HomeMy WebLinkAboutItem #10 Approval of City of Winter Garden Constructing 780 Feet of 8-Inch Water Main from the Southwest Development Utility Improvements Phase II ocoee florida AGENDA ITEM COVER SHEET Meeting Date: June 19, 2018 Item # Reviewed By: Contact Name: Charles K. Smith, P.E. Department Director: Chart S .,,j • 4-,- :; Contact Number: (407) 905-3159 City Manager: Robert Fra;�,� / ' or " Subject: City of Winter Garden constructing 780' of 8" water main from the outhwest Development Utility Improvements Phase II; District 1 Commissioner Firstner Background Summary: The Southwest Development Area (SWDA) is comprised of five (5) parcels of land located in the southwest corner of the City of Ocoee, more specifically adjacent to Tomyn Boulevard/Windermere Road and Roberson Road between Patriots Point Drive and Wesmere Parkway. Each parcel on its own would not be large enough (developmental density) to extend utilities to support the parcels' development. Therefore, the City initiated a "Southwest Development Utility Project" causing the needed utilities to be designed and permitted; and the construction of Phase 1 and the North Phase of the project (see attached Diagram 1: Southwest Development Utilities Improvements.) Phase II of the project is planned to be constructed by the first of the developing parcels along Roberson Road. To cover the construction cost of the project, each of the parcels upon development shall reimburse the City their fair share. Legacy Lifestyle of Ocoee, that appears to be the first developing parcel, has agreed to construct Phase II. Legacy will be allowed to use their fair share obligation and their water/sewer capital fees to offset construction cost. Legacy must provide needed funds over their fair share and capital fees if construction cost are more than the combined share and fee; and reimburse the difference if the construction cost if less than their total obligation. At the time of this action, Legacy has not begun any work on the needed utilities. The City of Winter Garden has scheduled within the next sixty (60) days the reconstruction of the Roberson Road &Windermere Road intersection utilizing a roundabout configuration. There is seven hundred eighty (780) feet of 8" of the Phase II water main in the construction limits of the Winter Garden's roundabout project and both Cities' staff agrees the water main should be constructed by Winter Garden. Winter Garden has publicly bid the work and proposes to construct the 8" water main (see attached letter from Winter Garden) based on Ocoee's reimbursement of the cost in the amount of $56,884.40 (construction cost plus 15% contingency.) The remaining portion of the Phase II project will remain the responsibility of the first development on Roberson Road. The City Attorney has reviewed Winter Garden's proposal letter and had no exception to accepting the letter's conditions. Issue: Should the City Commission approve the City of Winter Garden constructing 780' of 8" water main from the Southwest Development Utility Improvements Phase II? Recommendations: Motion to authorize City Manager to accept the City of Winter Garden's proposal to construct 780' of 8" Water Main in the amount of$56,884.40. Attachments: 1. City of Winter Garden's Proposal Letter including Bid Tabulation 2. Winter Garden's Roundabout Plans Utilities Sheets 3. Diagram No 1: Southwest Development Utilities Improvements 4. Legacy of Life Letter of Understanding Financial Impact: The total Southwest Project construction cost was estimated at $636,266.50 in October of 2014, but was increase by $126,117.64 to $762,390.00. The increase, by change order to the phase I project, was needed for upsizing lines serving Inspired Living @ Ocoee (reimbursed by Inspired Living.) The original Engineer's Estimate of the Probable Cost for Phase II construction in 2014 was $386,515.50, with a present day adjusted amount of $440,000. Legacy's total commitment to the City for its fair share and capacity fees is $597,358.44, requiring Legacy to make an estimated cash payment to the City of $157,360.00. In addition, any offset expenses incurred by Winter Garden's work will increase the amount owed by Legacy to the City. Finally, funding for the Winter Garden construction will come from the Carry Over Project Funding (408-531-00-6302) and shall be replaced upon receipt from Legacy or other developers along Roberson Rd. Type of Item: (please mark with an 'x') Public Hearing For Clerk's Dept Use: Ordinance First Reading X Consent Agenda Ordinance Second Reading Public Hearing Resolution Regular Agenda X Commission Approval Discussion& Direction Original Document/Contract Attached for Execution by City Clerk X Original Document/Contract Held by Department for Execution Reviewed by City Attorney N/A Reviewed by Finance Dept. ` R_6aec,_+s_T),u N/A Reviewed by ( ) N/A • 2 • t GARD { R May 30,2018 Charles Smith,P.E. Utilities Director,City of Ocoee 150 North Lakeshore Drive Ocoee,FL 34761 SUBJECT: BID# 13-017-Stoneybrook West Parkway/Roberson Road/Windermere Road Roundabout Project Dear Mr. Smith: On December 5, 2017, the City of Winter Garden received a sealed construction bid for the referenced project from one(1)contractor. The attached tabulation of bids represents a summary of unit prices for the received bid from Atlantic Civil Constructors Corporation. The bid received appears to be in proper form and is complete and properly executed. The bidder has acknowledged receipt of all addenda as prescribed and has submitted proposal to comply with other bidding requirements and we believe that this bid proposal is in conformance in all material respects to the invitation for bids and is therefore a responsive bid. The City of Ocoee's utility work was included in the bid documents as Additive Alternate 1, and the bid price for this work came in at $49,464.70. The Engineer's Estimate for this work was $57,060.00. It's our understanding that the City of Ocoee has elected to accept this bid price and has elected to have Atlantic Civil Constructors Corporation perform the work. Please provide us with a check in the amount of$56,884.40 which includes the bid amount and a 15%contingency. We look forward to working with the City of Ocoee on this project. If you have any questions or require additional information,please contact us. Sincerely, City Winter Garden L____ James P.Monahan,P.E. City Engineer Attachment: Bid Tabulation 300 West Plant Street• Winter Garden, FL 34787•(407)656-4111 • www.wintergarden fl.gov BID 413-017 STONEYBROOK WEST PARKWAY/ROBERSON ROAD/WINDERMERE ROAD ROUNDABOUT IMPROVEMENTS BID TABULATION MattIMIL IUIDTER URDU] Atlantic Civil Constructors Corp. Item No. Descrition Unit Estimated Quantity Unit Price Total Price 101-1 MOBILIZATION LS 1 $ 242,832.78 $ 242,832.78 102-1 MAINTENANCE OF TRAFFIC LS 1 $ 492,980.49 $ 492,980.49 102-99 PORTABLE CHANGEABLE MESSAGE SIGNS-TEMPORARY ED 1,136 $ 18.00 $ 20,448.00 102-104 TEMPORARY SIGNALIZATION AND MAINTENANCE OF INTERSECTION ED 270 $ 1.50 $ 405.00 102-107-1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE OF INTERSECTION ED 270 $ 150 $ 405.00 104-14 PREVENTION,CONTROL&ABATEMENT OF EROSION&WATER POLLUTION LS 1 $ 5,237.60 $ 5,237.60 107-1 LITTER REMOVAL AND DISPOSAL AC 13.8 $ 58.43 $ 806.33 107-2 MOWING AC 13.8 $ 75.82 $ 1,046.32 110-1-1 CLEARING AND GRUBBING(2.4 ACRES) LS 1 $ 129,244.81 $ 129,244.81 120-1 EXCAVATION,REGULAR CY 2,143 $ 26.70 $ 57,218.10 120-6 EMBANKMENT CY 1,051 $ 21.19 $ 22,270.69 120-99 SPECIAL EXCAVATION&EMBANKMENT CY 2,447 $ 18.90 $ 46,248.30 160-4 STABILIZATION-TYPE B SY 4,894 $ 17.64 $ 86,330.16 285-711 BASE GROUP 11(TYPE B-12.5 ONLY) SY 3,960 $ 41.80 $ 165,528.00 327-70-6 MILLING EXISTING ASPHALT PAVEMENT(15"AVERAGE DEPTH) SY 4,351 $ 4.00 $ 17,404.00 334-1-53 SUPERPAVE ASPHALTIC CONCRETE(TRAFFIC LEVEL C)(PG 76-22) TN 621.0 $ 150.00 $ 93,150.00 337-7-43 ASPHALTIC CONCRETE FRICTION COURSE(TRAFFIC C,FC-12.5,PG 76-22) TN 667.4 $ 160.00 $ 106,784.00 425-1-311 INLETS-CURB TYPE P-1(<10') EA 5 $ 5,852.19 $ 29,260.95 425-1-341 INLETS-CURB TYPE P-4(<10') EA 3 $ 5,724.69 $ 17,174.07 425-1-365 INLETS-CURB TYPE P-6(PARTIAL) EA 1 $ 2,539.41 $ 2,539.41 425-1-461 INLETS-CURB TYPE J-6(<10') EA 1 $ 6,836.04 $ 6,836.04 425-1-521 INLETS-DBI TYPE C(<10') EA 2 $ 3,743.85 $ 7,487.70 425-2-41 MANHOLE DRAINAGE-TYPE P-7(<10') EA 6 $ 3,836.08 $ 23,016.48 425-11 MODIFY EXISTING DRAINAGE STRUCTURE EA 1 $ 1,316.91 $ 1,316.91 430-175-118 PIPE CULVERT-RCP(S/CD)(CLASS 111)(18"ROUND) LF 1,003 $ 61.51 $ 61,694.53 430-175-124 PIPE CULVERT-RCP(S/CD)(CLASS III)(24"ROUND) LF 8 $ 190.17 $ 1,521.36 430-175-218 PIPE CULVERT-RCP(S/CD)(CLASS III)(14"a 23"ELLIPTICAL) LF 204 $ 7052 $ 14,386.08 430-830 FILLING AND PLUGGING PIPE-PLACE OUT OF SERVICE CV 12 $ 224.17 $ 2,690.04 430-982-425 MITERED END SECTION-CONCRETE PIPE ELLIPTICAL(CD)(14"X23") EA 1 $ 1,364.79 $ 1,364.79 520-1-7 CONCRETE CURB&GUTTER(TYPE E) LF 751 $ 26.84 $ 20,156.84 520-1-10 CONCRETE CURB&GUTTER(TYPE F) LF 2,234 $ 24.33 $ 54,353.22 520-2-4 CONCRETE CURB(TYPED) LF 154 $ 22.33 $ 3,438.82 520-2-8 CONCRETE CURB(TYPE RA) LF 220 $ 31.97 $ 7,033.40 520-3 CONCRETE VALLEY GUTTER LF 99 $ 21.32 $ 2,110.68 520-70-B9 CONCRETE TRAFFIC SEPARATOR(VARIABLE WIDTH) SY 363 $ 114.84 $ 41,686.92 522-1 CONCRETE SIDEWALK(4"THICK) SY 778 $ 34.75 $ 27,03550 526-1-1 BRICK PAVERS,ARCHITECTURAL(ROADWAY) SY 221 $ 97.50 $ 21,547.50 527-2 DETECTABLE WARNINGS SF 243 $ 25.00 $ 6,075.00 530-3-4 RUBBLE RIPRAP(DITCH LINING) TN 4.0 $ 351.58 $ 1,406.32 550-10-110 FENCE TYPE A(STANDARD HEIGHT)(STANDARD FEATURES) LF 54 $ 24.07 $ 1,299.78 550-10-222 FENCE TYPE B(W/BLACK VINYL COATING)(6'HEIGHT) LF 30 $ 56.67 $ 1,700.10 570-1-2 PERFORMANCE TURF-SOD SY 5,993 $ 2.58 $ 15,461.94 999-1 CONCRETE FLUMES EA 4 $ 741.69 $ 2,966.76 999-2 ORANGE COUNTY PERMITTING LS 1 $ 2,500.00 $ 2,500.00 SUBTOTAL ROADWAY $ 1,866,400.72 700-1-11 SINGLE POST SIGN(F&I)(UP TO 12 S.F.) AS 22 $ 258.00 $ 5,676.00 700-1-12 SINGLE POST SIGN(F&I)(12 TO 20 S.F.) AS 5 $ 2,096.00 $ 10,480.00 700-1-14 SINGLE COLUMN CANTILEVER SIGN(F&I)(21 TO 30 S.F.)(BREAKAWAY BASE) AS 2 $ 1,400.00 $ 2,800.00 700-1-50 SINGLE POST SIGN(RELOCATE) AS 5 $ 110.00 $ 550.00 700-1-60 SINGLE POST SIGN(REMOVE) AS 16 $ 13.00 $ 208.00 700-2-14 MULTI-POST SIGN(F&I)(31 TO 50 S.F.) AS 2 $ 3,300.00 $ 6,600.00 706-3 RETRO-REFLECTIVE PAVEMENT MARKERS EA 207 $ 4.00 $ 828.00 711-11-123 THERMOPLASTIC PAVEMENT MARKINGS(STANDARD)-WHITE(SOLID)(12") LF 398 $ 1.65 $ 656.70 711-11-124 THERMOPLASTIC PAVEMENT MARKINGS(STANDARD)-WHITE(SOLID)(18") LF 238 $ 1.85 $ 440.30 711-11-125 THERMOPLASTIC PAVEMENT MARKINGS(STANDARD)-WHITE(SOLID)(24") LF 38 $ 3.00 $ 114.00 711-11-141 THERMOPLASTIC PAVEMENT MARKINGS(STANDARD)-WHITE(GUIDE LINES)(2'-4')(6'-10') GM 0.041 $ 1,320.00 $ 54.12 711-11-160 THERMOPLASTIC PAVEMENT MARKINGS(STANDARD)-WHITE(MESSAGES) EA 2 $ 110.00 $ 220.00 711-11-170 THERMOPLASTIC PAVEMENT MARKINGS(STANDARD)-WHITE(ARROWS) EA 6 $ 55.00 $ 330.00 711-11.180 THERMOPLASTIC PAVEMENT MARKINGS(STANDARD)-WHITE(YIELD LINE) IF 80 $ 9.00 $ 720.00 711-11-224 THERMOPLASTIC PAVEMENT MARKINGS(STANDARD)-YELLOW(SOLID)(18") LF 174 $ 1.85 $ 321.90 711-14-125 THERMOPLASTIC PAVEMENT MARKINGS(PREFORMED)-WHITE(SOLID)(24") LF 360 $ 14.00 $ 5,040.00 711-16-101 THERMOPLASTIC PAVEMENT MARKINGS(STANDARD OTHERSURFACES)-WHITE(SOLID)(6") GM 1.101 $ 4,224.00 $ 4,650.62 711-16-131 THERMOPLASTIC PAVEMENT MARKINGS(STANDARD OTHER SURFACES)-WHITE(SKIP)(10'-30') GM 0.604 $ 1,320.00 $ 797.28 711-16-201 THERMOPLASTIC PAVEMENT MARKINGS(STANDARD OTHER SURFACES)-YELLOW(SOLID)(6") GM 1.294 $ 4,224.00 $ 5,465.86 SUBTOTAL SIGNING AND PAVEMENT MARKINGS $ 45,952.78 Ul 8"DR 18 PVC WATER MAIN LF 900 $ 39.04 $ 35,136.00 U2 12"DR 18 PVC WATER MAIN LF 90 $ - 95.78 $ 8,620.20 U3 10"HDPE WATER MAIN DIRECTIONAL DRILL LF 50 $ 169.85 $ 8,492.50 U4 2"PVC IRRIGATION SLEEVES LF 340 $ 15.89 $ 5,402.60 U5 8"X 8"WET TAP CONNECTION(WATER MAIN) EA 1 $ 4,559.29 $ 4,559.29 U6 12"GATE VALVE(INC.VALVE BOX&LID) EA 1 $ 1,754.06 $ 1,754.06 U7 12"INSERTION VALVE(INC.VALVE BOX&LID) EA 1 $ 13,581.91 $ 13,581.91 U8 8"GATE VALVE(INC.VALVE BOX&LID) EA 1 $ 2,280.74 $ 2.280.74 U9 CONNECTION TO EXISTING WATER MAIN EA 10 $ 658.46 $ 6,584.60 U10 WATER MAIN FITTINGS TN 1.5 $ 17,344.91 $ 26,017.37 Ull AIR RELEASE VALVE(W/VAULT) EA 2 $ 7,722.40 $ 15,444.80 U12 WATER MAIN CLEARANCE EA 1 $ 2,633.83 $ 2,633.83 U13 ADJUST EXISTING VALVE BOX TOPS EA 2 $ 658.46 $ 1,316.92 SUBTOTAL UTILITIES-CITY OF WINTER GARDEN-WATER MAIN ITEMS $ 131,824.82 U14 8"DR 18 PVC FORCE MAIN LF 400 $ 56.33 $ 22,532.00 U15 8"X 8"WET TAP CONNECTION(FORCE MAIN) EA 2 $ 4,488.22 $ 8,976.44 U16 8"PLUG VALVE EA 3 $ 2,756.79 $ 8,270.37 U17 8"INSERTION PLUG VALVE EA 1 $ 8,246.91 $ 8,246.91 U18 SCAV(W/VAULT) EA 1 $ 7,534.96 $ 7,534.96 U19 FORCE MAIN FITTINGS TN 1 $ 14,803.74 $ 14,803.74 U20 CONNECTION TO EXISTING FORCE MAIN EA 2 $ 2,633.83 5,267.66 U21 REMOVE EXISTING FORCE MAIN AND VALVES LF 350 $ 15.05 $ 5,267.50 SUBTOTAL UTILITIES-CITY OF WINTER GARDEN-FORCE MAIN ITEMS $ 80,899.58 OU1 8"DUCTILE IRON WATER MAIN LF 780 $ 40.24 $ 31,387.20 OU2 8"GATE VALVE(INCL VALVE BOX&LID) EA 2 $ 1,906.90 $ 3,813.80 OU3 WATER MAIN FITTINGS TN 0.5 $ 12,778.21 6,389.11 OU4 AIR RELEASE VALVE(W/VAULT) EA 1 $ 5,339.94 $ 5,339.94 OU5 WATER MAIN CLEARANCE EA 1 $ 2,534.65 $ 2,534.65 SUBTOTAL ADDITIVE ALTERNATE 1-UTILITIES CITY OF OCOEE WATER MAIN ITEMS $ 49,464.70 Grand Total 2,174,542.59 .rV(19101 9102/91/f i(9330 1010Si(isS,n\000G09Z1691\lno910i(9 656[1'399(J)110)9.% `11' �I w 1 0 1 T o ` _ O w 0 / 1"Pp c, F4.:;, m ii: Zo :IL ic,co :j IIWoin( F Jam 3ri; i 0 W W m J a,9aR(4vU 11* v,. O 6 11 J LL if ,,o 0 �.11 o 2 a ® W w cg 2 H W m ® a e h o g '1 w4 QJCIN .°, ac 44 0 e 10) , 2 0 R k '-, `tt o z t 4 , .._ ,. q '; . c.) z i-E 6 ctl LI. cg ga o 04 k 8-4 (..) cq m oN N a 3 tl ,,.^C q � N 7 o W O E vni m dv Lt1 `• ,._' g,-5.-2 OZ aa, O k t t1 mow• = ^� N -. a M o � �= e t a ry_ 0 a ¢ =wQ rii U I_' ti 1 i N wovl�ti D 'h `m .. v Lu 0 2 '- '1 v w W2_e, Q . ea - '0a O O Q o w-L�wai h 'N 0 ` g. 2 V _¢�,»¢ to `aa vizwtitio oq n� E O i 'w w o ti ti ti `m 0 0 `O m k .n x�a».n ti„a 2 tiro �J.1 14J rd Q U 2 D � 1> to 'a .L:, ( E° a O Eaa V 1 , 11�ci ? �a 2BaaLi, d o00 2 vii 2 cc 2-" 8 8 a W >j R R R 0 a 3 3 q w 000�ti� > a'_ A� j 5.71� 4i i 6` , m O -. 0- O n o�j U` me coz°.2.' Q � I 9 t / \ 0 / i! I o 1' \ \ \ \ \ I [ \ \ 3 ( 3 °\I & I I I ` 0 kr, ` ` \ 1 ': ` \ \ \ co (\cx I � � \ \ \ +/ �\ f - U a \%\ ' - - C o /© ; 7 \ •V3x03 41 '-',.• §§ ` , /\ \ ` _ § : < �a }, � � \\\ H "!) . | /)/\ (V, {)\ IC ! : � 4 - - Im} m »2q�wM , ® _ a G @/ -- -- - -- -- -- -- ___ . 1 _ »,q�mM , •VI ' ---»----»---- W ---T - - ZS 7' ii P R _ J a :- !;; lam--� 0 . . Lu _ _ .�a % _ \ ii % // \ a u}\ § { 1V= ! -14 ! ` / %i\ : ~ \ , 9 \§# ®/`/ „ 1 2 QQ§ \ j '--\ ■®; - - \ . \ _ if,-mm \\ \ \\ \ , \3.4 q \ \ , « \ \\ ` k| ) %R\ \ / m!) &� % ' � \� % \Sk ��¥f� +{ _ | � @, \�G ' \\ \ \ ` « k \(/ / %/% `` ' \ I \\ �3 6 To..; I \ \ \ \ . . - \ ® §%;§2 \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ `- N 1 -� v O (5-00 133H5 335)0007+1£V15 3NIlHVW Lu ' ' I , O , Lu 1 • . \ :: \ c,) \ . . , y ' Z o z „ ' O wz w i �, 'I 3 U m WI, C 2 t r ^ w m e m m • '- '/'' z m w v • " , i.o z ma m '808'11 'V15 ld F-z " ' ' 0 , / O 4 1 _. m ' `3 m 3 ro C ' W' O 3 * ` 78 ' !` PC STA.30 `i , i , / / 013 O o O( m t C d1S it I O ' \g k.'44....,, ,...4". '4,j,-: ?,r r' IX; w n' m W i o w � 3O '44'1 � I ��J3%1 > ''......:277Q----. t P - - ' ., , 0 . , z,t w _ w 421 3213W2130N1M `� IIV - :yam "- .G8 21 32I3W 21 N 111.11.! r �ON/M Fri MSI,61,ON 3•,95£baN P7.1111111111 . .41 .111 ) lam C i Ye • , ... 0 ly� „ 1O - -.�-�� "� 10. 1B_•_ _ _ _ - m _ 1 S r:A: _ s ® i:,_, .. / �� $ '` o ?ae Ei ? I� 1 - / bHHI 6N • m� +6 y15 � n ti m z Ill I \ I L..... V i ) gt I c ES' t t n. \ . / , 7/ . , ,......„ , -----\ :Z'70+6'V 5 Jad : ii ,9.4., V 81'•6+¢Z Vlt ld/' m cI I ,o w C/1 3 / m ' Y i L', z 3 O> s m Y u. I I >a m w1— o g Ui I ' — I w o 0 3 z ?o N O 1n 4 (9-00 133N5 3391 ,. 00'00FOE VLS 3N17HJ1VW ,m o ' yti'm1+ m'I h (A v W'' r I 0 �� W a m 1I O 6 i y O I IW V i r a m m 'n I '' W el ' O Ec o d�¢m tel' r , I CC 11 F_:, ,.. m m I m i ' W ' m w c _ 3 10 I 0 I ' I ' M a 1 i I �1:C I I I W CC , ' Ip , I y ill W I 1 ' 03 t 13I m � z ' iI! jj J\\ I a l ll ' , Ail . w , m I V I a NAV '' p I I I i I I I ; a 1 ; W I p R z \ii ' 'I i ,' I ' a ZaO S m C WhYLL ' 1 I. i , y I w iiryo F . Yn 2 m W W I I I m l 11 m W FZ ca I W 1 pl " ' , mn 0.2_r-o ti io o ' '' 3 m ro s. lel \' d 1- f n 'i ' , W I IIz 'I I ; 'I 0 ' , _ rio 0 1L ml I ' I y ; cr. m 'I I I I p ' I o a .—II--( CD 11-111\ ' ' WI ' , z "1Y. y I ' 1 (t-00 133H5 335)0000+fE V15 3N11HJ1VW o§ x o' 0 0 ,i';, ry I2 O tiwW W Lu m J p 'a z O m 1' - 30 3O�1 3 ` , _ ` I II LL N n 3 o Q c z - 30 - : I , mr . __.) E 1 I- CD Z-', . I m +I Z ' o 1 e M- �O , O k y a, [ o; 11 I,7. � o Pcx . a 0 z z� K m , in'4 - 3 1- 2 i 1- m --' O m i ,',3 Z w oz ' o U V - y E,1 m ' mI 3 I . w simi I lirI , m3 z m I w w WW, O0 Ic,, o 1 1 R °z w z y^ . z I I. `rc zk co m za89, 5I ar521.31-"1t,FMr= fl Wy32 am aimz. ma, 01 CIP L,1,1 mo,_ '1 m %I WW Bio z 0O as a w w w • 0 C ( C N F Z y,2 I , j 30 "�� LL'3 I F i?,',E,'1,-- +� - ¢o I II" 3 J z � w I z mo` I- m h m 00 OO , m ':1-' , f1 I oa F/ 1 11 1 e ,,:1 8 ' ' • - ro - 1 B Q d (£-n0 133)5 335) rl 00'00+9£'V15 3NI1HJIVW -J. r- 0 C) LU k i o yaw O �w 3 oW �o w � 1. �Q o III `" z -ap' z,3 0 o ,, �� a� ;Z I '!- '' '''7" Q ;''1' w ft./ ' W ,, i ' C m z ooWw W z oW z p l o M o /( - w Q m w w O i o I VO q w -, . e ti z 1' O p z , , 'g i ' 7, [.k it 3 I i - ; i V o m ri � o w,- U m o- �,� W M p 3 w �a Z CC lilt Q S. W .41 I U ry a s , ti N I 1 ; 2 W Q H % C W R o K W o z 0 s ¢"LLoiW. J W eN a U ,., - im W.�uVm' 1 , FI a 2-i w ' z ; I ,,"- ' 'W ,IIp 3 o I i ... o m e u wm m ; I ; ; " - \ . . , F, (5-110 133H5 335100'05+15'VIS 3N171-1)IVW oa I `o 00 -n / _ L - North Phase \ T.' - Tomyn Blvd ' a \ 40 n e 0 I—i Phase I I-. C r . : m-----_-_-_ -..- p. DCm iiiiic F av o c ft V O .7 t][1-) 1 c;2 , C144,I 111 — — — Roberson}td _ I Phase II Winter Garden Roundabout Area la Diagram CITY OF OCOEE 11 TA No: Project Phasing &Vicinity Map !Pe ,1 Southwest Development Utilities Improvements/ ` j ^ �� \ 11, got ile DATE: June 2018 SCALE: 1" = 800' 11 „.,��111111 ' ::,n+illl)1�11��„��� 13rCLAY March 6,2017 A'mmorommiNom Planning and Building Department C; P. C) V p City of Ocoee 150 N.Lakeshore Drive office 727-733-7585 Ocoee, Floirda34761 fax 727-733-9510 2300 Curlew Road,Suite 100 Legacy Lifestyles of Ocoee—Water and Sewer Capital Charges Letter of Understanding Palm Harbor Florida 34683 www.barelaygroup.net To whom is may concern, Legacy Lifestyles Ocoee Property,LLC as the owner/developer of Legacy Lifestyles of Ocoee is providing a letter of understanding in regard to the mythology,calculations and payment obligations agreed to with the City for the Water and Sewer Capital Charges fees. Whereas stated in the Developers Agreement,the Developer is required to pay a prorated portion of the Southwest Development Utility Improvements Phase I construction and manage and construct the City's Southwest Development Utility Improvements Phase H project. The developer was provided by the City,the Southwest Development Utility Improvements Phase ll prepared by Pegasus Engineering. Legacy Lifestyles Ocoee Property,LLC acknowledges and agrees the following methodology,calculations and payment agreement. Calculations of Water and Sewer Capital Charges Fees: a. Prorated portion of the Southwest Development Utility Improvements Phase I=$211,500.00 b. City Water and Sewer Capital Charges fees=$385,858.44 c. Developers total Water and Sewer obligations=$597,358.44 Calculations of Developers Water and Sewer Credits: a. Final construction cost of the Southwest Development Utility Improvements Phase II=TBD** **(cost to be the actual cost to construct Phase II project including any and all City/County requested changes and revisions) b. Development/Management Fee of 5%on the final agreed Phase II construction cost. Developers Final Water and Sewer Capital Charges Fees Obligations and Costs: The total sum of the Water and Sewer Fees defined above=$597,358.44 Less the total sum of the Developers Water and Sewer Credits as defined above=TBD. Scottsdale,Arizona The Developer acknowledges and aggress that all Water and Sewer Capital Charges fees will be Dunedin.Florida determined,agreed to and paid prior to receiving the Substantial Completion Certificate for the Site. This does not include the Water and Sewer deposit fees which are due at the issuance of the building Atlanta.Georgia permits. Dallas,Texas Respectfully, •`'���r�,,,•. ,�o��" °s,,�,, M.E.SASSONE *1 Notary Public-State of Florida i'__'— M II My Comm.Expires Apr 2,2018 Deriver,COIOIad0 �—. I •7� : Je •.E,aaV Commission#FF 109050 Authorized Agent—Legacy Lifestyles Ocoee Property,LLC do Barclay Group //,v w4176,ge, Development. Construction„/Marketing. Property!Management.Asset Management .Y•e; . 7/ 2