac Cleaning or Jet-Vac Cleaning & CCTV Inspection crew. If plugging and dewatering line segments are required during the project and were not included in the initial quote, additional costs will be added to the final invoice. Plugging & Dewatering Operations costs: $450 for first plug (up to 24"), $800 for first plug (24"+), additional plugs on the same day: $225 (up to 24"), $400 (24"+). Cancellation Notice: Cancellations before 2:00 PM will result in a charge for the 4-hour minimum at the hourly rate, except for immediate weather conditions affecting safety. Payment: Flotech will invoice at the completion of each billing period and payment must be made within Thirty (30) days from the date of the invoice. Should payment not be received within 30 days of service, service may be interrupted until payment is received. Any balance remaining after 30 days will be assessed a 1.5% monthly finance charge. In the event of any action to collect unpaid invoices, Client and/or managing corporation, and/or entity shall be liable to Flotech or its assignee for all costs of collection, including but not limited to attorney’s fees and costs, including any costs of litigation relating to such collection and including the collection amount. Notice to Owner / Notice of Non-Payment In accordance with Florida lien law, Flotech files a Notice to Owner (NTO) on all projects at the commencement of work. If payment is not received within the agreed payment terms, Flotech will provide prior notice to Client before filing a Notice of Non-Payment (NNP) and may pursue all remedies available under Florida law, including lien enforcement. ACCEPTANCE OF PROPOSAL / SIGN & RETURN: Signature Signature Date Printed name Questions? Contact me Luis Ferre Business Development Associate luis.ferre@flotechllc.com +17862028723 Flotech Environmental, LLC 657 South Dr. Suite 401 Miami Springs, FL 33166 United States Inliner Solutions, LLC FL26-123-4 October 14, 2026 City of Ocoee, FL Attn: Russell Oliver 1 North Bluford Avenue Ocoee, FL 34761 Bid Proposal: Ocoee Hills West Side CIPP – ADAIR STREET Ocoee, FL Cured In Place Pipe (CIPP) Dear Russell, Inliner Solutions, LLC is pleased to offer the following proposal pricing to provide cured in place rehabilitation services of the 15-Inch through 24-Inch sewer lines for the above referenced project. This pricing includes providing all labor, material, supervision, and equipment necessary to complete the scope of work as listed below. Scope of work performed by Inliner Solutions, LLC: 1. Provide pre-work submittals. 2. Inliner Solutions, LLC will perform pre-rehab CCTV (normal only). Two-wheel drive vehicle access to manholes is required for this work. and to confirm pipe sizes and lengths before ordering materials or mobilizing our crew(s). 3. CIPP rehabilitation to be completed per ASTM 1216 standards utilizing water or air inversion & water or steam curing methods. 4. Reinstatement of service laterals is via internal robotic cutter only (if required). 5. Inliner Solutions, LLC will perform post lining CCTV inspection upon completion of our CIPP to confirm rehab work. 6. CIPP rehabilitation pricing is based on completing diameters & associated quantities as listed in this proposal’s schedule of values. Any change in overall or segmental length, diameters or liner thickness could result in pricing changes. 7. Demobilize all construction equipment and clean-up of all identifiable debris generated by Inliner Solutions, LLC crew(s). 8. Proposal includes costs for one mobilization. Additional mobilizations could result in additional charges. 9. This proposal includes a single flush of the lines only. No mechanical, chemical, or root/debris cleaning is included. Should the condition of the line require cleaning beyond a standard flush, this will be addressed via change order. Inliner Solutions, LLC proposes to complete the above scope of services for the prices listed below: Item No.Description Qty Unit Unit Price Total 1 Mobilization 1 LS $7,500.00 $7,500.00 2 CIPP, 15"36 LF $115.00 $4,140.00 3 CIPP, 18"816 LF $77.00 $62,832.00 4 CIPP, 24"230 LF $144.00 $33,120.00 5 QUICK CLEAN - FLUSH, 15"-24"1082 LF $6.00 $6,492.00 Total $114,084.00 This pricing does not include the cost for the following: 1. Furnishing Bid, Performance, or Payment Bonds. 2. Prevailing wages (none provided). 3. This proposal pricing does not include Inliner Solutions, LLC being signatory to any outside labor agreement. This includes any reference to union, project labor, or similar agreements. Any outside project labor agreement must be explicitly provided to Inliner Solutions, LLC during the proposal process. 4. Cleaning of any kind. 5. Owner is responsible for providing adequate upstream & downstream access to proposed lines, including but not limited to precast removal/replacement, access/easement clearing, roads, staging, & inversion areas, etc. (should it be required). Inliner Solutions, LLC and/or its subcontractors must be able to set up over each manhole. 6. Erosion or site control including plans, permits, implementation, inspection, etc. 7. Reinstatement of service laterals (other than by internal means only) or lateral rehabilitation or service reconnections of any kind, including but not limited to pipe bursting or open cut replacement. 8. Dewatering, grouting, monitoring, point repairs (internal or open cut), new installation, structure modification, etc. to be handled by Others if required. 9. This quote includes up to (1) 4” trash pump & 400’ of lay flat discharge hose to bypass normal flow conditions within the Inliner Solutions, LLC work-zone. Any additional equipment will be priced separately or provided by Others. 10. Traffic control outside of temporary signs & cones. 11. Testing outside of material physical properties. 12. Site restoration of any kind including but not limited to grading, grassing, concrete, or asphalt work. 13. Any permits or fees, including fees for water source for pipe cleaning or CIPP. Source and any associated fees to be provided by Others. 14. Changes in pipe diameter, quantities, liner thickness, or lengths (overall or segmental) could result in pricing changes. Pricing based on completing all listed quantities in one mobilization. 15. Costs for site specific training/badging (safety, security, or otherwise). 16. Any work not specifically detailed in this proposal. 17. This proposal pricing does not include Inliner Solutions, LLC being signatory to outside labor agreement. This includes any reference to union, project labor, or similar agreements. Any outside project labor agreement must be explicitly provided to Inliner Solutions, LLC during the proposal process. 18. Pricing firm for 30 days from date of this proposal. This proposal shall become an exhibit or attachment to any contractual agreement. After expiration, this proposal is deemed invalid or subject to adjustment and reissued accordingly. 19. Proposal pricing based on net 45-day net payment terms from the date of invoice, with no retainage held. Thank you for the opportunity to offer you this proposal. Should you have any questions or require additional information, please do not hesitate to contact me. Sincerely, Inliner Solutions, LLC Cristina Ribaudo Cristina Ribaudo Junior Estimator 708-986-4559 Cristina.ribaudo@puriscorp.com