Loading...
HomeMy WebLinkAboutItem #04 Approval of Construction Phase Engineering Services with CPH, Inc. on the North Side Reclaimed Water Main Extension Projectlkw"Y %/� Ocoee florid❑ AGENDA ITEM COVER SHEET Meeting Date: July 16 2013 Item # Contact Name: Contact Number David A. Wheeler, P.E. 407 - 905 -3100, Ext. 1504 Reviewed By: Department Director: City Manager: Subject: Construction Phase Engineering Services with CPH, Inc. on the North Side Reclaimed Water Main Extension Project - (District 1 — Commissioner Grogan) Background Summary: The North Side Reclaimed Water Main Extension project is the extension of the 16 inch reclaimed pipeline along McCormick and Ocoee - Apopka Roads to provide reuse water to the Forest Brooke, Eagle's Landing, Westyn Bay, Vineyards, Fountains West, and Ocoee Crown Point developments. The construction contract was awarded to Hazen Construction LLC at the April 16, 2013, City Commission meeting. By action of the City Commission at the June 19, 2012 Commission Meeting, CPH, Inc. was authorized to proceed with preliminary layout, detailed design including survey and geotechnical services, and assistance during the bidding of the project. No construction phase services from CPH, Inc. were included at that time because the Engineering and Utilities Departments were planning to perform most of the construction services in- house. City personnel are performing the daily field inspection of the construction, review and approval of shop drawings and contractor monthly pay requests, answering questions from the contractor and /or property owners along the project route, and many other administrative tasks related to the project. However, there may be times when assistance would be needed from CPH, Inc. The attached proposal details many of the deliverables required to finalize the permits with Orange County and OOCEA to work within their rights -of -way and possible functions that may require staff to request interpretation and /or assistance from the engineer of record. The proposal is based upon the request for time and materials and is not a lump sum proposal. The proposal for Construction Phase Engineering Services with CPH, Inc. on the North Side Reclaimed Water Main Extension Project is a not to exceed amount of $5,965.00. Issue: Should the City Commission approve the change order for construction services with CPH, Inc. for the North Service Area Reclaimed Water Main Extension Project? Recommendations The Engineering and Utilities Departments recommend that the City Commission approve the change order for construction services with CPH, Inc. for the North Service Area Reclaimed Water Main Extension Project and authorize staff to amend the current purchase order to CPH, Inc. on this project in the amount of $5,965.00. Attachments: Proposal from CPH, Inc. Financial Impact: There are sufficient funds within the project budget to cover these additional costs. Type of Item: (please mark with an 'k') Public Hearing For Clerk's Dept Use: Ordinance First Reading Consent Agenda Ordinance Second Reading Public Hearing Resolution Regular Agenda Commission Approval Discussion & Direction Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney N/A Reviewed by Finance Dept. N/A Reviewed by O N/A 2 June 4, 2013 City of Ocoee 150 North Lakeshore Drive Ocoee, Florida 34761 1117 East Robinson Street Orlando, Florida 32801 Phone: 407.425.0452 Fax: 407.648.1036 www.cphengineers.com Attention: David A. Wheeler, P.E. RE: Proposal for North Side Reclaimed Water Main Extensions - Change Order No. 1 - Construction Assistance CPH Project No. 06007 Dear Mr. Wheeler: Attached please find our proposal for the Construction Assistance Services for the North Side Reclaimed Water Main Extensions. CPH has completed the design and bidding phase services for the first phase of the subject extensions intended to connect those neighborhoods within the City of Ocoee reclaimed water service area to the City's reclaim distribution system. This will allow the neighborhoods to be irrigated with reclaimed water rather than with potable water. The City has indicated that the majority of the Construction Administration Services will be performed by City personnel. CPH proposes our scope of services to consist of: Providing a sketch and description for the easement across the City of Winter Garden wastewater disposal site. 2. Providing the City seven (7) signed and sealed sets of the "Conformed" construction drawings for the City's use during the construction phase of the Project. 3_ Providing the City with a CD with AutoCAD files of the conformed construction drawings for the contractor's use in laying out the project and preparing the as- bulits. 4. Attending the pre- construction conference. 5. Providing clarification and interpretation of the Contract Documents when requested by the City. 6. Performing any necessary site visits to provide clarification and input in the event of unforeseen underground conditions. 7. The ENGINEER will assist the City in the review of Contractor provided as -built drawings /surveys and other as -built data for installed facilities and present any apparent discrepancies between the as -built conditions and the design conditions to the attention of the City. Coordinate with the Contractor regarding provision of the construction as -built drawings prior to final on -site inspections and punch list preparation. J: \06000.00 \ContrachNorth Side RWM Extension \North Side Reclaimed Water Improvements - Construction Assistance.doc Engineers • Surveyors • Architects (AA26000926) • Planners • Landscape Architects • Environmental Scientists • Construction Management • Design /Build 8. The ENGINEER will prepare a final set of Record Drawings for the City. The Record Drawing Package will include both hard copies of the plans as well as electronic files for the project. Deliverables shall include two 24" x 36" drawings and a compact disk with the project cad files (2012 AutoCad) and PDF files of all sheets. Compensation paid to Engineer for services described herein and rendered by principals and employees assigned to the project are computed by multiplying Standard Classification Billing Rates as per our continuing services agreement for all classifications of employees directly engaged on the project, times the number of hours worked on the project. The Estimated Engineering not to exceed fee for the services described herein is $5,965.00. The Estimated fee includes $5,015.00 in labor expenses, $750.00 in subconsultant fees and out -of- pocket expenses of $200.00. The expenses will be specifically identified in the periodic invoicing, and include such items as transportation and subsistence of principals and employees when traveling in connection with the project, tolls, telephone calls, photocopies, blueprints and plots, etc. Invoices will be submitted periodically, indicating the hours expended during that billing cycle. Progress invoices will be submitted based on the time hours worked by CPH employees at the time of invoicing. Expenses for items not specifically valued herein are to be reimbursed to the engineer at the actual cost thereof. If this Contract is terminated during prosecution of the services prior to completion of the services, payments to be made on account of that and all prior work under this Contract shall be due and payable, and shall constitute total payment for services rendered. In addition, upon termination, engineer shall be paid for any Supplementary Services authorized and rendered. If you are in agreement with the terms and fees proposed, please sign on the space provided below and return one (1) copy to us, or provide us with the purchase order for CPH to begin work on the project. CPH Engineers, Inc. appreciates this opportunity to provide our services to the City of Ocoee. If you have any questions, or if you need any additional information, please do not hesitate to call. Sincerely, H, INC. David E. Mahler, P. E. Sr. Vice President/Associate For the City of Ocoee: David A. Wheeler, P.E., City Engineer Date J. \06000.00 \Contract \North Side RWM Extension \North Side Reclaimed Water Improvements - Construction Assistance.doc T- 0 Z d V O d QI C m L _ V O y � C tss v � O L m O V R v d QC d N t O Z a� V• O O O O L i (a O C O Cl. a > v o w LO O O > M O . C r O Co + O N C M LO N C l!) En 49 6% O �' ` O O O U O -o U L T O 7 .O O)._ 4= O) LL U c 0 E m Co o W 0 cn cu �. N C C U O O - M E m v� M a ,n U >o y o m vi a) U Q N c cu o a) > N` Q E _o 0 w O C N U O N r O) O U U Q � L N N U O C O N '+• p O N N 0� a) cu U o a Q a) w°.). w C rn a o C N 3 0 0 O N r V• O O O O O O O O a > v o U') LO O O > M O r tr) O °N�!+.: d � O O r- N C M to l!) En 49 E O �' ` O O O U O -o O IM N N (D (D N st N N N N O O c vi 0 N W N d >< p w W U ( j in .n uj O U cA ~ O L Z cu J J Q O O O O O O O O O O O 66.. . O to N O Cl) (O r - ��tNN O 4 69X69 6 � co O Cl) N — � O O O O Q O O V) to '-T C'4 m ;; v; b L 0) 4) M L M c h M c W in- Q t36 U U O N N W 0 2 M 1. 0 0 O O as c in ( u 'C O U) a Q C (D L C O o co ` >' c a) a > v o v ` O U N N y > M O C7 io 3 E rn °N�!+.: d � N 0 C c C M o f (D U M E O �' ` O O O U O -o _ N N C C T O .O O)._ 4= O) LL U c 0 E m Co o W 0 cn cu CL U O O U a v� M a ,n U >o y o m vi a) U c cu o a) > N` a E _o 0 w O d� O N U O N C Q N O U U Q N N U O C O N '+• p O p p V N L a) cu U o a Q a) w°.). w C rn a o C N 3 0 Bf CO N 7 U CL CD 0 0 Q d o od D o o .c O N N N a ` O W M ❑ O c O C C U) N O M@ u C N m c o ro e c CO -< a (0 - L C y C " m D in U) 3 0 c o U C4 C O f0 (� 0 Y -0 N W a L F > s m w u 'a c o Q M C- o w a) 0 ip o a) a c o f w 0 C U N N Y y L a C � c o c �j y7 y N N O Ip C U M a C U to c) U) m t` t N L U v- L d 0 M N O F Y N a 'fl C N > >> 3 >> p C T; O 0 M ' O F Q U O N O H - 3a� M$¢a` ma M a` � mo C.) a_ a Y N M �t LO co fl- co O O O O O O O O O O 66.. . O to N O Cl) (O r - ��tNN O 4 69X69 6 � co O Cl) N — � O O O O Q O O V) to '-T C'4 m ;; v; b L 0) 4) M L M c h M c W in- Q t36 U U O N N W 0 2 M 1. 0 0 O O as c in ( u 'C O U) a Q