Loading...
HomeMy WebLinkAboutItem #10 Approval of Change Order No. 1 Regarding Marshall Farms Road Resurfacing, Bid #B18-02 Asphalt Paving Projects FY 2018 with Orlando Paving Company /44 Ocoee florida AGENDA ITEM COVER SHEET Meeting Date: September 18, 2018 Item # l� Reviewed By: Contact Name: Stephen C. Krug Department Director: ��;,� _//- Contact Number: 6002 City Manager: /419, Subject: Marshall Farms Road Resurfacing, Change Order 1, B18-02 Asphalt Paving Projects FY 2018 with Hubbard Construction Company. Commissioner Firstner, District 3. Background Summary: At the May 15, 2018 Commission meeting, the FY 2018 asphalt paving projects bid was awarded to Hubbard Construction Company (HCC). The City had allocated funding for the resurfacing of Marshall Farms Road in previous fiscal years, yet deferred moving forward with the work until such time as the parallel State Road 50 widening project was completed. The State completed their project about the same time the City awarded the resurfacing projects. Public Works approached HCC to extend the awarded bid pricing to incorporate the work on Marshall Farms Road as this heavily traveled access road for commercial traffic is long overdue for resurfacing. The $288,465.39 cost to mill and resurface approximately 3,000 linear feet of roadway is adequately funded with the carry-forward funds allocated for this project in previous fiscal years. Public Works recommends approval of the change order to incorporate Marshall Farms Road resurfacing in the FY 2018 asphalt paving program. Issue: Request the City Commission approval of Change Order #1 with Hubbard Construction Company to incorporate Marshall Farms Road resurfacing into the FY 2018 asphalt paving program. Recommendations: Recommend the City Commission approve Change Order #1 in the amount of $288,465.39 with Hubbard Construction Company, Winter Park, Florida, to incorporate the Marshall Farms Road resurfacing into the awarded Asphalt Paving Projects for FY 2018. Attachments: Change Order No 1, B18-02 Asphalt Paving Projects FY 2018. Financial Impact: The $288,465.39 cost for the change order is adequately funded in the FY 2018 paving program with the carry-forward funds allocated for this project in previous fiscal years. Type of Item: (please mark with an "x") Public Hearing For Clerk's Dept Use: Ordinance First Reading x Consent Agenda Ordinance Second Reading Public Hearing Resolution Regular Agenda X Commission Approval Discussion&Direction Original Document/Contract Attached for Execution by City Clerk Original Document/Contract Held by Department for Execution Reviewed by City Attorney N/A Reviewed by Finance Dept. \ 'v N/A Review ed by ( ) N/A 2 ocoee florida CITY OF OCOEE 150 North Lakeshore Drive Ocoee,Florida 34761 B18-02 ASPHALT PAVING PROJECTS FY 2018 CHANGE ORDER FORM DATE: 8/21/2018 PURCHASE ORDER: 1425622 The following changes are hereby made to the CONTRACT DOCUMENTS. Original CONTRACT PRICE $835,757.00 Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDERS $835,757.00 Net Increase(Decrease)Resulting from this CHANGE ORDER $288,465.39 The current CONTRACT PRICE including this CHANGE ORDER $1,124,222.39 Original CONTRACT COMPLETION DA lb: 11/2/2018 Current CONTRACT COMPLETION DATE adjusted by previous CHANGE ORDERS 11/2/2018 Net Increase Resulting from this CHANGE ORDER 0 days Current CONTRACT COMPLETION DATE including this CHANGE ORDER 11/2/2018 B 18-02 Asphalt Paving Projects CHANGES ORDERED: I. REQUIRED CHANGES: Public Works requests contract changes to include the milling and resurfacing of Marshall Farms Road at the unit costs presented by Hubbard Construction. Capital Improvements for this asphalt project was approved in prior fiscal year; however Public Works postponed the project due to the FDOT reconstruction of SR 50. In evaluating the unit costs submitted by Hubbard Construction,Public Works believes it is cost effective to include the asphalt repairs at this time. II. JUSTIFICATION: Marshall Farms Road milling and resurfacing is justified due to current pavement condition. Pursuant to the Pavement Survey and Evaluation Report prepared by Universal Engineering Sciences,Inc.,the pavement is in poor condition with severe rutting, raveling,shoving and cracking. III. NARRATIVE OF NEGOTIATIONS:Current unit are cost effective. Refer to attached Bid Form IV. PAYMENT: Total Change Order is$288,465.39 V. APPROVAL AND CHANGE AUTHORIZATION This proposed change to the Contract requires approval by the Ocoee City Commission or the City Manager, dependent upon project approval authority, in order to supplement the project budget to fund the changes.It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein. CONTRACTOR acknowledges,by its execution and acceptance of this Change Order,that the adjustments in Contract Price and Time shown hereon constitute full and complete compensation and satisfaction for all costs and modifications of performance time incurred by the CONTRACTOR as a result of this Change Order. No other claim for increased costs of performance or modifications of time will be granted by the OWNER for the Work covered by this Change Order. The CON TRACTOR hereby waives and releases any further claims for cost or time against the OWNER arising from or relating to the matters or Work set forth or contemplated by this Change Order. B 18-02 Asphalt Paving Projects RECOMMENDED BY: ACCEPTED BY: CITY OF OCOEE,FLO• IDA Hubbard Construction Company By: `i. / / 4.0"11110624—c-1 By: Signature Signature Date: ff/ZZb!O Date: df/?-/l//F /� P. Frederick O'Dea,Jr. Title: e IA/4/AJ ie Title: Vice President&Secretary APPROVED BY: CITY OF OCOEE F ORIDA By: . Date: 'o —Z-2---2---2 6 i g Stev- Arg, ublic Wo Director ByaltkOc-i . .t tS Date: g` 077 1 it) Rebecca Roberts,Director of Finance I g( By: Date: 2 I Robert D. rank, City Manager By: Date: Rusty Johnson, Mayor Attest: Melanie Sibbitt, City Clerk FOR USE AND RELIANCE ONLY BY THE APPROVED BY THE CITY OF OCOEE CITY OF OCOEE,APPROVED AS TO FORM COMMISSION IN A MEETING HELD ON AND LEGALITY THIS DAY OF , 20 UNDER ,20 AGENDA ITEM NO. By: City Attorney B18-02 Asphalt Paving Projects O R LA n D O PAV I n G ORLANDO PAVING COMPANY A division of Hubbard Construction Company co m PA n y 1936 Lee Road,Suite 300-Winter Park,FL 32789 P.O.Box 547186-Orlando,FL 32854-7186 T/407-578-9779-F/407-578-5251 www.hubbard.com To: City of Ocoee Attn: Richard Campanale, PE Address: 150 N. Lakeshore Drive Email: richard.campanale@ci.ocoee.fl.us Ocoee, FL 34761-2258 Phone: (407)905-3100 Mobile: (321)281-7025 Estimate: 018-150719 Project: City of Ocoee(Marshall Farm Road) Bid Date: 07/17/2018 #of Addenda: Completion: End of 3-QTR-2018 100.00 MOBILIZATION&CONSTRUCTION REQUIREMENTS 1.000 LS $7,615.57 $7,615.57 MARSHALL FARMS ROAD 101.01 MILL EXIST ASPH PAVT,3.00"AVG DEPTH 5,750.000 SY $ 3.99 $22,942.50 101.02 MILL EXIST ASPH PAVT,5.50"AVG DEPTH 2,400.000 SY $ 9.62 $23,088.00 101.03 1.50"SP-12.5 RESURFACING 5,750.000 SY $ 11.75 $67,562.50 101.04 4.00"SP-12.5 RESURFACING 2,400.000 SY $ 27.63 $66,312.00 101.05 1.50" FC-12.5,PG76-22 OVERLAY 8,150.000 SY $ 9.96 $81,174.00 101.06 TEMP PAINT&FINAL THERMOPLASTIC PAVEMENT MARKINGS 1.000 LS $19,770.82 $19,770.82 GRAND TOTAL: $288,465.39 **ALL PRICING IS CONFIDENTIAL** Qualifications: - Night work is excluded. - Priced as Change Order to existing contract"B18-02 Asphalt Paving Projects for 2018." Respectfully submitted, Dustin Baker-Estimator July 19,2018 2:41 PM Page 1 of 1