Subject: Amend the existing ARRA funding agreement with the Florida DOT to reflect the actual
contract price - District 4, Commissioner Keller.
Contact Name:
Contact Number:
AI Butler ~
407-905-3100, ext. 1543
Background Summary:
The City of Ocoee received funding up to $1,675,000 from the Florida Department of
Transportation (FOOT) for rehabilitating the pavement on Clarke Road north of Silver Star Road as
part of the 2009 American Recovery and Reinvestment Act (ARRA) stimulus program for
transportation, These funds were for construction and engineering inspection of the work and
were based on historical construction costs and are provided through the FOOT Local Agency
Program (LAP).
Due to current economic conditions and the resulting increase in competitive pricing for
construction work of this type, bid prices reduced the total project cost to $1,157,651.82. As a
result of these lower costs and the need to utilize all ARRA funds in a timely manner, FOOT has
asked the City to agree to a reduction in project funding to the level of actual contract pricing.
Issue:
The Engineering Department proposes that the City Commission approve the amendment drafted
by FOOT to reduce the funding for the Clarke Road Rehabilitation project to the total of executed
construction and engineering inspection contracts, and to authorize the Mayor to execute any
documents necessary for this purpose.
Recommendations
The Engineering Department recommends that the City Commission approve the Supplemental
LAP Amendment for FPN 426342-2-58-1, Contract No. APR70 (originally executed on November
13, 2009), authorize the Mayor to execute the amendment, which will unencumber the remaining
FOOT project funds, and authorize the Finance Department to alter the project budget accordingly.
Attachments:
The draft Local Agency Program Supplemental Amendment from FOOT.
Financial Impact:
The proposed amendment will reduce committed project funds to the total of the construction and
engineering inspection contracts awarded by the City. The original funding commitment was
$1,675,000. The total construction contract value is $1,005,542.50. The total engineering inspection
1
contract's maximum limiting amount is $152,109.32. The FDOT funding commitment will be reduced
by $517,348.18 to the sum of these two contracts ($1,157,651,82). The released ARRA funds will be
made available for other Central Florida projects. The City of Ocoee has submitted three more
stimulus program road construction projects totaling slightly more than $1 million for ARRA funding.
Type of Item: (please mark with an "x'J
_ Public Hearing
_ Ordinance First Reading
Ordinance Second Reading
Resolution
Commission Approval
Discussion & Direction
For Clerk's DeDt Use:
_____ Consent Agenda
_____ Public Hearing
_____ Regular Agenda
---L Original Document/Contract Attached for Execution by City Clerk (3 originals)
_ Original Document/Contract Held by Department for Execution
Reviewed by City Attorney
Reviewed by Finance Dept.
Reviewed by ( )
~/13-;J-
N/A
N/A
N/A
2
Page 1 of 1
Butler, AI
Broxton, Yvonne [Yvonne.Broxton@dot.state.f1,us]
Monday, February 01, 201010:08 AM
Butler, AI; Elmaghraby, Ashraf; Liatsos, Bill
Horne-Harley, Edna; Patel, Tushar; Bass, Gary; Vacchiano, Vincent; Grooms, Richard;
Carmichael, Trent; Arcand, Chris; Schoelzel, Mary; Ferguson, Gene
Subject: Supplemental LAP Agreement for the City of Ocoee Stimulus Project FPN 426342-2/Clarke Rd
Attachments: FPN 426342-2 SA Clarke Road City of Ocoee.pdf
Good morning AI,
From:
Sent:
To:
Cc:
Attached is the Supplemental LAP Agreement for the above Stimulus Project for the City's
adoption and execution. Please make a minimum of 3 copies of Supplemental for council
presentation. After the City executes the Supplemental (3 Originals) please return all 3 to me
along with 1 Originally signed or notarized copy of the Resolution adopting the Agreement.
At you earliest convenience, please reply email with a date of next Council meeting. Any
questions or concerns, please feel free to call. Have a super week!
yvonne 'Broxton
Senior CCerk
Florida Department of Transportation D5
Consultant Project Management
719 S. Woodland Blvd
Deland FL 32720
Yvonne.Broxton@dot.state.f1,us
Office: (386) 943-5408
2/1/2010
525-010-32
PRODUCTION SUPPORT
02109
Pace 1 of 3
SUPPLEMENTAL NO.
1
DUNS NO,
80-939-7102
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
LOCAL AGENCY PROGRAM
SUPPLEMENTAL
AGREEMENT
FPN
426342-2-58-01
CONTRACT NO,
APR70
The STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION and the CITY OF OCOEE desires to supplement the
original Agreement entered into and executed on November 13. 2009 as identified above. All provisions in the original
Agreement and supplements, if any, remain in effect except as expressly modified by this supplement.
The changes to the Agreement and supplements, if any, are described as follows:
PROJECT DESCRIPTION
Name Clarke Road Rehabilitation
Length -2,5 miles
Termini From Silver Star Road to Clarcona-Ocoee Road
DESCRIPTION OF WORK:
The project involves milling to a depth of approximately 2.5 inches below the pavement surface and replacement with said 2,5 inches of
SP12.5/9.5 asphaltic concrete. The project also includes point repairs at selected stormwater inlets, as needed, to re-establish soil
density that may have been lost over time, Additionally, maintenance of traffic, temporary striping, permanent thermoplastic striping,
and clean-up will be required in the project, The length of the project is approximately 13,300 linear feet and involves a four lane
section from Silver Star Road to north of A.D. Mims Road and a two lane section from north of AD, Mims Road to Clarcona-Ocoee
Road
SPECIAL CONSIDERATIONS BY AGENCY:
Pursuant to Paragraph 4.0 of the Local Agency Program Agreement, the Agency and the Department acknowledge and agree that the
schedule of funding for construction (that includes the authorized and encumbered federal funding) for this American Recovery and
reinvestment Act (ARRA) project shall be reduced to an amount equal to the Agency's construction contract award amount of
$ 1,005,542.50 plus the contract amount of the Agency's CEI services contract in the amount of $ 152,109.32, for a total of
$ 1.157.651,82 , Said revision is reflected on the Schedule of Funding, attached hereto and incorporated herein, as Exhibit "A".
525-010-32
PRODUCTION SUPPORT
02/09
Pace 2 of 3
SUPPLEMENTAL NO, STATE OF FLORIOA OEPARTMENT OF TRANSPORTATION FPN
1 LOCAL AGENCY PROGRAM
SUPPLEMENTAL 426342-2-58-01
DUNS NO, AGREEMENT CONTRACT NO,
80-939-7102 APR70
FUNDING
TYPE OF WORK
By Fiscal Year (1) (2) (3) (4) (5)
PREVIOUS TOTAL ADDITIONAL CURRENT TOTAL TOTAL AGENCY TOTAL STATE &
PROJECT FUNDS PROJECT FUNDS PROJECT FUNDS FUNDS FEDERAL FUNDS
Planning
2007-2008
2008-2009
2009-2010
2010-2011
Total Plannina Cost $0.00 $0,00 $0,00 $0,00 $0.00
Project Development &
Environment (PD&E)
2007-2008
2008-2009
2009-2010
2010-2011
Total PD&E Cost $0,00 $0.00 $0.00 $0,00 $0,00
Design
2007-2008
2008-2009
2009-2010
2010-2011
Total Design Cost $0,00 $0.00 $0.00 $0.00 $0,00
Right-of-Way
2007-2008
2008-2009
2009-2010
2010-2011
Total Right-of-Way Cost $0,00 $0,00 $0.00 $0,00 $0,00
Construction
2007-2008
2008-2009
2009-2010 $1,675,000.00 $1 ,005,543,00 $1,005,543,00
2010-2011
Total Construction Cost $1.675,000.00 $0,00 $1,005.543,00 $0.00 $1,005,543.00
Construction Engineering and
Inspection (CEI)
2007-2008
2008-2009
2009-2010 $152,109,00 $152,109,00
2010-2011
Total CEI Cost $0.00 $0,00 $152,109,00 $0,00 $152,109,00
Total Construction & CEI Costs $1.675,000.00 $0.00 $1,157.652.00 $0,00 $1,157.652,00
TOTAL COST OF THE
PROJECT $1,675,000.00 $0.00 $1,157,652.00 $0.00 $1,157,652.00
Funding within State Comptrollers Office is rounded to nearest dollar, Project shall be reduced to an amount equal to the Agency's construction contract
award amount of $1,157,652,00. Project was reduced by $517,348,00
525-01()'32
PROOUCTION SUPPORT
02109
aQe 3 0 3
SUPPLEMENTAL NO, STATE OF FLORIDA OEPARTMENT OF TRANSPORTATION FPN
1 LOCAL AGENCY PROGRAM 426342-2-58-01
SUPPLEMENTAL
DUNS NO, AGREEMENT CONTRACT NO,
80-939-7102 APR70
P
IN WITNESS WHEREOF, the parties have caused these presents to be executed the day and year first above written,
AGENCY (City of Ocoee)
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
By:
Name:
Title:
By:
Name: Rise' K. Wall
Title: Director of Transportation Support
Attest:
Name:
Title:
Attest:
Name:
Title:
Date:
Date:
As to form:
As to form:
Attorney
District Attorney