HomeMy WebLinkAboutItem #06 Approval of Central Park Boat Dock Construction 1--- - center of GOOd Lt ~ AGENDA ITEM COVER SHEET Meeting Date: November 17, 2009 Item # lo Contact Name: Contact Number: AI Butler 407 -905-3100 ext 1543 Reviewed By: Department Director: City Manager: ~'--- Subject: Central Park boat dock extension - District 1 (Commissioner Hood) Background Summary: An observation pier was recently completed on Lake Moxie in the City's Central Park. As part of the next phase of improvements to that park, the City plans to construct a sand-bottom, non-motorized boat ramp adjacent to the pier. The observation pier is too high above the water to serve effectively as a boat dock, so staff solicited bids from dock construction companies to build and install a 16 ft. by 8 ft. floating platform with aluminum ramp at the end of the pier. The floating dock, which would be placed longitudinally across the end of the higher structure, would both eliminate the ability for illicit divers to use the higher platform and provide a means for boating users to access their vehicles from the structure. (They would otherwise have to wade to the boat after launching.) The cost proposal is $7,296.00 for the floating platform and gangway, plus an additional $500 to modify the existing pier to mount the gangway. The price for the work is based on award of the similar construction at Prairie Lake Park. Issue: Should the City of Dcoee execute the proposed Project Agreement with Doherty Brothers Marine Construction, Inc., to construct a floating boat dock at Lake Moxie in Central Park? Recommendations The City's Engineering and Parks & Recreation departments recommend that the City Commission authorize the Mayor and City Clerk to execute the Project Agreement as the most efficient and cost-effective way for the City to improve boating facilities at Lake Moxie in Central Park. The specific improvement to authorize is to construct and install a 16' x 8' floating dock with a 4' x 16' hinged aluminum ramp at the end of the existing Central Park observation pier @ $7,796.00. Attachment: . Proposed Project Agreement between the City of Dcoee and Doherty Brothers Marine Construction, Inc. . Diagram showing proposed improvement. Financial Impact: The $7,796.00 cost of the improvements at Central Park would be paid from the $10,709 in funds remaining in the original FY 2009 allocation for construction of the affected boardwalk and observation pier under Job No. 30501. Type of Item: (please mark with an "x') Public Hearing _ Ordinance First Reading _ Ordinance Second Reading Resolution -L Commission Approval Discussion & Direction For Clerk's Deat Use: _____ Consent Agenda _____ Public Hearing _____ Regular Agenda ~ Original Document/Contract Attached for Execution by City Clerk _____ Original Document/Contract Held by Department for Execution Reviewed by City Attorney Reviewed by Finance Dept. Reviewed by 0 ~ & ff.J(QflLJt A f N/A N/A N/A Note, only one copy of the agreement needs to be executed for the Prairie Lake Park and Central Park construction. Staff will line through those portions of the proposal that are not accepted by the City. 2 Pile Guid Anchoring P Aluminum Dock E :.. , i i , ; ; 16'-0" ~: e -.---.-.--- - - ?~I \ D u ..;;;;; - \ ~ ;i:~~- 1"-.. "-.. "'-. " ---- FI GangwaY"'\ -" \ ==--- xtension ~ "-.. / / L . --- --- ~~ L--- <>> ,- ~ p Cleat, Typ. oating Platform Pressure-treated Wood Boat Dock Dock End Detail Showing Floating Dock and Aluminum Gangway DOHERTY BROTHERS Marine Construction, Inc. November 24,2009 City of Ocoee 150 North Lakeshore Drive Ocoee, FL 34761 Attention: Al Butler Subject: Prairie Lake Park Dock Reference: 1. Baker Klein Drawings for Central Park Boardwalk 2. Your e-mail dated 10/13/2009 Dear AI, Doherty Brothers Marine Construction, Inc. (DBMC) is pleased to offer a firm, fixed price proposal for construction of a Wooden Dock with an option for a terminal platform. In order to provide the City of Ocoee with greater flexibility to chose the size and scope of the project we are providing unit pricing consistent with the recently completed Central Park Boardwalk. Per our discussions the design will be similar to Baker Klein drawings with the understanding there will be minor modifications and the possible addition of a floating dock for boat access. DockIBoardwalk Construction (8' wide): $305.00 per LF DockIBoardwalk Construction: $38 per square foot Construction of an 80' x 8' Dock: $24,400.00 Construction of a 70' x 8' Dock with a 12' x 12' Terminal Platform: $26,572.00 16' x 8' Floating Dock with a 4' x 16' Hinged Aluminum Ramp with handrail: $7,296.00 Extend Fishing Pier at Central Park Boardwalk Approximately 10' waterward $6,000.00 P. O. Box 380034 Jacksonville, FL 32205 Page 1 of 4 (904) 387.3832 (904)388.6235 FAX DOHERTY BROTHERS Marine Construction. Inc. Standards of Construction Wood: Southern Yellow Pine Non-Immersed Pressure Treatment: .40 ACQ Immersed Pressure Treatment: .80 CCA Dock Pilings: 9" diameter, ASTM D25 Deck Boards: No.1 Dense, Eased Edge Nails: Hot Dip Galvanized Threaded Fasteners: Hot Dip Galvanized Screws: Marine Grade Stainless Steel Wood Connectors: Simpson Strong-tie, Z-Max finish References 1. City ofSt. Augustine Beach, London Tract Boardwalk: 8' x 1,800' elevated boardwalk over beach dune and environmentally sensitive wetlands. Constructed 2009. POC: Mark Chattin, Director of Public Works, 904.699.4325 2. Morningstar Marinas, Mayport Marina Renovation: Replace 270' Facility Bulkhead; Install approximately 400' concrete floating dock and approximately 300' of wood floating dock with associated concrete piles. Constructed 2009. POC: Jack McLeod, Director of Construction, 704.907.3105 Terms and Conditions 1. ACCESS: Materials of construction shall be delivered and moved across the property to the work site. DBMC employees shall park their vehicles in a safe and lawful manner compliant with community rules as applicable. 2. BILLING RATE: $60.00 straight time, $90.00 overtime. 3. CHANGE ORDERS: Work not within the scope of this proposal shall be submitted and approved in writing before commencement. Change orders shall be due with final payment unless otherwise agreed upon in writing. 4. CONCEALED OR UNKNOWN CONDITIONS: In preparing this proposal DBMC has assumed there are no concealed or unknown physical conditions (subsurface or otherwise) which will aversely affect DBMC ability to perform the scope of this proposal. If such conditions are encountered, DBMC will immediately notify the owner in writing of adverse conditions and will be entitled to an adjustment of contract value, schedule, or both. 5. FORCE MAJEURE: Neither party shall be liable in damages or have the right to terminate this Agreement for any delay or default in performing hereunder if such delay or default is caused by conditions beyond its control including, but not limited to Acts of God, Government restrictions, and/or any other cause beyond the reasonable control of the party whose performance is affected. P. O. Box 380034 Jacksonville, FL 32205 Page 2 of 4 (904) 387.3832 (904)388.6235 FAX DOHERTY BROTHERS Marine Construction, Inc. 6. HEA VY WEATHER: During a named storm DBMC reserves the right to demobilize and remove equipment from the jobsite without penalty for schedule delay(s). 7. INCLEMENT WEATHER: Due to the nature of outdoor construction inclement weather may affect schedule. Every effort shall be made to maintain proposed schedule, however DBMC shall not incur additional expenses due to weather delays. 8. INSURANCE: Certificate available upon request. 9. LANDSCAPING: Project may require use of equipment that will disturb/damage sod and/or landscaping. No allowance is made for repair/replacement of sod or landscaping. I O. PAYMENT SCHEDULE: 15% upon mobilization Progress payments based upon percent complete Balance upon final acceptance 11. PAYMENT TERMS: Due upon receipt. Interest will be charged on past due accounts at 18% per annum. IfDBMC is required to employ an attorney to collect any amount past due as a result of default of the Buyer, the Buyer shall pay all cost of collections, including reasonable attorney's fees and court costs. 12. PERMITS: Not included with this proposal. 13. PRICE VALIDITY: Thirty (30) days from date of quotation except stainless steel items which are five (5) days. 14. UNDERGROUND SERVICES: Project may require excavation. Owner is responsible for locating and identifying all underground utilities, sprinkler systems, pool piping, septic tanks, drain fields, or other items subject to damage from equipment movement or excavation. DBMC is not responsible for accidental damages, direct or consequential. Any relocation required shall be the responsibility of the owner. 15 . WARRANTY: Workmanship and material will be free from defects for one (1) year from completion and fmal acceptance. Owner shall submit in writing claim of defect within ten (10) days of discovery. Owner's sole and exclusive remedy for defective materials or workmanship is limited to the repair or replacement of the defect by DBMC. 16. DISCLAIMER OF WARRANTIES: Section 15 sets forth the exclusive remedy for claims based on failure of or defects in services, workmanship, or materials furnished by DBMC, whether claim is based on contract, warranty, tort (including negligence) or any other cause of action, and however instituted, and upon expiration of the warranty period all such liability shall terminate. The foregoing warranty or repair or replacement is exclusive in lieu of all other warranties, whether written, oral, implied, or statutory. IT IS SPECIFICALLY UNDERSTOOD AND AGREED TO BY BUYER THAT (1) DBMC SHALL NOT IN ANY WAY BE LIABLE OR REPSONSIBLE FOR ANY NEGLIGENT ENGINEERING, CONSTRUCTION, REPAIRS, OR DEFECTS IN THE WORK AFTER THE EXPIRATION OF ONE YEAR FROM COMPLETION AND FINAL ACCEPTANCE, (2) NO OTHER WARRANTIES, EXPRESS OR IMPLIED, ARE OR WILL BE DEEMED TO HAVE BEEN MADE BY DBMC, EXCEPT THE WARRANTY HEREINFORE SET FORTH, (3) THE IMPLIED WARRANTIES OF MERCHANT ABILITY AND FITNESS FOR PURPOSE ARE SPECIFICALL Y EXCLUDED, (4) THIS WARRANTY IS GIVEN IN LIEU OF ANY IMPLIED WARRANTIES, AND (5) THER ARE NO WARRANTIES GIVEN WHICH EXTEND BEYOND THE LANGUAGE AND DESCRIPTION ON THE FACE HEREOF. P. O. Box 380034 Jacksonville, FL 32205 Page 3 of 4 (904) 387.3832 (904)388.6235 FAX DOHERTY BROTHERS Marine Construction, Inc. 17. WORKING HOURS: Monday through Friday, 8 hours per day, 7:00 A.M. to 4:00 P.M. Thank you for the opportunity to quote your marine construction needs. If you have any questions, please contact us at your earliest convenience. Sincerely, Mike Doherty President P. O. Box 380034 Jacksonville, FL 32205 Page 4 of 4 (904) 387.3832 (904)388.6235 FAX