Loading...
HomeMy WebLinkAboutItem #03 Approval of Change Order No. 1 for Utilities Building AGENDA ITEM COVER SHEET Meeting Date: September 16, 2008 Item # -8 Contact Name: Contact Number: Charles K. Smith, P.E. 407 -905-3100 ext. 4000 Reviewed By: Department Director: Charles K. Smith City Manager: Robert Frank Subject: Change order to Utilities Administration Building, Project B08-05 Background Summary: The Utilities Department is submitting Change Order #1 to the Utilities Administration Building contract with Southern Building Services, Inc., for Commission approval. The contractor was tasked to submit the construction plans for building review which took thirty (30) days to complete, thus delaying the beginning of construction. Utilities staff is recommending the addition of public services of a bulk reclaim fill and a RV sanitary dump by having the contractor pour the concrete pad for a station. During the building design, the front porch wrap of columns and railings, and the north sidewalk were removed from the plans for value engineering. Based on a bid that was lower than anticipated, staff is recommending the re-inclusion of these items into the building construction. The sidewalk between the Jim Beech Recreation Center and the administration building will provide pedestrian access between both facilities. It is anticipated that the administrative conference/training room will be utilized by both Recreation and Utilities. The Jim Beech Recreation Center is scheduled to be repainted and to ensure color adherence and the elimination of mobilization charges; staff is recommending both buildings be painted by the same painter. Finally, the Utilities department desires to construct the building to be consistent with the SJRWMD WaterStar program for practical conservation and for future demonstration. Issue: Should the Mayor and Commission approve Change Order #1 to the Utilities Administration Building contract, in the amount of $17,946.00? Recommendations Motion to approve Change Order #1 to the Utilities Administration Building contract; including extension of contract by thirty (30) days, addition of a reclaim fill and RV dump station and pedestrian sidewalks, addition of finish of the front building columns, painting of the Jim Beech Recreation Center and modification of the building's plumbing to meet WaterStar standards in the amount of $17,946.00. Attachments: Proposal from Southern Building Services Inc.; and Change Order #1, to be executed. Financial Impact: 1 Connection Sidewalk ($1,415.50) funds shall come from Contractual Services 401-533-00-3400. North sidewalk ($1,970.10) and finish to columns & railing ($6,493.00) funds to come from unencumbered project funding 408-531-00-6302, Job # 31901. Fill/RV Dump station concrete work ($1,114.40) to come from 401- 535-00-3400. Beech Center painting: ($6,000.00) was budgeted this year and comes from 001-572-00- 3400. Finally, WaterStar Plumbing upgrades ($953.00) are to come from the POWR budget, 401-531-00- 4005, Job # 30711. No additional increases and/or change order are anticipated with building construction. Type of Item: (please mark with an "x'? _ Public Hearing Ordinance First Reading - Ordinance Second Reading Resolution _ Commission Approval Discussion & Direction For Clerk's Deat Use: _ Consent Agenda _ Public Hearing _ Regular Agenda _ Original Document/Contract Attached for Execution by City Clerk _ Original Document/Contract Held by Department for Execution Reviewed by City Attorney Reviewed by Finance Dept. Reviewed by ( ) N/A N/A N/A 2 Southern Building . el'Vlces, nc. Licensed General Contractor PROPOSAL Established 1998 September 5, 2008 Attention: City ofOcoee-Utilities Department Regarding: Additional Sidewalk Jim Beech Rec. Center Painting Columns, beam wrap and handrails Fixture Upgrades The quote is based on your request on July 28, 2008 at 8:00am on site. Dear, Charles Smith This is a proposal to furnish all the necessary labor, equipment and materials to complete the additional sidewalk from the parking lot of the Jim Beech Rec. Center. Also to Paint, caulk and protect all surrounding areas with plastic and tarps to keep from over spraying. This work will be done at the Jim Beech Rec. Center. Additional work on the Utilities site will include the pump station pad per prints "sp4" dated 1/08/08. Add sidewalk to north side of the building, from the landing at door number 117 to the east till the end of the porch. The wrapping of the columns and beams on the east side of the building. We will us Hardi product to perform this. We have completed without approval for the City OfOcoee. This is also for supplying and installing a vinyl picket hand rail between all columns at the front porch area. Also to help the City of Ocoee to meet the certification Program for Water Star. That includes the purple colored piping to the water closets. Install armored/metal hoses on all sinks and water closets. Water closets to be Caroma, model Sydney 270EL ADA floor mounted. Flush shall not be any larger than 1.6 G (6L) high efficiency. Due to the order of the shower system comes as a package deal, so there is no credit on the shower heads. All fixtures to us a ~ turn shut offva1ve. Scope of Work o Layout of sidewalk and lift station pad o Removal and haul off of sod o Form sidewalk with grade ofland o Purchase and finish concrete for sidewalk o Saw cut joints every 5 foot o Removal of fonn work and clean up at sidewalk o Coordinate location of pump station pad with owner 1165 E. PLANT STREET STE. 9'" WINTER GARDEN, FL 34787'" PH 407-877-1108'" FAX 407-877-7188 This ProlJosal is tlOod (or 30 dava Southern Building . erVlCeS, nc. Licensed General Contractor o Form pad according to drawings o Purchase and finish concrete for lift station pad Established J 998 o Slop pad according to drawings o Removal of form work and clean up lift station pad o Pressure wash and clean the Jim Beech Rec. Center Building o Protect all non painted surfaces W Itarps and plastic oRe-Caulk all failed caulk joints o Apply an elastomeric sealant to area of the walls were building stress cracks visible o Primer coat shall be an Sherwin-Williams loxon guide o Two finish coats shall be an Sherwin-Williams A-IOO Latex . 0 Clean up of all overspray if encountered and trash created o Wrapping of the columns and beams on the east side of the building. We- will us Hardi product to perform this. o This is also for supplying and installing a picket hand rail between all columns at the front porch area. We wiUleave opening in front of east door and north side of the building were the side walk is going to be added. o Purple painted CPVC o Armored/metal hoses o Caroma type water closet o 1.5 gpm maximum on all faucets o 1.t turn shut off valves Cost: Seventeen thousand nine hundred (om six dollars and 00/100 $17,946.00 Notes: Due to vermitting issues our start was delayed · We are requesting our contract end date to be extended 30 calendar davs · Original contract end date(12/17/08)Proposed contract end date(1/14/09) · No General ditions will be re uested at this time and discuss scope of work, as well as any pricing questions. 1165 E. PLANT STREET STE. 9 * WINTER GARDEN, FL 34787 * PH 407-877-1108 * FAX 407-8V.J-7188 This Proposal is flood for 30 davs Southern Building erVlces, nc. Licenud Gmenzl Contractor established 1998 C.O.1 Subs Cemex Olvera Concrete 11.5 yds 565 sf $2,000.00 $2,100.00 Sub-Total $4,100.00 Sub-Total $4,100.00 $4.100.00 SSS Bobcat mobilization $300.00 Bobcat operator 1 .5 hour $100.00 $0.00 Sub Total $400.00 0.00% $0.00 $400.00 Sub-Total $4,500.00 Nor+h 51 cleV\fClll( ~ $4,500.00 L1Cf, 5:' =*. 5-*1}..q(o Sub-Total $4,500.00 Pu rn p '" $4,500.00 s-r-crh 0 n :. IYO S.-f. .~. 0, q (0 $0.00 Total $4,500.00 $4,500.00 Credits Credit COP Total $4,500.00 1165 E. PLANT STREET STE. 9 · WINTER GARDEN, FL 34787 .. PH 407-877-1108 * FAX 407-877-7188 tonnectlon tetvveeYl butldrng 9 1; I) Y is'o 50- L.lOI- 533-CD- 3YCX) Nor-t-h 5\~dLw(tj K" -~ :$ I J C1'l O. 10 -- LJ08- ~:)31 - 00- (0302 I Jobtt ~iqO ~~ S-tn.ilo on . ~ j) I) I ~LI ' L/O - L-{ 0 \ - 5:3, 'S-- (}) - 3Lf(XJ \=1\\ Southern Building . el'VJ.ces, nc. Uansed Gmmzl Ctmtnlctor Established 1998 C.O.1 Subs Zadok Mills Rough Carpenter Finish Carpenter Labor Materials 1 @ $31.00 A Hour For 16 Hours 2 @ $42.50 A Hour For 27 Hours 1 @$15.00A Hour For 8 Hours Fasteners and Caulk Sub-Total $496.00 $2,295.00 $120.00 $89.00 $3,000.00 Sub-Total $3,000.00 $3,000.00 SBS 85 Lumber 17 4x8 @ 32.41 each $550.00 sas Handrail Labor $1.600.00 Mid Atlantic Handrai Materials $1.343.00 Sub Total $3,493.00 0.00% $0.00 $3,493.00 Sub-Total $6,493.00 $6,493.00 Sub-Total $6,493.00 $6,493.00 $0.00 Total $6,493.00 $6,493.00 Credits Credit COP Total $6,493.00 1165 E. PLANT STREET STE. 9* WINTER GARDEN, FL 34787 .. PH 407-877-1108" FAX 407-877-7188 l=\ni"sh of colLlmns - W08-53J-OQ-(o3'{)2 JTC)b~3ig(J/ Southern Buildin Services, Inc. Licensed General Omtrador ESlobll3hed 1998 C.O.1 . Subs Real Painting $6,000.00 Sub-Total $6.000.00 Sub-Total $6,000.00 $6,000.00 SBS $0.00 Sub Total $0.00 0.00% $0.00 $0.00 Sub-Total $6,000.00 $6.000.00 Sub-Total $6,000.00 $6,000.00 $0.00 Total $6,000.00 $6,000.00 Credits Credit COP Total $6.000.00 . . c. ?o(:;:~\ 0..' ' 1165 E. PLANT STREET STE. 9 * WINTER GARDEN, FL 34787 * PH 407-877-1108 '* FAX 407-877-7188 ~eC- Beeel') C~nt-cr FY\1-5'l2-a)<3YOO peu rrtl () Cj' "J,J.' . Southern Buildin Services, Inc. Licensed General Contractor Established 1998 C.O.1 Subs Bordeau's Water Closet Upgrade $953.00 Sub-Total $953.00 Sub-Total $953.00 $953.00 SSS $0.00 Sub Total $0.00 0.00% $0.00 $0.00 Sub-Total $953.00 $953.00 Sub-Total $953.00 $953.00 $0.00 Total $953.00 $953.00 Credits Credit Bordeau's No Credit For Shower Heads COP Total $953.00 1165 E. PLANT STREET STE. 9 · WINTER GARDEN, FL 34787 · PH 407-877-1108. FAX 407-877-7188 , P \ lHYI b\ (19 uP9t~C\cte'S -for .' ~ r WW('r:~mr = L/Ol- S3(- OJ- YOJ'S Jl')b ~ 30f) 1/ SECTION 00842 center of Good L . <\,~e Itr~ CITY OF OCOEE 150 North Lakeshore Drive Ocoee, Florida 34761 CITY OF OCOEE CHANGE ORDER NO. PROJECT NO.: B08-05 DATE: August 16. 2008 CONTRACTOR: Southern Building Service AGREEMENT DATE: 5-07-2008 The following changes are hereby made to the CONTRACT DOCUMENTS. Original CONTRACT PRICE Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER Net Increase (Decrease) Resulting from this CHANGE ORDER The current CONTRACT PRICE including this CHANGE ORDER ORIGINAL CONTRACT TIME: $348.567.00 $348.567.00 $ 17.946.00 $366.513.00 Consecutive Calendar Days from Notice to Proceed Date: 12-17-2008 Current CONTRACT TIME adjusted by previous CHANGE ORDERS Date: 12-17-2008 Net Increase Resulting from this CHANGE ORDER Days: 30 Project B08-05 00842-1 030105 Current CONTRACT TIME Including this CHANGE ORDER CHANGES ORDERED: Date: 1-14-2009 I. GENERAL This change order is necessary to cover changes in the work to be performed under this Contract. The GENERAL CONDITION, SUPPLEMENTARY CONDITIONS, SPECIFICATIONS and all parts of the Project Manual listed in Article 1, Definitions, of the GENERAL CONDITIONS apply to and govern all work under this change order. II. REQUIRED CHANGES: 1. Thirty (30) days contract extension due to delays in building plan review. 2. Add concrete reclaim fill and RV dump station to project, concrete sidewalk from admin building to Beech Rec. Center and concrete sidewalk on north side of building from porch to side door. 3. Trim wrap 6"x6" P. T. post on porch and install picket rails between posts. 4. Paint the Beech Recreation Center. 5. Modify plumbing to assure plumbing consist with SJRWMD WaterStar Program. III. JUSTIFICATION 1. The contractor was tasked to submit the construction plans for review and coordinate the plan's review before beginning construction. The construction was delayed thirty days until plan review was completed. 2. The reclaim fill and RV dump station will add to services the Utilities Department will have available for public. Both sidewalks will provide pedestrian access between the building and the conservation laboratory area. 3. During the plan review the finish of the front building columns and porch were removed to ensure success in project bidding. It was planned that staff would complete the task but due to awarded cost of build the work is being added back into the proj ect. 4. The Beech Recreation Center is in need of painting and thus inclusion would allow for the work to be included so that both buildings would be painted at the same time. IV. NARRATIVE OF NEGOTIATIONS V. PAYMENT Change Order Description Net Increase Unit Unit Price Net Increase Item No. (Decrease (Decrease) Price Quantity 1 See Above nla nla nla nla 2 See Above 1 Lump Sum $4,500.00 $4,500.00 Project B08-05 00842-2 030105 3 See Above 4 See Above 5 See Above Total Net Increase (Decrease) Change Order No. 1 1 1 $17.946.00 Lump Sum Lump Sum Lumo Sum $6,493.00 $6000.00 $953.00 $6,493.00 $6,000.00 $953.00 VI. APPROVAL AND CHANGE AUTHORIZA nON This proposed change to the Contract is to be approved by the City of Ocoee Commission. Project B08-05 00842-3 030105 Acknowledgements: The aforementioned change, and work affected thereby, is subject to all provisions of the original contract not specifically changed by this Change Order; and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. CONTRACTOR acknowledges, by its execution and acceptance of this Change Order, that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the OWNER for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order. RECOMMENDED BY: ACCEPTED BY: CITY OF OCOEE. FLORIDA By: By: Signature Signature Date: Date: Title: Title: APPROVED BY: CITY OF OCOEE. FLORIDA Owner By: Date Attest: FOR USE AND RELIANCE ONLY BY THE CITY OF OCOEE, APPROVED AS TO FORM AND LEGALITY THIS DAY OF ,20_. APPROVED BY THE CITY OF OCOEE COMMISSION IN A MEETING HELD ON , 20_ UNDER AGENDA ITEM NO. By: City Attorney END OF SECTION Project B08-05 00842-4 030105