HomeMy WebLinkAbout09-16-14 Emergency Item #02 - Contract with SB Ocoee FDS, LLC to Install a Sanitary Sewer Lift Station and a Portion of the Downtown - Western Force Main Project as Part of the Family Dollar Project`` % 0C,0( florida AGENDA ITEM COVER SHEET Meeting Date: September 16, 2014 Item # Reviewed By: Contact Name: David A. Wheeler, P.E. Department Director: ;e Contact Number: (407) 9 -3100, ext. 1504 City Manager: ' / ' Subject: Contract with SB Ocoee FDS, LLC to install a sanitary sewer lift station and a portion of the Downtown — Western Force Main Project as a part of the Family Dollar project (District 1 — Commissioner John Groaan) Background Summary: SB Ocoee FDS, LLC is close to completing construction of the Family Dollar Store on Wurst Road. The initial design had the commercial complex using a septic tank and drain field to handle the sanitary waste for the facility. The customers of the City's sanitary sewer system in this area are all on privately owned septic systems. Staff has worked with the developer and their engineer to site, design and construct a lift station that will not only serve the Family Dollar store, but the adjacent Kangaroo Express /Chevron Pantry, Inc., the commercial parcels across Wurst Road, and possibly some of the residential properties in the Spring Lake Circle subdivision. SB Ocoee FDS, LLC has committed the funds that they would have spent to install the septic system for the Family Dollar store and had its engineer design and permit the lift station. That amount was $5,500.00. The total cost to install the lift station is $37,429.00. The remainder of the funds ($31,929.00) needed to install the lift station will come from already budgeted funds in the annual "Sewer and Reclaim Line Upsize Associated with Development" Program. Capital Charges collected from the Family Dollar store were $19,102.35 ($3,085.80 for Water and $16,016.55 for Sanitary Sewer). In addition, the City awarded a small design project to Stephens Barrios, LLC to complete final design of the force main to run from the Family Dollar property on Wurst Road to the wastewater treatment facility on A.D. Mims Road, approximately 1800 feet to the east. SB Ocoee FDS, Inc. has secured bids from four contractors to install the 1800 linear feet of force main from the Family Dollar store to the A.D. Mims WWTF. The installation of this portion of the force main will allow the new lift station to pump to the A.D. Mims WWTF and not require either SB Ocoee FDS, Inc. or the City to pump out the lift station until the final design and construction of the Downtown — Western Force Main Loop has been completed. The larger project will be at least one year if not longer to complete and neither the developer nor the City wants to be responsible for pumping the lift station that long. SB Ocoee FDS, Inc. has selected Central Florida Environmental Corporation as the lowest responsive bidder for the project. SB Ocoee FDS, Inc. proposal is for $437,395.10; including CFE Corp.'s construction bid of $421,655.44, a not to exceed amount of $3,000 for geotechnical and material testing, and 3% markup by SB Ocoee FDS, Inc. SB Ocoee FDS, Inc. and their consultant, Stephens Barrios, LLC have secured the Florida Department of Environmental Protection wastewater and Central Florida Railroad permits. Staff has reviewed the bid and believes the unit prices are in line with similar projects. Issue: Should the City contract with SB Ocoee FDS, LLC to install a sanitary sewer lift station and a portion of the Downtown — Western Force Main Project as a part of the Family Dollar project? Recommendations: The Engineering and Utilities Department recommends that the City Commission approve the following items to be constructed as part of the Family Dollar store: 1) Contract with SB Ocoee FDS, LLC in the amount of $31,929.00 to install a sanitary sewer lift station and authorize staff to proceed through the Purchase Order process to complete the work. 2) Contract with SB Ocoee FDS, LLC in the amount of $437,395.10 to install a portion of the Downtown — Western Force Main Project from the Family Dollar property to the A.D. Mims WWTF and authorize staff to proceed through the Purchase Order process to complete the work. Staff also recommends that the City Manager be authorized to approve change orders to this purchase order up to the limit of his purchasing authority for each change order and up to the budgeted amount of 5% of project ($21,869.76) for all change orders. Attachments: 1) Proposal for the installation of a lift station from SB Ocoee FDS, LLC dated September 15, 2014 2) Proposal for the installation of a portion of the Downtown — Western Force Main Project from the Family Dollar property to the A.D. Mims WWTF from SB Ocoee FDS, LLC dated September 15, 2014 Financial Impact: 1) The money to cover the City's share of the lift station installation shall to come from the annual "Sewer and Reclaim Line Upsize Associated with Development" Program (405- 535 -00- 6302). The F.Y. 2014 funding level was $40,000 leaving a remaining unspent amount of $8,071.00. 2) The money to pay for the portion of the Downtown — Western Force Main project ($459,269.86), City project no. 31107, will be included in the 2014/15 budget under this project in account 401- 531 -00- 6302, contingent upon City Commission inclusion of the funds in the 2014/15 Fiscal Year Budget. Type of Item: (please mark with an 'Y) Public Hearing Ordinance First Reading Ordinance Second Reading Resolution Commission Approval Discussion & Direction For Cleric's Dept Use: XX Consent Agenda Public Hearing Regular Agenda Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney Reviewed by Finance Dept. Reviewed by () N/A N/A N/A 2 0 - SB MOVE MS, LLC September 15, 2014 Mr. David Wheeler, P.E. City of Ocoee 150 N Lakeshore Dr. Ocoee, FL 32761 RE: Provide and Install Package Lift Station Wurst Road, Ocoee, FL Dear Mr. Wheeler: Thank you for the opportunity to earn your business and provide a proposal for the installation of the Package Lift Station to serve the new Family Dollar Store, existing Kangaroo Gas Station, and the Discount Store across Wurst Rd.. The Scope of Work shall be as follows: 1. Provide and Install Lift Station with 2" grinder pumps to service new Family Dollar Store and Kangaroo Gas Station with 2" sanitary stub out for future connection of discount store across Wurst Rd. - $37,429.00 2. Credit from SB Ocoee FDS, LLC to the City of Ocoee for the installation of Sanitary Septic Sewer as per approved construction plans — ($5,500.00) Total Price - $31,929.00 This proposal includes the following qualifications and exclusions: 1. Lift Station to be provided by Riley and Co. and Installed by AP Construction /Jim's Logging as per attached proposal. Again, we thank you for the opportunity to work with you and the City of Ocoee on this project. Best regards, Carlos A. Barrios, P.E. SB Ocoee FDS, LLC t is Irina Avenue - Orland«, Florida :32803 Phone: 107 -2S6 -4670 0 ro m B O a-+ t/1 J V 3 a, z 0 oc N L 3 WORK ORDER Date: August 25, 2014 Work Order # 004 Family Dollar -Ocoee AP Construction Contractor,LLC 1403 Wurst Road, 100 W. Lucerne Circle Ocoee, FL 34761 Orlando, FL 32803 Ph.: (407) 949 -6699 2014 -001 Distribute To: 0 Owner 0 Contractor ❑ Designer ❑ Inspection Estimate Time to Complete: 10 calendar days (After approval) SB Ocoee FDS, LLC 823 Irma Avenue Orlando, FL 32803 Carlos Barrios, PE Item # Cost Description 01 $37,429.00 Lift Station supply & installation, including electrical and 2" force line to north right way & septic tank credit 02 ($ 5,500.00) Brownie's Septic & Plumbing, Septic Tank Credit Total $31,929.00 Submitted by: Contractor AP Constru , n Contract , o�C) / 5C' Signature, by: Luis M. Pagan Date Accepted By: Owner SB Ocoee FDS, LLC Signature, by: Carlos A. Barrios, P.E. Date ?r-V1 M I . ' ,k TEMUOTA Date: July 9. 2014 To: Stephens.Barrios 332 Irma Ave. Orlando, FL 32$03 Re: Change Order 41 (Lift Station) Familly Dollar -Ocoee 1403 Wurst Road Ocoee, FL 34761 AP Construction Contractor, LLC. ("APCC "), is please to submit for your consideration our proposal for labor, equipment & materials required for the Lift station installation for the above reference project. "SCOPE OF WORK" 1 Lift Station Installation ............................................ ........................... . . .. ..................$6,750.00 2 Additional Force Main Line, for future sewer .. ............................... ......................$1,700.00 3 Install 100A, 120/208V, 3Phase Service ........... ............................... ......................$3,479.00 Include: - Pedestal for mounting equipment - Meter can, N4 Disconnect & Secondary service with 1/0 ALU conductors 4 Install 180 If 2" pvc pipe, power run from west to east property line ...............1,293.00 5 Lift Station ........................................................... ............................... .....................$20,805.00 6. OH & Profit 10% $ 3402.70 Total Amount this C.O. S 37,429.00 Family Dollar-Ocoee Proposal: Change Order 1r i July 8_ 1 2014 EXCLUSIONS: 0 1- All other work after disconnect. 2- Rock removal, excavation, fragmentation or blasting. 3- Borrow to fill material due to over excavation requested by others. 4- Water and/or electricity meters of any kind. 5- Road crossing for utilities installations and/or others. 6- Design, engineering drawings and or studies of any kind. 7- Removal, disposal and /or handling of any hazardous materials. 8- Impact Fees, assessments, tap fees and /or any other utilities fees, to be paid by other. 9- Permits, fees, contributions and /or other are not included. 10- Contingencies and/or Allowances of any kind. STANDAR QUALIFICATIONS & CLARIFICATIONS: i- APCC assumes no responsibility for design compliance with national, state and /or local building codes or ordinances. 2- APCC reserves the right to adjust the proposed iwnp sum price due to design revisions, changes in scope, different site conditions and/or agencies requirement having jurisdiction. 3- APCC does not include in this proposal the city cost/fees for water meters, sewer connections and other utilities. 4- APCC does not include in this proposal the electric power supplier companies cost/fees for for connection and /or improvement. ti- Electrical point of connection. 6- Contractor's construction time will starts upon receipt of executed contract, latest owner approved construction drawings and all permits require to completing the project. If contractor does not have the fore mentioned items and owner directs contractor to start without all owner furnished permits and progress is held up for this cause. Contractor can request time extension and extend G.C.'s. 7- Estimate time for substantial completion of the work is 7 calendar days after project start, receipt Notice to Proceed, executed contract, building permits, certification of funding and owners builders risk policy. 8- This complete list of "Exclusions, Standard Qualification and Clarifications" shall become a part of the construction contract, in case an agreement is made. 9- This proposal is valid for 30 days. Truly yours, Luis M. Pagan Partner Accepted By: Date: Tim's Loguin- & Landclearing, Inc. 1620 Fast SR 46 Geneva. Fl 3273? 407-349-0200 407 July S. 2014 AP Construction Contractors, LLC 100 W. Lucerne Circle Ste. 200 Orlando. F1 32801 ,attention Clarence Thornton Family Dollar Ocoee Change Order �z 1 Install Littstation Labor Only $ 6750.00 Additional Forcemain Line $1700.00 Total CO = l S84-50.00 Sincerely. Jim Chaudoin. President 5491 Benchmark Lane PROPOSAL RC13405 Sanford, FL 32773 RILEY Phone: (407) 265 -9963 c4c company; Inc. Date: 6/1 Q /14 Fax: (407) 265 -9967 Valid For: 30 Days THIS PROPOSAL IS CONFIDENTAL AND INTENDED FOR THE INDICATED RECIPIENT ONLY. To: Stephens- Barrios Development 1231 N. Orange Ave., Suite B Orlando, FL 32804 Phone: 407 - 286 -2610 Fax: 509- 265 -8150 Project: Family Dollar Ocoee -REV .4itn: Kyle Massie, E.1 Quote By: Dan B Ladies & Gentlemen: We are pleased to submit our quotation for the Riley and Company. Inc. "H -20 Grinder Pac" FLYGT A-fP3068 Grinder Pumps, 6hp, 2' 10V/3 Phase, 30' Cables FLYGT Discharge Bases SS Guide Rails Pre - Plumbed (H -20 Rated) Fiberglass Wetwell Zvi Lifting Lugs (36" x' 186" Deep) ,Aluminum Wetwell Cover Pre - Plumbed Fiberglass Valve Box (40" x 30" x 24 ") .Aluminum Valve Box Cover SS Duplex Control Panel (City of Ocoee Spec) SS Lifting Chains SS Float Bracket Float Switches Cast -Iron Flanged Check Valves (2 ") Cast -Iron Flanged Plug Valves (2 ") SS Pressure Gauge SS Upper Guide Rail Brackets Inlet Hub Kit (Field Installed by Riley & Company) Start -Up Service NOTES: Price: $20,805.00 + Tax This quote is based on the specifications as shown on this proposal. Any changes or deviations from these specifications will affect the price. 1. Wetwell is shipped pre - plumbed w/ integral lifting= lugs, fiberglass slope in bottom, SCH. 80 PVC Piping, pump bases, guide rail assembly. SS Cable holder, vent, cover, and access hatch installed. 2. Valve box is shipped pre - plumbed wi fittings, valves, pump -out and lockable cover installed 3. Estimated ship date: 3 -4 weeks AFTER SHOP DRAWING .APPROVAL 4. Price includes freight charges to jobsite 5. P -Trap & Piping from wetwell to valve box slipped loose for contractor installation 6. Sci -Text Advantage System NOT included NOTE: Price DOES NOT Include parts & Labor to build control panel rack, mount control panel, run electrical conduits w/ seal -offs from wetwell to control panel, install pumps, and pull pump and float cables thru conduits for final start -up. 4Y.t1L:t'T TER1 1S: A'er 30 >1ays frnm invoice date, or be %ar•e Start -L• , whichever comes first -upon approved credit. Othernvi, pmvrnew shall be due on delivery qJ materials. Pavnrent shall not be dependent or contingent upon other pm•ments or draws. ACCF_PT.4 A'CF.• The above materials, prices, and pc{vnient rernu tire satisfacrory and hereby accepted by signatures below. Company Name: Signature. Date: Signature: Date: Riley and Company, Inc ?t'"' Elite Electrical of North Florida, Inc. 515 N Palm Ave, Suite 102 Palatka, Fl 32177 Ph:386 -3$5 -3152 CHANGE ORDER NUMBER 1 DATE 7/2114 OWNERlGC REF. NO SUBCONTRACT ORIGINAL CONTRACT AMOUNT TOTAL PREVIOUS CONTRACT CHANGES $ TOTAL BEFORE THIS CHANGE ORDER $ AMOUNT OF THIS CHANGE ORDER $ 4772.00 REVISED CONTRACT TO DATE $ TO: AP CONSTRUCTION PROJECT FAMILY DOLLAR OCOEE RETURN SIGNED CHANGE ORDER. WE WILL EXECUTE AND RETURN ONE (1) COPY FOR YOUR FILES. GENTLEMEN: ALL WORK TO BE PERFORMED IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS OF THE ABOVE REFERENCED CONTRACT AND THE APPLICABLE PORTIONS OF THE PLANS AND SPECIFICATIONS INCLUDING ALL ADDENDUMS. DESCRIPTION ADD INSTALL 100A, 1201208V, 3PHASE SE RVICE FOR LIFT STATION ! NCLUDES PEDESTALFOR MOUNTING EQU IPMENT $3479. INCLUDES METER CAN, N4 DISCONNECT AND SECONDARY SERVICE WITH 1/0 ALU CONDUCTORS ALL OTHER WORK AFTER DISCONNE SHALL BE BY OTHERS. COST TO INSTALL 18OFT 2° PVC $1293.00 CHANGES ACCEP D: SIGNED. NAME: lo� v I 5 e I rl r} DATE: f�"v Z 5, ao / '7_ The Work covered by this change order shall be performed under the same Terms and Conditions as that included in the original contract, unless stated otherwise above. Elite Electrical of North Florida, Inc. M SUBMITTED TO: DAYTIME PHONE: AP Construction 407 -212 -9928 ADDRESS: Fax /Email: Family Dollar CITY DATE Ocoee 2/17/14 SUPERVISOR: CONTACT: Derek Clarence Thornton BROWNIE'S SEPTIC AND PLUMBING PROPOSES THE FOLLOWING: Customer obtained Permit and Design Install a 1050 gallon Septic tank and 690 square foot drainfield 5500.00 - Customers plumber to connect tank once installed — install new outlet T and Header pipe with filter - cover to rough grade - Brownies not responsible for sod, irrigation or landscaping Sand for excavation and backfill 0275.00 per load if needed *Brownies will re submit proposal if scope of work changes* PAYMENT IS AS FOLLOWS: 2700.00 Deposit, balance due at Job Cover- U I authorize this work to be done. Prices do not include electrical wiring or connections. Brownie's Septic and Plumbing does not assume any responsibilities for damage to driveways, landscaping, sprinkler systems, sidewalks, fences, waterlines, sod, underground damages or mound stabilization, unless otherwise agreed to in writing. Initials Acceptance of quotation and contract —The prices and terms are satisfactory and are hereby accepted. Any and all changes must be initialed by both parties. Brownie's Septic and Plumbing Date of Acceptance Acceptance Signature SB SI3 OCOEE FDS, LLC September 15, 2014 Mr. David Wheeler, P.E. City of Ocoee 150 N Lakeshore Dr. Ocoee, FL 32761 RE: 20" Force Main Extension Wurst Road, Ocoee, FL Dear Mr. Wheeler: Thank you for the opportunity to earn your business and provide a proposal for the installation of the 20" Sanitary Force Main along Wurst Rd as per Civil Engineering Plans by Barrios Engineering, LLC. The Scope of Work shall be as follows: 1. Installation of 20" sanitary force main by CFE Corp. (David Stalowy) as per attached bid proposal to match scope of work from approved drawings - $421,655.44 2. Soils Testing - $3,000 (Not To Exceed) 3. Overhead (3 %) - $ 12,739.66 TOTAL PRICE - $ 437,395.10 This proposal includes the following qualifications and exclusions: 1. The Contractor will provide a credit to the City of Ocoee for the difference in quantities between bid amounts and actual/field installed amounts when field amounts are less than quantities shown on bid proposal. Conversely, the City will pay the contractor for additional /field amounts when these are greater than quantities shown on bid proposal. 2. All additive change orders and /or credits will be based on prices as per bid proposal attached hereto. 3. The contractor has excluded dewatering, if necessary. Again, we thank you for the opportunity to work with you and the City of Ocoee on this project. Best regards, y Carlos A. Barrios, P.E. SB Ocoee FDS, LLC 823 Irma ;k%enue - Orlando. Florida 32803 Phone: 107-2S6-2610 V) 0 m c a Q. w ,m V1 C O X W . C u L O 1 m O CC N C E C Q m O N L 3 CFE - 8 Weeks Schuller - 8 Weeks Tri -Sure - 8 Weeks Dewitt - 30 Weeks Pay Item # Description Unit Total Units Unit Cost Total Cost Unit Price Total Price Unit Cost Total Cost Unit Cost Total Cost U1 Bonds 1 LS $6,000.00 $6,000.00 $4,000.00 $4,000.00 $10,000.00 $10,000.00 $10,944.00 $10,944.00 U2 Mobilization, General Conditions 1 LS $15,610.00 $15,610.00 $30,000.00 $30,000.00 $35,000.00 $35,000.00 $97,500.00 $97,500.00 U3 IMaintenance of Traffic 1 LS $37,955.00 $37,955.D0 $10,000.00 $10,000.00 $5,000.00 $5,000.00 $19,600.00 $19,600.00 U4 Locate Utilities in Advance of Constrution 1 LS $4,672.00 $4,672.00 $4,000.00 $4,000.00 $10,000.00 $10,000.00 $5,160.00 $5,160.00 US Erosion and Sedimentation Control 1 LS $1,366.00 $1,366.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $5,880.00 $5,880.00 U6 Remove Cap and connect to existing 20" PVC DR -18 Forcemain 1 EA $2,541.00 $2,541.00 $1,000.00 $1,000.00 $5,500.00 $5,500.00 $8,672.30 $8,672.30 U7 Furnish & Install 20" PVC (C905) DR -18 Forcemain by Open Cut 1600 LF $78.50 $125,600.00 $95.00 $152,000.00 $120.00 $192,000.00 $84.61 $135,376.00 U8 Furnish & InstaII16" HDPE DR -11 with 24" HDPE DR -17 Casing by Direction Bore (Including Grout around Casing Pipe) 240 LF $323.25 $77,580.00 $325.00 $78,000.00 $400.00 $96,000.00 $381.32 $91,516.80 U9 Remove & Replace Existing Asphalt Driveway 122 SY $88.10 $10,767.78 $52.00 $6,355.56 $60.00 $7,320.00 $65.00 $7,930.00 U10 Open Cut & Restore Existing Roadway 319 SY $111.30 $35,492.33 $55.00 $17,538.89 $60.00 $19,140.00 $90.00 $28,710.00 U11 Mill and Construct 1" Type S -III Overlay on Roadway 320 SY $30.80 $9,856.00 $65.00 $20,800.00 $30.00 $9,600.00 $90.00 $28,800.00 U12 Remove & Replace Existing Sod - Bahia 2794 SY $3.80 $10,618.89 $4.00 $11,177.78 $3.00 $8,382.00 $6.25 $17,462.50 U13 Furnish & Install 16" Plug Valve 2 EA $6,081.00 $12,162.00 $10,000.00 $20,000.00 $7,500.00 $15,000.00 $6,742.50 $13,485.00 U14 Furnish & Install 16" 22.5 Bends 2 EA $2,342.00 $4,684.00 $3,200.00 $6,400.00 $1,500.00 $3,000.00 $2,105.70 $4,211.40 U15 Furnish & Install 20" x 16" Reducer 2 EA $2,516.00 $5,032.00 $2,800.00 $5,600.00 $1,500.00 $3,000.00 $2,488.55 $4,977.10 U16 Furnish & Install 20" x 4" Service Saddle with Corporation Stop 1 EA $4,604.00 $4,604.00 $5,000.00 $5,000.00 $1,500.00 $1,500.00 $5,600.50 $5,600.50 U17 Furnish & Install 4" Plug Valve 1 EA $1,486.00 $1,486.00 $1,500.00 $1,500.00 $1,000.00 $1,000.00 $975.00 $975.00 U18 Abandon Existing 4" FM (Cut and Cap Only) 1 EA $1,302.00 $1,302.00 $800.00 $800.00 $2,500.00 $2,500.00 $830.00 $830.00 U19 lRemove & Replace Existing Asphalt Sideslopes of Drainage Ditch 176 SY $93.05 $16,335.44 $50.00 $8,777.78 $100.00 $17,600.00 $75.00 $13,200.00 U20 Remove & Replace 15" RCP under Dirt Drive 20 LF $65.00 $1,300.00 $60.00 $1,200.00 $100.00 $2,000.00 $120.00 $2,400.00 U21 Furnish & Install 20" 45 Bends 2 EA $2,769.00 $5,538.00 $3,000.00 $6,000.00 $2,500.00 $5,000.00 $2,788.70 $5,577.40 U22 Install & Furnish 2" Air Pressure Release Valve 1 EA $5,625.00 $5,625.00 $6,500.00 $6,500.00 $7,500.00 $7,500.00 $12,711.50 $12,711.50 U23 24" x 20" Forcemain Connection 1 EA $4,625.00 $4,625.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $13,826.70 $13,826.70 U24 Furnish & Install 24" x 20" Reducer 1 EA $4,017.00 $4,017.00 $3,000.00 $3,000.00 $2,500.00 $2,500.00 $3,339.45 $3,339.45 U25 Furnish & Install 24" Plug Valve 1 EA $15,186.00 $15,186.00 $17,000.00 $17,000.00 $19,500.00 $19,500.00 $12,500.00 $12,500.00 U26 Railroad Insurance & Inspections 1 LS $1,700.00 $1,700.00 $4,000.00 $4,000.00 $12,000.00 $12,000.00 $8,750.00 $8,750.00 Total $421,655.44 $428,650.00 $498,042.00 $559,935.65 CFE CORPORATION September 16, 2014 Carlos A. Barrios, PE and Mr. David Wheller, PE, City Engineer Stephens - Barri os City Of Ocoee 823 Irma Avenue 150 North Lakeshore Drive Orlando, Florida 32803 Ocoee. Florida 34761 -2258 RE: WURST ROAD FORCE MAIN EXTENSION Should The City Of Ocoee select CFE, Corp. as the General Contractor for the WURST ROAD FORCE MAIN EXTENSION: Allow this signed /notarized document as my 45 day promise from the above date to allow The Ciry Of Ocoee to use the bid form provided by Stephens - Barrios in a formal agreement with the City of Ocoee for a Total Cost of $421,655.44 according to City of Ocoee General Conditions Section 01270 °Aleasurement And Payment' . I acknowledge and include all provisions within the License Agreement dated August 5 "'. 2014 between the Citv of Ocoee and the Florida Central Railroad Company. Inc. along with the City Of Ocoee Section 01270 Measurement And Payment Part 1- GENERAL and understand that payment to the contractor will be made only for the actual quantities of work performed. This written document recognizes The City Of Ocoee as the authority in which the bid form. prepared by Stephens - Barrios and completed by CFE, Corp. for the Total of 5421,655.44 to complete the project in 8 weeks maybe used in a formal agreement with the City Of Ocoee. Respectfully Submitted, David StaloNvy. pr sident CFE. Cog). Sworn to and subscribed before me this 16 day of September, 2014 Pers0__W knn.k OR produced identification . Identification type:__ Notary Public: State of FLORIDA COUNTY of Seminole 1 A CHRISTINA TABOR �(I T�L _ __ ___ My COMMISSION #FFI1g291 Prated, typed or m ' stamped commissioned name of notary public ? ,n�A EXPIRES April 7, 2015 (Q��) a98 ois� Flondallota rySewiee.com My Commission expires qh Central Florida Environmental, Corp. g'10 Belle Avenue • Suite ' • Winter Springs, Florida 327o8 Phone (4 8 34 -611 .5 • Fax (4 834-6391 CORPORATE AUTHORITY TO EXECUTE DOCUMENTS I HEREBY CERTIFY that a meeting of the Board of Directors of Central Florida Environmental Corgi a corporation under (Contractor's Corporate Name) the laws of the State of Florida held on the 16 day of September , 2014, the following resolution ww�s duly passed and adopted: f� ^� "RESOLVED, that David Statov,y (signature of i dividual) (typed name of individual) as president of the corporation, is hereby authorized to execute and all documents required to be signed by an officer of the Corporation in order to submit a valid bid, contract and bond for CITY OF OCOEE W44154 Rd. Forcerla" ', rX�e- i)&ion between the CITY OF OCOEE, a municipal corporation, and this corporation, and that his execution thereof, attested by the Secretary of the corporation and with corporate seal affixed shall be the official act and deed of this corporation." I FURTHER CERTIFY that said resolution is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the corporation t his 16th da of Septembe 2014. (CORPORATE SEAL.) (Corporate Secretary) i STATE OF Florida CITY OF Winter Springs The foregoing instrument was acknowledged before me this 16th d ay of cam, 2 014 b (name of officer or agent, title of officer or agent), of C FC, Co (name of corporation acknowledging), a 1'�o.��a (state at or place of incorporation) corporation, on behalf of the corporation. He She i personally known o me or has produced identification (type of identification) as identification and did/did not take an oath. 1 (Notary Public) CHRISTINA TABOR Mti' Commission Expires: IB MY COMMISSION #FF110291 EXPIRES April 7, 2018 (407) 3980153 Fl— dallotaryS —ice com CFE CORPORATION Non - Collusion Affidavit (1) The undersigned is authorized to make this affidavit on behalf of, Central Florida Environmental Corp. A Corporat formed under the laws of FL of which he is President (2) He is fully informed respecting the preparation and contents of the submitted bid proposal and of all pertinent circumstances respecting such bid; (3) Such bid proposal is genuine and is not a collusive or a sham; the person, firm or corporation named above has not colluded, conspired, connived or agreed directly or indirectly with any bidder or person, firm or corporation, to put in a sham Proposal, or that such other person, firm or corporation, shall refrain from bidding, and has not in any manner, directly or indirectly sought by agreement or collusion, or communication or conference with any person, firm or corporation, to fix the price or prices of said proposal or proposals of any other bidder; (AFFI NT) TAKEN, SWORN AND SUBSCRIBED TO BEFORE ME this Vb� day of 2014 Notary Public ( = BOR io2-1 TABOR nFF11U29i ril 7. 2018 (Print, Type or Stamp Commissioned Name of Notes Public) roice_com Personallv Known__ produced Identification _. Tvpe of Bid Form - Wurst Rd Force Main Extension CFE CORP. q - 15 -ZG 1-� Pay Item # Description Unit Total Units Unit Price Total Price U1 Bonds 1 LS $6,000.00 $6,000.00 U2 Mobilization, General Conditions 1 LS $15,610.00 $15,610.00 U3 Maintenance of Traffic 1 LS $37,955.00 $37,955.00 U4 Locate Utilities in Advance of Constrution 1 LS $4,672.00 $4,672.00 U5 Erosion and Sedimentation Control 1 LS $1,366.00 $1,366.00 U6 Remove Cap and connect to existing 20" PVC DR -18 Forcemain 1 EA $2,541.00 $2,541.00 U7 Furnish & Install 20" PVC (C905) DR -18 Forcemain by Open Cut 1600 LF $78.50 $125,600.00 U8 Furnish & Insta1116" HDPE DR -11 with 24" HDPE DR -17 Casing by Direction Bore (Including Grout around Casing Pipe) 240 LF $323.25 $77,580.00 U9 Remove & Replace Existing Asphalt Driveway 122 SY $88.10 $10,767.78 U10 10pen Cut & Restore Existing Roadway 319 SY $111.30 $35,492.33 U11 Mill and Construct 1" Type S -III Overlay on Roadway 320 SY $30.80 $9,856.00 U12 Remove & Replace Existing Sod - Bahia 2794 SY $3.80 $10,618.89 U13 Furnish & Install 16" Plug Valve 2 EA $6,081.00 $12,162.00 U14 Furnish & Install 16" 22.5 Bends 2 EA $2,342.00 $4,684.00 U15 Furnish & Install 20" x 16" Reducer 2 EA $2,516.00 $5,032.00 U16 Furnish & Install 20" x 4" Service Saddle with Corporation Stop 1 EA $4,604.00 $4,604.00 U17 Furnish & Install 4" Plug Valve 1 EA $1,486.00 $1,486.00 U18 Abandon Existing 4" FM (Cut and Cap Only) 1 EA $1,302.00 $1,302.00 U19 Remove & Replace Existing Asphalt Sideslopes of Drainage Ditch 176 SY $93.05 $16,335.44 U20 Remove & Replace 15" RCP under Dirt Drive 20 LF $65.00 $1,300.00 U21 Furnish & Install 20" 45 Bends 2 EA $2,769.00 $5,538.00 U22 Install & Furnish 2" Air Pressure Release Valve 1 EA $5,625.00 $5,625.00 U23 24" x 20" Forcemain Connection 1 EA $4,625.00 $4,625.00 U24 Furnish & Install 24" x 20" Reducer 1 EA $4,017.00 $4,017.00 U25 Furnish & Install 24" Plug Valve 1 EA $15,186.00 $15,186.00 U26 lRailroad Insurance & Inspections 1 LS $1,700.00 $1,700.00 Total Cost I Cost to complete in 8 weeks from NTP $421,655.44