Loading...
HomeMy WebLinkAboutItem VI (A) Bid Award - City Hall / Police Department "CENTER OF GOOD LIVING-PRIDE OF WEST ORANGE" AGENDA 7-20-93 O� Ocoee Item VI A , '`?Wpit ° COMMISSIONERS CITY OF OCOEE RUStTYJOHNSON �.. r ' O. 150 N.LAKESHORE DRIVE PAUL W.FOSTER '-'\ /` OCOEE,FLORIDA 34761 VERN COMBS f+� �t1 (407)656 2322 SAM WOODSON ylF ``�s`>` QTY MANAGER OF G 0 0 ELLIS SHAPIRO MEMORANDUM DATE: July 16, 1993 TO: THE HONORABLE MAYOR AND BOARD OF CITY COMMISSIONERS 7�� FROM: Montye E. Beamer, Director �!J Administrative Services SUBJECT: BID AWARD - CONSTRUCTION OF CITY HALL AND POLICE DEPARTMENT On June 21, 1993 bids for the construction of City Hall and Police Department were opened. The bid tabulation (Attachment 1) show the results. The apparent low bid was Huber Design & Construction Company, Inc; second and third low were RHS Construction Company Inc. and A. D. Arnold Construction Company, respectively. All three were asked to submit their subcontractors list by 5: 00 p.m. June 21, 1993. Such lists were received from Huber and RHS; they also submitted their schedule of values in a timely fashion. C.T. Hsu reviewed the bids and their recommendation along with references for Huber Design & Construction Company, Inc. is included here as Attachment 2. A description of the six (6) Add Alternates with cost has been provided in Attachment 3 . Attachment 4 represents the Schedule of Values along with a clarification on item number 2 as it relates to utilities. The Honorable Mayor and Board of City Commissioners July 16, 1993 Page Two The project budget with Add Alternates 2 and 3 is as follows: Bond Revenue 2,220,863 Contracted Expenditures Architectural 30,240 Engineering 4, 100 Geotechnical Engineering 11,343 Construction Bid Huber 1, 677,266 Site Utilities Cost 97,191 Add Alternate 2 3,735 Add Alternate 3 3,082 Sewer Capital Charge 32,088 Furniture, Fixture and Equipment Communications equipment 200,000 Computer Cabling, Generator Link, Air Conditioning equipment, Projection Screen and Lectern Contingency 356,200 2,318,054 2, 318. 054 Staff recommends the award to Huber Design & Construction Company, Inc. for $1, 677,266.00 plus Add Alternates 2 ($3,725.00) and 3 ($3, 082.00) for completion of work within 180 calendar days after the Notice to Proceed. The outstanding issue as to design was the interior palette. On July 7, 1993 the Mayor and Commission were individually shown the interior designer recommendation for the color scheme and type of carpet identified in the bid. These were found to be acceptable by a majority of the commission. During these meetings, however, additional concerns were voiced; they are listed below should discussion of any of these items be deemed necessary: The Honorable Mayor and Board of City Commissioners July 16, 1993 Page Three 1) Mayor Vandergrift • Hurricane proofing of cupola • Possible adverse reaction from the Public to dark color of wood 2) Commissioner Johnson • French Doors instead of windows in Commission Conference Room • Landscaping Plan for Site 3) Commissioner Combs • Importance of Cupola to design • Attention to detail in areas most likely seen by the majority of citizens - entrances, lobby, Chambers • Maintenance costs for exterior since it will be pine • Walkways utilizing the historical bricks ACTION REQUESTED The Mayor and City Commissioners (1) award the construction bid for the City of Ocoee Municipal Complex (City Hall and Police Department) to Huber Design & Construction Company, Inc. for $1,677,266.00 with completion in 180 calendar days and (2) authorize the Mayor and City Clerk to execute all necessary documents as included in bid package. MEB/jbw Attachments iy C C - 'ti o °r 2 gp e z p 551 ra z c 4 c X Ca A z o z y C C C A C C ca O C 0 0 ox � wiml C 'b n C A A O O d z c tm O A p4 X z 'c 'S' r r r r r r r to A o W w d t• r It 31, v Foho In o A r r r :- 1- r r C g a o F 0 I 1 I U) A O o H IT] - .Ao pe r r r > 0 g rs § ; 1-3 i tcoi)4-t d - H 2 O f. S"' f' r y r� I il V § r w I-. r r r A i -14 VI CA r0 U) U 4U1 401 �1 a a EiD fie V,I P Eft p 66 r y 1 i § w 8 pt rl FF w ATTACHMENT 2 C.T. HSU + ASSOCIATES, P.A. ARCHITECTURE • PLANNING • LANDSCAPE • INTERIOR DESIGN ■■ License#AA-C 001322 ■, 820IRMAAVENUE • ORLANDO,FLORIDA32803 • 407423-0098 • FAX#407423-4793 July 10, 1992 Ms. Montye E. Beamer Director of Administrative Services City of Ocoee 150 N. Lakeshore Drive Ocoee, FL 34761 RE: HUBER DESIGN AND CONSTRUCTION, LOW BIDDER (for City of Ocoee Municipal Complex) REPORT OF COMPLAINTS OR INCOMPLETION OF PROJECTS STARTED Dear Montye: The following firms and agencies were contacted - 1. Huckleberry, Sibley and Harvey Phone #647-1616 Insurance and Bonding for Construction Contact Person: Gail Chapman Comments: Huber has been a client for 12 years or more, bond capacity around 12 million. No defaults or liens on record from owners sub-contractors or suppliers. 2. Central Florida Builder's Exchange Phone #629-2411 Contact Person: Pamela Faiello Comments: No complaints on record. 3. Orlando Notice to Owner's, Inc. Phone #647-6686 Comments: Not available at this date. 4. Better Business Bureau Not a member. 5. Florida Construction Industry License Board Phone #1-904-359-6310 Comments: No complaints on record. CTH+A, based upon the above comments, recommends that Huber Design and Construction Inc. be considered as Low Bidder for contract to perform the required construction work for the City of Ocoee Municipal Complex. Sincerely, C. T. HSU + ASSOCIATES 1,�- Wilbur Peeler Construction Administrator WP/ed c: File (CR)(PF) C.T. HSU + ASSOCIATES, P.A. ARCHITECTURE • PLANNING • LANDSCAPE • INTERIOR DESIGN ■■ License#AA-C 001322 ■, 8201RMAAVENUE • ORLANDO,FLORIDA 32803 • 407423-0098 • FAX#407423-4793 July 13, 1993 via fax: (407) 656-5725 Ms. Montye E. Beamer Director of Administrative Services City of Ocoee 150 N. Lakeshore Drive Ocoee, FL 34761 RE: OCOEE MUNICIPAL COMPLEX Dear Montye: I am writing concerning the qualification of Huber Design and Construction (Huber) as General Contractor for our municipal complex project. Huber is one of the continuing vertical contractors selected by the Greater Orlando Aviation Authority. CTH+A has been working with Huber on four concurrent projects at Orlando International Airport this year. The projects are very demanding in terms of schedule and maintaining owner access to existing facilities and their operations. Our work with Huber on these projects has proceeded very well. The response of personnel on the project team as well as their workmanship has been expedient and professional. Buddy Peeler, of our office, has also had the opportunity to work with Huber at Jackson Court Housing Complex,a project by the Orlando Housing Authority. The client was extremely happy with the final project and again the working relationship between owner and contractor was very cooperative. We have attached, for your review, Huber's Contractor Qualification Statement and letters of reference. We respectfully recommend that the City of Ocoee award the construction contract to Huber, the qualified low bidder. Please let us know if you have any questions or need additional information. We look forward to the successful completion of this most important project. Sincerely, C.T. HSU + ASSOCIATES,,�, P.A. QUAIF201 Chu-Tzu Hsu, A.I.A. President CTH:cg Enclosures as stated cc: File (CR),(PF) THE AMERICAN INSTITUTE O F ARCHITECTS RIP .,'747-- AIA Document A305 Contractor's Qualification Statement 1986 EDITION Thisform is approved and recommended by The American Institute ofArchitects(ALA) and The Associated General Contractors ofAmerica(AGC)for use in evaluating the qualifications of contractors.No endorsement of the submitting party or verification of the information is made by AIA or AGC. The Undersigned certifies under oath that the information provided herein is true and sufficiently complete so as not to be misleading. SUBMIIII.DTO: Mr. C.T. Hsu, AIA C.T. Hsu Architects, Inc. ADDRESS: 820 Irma Avenue Orlando, Florida 32803 SUBMII IED BY: Corporation IN NAME: HUBER DESIGN&CONSTRUCTION,INC. Partnership ❑ ADDRESS: 35 W. Church St. Individual 0 PRINCIPAL OFFICE: Orlando, FL 32801 Joint Venture 0 Other 0 NAME OF PROJECT(if applicable): Various TYPE OF WORK (file separate form for each Classification of Work): XX General Construction HVAC Plumbing Electrical Other (please specify) Copyright 1964,1969,1979.01986 br The American Institute of Architects.1735 New York Avenue,N.W.,Washington,D.C.20006.Reproduction of the material herein or substantial cruoution of Its provisions without written permission of the AIA violates the copyright laws of the United States and will be subject to legal prosecution. ALA DOCUMENT A305 • CONTRACTOR'S QUALIFICATION STATEMENT • 1986 mfTTON • AIA • 01986 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N ., WASHINGTON, D.C. 20006 A305-1986 1 1. ORGANIZATION l l How many years has your organization been in business as a Contractor? 23 1.2 How many years has your organization been in business under its present business name? 22 1.2.1 Under what other or former names has your organization operated? N/A 1.3 If your organization is a corporation, answer the following: 1.3.1 Date of incorporation: 2/16/78 1.3.2 State of incorporation: FLORIDA 1.3.3 President's name: DON HUBER 1.3.4 Vice-presidents name(s): 1.3.5 Secretary's name: MARY LOU HUBER I.3.6 Treasurer's name: MARY LOU HUBER 1.4 If your organization is a partnership, answer the following: 1.4.1 Date of organization: 1.4.2 Type of partnership (if applicable): N/A 1.4.3 Name(s) of general partner(s): .5 If your organization is individually owned, answer the following: 1.5.1 Date of organization- 1.5.2 rganiruion- 1.5.2 Name of owner AIA DOCUMENT A305•CONTRACTOR'S(?l ALIFI(..ATION STATEMENT• 1986 EDI ION• :\IA`" • ';',1980A305-1986 2 THF AMFRI( AN INSTITI'TF:OF ARCHTT FCrti I'(S NFW YORK A\'FNI E. N W \CASHIN(;roN. I)I 200HO 1.6 If the form of your organization is other than those listed above, describe it and name the pnncpals N/A • 2. LICENSING 2 1 List jurisdictions and trade categories in which your organization is legally qualified.to do business, and indicate registration or license numbers, if applicable Certified General Contractor - Donald M. Huber License # GC CO10065 2.2 List jurisdictions in which your organization's partnership or trade name is filed. State of Florida 3. EXPERIENCE I List the categories of work that your organization normally performs with its own forces Demolition, Foundations and Earthwork, Concrete, Masonry, Carpentry, Metal Stud and Drywall i ? Claims and Suits (II the answer to any of the questions below is yes, please attach details ) S? I Has your organization ever failed to complete any work awarded to it? NO ? 2 Are there any judgments, claims. arbitration proceedings or suits pending or outstanding against your organization or its officers? NO t 2 i I las your organization filed any law suits or requested arbitration with regard to construe tion contracts within the last five years? NO Within the last five years, has any officer or principal of your organization ever been an officer or principal of another organization when it failed to complete a construction contract?(If the answer is yes, please attach details.) NO AIA DOCUMENT A305 •(. )NTHACTUI(' Lx AI.IEICAIION STATEMENT• 19$u EDITION• AIA°i • c,19).“, TIE >.+rui( SN i oiIII IF 01- Alt( IUTr( NE.\r; YOHH SVEN1'r Nu \X'ASIIIN(;iON n( SnuiK, A305-1986 3 3 . 4 Major construction projects our organization has in progress giving the name of the project, owner, architect, contract amount, percent complete , and scheduled completion date. WINN DIXIE-OCALA WINN DIXIE - APOPKA OWNER: Winn Dixie Stores OWNER: Winn Dixie Stores ARCHITECT: Carl Garlington ARCHITECT: Carol Garlington CONTRACT AMOUNT: $642 , 864 CONTRACT AMOUNT: $639 , 800 . COMPLETE: 0% COMPLETE: 45% COMPLETION DATE: 7/93 COMPLETION DATE: 8/93 WINN DIXIE-TAMPA V-59 TUNNEL MURRALS OWNER: Winn Dixie Stores OWNER: (GOAA) Greater Orlando ARCHITECT: The Muse Organiz . Aviation Authority CONTRACT AMOUNT: $1 , 223 , 900 ARCHITECT: KBJ Architects, Inc. COMPLETE: 95% CONTRACT AMOUNT: $241 , 028 COMPLETION DATE: 6/93 COMPLETE: 90% COMPLETION DATE: 7/93 WINDERMERE MAIN POST OFFICE V-66 MISCELLANEIOUS CONVEYORS OWNER: U. S . Postal Service OWNER: (GOAA) Greater Orlando ARCHITECT: Cuhaci & Peterson Aviation Authority CONTRACT AMOUNT: $1 , 500, 000 . ARCHITECT: C.T. HSU COMPLETE: 80% CONTRACT AMOUNT: $374 , 630 COMPLETION DATE: 8/93 COMPLETE: COMPLETION DATE: V-63 INS PROCESSING FACILITY V-66 INS OFFICE ADDITION OWNER: (GOAA) Greater Orlando OWNER: (GOAA) Greater Orlando Aviation Authority Aviation Authority ARCHITECT: C.T. Hsu ARCHITECT: C.T. HSU CONTRACT AMOUNT: $537 , 080 . CONTRACT AMOUNT: $288 , 519 COMPLETE: 50% COMPLETE: 50% COMPLETION DATE: 4/93 COMPLETION DATE: 4/93 V-64 INS OFFICE ADDITION WINN DIXIE-DADE CITY OWNER: (GOAA) Greater Orlando Aviation OWNER: WINN DIXIE STORES , INC. Authority ARCHITECT: Cuhaci & Peterson ARCHITECT: C.T. HSU CONTRACT AMOUNT: $2 , 400 , 000 . CONTRACT AMOUNT: $288 , 519 COMPLETE: 0% COMPLETE: 50% COMPLETION DATE: 11/93 COMPLETION DATE: 4/93 WINN DIXIE-AMERICANA BLVD. OWNER: Winn Dixie Stores ARCHITECT: Carl Garlington CONTRACT AMOUNT: $1 , 212 , 289 . COMPLETE: 10% COMPLETION DATE: 11/93 3 . 5 Major projects completed in the past five years, giving the name of the project, owner, architect, contract amount, date of completion and percentage of the cost of work performed with our own forces . RIPLEY 'S BELIEVE IT OR NOT OWNER: Strand Key West ARCHITECT: Steve Abrams CONTRACT AMOUNT: $800 , 000 . COMPLETION DATE: 4/93 PLAZA INTERNATIONAL WINN DIXIE - DELAND OWNER: Plaza International Ltd. OWNER: Winn Dixie Stores ARCHITECT: Cuhaci & Peterson ARCHITECT: P. B. C. INC. CONTRACT AMOUNT: $1 , 760 , 000 . CONTRACT AMOUNT: $608 , 310 COMPLETED: 12/92 COMPLETED: 4/93 WINN DIXIE-CASSELBERRY BOYS AND GIRLS CLUB OWNER: Winn Dixie Stores OWNER: Boys & Girls Club ARCHITECT: Cuhaci & Peterson ARCH: Catalyst Reiff & Assoc. CONTRACT AMOUNT: $799 , 256 CONTRACT AMT: $481, 000 . COMPLETED: 2/93 COMPLETED: 3/93 WINN DIXIE-PALM BAY WINN DIXIE - DELTONA OWNER: Winn Dixie Stores OWNER: Winn Dixie Stores ARCHITECT: Carl Garlington ARCHITECT: Cuhaci & Peterson CONTRACT AMOUNT: $738 , 000 CONTRACT AMOUNT: $614 , 000 COMPLETED: 2/93 COMPLETED: 6/92 REFLECTIONS OF HIDDEN LAKE LAQUINTA MOTOR INN DAYTONA OWNER: PTC Enterprises OWNER: LaQuinta Motor Inn CONTRACT AMOUNT: $650 , 000 CONTRACT: Confidential COMPLETED: 4/92 COMPLETED: 2/92 WINN DIXIE-CRYSTAL RIVER RIPLEY'S BELIEVE IT OR NOT OWNER: Winn Dixie Stores OWNER: Ripley' s ARCHITECT: Cuhaci & Peterson ARCHITECT: Cuhaci & Peterson CONTRACT AMOUNT: $2 , 350 , 000 CONTRACT AMOUNT: $800, 000 . COMPLETED: 10/92 COMPLETED: 7/92 SOUTHTRUST BANK PETSMART OWNER: SouthTrust OWNER: New Market Cortez ARCHITECT: Cuhaci & Peterson ARCHITECT: Cuhaci & Peterson CONTRACT AMOUNT: $360 , 267 CONTRACT AMOUNT: $814 , 000 COMPLETION DATE: Oct. 1992 COMPLETION DATE: Sept. 1992 CROWN CENTRE PHASE II-PUBLIX AMERICAN LEGION HEADQUARTERS OWNER: Crown Centre Partners OWNER: American Legion ARCHITECT: Cuhaci & Peterson ARCHITECT:Andrew Kutz CONTRACT AMOUNT: $3 , 719 , 495 CONTRACT AMOUNT: COMPLETION DATE: 5/92 COMPLETION DATE: May 2 , 1991 WINN DIXIE-LAKELAND OWNER: Winn Dixie Stores, Inc. ARCHITECT: The Muse Organization CONTRACT AMOUNT: $661 , 000 . COMPLETION DATE: June 1990 WINN DIXIE-ARCADIA WINN DIXIE-PORT ST. JOHN OWNER: Winn Dixie Stores OWNER: Winn Dixie Stores ARCHITECT: Cuhaci & Peterson ARCHITECT: Cuhaci & Peterson CONTRACT AMOUNT: $2 , 046 , 000 CONTRACT AMOUNT: $678 , 000 COMPLETION DATE: 8/92 COMPLETION DATE : June 1990 SHULMAN RESIDENCE HOFFMAN RESIDENCE OWNER: Mr. & Mrs . Shulman OWNER: Mr. & Mrs . John Hoffman ARCHITECT: Gary Winters ARHICTECT: Fugleburg Koch CONTRACT AMOUNT: 930, 000 CONTRACT AMT: 840 , 000 COMPLETION DATED: Mar. 1991 COMPLETION DATE: Mar. 1991 CROWN CENTRE PLAZA RETAILS LAQUINTA MOTOR INN ALTAMONTE OWNER: Crowne Centre Partners OWNER: LaQuinta Inn ARCHITECT: Cuhaci & Peterson ARCHITECT: LaQuinta Inns, Inc. CONTRACT AMOUNT: $540, 656 . CONTRACT AMT: Confidential COMPLETED: August, 1990 COMPLETED: 11/90 OFFICE BUILDING - KIRKMAN RD CROWN CENTRE PLAZA-SITE OWNER: Huber Investments OWNER: Crown Center Partners ARCHITECT: Ray Johnson & Assoc. ARCHITECT: Conklin & Porter CONTRACT AMOUNT: $670 , 000 CONTRACT AMOUNT: $1 , 750 , 705 COMPLETED: November, 1990 COMPLETED: August, 1990 WINN DIXIE - BRADENTON WINN DIXIE - LAKE PLACID OWNER: Winn Dixie Stores OWNER: Winn Dixie Stores ARCHITECT: Cuhaci & Peterson ARCHITECT: Cuhaci & Peterson CONTRACT AMOUNT: $655 , 850 CONTRACT AMT: $798 , 715 COMPLETED: Jan. 1991 COMPLETED: Mar. 1991 PARC CORNICHE RESORT II WAL-MART #1501 - TAMPA, FL OWNER: Orlando International OWNER: Wal"-Mart Stores Development ARCHITECT: BSW Architects ARCHITECT: Jenkins Hancock & CONTRACT AMOUNT: $1 , 704 , 000 Side COMPLETED: Dec. 1990 CONTRACT AMOUNT: $4 , 457 , 324 . COMPLETED: April 1990 PALM BAY WEST SHOPPING CTR. EDGEWATER PLAZA OWNER: Palm Bay West, Inc. OWNER: Winn Dixie Stores ARCHITECT: Cuhaci & Peterson ARCHITECT: Cuhaci & CONTRACT AMOUNT: $ 8 , 862 , 000 . Peterson Arch. OWN FORCES : 15% CONTRACT AMT: $1 , 211 , 000 . COMPLETED: March 1990 OWN FORCES : 20% COMPLETED: June 1989 MCCORMACK RESIDENCE WINN DIXIE - ZEPHYRHILLS OWNER: Mr. & Mrs . McCormack OWNER: Winn Dixie Stores ARCHITECT: Arch. Design Group ARCH : Cuhaci & Peterson CONTRACT AMT: $2 , 300 , 000 . CONTRACT AMT: $596 , 000 . OWN FORCES : 20% OWN FORCES : 20% COMPLETED: May 1989 COMPLETED: January 1990 PARC CORNICHE - PHASE I ISLE OF OSPREY GUARDHOUSE OWNER: Orlando Int ' l Dev. OWNER: Isle of Osprey ARCHITECT: Jenkins, Hancock Joint Venture & Sides ARCHITECT: Robert Harris CONTRACT AMT: $5 , 294 , 203 . CONTRACT AMT: $249 , 000 . OWN FORCES : 20% OWN FORCES : 20% COMPLETED: December 1989 COMPLETED: June, 1989 WINN DIXIE - ALBANY, GEORGIA JACKSON COURT MIDTOWN SHOPPING CENTER OWNER: Orlando Housing OWNER: Southmark Properties Authority ARCHITECT: Cuhaci & Peterson ARCHITECT: Catalyst, Inc. • CONTRACT AMT: $2 , 565 , 000 . CONTRACT AMT: $1 , 800 , 000 . OWN FORCES : 5% OWN FORCES : 10% COMPLETED: June 1989 COMPLETED: December 1988 FLORIDA SHORES CAMPBELL RESIDENCE OWNER: Winn Dixie Stores OWNER: Ron Campbell ARCHITECT: Cuhaci & Peterson ARCHITECT: Evans Group CONTRACT AMT: $2 , 300 , 000 . CONTRACT AMT: $1 , 300 , 000 . OWN FORCES : 10% OWN FORCES : 30% COMPLETED: November 1988 COMPLETED: June 1988 LEESBURG MARKETPLACE MCLAUGHLIN RESIDENCE OWNER: Huber Investments OWNER: Jim McLaughlin ARCHITECT: Cuhaci & Peterson ARCHITECT: Cuhaci & CONTRACT AMT: $2 , 800, 000 . Peterson OWN FORCES : 20% CONTRACT AMT: $780 , 000 . COMPLETED: May, 1988 OWN FORCES : 30% COMPLETED: February 1989 KANE FURNITURE STORE WEST VILLAGE COMMONS OWNER: Kane Furniture Co. OWNER: Community Shopping ARCHITECT: Burke & Bales Assoc. Center CONTRACT AMT: $1 , 545 , 000 . ARCHITECT:Mudano & Assoc. OWN FORCES : 20% CONTRACT AMT: $3 , 650 , 000 . COMPLETED: September 1986 OWN FORCES : 20% COMPLETED: January 1986 PAK N SAVE SHOPPERS WORLD OWNER: Safeway Stores, Inc . OWNER: Shoppers World ARCHITECT: Design Circle ARCHITECT: Blaine Miller CONTRACT AMT: $2 , 123 , 239 . CONTRACT AMT: $3 , 441 , 116 . OWN FORCES : 20% OWN FORCES : 20% COMPLETED: March 1987 COMPLETED: February 1986 INDIAN RIVER PLAZA DOWDY PLAZA OWNER: Barna & Harrison OWNER: Ron Dowdy ARCHITECT: Burke & Bales Assoc. • ARCHITECT: Burke & Bales CONTRACT AMT: $2 , 557 , 000 . CONTRACT AMT: $1 , 540 , 000 . OWN FORCES : 30% OWN FORCES ; 10% COMPLETED: February 1986 COMPLETED: September 1985 INTERNATIONAL OUTLET OCALA WEST SHOPPING CTR OWNER: Oakridge Investments OWNER: Community Shopping ARCHITECT: Burke & Bales Assoc. ARCHITECT: Mudano & Assoc CONTRACT AMT: $1 , 200, 000 . CONTRACT AMT: $1 , 703 , 916 . OWN FORCES : 20% OWN FORCES : 10% COMPLETED: June 1985 COMPLETED: December 1984 MELBOURNE SHOPPING CENTER PROVIDENCE PLAZA CENTER OWNER: American Shopping Ctr. OWNER: Normandy Pines Venture ARCHITECT: Burke & Bales Assoc. ARCHITECT: Mudano & Assoc. CONTRACT AMT: $2 , 900 , 000 . CONTRACT AMT: $1 , 980 , 000 . 00 OWN FORCES : 20% OWN FORCES : 10% COMPLETED: December 1984 COMPLETED: Spetember 1984 BEACH PLAZA FOREST EDGE PLAZA OWNER: American Shopping Ctr. OWNER: Forest Edge Plaza ARCHITECT: Burke & Bales Assoc . ARCHITECT: Burke & Bales CONTRACT AMT: $2 , 333 , 228 . CONTRACT AMT: $2 , 024 , 000 . OWN FORCES : 10% OWN FORCES : 20% COMPLETED: February 1984 COMPLETED: July 1984 INTERNATIONAL PLACE DAIRY PLAZA OWNER: Oakridge Investments OWNER: Reilly-Jospeh Co. ARCHITECT: Burke & Bales ARCHITECT: Burke & Bales CONTRACT AMT: $3 , 503 , 090 . CONTRACT AMT: $2 , 471 , 625 . OWN FORCES : 10% OWN FORCES : 20% COMPLETED: December 1986 COMPLETED: December 1986 • WEST ORANGE PLAZA MT. DORA MARKETPLACE OWNER: Southmark Corp. OWNER: MLD Development ARCHITECT: David L. Hewell ARCHITECT: Burke & Bales CONTRACT AMT: $3 , 955, 371 . CONTRACT AMT: $2 , 547 , 000 . OWN FORCES : 15% OWN FORCES : 10% COMPLETED: November 1986 COMPLETED: October 1986 SPRINGS PLAZA HUBER OFFICE BUILDING OWNER: American Shopping Ctr. OWNER: Huber Investments ARCHITECT: Cuhaci & Peterson ARCHITECT: Burke & Bales CONTRACT AMT: $2 , 473 , 507 . CONTRACT AMT: $350 , 000 . OWN FORCES ; 20% OWN FORCES : 20% COMPLETED: February 1987 COMPLETED: February 1987 DEBARY SQUARE INTERNATIONAL TOWNE CTR. OWNER: Debary Commons OWNER: Westwood Investment ARCHITECT: Mudano Assoc. ARCHITECT: Burke & Bales CONTRACT AMT: $1 , 799 , 770 . CONTRACT AMT: $1 , 489 , 206 . OWN FORCES ; 20% OWN FORCES : 20% COMPLETED: March 1987 COMPLETED: April 1987 3 . 6 Construction experience and present commitments of the key individuals of our organization Donald M. Huber- - President, Owner, 23 years experience, State Certified (Class A) General Contractor, shopping centers warehouse, office building, medical facilities, hotels, and banks . Steven L. Baxley - Project Manager, 16 years experience, State Certified (Class A) General Contractor, BS Degree in Finance, Project Manager of commercial projects to $8 million. Nick P. Roznak - Estimator, 12 years experience, State Certified (Class A) General Contractor , Bachelor Degree in Building Construction. Experience in shopping centers, banks, offices, hi- rise condominiums, auto service facilities, single family and multifamily residential . Paul J. Muller - Project Manger/Superintendent, Over 30 years as Project Manager and Superintendent, State Certified (Class A) General Contractor, Major projects include Airports, Industrial , Hospitals, Laboratories , School Facilities, Hotel and Shopping Centers, Government and Private Sector - Fast track & high tech. Paul S. Gula - Project Manager, 16 years experience, Professional Engineer, MS and BS degrees in Civil Engineering. Construction and Design/Build experience in Office Buildings , Medical Facilities, Churches, Banks and Condominiums . Michael R. Kelly - Project Manager, 24 years experience, State Certified (Class A) General Contractor. Formal education in Building Construction and Construction Engineering.. Management experience in Design and Construction of Public and Private Sector projects ranging from $1 million to over $150 million . Jeffrey R. McElyea - Estimator, 8 years experience, State Certified (Class B) Building Contractor, Bachelors Degree in Building Construction. Experience in Shopping Centers, Office Buildings, Banks, Churches, Warehouse and Single Family Custom Residences . 3.4 On a separate sheet, list major construction projects your organization has in progress, giving the name of project, owner, architect, contract amount, percent complete and scheduled completion date 3.4 I State total worth of work in progress and under contract: See Attached 3.5 On a separate sheet, list the major projects your organization has completed in the past five years, giving the name of project, owner,architect, contract amount, date of completion and percentage of • the cost of the work performed with your own forces. 3 5 I State average annual amount of construction work performed during the past five years: See Attached 3.6 On a separate sheet, list the construction experience and present commitments of the key individ- uals of your organization. See Attached 4. REFERENCES 4.1 Trade References: Abbott-True Electric, Inc. Tharp Plumbing Systems, Inc. Addison Steel, Inc. 4.2 Bank References: Sun Bank, N.A. • 200 S. Orange Ave. 5th Floor Orlando, FL 32801 i i Surety 4.3 I Name of bonding company. See Agent 4.3.2 Name and address of agent: Huckleberry, Sibley & Harvey 1901 Lee Rd. Winter Park, FL 32789 AIA DOCUMENT A305•CONTRACTOR'S QI AI-IrICATION STATEMENT• 1980 EDITION• AIA ' • -,I vnn iitr- ,11:01CATI tN.-t'i't'i"1-t- r1t- nw!'11I'1'1:("I'; I-1S N4'\V V(11711 8VVI,JI'I' N VUA\IIIN(:'I/1N n( A305-1986 4 5. FINANCING 5.1 Financial Statement 5.1.1 Attach a financial statement, preferably audited, including your organization's latest balance sheet and income statement showing the following items: Current Assets (e.g., cash, joint venture accounts, accounts receivable, notes receivable, accrued income, deposits, materials inventory and prepaid expenses):. Net Fixed Assets; Other Assets; Current Liabilities (e.g , accounts payable, notes payable, accrued expenses, pro- vision for income taxes. advances, accrued salaries and accrued payroll taxes); Other Liabilities (e.g., capital, capital stock, authorized and outstanding shares par values, earned surplus and retained earnings). 5.1.2 Name and address of firm preparing attached financial statement, and date thereof Cline & Bailes 801 N. Magnolia Ave. , Suite 210, Orlando, FL 32802 5.I.3 Is the attached financial statement for the identical organization named on page one? 5.1.4 If not, explain the relationship and financial responsibility of the organization whose financial statement is provided (e.g.. parent-subsidiary). 5.2 Will the organization whose financial statement is attached act as guarantor of the contract for con struction? AIA DOCUMENT A305•CONTRACrOK's`t Al II'r(.AI I(,' •11-rPMtr:N I • l9:-t(, F:I)Ill,l\ • .AI.\ • I'Al ,,,I, Rr1n1,C, I, ,\H I\(.fl15 ,„ 4305-1986 5 6. SIGNATURE 6.1 Datedat this 9th dayof July Name of Organization: HUBER DESIGN&CONSTRUCTION,INC. Title: President 6.2 Mr. Don Huber being duly sworn deposes and says that the information provided herein is true and sufficiently complete so as not to be misleading. Subscribed and sworn before me this 9th day of July 19 93 Notary Public: C'& ) <4_ - •• °�Y ••. OFFICIAL SEAL My Commission Expires: I CAROL SHEARER My Commission Expires �•.;r�, 41:1(74. Feb. 15, 1995 •.;°;;;•• Comm. No. CC 077375 MA DOCUMENT A305 • CONTRACTOR'S QUALIFICATION STATEMENT • 1986 EDITION • AIA( • 01986 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20306 A305-1986 6 GREATER ORLANDO AVIATION AUTHORITY Office of The Executive Director Orlando International Airport One Airport Boulevard Orlando. Florida 32827-4399 (407) 825-2001 March 25, 1993 TO WHOM IT MAY CONCERN: Huber Design & Construction, Inc. is one of the continuing vertical contractors for the Greater Orlando Aviation Authority. This role requires Huber to respond to shortened bid periods, as well as compressed construction time frames. Huber Design & Construction is currently constructing several projects at Orlando International Airport which will increase international passenger processing. These projects are critical for the upcoming season, and Huber Design & Construction is prepared to meet our critical schedule. Huber Design & Construction has an excellent track record at Orlando International Airport, and I can highly recommend Huber for construction projects as competitive and demanding as those for the Greater Orlando Aviation Authority. Sind / •=:" iea• :7-- firrea 'xecutive Di •-c • NJG:jm °WAND° AO.F ,—: fx t'- e .1"4.;,. TTY BEM' Cnitt of (3rlttnoo PLANNING AND DEVELOPMENT 400 S. ORANGE AVENUE TELEPHONE DEPARTMENT ORLANDO, FLORIDA (407) 246-2271 BUILDING CODE ENFORCEMENT BUREAU 32801 FAX (407) 246-2882 , March 16, 1992 Reference: Letter of Reference Huber Design & Construction, Inc. To Whom It May Concern; I ' ve had the pleasure of dealing with Don Huber and Huber Design & Construction, Inc. for over 20 hears . In that time they have earned a reputation of high quality work and professionalism. We 've considered this company very cooperative when dealing with our department, and consider their projects as an asset to our community. It is my opinion that they are very qualified General Contracting firm. Should you have any questions, please call . J. . "Bil ' Neese B ilding Official Bureau of Code Enforcement 1c0y0 Gzcr Oim 0 GrHORic 0 4 0 Ill 0 • V9'ate K(// Or a 7/ / d a COMMISSIONERS: 500 ✓lee4,e4 am/ S.R.McDaniell,Jr. Patrick Donovan Dean,Chairman Executive Director Sheldon B.Watson, Vice Chairman a/amdo, A/o, z 32801 Emma E.Crawford Dennis Morgan Thelma J.Dudley �e%'i/ane,740 /89.4-1500 Assistant Executive Director Betty Jo Hurt Hector R.Mendez,M.D William F.Warden,Jr ATTORNEYS. August 9 , 1989 Anderson and Rush Re: Letter of Recommendation To Whom It May Concern: Huber Design and Construction recently completed a 43 unit concrete block apartment complex for the Orlando Housing Authority Properties, Inc./City of Orlando. This $1, 800 , 000 project was completed within the budget limitations. It further required few Change Orders (2 . 8%) from the original contract, many of which were imposed by City inspectors and beyond the contractor ' s control . The quality of work was well above satisfactory, especially when considering the innovative design and severe time constraints imposed by the contract. All of these were fulfilled by the team at Huber Design and Construction into a finished product that vastly improves the quality of housing in Orlando. Sincerel , . R. McDaniell , Jr. Executive Director SRM: ack • • ATTACHMENT 3 C.T. HSU + ASSOCIATES, P.A. ARCHITECTURE • PLANNING • LANDSCAPE • INTERIOR DESIGN CRlilmiALicense NAA-C 001322 820 IRMA AVENUE • ORLANDO,FLORIDA 32803 • 407423-0098 • FAX#407423-4793 CITY OF OCOEE MUNICIPAL COMPLEX ADD ALTERNATE EVALUATION Schedule of Alternates: 1. Add Alternate No. 1: Rooftop Dormers $11,100.00 Provide rooftop dormers as indicated on sheets A-4 and A-5. 2. Add Alternate No. 2: Cupola $ 3,735.00 Provide ornamental cupola as indicated on sheet A-4. 3. Add Alternate No. 3: Rooms P129 and P130 $ 3,082.00 Provide Rooms P129 and P130 as indicated on drawings. Basic bid is rough in utilities in floor and wall. Tape and sand walls. 4. Add Alternate No.4: Finish Upgrade $11,950.00 Provide carpet"FB",wood wainsott,wallpaper per allowance in Rooms 109, 110, 111, 204 and 205. 5. Add Alternate No. 5: Sallyport $ 5,532.00 Provide complete sallyport as indicated on drawings. Basic bid to provide asphalt paving only. 6. Add Alternate No. 6: Trophy Case $ 2,440.00 Provide glass and wood trophy display case as indicated and detailed on sheet A-12 and A-14. ATTACHMENT 4 TO (OWNER): CITY OF OCOEE PROJECT: CITY OF OCOEE APPLICATION # DISTRIBUTION: 150 N. LAKESHORE DRIVE MUNICIPAL COMPLEX OCOEE, FLORIDA 34761 PERIOD TO: OWNER FROM (CONTRACTOR): HUBER CONSTRUCTION ARCHITECT: C. T. HSU & ASSOCIATES ARCHITECTS _ ARCHITECT P.O.BOX 960 820 IRMA AVENUE PROJECT NO: 9213.00 ORLANDO, FL 32802 ORLANDO, FLORIDA 32803 CONTRACTOR CONTRACT FOR: GENERAL CONSTRUCTION CONTRACT DATE: Application is made for Payment, as shown below, in con- CONTRACTOR'S APPLICATION FOR PAYMENT nection with the Contract. Continuation Sheet is attached. CHANGE ORDER SUMMARY 1. ORIGINAL CONTRACT SUM $ 1,677,266 Change Orders approved in ( 2. Net change by Change Orders $ 0 previous months by Owner ADDITIONS DEDUCTIONS TOTAL i 3. CONTRACT SUM TO DATE (Line 1 +/- 2) $ 1,677,266 Approved this month 4. TOTAL COMPLETED & STORED TO DATE $ 0 (Column G on Continuation Sheet) No. Date approved 5. RETAINAGE: a. % of Completed Work $ (Column D+E on CS) b. % of Stored Material $ (Column F on CS) Total Retainage (Line 5a+5b or Total in Column I of CS) $ 0 TOTALS 6. TOTAL EARNED LESS RETAINAGE $ 0 Net change by Change Orders (Line 4 less Line 5 Total) The undersigned Contractor certifies that to the best of 7. LESS PREVIOUS CERTIFICATES FOR $ 0 the Contractor's knowledge, information and belief the PAYMENT (Line 6 of prior Certificate) Work cornered by this Application for Payment has been com- pleted in accordance with the Contract Documents, that all 8. CURRENT PAYMENT DUE $ 0 amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and 9. BALANCE TO FINISH, PLUS RETAINAGE $ 1,677,266 payments received from the Owner, and that current payment (Line 3 less Line 6) shown herein is now due. State of: CONTRACTOR: Subscribed and sworn to before me this day of 19 . Notary Public: By: Date: My Commission expires: ARCHITECT'S CERTIFICATE FOR PAYMENT AMOUNT CERTIFIED (Attached explanation if amount certified differs from the In accordance with the Contract Documents, based on on- amount applied for.) site observations and the data comprising the above appli- ARCHITECT: cation, the Architect certifies to the Owner that to the By: Date: best of the Architect's knowledge, information and belief This Certificate is not negotiable. The AMOUNT CERTIFIED is the Work has progressed as indicated, the quality of the payable only to the Contractor named herein. Issuance, pay- Work is in accordance with the Contract Documents, and the ment and acceptance of payment are without prejudice to any Contractor is entitled to payment of the AMOUNT CERTIFIED. rights of the Owner or Contractor under this Contract. v PROJECT NAME: CITY OF OCOEE MUNICIPAL COMPLEX A 1 B I C I D I E I F I G I H I I ITEMI DESCRIPTION OF WORK I SCHEDULED 1 WORK COMPLETED I MATERIALS I TOTAL I PER 1 BALANCE I RETAINAGE NO. I I VALUE I FROM PREY. 1 THIS I PRESENTLY 1 COMPLETED I CENT I TO FINISH I I (APPLICATION I PERIOD I STORED 1 AND STORED 1 % I I I I I 1 (D+E) (RETAIN & CO I I TO DATE 1 ( I I 1 GENERAL REQUIREMENTS $61,697 $0 $0 $0 $0 0% $61,697 $0 2 SITE WORK $189,802 $0 $0 $0 $0 0% $189,802 $0 3 REMOVE UNSUITABLE SOIL $14,994 $0 $0 $0 $0 0% $14,994 $0 4 REMOVE CONCRETE GROUT $4,815 $0 $0 $0 $0 0% $4,815 $0 5 CONCRETE $71,947 $0 $0 $0 $0 0% $71,947 $0 6 GYPCRETE $13,700 $0 $0 $0 $0 0% $13,700 $0 7 MASONRY $35,495 $0 $0 $0 $0 0% $35,495 $0 8 STRUCTURAL & MISC. STEEL $29,866 $0 $0 $0 $0 0% $29,866 $0 9 CARPENTRY $227,118 $0 $0 $0 $0 0% $227,118 $0 10 MILLWORK $42,087 $0 $0 $0 $0 I 0% $42,087 $0 11 ROOFING $28,700 $0 $0 $0 $0 0% $28,700 $0 12 INSULATION $22,950 $0 $0 $0 $0 0% $22,950 $0 13 SEALANTS $3,388 $0 $0 $0 $0 0% $3,388 $0 14 DOORS & FRAMES $24,865 $0 $0 $0 $0 0% $24,865 $0 15 OVERHEAD GRILLES $3,870 $0 $0 $0 $0 0% $3,870 $0 16 STOREFRONT & GLAZING $29,182 $0 $0 $0 $0 0% $29,182 $0 17 WINDOWS $7,246 $0 $0 $0 $0 0% $7,246 $0 18 FINISH HARDWARE $36,759 $0 $0 $0 $0 0% $36,759 $0 19 GYP. BOARD & METAL FRAMING $56,225 $0 $0 $0 $0 0% $56,225 $0 20 CERAMIC TILE $24,754 $0 $0 $0 $0 0% $24,754 $0 21 ACOUSTICAL CEILINGS $21,325 $0 $0 $0 $0 0% $21,325 $0 22 FLOORING $29,000 $0 $0 $0 $0 0% $29,000 $0 23 PAINTING $33,559 $0 $0 $0 $0 0% $33,559 $0 24 LOUVERS $4,594 $0 $0 $0 $0 0% $4,594 $0 25 TOILET PARTITIONS $12,252 $0 $0 $0 $0 0% $12,252 $0 26 FIRE EXTINGUISHERS $888 $0 $0 $0 $0 0% $888 $0 27 TOILET ACCESSORIES $6,523 $0 $0 50 $0 0% $6,523 $0 28 AUDITORIUM SEATING $12,745 $0 $0 $0 $0 0% $12,745 $0 29 ELEVATOR $22,760 $0 $0 $0 $0 0% $22,760 $0 30 PLUMBING $48,655 $0 $0 $0 $0 0% $48,655 $0 31 FIRE SPRINKLERS $59,950 $0 $0 $0 $0 0% $59,950 $0 32 H.V.A.C. $235,000 $0 $0 $0 $0 0% $235,000 $0 33 ELECTRICAL $175,000 $0 $0 $0 $0 0% $175,000 $0 34 PERMIT $2,754 $0 $0 $0 $0 0% $2,754 $0 35 BOND $19,815 $0 $0 $0 $0 0% $19,815 $0 36 OVERHEAD & PROFIT $62,986 $0 $0 $0 $0 0% $62,986 $0 I � I I I I I I I I (TOTALS 1$1,677,266 1 $0 I $0 1 $0 1 $0 I 0% 151,677,266 1 $0 1 07!16/93 11:26 J U L lb ' b., i o: :a a $ 407 423 4793 C.T. HSU & ASSOC 02 il • , HUBER DESIGN & CITY OF OCOEE MUNICIPAL COMPLEX COWSTIWCUON SITE SCHEDULE OF VALUES INCORPORATID .2"-T-49-1 I0 `ae72 Z-. STATE CERTIFIED Cticomes arn-f?y A/L77OAJ .T . N ti• y'•~ SITE DEMOLITION REMOVE BASE & PAVING 33300 SF REMOVE SIDEWALKS 6887 SF REMOVE SEPTIC SYSTEM 3590 SF REMOVE CURB 918 LF REMOVE SIGNS 10 EA $ 7,200 . EARTHWORX CLEARING 4 LD STRIP TOPSOIL 520 CY FILL PAD 6300 CY GRADE PARKING LOT 260 CY EXCAVATE POND 2458 CY • IMPORT FILL 8260 CY $ 54,432 .,#'1 MUCK REMOVAL I !' CONCRETE GROUT REMOVAL & 4REPLACEMENT OF CLEAN FILL ;{•� MUCK REMOVAL & REPLACEMENT 500 CY $ 4.8.15 •/ OF CLEAN FILL 2100 CY $ 14,994 PAVEMENT 12" COMPACTED SUBGRADE 216 SY 6" SOIL CEMENT 216 SY 1" 5-3 216 SY SEALCOTE 1825 SY 6" X 16" CURB 323 LF PAINT: PARKING STALL 36 EA HANDICAP STALL 2 EA • ARROW 3 EA 4" WHITE LINE 45 LF RESET WHEEL STOPS 1 LS S 9,095 SANITARY SEWER --- 6" PVC SEWER LATERAL 326 LF 8" PVC SEWER MAIN 197 LF 8" DIP SEWER MAIN 18 LF MANHOLE (6'-B') 1 EA 6" PVC CLEANOUT ASSEMBLY 7 EA LIFT STATION COMPLETE 3. LS . 4" PVC FORCEMAIN 1385 LF 4" DIP FORCEMAIN 100 LF . 16" BORE 8 JACK 67 LF FITTINGS & BLOcKING 1 LS SOD RESTORATION OFF-SITE 1450 SY 35 W.CHURCH$TREET•POST ornc.sox ISD•ORLANDO.R.MOB •PRONE:(407)SWIM•FAX(4071r141.M16 07/16/93 11127 a 407 423 4793 C.7. NSU & ASSOC 03 • STORMWATER SYSTEM. 18" RCP 83. LF 24" RCP 24 LF TYPE 'C' INLET 1 SA CONTROL STRUCTURE 3. EA I8" MES 1 EA 24" HEADWALL 1 EA RIP RAP 245 SF WATER SERVICE REMOVE 2" WATERMAIN 313 LF 4" PVC SERVICE 74 LF 6" PVC 446 LF 6" GATE VALVE & BOX 3. • EA . 6" X 6" TAPPING SLEEVE 2 EA HYDRANT ASSEMBLY 1 EA 4" MASTER DETER ASSEMBLY 2 EA • TOTAL SITE (JTILITES COST $117,000 LE55 4'4ic TT F s " 191009 • • • • WOW OiguaN I CONSTRUCTION INCORPORATED.35 W.CHURCH STREET.RO.SOX NO,ORLANDO,R.32902•PHONE:t4Cn'}61/4 ' * TOTRL PAGE.003 **