Loading...
HomeMy WebLinkAboutItem #13 Comprehensive Plan Amendment Ordinance - Capital Improvements Element Update\W` %/ 0( 0e Florida AGENDA ITEM COVER SHEET Meeting Date: November 4, 2014 Item # 13 6�� Reviewed By: Contact Name: Michael Rumer Department Director: Contact Number: (407) 905 -3100 x 10 18 City Manager: Subject: Capital Improvements Element —Amendment Addition of the Fiscal Years 2014/2015 — 2018/2019 Capital Improvements Program Background Summary: The Capital Improvement Element (CIE) of the City of Ocoee Comprehensive Plan is a requirement of Chapter 163, Florida Statutes (FS) and enables implementation of the Plan goals, objectives, and policies needing capital funding for a 5 -20 year planning horizon. Each year, the table section of the CIE will be updated to ensure that the adopted list of capital projects in the CIE matches the City's newly adopted fiscal year budget and approved five year Capital Improvements Program (CIP). The CIE does not propose any new projects not previously reviewed and approved by the Commission. The Florida Legislature enacted legislation allowing adoption of the annual amendment to the CIE to be accomplished with a single public adoption hearing. Additionally, State Statute no longer requires a copy of the Ordinance to be transmitted to the Florida Department of Economic Opportunity (FKA: Department of Community Affairs "DCA "). Therefore, adoption of this Ordinance is final in its form and content. Issue: Should the Honorable Mayor and City Commission recommend adopting an Ordinance amending the Capital Improvements Element of the City of Ocoee Comprehensive Plan that includes the addition of the Fiscal Years 2014/2015 — 2018/2019 Capital Improvements Program? Recommendation: Staff recommends that the Honorable Mayor and City Commissioners adopt an Ordinance amending the Capital Improvements Element of the City of Ocoee Comprehensive Plan that includes the addition of the Fiscal Years 2014/2015 — 2018/2019 Capital Improvements Program. Attachments: Ordinance; Fiscal Years 2014/2015 — 2018/2019 Capital Improvements Program Financial Impact: Financial Impacts are indicated in the 5 -Year Capital Improvements Plan. Type of Item: (please mark with an z') Public Hearing For Clerk's Dept Use: X Ordinance First Reading Consent Agenda Ordinance Second Reading Public Hearing Resolution Regular Agenda Commission Approval Discussion & Direction Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney N/A Reviewed by Finance Dept. N/A Reviewed by () N/A 2 ORDINANCE NO. 2014- AN ORDINANCE OF THE CITY OF OCOEE, FLORIDA AMENDING THE OCOEE COMPREHENSIVE PLAN AS ADOPTED IN 1991, AS AMENDED, IN ORDER TO COMPLY WITH SECTION 163.3177, FLORIDA STATUTES; AMENDING THE CAPITAL IMPROVEMENTS ELEMENT OF THE COMPREHENSIVE PLAN; PROVIDING FOR SEVERABILITY; PROVIDING AN EFFECTIVE DATE. WHEREAS, on September 18, 1991, the City Commission of the City of Ocoee (the "Ocoee City Commission ") adopted the City of Ocoee Comprehensive Plan pursuant to Chapter 163, Florida Statutes, as set forth in Ordinance No. 91 -28, which has been amended from time to time (the "Comprehensive Plan "); and WHEREAS, pursuant to the provisions of Section 163.3177, Florida Statutes, the Ocoee City Commission is required to amend the Capital Improvements Element of the Comprehensive Plan to include an updated five -year schedule of capital improvements; and WHEREAS, the City has initiated an amendment to the Comprehensive Plan (the "Amendment ") in order to amend the Capital Improvements Element of the Comprehensive Plan to include an updated five -year schedule of capital improvements; and WHEREAS, pursuant to Section 163.3177(3)(b), Florida Statutes, the Amendment only requires a single public hearing which shall be an adoption hearing and does not count toward the limitation on the frequency of adoption of amendments to the comprehensive plan; and WHEREAS, the Ocoee City Commission desires to adopt the Amendment with such changes thereto as the Ocoee City Commission deems appropriate. NOW THEREFORE, BE IT ENACTED BY THE CITY COMMISSION OF THE CITY OF OCOEE, FLORIDA, AS FOLLOWS: Section 1. Authority The Ocoee City Commission has the authority to adopt this Ordinance pursuant to Article VIII of the Constitution of the State of Florida and Section Chapters 163 and 166, Florida Statutes. Section 2. Amendment to Table 6A of the Capital Improvements Element The Ocoee City Commission hereby replaces the existing Table 6A of the Capital Improvement Element of the Comprehensive Plan with the amended Table 6A as set forth on Exhibit "A" attached hereto and by this reference made a part hereof. Section 3. Severability If any section, subsection, sentence, clause, phrase, or portion of this Ordinance is for any reason held invalid or unconstitutional by any court of ORLA_ -I- competent jurisdiction, such portion shall be deemed a separate, distinct, and independent provision and such holding shall not affect the validity of the remaining portion hereto. Section 4. Effective Date This Ordinance shall become effective on the tenth (10 day after passage and adoption. PASSED AND ADOPTED this day of , 2014. APPROVED: ATTEST: Beth Eikenberry, City Clerk (SEAL) CITY OF OCOEE, FLORIDA S. Scott Vandergrift, Mayor ADVERTISED AND READ AND ADOPTED 2014 UNDER AGENDA ITEM NO. ORLA_ -2- EXHIBIT "A" (Table 6A) [SEE ATTACHED PAGES] ORLA_ -3- CAPITAL PROGRAM FISCAL YEARS 2015 - 2019 EXHIBIT "A" Capital Investment Program Project List, September 30, 2014 Dept./ Project Funding Description Fund Manager Total Need FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Source Major Buildings Withers- Maguire House Annual museum exhibit display upgrades; support for rotating exhibits 518 -00 SS $100,000 $25,000 $25,000 $25,000 $25,000 A(Wish List) City Hall and West Wing Buildings Upgrade Lighting and Install fence along parking lots at City Hall Complex 519 Pworks $18,000 $18,000 A(Wish List) Northwest Fire Station Design & construct free - standing fire station (also requires $400,000 for equipment and 12 new staff positions) 522 Fire $1,600,000 $1,600,000 A Police Headquarters Building Reconfigure training rooms to support larger groups 521 Pworks $30,000 $30,000 A Covered overhang for outside patio 521 Pworks $15,000 $15,000 A Handicap Access 521 Pworks $15,000 $15,000 A City Police Gun Range Construct new gun range 521 Pworks $100,000 $100,000 A Clean up old gun range 521 Pworks $100,000 $100,000 A Lakeshore Center Resurface parking lot 521 Pworks $25,000 $25,000 A Total Funding Required for Major Buildings g q g $2,003,000 $83,000 $170,000 $125,000 $25,000 $1,600,000 Funding Source Codes: A = Current Operating Revenues, B = Road Impact Fees, C = Revenue Bonds, D = Grant, E = Developer Contributions; F = Other, G = Repair Replacement Funds, H = Other Impact Fees Prepared by AI Butler on 10/27/2014 Page 1 CAPITAL PROGRAM EXHIBIT "A" FISCAL YEARS 2015 - 2019 Capital Investment Program Project List, September 30, 2014 Dept./ Project Funding Description Fund Manager Total Need FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Source Road Capacity additional stormwater retention 541 -10 Eng $4,335,000 Clarke Road $335,000 $4,000,000 B, E Update design Construct 112 mile of additional 2 lanes of Clarke Road and add $35,000 left -turn lane south of Clarcona -Ocoee Rd. 541 -10 Eng $896,232 $100,000 $650,000 $146,232 A, B Design $100,000 $100,000 $300,000 Roadway construction $650,000 $650,000 Utility construction $146,232 $4,000,000 $146,232 Fullers Cross Rd. at Ocoee - Apopka Rd. Reconstruct intersection by adding left -turn lanes on all Widen & improve road north of SR 50 approaches and reconstructing traffic signal 541 -10 Eng $750,000 $75,000 $675,000 B, E Design $75,000 $75,000 Construction $675,000 $675,000 '$250,000 received by Eagle Creek of Ocoee (Chevron) Franklin St. E Maguire Rd. - Phase V - Construct two additional lanes from end of four -lane 541 -10 Eng $1,800,000 section north of SR 50 to Story Rd. /Geneva St.; includes A (Wish List) Maine St. additional stormwater retention 541 -10 Eng $4,335,000 $335,000 $4,000,000 B, E Update design $35,000 $35,000 ROW acquisition $300,000 $300,000 Road construction $4,000,000 $4,000,000 Marshall Farms Rd. Widen & improve road north of SR 50 541 -10 Eng $112,486 $112,486 A Utility construction $112,486 $112,486 Franklin St. - Widen to SR 429 541 -10 Eng $1,800,000 $1,800,000 A (Wish List) Maine St. Construct an extension of Maine St. from Maguire Rd. to Bluford Ave. 541 -10 Eng $325,000 $325,000 A (Wish List) Richmond to Blackwood Avenue 541 -10 Eng $1,200,000 $1,200,000 A (Wish List) Old Winter Garden Rd. Extend road from Maguire Rd. west to Marshall Farms Rd. 533 Eng $104,000 $104,000 A Utility construction $104,000 $104,000 Extend Road West to Economic Ct/ SR 50 541 -10 Eng $800,000 $800,000 A (Wish List) Funding Source Codes: A = Current Operating Revenues, 6 = Road Impact Fees, C = Revenue Bonds, D = Grant, E = Developer Contributions, F = Other, G = Repair Replacement Funds; H = Other Impact Fees Prepared by Al Butler on 10/27/2014 Page 2 CAPITAL PROGRAM FISCAL YEARS 2015 - 2019 EXHIBIT "A" Capital Investment Program Project List, September 30, 2014 $150,000 $150,000 $150,000 $1,850,000 $450,000 Dept./ Proje Description Fund Manaq Roberson Rd. $500,000 Widen road to add turn lanes associated with Belmere commercial development; includes improvements at the Maguire $325,000 $1,475,000 $485,000 $6,212,718 Rd. intersection 541 -10 Eng State Road 50 (FDOT Project) Widen road to six lanes - Phase 2 (SR 429 interchange to Vintage Village Pkwy.) Multiple Eng Dash 3 Rest of Ocoee Install lighting Install landscaping (D3 & D5) Acquire ROW and construct Maguire Rd. SB thru lane south of SR 50 to provide 2 thru lanes across SR 50 Dash 5 Lake Lotta Install lighting Total Funds Required for Road Capacity Projects ct er Total Need FY 2015 $1,300,000 $1,300,000 $2,300,000 $0 $150,000 $150,000 $150,000 $1,850,000 $450,000 $150,000 $150,000 $150,000 $1,350,000 $1,350,000 $500,000 $500,000 $120,000 $120,000 $14,042,718 $5,545,000 $325,000 $1,475,000 $485,000 $6,212,718 FY 2016 FY 2017 FY 2018 FY 2019 Funding Source B, E A, F F (FDOT) F (FDOT) A F (FDOT) Funding Source Codes: A = Current Operating Revenues, B = Road Impact Fees; C = Revenue Bonds, D = Grant, E = Developer Contributions, F = Other, G = Repair Replacement Funds; H = Other Impact Fees Prepared by Al Butler on 10/27/2014 Page 3 CAPITAL PROGRAM FISCAL YEARS 2015 - 2019 $394,465 $353,081 $22,736 $87,000 $39,000 $330,345 $60,520 $57,945 $150,000 Capital Investment Program Project List, September 30, 2014 Dept./ Project Description Fund Manager Total Need FY 2015 FY 2016 Road Operations $30,000 $75,900 $30,000 A Street Resurfacing Program $71,550 Repave and /or reconstruct City streets (specific fiscal year project $4,350 assignments are made according to need and funding) 541 -10 Streets $1,947,546 Marshall Farms Rd. Eastern Segment $25,000 $25,000 $25,000 $22,736 Bluford (Geneva to Maine Street) $50,000 $50,000 $50,000 $87,000 Bluford (Columbus to Geneva) $39,000 Wurst Rd $330,345 Ridgefield Avenue (includes Speed Table Repairs) $60,520 Ocoee Hills Road $57,945 Olympus Drive /Acropolis Circle /Adriatic Drive $150,000 Sidewalk Construction Program Install sidewalks along City rights of way 541 -10 Streets $165,900 Kissimmee Ave. from Orlando Ave. to McKey St. $71,550 Beech Center area $4,350 Street Lighting 541 -10 Streets $10,000 Right of Way Improvement Program Enhance entranceway signing 541 -10 Streets $100,000 Install ROW landscaping & make repairs 541 -10 Streets $200,000 Install Crowne Point Pkwy. landscaping & irrigation 541 -10 Streets $100,000 Hackney Prairie Road Modify street to remove one lane of pavement on alternating sides so as to induce curves (traffic calming for new school) 541 -10 Streets $150,000 Toal Funds Required for Road Operations Projects $2,673,446 EXHIBIT "A" Funding FY 2017 FY 2018 FY 2019 Source $400,000 $400,000 $400,000 A $30,000 $30,000 $75,900 $30,000 A $71,550 $4,350 $10,000 A $25,000 $25,000 $25,000 $25,000 A $50,000 $50,000 $50,000 $50,000 A $100,000 A $150,000 A $394,465 $718,081 $505,000 $550,900 $505,000 Funding Source Codes: A = Current Operating Revenues, B = Road Impact Fees; C = Revenue Bonds, D = Grant, E = Developer Contributions, F = Other, G = Repair Replacement Funds, H = Other Impact Fees Prepared by AI Butler on 10/27/2014 Page 4 CAPITAL PROGRAM FISCAL YEARS 2015 - 2019 EXHIBIT "A" Capital Investment Program Project List, September 30, 2014 Dept./ Project Funding Description Fund Manager Total Need FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Source Utilities (Water, Sanitary Sewer, and Reclaimed Water) Citywide Water System Improvements 535 -10 Eng $796,125 Wesmere retrofit - Phase 1 535 -10 Eng $928,012 Wesmere retrofit - Phase 2 535 -10 Make minor repairs and upgrades to water plants 533 Water $113,743 $21,000 $21,840 $22,714 $23,622 $24,567 A Make minor waterline replacements & upgrades 533 -10 Water $81,245 $15,000 $15,600 $16,224 $16,873 $17,548 A Make major waterline replacements & upgrades 533 -10 Water $2,031,121 $375,000 $390,000 $405,600 $421,824 $438,697 A,G Replace and /or install new fire hydrants 533 -10 Water $81,245 $15,000 $15,600 $16,224 $16,873 $17,548 A South Water Plant Well #3 Pre -Stage Piping Project 533 Water $150,000 $150,000 A Florida Turnpike Widening 533 -10 Water $584,929 $584,929 G Water Facilities renewal replacements 533 Water $841,466 $157,900 $114,504 $235,248 $286,727 $47,087 G Waterline upsizing new development 533 -10 Water $269,485 $84,000 $43,680 $45,427 $47,244 $49,134 A,H Citywide Sanitary Sewer Collection & Transmission System Improvements Replace sanitary sewer manholes 535 -10 SanSew $81,245 $15,000 $15,600 $16,224 $16,873 $17,548 A Generator Addition for Lift Station #32 535 -10 SanSew $85,000 $85,000 A Make minor repairs and upgrades to wastewater plant 535 SanSew $113,743 $21,000 $21,840 $22,714 $23,622 $24,567 A Lift station renewal replacements 535 -10 SanSew $955,344 $139,378 $266,506 $177,899 $226,779 $144,782 G Wastewate treatment plant renewal and replacements 535 SanSew $1,589,662 $228,500 $273,056 $473,395 $337,572 $277,139 G Sewer line upsizing new development 535 -10 SanSew $269,485 $84,000 $43,680 $45,427 $47,244 $49,134 H Reclaimed Water Distribution System Construct system extensions Lake Olympia retrofit 535 -10 Eng $796,125 Wesmere retrofit - Phase 1 535 -10 Eng $928,012 Wesmere retrofit - Phase 2 535 -10 Eng $1,085,775 Plantation Grove West (Windermere Groves) 535 -10 Eng $300,300 Improvements Related to Specific Developments Eagle Creek (water & reclaimed water main upsizing) 535 -10 Eng $250,000 Arden Park South (upsizing reclaim line) 535 -10 Eng $40,000 Old Winter Garden Road extension west of Maguire Road 533/535 Eng $112,486 Marshall Farms Road south of SR 50 533/535 Eng $108,160 Clarke Road Widening 533/535 Eng $146,232 Maine Street Extension 533/535 Eng $112,486 $796,125 $300,300 $40,000 Downtown CRA 533/535 Eng $112,486 Total Funds Required for Utility Projects $11,239,774 $2,186,903 $1,562,206 A $928,012 A,C,F $1,085,775 A,C,F A,C,F $250,000 C,F A $112,486 C,F $108,160 C,F $146,232 A,G,H $112,486 A,C,H $112,486 A,G,H $1,477,096 $2,868,237 $3,145,333 Funding Source Codes: A = Current Operating Revenues, B = Road Impact Fees, C = Revenue Bonds, D = Grant, E = Developer Contributions, F = Other, G = Repair Replacement Funds; H = Other Impact Fees Prepared by Al Butler on 10/27/2014 Page 5 CAPITAL PROGRAM FISCAL YEARS 2015 - 2019 EXHIBIT "A" Capital Investment Program Project List, September 30, 2014 Dept./ Project Funding Description Fund Manager Total Need FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Source Parks & Recreation Jim Beech Park Install soccer field concession stand 572 -10 P &R $110,000 $110,000 A, F Storage Building 572 -10 P &R $50,000 $50,000 A Make athletic field improvements (grading, Bermuda sod, irrigation upgrades, security fence, parking area expansion, signage, and backstops) 572 -10 P &R $150,000 $150,000 A Skate park 572 -10 P &R $250,000 $250,000 H Parkside /Coventry Replace playground equipment and install safety surface 572 -10 P &R $75,000 $75,000 A Install lights at tennis court 572 -10 P &R $31,000 $31,000 A,F City Trail System Build north- central segment (connects Lake Hackney, Prairie Lake, and Lake Meadow using mainly City -owned property) 572 -10 P &R $2,500,000 $625,000 $625,000 $625,000 $625,000 H Tiger Minor Park Install 4 -inch well and irrigation system 572 -10 P &R $12,000 $12,000 A Construct Phase 2 of tennis courts and parking 572 -10 P &R $200,000 $200,000 A Construct Phase 3 of tennis courts and parking 572 -10 P &R $1,100,000 $1,100,000 A Rogers Property Develop recreational facility (Note: Funding has been allocated in each fiscal year 110 P &R $7,412,465 $220,000 $1,900,000 $1,500,000 $1,500,000 $2,292,465 A,C,D,F,H Softball tournament -level complex (4 fields & parking) $3,500,000 $100,000 $1,900,000 $1,500,000 H (Wish List) Extend Wurst Road (includes ROW acquisition) $750,000 $750,000 Extend water and sewer utilities $292,465 $292,465 Construct basketball courts, playgrounds, trails, picnic shelters, and other inprovements (funds are required beyond the CIP Plan horizon to complete the project) $2,750,000 $457,535 $2,292,465 Acquire additional property $120,000 $120,000 A (Wish List) Funding Source Codes: A = Current Operating Revenues, B = Road Impact Fees, C = Revenue Bonds, D = Grant; E = Developer Contributions, F = Other; G = Repair Replacement Funds; H = Other Impact Fees Prepared by Al Butler on 10/27/2014 Page 6 CAPITAL PROGRAM FISCAL YEARS 2015 - 2019 EXHIBIT "A" Capital Investment Program Project List, September 30, 2014 Dept./ Project Funding Description Fund Manager Total Need FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Source Vignetti Park Athletic field expansion & improvements to western area of park (drainage improvements, Bermuda sod, irrigation upgrades, security fence, parking area expansion, signage, backstops, and goals) 572 -10 P &R $280,000 $280,000 A Skateboard Park 572 -10 P &R $250,000 $250,000 A (wish List) Install sport lighting on multipurpose athletic fields 572 -10 P &R $200,000 $200,000 A Renovate softball field and spectator area 572 -10 P &R $200,000 $200,000 A Renovate parking area and service drive 572 -10 P &R $30,000 $30,000 A Replace playground equipment 572 -10 P &R $75,000 $75,000 A Make general park improvements (replace property line fence, renovate basketball and handball courts, upgrade walkways and picnic area) 572 -10 P &R $300,000 $300,000 A Safety netting 572 -10 P &R $100,000 $100,000 A (wish List) Multiple Parks Retrofit athletic facility lighting 572 -10 P &R $200,000 $100,000 $100,000 A, C, D, E, F, H Renovate tennis courts, restrooms, and concession stands 572 -10 P &R $250,000 $125,000 $125,000 A, C, D, E, F, H Central Park Make general park improvements (renovate walkways and pavilions, improve security lighting, renovate restrooms, improve signage, upgrade entrance sign, improve fence) 572 -10 P &R $200,000 $100,000 $100,000 A Upgrade sport field lighting 572 -10 P &R $183,000 $183,000 A (wish List) Sorensen Park Renovate restrooms and concession building 572 -10 P &R $150,000 $150,000 A Replace property line fence 572 -10 P &R $75,000 $75,000 A Renovate parking area and extend service drive; improve stormwater drainage and control erosion 572 -10 P &R $300,000 $300,000 A Montgomery Rd Construct improvements 572 -10 P &R $10,000 $10,000 A Jamela Street Park Construct improvements 572 -10 P &R $40,000 $40,000 A, C, D, F, H Funding Source Codes: A = Current Operating Revenues; B = Road Impact Fees; C = Revenue Bonds, D = Grant; E = Developer Contributions, F = Other, G = Repair Replacement Funds, H = Other Impact Fees Prepared by Al Butler on 10/27/2014 Page 7 CAPITAL PROGRAM FISCAL YEARS 2015 - 2019 EXHIBIT "A" Capital Investment Program Project List, September 30, 2014 Description Ocoee Cemetery improvements Construct improvements Removal of existing chain link fence and installation of ornamental fence with brick columns along the front of the cemetery Bridge Enhancement (remove existing stucco finish and install new brick or stone veneer), Install new ornamental style gate to match ornamental fence, Install new security lights at the entrance and interior of Cemetery, and Enhance landscape within interior of Cemetery Replace existing galvanized chain link fence with new black vinyl coated chain link fence Install irrigation system and Enhance landscape along the front of the Cemetery and interior sections Install entrance sign, Enhance roadway bollards, and Enhance amenities Total Funds Required for Parks & Recreation Projects Dept./ Project Funding Fund Manager Total Need FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Source 539 -00 P &R $245,000 A $45,000 $50,000 $50,000 $50,000 $50,000 $14,978,465 $858,000 $3,792,000 $3,931,000 $3,000,000 $3,397,465 Funding Source Codes: A = Current Operating Revenues; B = Road Impact Fees, C = Revenue Bonds, D = Grant; E = Developer Contributions: F = Other, G = Repair Replacement Funds, H = Other Impact Fees Prepared by Al Butler on 10/27/2014 Page 8 CAPITAL PROGRAM FISCAL YEARS 2015 - 2019 EXHIBIT "A" Capital Investment Program Project List, September 30, 2014 $59,000 City Contribution - Construction Dept./ Project $100,000 Description Fund Manager Total Need FY 2015 Stormwater 538 -20 Storm $35,000 $35,000 A Wekiva Basin Projects Design & build projects described in the Wekiva Basin Plan 538 -20 Storm $1,300,000 $300,000 Peach Lake Manor 4 Correct flooding problem and upgrade stormwater management 538 -20 Storm $581,000 $300,000 $300,000 $300,000 A (Phases 6 and 7) $4,648,000 $1,258,000_ $1,290,000 $1,000,000 $550,000 $550,000 (Phase 8) $49,585,403 $10,325,368 $7,857,287 $8,513,096 $7,479,137 $15,410,516 Starke Lake Drainage Improvements (Main Ditch) Design & Construct Baffle Box System on Main Ditch at City Hall 538 -20 Storm $350,000 Flewelling Avenue Project 538 -20 Storm $200,000 Storm Drainage replacement $200,000 Retention Pond #19 538 -20 Storm $100,000 Replace pond with sedimentation structure Industrial Regional Stormwater Treatment Facility 538 -20 Storm $182,000 Preliminary Design, Permits Grant Application $23,000 Funding FY 2016 FY 2017 FY 2018 FY 2019 Source $250,000 $250,000 $250,000 $250,000 A $186,000 $395,000 $100,000 A $350,000 A A A A Final Design $59,000 City Contribution - Construction $100,000 Russell Drive Drainage Improvements Endwall replacement 538 -20 Storm $35,000 $35,000 A Misc Pond at Public Works Site Compensating storage for OLC 538 -20 Storm $300,000 $300,000 A Other Capital Investments Conduct small projects 538 -20 Storm $1,600,000 $400,000 $300,000 $300,000 $300,000 $300,000 A Total Funds Required for Stormwater Projects $4,648,000 $1,258,000_ $1,290,000 $1,000,000 $550,000 $550,000 Total Capital Improvement Program Funding $49,585,403 $10,325,368 $7,857,287 $8,513,096 $7,479,137 $15,410,516 Funding Source Codes: A = Current Operating Revenues, B = Road Impact Fees; C = Revenue Bonds, D = Grant, E = Developer Contributions; F = Other; G = Repair Replacement Funds; H = Other Impact Fees Prepared by Al Butler on 10/27/2014 Page 9