Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Item #08 Approval of Reclaimed Water Main Extension by the Arbours at Crown Point Apartments
t ocoee florlda AGENDA ITEM COVER SHEET Meeting Date: February 7, 2017 Item # Contact Name: Milen D. Womack, MAyV Development Engineer Contact Number: 407-554-7081 Reviewed By. - Department Director: Chart S.E. i City Manager: Robert Fr Subject: Reclaimed Water Main Extension by the Arbours at Crown Point Apartments Background Summary: To provide customers with cost effective utility services and conserve valuable potable water, the City of Ocoee has been maturing the North Utility Service Area by constructing a looped system of reclaimed water mains. Currently the loop is constructed on Ocoee -Apopka Rd, West McCormick Rd, Ingram Rd, and the Northern portion of Clarke Rd. Please refer to the attached Figure 1 to see the system of mains and proposed links to be completed. Having a mature reclaimed system will allow the City to adequately provide reclaimed water to the current neighborhoods in the North Part of the City and the neighborhoods currently under construction such as Crown Pointe Cove, The Preserve at Crown Point, Westyn Bay Commercial, Forest Lake Estates, Arden Park, Oak Trail Reserve, McCormick Reserve, and the Arbours Apartments at Crown Point City Staff worked with the developer of the Arbours at Crown Point PUD, Arbour Valley Development, LLC, and agreed to construct a portion of the loop north of Fountains West Blvd (Segment 2 in Figure 1) provided the City reimburse the developer for the improvement. The portion of the main constructed by Arbour Valley Development was 540 linear feet of twelve (12) inch reclaimed water pipe and will stub out near the City of Winter Garden property to the north. A connection from this reclaimed water main to the City Owned Forest Lake Golf Course property will be constructed in the future. Attached is the Arbour Valley Development Reclaimed Utility Line Reimbursement Request (dated January 16, 2017) for the twelve (12) inch reclaimed line north of Fountains West Boulevard. This reimbursement request includes the direct cost paid to the contractor, direct cost paid to the civil engineer for design, and a do -not - exceed amount for legal fees associated with creating an easement for the reclaimed water main. Additionally, the Change Order by Doster Construction Company, LLC (signed September 9, 2016) in the amount of $24,772 is attached along with an invoice from Miller Legg for the Reclaim Main Design (sent August 24, 2016) in the amount of $3,500. These costs appear to be reasonable to other costs recently experienced by staff. Issue: Should the City reimburse Arbour Valley Development, LLC for the construction of 540 feet of a twelve (12) inch reclaimed main extension north of Fountains West Boulevard in the amount of $33,272? Recommendations The Utilities Department recommends the acceptance of the Proposal submitted by Arbour Valley Development, LLC for the reclaimed water main extension north of Fountains West Boulevard and that the funds be released to reimburse Arbour Valley Development, LLC accordingly ($33,272). Attachments: 1. Arbour Valley Development Reclaimed Utility Line Reimbursement Request (dated January 16, 2017) 2. Doster Construction Company, LLC Change Order (signed September 9, 2016) 3. Miller Leqq Invoice for the Reclaim Main Design (sent August 24, 2016) 4. Wholesale Reclaimed Water Service Area (Figure 1). Financial Impact: Funds to be used by this project will be expended from (408-535-10-6302) in the amount of $33,272.00 using funds available due to the favorable bid of the Lake Olympia Neighborhood Reclaimed Water Retrofit Project in the amount of $576,429.50, where $1,046,125 was programmed for the project. Type of Item: (please mark with an `k ) Public Hearing For Clerk's Dept Use: Ordinance First Reading Consent Agenda Ordinance Second Reading Public Hearing Resolution Regular Agenda X Commission Approval Discussion & Direction Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney IN/A Reviewed by Finance Dept. PN/A Reviewed by () N/A 2 &TARBOUR a,VALLEY OEVELOPMENI To: City of Ocoee From: Arbour Valley Development, LLC Date: Jan 16, 2017 Re: Re-claimed Utility Line Reimbursement Request In accordance with the City of Ocoee's request, Arbour Valley Development has completed the installation of a City -owned re-claimed utility line on the site of our development project, the Arbours at Crown Point. Arbour Valley Development is requesting that the City reimburse the direct costs that we have incurred in order to design and construct this project in accordance with the City's wishes. Arbour Valley Development's direct costs are as follows: Direct cost paid to contractor: $24,772 Direct cost paid to civil engineer for design: $3,500 Legal fees associated with easement: $5,000 Please make the reimbursement check payable to Arbours at Crown Point, LLC. Thank you for your expeditious processing of this request, and we are happy to have been able to accommodate the City's request and help improve the City's infrastructure. Sincerely, Gabe Ehrenstein Managing Member Corporate Office: 242 Inverness Center Drive, Birmingham, AL 35242 T 205-981-3300 www.arbourvalley.com MILLERLEGG ARBOUR VALLEY DEVELOPMENT, LLC Invoice Number 6340 VIA TIERRA Date BOCA RATON, FL 33433 Contract: 1300203 Client ID: 2477 ARBOURS APARTMENTS 1300203-00037 8/24/2016 Email Invoice to Gabe Ehrenstein: nabeC5larbourvalley.com Mail Invoice to Stacey Graveman: 33 Inverness Center Pkwy. SteLL120, Birmingham, AL 35242 FOR PROFESSIONAL SERVICES: For work in progress from 7/24/16 through 8/20/16. Task Description Contract Amount Percent Complete Billed To Date Previously Billed Current Billed 12T2 Update Record Drawings 3,600.00 12T3 Off -Site Design -Water Reuse Main 3,500.00 100.00% 100.00% 3,600.00 3,500.00 0.00 0.00 3,600.00 3,500.00 Lump Sum Total 7,100.00 100.00% 7,100.00 0.00 7,100.00 12T1 Miscellaneous Construction Services Hours Rate Amount ENGINEER II — Timothy Ziegler 10.00 135.00 1,350.00 - Review as -built drawings - Review as built - Closeout FDEP clearance ENGINEER III — Joaquin Mojica 9.00 170.00 1,530.00 - review concrete shop drawings - coord. club house drainage solution Labor subtotal 19.00 2,880.00 Task subtotal 2,880.00 Reimbursable Expenses Units Rate Amount FEDEX-Bob Smith -Public Works 6/30/16 35.51 Blackline Prints-24x36 B/W - 8/8/16 12.00 1.62 19.44 Reimbursable subtotal 12.00 54.95 Task subtotal 54.95 Previous balance due 0.00 Total due (to date) 10,034.95 DUE ON PRESENTATION: 1.5 % Carrying Charge After 30 Days. IMPROVING COMMUNITIES. CREATING ENVIRONMENTS. South Florida Office: S747 N Andrews Way - Fort Lauderdale, Florida 33309-2364 (954) 436-7000 - Fax: (9S4) 493-6S39 )E / [)FW www.millerleggcom Change Order Request Detailed (with Breakdown of PCOs), Grouped by Each Number 16-2-00 Arbours at Crown Point FEE AGREEMENT Project # 16-2-00 Doster Construction Company, Inc. 1176 Arbour Point Way Tel: 205-757-4781 Fax: Ocoee, Florida 34761 To: Gabe Ehrenstein From: Brian Corley Arbours at Crown Point, LLC Doster Construction Company, Inc. 33 Inverness Center Parkway 2100 International Park Drive Suite LL130 Birmingham, AL 35243 Birmingham, AL 35242 Description Category Status Additional 12" Reuse Reference Required By Days Req Amt Req 9/9/2016 0 24,772 Notes PCO No, Date Reference Amt Prop Days Req Category Reason Description Notes DCCI017 9/2/2016 24,772 0 12" Reuse Line Item No Item Description Amt Prop Reference 001 SDC install new 12" reuse line on East side of 22,318 Property 002 Subguard Bond 1 % 223 003 Doster GCs 6% 1,339 004 Doster BO 2% 446 005 Doster Fee 2% 446 Approved By: 9-6-16 Signature Name Gabe Ehrenstein Date Prolog Manager Printed on: 9/2/2016 Doster Constructionl Page 1 Lake Al, op kn t I r'h 11 t / Y I Beach Ave HIII or c v y � q Section J Dr a m c T o J J ti N N Paradise E N 0 > c o c` L co a aHeightsy valley Dr a 1 Fine Glhror� ke F 6„ 1 16" 2" Future Storage and Repump Facility - Site A 1j •••n, ••III 11 it t WHOLESALE SERVICE AREA = 6" "II 1 toy'.: nd 12 1 Future Storage and 1 IRepump Facility/- Site B 1 1� I � ••Ln>• 1 12" 1 polo! kloy re Fullers ♦�*p7 ,r� n es`Ef �ef*�i�T Is t ■ OVA ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ is 2 n d Ave ero K a v n Orange County Utilities Northwest N 0 Water Reclamation Facility W E S OCU Point of o 1,000 2,000 Connection u Feet R 1 © 1 LEGEND ® Phase II Future RW Facility tr,L'.IK� to l w Reclaimed Pipe - Segment I Pipe (Existing) Segment 2 Pipe (In Construction; L li.N jIFl, Segment 3 Future Pipe = Segment 4 Future Pipe —Segment 5 Future Pipe 1 — Existing Pipe i Existing Golf Course Pipe a19.■ s i 11 CENTRAL SERVICE AREA U �a Y ■ ■ ■ Sub -Service Areas att.■.■vaerr ��1 Reclaimed Service Area City of Ocoee Kko Wholesale Reclaimed Water Service Area (WRWSA) Figure 1 Existing Infrastructure 9 Reclaimed Plan Uodale - Fiqure 2.mxd