AGENDA ITEM COVER SHEET
Contact Name:
Contact Number:
Bob Zaitooni
6002
Meeting Date: January 18, 2005
Item # ~
~==~ Director: :tit ~
City Manager: _ _,_ __~ _ =-------
Subject: Repair of 54" RCP and Drainage Junction Box on lson Lane
Background Summary:
The 54" RCP drainage pipe and junction box have separated at various joints resulting in underground flow discharge
causing considerable depression effecting the easement and private property at 1603 Ison Lane. Due to the depth (over
20' deep) of the pipe and the junction box, out-sourcing to a specialized contractor is necessary. At least 3 specialized
contractors were contacted with only one contractor, Miller Pipeline Corporation responding.
Issue:
City Commission to authorize up to $10,000 for repair of the stonnwater system and approve award.
Recommendations
Honorable Mayor and City Commission authorize up to $10,000 from Stonnwater Operating Contingency Funds and
approve award to Miller Pipeline Corporation.
Attachments:
Quote
Financial Impact:
The funds are available from Stonnwater Operating Contingency with a balance of $68,195.
Type of Item:
o Public Hearing
o Ordinance First Reading
o Ordinance First Reading
o Resolution
o Commission Approval
o Discussion & Direction
For ClerKs DeDt Use:
~ Consent Agenda
o Public Hearing
o Regular Agenda
o Original Document/Contract Attached for Execution by City Clerk
o Original Document/Contract Held by Department for Execution
1_ I 0 - 0 '.7
I:8J N/A
o N/A
o N/A
Reviewed by City Attorney
Reviewed by Finance Oept.
Reviewed by ( )
City Manager
Robert Frank
Commissioners
Danny Howell. District 1
Scott Anderson. District 2
Rusty Johnson. District 3
Nancy J. Parker. District 4
Mayor
S. Scott Vandergrift
STAFF REPORT
TO:
The Honorable Mayor and City Commissioners
FROM:
Bob Zaitooni, Director of Public Works
DATE:
January to, 2005
RE:
Repair of 54" RCP and Drainage Junction Box on Ison Lane
ISSUE
Should the Honorable Mayor and City Commission authorize up to $10,000 from Stormwater Operating
Contingency Funds for repair of 54" RCP and drainage junction box on Ison Lane~ and approve award of
project to Miller Pipeline Corporation?
BACKGROUNDIDISCUSSION
The 54" RCP drainage pipe and junction are located at a depth of over 20' from finished ground. The joint
between the pipe and the drainage structure, as well as, the joints at various sections of the junction box have
separated resulting in underground discharge. The flow has caused erosion resulting in a deep depression
effecting the easement and private property at 1603 Ison Lane. Temporary repairs have been made, however
due to the depth (over 20' deep) of the pipe and the junction box, out-sourcing to a specialized contractor is
necessary.
Staff attempted to solicit at least 3 written quotes from specialized contractors. Due to the depth of the pipe and
the junction box, only 1 contractor, Miller Pipeline Corporation, responded with a quote not-to-exceed $10,000.
The funds are available from Stormwater Operating Contingency Funds with a balance of$ 68,195.
RECOMMENDATION
Staff respectfully requests that the Honorable Mayor and City Commission to authorize up to $10,000 from
Stormwater Operating Contingency Funds for this project~ and approve award of the project to Miller Pipeline
Corporation.
Dee 07 04 03:43p
Miller t-'lpel1ne
1.:J"~.:JCII"''''UU'
r. A
Miller Pipeline Corporation
21902 State Road 46
MOtJDl Dora, Florida 32757
(352) 383-1222, Fax (352) 383-6607
Agreement for Service
Job No.:
Client:
1603 lson Lane
CityofOooee
301 Maguire Road
Ocoee Florida 34761
Mr. Buddy Elmore
40 905-3170 Offite
Date:
Project Location:
December 7 2004
1603 Ison Lane
Ocoee, Florida
Atte.lion:
Miller Contact:
ITEM #
I
2
3
4
This agreement is hued 1IpOII.be Client providiDg the followiDg and bearing aD related costs:
· All required Maintenance OfTmffic (MOl) needs beyond standard constnrction cones.
· Accurate system drawings, sufficient to locate the pipelines. manholes and appurtenan<lCS in the field
· Exposing all buried manholes/catch basins to allow for completion of quoted WOIk items.
· Water for pipe clc:aniog opemtion via a standard fire bydrant connection
· Dump site for debris removed via pipe cleaning operation
· Pump down of affected storm drainage system following plug insertion and inflation
· Adequate access for construction equipment to all structures included in project scope
The tenus and oonditions of this agreement are accepted by the Client and
. er Pipeline C<>rpcntiOll is authorized 10 proceed with the described work.
By:
MiUer Pipeline Corporation
Title:
M. ROBERT GARRISON
General Manager, Southeast Region
Date:
This agreement may be withdrawn by ContIactor if not
accepted within 30 days.