HomeMy WebLinkAboutEmergency Item #04 Change Order No. 2 with R.A. Scott Construction Co. for Blackwood Ave. 16-inch Reclaimed Water Main Project AGENDA ITEM COVER SHEET Meeting Date: October 6, 2009 Item # t-JY\~en('1 ~~ /M~ t fJ~lJjeJr , Reviewed By: Department Director: City Manager: Contact Name: Contact Number: Al Butler 407-905-3100 Ext 1543 Subject: Change Order No.2 with R.A. Scott Construction Company for Blackwood Avenue 16-Inch Reclaimed Water Main Project Background Summary: The above project includes construction of a reclaimed water distribution system extension at Blackwood Avenue and S.R.50. The project consists of the installation of 16-inch (16") ductile iron reclaimed water main from north of Old Winter Garden Road and across S.R50 connecting to an existing 16" reclaimed water main that was constructed as part of Ocoee Commons PUD. The S.R50 right-of-way crossing includes 16" reclaimed pipe installation within a 30" steel casing pipe. The current S.R.50 widening project plans were taken into account during design of this reclaimed water project. Change Order No.2 in the amount of$40,616.00 adds 2 items: 1. An Air Release Valve (ARV) on the new 16" reclaimed main and 2. Forcemain work in the S.R.50 right-of-way at two locations. The ARV modification was requested by the City's Utilities Department and is anticipated to cost $3,825.00. The forcemain work in the amount of$36,791.00 allows for sewer utility work within the S.R.50 right-of-way in two locations. The first location is just north of the hospital and east of the S.R.50 crossing for the 16" reclaimed water project and the second location is south of the West Oaks Mall. The forcemain work north of the hospital includes connecting the hospital's 6" forcemain to the Ocoee Commons PUD 6" forcemain. The forcemain work south of the Mall includes connecting an existing 4" forcemain crossing originating from the southern plaza lift station that serves both the West Oaks Square rnc plaza and the Centra Care and connecting it to a 6" forcemain that resides on the West Oaks Mall property. Both forcemains are currently connected to a 12" forcemain that is slated for removal from service. Issue: The change order is needed to accommodate the Utilities Department's request for an ARV and to allow the City to realize a cost savings for the forcemain connection work that is needed to completely abandon the S.R50 12" forcemain, which is subject to frequent line breaks. Recommendations The Utilities and Engineering Departments recommend that the City Commission approve Change Order No.2 with RA. Scott Construction Company in the amount of $40,616.00 and authorize the Mayor and City Clerk to execute the Change Order. Since the RA. Scott Construction Company is already working in the S.R50 right-of-way in the immediate 1 vicinity of the work described above, the City would realize a cost savings for contractor mobilization if the forcemain work were to be timely awarded to RA. Scott. Attachments: CO #2 Form and backup documentation Financial Impact: Change Order No.2 will be paid out of previously budgeted funds for the work in the amount of $40,616.00. Type of Item: (please mark with an '~'J _ Public Hearing _ Ordinance First Reading _ Ordinance Second Reading Resolution _ Commission Approval Discussion & Direction For Clerk's Deat Use: _ Consent Agenda _ Public Hearing _ Regular Agenda _ Original Document/Contract Attached for Execution by City Clerk _ Original Document/Contract Held by Department for Execution Reviewed by City Attorney Reviewed by Finance Dept. Reviewed by 0 N/A N/A N/A 2 SECTION 00842 center of Good L . <),,'o-e - If?il} , ~ CITY OF OCOEE 150 North Lakeshore Drive Ocoee, Florida 34761 CITY OF OCOEE CHANGE ORDER NO.2 PROJECT NO.: DATE: October 6. 2009 CONTRACTOR: R. A. Scott Construction Company AGREEMENT DATE: July 22. 2009 The following changes are hereby made to the CONTRACT DOCUMENTS. Original CONTRACT PRICE $194.035.00 Current CONTRACT PRICE (includes previous Change Orders) $216.835.00 $40.616.00 Net rncrease (Decrease) resulting from this CHANGE ORDER Revised CONTRACT PRICE resulting from this CHANGE ORDER $257.451.00 ORIGINAL CONTRACT TrME: 150 Consecutive Calendar Days from Notice to Proceed dated 7/23/09 Current CONTRACT TIME (includes previous Change Orders) Days: 157 Net rncrease (Decrease) Resulting from this CHANGE ORDER Days: Q Completion Date 12/27/09 Blackwood Avenue Reclaimed Water 00842-1 CHANGES ORDERED: I. GENERAL This change order is necessary to cover changes in the work to be performed under this Contract. The GENERAL CONDrTrONS, SUPPLEMENTARY CONDrTIONS, SPECrFrCATIONS and all parts of the Project Manual listed in Article 1, Definitions, of the GENERAL CONDrTIONS apply to and govern all work under this change order. II. REQUrRED CHANGES rtem 1 - ARV - rnstallation of2" Air Release Valve including a 4'x4' concrete vault with frame and cover with the utility easement dedicated to the City of Ocoee located Ocoee Commons PUD driveway which connects to SR 50. Item 2 - rnstallation of a forcemain connection within the SR50 right-of-way. Item 2 forcemain work is located on the northern portion of SR50 (northern shoulder) between Shoppes at Ocoee (Ocoee Commons PUD) on the north and Health Central on the south. This new forcemain connection has taken into account the future SR50 widening project plans generated to date. Item 3 - Installation of a forcemain connection within the SR50 right-of-way. Item 3 forcemain work is located on the northern portion of SR50 adjacent to the Mall. This new forcemain connection has taken into account the future SR50 widening project plans generated to date. III. JUSTrFrCA TION Item 1 - Needed to satisfy request of Utilities Department. Item 2 - Needed to completely abandon the 12" SR50 forcemain which is subject to frequent line breaks. Item 3 - Needed to completely abandon the 12" SR50 forcemain which is subject to frequent line breaks. rv. NARRATIVE OF NEGOTrATIONS V. PAYMENT Change Order Description Net Increase Unit Unit Price Net Increase Item No. (Decrease) (Decrease) Quantity Price 1 Installation of 2" 1 EA $3,825.00 $3,825.00 Air Release Valve including a 4'x4' concrete vault with frame and cover. 2 Hospital FM - 1 LS $25,007.50 $36,791.00 Installation of236' of 4" HDPE forcemain via direction drilling, 22' of 4" pve via open cut, and 155' 6" PVC via open Blackwood Avenue Reclaimed Water 00842-2 cut. 3 MallFM-FMB- 1 Installation of 51 ' of 4" PVC via o )en cut method. Total Net Increase (Decrease) Change Order No. -1...- LS $11,783.50 $40,616.00 VI. APPROVAL AND CHANGE AUTHORIZA TrON This proposed change to the Contract is to be approved by the City of Ocoee Commission. Acknowledgements: The aforementioned change, and work affected thereby, is subject to all provisions of the original contract not specifically changed by this Change Order; and, It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. CONTRACTOR acknowledges, by its execution and acceptance of this Change Order, that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the OWNER for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order. RECOMMENDED BY: ACCEPTED BY: CrTY OF OCOEE. FLORIDA By: /b~ . Signature Date: {)c/xJkr {" '2005/ / Title: CJ P (Y)c?I'PJer APPROVED BY: CITY OF OCOEE. FLORIDA Owner By: Signature Date: Title: By: Date Attest: Blackwood Avenue Reclaimed Water 00842-3 FOR USE AND RELIANCE ONLY BY THE CITY OF OCOEE, APPROVED AS TO FORM AND LEGALITY THIS DAY OF ,20_, APPROVED BY THE CITY OF OCOEE COMMISSION IN A MEETING HELD ON ,20_ UNDER By: AGENDA ITEM NO. City Attorney Blackwood Avenue Reclaimed Water END OF SECTION 00842-4