Loading...
HomeMy WebLinkAboutItem III (D) Aproval and Acceptance of Plantation Grove PUD (Single Family Portion - Cross Creek) Final Subdivision Plans (Pizzuti) AGENDA 7-20-93 "CENTER OF GOOD LIVING-PRIDE OF WEST ORANGE" Item III D Ocoee ...—-- •------- '`jy _ CITY OF OCOEE RUS Off ON "" r.c.: % 0. 150 N.LAKESHORE DRIVEPAUL W.FOSTER v / O OCOEE,FLORIDA 34761 VERN COMBS CI!) +� ?� (407)656-2322 SAM WOODSON ylE, of G 000%> CITY MANAGER ELLIS SHAPIRO MEMORANDUM To: The Honorable Mayor and Board of City Commissioners From: Jean Grafton, City Clerk Date: July 15, 1993 Subject: Plantation Grove PUD/Cross Creek/Pizzutti Late this afternoon the applicant requested that this item be pulled from this agenda and be considered at the next meeting rather than this meeting. AGENDA 7-20-93 .,_{ 's Item III D "CENTER OF GOOD LIVING-PRIDE OF WEST ORANGE" Ocoee -- •____------- di(/ ' t0 CITY OF OCOEE RUSTY JOHNSON "" 3i:4 Q. 150 N.LAKESHORE DRIVE PAUL W.FOSTER v O OCOEE,FLORIDA 34761 VERN COMBS ",� ?V (407)656-2322 SAM WOODSON yrEiP �f G ., ��,` CITY MANAGER ELLIS SHAPIRO SRP-394 STAFF REPORT TO: The Honorable Mayor and City Commission FROM: Bruce Behrens , Director of Planning/��j' DATE: July 14, 1993 ��QQ��'' SUBJECT: PLANTATION GROVE P.U.D. (SINGLE-FAMILY PORTION-CROSS CREEK) FINAL SUBDIVISION PLANS (PIZZUTI) ISSUE: Should the Honorable Mayor and City Commission approve Phase I of the Final Subdivision Plans for the Single Family portion of the Plantation Grove P.U.D. named "Cross Creek"? BACKGROUND: Plantation Grove P.U.D. is a mixed use P.U .D. located on the east side of Maguire Road, directly north of Moore Road. It has certain vested rights as outlined in Certificate of Vesting CV-92-1 . This proposed Final Subdivision Plan calls for 322 single family lots on 90 . 77 acres resulting in a gross density of 3 . 547 units per acre. The Developer is Maguire Road Corporation and Pizzuti Development , Inc. is the authorized agent for the single-family portion. Typical lot size is 60 ' x 115 ' , with a 6, 800 sq. ft . minimum; setbacks would be 25 ' front , 25 ' rear and 7 . 5 ' side; and minimum living area would be 1200 sq. ft . . . . all consistent with the approved Revised Land Use Plan. Private recreational amenities are provided in a 2 . 3 area recreation area and includes a tennis court , basketball court , community pool , barbecue area and tot lot . Parking for cars and bicycles is also provided. di C Staff Report - Plantation Grove PUD (Pizzuti ) July 14 , 1993 Page 2 The City Commission approved the Preliminary Subdivision Plans on May 18 , 1993 subject to the following conditions : (1) Receipt of the Warranty Deeds , Partial Release of Mortgage, and related title opinion for the dedication of the right-of-ways for Maguire and Moore Roads as required by Condition of Approval No. 20 of the Revised Land Use Plan within sixty ( 60) days; (2 ) Addition of phasing lines to Sheets 2 and 3 of the Preliminary Subdivision Plans within thirty ( 30) days ; and (3) Revision of the Legal Description on Sheet 1 of the Final Subdivision Plans to correctly describe the land within fifteen (15) days . DISCUSSION : The Development Review Committee reviewed and recommended approval of Phase I of the Final Subdivision Plans on June 30 , 1993 with the following conditions : (1) No building permits will be issued until all rights-of-way have been conveyed to and accepted by the City as required by Condition of Approval No. 20 of the Revised Land Use Plan; (2) All concurrency issues for Phase I , including water and sewer capacity are resolved prior to the Engineering Plans being placed on the City Commission Agenda; (3) All required changes to the Final Subdivision Plan, as stipulated in the DRC meeting of June 30 , 1993 be included in the Revised Plan (copy attached) . CONCURRENCY MANAGEMENT: A staff report on concurrency by Planner Resnik is attached. P & Z RECOMMENDATION : The Planning and Zoning Commission reviewed and Recommended Approval of the Final Engineering Plans on July 13 , 1993 . STAFF RECOMMENDATION : Staff respectfully recommends that Final Engineering Plans for "Cross Creek" Subdivision, (Plantation Grove P.U.D. - East - Single Family Portion) be approved when all concurrency requirements have been met . 07/14/93 11:49 12407 875 8308 CCL CONSULTANTS 0D2/004 CCL CONSULTANTS, INC. Conte tine Engineers SurveyO/s Plan 26Q0 LAKE LUCIEN DRIVE, SUITE 105, MAITLAND,FLORIDA 32751 • (407)660-2120• FAX(407)876-8308 June 25, 1993 MxBruce Behrens CITY OF OCOEE 150 N. Lakeshore Drive Ocoee, Florida 34761 Re: Pizzuti Development, Inc. Plantation Grove P.U.D. Parcels B,C,D,G and I. #93-001 CCL Project No. 7332-00 Dear Mr. Behrens: The following are responses to the DRC comments dated June 24, 1993: Concurrency Management 1. The note has been added to the plans, see cover sheet note 3. 2, The note has been revised. City Vide Engineering Consultants: 1. The width of the stripe has been revised. 2. Pavement markings have been added to the plans. 3. Signing and striping at Street "A" has been added to the plans. 4. The 15' utility easement has been added to the plans. 5. The water main in this section has been up-sized with the understanding that the City of Ocoee will pay the difference between the cost of an 8 inch main and a 12 inch main. 6. The lift station calculations have been revised and corresponding elevations. 7. We are coordinating with Mr. Jim Shira to determine to what extent the filling of the ditch needs to accommodate existing flow from the parcel to the north. If piping is required it will be added to the plans. 07/14/93 11:49 $407 873 8308 CCL CONSULTANTS J003/004 • Mr. Bruce Behrens June 25, 1993 Page 2 Public Works rknartmenu 1. A note has been added to sheet 3 of the plans. 2. The ownership of the internal roadways has been identified as the Homeowner's Association, see sheet 2. Fire Departin . 1. A hydrant has been added. 2. The hydrants will be painted and a marker in the roadway will be installed in accordance with the City's requirements, a note has been added to sheet 4. City Attor�ev: Final Subdivision Plans 1. This issue is currently being negotiated with the City of Ocoee and Orange County. 2. Items a through f relate to locations and sizes of easements changing from the preliminary subdivision plan to final engineering. Since the actual location cannot be determined until final engineering it is not uncommon for slight adjustments to occur. These changes should be acceptable to the city. A note has been added to sheet 3 regarding the ownership and maintenance of these easements. 3. The title has been revised. 4. The easement required has been added. 5. This has been coordinated and approved by the City Engineer. 6. This has been coordinated and approved by the City Engineer. 7. The estimated seasonal high water tables have been added to the plans. 8. There are not Landscape/screening details required at this time. 9. It was previously approved by the DRC that when this project's Phase II is constructed that Moore Road would be constructed. 10. This should be acceptable to the city. CCL CONSULTANTS, [NC. 07/14/93 11:50 12407 875 8308 CCL CONSULTANTS [ 1004/004 Mr. Bruce Behrens June 25, 1993 Page 3 Concurrency Vesting; 1. No action required. 2. This is being coordinated with the City. 3. The note has been added to the plans. Roadway Dedications: 1. We are coordinating with Maguire Road Corporation for the dedication of the right-of-way. The above responses should adequately address the comments. Please schedule this project for your next available DRC meeting. Thank you for your attention to this matter. Very truly yours, CCL CONSULTANTS, INC. /1/0?,&ddi- Steve L. Mellich, P.E. Vice President SLM/kas cc: Steve Ivins C:\DOC\7332\COMMEENTS.SLM CCL CONSULTANTS, INC. "CENTER OF GOOD LIVING-PRIDE OF WEST ORANGE" MAYOR•COMMISSIONER Ocoee S.SCOTT VANDERGRIFT ° '"W _ CITY OF OCOEE RUSTY JOHNSON "" 740 a. 150 N.LAKESHORE DRIVE PAUL W.FOSTER 0 OCOEE,FLORIDA 34761 VERN COMBS (407)656-2322 SAM WOODSON yf OF G00�N`,` CITY MANAGER ELLIS SHAPIRO STAFF REPORT TO: THE HONORABLE MAYOR AND BOARD OF CITY COMMISSIONERS FROM: JANET RESNIK, DEVELOPMENT ADMINISTRATOR, CONCURRENCY MANAGEMENT DATE: JULY 15, 1993 SUBJECT: PLANTATION GROVE PUD - SINGLE FAMILY PORTION (CROSS CREEK) ISSUE Should the Honorable Mayor and Board of City Commissioners approve the Cross Creek Final Subdivision Plans, Phase I? BACKGROUND The proposed subdivision has a total of 322 lots and is part of the Plantation Grove PUD owned by Maguire Road Corporation. Plantation Grove PUD received vested rights covering traffic circulation, solid waste, and recreation and open space requirements for 322 single family units. These plans take advantage of 154 of those 322 units which have vested rights (as noted on the plans) . DISCUSSION The developer is seeking Final Subdivision Plan approval on Phase I which consists of 154 lots. Application has been made for a Final Certificate of Concurrency. Because of the vesting status, the developer only needs concurrency approval on water, sanitary sewer, and stormwater drainage. Stormwater drainage approval was recommended by staff as depicted on the Final Subdivision Plans. The developer has not yet purchased water and sewer capacity. Staff approved the plans subject to this reservation being made prior to City Commission approval of the plans. RECOMMENDATION If the purchase of the necessary water and sewer capacity is completed before the July 20, 1993 City Commission meeting, it is respectfully recommended that the Honorable Mayor and Board of City Commissioners approve the Final Subdivision Plans for Cross Creek, Phase I. cc: Ellis Shapiro, City Manager Montye Beamer, Administrative Services Director