HomeMy WebLinkAboutItem VI (D) Consideration of Purchase of 350 KW Generator for Municipal Complex AGENDA 8-2-94 "CENTER OF GOOD LIVING-PRIDE OF WEST ORANGE" Item VI D 6rOcoee �../,1 vruvuntct,iur1 dirle.44 .' ° CITY OF OCOEE RUSTY COMMISSIONERS 150 N.LAIESHORE DRIVE PAUL W.FOSTER v OCOEE FLORIDA 34761-2258 VERN COMBS O....„).4' (407)656-2322 JIM GLEASON �'POFGOP QTY MANAGER ELLIS SHAPIRO MEMORANDUM To: The Honorable Mayor and Board of City Commissioneerrs�, From: Montye Beamer, Director of Administrative Services / Date: July 29, 1994 Re: Generator, Ocoee Municipal Complex Emergency Purchase As you are well aware, the generator bought at Starke is not compatible with the transfer switches or the power demand attached to the new Police Department and new City Hall. This generator is probably thirty years old and is a 150 KW. To make the Police Department a full Emergency Operations Center requires that full amount (150 KW) and more; at this point the generator has not been tested as to its true output and, thereby, its rating. The transfer switches are more sophisticated in their diagnostics than the generator is in its ability to respond. The City, with the purchase and the demilitarizing/rebuilding of the unit, has spent a total of $11,084 on the generator. There are several vendors who will submit bids for buying it. On an emergency basis, I have authorized the purchase of a new Cummins/Onan 350 KW, 300 gallon base fuel tank for $41,600.00 and a new 800 Amp transfer switch for the Police Department at a cost of $15,961.40. The availability of such a switch and the fact that it has to be flown to two locations - one to enclose it for outside use and back for testing before it gets to Ocoee - drives the cost up some $6,000.00 (none of this travel is eligible for frequent flyer miles). Computer Power Systems, Inc. provided the attached cost comparisons, the steps to complete, and the downtime for both buildings. The City has received response from Amber (Huber Construction's sub-contractor) as to their willingness to cooperate since the City has no as-builts, their time and materials to complete the work as outlined, and their schedule for beginning these tasks. The generator and transfer switch will be on site Monday afternoon or at the latest Tuesday morning. Florida Power Corporation will cut power as necessary. Monies to be provided through the $200,000 allocated at mid-year to the project. 1 Staff Report/Beamer/Generator July 29, 1994 Staff Recommendation: The Honorable Mayor and Board of City Commissioners approve the emergency purchase of the generator, transfer switch, Amber's time and materials, Huber's supervision and Computer Power System's time and material to complete the work necessary for relocating the Police Department to its new building and confirm these emergency purchases. 2 COMPUTER POWER SYSTEMS, INC. 251 E. Palmetto Ave. Longwood, FL 32750 Office: (407) 834-6985 • Fax: (407) 332-4799 July 28, 1994 City of Ocoee Attn: Ms. Montye Beamer 150 N. Lakeshore Drive Ocoee, FL 34761 Subject : Generator Pricing Dear Ms. Beamer: After careful review, the most cost effective generator size for your new complex has been determined to be 350 KW. This capacity will allow for total back-up of the Police Station and the existing circuits now on generator power in City Hall , with approximately 20% reserve capacity. This size system will fit on your existing generator pad with ample space for the required switch gear and conduit rework. As you are aware, space in this area is a factor and plays a role in sizing consideration. Also, 1 week delivery is mandatory. The following prices have been quoted for this project : - Ringhaver : Cat 320 KW, 270 gallon base fuel tank, used system with approximately 1200 hours $41 ,900 .00 - Transfer switch (NEMA 3R) not available until september - Core Power: Cat 355 KW, 300 gallon base fuel tank, used system with approximately 2000 hours $45,000 .00 - Transfer switch, 800 Amp, NEMA 3R, new $15 .961 .40 ( Includes overnight , 2 states, and next day delivery) - Cummins Southeastern: Cummins/Onan 350 KW, 300 gallon base fuel tank, new system $41 ,600 .00 - Transfer switch (NEMA 3R) not available until late August It is our recommendation that the Cummins/Onan new unit be purchased along with the transfer switch from Core Power . The switch is a Westinghouse product and is a quality device. I am in the process of having Quotes sent to you for your direct purchase of these items. If I may assist further , please advise. Sincerely, Kenneth F. Kuzmick President 7\----= COMPUTER POWER SYSTEMS, INC. 251 E. Palmetto Ave. Longwood, FL 32750 Office: (407) 834-6985 • Fax: (407) 332-4799 July 28, 1994 City of Ocoee Attn: Ms. Montye Beamer 150 N. Lakeshore Drive Ocoee, FL 34761 Subject : Generator Installation Dear Ms. Beamer: After careful review of your existing site, the following installation changes are recommended to accommodate your new generator : - Un-hook and remove the existing generator from the concrete pad. - Install new 800amp transfer switch and 800 amp disconnect adjacent to utility transformer and install new 350 KW genset on concrete pad. - Rework existing 800 amp Police Station feed from utility transformer to new transfer switch disconnect. - Install new 800 amp feed from utility transformer to new transfer switch disconnect ( approximately 5 feet apart) complete with a new CT meter at this location. - Install new 800 amp feed from the generator to the new transfer switch and a 300 amp feed to the existing 300 amp breaker feeding the City Hall transfer switch. - Move existing Police Station meter to new location and install a blank cover in meter can. - Remove existing 100 amp transfer switch, install junction box, and tie 100 amp feed to load conductors. - Remove 100 amp generator feed from generator/Police Station conduit run and replace with remote annunciator wiring . All removal items to remain the property of the City. Estimated time to complete this task is 5 working days. I have discussed these changes with Ken Rigby of GRG, and he concurs that this is a workable plan. Please advise if I may further assist . Sincerely, 5.17/-c \-( Kenneth F. Kuzmick President Itomonmegi COMPUTER POWER SYSTEMS, INC. 251 E. Palmetto Ave. Longwood, FL 32750 Office: (407) 834-6985 • Fax: (407) 332-4799 July 28, 1994 City of Ocoee Attn: Ms. Montye Beamer 150 N. Lakeshore Drive Ocoee, FL 34761 Subject : Generator replacement Dear Ms. Beamer : Please be advised that when work begins on the generator change out , power to the Police Station will be interrupted while the new transfer switch is installed and power is rewired through the switch . This task should take 2 or 3 days. It may also be necessary to interrupt power to City Hall for a few hours while un-hooking and re-hooking the Police Station circuit to the utility transformer . Exact scheduling has not yet been determined. Monday, 8/1 , is the projected time to commence work. Tim Libke, with Amber Electric, should be contacting you with this schedule. Sincerely, Kenneth F. Kuzmick President