MEMORANDUM
DATE: July 16, 1993
TO: THE HONORABLE MAYOR AND
BOARD OF CITY COMMISSIONERS 7��
FROM: Montye E. Beamer, Director �!J
Administrative Services
SUBJECT: BID AWARD - CONSTRUCTION OF CITY HALL
AND POLICE DEPARTMENT
On June 21, 1993 bids for the construction of City Hall and Police
Department were opened. The bid tabulation (Attachment 1) show the
results. The apparent low bid was Huber Design & Construction
Company, Inc; second and third low were RHS Construction Company
Inc. and A. D. Arnold Construction Company, respectively. All
three were asked to submit their subcontractors list by 5: 00 p.m.
June 21, 1993. Such lists were received from Huber and RHS; they
also submitted their schedule of values in a timely fashion.
C.T. Hsu reviewed the bids and their recommendation along with
references for Huber Design & Construction Company, Inc. is
included here as Attachment 2. A description of the six (6) Add
Alternates with cost has been provided in Attachment 3 . Attachment
4 represents the Schedule of Values along with a clarification on
item number 2 as it relates to utilities.
The Honorable Mayor and Board of City Commissioners
July 16, 1993
Page Two
The project budget with Add Alternates 2 and 3 is as follows:
Bond Revenue 2,220,863
Contracted Expenditures
Architectural 30,240
Engineering 4, 100
Geotechnical Engineering 11,343
Construction Bid
Huber 1, 677,266
Site Utilities Cost 97,191
Add Alternate 2 3,735
Add Alternate 3 3,082
Sewer Capital Charge 32,088
Furniture, Fixture and Equipment
Communications equipment 200,000
Computer Cabling, Generator
Link, Air Conditioning equipment,
Projection Screen and Lectern
Contingency 356,200
2,318,054 2, 318. 054
Staff recommends the award to Huber Design & Construction Company,
Inc. for $1, 677,266.00 plus Add Alternates 2 ($3,725.00) and 3
($3, 082.00) for completion of work within 180 calendar days after
the Notice to Proceed.
The outstanding issue as to design was the interior palette. On
July 7, 1993 the Mayor and Commission were individually shown the
interior designer recommendation for the color scheme and type of
carpet identified in the bid. These were found to be acceptable by
a majority of the commission. During these meetings, however,
additional concerns were voiced; they are listed below should
discussion of any of these items be deemed necessary:
The Honorable Mayor and Board of City Commissioners
July 16, 1993
Page Three
1) Mayor Vandergrift
• Hurricane proofing of cupola
• Possible adverse reaction from the Public to dark
color of wood
2) Commissioner Johnson
• French Doors instead of windows in Commission
Conference Room
• Landscaping Plan for Site
3) Commissioner Combs
• Importance of Cupola to design
• Attention to detail in areas most likely seen by
the majority of citizens - entrances, lobby,
Chambers
• Maintenance costs for exterior since it will be
pine
• Walkways utilizing the historical bricks
ACTION REQUESTED
The Mayor and City Commissioners (1) award the construction bid for
the City of Ocoee Municipal Complex (City Hall and Police
Department) to Huber Design & Construction Company, Inc. for
$1,677,266.00 with completion in 180 calendar days and (2)
authorize the Mayor and City Clerk to execute all necessary
documents as included in bid package.
MEB/jbw
Attachments
iy C C - 'ti
o °r 2 gp e z
p 551 ra z c 4 c X
Ca A z
o z y C C C A C
C
ca O C 0 0
ox � wiml
C 'b n C A A
O
O d z c tm
O A
p4 X
z
'c
'S'
r r r r r r r to A
o
W w d t•
r
It
31, v Foho In o A
r r r :- 1- r r C
g a o F 0
I 1 I U) A
O o H
IT] - .Ao pe r r r >
0 g rs § ; 1-3 i tcoi)4-t
d - H
2
O f. S"' f' r y r�
I il V § r
w
I-. r r r A
i -14
VI CA r0 U) U 4U1 401 �1
a
a
EiD fie V,I P Eft p 66
r y
1 i § w 8 pt rl FF
w
ATTACHMENT 2
C.T. HSU + ASSOCIATES, P.A.
ARCHITECTURE • PLANNING • LANDSCAPE • INTERIOR DESIGN ■■
License#AA-C 001322 ■,
820IRMAAVENUE • ORLANDO,FLORIDA32803 • 407423-0098 • FAX#407423-4793
July 10, 1992
Ms. Montye E. Beamer
Director of Administrative Services
City of Ocoee
150 N. Lakeshore Drive
Ocoee, FL 34761
RE: HUBER DESIGN AND CONSTRUCTION, LOW BIDDER
(for City of Ocoee Municipal Complex)
REPORT OF COMPLAINTS OR INCOMPLETION OF PROJECTS STARTED
Dear Montye:
The following firms and agencies were contacted -
1. Huckleberry, Sibley and Harvey Phone #647-1616
Insurance and Bonding for Construction
Contact Person: Gail Chapman
Comments: Huber has been a client for 12 years or more, bond capacity around 12 million.
No defaults or liens on record from owners sub-contractors or suppliers.
2. Central Florida Builder's Exchange Phone #629-2411
Contact Person: Pamela Faiello
Comments: No complaints on record.
3. Orlando Notice to Owner's, Inc. Phone #647-6686
Comments: Not available at this date.
4. Better Business Bureau
Not a member.
5. Florida Construction Industry License Board Phone #1-904-359-6310
Comments: No complaints on record.
CTH+A, based upon the above comments, recommends that Huber Design and Construction Inc.
be considered as Low Bidder for contract to perform the required construction work for the City of
Ocoee Municipal Complex.
Sincerely,
C. T. HSU + ASSOCIATES
1,�-
Wilbur Peeler
Construction Administrator
WP/ed
c: File (CR)(PF)
C.T. HSU + ASSOCIATES, P.A.
ARCHITECTURE • PLANNING • LANDSCAPE • INTERIOR DESIGN ■■
License#AA-C 001322 ■,
8201RMAAVENUE • ORLANDO,FLORIDA 32803 • 407423-0098 • FAX#407423-4793
July 13, 1993 via fax: (407) 656-5725
Ms. Montye E. Beamer
Director of Administrative Services
City of Ocoee
150 N. Lakeshore Drive
Ocoee, FL 34761
RE: OCOEE MUNICIPAL COMPLEX
Dear Montye:
I am writing concerning the qualification of Huber Design and Construction (Huber) as General
Contractor for our municipal complex project.
Huber is one of the continuing vertical contractors selected by the Greater Orlando Aviation
Authority. CTH+A has been working with Huber on four concurrent projects at Orlando
International Airport this year. The projects are very demanding in terms of schedule and
maintaining owner access to existing facilities and their operations. Our work with Huber on these
projects has proceeded very well. The response of personnel on the project team as well as their
workmanship has been expedient and professional.
Buddy Peeler, of our office, has also had the opportunity to work with Huber at Jackson Court
Housing Complex,a project by the Orlando Housing Authority. The client was extremely happy with
the final project and again the working relationship between owner and contractor was very
cooperative.
We have attached, for your review, Huber's Contractor Qualification Statement and letters of
reference. We respectfully recommend that the City of Ocoee award the construction contract to
Huber, the qualified low bidder.
Please let us know if you have any questions or need additional information. We look forward to
the successful completion of this most important project.
Sincerely,
C.T. HSU + ASSOCIATES,,�, P.A.
QUAIF201
Chu-Tzu Hsu, A.I.A.
President
CTH:cg
Enclosures as stated
cc: File (CR),(PF)
THE AMERICAN INSTITUTE O F ARCHITECTS
RIP
.,'747--
AIA Document A305
Contractor's Qualification Statement
1986 EDITION
Thisform is approved and recommended by The American Institute ofArchitects(ALA)
and The Associated General Contractors ofAmerica(AGC)for use in evaluating the
qualifications of contractors.No endorsement of the submitting party or verification
of the information is made by AIA or AGC.
The Undersigned certifies under oath that the information provided herein is true and sufficiently complete so
as not to be misleading.
SUBMIIII.DTO: Mr. C.T. Hsu, AIA
C.T. Hsu Architects, Inc.
ADDRESS: 820 Irma Avenue
Orlando, Florida 32803
SUBMII IED BY: Corporation IN
NAME: HUBER DESIGN&CONSTRUCTION,INC. Partnership ❑
ADDRESS: 35 W. Church St. Individual 0
PRINCIPAL OFFICE: Orlando, FL 32801 Joint Venture 0
Other 0
NAME OF PROJECT(if applicable): Various
TYPE OF WORK (file separate form for each Classification of Work):
XX General Construction HVAC
Plumbing Electrical
Other
(please specify)
Copyright 1964,1969,1979.01986 br The American Institute of Architects.1735 New York Avenue,N.W.,Washington,D.C.20006.Reproduction of
the material herein or substantial cruoution of Its provisions without written permission of the AIA violates the copyright laws of the United States and
will be subject to legal prosecution.
ALA DOCUMENT A305 • CONTRACTOR'S QUALIFICATION STATEMENT • 1986 mfTTON • AIA • 01986
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N ., WASHINGTON, D.C. 20006
A305-1986 1
1. ORGANIZATION
l l How many years has your organization been in business as a Contractor? 23
1.2 How many years has your organization been in business under its present business name? 22
1.2.1 Under what other or former names has your organization operated?
N/A
1.3 If your organization is a corporation, answer the following:
1.3.1 Date of incorporation: 2/16/78
1.3.2 State of incorporation: FLORIDA
1.3.3 President's name: DON HUBER
1.3.4 Vice-presidents name(s):
1.3.5 Secretary's name: MARY LOU HUBER
I.3.6 Treasurer's name: MARY LOU HUBER
1.4 If your organization is a partnership, answer the following:
1.4.1 Date of organization:
1.4.2 Type of partnership (if applicable): N/A
1.4.3 Name(s) of general partner(s):
.5 If your organization is individually owned, answer the following:
1.5.1 Date of organization-
1.5.2
rganiruion-
1.5.2 Name of owner
AIA DOCUMENT A305•CONTRACTOR'S(?l ALIFI(..ATION STATEMENT• 1986 EDI ION• :\IA`" • ';',1980A305-1986 2
THF AMFRI( AN INSTITI'TF:OF ARCHTT FCrti I'(S NFW YORK A\'FNI E. N W \CASHIN(;roN. I)I 200HO
1.6 If the form of your organization is other than those listed above, describe it and name the pnncpals
N/A
•
2. LICENSING
2 1 List jurisdictions and trade categories in which your organization is legally qualified.to do business,
and indicate registration or license numbers, if applicable
Certified General Contractor - Donald M. Huber
License # GC CO10065
2.2 List jurisdictions in which your organization's partnership or trade name is filed.
State of Florida
3. EXPERIENCE
I List the categories of work that your organization normally performs with its own forces
Demolition, Foundations and Earthwork, Concrete, Masonry,
Carpentry, Metal Stud and Drywall
i ?
Claims and Suits (II the answer to any of the questions below is yes, please attach details )
S? I Has your organization ever failed to complete any work awarded to it? NO
? 2 Are there any judgments, claims. arbitration proceedings or suits pending or outstanding
against your organization or its officers? NO
t 2 i I las your organization filed any law suits or requested arbitration with regard to construe
tion contracts within the last five years? NO
Within the last five years, has any officer or principal of your organization ever been an officer or
principal of another organization when it failed to complete a construction contract?(If the answer is
yes, please attach details.) NO
AIA DOCUMENT A305 •(. )NTHACTUI(' Lx AI.IEICAIION STATEMENT• 19$u EDITION• AIA°i • c,19).“,
TIE >.+rui( SN i oiIII IF 01- Alt( IUTr( NE.\r; YOHH SVEN1'r Nu \X'ASIIIN(;iON n( SnuiK, A305-1986 3
3 . 4 Major construction projects our organization has in progress giving
the name of the project, owner, architect, contract amount, percent
complete , and scheduled completion date.
WINN DIXIE-OCALA WINN DIXIE - APOPKA
OWNER: Winn Dixie Stores OWNER: Winn Dixie Stores
ARCHITECT: Carl Garlington ARCHITECT: Carol Garlington
CONTRACT AMOUNT: $642 , 864 CONTRACT AMOUNT: $639 , 800 .
COMPLETE: 0% COMPLETE: 45%
COMPLETION DATE: 7/93 COMPLETION DATE: 8/93
WINN DIXIE-TAMPA V-59 TUNNEL MURRALS
OWNER: Winn Dixie Stores OWNER: (GOAA) Greater Orlando
ARCHITECT: The Muse Organiz . Aviation Authority
CONTRACT AMOUNT: $1 , 223 , 900 ARCHITECT: KBJ Architects, Inc.
COMPLETE: 95% CONTRACT AMOUNT: $241 , 028
COMPLETION DATE: 6/93 COMPLETE: 90%
COMPLETION DATE: 7/93
WINDERMERE MAIN POST OFFICE V-66 MISCELLANEIOUS CONVEYORS
OWNER: U. S . Postal Service OWNER: (GOAA) Greater Orlando
ARCHITECT: Cuhaci & Peterson Aviation Authority
CONTRACT AMOUNT: $1 , 500, 000 . ARCHITECT: C.T. HSU
COMPLETE: 80% CONTRACT AMOUNT: $374 , 630
COMPLETION DATE: 8/93 COMPLETE:
COMPLETION DATE:
V-63 INS PROCESSING FACILITY V-66 INS OFFICE ADDITION
OWNER: (GOAA) Greater Orlando OWNER: (GOAA) Greater Orlando
Aviation Authority Aviation Authority
ARCHITECT: C.T. Hsu ARCHITECT: C.T. HSU
CONTRACT AMOUNT: $537 , 080 . CONTRACT AMOUNT: $288 , 519
COMPLETE: 50% COMPLETE: 50%
COMPLETION DATE: 4/93 COMPLETION DATE: 4/93
V-64 INS OFFICE ADDITION WINN DIXIE-DADE CITY
OWNER: (GOAA) Greater Orlando Aviation OWNER: WINN DIXIE STORES , INC.
Authority ARCHITECT: Cuhaci & Peterson
ARCHITECT: C.T. HSU CONTRACT AMOUNT: $2 , 400 , 000 .
CONTRACT AMOUNT: $288 , 519 COMPLETE: 0%
COMPLETE: 50% COMPLETION DATE: 11/93
COMPLETION DATE: 4/93
WINN DIXIE-AMERICANA BLVD.
OWNER: Winn Dixie Stores
ARCHITECT: Carl Garlington
CONTRACT AMOUNT: $1 , 212 , 289 .
COMPLETE: 10%
COMPLETION DATE: 11/93
3 . 5 Major projects completed in the past five years, giving the name of
the project, owner, architect, contract amount, date of completion
and percentage of the cost of work performed with our own forces .
RIPLEY 'S BELIEVE IT OR NOT
OWNER: Strand Key West
ARCHITECT: Steve Abrams
CONTRACT AMOUNT: $800 , 000 .
COMPLETION DATE: 4/93
PLAZA INTERNATIONAL WINN DIXIE - DELAND
OWNER: Plaza International Ltd. OWNER: Winn Dixie Stores
ARCHITECT: Cuhaci & Peterson ARCHITECT: P. B. C. INC.
CONTRACT AMOUNT: $1 , 760 , 000 . CONTRACT AMOUNT: $608 , 310
COMPLETED: 12/92 COMPLETED: 4/93
WINN DIXIE-CASSELBERRY BOYS AND GIRLS CLUB
OWNER: Winn Dixie Stores OWNER: Boys & Girls Club
ARCHITECT: Cuhaci & Peterson ARCH: Catalyst Reiff & Assoc.
CONTRACT AMOUNT: $799 , 256 CONTRACT AMT: $481, 000 .
COMPLETED: 2/93 COMPLETED: 3/93
WINN DIXIE-PALM BAY WINN DIXIE - DELTONA
OWNER: Winn Dixie Stores OWNER: Winn Dixie Stores
ARCHITECT: Carl Garlington ARCHITECT: Cuhaci & Peterson
CONTRACT AMOUNT: $738 , 000 CONTRACT AMOUNT: $614 , 000
COMPLETED: 2/93 COMPLETED: 6/92
REFLECTIONS OF HIDDEN LAKE LAQUINTA MOTOR INN DAYTONA
OWNER: PTC Enterprises OWNER: LaQuinta Motor Inn
CONTRACT AMOUNT: $650 , 000 CONTRACT: Confidential
COMPLETED: 4/92 COMPLETED: 2/92
WINN DIXIE-CRYSTAL RIVER RIPLEY'S BELIEVE IT OR NOT
OWNER: Winn Dixie Stores OWNER: Ripley' s
ARCHITECT: Cuhaci & Peterson ARCHITECT: Cuhaci & Peterson
CONTRACT AMOUNT: $2 , 350 , 000 CONTRACT AMOUNT: $800, 000 .
COMPLETED: 10/92 COMPLETED: 7/92
SOUTHTRUST BANK PETSMART
OWNER: SouthTrust OWNER: New Market Cortez
ARCHITECT: Cuhaci & Peterson ARCHITECT: Cuhaci & Peterson
CONTRACT AMOUNT: $360 , 267 CONTRACT AMOUNT: $814 , 000
COMPLETION DATE: Oct. 1992 COMPLETION DATE: Sept. 1992
CROWN CENTRE PHASE II-PUBLIX AMERICAN LEGION HEADQUARTERS
OWNER: Crown Centre Partners OWNER: American Legion
ARCHITECT: Cuhaci & Peterson ARCHITECT:Andrew Kutz
CONTRACT AMOUNT: $3 , 719 , 495 CONTRACT AMOUNT:
COMPLETION DATE: 5/92 COMPLETION DATE: May 2 , 1991
WINN DIXIE-LAKELAND
OWNER: Winn Dixie Stores, Inc.
ARCHITECT: The Muse Organization
CONTRACT AMOUNT: $661 , 000 .
COMPLETION DATE: June 1990
WINN DIXIE-ARCADIA WINN DIXIE-PORT ST. JOHN
OWNER: Winn Dixie Stores OWNER: Winn Dixie Stores
ARCHITECT: Cuhaci & Peterson ARCHITECT: Cuhaci & Peterson
CONTRACT AMOUNT: $2 , 046 , 000 CONTRACT AMOUNT: $678 , 000
COMPLETION DATE: 8/92 COMPLETION DATE : June 1990
SHULMAN RESIDENCE HOFFMAN RESIDENCE
OWNER: Mr. & Mrs . Shulman OWNER: Mr. & Mrs . John Hoffman
ARCHITECT: Gary Winters ARHICTECT: Fugleburg Koch
CONTRACT AMOUNT: 930, 000 CONTRACT AMT: 840 , 000
COMPLETION DATED: Mar. 1991 COMPLETION DATE: Mar. 1991
CROWN CENTRE PLAZA RETAILS LAQUINTA MOTOR INN ALTAMONTE
OWNER: Crowne Centre Partners OWNER: LaQuinta Inn
ARCHITECT: Cuhaci & Peterson ARCHITECT: LaQuinta Inns, Inc.
CONTRACT AMOUNT: $540, 656 . CONTRACT AMT: Confidential
COMPLETED: August, 1990 COMPLETED: 11/90
OFFICE BUILDING - KIRKMAN RD CROWN CENTRE PLAZA-SITE
OWNER: Huber Investments OWNER: Crown Center Partners
ARCHITECT: Ray Johnson & Assoc. ARCHITECT: Conklin & Porter
CONTRACT AMOUNT: $670 , 000 CONTRACT AMOUNT: $1 , 750 , 705
COMPLETED: November, 1990 COMPLETED: August, 1990
WINN DIXIE - BRADENTON WINN DIXIE - LAKE PLACID
OWNER: Winn Dixie Stores OWNER: Winn Dixie Stores
ARCHITECT: Cuhaci & Peterson ARCHITECT: Cuhaci & Peterson
CONTRACT AMOUNT: $655 , 850 CONTRACT AMT: $798 , 715
COMPLETED: Jan. 1991 COMPLETED: Mar. 1991
PARC CORNICHE RESORT II WAL-MART #1501 - TAMPA, FL
OWNER: Orlando International OWNER: Wal"-Mart Stores
Development ARCHITECT: BSW Architects
ARCHITECT: Jenkins Hancock & CONTRACT AMOUNT: $1 , 704 , 000
Side COMPLETED: Dec. 1990
CONTRACT AMOUNT: $4 , 457 , 324 .
COMPLETED: April 1990
PALM BAY WEST SHOPPING CTR. EDGEWATER PLAZA
OWNER: Palm Bay West, Inc. OWNER: Winn Dixie Stores
ARCHITECT: Cuhaci & Peterson ARCHITECT: Cuhaci &
CONTRACT AMOUNT: $ 8 , 862 , 000 . Peterson Arch.
OWN FORCES : 15% CONTRACT AMT: $1 , 211 , 000 .
COMPLETED: March 1990 OWN FORCES : 20%
COMPLETED: June 1989
MCCORMACK RESIDENCE WINN DIXIE - ZEPHYRHILLS
OWNER: Mr. & Mrs . McCormack OWNER: Winn Dixie Stores
ARCHITECT: Arch. Design Group ARCH : Cuhaci & Peterson
CONTRACT AMT: $2 , 300 , 000 . CONTRACT AMT: $596 , 000 .
OWN FORCES : 20% OWN FORCES : 20%
COMPLETED: May 1989 COMPLETED: January 1990
PARC CORNICHE - PHASE I ISLE OF OSPREY GUARDHOUSE
OWNER: Orlando Int ' l Dev. OWNER: Isle of Osprey
ARCHITECT: Jenkins, Hancock Joint Venture
& Sides ARCHITECT: Robert Harris
CONTRACT AMT: $5 , 294 , 203 . CONTRACT AMT: $249 , 000 .
OWN FORCES : 20% OWN FORCES : 20%
COMPLETED: December 1989 COMPLETED: June, 1989
WINN DIXIE - ALBANY, GEORGIA JACKSON COURT
MIDTOWN SHOPPING CENTER OWNER: Orlando Housing
OWNER: Southmark Properties Authority
ARCHITECT: Cuhaci & Peterson ARCHITECT: Catalyst, Inc.
• CONTRACT AMT: $2 , 565 , 000 . CONTRACT AMT: $1 , 800 , 000 .
OWN FORCES : 5% OWN FORCES : 10%
COMPLETED: June 1989 COMPLETED: December 1988
FLORIDA SHORES CAMPBELL RESIDENCE
OWNER: Winn Dixie Stores OWNER: Ron Campbell
ARCHITECT: Cuhaci & Peterson ARCHITECT: Evans Group
CONTRACT AMT: $2 , 300 , 000 . CONTRACT AMT: $1 , 300 , 000 .
OWN FORCES : 10% OWN FORCES : 30%
COMPLETED: November 1988 COMPLETED: June 1988
LEESBURG MARKETPLACE MCLAUGHLIN RESIDENCE
OWNER: Huber Investments OWNER: Jim McLaughlin
ARCHITECT: Cuhaci & Peterson ARCHITECT: Cuhaci &
CONTRACT AMT: $2 , 800, 000 . Peterson
OWN FORCES : 20% CONTRACT AMT: $780 , 000 .
COMPLETED: May, 1988 OWN FORCES : 30%
COMPLETED: February 1989
KANE FURNITURE STORE WEST VILLAGE COMMONS
OWNER: Kane Furniture Co. OWNER: Community Shopping
ARCHITECT: Burke & Bales Assoc. Center
CONTRACT AMT: $1 , 545 , 000 . ARCHITECT:Mudano & Assoc.
OWN FORCES : 20% CONTRACT AMT: $3 , 650 , 000 .
COMPLETED: September 1986 OWN FORCES : 20%
COMPLETED: January 1986
PAK N SAVE SHOPPERS WORLD
OWNER: Safeway Stores, Inc . OWNER: Shoppers World
ARCHITECT: Design Circle ARCHITECT: Blaine Miller
CONTRACT AMT: $2 , 123 , 239 . CONTRACT AMT: $3 , 441 , 116 .
OWN FORCES : 20% OWN FORCES : 20%
COMPLETED: March 1987 COMPLETED: February 1986
INDIAN RIVER PLAZA DOWDY PLAZA
OWNER: Barna & Harrison OWNER: Ron Dowdy
ARCHITECT: Burke & Bales Assoc. • ARCHITECT: Burke & Bales
CONTRACT AMT: $2 , 557 , 000 . CONTRACT AMT: $1 , 540 , 000 .
OWN FORCES : 30% OWN FORCES ; 10%
COMPLETED: February 1986 COMPLETED: September 1985
INTERNATIONAL OUTLET OCALA WEST SHOPPING CTR
OWNER: Oakridge Investments OWNER: Community Shopping
ARCHITECT: Burke & Bales Assoc. ARCHITECT: Mudano & Assoc
CONTRACT AMT: $1 , 200, 000 . CONTRACT AMT: $1 , 703 , 916 .
OWN FORCES : 20% OWN FORCES : 10%
COMPLETED: June 1985 COMPLETED: December 1984
MELBOURNE SHOPPING CENTER PROVIDENCE PLAZA CENTER
OWNER: American Shopping Ctr. OWNER: Normandy Pines Venture
ARCHITECT: Burke & Bales Assoc. ARCHITECT: Mudano & Assoc.
CONTRACT AMT: $2 , 900 , 000 . CONTRACT AMT: $1 , 980 , 000 . 00
OWN FORCES : 20% OWN FORCES : 10%
COMPLETED: December 1984 COMPLETED: Spetember 1984
BEACH PLAZA FOREST EDGE PLAZA
OWNER: American Shopping Ctr. OWNER: Forest Edge Plaza
ARCHITECT: Burke & Bales Assoc . ARCHITECT: Burke & Bales
CONTRACT AMT: $2 , 333 , 228 . CONTRACT AMT: $2 , 024 , 000 .
OWN FORCES : 10% OWN FORCES : 20%
COMPLETED: February 1984 COMPLETED: July 1984
INTERNATIONAL PLACE DAIRY PLAZA
OWNER: Oakridge Investments OWNER: Reilly-Jospeh Co.
ARCHITECT: Burke & Bales ARCHITECT: Burke & Bales
CONTRACT AMT: $3 , 503 , 090 . CONTRACT AMT: $2 , 471 , 625 .
OWN FORCES : 10% OWN FORCES : 20%
COMPLETED: December 1986 COMPLETED: December 1986
•
WEST ORANGE PLAZA MT. DORA MARKETPLACE
OWNER: Southmark Corp. OWNER: MLD Development
ARCHITECT: David L. Hewell ARCHITECT: Burke & Bales
CONTRACT AMT: $3 , 955, 371 . CONTRACT AMT: $2 , 547 , 000 .
OWN FORCES : 15% OWN FORCES : 10%
COMPLETED: November 1986 COMPLETED: October 1986
SPRINGS PLAZA HUBER OFFICE BUILDING
OWNER: American Shopping Ctr. OWNER: Huber Investments
ARCHITECT: Cuhaci & Peterson ARCHITECT: Burke & Bales
CONTRACT AMT: $2 , 473 , 507 . CONTRACT AMT: $350 , 000 .
OWN FORCES ; 20% OWN FORCES : 20%
COMPLETED: February 1987 COMPLETED: February 1987
DEBARY SQUARE INTERNATIONAL TOWNE CTR.
OWNER: Debary Commons OWNER: Westwood Investment
ARCHITECT: Mudano Assoc. ARCHITECT: Burke & Bales
CONTRACT AMT: $1 , 799 , 770 . CONTRACT AMT: $1 , 489 , 206 .
OWN FORCES ; 20% OWN FORCES : 20%
COMPLETED: March 1987 COMPLETED: April 1987
3 . 6 Construction experience and present commitments of the key
individuals of our organization
Donald M. Huber- - President, Owner, 23 years experience, State
Certified (Class A) General Contractor, shopping centers warehouse,
office building, medical facilities, hotels, and banks .
Steven L. Baxley - Project Manager, 16 years experience, State
Certified (Class A) General Contractor, BS Degree in Finance, Project
Manager of commercial projects to $8 million.
Nick P. Roznak - Estimator, 12 years experience, State Certified
(Class A) General Contractor , Bachelor Degree in Building
Construction. Experience in shopping centers, banks, offices, hi-
rise condominiums, auto service facilities, single family and
multifamily residential .
Paul J. Muller - Project Manger/Superintendent, Over 30 years as
Project Manager and Superintendent, State Certified (Class A) General
Contractor, Major projects include Airports, Industrial , Hospitals,
Laboratories , School Facilities, Hotel and Shopping Centers,
Government and Private Sector - Fast track & high tech.
Paul S. Gula - Project Manager, 16 years experience, Professional
Engineer, MS and BS degrees in Civil Engineering. Construction and
Design/Build experience in Office Buildings , Medical Facilities,
Churches, Banks and Condominiums .
Michael R. Kelly - Project Manager, 24 years experience, State
Certified (Class A) General Contractor. Formal education in Building
Construction and Construction Engineering.. Management experience in
Design and Construction of Public and Private Sector projects ranging
from $1 million to over $150 million .
Jeffrey R. McElyea - Estimator, 8 years experience, State Certified
(Class B) Building Contractor, Bachelors Degree in Building
Construction. Experience in Shopping Centers, Office Buildings,
Banks, Churches, Warehouse and Single Family Custom Residences .
3.4 On a separate sheet, list major construction projects your organization has in progress, giving the
name of project, owner, architect, contract amount, percent complete and scheduled completion
date
3.4 I State total worth of work in progress and under contract: See Attached
3.5 On a separate sheet, list the major projects your organization has completed in the past five years,
giving the name of project, owner,architect, contract amount, date of completion and percentage of •
the cost of the work performed with your own forces.
3 5 I State average annual amount of construction work performed during the past five years:
See Attached
3.6 On a separate sheet, list the construction experience and present commitments of the key individ-
uals of your organization. See Attached
4. REFERENCES
4.1 Trade References:
Abbott-True Electric, Inc.
Tharp Plumbing Systems, Inc.
Addison Steel, Inc.
4.2 Bank References:
Sun Bank, N.A.
• 200 S. Orange Ave.
5th Floor
Orlando, FL 32801
i i Surety
4.3 I Name of bonding company. See Agent
4.3.2 Name and address of agent: Huckleberry, Sibley & Harvey
1901 Lee Rd.
Winter Park, FL 32789
AIA DOCUMENT A305•CONTRACTOR'S QI AI-IrICATION STATEMENT• 1980 EDITION• AIA ' • -,I vnn
iitr- ,11:01CATI tN.-t'i't'i"1-t- r1t- nw!'11I'1'1:("I'; I-1S N4'\V V(11711 8VVI,JI'I' N VUA\IIIN(:'I/1N n( A305-1986 4
5. FINANCING
5.1 Financial Statement
5.1.1 Attach a financial statement, preferably audited, including your organization's latest
balance sheet and income statement showing the following items:
Current Assets (e.g., cash, joint venture accounts, accounts receivable, notes
receivable, accrued income, deposits, materials inventory and prepaid
expenses):.
Net Fixed Assets;
Other Assets;
Current Liabilities (e.g , accounts payable, notes payable, accrued expenses, pro-
vision for income taxes. advances, accrued salaries and accrued payroll taxes);
Other Liabilities (e.g., capital, capital stock, authorized and outstanding shares
par values, earned surplus and retained earnings).
5.1.2 Name and address of firm preparing attached financial statement, and date thereof
Cline & Bailes
801 N. Magnolia Ave. , Suite 210, Orlando, FL 32802
5.I.3 Is the attached financial statement for the identical organization named on page one?
5.1.4 If not, explain the relationship and financial responsibility of the organization whose
financial statement is provided (e.g.. parent-subsidiary).
5.2 Will the organization whose financial statement is attached act as guarantor of the contract for con
struction?
AIA DOCUMENT A305•CONTRACrOK's`t Al II'r(.AI I(,' •11-rPMtr:N I • l9:-t(, F:I)Ill,l\ • .AI.\ • I'Al
,,,I, Rr1n1,C, I, ,\H I\(.fl15 ,„ 4305-1986 5
6. SIGNATURE
6.1 Datedat this 9th dayof July
Name of Organization: HUBER DESIGN&CONSTRUCTION,INC.
Title: President
6.2
Mr. Don Huber being
duly sworn deposes and says that the information provided herein is true and sufficiently complete so
as not to be misleading.
Subscribed and sworn before me this 9th day of July
19 93
Notary Public: C'& ) <4_ -
•• °�Y ••. OFFICIAL SEAL
My Commission Expires: I CAROL SHEARER
My Commission Expires
�•.;r�,
41:1(74. Feb. 15, 1995
•.;°;;;•• Comm. No. CC 077375
MA DOCUMENT A305 • CONTRACTOR'S QUALIFICATION STATEMENT • 1986 EDITION • AIA( • 01986
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20306 A305-1986 6
GREATER ORLANDO AVIATION AUTHORITY Office of The Executive Director
Orlando International Airport
One Airport Boulevard
Orlando. Florida 32827-4399
(407) 825-2001
March 25, 1993
TO WHOM IT MAY CONCERN:
Huber Design & Construction, Inc. is one of the continuing vertical
contractors for the Greater Orlando Aviation Authority. This role
requires Huber to respond to shortened bid periods, as well as
compressed construction time frames.
Huber Design & Construction is currently constructing several projects
at Orlando International Airport which will increase international
passenger processing. These projects are critical for the upcoming
season, and Huber Design & Construction is prepared to meet our critical
schedule.
Huber Design & Construction has an excellent track record at Orlando
International Airport, and I can highly recommend Huber for construction
projects as competitive and demanding as those for the Greater Orlando
Aviation Authority.
Sind /
•=:" iea• :7-- firrea
'xecutive Di •-c •
NJG:jm
°WAND°
AO.F
,—: fx t'-
e .1"4.;,.
TTY BEM'
Cnitt of (3rlttnoo
PLANNING AND DEVELOPMENT 400 S. ORANGE AVENUE TELEPHONE
DEPARTMENT ORLANDO, FLORIDA (407) 246-2271
BUILDING CODE ENFORCEMENT BUREAU 32801 FAX (407) 246-2882
,
March 16, 1992
Reference: Letter of Reference
Huber Design & Construction, Inc.
To Whom It May Concern;
I ' ve had the pleasure of dealing with Don Huber and Huber Design
& Construction, Inc. for over 20 hears . In that time they have
earned a reputation of high quality work and professionalism.
We 've considered this company very cooperative when dealing with
our department, and consider their projects as an asset to our
community. It is my opinion that they are very qualified General
Contracting firm.
Should you have any questions, please call .
J. . "Bil ' Neese
B ilding Official
Bureau of Code Enforcement
1c0y0
Gzcr Oim 0
GrHORic
0 4 0 Ill 0 • V9'ate K(// Or a 7/ / d a
COMMISSIONERS: 500 ✓lee4,e4 am/ S.R.McDaniell,Jr.
Patrick Donovan Dean,Chairman Executive Director
Sheldon B.Watson, Vice Chairman a/amdo, A/o, z 32801
Emma E.Crawford Dennis Morgan
Thelma J.Dudley �e%'i/ane,740 /89.4-1500 Assistant Executive Director
Betty Jo Hurt
Hector R.Mendez,M.D
William F.Warden,Jr
ATTORNEYS. August 9 , 1989
Anderson and Rush
Re: Letter of Recommendation
To Whom It May Concern:
Huber Design and Construction recently completed a 43 unit
concrete block apartment complex for the Orlando Housing
Authority Properties, Inc./City of Orlando.
This $1, 800 , 000 project was completed within the budget
limitations. It further required few Change Orders (2 . 8%) from
the original contract, many of which were imposed by City
inspectors and beyond the contractor ' s control .
The quality of work was well above satisfactory, especially
when considering the innovative design and severe time
constraints imposed by the contract. All of these were fulfilled
by the team at Huber Design and Construction into a finished
product that vastly improves the quality of housing in Orlando.
Sincerel ,
. R. McDaniell , Jr.
Executive Director
SRM: ack
•
•
ATTACHMENT 3
C.T. HSU + ASSOCIATES, P.A.
ARCHITECTURE • PLANNING • LANDSCAPE • INTERIOR DESIGN
CRlilmiALicense NAA-C 001322
820 IRMA AVENUE • ORLANDO,FLORIDA 32803 • 407423-0098 • FAX#407423-4793
CITY OF OCOEE
MUNICIPAL COMPLEX
ADD ALTERNATE EVALUATION
Schedule of Alternates:
1. Add Alternate No. 1: Rooftop Dormers $11,100.00
Provide rooftop dormers as indicated on sheets A-4 and A-5.
2. Add Alternate No. 2: Cupola $ 3,735.00
Provide ornamental cupola as indicated on sheet A-4.
3. Add Alternate No. 3: Rooms P129 and P130 $ 3,082.00
Provide Rooms P129 and P130 as indicated on drawings. Basic bid is rough in
utilities in floor and wall. Tape and sand walls.
4. Add Alternate No.4: Finish Upgrade $11,950.00
Provide carpet"FB",wood wainsott,wallpaper per allowance in Rooms 109, 110, 111,
204 and 205.
5. Add Alternate No. 5: Sallyport $ 5,532.00
Provide complete sallyport as indicated on drawings. Basic bid to provide asphalt
paving only.
6. Add Alternate No. 6: Trophy Case $ 2,440.00
Provide glass and wood trophy display case as indicated and detailed on sheet A-12
and A-14.
ATTACHMENT 4
TO (OWNER): CITY OF OCOEE PROJECT: CITY OF OCOEE APPLICATION # DISTRIBUTION:
150 N. LAKESHORE DRIVE MUNICIPAL COMPLEX
OCOEE, FLORIDA 34761 PERIOD TO: OWNER
FROM (CONTRACTOR): HUBER CONSTRUCTION ARCHITECT: C. T. HSU & ASSOCIATES ARCHITECTS _ ARCHITECT
P.O.BOX 960 820 IRMA AVENUE PROJECT NO: 9213.00
ORLANDO, FL 32802 ORLANDO, FLORIDA 32803 CONTRACTOR
CONTRACT FOR: GENERAL CONSTRUCTION CONTRACT DATE:
Application is made for Payment, as shown below, in con-
CONTRACTOR'S APPLICATION FOR PAYMENT nection with the Contract. Continuation Sheet is attached.
CHANGE ORDER SUMMARY 1. ORIGINAL CONTRACT SUM $ 1,677,266
Change Orders approved in ( 2. Net change by Change Orders $ 0
previous months by Owner ADDITIONS DEDUCTIONS
TOTAL i 3. CONTRACT SUM TO DATE (Line 1 +/- 2) $ 1,677,266
Approved this month 4. TOTAL COMPLETED & STORED TO DATE $ 0
(Column G on Continuation Sheet)
No. Date approved
5. RETAINAGE:
a. % of Completed Work $
(Column D+E on CS)
b. % of Stored Material $
(Column F on CS)
Total Retainage (Line 5a+5b or
Total in Column I of CS) $ 0
TOTALS
6. TOTAL EARNED LESS RETAINAGE $ 0
Net change by Change Orders (Line 4 less Line 5 Total)
The undersigned Contractor certifies that to the best of 7. LESS PREVIOUS CERTIFICATES FOR $ 0
the Contractor's knowledge, information and belief the PAYMENT (Line 6 of prior Certificate)
Work cornered by this Application for Payment has been com-
pleted in accordance with the Contract Documents, that all 8. CURRENT PAYMENT DUE $ 0
amounts have been paid by the Contractor for Work for
which previous Certificates for Payment were issued and 9. BALANCE TO FINISH, PLUS RETAINAGE $ 1,677,266
payments received from the Owner, and that current payment (Line 3 less Line 6)
shown herein is now due.
State of:
CONTRACTOR: Subscribed and sworn to before me this day of
19 .
Notary Public:
By: Date: My Commission expires:
ARCHITECT'S CERTIFICATE FOR PAYMENT AMOUNT CERTIFIED
(Attached explanation if amount certified differs from the
In accordance with the Contract Documents, based on on- amount applied for.)
site observations and the data comprising the above appli- ARCHITECT:
cation, the Architect certifies to the Owner that to the By: Date:
best of the Architect's knowledge, information and belief This Certificate is not negotiable. The AMOUNT CERTIFIED is
the Work has progressed as indicated, the quality of the payable only to the Contractor named herein. Issuance, pay-
Work is in accordance with the Contract Documents, and the ment and acceptance of payment are without prejudice to any
Contractor is entitled to payment of the AMOUNT CERTIFIED. rights of the Owner or Contractor under this Contract.
v
PROJECT NAME: CITY OF OCOEE MUNICIPAL COMPLEX
A 1 B I C I D I E I F I G
I H I I
ITEMI DESCRIPTION OF WORK I SCHEDULED 1 WORK COMPLETED I MATERIALS I TOTAL I PER 1 BALANCE I RETAINAGE
NO. I I VALUE I FROM PREY. 1 THIS I PRESENTLY 1 COMPLETED I CENT I TO FINISH I I
(APPLICATION I PERIOD I STORED 1 AND STORED 1 % I I I
I I 1 (D+E) (RETAIN & CO I I TO DATE 1 ( I I
1 GENERAL REQUIREMENTS $61,697 $0 $0 $0 $0 0% $61,697 $0
2 SITE WORK $189,802 $0 $0 $0 $0 0% $189,802 $0
3 REMOVE UNSUITABLE SOIL $14,994 $0 $0 $0 $0 0% $14,994 $0
4 REMOVE CONCRETE GROUT $4,815 $0 $0 $0 $0 0% $4,815 $0
5 CONCRETE $71,947 $0 $0 $0 $0 0% $71,947 $0
6 GYPCRETE $13,700 $0 $0 $0 $0 0% $13,700 $0
7 MASONRY $35,495 $0 $0 $0 $0 0% $35,495 $0
8 STRUCTURAL & MISC. STEEL $29,866 $0 $0 $0 $0 0% $29,866 $0
9 CARPENTRY $227,118 $0 $0 $0 $0 0% $227,118 $0
10 MILLWORK $42,087 $0 $0 $0 $0 I 0% $42,087 $0
11 ROOFING $28,700 $0 $0 $0 $0 0% $28,700 $0
12 INSULATION $22,950 $0 $0 $0 $0 0% $22,950 $0
13 SEALANTS $3,388 $0 $0 $0 $0 0% $3,388 $0
14 DOORS & FRAMES $24,865 $0 $0 $0 $0 0% $24,865 $0
15 OVERHEAD GRILLES $3,870 $0 $0 $0 $0 0% $3,870 $0
16 STOREFRONT & GLAZING $29,182 $0 $0 $0 $0 0% $29,182 $0
17 WINDOWS $7,246 $0 $0 $0 $0 0% $7,246 $0
18 FINISH HARDWARE $36,759 $0 $0 $0 $0 0% $36,759 $0
19 GYP. BOARD & METAL FRAMING $56,225 $0 $0 $0 $0 0% $56,225 $0
20 CERAMIC TILE $24,754 $0 $0 $0 $0 0% $24,754 $0
21 ACOUSTICAL CEILINGS $21,325 $0 $0 $0 $0 0% $21,325 $0
22 FLOORING $29,000 $0 $0 $0 $0 0% $29,000 $0
23 PAINTING $33,559 $0 $0 $0 $0 0% $33,559 $0
24 LOUVERS $4,594 $0 $0 $0 $0 0% $4,594 $0
25 TOILET PARTITIONS $12,252 $0 $0 $0 $0 0% $12,252 $0
26 FIRE EXTINGUISHERS $888 $0 $0 $0 $0 0% $888 $0
27 TOILET ACCESSORIES $6,523 $0 $0 50 $0 0% $6,523 $0
28 AUDITORIUM SEATING $12,745 $0 $0 $0 $0 0% $12,745 $0
29 ELEVATOR $22,760 $0 $0 $0 $0 0% $22,760 $0
30 PLUMBING $48,655 $0 $0 $0 $0 0% $48,655 $0
31 FIRE SPRINKLERS $59,950 $0 $0 $0 $0 0% $59,950 $0
32 H.V.A.C. $235,000 $0 $0 $0 $0 0% $235,000 $0
33 ELECTRICAL $175,000 $0 $0 $0 $0 0% $175,000 $0
34 PERMIT $2,754 $0 $0 $0 $0 0% $2,754 $0
35 BOND $19,815 $0 $0 $0 $0 0% $19,815 $0
36 OVERHEAD & PROFIT $62,986 $0 $0 $0 $0 0% $62,986 $0
I �
I I
I I
I I
I I
(TOTALS 1$1,677,266 1 $0 I $0 1 $0 1 $0 I 0% 151,677,266 1 $0 1
07!16/93 11:26
J U L lb ' b., i o: :a a $ 407 423 4793 C.T. HSU & ASSOC 02
il • ,
HUBER
DESIGN & CITY OF OCOEE MUNICIPAL COMPLEX
COWSTIWCUON SITE SCHEDULE OF VALUES
INCORPORATID .2"-T-49-1 I0 `ae72 Z-.
STATE CERTIFIED
Cticomes arn-f?y A/L77OAJ
.T . N ti• y'•~
SITE DEMOLITION
REMOVE BASE & PAVING 33300 SF
REMOVE SIDEWALKS 6887 SF
REMOVE SEPTIC SYSTEM 3590 SF
REMOVE CURB 918 LF
REMOVE SIGNS 10 EA $ 7,200
. EARTHWORX
CLEARING 4 LD
STRIP TOPSOIL 520 CY
FILL PAD 6300 CY
GRADE PARKING LOT 260 CY
EXCAVATE POND 2458 CY •
IMPORT FILL 8260 CY $ 54,432
.,#'1 MUCK REMOVAL
I !' CONCRETE GROUT REMOVAL &
4REPLACEMENT OF CLEAN FILL
;{•� MUCK REMOVAL & REPLACEMENT
500 CY $ 4.8.15
•/ OF CLEAN FILL 2100 CY $ 14,994
PAVEMENT
12" COMPACTED SUBGRADE 216 SY
6" SOIL CEMENT 216 SY
1" 5-3 216 SY
SEALCOTE 1825 SY
6" X 16" CURB 323 LF
PAINT: PARKING STALL 36 EA
HANDICAP STALL 2 EA •
ARROW 3 EA
4" WHITE LINE 45 LF
RESET WHEEL STOPS 1 LS S 9,095
SANITARY SEWER ---
6" PVC SEWER LATERAL 326 LF
8" PVC SEWER MAIN 197 LF
8" DIP SEWER MAIN 18 LF
MANHOLE (6'-B') 1 EA
6" PVC CLEANOUT ASSEMBLY 7 EA
LIFT STATION COMPLETE 3. LS .
4" PVC FORCEMAIN 1385 LF
4" DIP FORCEMAIN 100 LF .
16" BORE 8 JACK 67 LF
FITTINGS & BLOcKING 1 LS
SOD RESTORATION OFF-SITE 1450 SY
35 W.CHURCH$TREET•POST ornc.sox ISD•ORLANDO.R.MOB •PRONE:(407)SWIM•FAX(4071r141.M16
07/16/93 11127 a 407 423 4793 C.7. NSU & ASSOC 03
•
STORMWATER SYSTEM.
18" RCP 83. LF
24" RCP 24 LF
TYPE 'C' INLET 1 SA
CONTROL STRUCTURE 3. EA
I8" MES 1 EA
24" HEADWALL 1 EA
RIP RAP 245 SF
WATER SERVICE
REMOVE 2" WATERMAIN 313 LF
4" PVC SERVICE 74 LF
6" PVC 446 LF
6" GATE VALVE & BOX 3. • EA .
6" X 6" TAPPING SLEEVE 2 EA
HYDRANT ASSEMBLY 1 EA
4" MASTER DETER ASSEMBLY 2 EA
•
TOTAL SITE (JTILITES COST $117,000
LE55 4'4ic TT F s " 191009 •
•
•
•