Loading...
HomeMy WebLinkAboutItem III (G) Approval and Authorization of Expenditure of an Additional $11,039.62 from Water Repair and Renewal Account to Pay for Repair of Water Well at Jamela Water Plant Agenda 3-16-93 • •ee Item III G tot' a o 0* of c000`��`�• JAMES W.SHIRA,P.E. CITY ENGINEER/UTILITIES DIRECTOR 150 N.LAKESHORE DRIVE•OCOEE,FLORIDA 34761 (407)656-2322 MEMORANDUM DATE: March 3, 1993 TO: Honorable Mayor and Board of City Commissioners FROM: James W. Shira, P.E. City Engineer/Utilit es Director SUBJECT: Repair of Water Well at Jamela Water Plant At the January 19, 1993 Commission meeting you approved the emergency repair of a well at the Jamela water plant. At that time I reported to you that I was unable to provide a precise description of the work required or of the anticipated final cost until the well column had actually been pulled out of the ground and had been inspected. When our contractor, Layne-Atlantic Company, pulled the well column out of the ground, it was apparent that it was in much worse shape than had been anticipated. We had expected to find A hole in the column at some point, but found instead that every section of column pipe was riddled with holes. The contractor had to replace all 140 feet of column pipe, and had to replace one of the pump bowl assemblies which was eroded too badly to repair. The casing was viewed with a television camera to make sure that no perforations of the casing were seen, and it appears that the casing is still in good condition. The well has been repaired and is now back in continous operation. This well had been in continuous service since the early seventies, with no maintenance that we know of. We should not have this sort of experience with the newer wells, since we plan to pull each well column at approximately five to eight year intervals for inspection. At the January 19 meeting, an authorization in the amount of $10,000.00 from the Water Repair and Renewal account was given for this repair based on our estimate of the damage to be found. As stated above, the damage was much more extensive than had been anticipated, and the total cost of the work is $21,039.62. I recommend that the City Commission authorize an additional $11,039.62 from the Water Repair and Renewal account to pay this invoice. THE PRIDE OF WEST ORANGE 1 `�