HomeMy WebLinkAboutItem VI (B) Award Sidewalk Bid AGENDA 3-1-94 Item VI B MEMORANDUM DATE: February 25, 1994 TO: The Honorable Mayor and Board of City Commissioners FROM: Montye E. Beamer, Director !�7 f Administrative Services SUBJECT: Bid B94-004, Sidewalk Construction On February 3, 1994 Bid B94-004, Sidewalk Construction was opened. There were six bids. One was disqualified on a technicality (no sworn statement). All others bid a linear foot price: Metropolitan Construction, Inc. 8.56 K-D Construction 9.25 Perri Builders, Inc. 7.85 Planted Earth Contracting, Inc. 8.67 Technical Specialty Constructors 9.25 The linear feet as adopted in the FY93/94 Budget totalled 3,195 with Doreen Avenue (1,440 L.F.), Sal Street (155 L.F.), and Maureen Avenue (1,600 L.F.). The bids were reviewed and references were checked. Staff is recommending award to Planted Earth Contracting, Inc. at $8.67 a linear foot for a total of$27,700. The amount budgeted included $15,050 (Doreen), $1,600 (Sal Street), and $16,800 (Maureen) for a total of $33,450. This recommendation is based upon their references as well as the additional information in their submitted bid as to how they propose to comply with specifications, terms and conditions. These items are as follows: New Sidewalk will match the grade of existing driveways. Finish grade of new sidewalks will be approximately 2" above grade. Planted Earth Contracting, Inc. will furnish and install a 1" wide strip of sod along each side of new sidewalk where necessary. Planted Earth Contracting, Inc. will saw cut approximately every five feet 1" deep. The Honorable Mayor and Board of City Commissioners February 25, 1994 Page Two Furthermore, the reference from an actual sidewalk job three years ago for the apparent low bid was not favorable; their other experience dealt with much larger construction projects. The apparent second low has no experience listed; they have been in business approximately one year. All reference checks were positive for the third apparent low bid. For these reasons, the third apparent low bid is the most responsive. Action Requested The Mayor and Board of City Commissioners award Bid B94-004 to Planted Earth Contracting, Inc. for a total of $27,700. MEB/jbw W P6O\DOCSIADEwMX.MAY\25F \c:mEB