HomeMy WebLinkAboutItem #14 Approval of Project Funding Increase to Finalize the Lift Station #62 Project C)COee Florida AGENDA ITEM COVER SHEET Meeting Date: April 5, 2016 Item # y Reviewed By: 'I Contact Name: Charles K. Smith, P.E. Department Director: Charles K. 'mith, P.E. Contact Number: 407-905-3159 City Manager: Robert Frank / Subject: Approval of Project Funding Increase to Finalize the Lift Station#62 - • ect Background Summary: On June 16, 2015, City Commission awarded a construction contract to Central Florida Environmental Corp. (CFE) for the construction of the Consumer Court Lift Station #62 in the amount of $297,629.28; and on November 17, 2015, Commission authorized Change Order#1, increasing the project's cost by $33,584.80, for a revised construction contract amount of$331,214.08. A second change order{Change Order#2 (Final)}, with an increase of$834.21, (to be authorized by the City Manager) brings the final construction contract amount for the project to $332,048.29. The original total project budget was $429,196.00, and included within Change Order #1 was an increase bringing the total project budget to $443,496.00, an increase of $14,300.00. This action is requesting an increase of$11,504.00, making the final total project cost $455,000.00. A summary of the project expenses is attached. The station, located at the southern end of Consumer Court south of S.R. 50, is in operation and improves the sanitary collection system along S.R. 50 and provides for significant conveyance capacity increases in the area. Issue: Should the Mayor and City Commission increase the Lift Station #62 project's total funding by $11,504.00 to $455,000.00? Recommendations Motion for Mayor and Commission to approve increasing the Lift Station #62 project's total funding by $11,504.00 to $455,000.00. Attachments: Summary of Project Costs for Lift Station #62 Financial Impact: The$11,504.00 will utilize funds from Fund 408 - Maguire Road Reclaim Pumping Project,job#14212. Type of Item: (please mark with an x') Public Hearing For Clerk's Dept Use: Ordinance First Reading X Consent Agenda Ordinance Second Reading Public Hearing Resolution Regular Agenda X Commission Approval Discussion&Direction Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney N/A Reviewed by Finance Dept. ` N/A Reviewed by 0 N/A 2 Mayor Commissioners Rusty Johnson John Grogan District 1 City Manager 4N9,14. Rosemary Wilsen, District 2 Richard Firstner, District 3 Robert Frank )('()(-)() Joel F. Keller, District 4 florid° MEMORANDUM TO: Robert Frank City Manager FROM: Charles K. Smith, P.E. Utilities Director DATE: April 5, 2016 RE: Summary of Project Costs for Lift Station 62 Below is the final project expense summary for Lift Station #62's design, construction and placement into service: Company/Vendor Expense Description Totals Central Florida Environmental, Inc. $332,048.29 Contractor Installing Lift Station Construction Subtotal: $332,048.29 Miscellaneous Expenses Amec,Inc. $5,500.00 Pre-design sub-soils Investigation Tierra $2,475.00 Construction material testing Duke Energy $16,745.00 Electrical Service Sanders*A $4,120.00 Pump Variable Frequency Drive Supplier(VFD) Xylem(Flygt)*A $66,756.00 Pump and Panel(Including SCADA Control System)Supplier Wekiva River Mitigation Bank $2,200 Mitigation Requirement From FDEP/SJRWMD for wetland encroachment Reiss Hydraulic Design and FDEP permit support for $18,120.00 both Operational and Wetland Permits FDEP $670.00 Permit Fees EMI Consulting Specialties $1,128.00 Electrical Review and Certification of Plans Orlando Sentinel $185.00 Construction Bid Advertisement Misc. Expenses $5052.71 Numerous Items to support project Misc.Expense Subtotal: $122,951.71 Final Project Cost: $455,000.00 *A Due to project time: pumps, controls and VFDs were preordered directly by the City. City of Ocoee Utilities Department• 1800 A.D. Mims Road • Ocoee, Florida 34761 Phone: (407) 905-3159 • Fax: (407) 877-5899 •www.ocoee.org