MINUTES OF THE SPECIAL SESSION OF THE CITY COMMISSION HELD ON
NOVEMBER 16, 1987
Mayor Ison called the meeting to order at 7:43 p.m. and led
in prayer and the pledge of allegiance.
PRESENT: Mayor Ison; Commissioners Johnson,
and Hager; City Manager Ryan; City Attorney
City Clerk Catron; City Engineer Kelley;
Financial Consultant Stanley Cohen.
Dabbs, Bateman,
Kruppenbacher;
and Special
ABSENT: None
DISCUSSION ON THE ACQUISITION OF PRIMA VISTA UTILITIES
e
Mayor Ison presented a summary of the negotiations that had
occurred between the City and Prima Vista Utilities (PVU)
since the mid 1970s. He said the City originally planned to
enter an arrangement with Winter Garden for a Joint sewer
company but then decided against the deal. In 1981 the City
began to negotiate a franchise agreement with PVU but by
1982, Ocoee had decided to pursue building its own plant. In
1983, the City considered building a plant off White Road,
then in 1984, the City began negotiations with PVU for
acquisition of the company but voted against that proposal.
Then in 1985 the City began the process of purchasing PVU.
There were further problems with the acquisition process but
negotiations continued. Mayor Ison said the two most
negative outcomes stemming from the length of time the
proceedings have drawn out were the lack of commercial
development and the strain on intergovernmental relations.
City Engineer Kelley said his firm had assisted the City in
the decision making process with on-site inspections of the
plant. He discussed proJects presently served by PVU and
future developments and commercial sites. The on-site
inspections were done mainly to estimate the cost of repairs
that need to be done to the two treatment plants. City
Engineer Kelley detailed the results of the inspections in a
formal written report to the Mayor and Commissioners but
basically referred to a one-page table containing the
summation of the costs involved (see Table 4-1 attached).
.
Barry Goodman of Altamonte Springs and President of
Residential Communities of America -- which owned the sewer
company stressed that any new State regulations that
raised the cost of treating the sewage could be passed on
directly to developers. Mr. Goodman also called attention to
Mr. Kelley's cost estimate and said that the figures were not
correctly totaled. Mr. Kelley said that Item 5 had been
changed but was not changed on the handout. It should have
read $502,000. Mr. Kelley said the bottom line figure was
correct.
1
~
-
Page 2
Special Session City Commission Meeting
November 16, 1987
City Manager Ryan told the Commission that in regards to Item
4 and Item 5, anything above $500,000 could be passed on to
developers to help pay for improvements to the system.
City Engineer Kelley introduced David Refling of Professional
Engineering Consultants. Mr. Refling explained Table 6-1
(see attached) to the Mayor and Commissioners. The table
showed the differences in the appraisal PVU had on its own
company and the one done by P.E.C. Mr. Refling stressed that
his company was not involved in Items 9-16 and that those
issues would need to be addressed by Stanley Cohen, the
City's special financial consultant.
e
Mr. Cohen presented a financial overview to the Mayor and
Commissioners. Mr. Cohen said the City would have to pay $4
million in cash as the purchase price for the sewer company.
He said the City and PVU had accomplished significant
reductions in the complexities with this latest contract.
For the $4 million in cash, Mr. Cohen said the City would
receive all the operating assets and all the assets to
encompass additional customers. The City would also receive
$2,560.000 representing prepayments from specified developers
and that this money would not have any restrictions to its
usage. Mr. Cohen told the Commission that the only
significant continuing obligation would be to make sure that
there would be capacity available when needed to service the
commercial and residential sites that would be coming on
course in the future.
The developers involved would be entering into new Developers
Agreements with the City. These agreements would provide
that developers get connections and the City would be
obligated to give those connections. Mr. Cohen said the two
maJor contingencies for dollar amounts changing were if the
Department of Environmental Resources were to change its
compliance requirements or if changes would need to be
made in dealing with the effluent disposal system. He said
if any changes were necessary due to environmental
requirements, the City could charge the developers for any
amount over $100,000. Similarly, in matters dealing with
effluent disposal, developers would pay for any costs in
excess of $500,000.
At the time of the closing, all developers would be required
to pay guaranteed revenues in the amount of $100 for each
connection (ERU) that they wanted guaranteed connections to
at a later time.
e
Mr.
risk
Cohen said these figures represented a minimal financial
to the City and that he knew this because banks were
2
e
Page 3
Special Session City Commission Meeting
November 16, 1987
willing to lend the City the money with only the sewer
company as collateral.
Mr. Cohen recommended to the Mayor and Commissioners that
they consider changing the rate structure from what was now a
flat rate, to a variable rate, such as the City now does with
the water customers.
City Engineer Kelley said his company estimated the fair
market value of the sewer system at $3,036,000 before
deductions. Mr. Cohen said the system was presently run
without a surge tank or sludge management system. The costs
for those features are $375,000 and $150,000 respectively.
PVU now hauls its sludge -- which was mostly water -- to
another site. This method was costly since water was weight
intensive. If the City were to build a new plant that
managed the sludge, then most of the water would be filtered
out and the City's expense to haul the sludge would be
greatly reduced.
e
Mr. Cohen said the only "broken" part of the present system
was the pipes, with an estimated repair cost of $100,000.
All the other improvements being talked about were meant to
make the system more cost efficient. The value of the system
without the land was estimated at $2,936,000. The mid-point
value of the land (incorporating the City's appraisal and the
present owner's appraisal) was 2,260,000. These figures
combined add up to approximately $5,200,000. In addition to
that total value, the City would also acquire $2,560,000 in
cash from the future developers. The total amounts to more
than $7,700,000 for which the City was paying $4 million in
cash. Mr. Cohen said this represented a minimal risk
transaction. Mr. Cohen reminded the Commission that the
banks were willing to advance the City the entire amount with
nothing but the sewer system itself as collateral.
Mr. Cohen asked Mr. Goodman if his presentation was an
accurate summation of the agreement and Mr. Goodman agreed.
The Mayor asked if any citizens wanted to speak. Since there
were no comments from citizens, the Mayor then asked for
comments from Commissioners. Commissioner Bateman asked the
City Manager for a cost estimate to date of attorney fees,
etc. City Manager Ryan said the amount totaled almost
$500,000 in engineering, legal, and other fees. Commissioner
Dabbs said he was pleased with what he had heard, that the
system was generally in good repair and that the financing
looked good. City Manager Ryan commented that Mr. Cohen and
City Engineer Kelley should be commended for doing such a
e
3
i
__J
e
Page 4
Special Session City Commission Meeting
November 16, 1987
good Job. Mr. Ryan urged the Commission to support the
acquisition and felt it was a "win-win" arrangement. Mayor
Ison wanted to correct Exhibit D-1 in the Developers
Agreement for the record. He said under D-1(A), the GPD
connected under Town Square Out Parcels should read "no"
instead of "yes", and under D-1(C), the 140 connections from
the Lake Olympia proJect had all been prepaid.
e
City Attorney Kruppenbacher said he had not been involved in
the negotiations because his law firm had a conflict in
representing either side. He said he was asked to review the
documents last week and his questions were handled to a large
extent through meeting with the City Manger. Mr.
Kruppenbacher reminded the Commission that he was only
looking at the documents from a legal standpoint and was not
available to comment on any financial agreements because of
his conflict. Attorney Kruppenbacher said the City also
asked him to review a list of comments from Special Legal
Counsel Jim Ade, but that he had Just received the list and
did not have ample time to review it. He therefore asked to
Commission to grant the authority to proceed further with the
finalized Purchase and Sale Agreement. Attorney
Kruppenbacher asked the Mayor and Commissioners if Staff
could finalize the terms of the agreement in final written
form for the Commission that they had discussed tonight, and
in the meantime, Mr. Kruppenbacher would review the comments
from Attorney Ade with guidance from City Manager Ryan, and
present the entire package to the Commission in the next week
or so. Attorney Kruppenbacher said he would meet with Mr.
Goodman and then with City Manager Ryan to review Attorney
Ade's comments.
Mayor Ison asked the Commissioners to continue the Public
Hearing to Monday, November 23, at 7:30 p.m. Attorney
Kruppenbacher said the approval to continue should be put in
the form of a motion and that the Commission was in affect
accepting the concept of the financial terms outlined by Mr.
Cohen and the engineering terms outlined by Mr. Kelley by
agreeing to continue the hearing. Attorney Kruppenbacher
said the final approval was subJect to the Staff having the
necessary documents ready to conclude the deal by the
November 23 meeting. Commissioner Johnson moved to accept
conceptually the financial and engineering terms as outlined
by Mr. Cohen and Mr. Kelley and Commissioner Dabbs seconded.
Commissioners Johnson, Dabbs, and Hager all were in favor.
Commissioner Bateman responded ney. Commissioner Hager moved
e
4
.
Page 5
Special Session City Commission Meeting
November 16, 1987
to continue the Public Hearing to Monday,
7:30 p.m., Commissioner Bateman seconded,
unanimous.
November 23, at
and approval was
ADJOURNMENT: 9:11 P.M.