AGENDA ITEM COVER SHEET
Meeting Date: November 20, 2018
Item #
Reviewed By:
Contact Name: Stephen C. Krug Department Director:
Contact Number: 6002 City Manager: /p7 /,
Subject: Downtown Redevelopment Drainage Improvements with Pegasus Engineering.
Commissioner Wilsen, District 2 and Commissioner Firstner, District 3.
Background Summary:
A key component of the City Commission approved Downtown Master Plan is the development of the
master regional stormwater facility. Continuing engineering services firm, Pegasus Engineering, was
assigned the first step in the design process by conducting a feasibility study for the facility which was
completed December of 2017. Using the results of the feasibility study to establish the parameters for
the design of the regional stormwater facility, the City successfully solicited Engineering services for the
final design and construction. GAI Consultants were awarded the design of the Downtown Master
Regional Stormwater Facility and are in the preliminary concept and design phase.
While GAI continues to develop their final product, the City is in need of immediate engineering services
to ensure the current Bluford Avenue, Oakland Avenue and City Hall Complex project improvements will
function with the future master stormwater system. Public Works is requesting continuing engineering
services firm, Pegasus Engineering, to handle these immediate tasks as their team has the most
historical knowledge from completing the feasibility study and has already been coordinating with the
various project design teams. The major portion of this proposed work will allow the City to pipe the
open drainage ditch next to existing City Hall from the railroad tracks at Franklin Street to Starke Lake,
increasing the area of developable property by reducing compensating pond storage area. Having
Pegasus complete this work allows the City's other project consultants to continue to work unimpeded
on their projects and eliminates future additional design fees on said projects. The $47,500.00 for the
work is available in the Stormwater Capital Improvements.
Public Works recommends approval of the work with Pegasus Engineering.
Issue:
Request the City Commission to approve the miscellaneous stormwater support services for the City's
Downtown Redevelopment Drainage Improvements with Pegasus Engineering.
Recommendations:
Recommend the City Commission approve the miscellaneous stormwater support services for the City's
Downtown Redevelopment Drainage Improvements with Pegasus Engineering, for the not to exceed
cost of $47,500.00 as funded in the Stormwater Capital Improvements. Also recommend the City
Manager be authorized to approve change orders to this contract up to the limit of his purchasing
authority for each change order, and up to the budgeted amount for this project for all change orders.
Attachments:
Pegasus Engineering Scope of Services.
Financial Impact:
The cost of the design services is adequately funded in Stormwater Capital Improvements.
Type of Item: (please mark with an 'x')
Public Hearing For Clerk's Dept Use:
Ordinance First Reading X Consent Agenda
Ordinance Second Reading Public Hearing
Resolution Regular Agenda
X Commission Approval
Discussion& Direction
Original Document/Contract Attached for Execution by City Clerk
Original Document/Contract Held by Department for Execution
Reviewed by City Attorney N/A
Reviewed by Finance Dept. � N/A
Review ed by ( ) N/A
2
JPegasus
ENEINEERINE
October 11, 2018 P-229442
Mr. Stephen C. Krug, P.E.
Public Works Director
City of Ocoee
301 Maguire Road
Ocoee, Florida 34761
Re: Downtown Redevelopment Drainage Improvements
Subj: Miscellaneous Stormwater Support Services
Dear Steve:
As requested, we are pleased to submit this proposal to the City of Ocoee to perform
miscellaneous stormwater support services associated with the Downtown Redevelopment
Drainage Improvements. More specifically, to assist the City of Ocoee and their Downtown
Redevelopment consultants (CPH, S&ME, and GAI Consultants), as well as their contractor
(Oelrich Construction), with the design of the following drainage improvements between
Kissimmee Avenue and Starke Lake;
• Box culvert system between Kissimmee Avenue / Railroad and Bluford Avenue in order
to eliminate the compensating storage area planned between Taylor Street and
Kissimmee Avenue/ Railroad;
• Culvert system crossing Bluford Avenue (currently under construction by Oelrich);
• Box culvert system between Bluford Avenue and Lakeshore Drive;
• Box culvert system crossing Lakeshore Drive;
• Control structure and outfall pipe associated with the future Regional Stormwater Pond
planned between Kissimmee Avenue/ Railroad and Bluford Avenue; and
• Pollutant removal structure (i.e., baffle box) to be installed immediately east of Bluford
Avenue.
"Engineering a Higher Standard"
301 West State Road 434,Suite 309,Winter Springs, FL 32708 • 407-992-9160 • Fax 407-358-5155
Mr.Stephen C.Krug,P.E.
Page 2
October 11,2018
With that said, it is our understanding that Pegasus Engineering shall perform the following
miscellaneous stormwater support services for the City of Ocoee and their Consultants:
1. Prepare for and attend four (4) Project Team Meetings with City staff and representatives of
CPH, GAI Consultants, and S&ME.
2. Prepare for and attend four (4) Bluford Avenue Construction Progress Meetings with City
staff and representatives of Oelrich and CPH.
3. Perform preliminary hydraulic calculations to evaluate various culvert configurations
crossing Bluford Avenue, including round concrete pipes, elliptical concrete pipes, and box
culverts.
4. Perform preliminary modeling in order to design conveyance improvements between
Kissimmee Avenue and Lakeshore Drive to eliminate the compensating storage area.
5. Review and comment on design alternatives and conceptual shop drawings for the Bluford
Avenue culvert system, as well as the conflicts associated with the intersection of Bluford
Avenue and Oakwood Avenue.
6. Coordinate with the St. Johns River Water Management District (SJRWMD) to schedule,
prepare for, and attend a pre-application meeting to discuss the concept of eliminating
compensating storage area and increasing conveyance without adversely impacting Starke
Lake.
7. Update the existing conditions and the proposed conditions models and drainage exhibits
for the Downtown Stormwater Master Plan — Phase 1 Feasibility Study (dated December
2017) to reflect recent construction projects (Sunbelt Rental and the expansion of the
Ocoee Business Park).
8. Update the proposed conditions stormwater model to also reflect the proposed Downtown
Redevelopment drainage improvements associated with the City Hall Campus by S&ME,
(Study Area 1), the Study Area 2 Regional Stormwater Pond by GAI Consultants, and the
Bluford Avenue improvements by CPH.
Mr.Stephen C.Krug,P.E.
Page 3
October 11,2018
9. Assist the Project Team,as needed,with the SIRWMD permit applications.
10.Assist the Project Team, as needed,with meetings and presentations to City staff and/or the
City Commission.
Once the proposed improvements are constructed, it is our recommendation that a FEMA
Letter of Map Revision (LOMR) be prepared to reflect the as-built conditions. A separate
proposal will be submitted to the City in the future to prepare a LOMR and revise the floodplain
limits based on the as-built conditions.
The above described will be performed for an hourly not-to-exceed fee amount of$47,500.00
in accordance with attached manhour and fee estimate (refer to Attachment"A").
We appreciate the opportunity to continue serving the City of Ocoee on this important
assignment. If you have any questions, please contact me directly at 407-992-9160, extension
309,or by email at david@pegasusengineering.net.
Respectfully,
PEGASUS ENGINEERING, LC
• W. Hamstra, P.E.,CFM
Stormwater Department Manager
cc: Richard Campanale, City of Ocoee
Mr.Stephen C.Krug,P.E.
Page 4
October 11,2018
Downtown Redevelopment Drainage Improvements
Miscellaneous Stormwater Support Services
Approved for Pegasus Engineering, LLC
/4 Principal October 11,2018
r
Fursan Munjed, P.E i Officer's Title Date
This proposal is here•y accepted and authorization to proceed is hereby given.
(Please return one executed copy of this proposal for our Pegasus Engineering records).
Authorized Signature Officer's Title Date
Attachment "A"
Manhour and Fee Estimate
DOWNTOWN REDEVELOPMENT DRAINAGE IMPROVEMENTS
0 0 0 o a o 0 0 0 0 0 0 00
0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0
y o o o o o o 0 0 o 0 o o 0 06
0 0
m mcm m Noo m 0 m m m m 0
406)
N n
i N i
A
p o 0
� ° NNc In .1 � mmo
tn
0
0 D o m w
c r'-",- m o
E ¢ > '� .n al
v
a o
0
Z
N 0 o -
u - `
0 c '- 0 '-L o
l'-' m o c o 0 E-
n .� 'o o c o ° al
o N m c c N ti `N m y o ry m 3 - .n Lu
h Ts ti o m E
S. v v 9 LL
N F a Q
Q v r
an
H
z « o
w ^ o 0 0
C ° CF. ul m m N 'i M N ° N
QlW ti M
.
o V '� U
K
a
w 2 vii
Q w r
Q
Q LU < N O 0 6 O N . _
Z w ai p d a` c« o , , c c c m c m m m 1° N
W LL
3 E H
a t z 3 ^ _
m
a d O
o o `n
Q Z> 0
O c
w fo
Z u E
v .
O a' E
Z a c °'
3 ° E o ,- o
0 m a o
c `oy
a E 2 f E
o c ° o
'o
G > u° u oz E
a
w
to
S to a 0
u cm5 '2-
,5,3
o °2 . uQ O - - oti
C IN . `y 0: o o
n ti o u c -
`o ' a a to a
o O p 0 L
w X
0 ti _
o
N Om m c w rv
Lm
2
F- ° m E. dm . ° _ c O
3 _
O
o ^ u ? oo .„ o2wu ` .ao -a nW a
a 0 2ma
E ' ° L � > - m am w vv > c ., v uU c ,� 0 0 _ Y
Y LL° c 2 z a
.o 42. a ' " 1a m u u o w
a m a o a Q u7. 7. 2 v o x
v a 4 to 0m v 2 o a 2 c
c a :Y N r I.1?-
E
w
occ
, ° a 2 , coo 'L3c ^^, g. 0 °
a i o u u Eo z �a c vuum r3
w ro ° m a ~ - O Ix LL
a ¢ 2 2 E uo 0 0o o° ° a = x3
0oE 0 0w. u w
00 v v ow a EO0ma
>3a a .0 a 0 a
= ¢ F
EL' EE_ 3 Y
E
v v aai `° t w 1O - - v a a ura
U O O Q Q K
a '
am a a a K a` D D DC < a F F- a u.