HomeMy WebLinkAboutItem III (C) Approval and Authorization to Transfer $1,700 from Wastewaater Contingency to Wastewater Engineering Expense for Boundary and Topographic Survey for Former M & M Park Site - PEC AGENDA 4-5-94
Item III C
"CENTER OF GOOD LIVING-PRIDE OF WEST ORANGE"
0000GG xu�i vAIN t�tnk.turi
ti CITY OF OCOEE RUST' JOHS ON
150 N.LAKESHORE DRIVE PAUL W.FOSTER
OCOEE FLORIDA 34761-2258 VERN COMBS
(407)656-2322 JIM GLEASON
CITY MANAGER
ELLIS SHAPIRO
MEMORANDUM
DATE: March 31, 1994
TO: The Honorable Mayor and Board of City Commissioners
FROM: Montye E. Beamer, Directoril). --
Administrative Services
SUBJECT: Former M & M Utility Site / Park Site Development
As part of the reclamation of the land on which the M &M Utility was located, several tasks must
be accomplished: (1) soils sediment sampling which was completed -- the results of which are
attached; (2) a boundary survey; and (3) a topographic evaluation. The latter two will provide
the information from which the cost for levelling the site for a change in use can be calculated.
The proposal for performing these services is also attached; the price is a not-to-exceed figure of
$1,700.00 to be paid from wastewater contingency. The current balance in the wastewater
contingency is $216,287.50.
After the reclamation has occurred, this area of approximately one acre in size located west of the
old Piggly Wiggly Shopping Center and east of Pioneer Key 2 will be utilized as a park. Monies
have already been awarded through the Community Development Block Grant Program for the
playground equipment. The park site should be completed during the fourth quarter of FY94.
Action Requested
The Mayor and Board of City Commissioner approve the transfer of$1,700.00 from wastewater
contingency 403-532-4900 to wastewater engineering expense 403-532-3102 for a boundary and
topographic survey.
MEB/jbw
WP60\DOCs mAioch.
44,
Geotechnical,
Environmental
& Materials
Engineers .
Lf Nodarse
March 2, 1994 &Associates,Inc.
Project No. 93-0597-2
TO: CITY OF OCOEE
150 North Lakeshore Drive
Ocoee, Florida 34761
Attn: Mr. Jim Shira, P.E.
City Engineer/Utilities Director
RE: Soil Sediment Sampling at Former Wastewater Treatment Plant, Ocoee, Orange
County, Florida
Dear Mr. Shira:
In accordance with our proposal (No. 93-0597-2) authorized by you and dated
February 11, 1994, we have completed soil/sediment sampling at the subject site. As
outlined in our proposal, we implemented the following scope of services:
1. Removed four soil/sediment samples from the locations of two former
wastewater disposal percolation ponds.
2. Analyzed each sample removed for TCLP Primary Standard Heavy
Metals.
3. Prepared a report on the analytical results of the soil testing.
Figure 1 indicates the approximate location of each of the four samples removed for
analyses. Each sample was taken from the upper one foot of the soil/sediment strata at
the designated location. Samples were removed utilizing a clean decontaminated stainless
bucket auger. Each sample removed was placed in laboratory prepared containers and
transported on ice to a Florida Department of Health and Rehabilitative Services (DHRS)
certified laboratory (Orlando Laboratories). All field sampling activities were performed
following Florida Department of Environmental Protection (FDEP) QA/QC Standard
Procedures.
- __
WR - 3 1994!
807 South Orlando Avenue♦Suite A•Winter Park, Florida 32789•Telephone 407.740. fug simile 407-744261.12i
•
•
Project No. 93-0597-2
Page Z'
As a result of the sampling and analysis undertaken as described above, none of the four
samples analyzed detected the presence of heavy metals above the method detection level
for the prescribed EPA test methodology. The only exception was the level of.Barium
detected at 1.5 parts per million (ppm) in the sample taken from the west end of the
north pond. Thislevel is well below the maximum allowable contaminant level in.soil
of 200 ppm.
• Based upon the soil/sediment sampling"and analysis undertaken, it appears that the
operation of the former wastewater treatment percolation ponds has not had a significant
impact on heavy metal concentrations in the soils at the locations sampled during this
limited investigation.
L.J. Nodarse & Associates, Inc. appreciates the opportunity of continuing our services
on your important project. Should you have any questions with -regards to the
information contained herein and attached, please do not hesitate to contact us.
Sincerely,
L.J. NODARSE & ASSOCIATES, INC.
David B. Twedell Michael J. Preim, P.E.
Senior Environmental Consultant Chief Engineer
Florida Registration No.24041
DBT/MJP:dK
e
. I'
--------- -- - --7
1
UFT
1
1 STATION
I 1I
1 I
1 •1 •2 I
INORTH PONQ I
1 I
1 J I
I I
1 1
1 I
I I
11
1 I
I I
I 1
i 1
I II
1 I
I I
I I
I I
I I
1 , I
I 3 I
I 1
1 SOUTH POND i
I I
I 1
1 • 4 I
LEGEND UNITED SOIL/SEDIMENT SAMPUNG
• APPROXIMATE LOCATION OF SOIL. SAMPLE CITY OF OCOEE
FORMER WASTEWATER TREATMENT PONDS
1 NORTH POND EAST END OCOEE. FLORIDA
1 2 NORTH POND WEST END
L.J. NODARSE et ASSOCIATES, INC.
p& 3 SOUTH POND NORTH END
4 SOUTH POND SOUTH END ORAWP MG SCALE: NTSPte' NO: 93-0597-2
°°`°: DST °ATE' 3-2-94 FIGURE: 1
03/31/94 16:01 ,' '1 407 849 9401 PEC INC Z 002/002
PEC
PROFESSWNAL ENGINEERING CONSULTANTS, INC.
March 31, 1994
Ms. Montye Beamer
Administrative Services Director
City of Ocoee
150 North Lakeshore Drive
Ocoee, Florida 34761
Re: 1 Acre Plus or Minus M & M Utility Site
Section 18, Township 22 South, Range 28 East
Dear Ms. Beamer:
Pursuant to your request, we are pleased to submit our proposal for professional land
surveying services in connection with the above-referenced site.
We propose to perform a boundary and topographic survey of the subject site based upon
the legal description to be furnished. The survey shall be performed in conformance with
the Minimum Technical Standards for Land Surveys in the State of Florida, pursuant to
Florida Statutes. The survey shall culminate in a certified manuscript showing the
boundary lines of the subject site, as well as one foot contour elevations. The elevations
shall be based upon Mean Sea Level Datum relative to Orange County benchmarks.
Please find the following as our manhour/fee estimate for the proposed work:
Field: 3-Man Survey Crew (Hopes. Rutter. Patrick):
Boundary Survey - 8 hours @ $75.00 per hour $ 600.00
Topographic Survey - 5 hours @ $75.00 per hour $ 375.00
Sub-Total Field Costs $ 975.00
Office:
Principal (White):
2 hours @ $90.00 per hour $ 180.00
Project Manager (Miller):
2 hours @ $80.00 per hour $ 160.00
Senior Technician (Sennet:
7 hours @$55.00 per hour $ 385.00
Sub-Total Office Costs $ 725.00
TOTAL PROPOSAL AMOUNT $1,700.00
engineers
planners
surveyors 200 East Robinson Street • Suite 1560 • Orlando, Florida 32801 • 407/422-8062 • FAX 407/849-9401
Ms. Montye Beamer/City of Ocoee
March 31, 1994
Page Two
We are prepared to commence immediately upon notice to proceed. We anticipate
completion within seven working days from authorization,
Thank you for the opportunity of submitting this proposal to you.
Very Truly Yours,
• •OFESSIONAL ENGINEERING CONSULTANTS, INC
•
II avid A. White P.L.S.
Vice-President
oo/soo
I‘iI TOFR BfiR /Of TA 77:er r. n