AGENDA ITEM COVER SHEET
Meeting Date: November 6, 2012
Item # ".o
Reviewed By:
Contact Name: Stephen C. Krug Department Director: /ii
Contact Number: 6002 City Manager: 1 % 7 j
Subject: Maguire Road Median Landscape Improvements With Valley Crest Landscape
Maintenance. District 3, Rusty Johnson
Background Summary:
The City has been working with Valley Crest Landscape Maintenance on an improved landscape solution
for the Maguire Road corridor south of the Turnpike with a focus on low maintenance plantings that have
a history of thriving in a roadway median environment with minimal watering. The proposed
improvements begin with the removal of existing plants that have out grown the confines of the medians
or have reached the end of their life cycle. The existing irrigation will be modified and new plants and
ornamental trees installed.
Public Works recommends awarding this work to Valley Crest, the City's landscape maintenance
contractor, as they will be providing the Society Garlic plants at no charge to the City as a warranty
replacement for the former perennial peanut beds at the median tips. Public Works has reviewed the
pricing and found it to be in line with industry standards.
Public Works will provide the maintenance of traffic control through the work zones for this project to
reduce the costs to the City. Public Works recommends awarding this work to Valley Crest.
Issue:
Request the City Commission award the Maguire Road landscape improvements to Valley Crest.
Recommendations
Recommend the City Commission award the Maguire Road landscape improvements per the attached
proposal, to Valley Crest Landscape Maintenance - Orlando in the amount of $46,168.00.
Attachments:
Valley Crest Maguire Road Landscape Proposal.
Public Works Landscape Plan.
Financial Impact:
This project is adequately funded from savings in capital improvements on the Clarke Road landscape
project.
Type of Item: (please mark with an °x')
Public Hearing For Clerk's Dept Use:
Ordinance First Reading Consent Agenda
Ordinance Second Reading Public Hearing
Resolution Regular Agenda
x Commission Approval
Discussion & Direction
Original Document/Contract Attached for Execution by City Clerk
Original Document/Contract Held by Department for Execution
Reviewed by City Attorney N/A
Reviewed by Finance Dept. N/A
Reviewed by ( ) N/A
2
ValleyCrest
Landscape Maintenance
October 10, 2012
Steve Krug
City of Ocoee Director of Public Works
301 Maguire Rd.
Ocoee, Florida 3476
RE: Maguire Rd. Center Medians Landscape Enhancement Proposal
Dear Steve,
Thank you, for the opportunity to present you with a proposal for landscape enitancentent for the above
referenced project. We hereby propose to fiurnish in the utmost professional manner, all necessary
materials, labor and equipment to perform the following work, as per the aerial photo plan & instructions
provided by Richard Campanale City of Ocoee Public Works Department.
*All Items noted throughout this proposal includes the following scope of work;
• Removal of plants and sod not to remain.
• Includes any necessary irrigation repair & retrofitting for areas noted on plans.
• Installation of materials (i.e. plants, mulch, etc.) listed below.
• A post planting fertilizer application for all new plantings.
• Includes mobilization cost, delivery & disposal fees.
ITEM#1 - LANDSCAPE INSTALLATION: $ 38,718.00
QTY. PRODUCT NAME SIZE/TYPE
808 Dwarf Walters Viburnum 3 Gallon
23 Crepe Myrtle Standards 65 Gallon
98 Mulch Shredded Hardwood Cubic Yards
ITEM #2 - IRRIGATION REPAIR & RETROFIT: 7,450.00
*TOTAL CONTRACT AMOUNT: $ 46,168.00
*Continued on Page 2
4777 Old Winter Garden Rd. Orlando, Florida 32811 407 292 -9600 407 291 -4966 (Fax)
Oii4 id Page 2
Maguire Rd. Center Medians Landscape Enhancement Proposal (Continued);
10 -10 -12
Special Conditions & Exclusions
The following items noted below are provided by ValleyCrest Landscape Maintenance, for the sole purpose of
providing our customer with concise and definitive guidelines in regards to the proposed scope of work described
in the aforementioned proposal for this project.
❑ ValleyCrest Landscape Maintenance is not responsible for the civil engineering of the site.
❑ Irrigation repair and retrofitting will be performed in areas of new work as described in the
aerial photo plans & instructions provided by Richard Campanale, City of Ocoee.
❑ Owner will be responsible for locating all private utilities, of which may need to he relocated,
prior to digging. ValleyCrest Landscape Maintenance will not be responsible for any damage
to private utilities.
❑ ValleyCrest Landscape Maintenance will be responsible for all public underground Utility
locates, prior to digging.
❑ The prices stated are valid for (90) days from the date of the proposal and are subject to
change after (90) days.
❑ City of Ocoee will provide all MOT for this project, and all work is to be performed between
the hours of 9:00am to 4 :OOpm, Monday through Thursday.
❑ City of Ocoee will allow ValleyCrest Landscape Maintenance to stage Roll Off Dumpsters on
the Maguire Rd. City of Ocoee Water Treatment Facility property.
Respectfully submitted,
Tim Harris (Designer/Estimator)
"This proposal properly signed by your agent has been accepted as authorization to perforin the work. An invoice will
be forwarded to your office for payment when the work is completed. All work will be performed in accordance with the
"General Terms & Conditions" which are printed on, attached and or incorporated herein by reference."
Should this revised proposal meet your approval, please sign and date below, for a total amount of
Authorized Client Representative Signature Approval Date
4777 Old Winter Garden Rd. Orlando, Florida 32811 407 292 -9600 407 291 -4966 (Fax)
Page 1 of 1
Krug, Stephen
From: Tim Harris [tharris @valleycrest.com]
Sent: Friday, October 12, 2012 3:38 PM
To: Krug, Stephen
Cc: Jason Haydu; Robert Maier
Subject: Maguire Rd. Center Medians Landscape Enhancement Proposal
Attachments: City of Ocoee Maguire Rd. Center Medians Landscape Enhancement Proposal 10- 10- 12.pdf
Steve,
Thank you, for the opportunity to present the attached proposal for your
consideration.
Also, I want to remind you that we will be replacing the perennial peanut
bed areas with Society Garlic (1 Gallon on 2 feet centers), during the same
time as the other work. This work will be warranty replacement at no charge
to the city.
Please do not hesitate to contact me, should you have any questions or need
any further assistance, regarding this matter.
Respectfully submitted,
Tim Harris
Florida Certified Landscape Contractor #84
Landscape Design, Digital Imaging, Sales & Estimating
ValleyCrest Landscape Maintenance
(407) 292 -9600 Ext. 1318 Office
(407) 291 -4966 Fax
(321) 303 -5994 CeII
tharris@ valleycrest.com