HomeMy WebLinkAboutItem #09 Award of Construction Contract to Southern Sites - West Road
,-
'--0, s-\-v~ WAe-c\ 0(\ da\S
center of GOOd L .
~.....'.....~.'.... I~.~........ ~oif\' \ S-\ d-tOl
?Q~OEHll'
AGENDA ITEM COVER SHEET
Meeting Date: January 15, 2008
Item # Ci
7/U~
Contact Name:
Contact Number:
David A. Wheeler
407 -905-3100, ext. 1505
Reviewed By:
Department Director:
City Manager:
Subject: Award of Construction Contract to Southern Site Works, Inc. for Construction of Turn Lanes on
West Road and Piggyback Contract with Orange County West Road Realignment Contract
Background Summary:
The West Road Realignment Proj~ct (also known as Clarcona-Ocoee Road from Ocoee-Apopka Road (CR 437)
to SR 429 County Project No. CIP 3038 West) is being undertaken by Orange County and is under construction at
this time. The project consists of the realigning of West Road from SR 429 to Ocoee-Apopka Road, forming a
"plus" intersection with Ocoee Crown Point Parkway, constructing a four lane urban road section, widening
portions of Ocoee-Apopka Road for improved left turning movements, and providing drainage improvements for
the road project.
The Turn Lanes on West Road Project consists of constructing two right turn lanes and one left lane from West
Road into the Fountains West commercial development within the road right-of-way. The turn lanes were a
requirement of the City because of the magnitude of the commercial development and the associated traffic
impacts on the road. The developer should have paid Orange County to include the turn lanes into its project.
However, through a developer agreement amendment, Ocoe, LLC - Halverson, Inc., agreed to pay the City of
Ocoee and let the City negotiate with Orange County for the turn lanes. The developer, Ocoe, LLC - Halverson,
Inc. has paid the City of Ocoee $200,000 for the construction of the turn lanes. The City staff has been working
closely with Orange County with regards to the realignment construction and was able to roll the turn lanes into the
project, but waited until after Orange County awarded their project.
The City contracted with the same consultant that Orange County employed to perform the design of the turn
lanes and the meshing of the turn lanes into the current construction project. The consultant, Inwood Consluting
Engineers, Inc., completed the design and obtained approval from Orange County for the addition of the turn lanes
prior to the break for the Christmas holidays. Using the contractor's bid, Inwood was able to provide the additional
material quantities and estimated cost based upon the bid prices in the County's contract. The cost for the turn
lanes was estimated at $134,356.00 using the bid prices. In essence Ocoee is "piggybacking" on the Orange
County contract for the West Road Realignment Project to construct the turn lanes as part of that same project.
Orange County allowed the City to negotiate directly with the County's contractor, Southern Site Works, Inc.
Southern Site Works, Inc. accepted the cost for the turn lanes but has requested an additional $3,046.00 for bonds
and insurance as it would relate to a separate project and not a change order to an existing project. As a
reference had the work been change ordered into the County's project, the contractor would be including
additional bond costs, too. Therefore the total project cost is $137,402.00. Southern Site Works, Inc. is not
looking for any increase in contract time as it relates to the turn lanes, they are projecting that they will be
completed according to their end date per their contract with Orange County at July 10, 2008.
Issue:
Whether the City of Ocoee should piggyback on the Orange County Contract to construct the West Road
Realignment Project and authorize Southern Site Works, Inc. to build turn lanes within the Orange County project.
Recommendations
Staff recommends that the City Commission authorize the Mayor and City Clerk to execute a contract with
Southern Site Works, Inc. in the amount of $137,402.00 for the Turn Lanes on West Road Project in accordance
with the following steps:
. Authorize the Engineering and Public Utilities Departments to execute the Notices of Intent To Award
and secure executed contract documents, bonds and insurance from the contractor.
. Authorize the Mayor and City Clerk to execute the contracts with Southern Site Works, Inc. at such time
as the contract documents are reviewed for compliance by staff and legal counsel, as needed.
Attachments:
Letter from Inwood Consulting Engineers, Inc.
Letter from Southern Site Works, Inc.
Financial Impact:
This project is funded through the Road Impact Fund from funds provided to the City by Deoe, LLC - Halverson,
Inc.
Type of Item: (please marl< with an "x')
Public Hearing
== Ordinance First Reading
Resolution
Commission Approval
Discussion & Direction
For Clerk's Dept Use:
_ Consent Agenda
_ Public Hearing
_ Regular Agenda
_ Original Document/Contract Attached for Execution by City Clerk
_ Original Document/Contract Held by Department for Execution
Reviewed by City Attorney
Reviewed by Finance Dept.
Reviewed by ( )
~l~Of~
N/A
N/A
N/A
January 15,2008
OCE-OO 1-0 1
David Wheeler
City Engineer, City of Ocoee
150 North Lakeshore Drive
Ocoee, FL 34761
RE: West Road Plans Revisions
Inwood Consulting Engineers has completed the design of the West Road Extension Plans Modifications
to include turn lanes into the site on the northeast comer of West Road and Ocoee Apopka Road. The
plans were submitted and accepted by Orange County. The contractor, Southern Site Works, is currently
constructing the West Road Extension per the original design plans. The plans revisions have been
completed prior to completion of a substantial portion of the construction of the original design allowing
the revisions to be incorporated without significant reconstruction or delay.
In order to realize the full potential cost savings of incorporating the new turn lanes into the construction
. of the original design, it is recommended that the City of Ocoee select Southern Site Works to
accomplish the construction. mwood has prepared a cost estimate using the bid unit prices for the
original project and the difference in quantities between the original design and the revised design. The
cost estimate separates premium costs to the City of Ocoee and a potential cost savings to Orange
County.
Thank you for the opportunity to work with you and your staff. Inwood will continue to work with the
City, County and Contractor to make sure the project is successful. Please contact.me immediately if you
need any assistance.
Very truly yours,
Derek D. Dean, P.E.
Associate Principal
cc: Roberto Ng, File
.,' . ~ ....:.i "" :~',.'A: .,,,,' _, ,.;. ':\'~:::.:.'.:>'..:..>.'
. . - '-, ~ .:": . . ".', ",' ..' . . . ',;',.' ,~. ",
,.,~ -.-,-.--- '---;~:;b-'a~;k,'-~~~~i.~'6~;k.'::~t'~'~~~~~-~-;~~:-4~{~~;;"~J~td!;:~'~~07.971;B955
I. ~~~~~,i~-ooo, ":d~'~'::\;'~}"":~':':"" <. "-.~':;' . ...". ..-......::. . :.'.~:>._~:.:-::;:.,::~::'?;\::<~. ,'.....'..'...:.
. .,' ...... '-. '.
... -\ -,.~.~ ,', . .; .. ,,-;:..' ";.." .
I
I
I
I
1
~
1
,
1
I
i
1
I
!
I
I
i
I
I
!
I
,
I
j
I
,
~
I
I
j
I
1
j
i
1
J
j
!
I
1
i
I
I
I
i
I
I
CHANGE IN COST ESTIMATE
Clarcona Ocoee Road from Ocoee Apopka Road to SR 429
COUNTY PROJECT No. 3038 West
PROJECT LENGTH = 0.454 Miles
Please be advised that this Estimate is based on Final Roadway Plans
and was prepared for informational purposes only/
The Quantities and costs shown below are approximate onlv,
J
~
I
'I
i
,I
J
j
]
j
j
1
1
J
]
j
~
1
L
160-4- T e B Stabilization SY 2,070 $2.55 $5.278.50
285-709- Base (12" son Cement) SY 2,092 $19.50 $40,794.00
331-72-34 T pe S Asphaltic Cone. (Inc. B~.) (3.5") SY 2.092 $16.75 $35,041.00
337-5-3 Aspha"ic Cone. Friction Course Rubber) (I") (FG-3) SY 2,092 $7.75 $16.213.00
339-1 Miscellaneous Ash halt Pavement TN 0.7 $118.00 $82.80
430-11-325 Cone. Pipe Culvert (S.S.)(Class 11I)(18") LF 252 $32.75 $8,253.00
430-11-333 Cone. Pipe Culvert (S.S.}(Class 11I)(30") LF 51 $54.50 $2,n9.50
430-11-334 Cone. Pipe Culvert (S.S.)(Class 11I)(48") LF 19 $129.50 $2,460.50
430-982.402 Milered End Section (C.D.)(Enlptical Cone. Pipe) 14"x23") EA 1 $t .125.00 $1.125.00
430-984-225 Mitered End Section (S.D.)(Conc. Pipe Round)(18") EA 5 $2,000.00 $10.000.00
520.1-10 Cone. Curb and Gutter T pe F LF 143 $14.25 $2,037.75
522-1 Cone. Sidewalk, 4" Thick SY 160 $41.00 $6,560.00
700-40- I SIGN SINGLE POST (LESS THAN 12) AS 4 $ 275.00 $1,100.00
706-3 REFLECTIVE PAVEMENT MARKERS EA 10 $ 4.25 $42.50
710-29 REFLECTIVE PAINT (ISLAND NOSE (WHITE) SY 0.7 $ 8.00 $5.60
710-30 REFLECTIVE PAINT (ISLAND NOSE) (YELLOW) SY 3.8 $ 8.00 $30.40
711-4 DIRECTIONAL ARROWS THERMO EA 12 $ 75.00 $900.00
711-33 SKIP TRAFFIC STRIPE THERMO (6' WHITE 2'- 4' SKIP) LF 82 $ 1.30 $106.60
711-35-81 SOUD TRAFFIC STRIPE THERMO (8' WHITE) LF 55 $ 1.15 $63.25
711-35.181 SOUD TRAFFIC STRIPE THERMO (18' WHITE) LF 33 $ 2.40 $79.20
711-35-241 SOUD TRAFFIC STRIPE THERMO (24" WHITE) LF 40 $ 5.75 $230.00
711-36-181 SOUD TRAFFIC STRIPE THERMO (18' YELLOW) LF 26 $ 2.40 $62.40
711-37-61 SOLID TRAFFIC STRIPE THERMO (6' WHITE) NM 0.075 $ 3,960.00 $297.00
711-37-121 SOUD TRAFFIC STRIPE THERMO (12" WHITE) LF 354.0 $ 2.30 $814.20
ESTIMATED COST OF TURN LANES $134,356,001
~OUTHERN
Q.TEQORKS
Complete Site Development
. ~6? () BOl:p.h R(IUd . Ic:phyrhi lis FL 3:\5'-11 . (8('0) q73-! 178 . PH (813 ) 788-6087 . FX (S 1:;) 738-61 :'i(, .
January 15,2008
Mr. David Wheeler
1 50 North lakeshore Drive
Ocoee, FL 34761
Re: Additional work at Clarcona-Qcoee /West Road
Dear Mr. Wheeler,
This letter is confirmation that Southern Site Works inc, agrees to do the additional work required for the
turn lane improvements on Clarcona-Qcoee road. And that we agree with the quantities and prices as
provided by Inwood Consulting Engineers that total $134,356.00 with the exception that the additional
cost of $3,046.00 be added to cover the cost of a bond(s} for a total of $137,404.00.
Sincerely,
Alan Peckham
Southern Site Works
WW\V.SOUTH ER ;\Sl T EWORKS.COM