HomeMy WebLinkAboutItem #06 Approval of Central Park Boat Dock Construction
1--- -
center of GOOd Lt
~
AGENDA ITEM COVER SHEET
Meeting Date: November 17, 2009
Item # lo
Contact Name:
Contact Number:
AI Butler
407 -905-3100 ext 1543
Reviewed By:
Department Director:
City Manager:
~'---
Subject: Central Park boat dock extension - District 1 (Commissioner Hood)
Background Summary:
An observation pier was recently completed on Lake Moxie in the City's Central Park. As part of the next phase
of improvements to that park, the City plans to construct a sand-bottom, non-motorized boat ramp adjacent to
the pier. The observation pier is too high above the water to serve effectively as a boat dock, so staff solicited
bids from dock construction companies to build and install a 16 ft. by 8 ft. floating platform with aluminum ramp
at the end of the pier. The floating dock, which would be placed longitudinally across the end of the higher
structure, would both eliminate the ability for illicit divers to use the higher platform and provide a means for
boating users to access their vehicles from the structure. (They would otherwise have to wade to the boat after
launching.) The cost proposal is $7,296.00 for the floating platform and gangway, plus an additional $500 to
modify the existing pier to mount the gangway. The price for the work is based on award of the similar
construction at Prairie Lake Park.
Issue:
Should the City of Dcoee execute the proposed Project Agreement with Doherty Brothers Marine Construction,
Inc., to construct a floating boat dock at Lake Moxie in Central Park?
Recommendations
The City's Engineering and Parks & Recreation departments recommend that the City Commission authorize
the Mayor and City Clerk to execute the Project Agreement as the most efficient and cost-effective way for the
City to improve boating facilities at Lake Moxie in Central Park. The specific improvement to authorize is to
construct and install a 16' x 8' floating dock with a 4' x 16' hinged aluminum ramp at the end of the existing
Central Park observation pier @ $7,796.00.
Attachment:
. Proposed Project Agreement between the City of Dcoee and Doherty Brothers Marine Construction, Inc.
. Diagram showing proposed improvement.
Financial Impact:
The $7,796.00 cost of the improvements at Central Park would be paid from the $10,709 in funds remaining in
the original FY 2009 allocation for construction of the affected boardwalk and observation pier under Job No.
30501.
Type of Item: (please mark with an "x')
Public Hearing
_ Ordinance First Reading
_ Ordinance Second Reading
Resolution
-L Commission Approval
Discussion & Direction
For Clerk's Deat Use:
_____ Consent Agenda
_____ Public Hearing
_____ Regular Agenda
~ Original Document/Contract Attached for Execution by City Clerk
_____ Original Document/Contract Held by Department for Execution
Reviewed by City Attorney
Reviewed by Finance Dept.
Reviewed by 0
~ & ff.J(QflLJt A
f
N/A
N/A
N/A
Note, only one copy of the agreement needs to be executed for the Prairie Lake Park and Central Park
construction. Staff will line through those portions of the proposal that are not accepted by the City.
2
Pile Guid
Anchoring P
Aluminum
Dock E
:..
,
i
i
,
;
;
16'-0"
~:
e -.---.-.---
- -
?~I \ D
u
..;;;;; -
\ ~ ;i:~~-
1"-.. "-..
"'-.
"
---- FI
GangwaY"'\ -"
\
==---
xtension
~ "-..
/ / L
. ---
--- ~~
L---
<>>
,-
~
p Cleat, Typ.
oating Platform
Pressure-treated
Wood Boat Dock
Dock End Detail Showing Floating Dock and Aluminum Gangway
DOHERTY BROTHERS
Marine Construction, Inc.
November 24,2009
City of Ocoee
150 North Lakeshore Drive
Ocoee, FL 34761
Attention:
Al Butler
Subject:
Prairie Lake Park Dock
Reference:
1. Baker Klein Drawings for Central Park Boardwalk
2. Your e-mail dated 10/13/2009
Dear AI,
Doherty Brothers Marine Construction, Inc. (DBMC) is pleased to offer a firm, fixed
price proposal for construction of a Wooden Dock with an option for a terminal platform.
In order to provide the City of Ocoee with greater flexibility to chose the size and scope
of the project we are providing unit pricing consistent with the recently completed
Central Park Boardwalk. Per our discussions the design will be similar to Baker Klein
drawings with the understanding there will be minor modifications and the possible
addition of a floating dock for boat access.
DockIBoardwalk Construction (8' wide):
$305.00 per LF
DockIBoardwalk Construction:
$38 per square foot
Construction of an 80' x 8' Dock:
$24,400.00
Construction of a 70' x 8' Dock
with a 12' x 12' Terminal Platform:
$26,572.00
16' x 8' Floating Dock with a 4' x 16'
Hinged Aluminum Ramp with handrail:
$7,296.00
Extend Fishing Pier at Central Park Boardwalk
Approximately 10' waterward
$6,000.00
P. O. Box 380034
Jacksonville, FL 32205
Page 1 of 4
(904) 387.3832
(904)388.6235 FAX
DOHERTY BROTHERS
Marine Construction. Inc.
Standards of Construction
Wood: Southern Yellow Pine
Non-Immersed Pressure Treatment: .40 ACQ
Immersed Pressure Treatment: .80 CCA
Dock Pilings: 9" diameter, ASTM D25
Deck Boards: No.1 Dense, Eased Edge
Nails: Hot Dip Galvanized
Threaded Fasteners: Hot Dip Galvanized
Screws: Marine Grade Stainless Steel
Wood Connectors: Simpson Strong-tie, Z-Max finish
References
1. City ofSt. Augustine Beach, London Tract Boardwalk: 8' x 1,800' elevated
boardwalk over beach dune and environmentally sensitive wetlands. Constructed
2009. POC: Mark Chattin, Director of Public Works, 904.699.4325
2. Morningstar Marinas, Mayport Marina Renovation: Replace 270' Facility
Bulkhead; Install approximately 400' concrete floating dock and approximately
300' of wood floating dock with associated concrete piles. Constructed 2009.
POC: Jack McLeod, Director of Construction, 704.907.3105
Terms and Conditions
1. ACCESS: Materials of construction shall be delivered and moved across the property to
the work site. DBMC employees shall park their vehicles in a safe and lawful manner
compliant with community rules as applicable.
2. BILLING RATE: $60.00 straight time, $90.00 overtime.
3. CHANGE ORDERS: Work not within the scope of this proposal shall be submitted and
approved in writing before commencement. Change orders shall be due with final
payment unless otherwise agreed upon in writing.
4. CONCEALED OR UNKNOWN CONDITIONS: In preparing this proposal DBMC has
assumed there are no concealed or unknown physical conditions (subsurface or
otherwise) which will aversely affect DBMC ability to perform the scope of this
proposal. If such conditions are encountered, DBMC will immediately notify the owner
in writing of adverse conditions and will be entitled to an adjustment of contract value,
schedule, or both.
5. FORCE MAJEURE: Neither party shall be liable in damages or have the right to
terminate this Agreement for any delay or default in performing hereunder if such delay
or default is caused by conditions beyond its control including, but not limited to Acts of
God, Government restrictions, and/or any other cause beyond the reasonable control of
the party whose performance is affected.
P. O. Box 380034
Jacksonville, FL 32205
Page 2 of 4
(904) 387.3832
(904)388.6235 FAX
DOHERTY BROTHERS
Marine Construction, Inc.
6. HEA VY WEATHER: During a named storm DBMC reserves the right to demobilize and
remove equipment from the jobsite without penalty for schedule delay(s).
7. INCLEMENT WEATHER: Due to the nature of outdoor construction inclement weather
may affect schedule. Every effort shall be made to maintain proposed schedule, however
DBMC shall not incur additional expenses due to weather delays.
8. INSURANCE: Certificate available upon request.
9. LANDSCAPING: Project may require use of equipment that will disturb/damage sod
and/or landscaping. No allowance is made for repair/replacement of sod or landscaping.
I O. PAYMENT SCHEDULE:
15% upon mobilization
Progress payments based upon percent complete
Balance upon final acceptance
11. PAYMENT TERMS: Due upon receipt. Interest will be charged on past due accounts at
18% per annum. IfDBMC is required to employ an attorney to collect any amount past
due as a result of default of the Buyer, the Buyer shall pay all cost of collections,
including reasonable attorney's fees and court costs.
12. PERMITS: Not included with this proposal.
13. PRICE VALIDITY: Thirty (30) days from date of quotation except stainless steel items
which are five (5) days.
14. UNDERGROUND SERVICES: Project may require excavation. Owner is responsible
for locating and identifying all underground utilities, sprinkler systems, pool piping,
septic tanks, drain fields, or other items subject to damage from equipment movement or
excavation. DBMC is not responsible for accidental damages, direct or consequential.
Any relocation required shall be the responsibility of the owner.
15 . WARRANTY: Workmanship and material will be free from defects for one (1) year
from completion and fmal acceptance. Owner shall submit in writing claim of defect
within ten (10) days of discovery. Owner's sole and exclusive remedy for defective
materials or workmanship is limited to the repair or replacement of the defect by DBMC.
16. DISCLAIMER OF WARRANTIES: Section 15 sets forth the exclusive remedy for
claims based on failure of or defects in services, workmanship, or materials furnished by
DBMC, whether claim is based on contract, warranty, tort (including negligence) or any
other cause of action, and however instituted, and upon expiration of the warranty period
all such liability shall terminate. The foregoing warranty or repair or replacement is
exclusive in lieu of all other warranties, whether written, oral, implied, or statutory. IT IS
SPECIFICALLY UNDERSTOOD AND AGREED TO BY BUYER THAT (1) DBMC
SHALL NOT IN ANY WAY BE LIABLE OR REPSONSIBLE FOR ANY
NEGLIGENT ENGINEERING, CONSTRUCTION, REPAIRS, OR DEFECTS IN THE
WORK AFTER THE EXPIRATION OF ONE YEAR FROM COMPLETION AND
FINAL ACCEPTANCE, (2) NO OTHER WARRANTIES, EXPRESS OR IMPLIED,
ARE OR WILL BE DEEMED TO HAVE BEEN MADE BY DBMC, EXCEPT THE
WARRANTY HEREINFORE SET FORTH, (3) THE IMPLIED WARRANTIES OF
MERCHANT ABILITY AND FITNESS FOR PURPOSE ARE SPECIFICALL Y
EXCLUDED, (4) THIS WARRANTY IS GIVEN IN LIEU OF ANY IMPLIED
WARRANTIES, AND (5) THER ARE NO WARRANTIES GIVEN WHICH EXTEND
BEYOND THE LANGUAGE AND DESCRIPTION ON THE FACE HEREOF.
P. O. Box 380034
Jacksonville, FL 32205
Page 3 of 4
(904) 387.3832
(904)388.6235 FAX
DOHERTY BROTHERS
Marine Construction, Inc.
17. WORKING HOURS: Monday through Friday, 8 hours per day, 7:00 A.M. to 4:00 P.M.
Thank you for the opportunity to quote your marine construction needs. If you have any
questions, please contact us at your earliest convenience.
Sincerely,
Mike Doherty
President
P. O. Box 380034
Jacksonville, FL 32205
Page 4 of 4
(904) 387.3832
(904)388.6235 FAX