Loading...
HomeMy WebLinkAbout10-16-12 Emergency Item ire center of Good Lt . gar er �'"„�,` AGENDA ITEM COVER SHEET Meeting Date: October 16, 2012 Item # /' Reviewed By: Contact Name: David A. Wheeler, P.E. Department Director: ,, !/ 4 • Contact Number: 407 - 905 -3100, ext. 1504 City Manager: L Subject: Contracting with DeWitt Excavating, Inc. for the Installation of 12 inch Reuse Main along Ingram Road and under Clarcona -Ocoee Road in Conjunction with the construction of the new Clarcona -Ocoee Road Background Summary: Orange County received bids for the final leg of the widening of Clarcona -Ocoee Road in February of this year. DeWitt Excavating, Inc., the low bidder, began construction in May. That project consists of construction of the four lane road section from east of Clarke Road to SR 429. The project also includes intersection improvements at all the existing intersections along the route, sidewalks, bike paths, and new traffic signal at Clarke Road, relocation of the West Orange Trail, and stormwater collection system. On June 19, 2012, the City Commission approved the City of Ocoee / Orange County Reclaimed Water Territorial Agreement and the City of Ocoee / Orange County Agreement for the Delivery and Use of Wholesale Reclaimed Water. Those two agreements established the service area for reclaimed water that includes the Brynmar subdivision and set time frames for the purchase of water from Orange County. The Brynmar subdivision is basically right across McCormick Road from Orange County's Northwest Wastewater Plant where the City is to connect to purchase the reclaimed water. The Ocoee Utilities Department has established a project to run a large diameter pipeline from the Orange County facility along McCormick Road from Kensington Manor to Ocoee - Apopka Road and then south to West Road. The second leg of that project is to extend the 12 inch main from McCormick Road south along Ingram Road and connect to the reuse pipeline being installed as part of the Arden Park south development. The portion of pipeline that lies along Ingram Road between the McCormick Woods and Brynmar subdivisions was install a few years ago as part of the construction of the McCormick Woods development. That project has just started the information gathering and preliminary design phase. The project is called the North Service Area Reclaimed Water Main Extension project and is initially funded in the amount of $800,000. DeWitt was approached to secure a proposal for installing the reuse pipeline under new Clarcona -Ocoee Road, the relocated West Orange Trail, and north under Ingram Road to the end of their project limits. The total length of the project is approximately 600 feet and includes valves and fittings and permitting through Orange County. The work to remove the West Orange Trail, install the pipe, and rebuild the Trail will need to be performed at night; this is a requirement of Orange County. Portions of the work require working around and under already installed stormwater collection piping and other existing utilities in the intersection. The pipe north of the intersection in Ingram Road is being installed under the road, because this is the less congested in relation to the other utilities. DeWitt has provided a cost proposal for performing the work in the amount of $93,142.29. The project cost is within range of similar costs on other projects. The City is having this work performed by DeWitt, the on -site contractor, and is realizing a benefit of mobilization and other general construction items from them. Issue: Should the City Commission approve the contracting with DeWitt Excavating, Inc. to install the portion of the North Service Area Reclaimed Water Main Extension along the southern portion of Ingram Road and under Clarcona -Ocoee Road? Recommendations The Engineering and Utility Departments recommend that the City Commission approve this initial portion of the North Service Area Reclaimed Water Main Extension and authorize staff to issue a purchase order to DeWitt Excavating, Inc. $93,142.29. Attachments: Proposal from DeWitt Excavating, Inc. Financial Impact: The North Service Area Reclaimed Water Main Extension project, which this work is a portion of, was funded at $645,505.08 (Project #31205). The project along McCormick Road has reduced the available funding to $484,862.68. Upon approval of this project, the available funding will be reduced to $391,720.39. Type of Item: (please mark with an x') Public Hearing For Clerk's Dept Use: Ordinance First Reading Consent Agenda Ordinance Second Reading Public Hearing Resolution Regular Agenda Commission Approval Discussion & Direction Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney N/A Reviewed by Finance Dept. t 46.,4 N/A Reviewed by () N/A 2 October 16, 2012 eWltt Excavating City of Ocoee Attn: David Wheeler REF: RECLAIMED WATER MAIN AT CLARCONA -OCOEE RD AND INGRAM Dear Mr. Wheeler: Please see the attached pricing for installation of the proposed 12" PVC Reclaimed Water Main at Clarcona -Ocoee Road and Ingram Road. Price includes Ductile Iron Pipe under the new Clarcona -Ocoee Road only. Due to DeWitt's progress on the current Clarcona -Ocoee project the proposed Reclaimed project will coincide with, the pricing must be approved and the project authorized by October 19, 2012. If you have any questions or comments regarding this matter, please feel free to contact me. Sincerely, Michael E. Knotts DEWITT EXCAVATING, INC. Project Manager Cc: Al Butler — City of Ocoee Gary Batchelor — Orange County Guy King — Orange County Juan Curi — Orange County Julie Naditz — Orange County Mike Wehrfritz — Orange County Roberto Ng — Orange County Robert Davila — DeWitt Excavating, Inc. Gary Croft — DeWitt Excavating, Inc. DeWitt #2843 14463 W. Colonial Drive — Winter Garden, FL 34787 — %In w.dewittexe.eom - (407) 656 -1799 — Fax (407) 656 - 0552 Land Clearing — Earth Work — Concrete work — Asphalt Paving — Utilities — Fill Material RECLAIM WATER LINE FOR THE CITY OF OCOEE UNIT 10/15/2012 15:09 U/M QUANTITY L - TOTAL - TOTAL 12" RW PIPE LF 600.00 - 83.06 - 49,836.00 12" GATE VALVE EA 2.00 - 1,714.54 - 3,429.08 12" TEE EA 2.00 - 477.91 - 955.82 12" 45 EA 19.00 - 385.89 - 7,331.91 12" 11 1 /4 EA 3.00 - 361.28 - 1,083.84 12" CAP EA 2.00 - 328.11 - 656.22 12" PLUG EA 2.00 - 335.60 - 671.20 12" ONE -LOC PVC RESTR. EA 44.00 - 322.76 - 14,201.44 OPEN CUT CLARCONA - OCOEE /INGRAM SY 119.00 - 75.00 - 8,925.00 OPEN CUT WEST ORANGE TRAIL SY 17.00 - 88.34 - 1,501.78 PRESSURE TESTING LS 1.00 - 850.00 - 850.00 SOILS TESTING LS 1.00 - 1,500.00 - 1,500.00 MOT LS 1.00 - 2,200.00 - 2,200.00 TOTAL - - - 93,142.29