HomeMy WebLinkAboutItem #10 Approval of Notification of Emergency Wastewater Treatment Plant Replacement SCADA Upgrade and Modifications to VT SCADA 9
`` 'J
ocoee
florida
AGENDA ITEM COVER SHEET
Meeting Date: November 17, 2015
Item # O /
Reviewed By: ,A
Contact Name: Charles Smith Department Director: Charles , i , ;
Contact Number: 407-905-3159 City Manager: Robert Frank ,7 7/-
Subject: Notification of Emergency Wastewater Treatment Plant Replacement SCADA Upgrade
and Modifications to VT SCADA
Background Summary:
The wastewater treatment plant is equipped with computers and process control software that
monitors and controls the treatment process. This system is called a Supervisory Control and Data
Acquisition (SCADA) system.
On July 7, 2015, the wastewater plant's operations building experienced a lightning strike which
severely damaged its SCADA computer. The older PC, running Windows XP, included a version of
Wonderware HMI SCADA software that was not upward compatible. Plant personnel were able to find
used parts to return the PC to rudimentary operation with limited functions and features. The obsolete
PC's continuous operation was tenuous, and any further repairs unlikely. Staff met with the City
Manager and it was agreed that the SCADA application need immediate replacement.
With the notion to centralize the department's SCADA operations, the Utilities Department selected VT
SCADA by Trihedral Engineering Limited, represented by Sanders Company, for the department's
future SCADA platform. The department was in the final stages of upgrading both water treatment
plants to VT SCADA, and was also in the process of upgrading the wastewater plant's lift station as
well. The wastewater plant's PC/PLC and software was under consideration for budgeting within the
next few years, but due to the status of the PC/compatibility with the SCADA software, the emergency
repair of the wastewater plant's SCADA system was initiated. The work was to be integrated with the
implementation of the water plants' SCADA conversion, with the cost for the wastewater plant
conversion totaling $31,264.00 and is to be completed by Sanders.
Per Section 21.6 Emergency Purchases of the City's purchasing policy: the Department Director may
make emergency purchases, with the authorization of the City Manager, in accordance with
emergency purchase procedures set forth in the Purchasing Manual.
Per Section 9 Emergency Purchases, purchases exceeding the City Manager's normal purchasing
limit of$25,000, shall require notification of the expenditure and nature of the emergency to the City
Commission by the Department Director or the City Manager.
Issue:
Notification to City Commission of the emergency conversion of the wastewater plant's SCADA
system to VT SCADA by Trihedral Engineering Limited, utilizing the services of Sanders Company.
Recommendations:
No motion required.
Attachments:
Sanders Company, Inc. Scope of Supply Proposal
Financial Impact:
Funding for the Emergency Wastewater Treatment Plant modifications from Kruger SCADA to VT
SCADA in the amount $31,264.00 shall come from the Repair & Replacement Fund (407-535-00-
6302).
Type of Item: (please mark with an "x")
Public Hearing For Clerk's Dept Use:
Ordinance First Reading X Consent Agenda
Ordinance Second Reading Public Hearing
Resolution Regular Agenda
Commission Approval
Discussion& Direction
X Original Document/Contract Attached for Execution by City Clerk
Original Document/Contract Held by Department for Execution
Reviewed by City Attorney N/A
Reviewed by Finance Dept. N/A
Reviewed by 0 N/A
2
4411) SANDERS
COMPANY, INC.
2816 Southeast Monroe Street
Stuart, Florida 34997
772.220.2900
Date: July 9, 2015
Project: Modification of Kruger HMI to VT Scada
City of Ocoee Tom King:
In accordance with the attached Terms and Conditions, Sanders Company is
pleased to offer the following materials/services for the above referenced project.
PRICE, DELIVERY AND TERMS OF OFFERING
Prices submitted are for equipment/services specifically listed within this Scope of
Supply which constitute our complete offering.
Scope of the Project
Option-A
Sanders Company is providing a quotation for the following:
Convert existing Kruger screens to VT Scada and load on server.
Convert existing Kruger script files to PLC logic and load into PLCs.
Setup redundancy between servers to maintain constant control of Plant.
SCI's price does not include: Taxes
Option "A" Price $ 13,764.00
Option-B is in addition Option "A" and converts all existing Kruger screens
to 3D enhanced graphics
Option "B" Price $ 17,500.00
Total for Option A&B Price $ 31,264.00
DELIVERY: weeks after complete and acceptable approval is received in the
Stuart offices of Sanders Company, Inc.
TERMS OF PAYMENT
Based on initial and continuing credit approval by Sanders Company, Inc., the
following payment terms apply: Net 30
SCI form 575 Terms and Conditions, which is attached, is an integral part
of this offering.
Thank you for the opportunity to offer this Scope of Supply.
Please contact me with any questions and/or comments regarding this offering.
PAGE i OF 3
SANDERS
COMPANY, INC.
2816 Southeast Monroe Street
Stuart, Florida 34997
772.220.2900
Rom RoOi,wtt¢
Sales
Cell 321-229-7643 Stuart office 800-247-0880
Ron@Mrsewage.com
PAGE2OF3
ilb, SANDERS
COMPANY, INC.
2816 Southeast Monroe Street
Stuart, Florida 34997
772.220.2900
TERMS AND CONDITIONS
Sanders Company, Inc.
2816 SE Monroe St
Stuart, Fl 34997
AN ORDER WILL CONSTITUTE A CONTRACT BETWEEN THE COMPANY AND THE
BUYER WHEN ACCEPTED IN WRITING BY THE COMPANY AT ITS HOME OFFICE
IN STUART FLORIDA. A CONTRACT RESULTING FROM THE ACCEPTANCE OF AN
ORDER MAY BE CANCELED OR ALTERED BY THE BUYER ONLY IF AGREED TO
IN WRITING BY THE COMPANY AT ITS HOME OFFICE SUBJECT TO PAYMENT OF
REAONABLE CHARGES NECESSARY TO PROTECT THE COMPANY FROM LOSS.
UNTIL ACCEPTED,AS PROVIDED HEREIN,AN ORDER SHALL CONSTITUTE AN
OFFER TO PURCHASE. NEITHER THE ACCEPTANCE OF ANY DEPOSIT MADE
WITH AN ORDER NOR THE CASHING OF ANY CHECK OR OTHER INSTRUMENT
THEREFOR, NOR THE HOLDING OF SUCH DEPOSIT BY THECOMPANY SHALL BE
DEEMED AN ACCEPTANCE OF AN ORDER, BUT IF THE ORDER IS NOT
ACCEPTED, THE COMPANY WILL PROMPTLY REFUND SUCH DEPOSIT. THE
COMPANY SHALL NOT BE LIABLE FOR ANY FAILURE TO MAKE DELIVERY OR
OTHER DEFAULT BY REASON OF ANY OCCURRENCE OR CONTINGENCY
BEYOND THE REASONABLE CONTROL OF THE COMPANY OR OF ANY OF ITS
SOURCES OF SUPPLY. IN THE EVENT OF ANY SUCH OCCURRENCE OR
CONTINGENCY THE COMPANY MAY EXTEND DELIVERY SCHEDULES OR MAY,
AT ITS OPTION, CANCEL THE ORDER IN WHOLE OR IN PART WITHOUT LIABILITY
OTHER THAN TO RETURN ANY DEPOSIT OR PRE-PAYMENT. SHOULD THE
WHOLE ORDER BE CANCELED, THE BUYER WILL REIMBURSE THE COMPANY
FOR ALL TAXES, EXPENSES AND SIMILAR CHARGES BASED UPON OR
MEASURED BY THE PRODUCTION, STORAGE, SALE, TRANSPORTATION OR USE
OF THE PRODUCTS DESCRIBED HEREIN.THE COMPANY SHALL NOT BE BOUND
BY ANY TERMS, CONDITIONS, OR REPRESENTATIONS WHICH ARE NOT STATED
HEREIN. THE COMPANY SHALL NOT BE OBLIGATED TO PERFORM HEREUNDER
IF AT ANY TIME: BUYER'S CREDIT RATING BECOMES IMPAIRED. THE COMPANY
SHALL RETAIN A SECURITY INTEREST IN THE PRODUCTS/SERVICES SUPPLIED
HEREUNDER TO SECURE PERFORMACE OF BUYER'S OBLIGATIONS AND BUYER
SHALL EXECUTE ALL FINANCING STATEMENTS AND OTHER INSTRUMENTS
THAT THE COMPANY DEEMS NECESSARY TO PERFECT ITS SECURITY
INTEREST. IF THE BUYER DEFAULTS IN ANY OF ITS OBLIGATIONS HEREUNDER
OR IS UNABLE TO PAY ITS DEBTS AS THEY MATURE, THE COMPANY SHALL
HAVE THE RIGHT TO REPOSSESS THE PRODUCTS WITH OR WITHOUT RESORT
TO LEGAL PROCESS. ACCEPTANCE OF THIS SUBMISSION ACKNOWLEDGES
THAT EQUIPMENT LISTED IS IN COMPLIANCE WITH THE PLANS AND
SPECIFICATIONS OR IS ACCEPTED AS AN EQUAL TO THE PLANS AND
SPECIFICATIONS. THE FOREGOING TERMS AND CONDITIONS WILL PREVAIL
NOTWITHSTANDING ANY VARIANCE WITH THE TERMS AND CONDITIONS OF
BUYER'S ORDER FOR THE PRODUCTS.
cr.! c-lr
PAGE 3OF3
Eggerichs, Brandy
From: King, Tom
Sent: Wednesday, October 21, 2015 2:48 PM
To: Smith, Charles
Subject: FW: Lightning Damage at the Wastewater Treatment Plant
One more time.This is it.
From: King, Tom
Sent: Wednesday, October 21, 2015 7:41 AM
To: Smith, Charles
Subject: Lightning Damage at the Wastewater Treatment Plant
Charles, please look at this and let me know if it needs changes.
Charles,
We have been working to resolve the lightning damage to the wastewater treatment plant that occurred on July 70,
2015.
Staff that was on duty at the time highly suspect the Utilities communications tower or the Operations Building took a
direct hit by lightning which severely damaged the plant SCADA computer.The WWTP process operating software was
damaged with the computer. Plant operations staff had to work around the clock to operate the plant while Sanders
made some temporary repairs to the SCADA system.The software for the Wastewater Treatment Plant is 20 years old
and is no longer supported.
As you are aware,Sanders is working on completing the Water Treatment Plant Instrumentation and SCADA project
along with converting several lift stations over to the new VTSCADA system. We are unable to have replace or get
support for the WWTP process operations software. In an effort to keep all of Utilities Facilities SCADA software
consistent, Sanders has been instructed facilitate emergency repairs and to replace the WWTP computer and install and
configure the new VTSCADA software and operations programming on the new WWTP computer. The cost to convert
existing Kruger screens and PLC logic to VTSCADA is$31,264.00
Please let me know if you have any questions.
/a/VP
Utilities Facilities Manager
City of Ocoee
1800 A. D. Mims Rd.
Ocoee FL, 34761
321 239 5283
1