Loading...
HomeMy WebLinkAboutItem #06 Approval of Floral Street ImprovementsI I kz Y �.O� o c o e_ e flo,ida AGENDA ITEM COVER SHEET Meeting Date: September 16, 2014 Item # (0 Reviewed By: Contact Name: Stephen C. Krug Department Director: Contact Number: 6002 City Manager: Subject: Floral Street Improvements. Commissioner Johnson, District 3. Background Summary: Public Works had identified Floral Street for curb line reconstruction to improve the flow of storm water draining to the existing curb inlets and also for installation of a sidewalk to improve the pedestrian access throughout the city center. The Public Works Team determined combining these two improvements into a single project reduces the total construction time and associated costs while accomplishing the improvements. Public Works solicited pricing from the contractors on the City's Small Construction Projects Term Contract. Four (4) contractors responded with the low bid below the Engineer's estimate. Public Works recommends awarding the project to the low bidder, Schuller Contractors, Inc., in the amount of $25,560.00. The project has a forty five (45) calendar day duration and is funded under the Stormwater Division's Miscellaneous Small Projects and Streets Divisions Capital Sidewalk Improvements. Issue: Request the City Commission approve award of Floral Street Improvements Project to Schulte Contractors, Inc. Recommendations: Recommend approval to award the Floral Street Improvements Project to Schuller Contractors, Inc. for $25,560.00 based on pricing solicited through the City's Small Construction Projects Term Contract RFP11 -004, and authorize City Manager to execute any change orders up to the limits in the approved purchasing code. Attachments: Floral Street Improvements Price Quotes. Floral Street Improvements Plan Sheet. Financial Impact: The project is adequately funded through the Public Works' Stormwater Division's Miscellaneous Small Projects ($15,560.00) and Streets Division's Capital Sidewalk Improvements ($10,000.00). Type of Item: (please mark with an 'Y) Public Hearing For Clerk's Dept Use: Ordinance First Reading Consent Agenda Ordinance Second Reading Public Hearing Resolution Regular Agenda X Commission Approval Discussion & Direction Original Document/Contract Attached for Execution by City Clerk X Original Document/Contract Held by Department for Execution Reviewed by City Attorney N/A Reviewed by Finance Dept. N/A Reviewed by ( ) N/A 2 9%upor� To: From: Date: Re: Sch C • # fi City of Ocoee Schuller Contractors Inc. 8/28/2014 Floral Street Sidewalk Improvements Richard, The break down on cost for the above referenced project is as follows: • $ lo,000 for the proposed sidewalk installation • $ 15,56o for road and drainage repairs • Total Job: $25,560.00 Thanks Jonathan Jaiseiwcz Project Manager 407- 509 -0803 Campanale, Richard From: Campanale, Richard Sent: Monday, May OS, 2014 10:22 AM To: 'majid @apec.us'; Elizabeth Diaz (Elizabeth @apec.us); Chris Sousa (chris.sousa@atlantic- civil.com); James Thompson (barracudabc @embargmail.com); Travis Greer (travis @brittconstructioninc.com); 'schullercontract @aol.com' (schullercontract @aol.com); 'David Stalowy'; info @mvbec.com; 'estimating @pcginc.org'; jeff suberman @rubybuilders.com; jeff @sbsfl.com Subject: Floral Sidewalk Improvements Morning Contractors: City has reviewed the bids prepared and submitted for the above referenced project. The apparent low bidder is Schuller Contractors. The following is a summary of the bids evaluated; Schuller Contractors - $25,560.00 Atlantic Civil - $31,532.00 Barracuda Building - $32,948.00 CFE - $38,231.00 Thank you all for bidding, The City will be in contact with Schuller Contractors to discuss the project schedule... Regards Richard Campanale, P.E. Street and Stormwater Operations Manager (407) 905 -3170 ph (321) 281 -7025 cell mill vu LIJ S 4 r- C r, .� Q 43 ; 44 45 46 . _ I w 5Q 50 I 50 12 118 - - - m I -y -_- FLORAL_ -- TILT - i -- s - - RESTORE'EXISTING BRICK _ CONSTRU aCONCRETE SIDWALK CONSTRUCT DRIVES 6" THICK, CN CONSTRUCT FDOTTYPE'D' ALONG CURBING AND DRIVES 11 6" RISER CURB 5' WIDE, TYPICAL t • V t1 ` 1 ��"' -' "� RELOCATE LANDSCAPING BRICK 6' OFF ROADWAY FOR NEW SIDEWALK i » RELO I-AE S REEi LIGHT ANO RISER 6` OFF ROADWAY FOR NEW SIDEWALK - .. e .. a .e • • - • a -' - • 339' a2 81 - 55.72. ?' >• 14�.L 47 w CONNECT SIDEWALK, > $'ORE DISTURBED AREAS 1 _ MATCH EXISTING GRADE 64 49 Li m _ - QQ ,° 63 L 55.72 82