Loading...
HomeMy WebLinkAboutItem III(H) Approval and Authorization to expend an additional $5,518.50 from Stormwater contingency for repairs to the storm sewer at the intersection of Flewelling and Ocoee Hills Road •, • _ _ AGENDA 10-4-94 o 0; # c Item III H a 1----------\..... I I or coo" JAMES W.SHIRA,P.E. CITY ENGINEER/UTILITIES DIRECTOR 150 N.LAKESHORE DRIVE•OCOEE,FLORIDA 34761 (407)656-2322 MEMORANDUM DATE: September 26, 1994 TO: The Honorable Mayor and Board of City Commissioners FROM: James W. Shira, P.E. City Engineer/Utiliti Director SUBJECT: Storm Drain Repairs - Flewelling and Ocoee Hills = ago== On August 16, 1994 the City Commission awarded an emergency contract to C.A. Meyer for repair to a storm sewer at this intersection. The award was for the amount of $21,910.00. This amount was based on their bid, which anticipated removal and replacement of 200 square yards of pavement. Due to the high water table, the whole intersection and the majority of the Flewelling Avenue pavement was destroyed in order to get a hole opened up large enough to work in without danger of cave-ins. This caused the pavement removal and replacement quantity to more than double the estimated amount. The work is complete, and the final field measured quantity of pavement removal and replacement is 483 square yards, which added $5,518.50 to the bid amount. The final amount of the work is $27,428.50. The other two original bids were $42,500 and $81,500. There are sufficient funds in the Stormwater Contingency account to cover this extra cost. I recommend that the City Commission authorize the expenditure of an additional $5,518.50 from Stormwater Contingency for repairs to the storm sewer at the intersection of Flewelling and Ocoee Hills. wp6owocslocoia.m i ‘ THE PRIDE OF WEST ORANGE C