HomeMy WebLinkAboutItem #07 Consumer Court Lift Station #62 Construction Project- Pre-Purchase of Station's Pump & Control Panel``'/ Ocoee florlda AGENDA ITEM COVER SHEET Meeting Date: May 19, 2015 Item # Contact Name: Contact Number Charles K. Smith, P.E 407 - 905 -3159 Reviewed By: Department Director: Charl City Manager: Robert Fra Subject: Consumer Court Lift Station #62 Construction Project — Pre - purchase of Station's Pump and Control Panel Background Summary: Due to construction conflicts, the second phase of the State Road 50 Widening project requires the relocation of portions of the City's sanitary sewer collection system. The affected infrastructures are the gravity mains and manholes on the south side of roadway west of Bluford Avenue, and the north side of the roadway from 300 west of Maguire Road. Currently, both the north and south side gravity main systems of S.R. 50 convey the flow to the east, eventually combine, and finally convey the flow to lift station #7. The general conveyance is counter intuitive as the flow must overcome rising topography, and the collection system has historically been subject to operational issues. The widening project provides the City with the opportunity to address operational issues and increases system capacity by first allowing much of the flow to be redirected west, this reduces flows to the remaining system. At the terminus of the new system is the proposed Consumer Court lift station (behind Dunkin' Donuts). Initially, the station will pump into the remaining S.R. 50 gravity system; however, upon completion of the proposed downtown sewer /western transmission main system, it will be diverted accordingly. Bids were solicited for the Consumer Court Lift Station #62 Construction Project on May 10, 2015, but due to significant lead time for the pumps and control panel, staff is requesting to directly purchase them from Xylem Inc., Flygt. City Commission approved Flygt, Xylem Inc., as a sole source vendor of the pumps and panels on May 1, 2012. Issue: Should the City Commission Authorize the City Manager to pre - purchase the Consumer Court Liftstation #62 Construction Project pumps and control panels from Flygt in the amount of $62,081.00? Recommendations Staff recommends the City Commission authorize the City Manager to pre - purchase the Consumer Court Liftstation #62 Construction Project from Flygt, Xylem Inc., in the amount of $62,081.00. Attachments: Proposal for Pumps and Control Panel, from Flygt, Xylem Inc., for Lift Station #26. Financial Impact: The S.R. 50 Project (City Project No. 31701) has a current balance of $145,529.24. The pump and control panel purchase of $62,081.00 will leave a remaining balance of $83,448.24. The estimated cost of the completed station, including pumps and panel is $330,000; therefore, $184,470.00 will need to be transferred from fund 408 until proceeds from a secured financing are received in late summer or fall 2015. Type of Item: (please mark with an 'V) Public Hearing Ordinance First Reading Ordinance Second Reading Resolution Commission Approval Discussion & Direction For Clerk's Dept Use: Consent Agenda Public Hearing Regular Agenda Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney Reviewed by Finance Dept. Reviewed by O N/A N/A N/A W FL IGW a xylem brand To: City of Ocoee Attn: Charles Smith, P.E., Utilities Director Subject: LS 8 Pump /Panel Quote Quote Number: We are pleased to offer the following equipment: Date: May 1, 2015 (1) Duplex Control Panel, 20HP, 460/3 to City Standards with SciTech RTU, Danfoss Variable Frequency Drives, Pyle National Generator Receptacle (100A) and Level Transducer (2) 4" Flygt NP 3153/462, 20HP, 460/3 with 50' Motor Cable and FLS Disabled Price: $ 62,081.00 plus taxes, freight included, FCA; Shipping Point (per Incoterms 2010) THIS PROPOSAL WILL EXPIRE IN NINETY (90) DAYS UNLESS EXTENDED IN WRITING BY XYLEM, INC. NOTE: WE DO NOT SUPPLY, PIPING, VALVES, GUIDE BARS, PRESSURE GAUGES, DISCONNECTS, JUNCTION BOXES, KELLUMS GRIPS, SURGE PROTECTION EQUIPMENT, SPARE PARTS, LABOR OR ANY OTHER ITEM NOT SPECIFICALLY LISTED ABOVE. TERMS: Subject to credit approval net 45 days after date of invoice or 100% payable before start -up of equipment (whichever comes first).A service charge of 1.5% per month will be added to all balances unpaid 30 days after invoice date. Failure to pay in accordance with these terms will void all warranties. A cancellation charge of 20% of the value of the order will be assessed for special orders or control panels cancelled after production is completed. CONDITIONS: 1. Price is firm based on our receiving complete approval and release for productions four (4) weeks after drawings have been submitted by Xylem, Inc. 2. PARTIAL BILLING WILL BE MADE ON ANY PARTIAL SHIPMENT. We thank you for your interest in our equipment and look forward to being of service to you in the near future. IN THE ABSENCE OF A FORMAL ISSUED PURCHASE ORDER, A SIGNED FACSIMILE COPY OF THIS PROPOSAL IS ACCEPTABLE AS A BINDING CONTRACT. Xylem Water Solutions, Inc. Scott Rachal Company Name: Accepted By: Print Name: Date: xylem Lets Solve Water Xylem Inc / Flygt Products 2152 Sprint Blvd. Apopka Florida 32703 Phone: 407 - 880 -2900 • Fax: 407 - 880 -2962