HomeMy WebLinkAboutEmergency Item #01 Approval for additional services in the amount of $17,598 to effect design changes directed by the City and to extend the contract time to the end of the construction schedule – Change Order No. 2. 4kr 000E'P_ florlda AGENDA ITEM COVER SHEET Meeting Date: May 1, 2018 Item # Emergency Reviewed By: Contact Name: Al Butler, Director Department Director: Contact Number: 407-554-7063 City Manager: .�� - Subject: Approval for additional services in the amount of $17,598 to effect design changes directed by the City and to extend the contract time to the end of the construction schedule — Change Order No. 2. Background Summary: The Lakeshore Center Expansion is a capital project included in the city's list of approved investments using funds allocated from the 2017 General Fund Capital Bond Issue and a focal point of the Downtown Master Plan. The original plan was to construct an adjacent and connected 400-seat banquet and conference facility at a cost of $4 million. A conceptual design study found that a less expensive alternative that reduced the overall footprint of the building was to expand the existing structure to the north. This approach produces a single 400-seat banquet hall with a construction cost estimate of slightly less than $2 million. In accordance with the Florida Consultants' Negotiation Act (CCNA), the City Commission awarded the design work to one of the city's two continuing services architectural firms, Rhodes + Brito, which had done the original design in 2013. In the course of developing the plan to expand the facility, it was determined that a separate storage building for outdoor event equipment (mostly chairs and tables) was more cost-effective than enlarging the main building by a comparable amount. The building will also include a laundry facility for staff to clean and prepare linens for rental events. In addition, a 125-seat banquet hall was included in the main building's design to accommodate smaller events, support larger indoor weddings, allow break-out sessions for business conferences, and provide a more suitable pre-function support space. After the final plan review, the Parks & Recreation Department requested changes that would enlarge the staff office space, which requires relocating the family restroom. These changes impact several plan sheets, including architecture, interior elevations, plumbing, electrical, HVAC, lighting, fire safety, and finishes. The amount of work imposed on the architect and design engineers have prompted a request to increase the design fee by $17,598. Of this amount, $7,309 would go to the architect and the majority ($10,289) would go to design subconsultants for HVAC, electrical, plumbing, and structural engineering elements of the work. The amount of the change order represents a 7% increase in the design fee. Design costs remain about 6% of the expected cost of construction. Issue: Should the City Commission approve the proposed Change Order No. 2? Recommendation: Staff recommends that the City Commission authorize the Mayor to execute the attached Change Order No. 2, and that the city accordingly increase the amount of the related purchase order. The increase in the design fee is justified by the increase in effort and is consistent with the increased cost of construction. In addition, staff recommends that the City Manager be given the ability to make future adjustments to contract amount and duration within the scope of his purchase approval authority. Attachments: • Draft Change Order No. 2 • Proposed design fee adjustment request from architect Financial Impact: Approval of the proposed Change Order No. 2 will increase project costs but is within the currently available funding. Type of Item: (please mark with an "x") Public Hearing For Clerk's Dent Use: Ordinance First Reading x Consent Agenda Ordinance Second Reading Public Hearing Resolution Regular Agenda x Commission Approval Discussion&Direction X Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney Uses existing contract and approved change order form X N/A Reviewed by Finance Dept. "- k,19 N/A Reviewed by ( ) N/A ocoee florid() CITY OF OCOEE 150 North Lakeshore Drive Ocoee, Florida 34761 LAKESHORE CENTER EXPANSION PROJECT CHANGE ORDER NO. 2 DATE: May 1, 2018 The following changes are hereby made to the CONTRACT DOCUMENTS. Original CONTRACT PRICE $203,753.00 Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDERS $239,348.00 Net Increase (Decrease) Resulting from this CHANGE ORDER $17,598.00 The current CONTRACT PRICE including this CHANGE ORDER $256,946.00 Original CONTRACT COMPLETION DATE: October 25, 2018 Current CONTRACT COMPLETION DATE adjusted by previous CHANGE ORDERS November 17, 2018 Net Increase Resulting from this CHANGE ORDER 120 days Current CONTRACT COMPLETION DATE including this CHANGE ORDER March 17, 2018 Lakeshore Center Expansion Project, Design Change Order#2 CHANGES ORDERED: REQUIRED CHANGES AND JUSTIFICATION This change order modifies the total cost of design services to accommodate an increase in cost of plan preparation due to recent changes directed by the City and to extend the period for providing construction administration services to the final completion date forecast by the construction manager at risk, The Collage Cos. II. NARRATIVE OF NEGOTIATIONS The proportional increase in Contract Price is substantially than the proportional change in the construction cost estimate, and the period of contract extension matches the period of construction. IV. PAYMENT There is no change in the payment schedule. Progress payments are made as the Work progresses. V. APPROVAL AND CHANGE AUTHORIZATION The original project and funding allocation was established by issuance of a City purchase order, subject to the terms and conditions contained in the City's contract and/or the Architect's service and price proposal, which collectively form the terms of an agreement between the City and the Architect for the performance of the Work. This proposed change to the agreement requires approval by the City Commission under the City's Purchasing Rules and Regulations and is consistent with any prior action by the City Commission to award the Work to the Architect. It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original agreement other than matters expressly provided herein. The Architect acknowledges, by its execution and acceptance of this Change Order, that the adjustments in contract price and time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the Architect as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the City for the Work covered by this Change Order. The Architect hereby waives and releases any further claims for cost or time against the City arising from or relating to the matters or Work set forth or contemplated by this Change Order. [signature page follows] Lakeshore Center Expansion Project, Design Change Order#2 RECOMMENDED BY: ACCEPTED BY: CITY OF OCOEE, FLORIDA RHODES +BRITO, ARCHITECTS By: A&'7 , By: Signature Si ,?! re Date: 4ri/ 24 g%9 Date: 1. Z '. 20/15 Title:Prete c „cp orl-- ,r'✓ices Title: f/�,.r4„e4Ev(Jr APPROVED BY: CITY OF OCOEE, FLORIDA Owner Date: Rusty Johnson, Mayor Attest: Melanie Sibbitt, City Clerk FOR USE AND RELIANCE ONLY BY THE APPROVED BY THE CITY OF OCOEE CITY OF OCOEE,APPROVED AS TO FORM COMMISSION IN A MEETING HELD ON AND LEGALITY THIS DAY OF ,20 AS , 20 AGENDA ITEM NO By: City Attorney Lakeshore Center Expansion Project, Design Change Order#2 rhodes+brito AA 0002809 ARCHITECTS April 24,2018 Mr.Jack A. Butler(Al) CIP Manager City of Ocoee 150 N Lakeshore Drive Ocoee, FL 34761 Re: Fee Proposal for City of Ocoee Lakeshore Center Expansion,Design Revision Additional Services-002 , p, Dear Al, In regards to the Owner/CM/Design Team kick-VE meeting held on March 29, 2018,we have prepared the attached additional services request for the proposed City of Ocoee, Lakeshore Center Expansion Building. The following scope revisions outline the proposed revisions to the project as discussed with you and City officials and supersede the scope outlined in our previous proposal of May 1, 2017. 1. Project Budget: The CM construction estimate is currently at$3,533,291 with value engineering options to help reduce cost. After submittal of project for permitting,the City has requested additional design changes via email on April 3, 2018. 2. Scope of Work: The scope of the project has been modified to include the following: 2.1 Add the space presently occupied by the Family Restroom to the existing space occupied by the Equipment Room to create the new Office space for staff occupancy. The existing door to the Family Restroom would be removed. There would be no changes to the existing plan to also repurpose the previously proposed new IT/Tech Room as an additional staff office area with an outside entrance from the new North Porch. 2.2 Relocate the Family Restroom to the area proposed for Bridal Suite lockers with a doorway to the north. 2.3 Relocate the proposed lockers to the outside new west wall of the proposed Family Restroom. 2.4 Relocate the door to the proposed restroom in the Bridal Suite to the west wall of that room. 2.5 Extend the Foyer hallway by relocating the present door to the Bridal Suite (nee Meeting Room) further west and removing the wall partition spanning from the restrooms on the south to the Food Service area on the north. 3. Schedule:We will make changes to the Construction Documents clouding all changes for submission to permitting. The schedule for the remaining construction documents will be submitted to the City once the permit is approved. 4. Additional Fee:Our proposed Lump Sum fee to provide this additional scope of work$17,598.The total design fee is as follows: Current Fee: $239,348 Proposed Additional Fee(ASR No. 2): $ 17,598 Total Project Fee: $256,946 Total Architectural Design Fee: $ 7,309 ■ 601 N.Magnolia Ave. • Suite 100 . Orlando,FL 32801 • 407.648.7288 •fax:407.648.7289 • www.rbarchitects.com :\11015-0000_city of ocoeecont sys\workorders\wo-0004_lakeshore community ctr expan\administration\agreements\addl svcs\asr no.02\11015-0004 Isco asr no.02.docx page 2 of 2 rhodes+brito architects inc. 5. Lump Sum Fee Distribution : The Fee Distribution shall be as follows: Permit/Bid Documents $ 17,598 $17,598 The Architect will submit invoices monthly on a percent complete basis. Reimbursable expenses will be submitted with receipts as a separate bill. 6. Construction Administration: The Architect will include Construction Administration Services as part of its basic scope of work for the Community Center Expansion project. All remaining terms of our original accepted proposal shall remain. Should you have any questions, please call or email me to meet with you to discuss. Again,we are very appreciative of this opportunity. RHODES+BRITO ARCHITECTS INC. • Ruffin A.Rhodes AIA, LEED'AP PRINCIPAL, DIRECTOR OF OPERATIONS Error!Not a valid link. N C O p Z -o cu coY G1 m N OJ LL Z W o 0 0 m r, c o \ 0 0 ill t+1 V O O O Q W O) O O O C no .--I 01 O O O .--I n O O O .4 O O O 00 a0 O O O 01 < O LO CO Vl 0 0 O to H m lO co o O o 0 U1 N O O O V? vT to to t/T to to 1./-10 0 0 CO CO O O O Cr; ui O O O V1 f,.lLI) N O o O N O N L!1 N .-i O O O .-1 U t/? t/T 14 N t/T t/T v1 14 00 ul O O O 00 M O O 00 00 co to O N O1 00 V l0 O O O .--I Cr N M O O O (Y1 Lr VN .--� O O O •-i D t/T ,nt/T N t/T to t- to• N O O O h (.6O co to 01 v mrsi 0 0 0 D ti CO crN O O O Si to t/T t.4 t/T to t/T N t/T t/} N N O O O V 71- O O O 00 O O O 01 O Lc) 00 to O O V1 m LO CO r\ O O t\ W r to N c-1 O O .-1 W LT t/T t/T co. t/?VT to 00 00 W W CC J O J 0] Q Q W U J (r) 00 v1 O 2 1— O_ 0 CO U F K LU m N •-• J 2 H 00 > w X- O Q W L/) U 0_ W 00 OO 01 01cc O O CO U1 + r7 O O w 0 H O O) co y, m UCC d' 1991 - 2017 S935G Lake Baldwin Lane Orlando, FL 32814 26 VVV (407)767-5188 i ci�iiii c i E N G IN E E RI N G4 (407)767-5772 fax ��,; • MEP CONSULTING ENGINEERS www.sgmengineering.com April 9, 2018 Rhodes + Brito Architects The Day Building 605 E Robinson St, Suite 750 Orlando, FL 32801 Attention: Mr. Ruffin Rhodes Reference: Proposal # 2017-131 AS2; Lakeshore Community Center Expansion Ocoee; Additional Services for design mods to keep IT tech 117 Dear Ruffin, It is our pleasure to provide additional Electrical Engineering services to provide design for the new storage building for the Lakeshore Community Center in the City of Ocoee. Scope of Professional Services: Provide design revisions to keep IT Tech 117 and relocate the family restroom to the new space in bridal suite. Modifications include wall relocations and corridor extensions. ➢ All other conditions remain in accordance with the base contract. ➢ It is assumed this work will be incorporate with the base contract work. If this work is done after the base is complete, the pricing is not valid. Compensation SGM is pleased to provide the described professional services for a lump sum fee of Five Thousand Six Hundred and Sixty Dollars ($5,660). SGM Engineering, Inc. • MEP Consulting Engineers 935 Lake Baldwin Lane, Orlando FL 32814 (407) 767-5188 • (407) 767-5772 (Fax) Page 2of2 Billing Category Hours Required Hourly Billing Rate Total Principal in Charge 1 $140 $140 Project Manager 8 $130 $1,040 Senior Engineer 12 $100 $1,200 Engineer 12 $90 $1,080 SR Designer 12 $85 $1,020 Designer 12 $80 $960 Registered Architect 0 $155 $0 2 Man Electrical Contrator with Service Val 0 $150 $0 Construction Administrator 0 $90 $0 Cadd Operator 2 $60 $120 Office Administration 2 $50 $100 TOTAL FEE $5,660 If you need any additional information or would like the scope modified, please let me know. Sincerely SGM ENGINEERING, INC. Mark A. Escott, P.E. LEED AP, CxA Director of Electrical Engineering SGM Engineering, Inc. • MEP Consulting Engineers 935 Lake Baldwin Lane, Orlando FL 32814 (407) 767-5188 • (407) 767-5772 (Fax) C&S Companies 605 East Robinson Street Q Suite 210 COMPANIES Orlando, FL 32801 407.422.11181 fax 407.841.9149 www.cscos.com April 4,2017 Mr. Ruffin Rhodes,AIA Principal/Director of Operations Rhodes+Brito Architects 605 E. Robinson St., Ste 750 Orlando, FL 32801 Re: Lakeshore Comm Center—Expansion—Additional Services Dear Mr. Rhodes«Title»: C&S is pleased to present this fee proposal to provide M/P/FP engineering design services for the Project mentioned above. The project includes revising the restrooms in the front lobby of the community center. Our Scope of Work is as follows: EFFORT REQUIRED: 1. Included disciplines: 1. HVAC 2. Plumbing 3. Fire Sprinkler 2. Revise sanitary and plumbing in the Men's restroom 3. Remove sanitary and domestic plumbing to previously plumbed family restroom 4. Provide domestic water connection for proposed fountain. 5. Provide new domestic and sanitary plumbing to relocated family restroom, adjacent to the women's restroom 6. Revise exhaust system design to accommodate new floor plan. 7. Revise sprinkler head layout to accommodate new floor plan. DELIVERABLES: 1. Construction Drawings in PDF format(single deliverable). 2. Revit Models,for internal use. EXCLUSIONS AND ASSUMPTIONS: 1. Additional meetings will be addressed as Additional Services. No meetings are included in this scope. 2. Electrical,Data,Communications,Lightning Protection,and Fire Alarm services are excluded. 3. Drawings will be conducted in Revit to a LOD- O LOD 300 4. Models will be used for internal coordination only. 5. Clash detection is excluded, except for internal design team coordination. A clash free model is excluded. 6. Maintaining multiple versions of Revit files is excluded from this effort. C&S will not move forward with drawing revisions until permits have been received and any permit comments addressed. F:\Marketing\Client\L68-Rhodes+Brito Architects\Ocoee Banquet Hall\Lakeshore Community Center-Expansion\Lakeshore Comm Center-Expansion C&S-2018-04-16.docx Ruffin Rhodes Lakeshore Comm Center-Expansion May 11,2017 Page 2 For the scope discussed above,we propose these services for a LUMP SUM FEE of 2,880. This fee may require modifications if the Scope of Services changes or additional work is requested.Rhodes +Brito will not be billed in excess of this amount without prior written or verbal authorization. If this proposal is acceptable, please acknowledge by signing below and emailing one executed letter agreement to my attention. We look forward to working with you and the rest of your staff. If you have any questions or require additional information,please do not hesitate to contact us. Very truly yours, C&S ENGINEERS, INC. XI;V .Q.1‘t 1-()•,_ Matthew McQuinn,PE Managing Engineer Accepted this day of ,2017. By: (Authorized Representative) (Printed Name) RAMSKI&COMPANY • INTERIOR DESIGN&PLANNING REQUEST FOR INTERIOR DESIGN SERVICES Per our original agreement, we are enclosing the following estimate for additional interior design services requested by Donald Williams Project: 1711 Lakeshore Community Center Addition SCOPE Hours Rate Total Additional Scope added to address changes to the floor plan per owner direction. Update Finish Plan per Owner Changes 5 $125 $625 Update Elevations 5 $125 $625 Meetings (2) 2ea $125 $500 TOTAL FEE $1,750 The above represents a flat fee. Invoicing will be monthly based on percentage of work completed. Client agrees to compensate Ramski and Company for fee, plus reimbursables. Reimbursable costs include, but are not limited to, printing, telephone charges, special postage for mailings or services,travel and accommodations outside the Orlando area (mileage billed at .550 per mile) presentation materials (renderings), delivery services, and additional consultants services (none anticipated). These services are subject to a 20%administrative mark-up and are invoiced in addition to fees. Hourly Rates: Principal $200.00/ hour Director of Design $150.00/ hour Senior Interior Designer $125.00/ hour Interior Designer/Associate $100.00 / hour Designer, 3D Modeler/Renderer $85.00/ hour BIM Technician $90.00/ hour Construction Administration $90.00/ hour Clerical/Support: $ 65.00/ hour Client approval is required to authorize the above requested interior design services. Work cannot be performed until signature is obtained. Sincerely, Jennifer E. Ramski, IIDA Principal Date 500 Delaney Ave.,Suite 301,Orlando, FL 32801 • Ph:407 898.6570 • www.ramskiandcompany.com • FL License#IB-0001127 0I I ° L._ 71 s � i(►it) w I 17 )" LL N i o 0 . .I z='� m N v) I I t I �LL o z� _I r N T i — - o re II 6 LIgo ffi g w W� _ U i 2 / r r/ I a aw I J ` I -J o J Ill.' LL t1:: C. 1 w Io I W i, 0C. -I IT Z g 0110 ci, LL 5 0 I I .6 /.22‘ 8,•-2 ii) <•\;*--,i-78 a w % /' a TA rt (m LL u. ^ Off a� ti.. :.,, p to _ u rX J -G-; -f `••‘,`*‘,6\ -z Q g -k- . .. aw Q. z s_) ,,, q uLLi r __ ,,,__ • Iw _� N 0- __, w i ^ f (�' fj' .lL 13 Q LL 1 iI` lc�j o 1 co g� �y 1 ,Is 1.4 s.:.-i 7S _ x Bbl W LL } . Cr 1,t-4 � \ `u� . J !col 1 0.1 1.i ki L__T _. lig i— —}.—.— I I 0 g r- LL co °' N0 u_ L NIl Gco 5 vii 3 p �o v,, u N u. _, 1:1 ,0°:. 1 I Ir I iT I