HomeMy WebLinkAboutItem #08 Approval of Change Order #1 to Bluford Avenue Stormwater and Utility Improvements Project ocoee florida AGENDA ITEM COVER SHEET Meeting Date: June 7, 2016 Item # l Reviewed By: Contact Name: Charles K. Smith, P.E. Department Director: Stevy r; • t/ Contact Number: 407-905-3159 City Manager: Robert Fr ,oji�// ( , Subject: Change Order #1 to Bluford Avenue Stormwater and Utility Improvements Project (District 2 Commissioner Wilsen/District 3 - Commissioner Firstner) Background Summary: The original Bluford Avenue Stormwater and Utility Improvements Project was comprised of certain roadway, drainage and utility improvements; and was awarded by City Commission to Dewitt Excavating, Inc. on October 6, 2015. The project's utility improvements included the installation of a 16" sanitary sewer forcemain running the length of Bluford Avenue from Delaware Street to Columbus Street. This main is a part of the Downtown Sewer—Western Transmission Project, which will contain a new sewer conveyance system, collecting flow from the west side of Ocoee and including the south Maguire Road corridor. The transmission project calls for the extension of a sanitary forcemain from the Ocoee Wastewater Treatment Facility along Wurst Road, North Lakewood Avenue, Rewis Street, Bluford Avenue, and Columbus Street, which will tie in to an existing forcemain located on Maguire Road. To receive flows from South Maguire Road, 150 feet of main has already been constructed under S.R. 50 with the road widening project. The western transmission project also includes a second 12" forcemain interconnection between Bluford Avenue and Maguire Road, within the Franklin Street right-of-way. With the completed forcemain under S.R. 50 and the Bluford Stormwater Project, the only segment of the western transmission main south of Delaware Street which still needs to be constructed is the 740 feet of main along Columbus Street. This extension is contiguous to the main constructed by the Bluford project. As the contractor is still onsite, and the installation of the main can be generally covered under the existing contracted unit items, the addition of the work to the current contract will minimize disruption to the area; and staff is recommending the Columbus Street forcemain work be added to the original scope of work through Change Order#1. Charles K. Smith, P.E., the Director of Utilities, will be available for any questions. Issue: Should the Mayor and City Commission approve Change Order#1 to authorize the addition of 740 feet of 16" sanitary forcemain for the Downtown Sewer—Western Transmission Project to the Bluford Avenue Stormwater and Utility Improvements Project? Recommendations: Motion for Mayor and Commission to approve Change Order #1 in the amount of $126,100.38, for a total project cost of $1,551,649.48, for the Bluford Avenue Stormwater and Utility Improvements Project. Attachments: 1) Change Order#1 2) Redlined Plan Sheets C-1 &C-2 Columbus Street Plan & Profile: Downtown —Western Transmission Project 3) Dewitt Fee Proposal Financial Impact: The $126,100.38 funds needed for Change Order#1 are available in the Downtown Sewer—Western Transmission Main Project (G/L #408-531-00-6302, project#24901) which currently has an unencumbered balance of$360,000. Type of Item: (please mark with an z') Public Hearing For Clerk's Dept Use: Ordinance First Reading X Consent Agenda Ordinance Second Reading Public Hearing Resolution Regular Agenda �J Commission Approval Discussion&Direction X Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney N/A Reviewed by Finance Dept. N/A Reviewed by 0 N/A 2 ocoee florida CITY OF OCOEE 150 North Lakeshore Drive Ocoee,Florida 34761 *This Change Order Requires Action by the City Commission* B 15-08 BLUFORD AVENUE STORMWATER AND UTILITY IMPROVEMENTS PROJECT (RE-BID) CHANGE ORDER NO._1_ DATE: 5/3/2016 PURCHASE ORDER: 1423788 The following changes are hereby made to the CONTRACT DOCUMENTS. Original CONTRACT PRICE $1,425,549.10 Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDERS $1,425,549.10 Net Increase (Decrease)Resulting from this CHANGE ORDER $126,100.38 The current CONTRACT PRICE including this CHANGE ORDER $1,551,649.48 Original CONTRACT COMPLETION DATE: [August 18,20161 Current CONTRACT COMPLETION DATE adjusted by previous CHANGE ORDERS [August 18, 20161 Net Increase Resulting from this CHANGE ORDER 101 days Current CONTRACT COMPLETION DATE including this CHANGE ORDER [August 18,20161 c, B15-08 Bluford Ave Stormwater&Utility Improvements(Re-Bid) CHANGES ORDERED: I. REQUIRED CHANGES Required Changes include 740 LF of 16"FM, fitting,valves and appurtenances. The construction of the new 16"FM is along Columbus Street beginning at Bluford Avenue and ending at Maguire Road. The 16"FM is to connect the two existing FM systems to the AD Mims Wastewater Treatment Facility. II. JUSTIFICATION The Downtown Sewer—Western Transmission Project builds a new sewer conveyance system, collecting flow from the west side of Ocoee including the south Maguire Road corridor. The work includes extending a forcemain from the Ocoee Wastewater Plant along Wurst Road,Lakewood Avenue,Rewis Street,Bluford Avenue, and Columbus Street, tying into an existing forcemain located on Maguire Road. To receive flows from South Maguire Road, 150 feet of main is needed under S.R. 50 (work has previously been completed under the state road widening project). The western transmission project also includes a second interconnection between Bluford Avenue and Maguire Road,with the proposed main planned along Franklin Street. With the completed forcemain under S.R. 50, and a portion of the transmission main included within the original Bluford Avenue project,the only segment of the western transmission main south of Delaware Street which still needs to be constructed is the 740 feet of main along Columbus Street. The completion of the remaining forcemain is timely as the Bluford Avenue project contractor is available and has a current, itemized contract with the City. Completing the work at this juncture shall minimize the disruption to the area that would be caused by a second contractor's efforts. III. NARRATIVE OF NEGOTIATIONS Dewitt and City Representatives utilized the current bid item quantity costs for the Bluford Avenue Improvements to estimate the costs for the 16"FM construction. IV. PAYMENT The construction cost for the 16"FM is$126,100.38 V. APPROVAL AND CHANGE AUTHORIZATION The original project and funding allocation was established by issuance of a CITY purchase order, subject to the terms and conditions contained in the CITY's solicitation, Project Manual, Drawings, Specifications, and/or the CONTRACTOR's service and price proposal, which collectively form the terms of an agreement between the CITY and the CONTRACTOR for the performance of the Work. This proposed change to the agreement requires approval by the City Commission under the CITY's Purchasing Rules and Regulations and is consistent with any prior action by the City Commission to award the Work to the CONTRACTOR. It is expressly Change Order#_1 (Commission) B15-08 Bluford Ave Stormwater&Utility Improvements(Re-Bid) understood and agreed that the approval of the Change Order shall have no effect on the original agreement other than matters expressly provided herein. CONTRACTOR acknowledges, by its execution and acceptance of this Change Order, that the adjustments in contract price and time shown hereon constitute full and complete compensation . and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the CITY for the Work covered by this Change Order. The CONTRACTOR hereby waives and releases any further claims for cost or time against the CITY arising from or relating to the matters or Work set forth or contemplated by this Change Order. [Balance of this page was left blank intentionally] Change Order#_1 (commission) B15-08 Bluford Ave Stormwater&Utility Improvements(Re-Bid) RECOMMENDED BY: ACCEPTED BY: CITY OF OCO E, FLORIDA 'Dewitt Excavation, LLCI / /X- B By: &a) Sinature /Signature Date: 5'LC - 16 Date: S` 3/ze/G Title: O„(/ g_eCTC1a . Title: SE fM APPROVED BY: CITY OF OCOEE, FLORIDA By: Date: Rusty Johnson,Mayor Attest: City Clerk FOR USE AND RELIANCE ONLY BY THE APPROVED BY THE CITY OF OCOEE CITY OF OCOEE,APPROVED AS TO FORM COMMISSION IN A MEETING HELD ON AND LEGALITY THIS DAY OF ,20 UNDER ,20 AGENDA ITEM NO. By: City Attorney Change Order#_1_(Commission) B15-08 Bluford Ave Stormwater&Utility Improvements(Re-Bid) , r� =• v 03 11- 5 o ; 0 a C) v 4 L d c. w r a > a t0 m ° .+r• a 1- qt re O a a "r 1. :2 3 = a, 0 m z 0 3 cl m �o c E r o L r �%] = rn 5 _ _ sa >co 0 U UF, e I- i' r Z d d 111111 r OO H a7 = o'd d [n P1 re al z IIIIIIIIII 1 gr) c s c Ei a a L !Ill! E 4 I Pal I 11111111111111 It 174 c O °, bi) L Cs U = E O i+ 1- m a)ai d o n Y CC Y 2 2, L (, N -o W ca O Z E 2 COLUMBUS STREET 16" FORCE MAIN WASTEWATER IMPROVEMENTS PROJECT BID FORM Item# Quantity Unit Item Description Unit Price Extensions 1.00 ROADWAY AND DRAINAGE 1.01 1 LS Mobilization/Execution of General Requirements(Max.5%) $2,500.00 $2,500.00 1.02 1 LS Prevention Control,Abatement of Erosion and Water Pollution $2,716.00 $2,716.00 1.03 1 LS Maintenance of Traffic $3,000.00 $3,000.00 1.04 1 LS Survey Stakeout for Construction/As-Built Survey $2,280.00 $2,280.00 1.13 50 SY Concrete Drives and Sidewalk(6"Thick) $34.29 $1,714.50 1.16 36 LF FDOT Type'F'Curb $12.83 $461.88 1.18 670 LF Miami Curb and Gutter $16.66 $11,162.20 1.19 55 LF FDOT 3'Valley Gutter $20.88 $1,148.40 1.40 1,230 SY Sodding(Bahia) $4.30 $5,289.00 SUBTOTAL= $30,271.98 2.00 SIGNING AND PAVEMENT MARKING 2.051 351 LF Solid Traffic Stripe,Thermoplastic(6"White)-Completed w/Bluford Striping I $2.28 $79.80 SUBTOTAL= $79.80 3.00 UTILITIES 3.04 2 EA Furnish and Install 16"x 2"Saddle Connection to 2"FM(Saddle and Valve Included) $1,000.00 $2,000.00 3.14 740 LF Furnish and Install 16"SDR 25 PVC Force Main w/Fitting $48.09 $35,586.60 3.17 465 LF Grout In-Place(Flowable Fill)(2"Line) $11.00 $5,115.00 3.22 1000 SY Roadway Restoration for Utilities(Columbus,Orlando,7th and Delaware) $37.65 $37,650.00 3.23A 60 LF Furnish and Install 2"Poly Force Main w/Fitting and Constraints $12.00 $720.00 3.24A 1 EA Furnish and Install 12"x 12"Wet Tap to Existing 12"FM(Saddle and Valve Included) $7,800.00 $7,800.00 3.25A 1 EA Furnish and Install 12"Plug Valve and Box(Force Main) $5,277.00 $5,277.00 3.26A 2 EA Furnish and Install 2"Plug Valve and Box(Force Main) $800.00 $1,600.00 SUBTOTAL= $95,748.60 TOTAL BASE BID $126,100.38 • N N , N �' 00+509 VLS 2NI1 H91VI $ C) b Fm I ".� �€ so F<o °g II; m g JI gggig 3 < Jsi3 ^'_ 1 $a o ti 3g> S3g3< I gao s�i - „ ' au 6 Y I n ie. w a r�'4 .= I I — d IN:it I G I - 10 iiI 3 .I $ m y = F- I'1. n O • d -' ii u v \I o w n ---�-- - „ 11 -o+ �� 'w iH 1 X 1 1 m O x \, a N w W S '6--- _. .._.....___ Y I�m$ Ste. a W �o . _, .7.__--- - — s o �. Ij I -1- m a� ce �1 �I� ��� m =o gl a r e W I- 0 cO r x 3 s 8 m+ o T..3 .. J ��� Ja I l! C NO r S •,;` � �� FI /I■U . l I1, 9 c S• ti H.8H '_ _ l ,� % r� &-Jb ws'° '4 x T. �� �I L`2� Fw \ y< li !_-1 „ LL 0OO _l I I U' LL W O W �r �� g5mo $ 'g a :Zv m \I o 8 > I g w�< $ ° �/ , QR xq . III \ _,I f r °m ll 1 l 58 < 3 5�" i , I ; n : W `'i Ii, - II k.I. g 1 ,y< \,II 1 I ! 1 _' R x - A 1 / . q0.a ..______-. o y J g-*---('''; / 1—..7.---T.--7- '�; yNNyb 31Y ' I 6 A .-.-'__ ° tea^'Z ' '.-7-7'- --. � _ 9 �x w z. I g w yy _ �h� _ I., 2b W2 1 He= _ ss2 `s °sue.<r� 3 aIk N o N $ro �O N O il- w I 1.` Wr $e I 11 i I I J LL rn ti CL n g as 51 p i 30 °t �° o ° �. — a 0 0 a+vmmns '1.'1' ;; �— �b I q 41 5 �, �` IP L < // __- .... --- 1 6 $ II:z t__ itill ii til 1 ii a _ 2 •T 1 m w r— o- ` a o LoLL,- I 2x z gig. °W "! a° o W O I I I j o So I ma o p o I HI °a o 17,LL h m .%b... z U �LL I ng g I I < } I� € I I O° O I °I-° 004.S09 V1S 3NI l HOltlW 1 I i I I I !..1 s W q g $ N z P ..S 3 ■ —_.... I 378 g'� : W s g'..15. — � o : R li $ ff _ ., n N I