Loading...
HomeMy WebLinkAboutItem #04 Approval and Authorization for the Finance Dept. to Amend the Adopted FY2011 CIP Budget to Advance the Arden park Road Capacity Project to the Current Year ` \-Ne ten ter of Good /,, e a' a "�'" .L?irke 5 --- AGENDA ITEM COVER SHEET Meeting Date: January 4, 2011 Item # Reviewed By: / ,J ' 4 4 Contact Name: Al Butler, CIP Manager Department Director: i� �/ Contact Number: 407 - 905 -3100, ext. 1543 City Manager: Subject: Approval of and authorization for the Finance Department to amend the Adopted FY 2011 CIP Budget to advance the Arden Park Road Capacity Project to the current year. (District 4 — Commissioner Keller) Background Summary: The adopted FY 2011 Capital Improvement Program Budget includes a road capacity project related to widening Clarke Road near its northern terminus at Clarcona -Ocoee Road in Fiscal Years 2014 and 2015 with a total budget of $750,000 from developer contributions. One of the developments prompting the Clarke Road construction is Arden Park, which is a residential development planned for the area north and south of Clarcona -Ocoee Road west of Clarke Road. Under the terms of the Arden Park Development Agreement, executed on November 7, 2006, the developer is to make a payment of $250,000 for construction of traffic signal control at the intersection of Clarke Road and Clarcona -Ocoee Road on or before November 7, 2010 (Para. 77, p. B -14). In the period of time since the Development Agreement was executed, Orange County has begun the widening of Clarcona -Ocoee Road and will undertake to construct that portion of the project from east of Clarke Road to SR 429 beginning in May 2011. The construction plans call for the County to install a mast -arm traffic signal at the current Tee - intersection of Clarke Road and Clarcona -Ocoee Road as part of this final phase of the project. With the planned changes to Clarke Road, staff identified an opportunity to modify the County's construction project to provide a four - legged intersection. Doing so will save substantial future costs, as it will permit construction of the Clarke Road extension without having to modify the intersection or block traffic on Clarcona -Ocoee Road. The County has agreed to work with the City to modify the construction plans to substitute a four - legged intersection conforming to a four -lane divided Clarke Road design. Stormwater structures, corner radius curbing, and intersection paving would be included in the 2011 construction project, and a foundation suitable for installation of a fourth mast -arm will be provided so the signal control can be efficiently modified in the future when the Clarke Road extension is constructed. The design firm that prepared the Clarcona -Ocoee Road construction plans for Orange County is Inwood Engineering, which is also under a continuing services contract with the City of Ocoee for engineering design work. Inwood Engineering has submitted a price proposal of $12,690.20 to make the required changes to the design documents and to estimate the construction cost impacts of the proposed intersection changes. The City Manager can authorize the Task Order for design services under the existing contract with Inwood Engineering and his established purchasing authority. Any agreement with Orange County to actually undertake the revised improvements will be submitted to the City Commission for its consideration at a later date. The current estimated increase in the cost of construction is less than $50,000, which would be funded by developer contributions. 1 Issue: The Engineering Department has proposed that the City issue a Task Order to Inwood Engineering in the amount of $12,690.20 to modify the existing Clarcona -Ocoee Road Widening Project construction plans prepared for Orange County to accommodate a full four -lane divided Clarke Road configuration. Time is of the essence, as the project is slated for bid advertising by the County in March 2011. Recommendations The Engineering Department recommends that the City Commission approve advancing the Arden Park Road Capacity Project from FYs 2014 -2015 to the current fiscal year and to include the project in the forthcoming Budget Amendment for FY 2011. Building the intersection now as part of the Orange County Clarcona -Ocoee Road Widening Project will provide significant savings to the City and other affected parties when the Clarke Road extension is constructed. Attachment: Proposal from Inwood Engineering Financial Impact: The cost of design and construction related to the intersection of Clarke Road and Clarcona -Ocoee Road will be covered by payments from the developer, as mandated under the terms of the existing Arden Park Development Agreement. The City may elect to have the developer make payments as funds are expended rather than in a lump sum. The initial cost of $12,690.20 for engineering services will be allocated to the developer's contribution in FY 2011. The portion of the City's Arden Park Road Capacity Project in FYs 2014 -2015 will remain unchanged, as it relates to the construction of the Clarke Road extension. Any agreement to pay the increased cost of construction to Orange County will be separately presented to the City Commission. Type of Item: (please mark with an "x') Public Hearing For Clerk's Dept Use: Ordinance First Reading Consent Agenda Ordinance Second Reading Public Hearing Resolution Regular Agenda X Commission Approval Discussion & Direction Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney N/A Reviewed by Finance Dept. N/A Reviewed by ( ) N/A 2 lnwoocl consulting engineers December 14, 2010 OCE- 004 -01'' Mr. Jack A. Butler City of Ocoee 150 North Lakeshore Drive Ocoee, FL 34761 RE: Intersection of Clarke Road with Clarcona Ocoee Road Reconfiguration of intersection to add north leg Mr. Butler: Thank you very much for allowing us the opportunity to provide you with a Scope of Services and Fee Estimate for the above - referenced project. The goal of this project is to modify the construction plans for Clarcona Ocoee Road West in order to accommodate a future north leg to the intersection of Clarke Road with Clarcona Ocoee Road. The modifications will include addition of the radius returns and curb ramps on the both the north and south sides of the intersection for the ultimate 4 -lane divided section. This E. would provide a stub out where the future roadways, to be built at a later date, would connect. The signal plans would also be modified to ensure that the location of all of the proposed poles and signal equipment accommodated this future expansion. Please review the attached Scope of Services and Fee Estimate from Inwood for this work. Again, thank you for allowing us this opportunity to provide engineering services to the City of Ocoee. Very truly yours, INWOOD CONSULTING ENGINEERS, INC. 4, '/ 0 a Derek D. Dean, P.E. co Associate Principal u • 0 v E 0 c L • 870 Clark Street • Oviedo, FL 32765 • tel• 407.971.8850 fax* 407.971.8955 Inwood ----consulting engineers SCOPE OF SERVICES Clarke Road Intersection with Clarcona Ocoee Road RECONFIGURATION OF INTERSECTION ADD NORTH LEG Engineering Design Tasks: 1. Modify the existing plans for the intersection of Clarke Road with Clarcona Ocoee Road: a. Add north leg to the intersection for future connection of extension of Clarke Road. The intersection construction will include the radius returns up to the PC or PT as appropriate and will be a 4 lane divided section (22' median) with dedicated southbound left and right turn lanes. b. Reconfigure the south leg of the intersection to a 4 lane divided section adding the southbound lanes up to the PC or PT of the radius returns as appropriate. The northbound lanes will have a dedicated left and right turn lane. c. No additional turn lanes will be added to the Clarcona Ocoee Road approaches eastbound or westbound. 2. It is anticipated that the intersection modifications will require revisions to the following construction document components: a. Summary of Pay Items, Summary of Quantities b. Typical Section # 7, Clarke Road c. Drainage Map, Plan and Profile Sheets for Clarcona Ocoee Road at Clarke Road Intersection. d. Plan and Profile sheets for Clarke Road including addition of a new Plan and Profile sheet. e. Cross Sections for Clarcona Ocoee Road in the vicinity of Clarke Road f. Cross Sections for Clarke Road including additional new cross sections g. Intersection detail for Clarke Road including an additional sheet for north leg h. Minor modifications to traffic control plans and utility adjustment sheets i. Traffic signal plans including summary of quantities j. Signing and Pavement Marking Plans including summary of quantities 3. Update Roadway Quantity Computation Book, Engineers Estimate and Bid Tabulation Forms 4. Modify drainage calculations to include additional impervious areas from expansion of the intersection. Verify spread calculations and inlet capacity. Verify the connections, pipe sizes and inverts of all connections to future construction. F f Inwood F consulting engineers 5. Facilitate and attend two (2) coordination meetings with members of City Staff, Orange County Staff and/or representatives of the area developers. a. At the first meeting, Inwood will present a conceptual layout of the intersection for review and discussion. When the conceptual layout is approved by all parties, Inwood will proceed into Final Design. b. The second meeting will occur after the modified plans have been submitted and all parties have completed their review. This meeting will serve to get consensus on all review comment responses and give clear direction in finalizing the construction documents. 6. Perform utility coordination, consisting of sending the modified intersection plans to all utility owners, showing their facilities on the new plan sheets. Inwood will make every effort to avoid additional utility conflicts as a result of these modifications. If any new utility impacts result from the changes to the intersection, Inwood will get them resolved at that time. Inwood will also coordinate with Woolpert, Inc. to avoid impacts to OCU's new facilities planned for that area. 7. Supply the City of Ocoee with CADD files for the project for use during the design of the Clarke Road Extensions both north and south. F e:\proposals \p06003 chapman road \scope&fees(1.10- 06).doc rtr to o In of o o r c E, 'n .- to N N v, o T. .2 0 Os h a ti^ 0 Z H H H H H H H S 8 S 8 p S Q 0 0p y pp0 R , r, O so, O Q O W 'O Q H � ei ea so y 1 e a 4 8 U H H H H H H H H co H H t. v 0 T > L+ a Ca 0 0 a g gg,,,, N +� L m to N Z O H O '� � W H H H H H H 7 r b b N a trl Y O 4 T O H 2 :, Z O • O C H • H H H H H H a E O W g O F VI U a 88 8 L T f 3 F m O H H O Q H H H H H H W e N e ~ oo o rill 3 t 8 8 8 8 0 1 y • o 4 g rn g o 0 00 4 F F L ti F ri U y 1 D H �(/,, W a ` O H H H H H H y } ?? II , .� w ] i I G N -. 0 _' [ O � T r � r+ y, 0 V F s 888888 g 48 ogooR M i M U g' o = • V (V N N V Al m at Z h Q 0 ` • �y N O C W H ^ Q , A { _ fi r{ H H H H H H F y F F F c V y N N V Al N 0 0 8 8 8 8 8 8 8 a g z a_ 4 o • O . °1 N O H _ Y a s H H H H H H 3 L 4i V o V m Os O a Z 1 . Y g e w 4 g s 4 3 co a a g no . ^ 2 e o H C/6 Q i - O Y �' 6 3 0 t g F N U • • • ,IUgZE "e c c3 o 6' o o zzz a O O U w ¢ v ° a a F l ATTACHMENT A Miscellaneous and Out -of- Pocket Expenses ROJECT NAME: Clarke Road Intersection Modifications COUNTY CONTRACT NO.: N/A CONSULTANT PROJECT NO.: OCE- 004-01 CONSULTANT NAME: Inwood Consulting Engineers CONSULTANT PHONE NO.: 407 - 971 - 8850 Plans Reproduction 30%,iitility submittal Design Calculations 8 -1/2" x 11" 0 sheets x 50.05 each @ 0 copies 50.00 Correspondence 0 sheets x 50.05 each @ 0 copies 50.00 11" X 17" 0 sheets x 50.10 per sheet 0 copies 50.00 1 Plans Reproduction 60 %, Pcrmits,utility Design Calculations 8 -1/2" x 11" 0 sheets x 50.05 each @ 0 copies 50.00 Correspondence 0 sheets x 50.05 each @ 0 copies 50.00 11" X 17" 0 sheets x 50.10 per sheet 12 copies 50,00 Plans Reproduction Utilities Design Calculations 8 -1/2" x 11" 0 sheets x 50.05 each @ 0 copies 50.00 Correspondence 10 sheets x 50.05 each @ 2 copies 51.00 11" X 17" 50 sheets x 50.10 per sheet 12 copies 560.00 Plans Reproduction Final Design Calculations 8 -1/2" x 11" 100 sheets x 50.05 each @ 2 copies 510.00 Correspondence 0 sheets x 50.05 each @ 0 copies 50.00 11" X 17" 314 sheets x 50.10 per sheet 2 copies $62.80 SUBTOTAL REPRODUCTION 5133.80 TRAVEL To City 30 miles x 50.29 per mile x 2 trips 517.40 To Project 0 miles x 50.29 per mile x 0 trips 50.00 SUBTOTAL DELIVERIES 517.40 OTHER REIMBURSIBLES Shipping 2 months x 525.00 per month 550.00 Mailouts for Public Information Meeting 0 mailouts 544.00 per mailout 50.00 Public Meeting Display Boards 0 boards 550.00 per board 50.00 SUBTOTAL OTHER 550.00 { TOTAL LIMITING AMOUNT 5201.20 (NOT TO EXCEED) EXPENSES . I 1 I HIGHWAY TASK LIST PROJECT NAME: Clarke Road Intersection Modifications COUNTY CONTRACT NO.: N/A CONSULTANT PROJECT NO.: OCE -004 -01 CONSULTANT NAME: Inwood Consulting Engineers CONSULTANT PHONE NO.: 407 -971 -8850 ESTIMATOR: Derek Dean ACTIVITY : Al. DESIGN MODIFICATIONS SUBACTIVITY: ( ( (3) (4) ( ( ( ( TASK BASIS NO. OF HOURS NO OF TOTAL CADD OF UNITS /UNIT SHEETS HOURS HOURS .. EST REMARKS 1. Roadway Design File LS 1 6 0 6 2. Drainage Design File LS 1 2 0 2 3. Profile Design File LS 1 4 0 4 4. Signal Design File LS 1 10 0 10 5. Pavement Marking Design File LS 1 8 0 8 6. Cross Section Design File LS I 8 0 8 7. Traffic Control Design File LS 1 2 0 2 tt . I SUBTOTAL 0 40' 13. Quality Control 5 -10% 5% 40 2 14. Supervision 5 -10% 5% 40 2 I I Y i "t s SUBTOTAL 0 4 TOTAL 0 44 1 1 I Fee Estimate Clarke Road.xls HIGHWAY TASK LIST PROJECT NAME: Clarke Road Intersection Modifications COUNTY CONTRACT NO.: N/A CONSULTANT PROJECT NO.: OCE -004 -01 CONSULTANT NAME: Inwood Consulting Engineers CONSULTANT PHONE NO.: 407 -971 -8850 ESTIMATOR: Derek Dean ACTIVITY : A2. PLANS REVISIONS SUBACTIVITY: . 7 (I) ( ( ( ( ( (V) ( TASK BASIS NO. OF HOURS NO OF TOTAL CADD OF UNITS /UNIT SHEETS HOURS HOURS EST. REMARKS 1. Summary of Pay Items LS 1 2 1 2 2. Summary of Quantities LS 1 1 1 1 3. Typical Section EA 1 2 1 2 New Typical Section for Clarke Road 4. Drainage Map EA 1 2 1 2 5. Plan and Profile Sheets Mainline EA 2 I 3 , 2 6. Plan and Profile Sheets Clarke Road LS 4 2 4 8 Edit 1 plan and 1 profile, create 1 plan and 1 profile 7. Mainline Cross Sections EA 0.5 2 2 1 _ 8. Clarke Road Cross Sections LS 1 4 6 4 Edit south leg, create new north leg cross sections 9. Intersection Detail LS 1 6 2 6 Edit south leg, create new north leg detail 10. Traffic Control /Utility Adjustment LS 1 4 4 4 11. Signal Revisions LS 1 12 3 12 12. Pavement Marking Revisions LS 1 10 3 10 !' SUBTOTAL 31 54 13. Quality Control 5 -10% 5% 54 3 14. Supervision 5 -10% _ 5% 54 3 SUBTOTAL 0 6 TOTAL 31 60 Fee Estimate Clarke Road.xls I HIGHWAY TASK LIST PROJECT NAME: Clarke Road Intersection Modifications COUNTY CONTRACT NO.: N/A CONSULTANT PROJECT NO.: OCE- 004 -01 CONSULTANT NAME: Inwood Consulting Engineers CONSULTANT PHONE NO.: 407 -971 -8850 ESTIMATOR: Derek Dean ACTIVITY : A3. OUANTITIES SUBACTIVITY: (1) ( ( (4) ( ( (7) ( TASK BASIS NO. OF HOURS NO OF TOTAL CADD OF UNITS /UNIT SHEETS HOURS HOURS EST. REMARKS 1. Quantity Computation Book LS 1 4 0 4 Create separate quantities for the additional work 2. Update Engineer's Estimate LS 1 2 0 2 Create separate quantities for the additional work 3. Update Bid Tabulations LS 1 2 0 2 Create separate quantities for the additional work 1 1 1 SUBTOTAL 0 8 7. Quality Control 5 -10% 5% 8 0 8. Supervision 5 -10% 5% 8 0 i SUBTOTAL H I == 0 �� TOTAL 8 I Fee Estimate Clarke Road.xls ( k I HIGHWAY TASK LIST PROJECT NAME: Clarke Road Intersection Modifications COUNTY CONTRACT NO.: N/A CONSULTANT PROJECT NO.: OCE -004 -01 CONSULTANT NAME: Inwood Consulting Engineers CONSULTANT PHONE NO.: 407 -971 4850 ESTIMATOR: Derek Dean f i ACTIVITY : A4. DRAINAGE CALCULATIONS SUBACTIVITY: (1) ( ( ( ( ( ( ( TASK BASIS NO. OF HOURS NO OF TOTAL CADD OF UNITS /UNIT SHEETS HOURS HOURS EST. REMARKS 1. Verify Spread LS 1 1 1 2. Update Contributing Areas LS 1 1 1 3. Update Drainage Calculations LS 1 2 2 Notebook SUBTOTAL 0 4 13. Quality Control 5 -10% 5% 4 0 14. Supervision 5 -10% 5% 4 0 1 — — SUBTOTAL 0 0 TOTAL I 0 4 J t Fee Estimate Clarke Road.xls HIGHWAY TASK LIST PROJECT NAME: Clarke Road Intersection Modifications COUNTY CONTRACT NO_: N/A CONSULTANT PROJECT NO.: OCE- 004 -01 CONSULTANT NAME: Inwood Consulting Engineers CONSULTANT PHONE NO.: 407 - 971 -8850 ESTIMATOR: Derek Dean ACTIVITY : A5. COORDINATION SUBACTIVITY: (I) ( ( ( ( ( ( ( TASK BASIS NO. OF HOURS NO OF TOTAL CADD OF UNITS /UNIT SHEETS HOURS HOURS EST. REMARKS 1. Initial Meeting LS 1 4 4 Review of Conceptual Layout 2. Final Meeting LS 1 4 4 Review Comments and Responses C 3 SUBTOTAL 0 8 14. Quality Control 5 -10% 5% 8 0 15. Supervision 5 -10% 5% 8 0 — � 1 SUBTOTAL 0 0 0 TOTAL 0 8 ) f fi Fee Estimate Clarke Road.xls HIGHWAY TASK LIST PROJECT NAME: Clarke Road Intersection Modifications COUNTY CONTRACT NO.: N/A CONSULTANT PROJECT NO.: OCE-004-0 1 CONSULTANT NAME: Inwood Consulting Engineers CONSULTANT PHONE NO.: 407- 971 -8850 ESTIMATOR: Derek Dean ACTIVITY : A6. UTILITIES SUBACTIVITY: ( ( ( ( ( ( ( (8) TASK BASIS NO. OF HOURS NO OF TOTAL CADD OF UNITS /UNIT SHEETS HOURS HOURS EST. REMARKS 1 Send Utilities Revised Sheets LS 1 4 4 2. Individual Coordination LS 1 2 2 SUBTOTAL 0 6 15. Quality Control 5 -l0% 5% 6 0 16. Supervision 5 -10% .5% 6 0 a ' SUBTOTAL 0 ?� TOTAL 0 6 • Fee Estimate Clarke Road.xls