Loading...
HomeMy WebLinkAboutResolution 84-10 RESOLUTION # 84-10 4It.orm 3517-S-FLA-Sheet 1 Revised Nov. 1983 RE-29799 10Tt0824841 24 e THIS EASEMENT AGREEMENT, Made and entered into this 24th day of August, 1984, by and between the SEABOARD SYSTEM RAILROAD, INC., a Virginia corporation, hereinafter referred to as Grantor, and CITY OF OCOEE, of the State of Florida, hereinafter referred to as the Grantee: e ~ WITNESSETH: That Grantor, for and in consideration of One Dollar to it in hand paid by Grantee, the receipt whereof is hereby acknowledged, and of the covenants and agreements to be kept and performed by Grantee as hereinafter expressed, hereby grants to Grantee an easement or right of way, within the limits hereinafter set out, for constructing and maintaining a highway or street crossing (including the usual appurtenances, such as approaches, paved roadway, curbs, gutters, sidewalks, shoulders, slopes, fills, cuts and drainage facilities) at grade across the right of way and track or tracks of Grantor at Prairie Lake Boulevard, Ocoee, Florida, said crossing being 60 feet in width, i.e., 30 feet wide on each side of a line which extends across said right of way in a northwest-southeast direction and intersects the center line of Grantor's main track at a point 1,850 feet southwestwardly measured along said center line from Milepost AVB-836; the travelway of said crossing being shown outlined in red on print of Grantor's Drawing No. 3971-102, dated July 31, 1984, attached hereto and made a part hereof; Grantor's right of way being 30 feet wide on each side of said center line. And Grantee hereby covenants and agrees in consideration of said easement: l(a). Said crossing shall be constructed at the cost and expense of Grantee, but in a manner and of materials in all respects satisfactory to the Division Engineer of Grantor, and all incidental expenses necessarily incurred in connection therewith shall be borne by Grantee. After said crossing has been completed, Grantee shall maintain said crossing at its expense and in a manner in all respects satisfactory to said Division Engineer, except, however, Grantor shall maintain, but at Grantee's expense, the portion of said crossing between the rails of said track(s) and for two feet on the outside of each rail thereof. e (b). Simultaneously with the execution of this agreement by the Grantee, the Grantee hereby agrees to deposit with Grantor the sum of $74,866.00, being the estimated amount of the cost of the work to be performed by Grantor and the materials to be furnished by Grantor in connection with the construction of said crossing; said estimated amount of $74,866.00 being divided as follows: (i) $18,366.00 for constructing a Type "R" Rubber Crossing in accordance with FDOT Index No. 560 - which will involve the portion of said crossing between the rails of said main track and for two feet on the outside of each rail thereof; said estimate being per the statement dated August 3, 1984, attached hereto and made a part hereof, and (ii) $56,500.00 for furnishing and installing a Class III Type III, automatic train activating traffic control device; the installation of which shall be in accordance with FDOT Standard Index No. 17882; said estimate being per the statement dated August 13, 1984, prepared by Grantor's Office of Chief Engineer Communications and Signals, also attached hereto and made a part hereof. In the event said deposit is less than the actual cost borne by Grantor, the Grantee shall also, upon receipt of bill rendered by Grantor, e 4Itorm 3S17-S-FLA-Sheet 2 Revised Nov. 1983 -l promptly pay such additional cost to Grantor. Should said deposit be in excess of the actual cost borne by Grantor, the Grantor shall promptly refund the difference to the Grantee. Upon completion of the construction of said crossing, Grantor shall furnish to Grantee a detailed statement showing the cost of the work, including materials used for construction of said crossing, including signals. - (c). After said signals have been placed in service, Grantor will operate and maintain said signals at the expense of the Grantee. The Grantee will pay to the Grantor, upon presentation of bill at the end of each year as long as said signals remain in service, the current rate of $980.00 for maintaining a Class III, Type III, signal installation. Rates for signal maintenance will be reviewed periodically, if rate should change, the amount billed will be revised accordingly. In addition to said sum for signal maintenance to be paid by the Grantee to the Grantor, the Grantee will be obligated, within sixty days after receipt of itemized bill from the Grantor, to (i) reimburse the Grantor for the cost of upgrading said signals to prevent obsolescence and (ii) reimburse the Grantor for the cost of repairing, or replacing, said signals as a result of damages thereto, howsoever resulting. L Cd). be open to operation. The Grantee understands and agrees that said crossing shall not public use until said signals have been installed and are in 2. At such time that the Grantor performs maintenance or repairs to trackage at said crossing, the Grantee will, during such time and at the directions of the Grantor, either close said crossing to traffic or provide flagging protection (and temporary detour grade crossing, if deemed necessary) at Grantee's expense. 3. The cost of all work performed by Grantor (including flagging and engineering services, if any) and all materials furnished by Grantor within the scope of this agreement to which Grantee is obligated to reimburse Grantor for the cost thereof shall have surcharges added thereto in accordance with Federal-Aid Highway Program Manual Transmittal 129, dated April 26, 1975, in effect at the time the work is accomplished. All other accounting and reimbursement shall be in accordance with Grantor's usual practice in effect for similar work at the time the project is in progress. e 4. The Grantee, for and in consideration of the privileges and benefits granted by the Grantor, and benefits flowing therefrom unto Grantee, agrees to save harmless Grantor, its successors and assigns, from any and all claims, including attorneys' fees, arising out of any suit, on account of personal injuries or damage to property of whatsoever nature arising during the construction or reconstruction of said crossing; and Grantee agrees to indemnify and save harmless Grantor, its successors and assigns, from any and all damages, including attorneys' fees, that might occur to Grantor on account of improper or faulty drainage at said crossing due to the construction or reconstruction thereof. Sea). The Grantor reserves the right at any time, if it so desires, to construct an additional track or tracks across said crossing; in such event, Grantor shall have the right and is hereby granted the privilege to remove any paving from said crossing to the extent necessary for the construction of said track or tracks and, upon completion of the trackage construction, e 4Itorm 3517-S-FLA-Sheet 3 Revised Nov. 1983 e Grantor will, but at Grantee's entire cost and expense, (i) restore said crossing and (ii) install flange boards between the rails of said track or tracks and for two feet on the outside of each rail thereof; thereafter, Grantor will, but at Grantee's expense, maintain the portion of said crossing between the rails of said track or tracks and for two feet on the outside of each rail thereof. In the event relocation of signals is required due to construction of said track or tracks, the cost thereof shall also be borne by Grantee. < "- (b). The Grantor also reserves the right at any time, if it so desires, to remove (abandon) any trackage located within the limits of said crossing; in such event Grantor shall have the right and is hereby granted the privilege to remove any paving from said crossing to the extent necessary for the removal of said trackage and, upon completion of said trackage removal, Grantee will restore said crossing at Grantee's entire cost and expense. 6. Grantee understands that this agreement does not allow Grantee to install or permit the installation of any other utility within the limits of the crossing described herein. 7. In consideration for the easement hereby granted, it is expressly agreed that the Grantor shall not at any time or in any manner be assessed with the cost or any part of the cost of the construction and maintenance of any improvement constructed now or at any time in the future on or adjacent to said crossing. It is understood and agreed that this easement agreement shall not be binding until it has been authorized or ratified by a proper ordinance or resolution of the Board of City Commissioners of Ocoee, Florida, a certified copy of which ordinance or resolution is attached hereto and made a part hereof. IN WITNESS WHEREOF the parties hereto have executed these presents in duplicate the day and year first above written. Witnesses for Grantor: SEABOARD SYSTEM RAILROAD, INC.: By (L.S.) Witnesses for Grantee: CITY OF OCOEE, FLORIDA: - 1~6' By~~JLj Mayor (L. S.) Attes~G..t1trr~ 3<CLuln~L) Deputy City Clerk ------- It e /1,~ - -,/ .'0"'. .. ~ OCDee. 2 P it>' c... Ora; r.a~ e p; p" 1-0 he i.1S failed flS ,ecru/red aJ RAN.G E COUH TY .>)r- ffj i ~ ~O SYSTEM RAILROAD \ I: ~ TAtJPA, FLORIDA \ OFC'\CE. OF D\\I\~\ON ENG!NEEP . ' ~-.c7,~-_. ,--------' . ,;c"ou' -~- ' ,------ , -' _S8D ~lvI Clqrcc"l{ -'T \ IBS 0' t' (1f I>V8-83' I ~ rc) seD f./rV' ..-- \ l \ l ::,'''':'ALE I I : 2:~~ 7_31_B~q?I-I02- - OCOEEJ FL. DA~E J 1/ =- 5()' - ~ e ~.... 'e /?Iu1: {;f"'J'.f"~, - G,.../~ AV8 'J.>. ,~- ESTIMATED COST OF WORK TO BE PERFORMED BY SBD RAILROAD COMPANY IN CONNECTION WITH e L,;n.1f"'"ef Pt'./r"~ L#k~ Sf".,/, (I,,''';J IG,.It''! JKSI" $'111/' I1fJ AV8.,fJ~ {)clJ~e , Ft. .. I. Engineering: II. Inspection & Supervision III. Accounting: IV. Crossing Work: A. Remove existing crossing, hrs. @ $ Replace j I crossties @ $ J2..$O, ..!:LL hrs. @ $ /1./1, Replace IS/' ft. of 9".5"' lb. rail with JGO lb. rail, ~ hrs. @ $II.//' (Material $ 7.'11) - Install 2. field welds @ $ /'0, ~ hrs. @ $ JJ.. /'7 Install IpD/"..!' lb. offset joints @ $ l/f.j- . Install ~ft. subgrade filter fabric, ~hrs. @ II., I, (Material $ ISJ ) Install LIS ft. Ty(t'.'. ~ ". JPD Ii crossing, 1!:1!i.-hrs. @ 11.11. (Material $J~250) Surface track ~c.y. ballast (Material $ 2.)..r ), ~hrs. @ $ 'I.lb Other: Other: Freight & Handling: State Tax: Arbitraries: e IV. B. Equipment Rental: Total for Crossing Work '/I,e 1, f ~ $ $ $ /2.0 1..1{ I) /I?t/ $ '113 9/1 2.72. '19..r I ~1. ) 2) 1'.57 5.32 tift 37" 72.0 J~ '1472. . . " e , 'e ,. .. --. . V. Communication Work: See estimate in the amount of $ a part of this estimate. VI. Signal Work: e See estimate in the amount of $ made a part of this estimate. VII. Barricade Service: days @ $ VI II . Paving Work: tons asphalt $ SUMMARY I. Engineering: II. Inspection & Supervision: III. Accounting: IV. Crossing Work: V. Communication Work: VI. Signal Work: VII. Barricade Service: VII I . Paving Work R/w: Crt?J,r""./ - ~..o./.. AV8-F.JJ":I.J- attached to and made ~..pe. 2 , f .4 attached to and per day in Place Total Estimated Cost e SBD Railroad Company Office: p/t/'a.fI#'" EnJ"tf'~'" Location: 74_/." Fl.. DAte: 8'jJ/Sl/ $ I JI /I".;tliu-., $ By 11~1'1''r...r $ I~D , < $ 1/-/P $ /P,'1 $ '1 '1P;J.. $ ~{. I.L J. $ NIt rlVl. $ By /IN/,'r..-I $ 8, /In/h..,-I $ /1;3" . , .. , . ~EABOARD SYSTEM RAILKUAU e To: City of Ocoee Project Ref. County: Orange location: Ocoee. Fla. SSO Mile Post: AVB-836.35 Route: Prairie Lake Blvd. Crossing Inv. No. Des cri pti on: Install automatic highway crossing flashing light signals. gates and bells. e " Estimated Cost '. Material Cost $26.000 Sa les Tax 1.300 Handling Transportation to Project 1.300 500 Total Materi a1 Cost Credit for Released Material' $29.100 00 Net Material Cost Supplemental Annuity on Labor Travel Allowance and Lodging Transportation of Equipment to Project Equipment Rental Estimated Material and Labor Cost Contingencies ~OTAL ESTIMATED COST $29.100 1.500 873 2.373 12.506 5.980 $18.486 96 2.000 120 1.635 II Engineering Plus Composite Additive Total Engineering Construction Labor Plus Composite Additive Total Construction Labor " $53.810 2.690 $56.500 Railroad Portion Outside Party Estimated Cost Office of Chief Communications & Signals Officer Jacksonville, Fla. Date: 8-13-84 - cvs 00 $56.500 ~..~,. ~ . . e SEABOARD SYSTEM RAILROAD e .. '. .' To: City of Ocoee Project Ref.: County: Orange lOlion: Ocoee, Fla. SBD Mile Post: AVB-836.35 Route: Prairie Lake Blvd. Drawing No. Crossing lnv. No. Description: Install automatic highway crossing flashing light signals. gates and bells. Estimate of Signal Material and Cost 1 - Lot control equipment, including cases. control apparatus, rectifiers. lightning protective devices. etc. $8,848 1 - Lo~ field materials, including foundations. pipe, cables. battery, battery boxes. insulated rail joints, etc. 8,970 2 - Combination gate and signal assembly. complete with 28-ft. arm and 4 lamp units on mast 8,182 Material Cost $26,000 . Office of Chief Communications and Signals Officer Jacksonville, Fla. Date: 8-13-84 - cvs e . . . - Form 3517-S-FLA-Sheet 4 Revised Nov. 1983 Extracts from minutes of meeting of the Board of City Commissioners of the City of Ocoee, Florida, held on the ~ day of ffo~b'((-, 199( RESOLUTION ~ e Be it resolved by the Board of City Commissioners of the City of Ocoee, Florida, in regular meeting assembled that the Mayor of said City be, and he hereby is, authorized to enter into an agreement with the SEABOARD SYSTEM RAILROAD, INC., and to sign same on behalf of said City whereby said Railroad Company grants to said City an easement or right of way for constructing and maintaining a highway or street crossing at Prairie Lake Boulevard, Ocoee, Florida, as particularly described in said agreement, which agreement is dated August 24, 1984, a copy of which agreement is filed with the Board of City Commissioners. I certify the above to be a true and correct copy. J~ ;j~cLj) Clerk e