Loading...
HomeMy WebLinkAboutItem E(07) Consideration to Authorize $10,000 from Stormwater Contingency Funds for Repairs to 54" RCP Pipe and Drainage Junction Box at 1603 Ison Lane; and Approval to Award Bid to Miller Pipeline Corporation - AGENDA ITEM COVER SHEET Contact Name: Contact Number: Bob Zaitooni 6002 Meeting Date: January 18, 2005 Item # ~ ~==~ Director: :tit ~ City Manager: _ _,_ __~ _ =------- Subject: Repair of 54" RCP and Drainage Junction Box on lson Lane Background Summary: The 54" RCP drainage pipe and junction box have separated at various joints resulting in underground flow discharge causing considerable depression effecting the easement and private property at 1603 Ison Lane. Due to the depth (over 20' deep) of the pipe and the junction box, out-sourcing to a specialized contractor is necessary. At least 3 specialized contractors were contacted with only one contractor, Miller Pipeline Corporation responding. Issue: City Commission to authorize up to $10,000 for repair of the stonnwater system and approve award. Recommendations Honorable Mayor and City Commission authorize up to $10,000 from Stonnwater Operating Contingency Funds and approve award to Miller Pipeline Corporation. Attachments: Quote Financial Impact: The funds are available from Stonnwater Operating Contingency with a balance of $68,195. Type of Item: o Public Hearing o Ordinance First Reading o Ordinance First Reading o Resolution o Commission Approval o Discussion & Direction For ClerKs DeDt Use: ~ Consent Agenda o Public Hearing o Regular Agenda o Original Document/Contract Attached for Execution by City Clerk o Original Document/Contract Held by Department for Execution 1_ I 0 - 0 '.7 I:8J N/A o N/A o N/A Reviewed by City Attorney Reviewed by Finance Oept. Reviewed by ( ) City Manager Robert Frank Commissioners Danny Howell. District 1 Scott Anderson. District 2 Rusty Johnson. District 3 Nancy J. Parker. District 4 Mayor S. Scott Vandergrift STAFF REPORT TO: The Honorable Mayor and City Commissioners FROM: Bob Zaitooni, Director of Public Works DATE: January to, 2005 RE: Repair of 54" RCP and Drainage Junction Box on Ison Lane ISSUE Should the Honorable Mayor and City Commission authorize up to $10,000 from Stormwater Operating Contingency Funds for repair of 54" RCP and drainage junction box on Ison Lane~ and approve award of project to Miller Pipeline Corporation? BACKGROUNDIDISCUSSION The 54" RCP drainage pipe and junction are located at a depth of over 20' from finished ground. The joint between the pipe and the drainage structure, as well as, the joints at various sections of the junction box have separated resulting in underground discharge. The flow has caused erosion resulting in a deep depression effecting the easement and private property at 1603 Ison Lane. Temporary repairs have been made, however due to the depth (over 20' deep) of the pipe and the junction box, out-sourcing to a specialized contractor is necessary. Staff attempted to solicit at least 3 written quotes from specialized contractors. Due to the depth of the pipe and the junction box, only 1 contractor, Miller Pipeline Corporation, responded with a quote not-to-exceed $10,000. The funds are available from Stormwater Operating Contingency Funds with a balance of$ 68,195. RECOMMENDATION Staff respectfully requests that the Honorable Mayor and City Commission to authorize up to $10,000 from Stormwater Operating Contingency Funds for this project~ and approve award of the project to Miller Pipeline Corporation. Dee 07 04 03:43p Miller t-'lpel1ne 1.:J"~.:JCII"''''UU' r. A Miller Pipeline Corporation 21902 State Road 46 MOtJDl Dora, Florida 32757 (352) 383-1222, Fax (352) 383-6607 Agreement for Service Job No.: Client: 1603 lson Lane CityofOooee 301 Maguire Road Ocoee Florida 34761 Mr. Buddy Elmore 40 905-3170 Offite Date: Project Location: December 7 2004 1603 Ison Lane Ocoee, Florida Atte.lion: Miller Contact: ITEM # I 2 3 4 This agreement is hued 1IpOII.be Client providiDg the followiDg and bearing aD related costs: · All required Maintenance OfTmffic (MOl) needs beyond standard constnrction cones. · Accurate system drawings, sufficient to locate the pipelines. manholes and appurtenan<lCS in the field · Exposing all buried manholes/catch basins to allow for completion of quoted WOIk items. · Water for pipe clc:aniog opemtion via a standard fire bydrant connection · Dump site for debris removed via pipe cleaning operation · Pump down of affected storm drainage system following plug insertion and inflation · Adequate access for construction equipment to all structures included in project scope The tenus and oonditions of this agreement are accepted by the Client and . er Pipeline C<>rpcntiOll is authorized 10 proceed with the described work. By: MiUer Pipeline Corporation Title: M. ROBERT GARRISON General Manager, Southeast Region Date: This agreement may be withdrawn by ContIactor if not accepted within 30 days.